Dolf Gielen
Director, IRENA Innovation and Technology Centre, Bonn, Germany GREIN Power Grid Interest Cluster, Auckland, New Zealand, 24 March 2013
Nauru roadmap
From scratch together with GIZ, SPC - Energy efficiency and renewables
RE for cities
Grids & storage enabling technologies Plans for 2013 German Voluntary Contribution Three island roadmaps blueprints
2
Pacific region: Cook Islands, FSM, Nauru, Samoa, Tonga, Tuvalu, Vanuatu
Caribbean region: Antilles, Dominican Republic, Haiti, Jamaica, US Virgin islands, C- SERMS (regional roadmap) AIMS (Africa, Indian Ocean, Mediterranean and South China Sea) region: Cape Verde, Maledives, Mauritius Any others? Pathways, roadmaps, energy plans, charts which lay out implementation plans
Combining wind energy and pumped hydro which targets to cover 75% of the island's electricity demand and the remaining 30% to be achieved by direct wind penetration into the grid. Achieving the goal of 100% electricity, largely through solar PV with lead-acid batteries.
To achieve a transition to 100% renewable energy island, the power system will be converted to 10 MW wind, 1 MW PV, 3 MW NaS batteries.
IRENA 2013 5
Palau
Resource mobilization
Plan Do Check Act cycle
IRENA 201
IRENA 2013 9
2010
2030
10
RRA: Assessing the current situation - Create a country taskforce - Country profile - Regional context - Identify key stakeholders and legal structure - Energy policy and regulatory framework - Financing and investments - Human capacity
IRENA 2013 11
Scenarios and strategies: identifying potential futures - Consider technical potential - Explore drivers - Analyse energy system design and integration - Determine economic, environmental and social impacts
Grid stability studies - Explore design constraints for RE power expansion - Propose solutions for reliable grid operation
IRENA 2013 12
Roadmaps: Prioritising action items - Identify champions - Determine a vision - List technology options and associated opportunities/barriers - Organise stakeholder workshops to rank technology options and prioritise action items - Establish implementation mechanisms - Develop indicators to monitor progress
IRENA 2013 13