Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1A: Enable the safe use of public spaces Achieving our goals in Fiscal Year 2012-13
1A: Enable the safe use of public spaces Achieving our goals in Fiscal Year 2012-13
Contractor 300
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
Old: slurry seal (took too long to dry) New: micro-surfacing (dries fast)
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1A: Enable the safe use of public spaces Alternate sidewalk treatment
Less costly than concrete Makes use of recycled materials Less material sent to landfill Reusable panels Eases tree-root maintenance
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1A: Enable the safe use of public spaces Alternate sidewalk treatment
Pour-in-place rubberized sidewalk
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1A: Enable the safe use of public spaces Alternate sidewalk treatment - BSSR
Rubberized panels
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1A: Enable the safe use of public spaces Alternate sidewalk treatment
Fiberglass panels
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1A: Enable the safe use of public spaces Alternate sidewalk treatment
Curb ramp lip project
Cement Shop is piloting on Market Street between Van Ness and Main
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1A: Enable the safe use of public spaces Alternate sidewalk treatment
Sidewalk cutting
BSSR is developing contract for pilot project
Before
After
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
In February our graffiti unit began using mobile tablets in the field to perform inspections
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
The tablet: increases productivity and efficiency expands the knowledge of inspectors in the field
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
The tablet: increases productivity and efficiency expands the knowledge of inspectors in the field allows for easy communication between field workers and office staff
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1C: Green the Citys infrastructure & DPWs business practices Hardscape to softscape
Goal: 80,000 sq ft
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1C: Green the Citys infrastructure & DPWs business practices Hardscape to softscape
Goal: 80,000 sq ft
Current: 100,910 sq ft
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1C: Green the Citys infrastructure & DPWs business practices Hardscape to softscape
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1C: Green the Citys infrastructure & DPWs business practices Streetscape projects
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1C: Green the Citys infrastructure & DPWs business practices Divert 100% of solid waste by 2020
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1C: Green the Citys infrastructure & DPWs business practices Divert 100% of solid waste by 2020
3RC
COMPOST
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1C: Green the Citys infrastructure & DPWs business practices Thank you
Paul Barradas Sue Black Maurice Chee Cynthia Chono Clinton Choy Fernando Cisneros John Dennis Iqbal Dhapa Mike Fernandez Frank Filice Lynn Fong Ananda Hirsch Sherman Hom Jason Hui Ramon Kong John Kwong Tony Leung Mindy Linetzky Cristina Olea Steve Shih Carla Short Ken Spielman Larry Stringer John Thomas Meghan Tiernan Michael Matsuoka Jerad Weiner Nancy Wong BSSR BBR BSM BDC IDC
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1D: Enhance the attractiveness and utility of public rights-of-way Utilizing the right-of-way
Mitigate the construction impacts that you see all around the City
Coordinating construction
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1D: Enhance the attractiveness and utility of public rights-of-way Utilizing the right-of-way
Mitigate the construction impacts that you see all around the City
Coordinating construction
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1D: Enhance the attractiveness and utility of public rights-of-way Current projects
Balboa Avenue
Folsom Street
Great Highway
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1D: Enhance the attractiveness and utility of public rights-of-way Proposed FY 12-13 DPW projects
Of the 31 projects, 17 projects are joined with one agency and 11 are joined with two or more agencies
Paving / Slurry Seal
Folsom Street 28th Avenue Kirkham Street Balboa Ave Bayshore Blvd & San Bruno Ave. 24th Street Various Locations #16 Various Loc. Slurry Contract #1 Various Loc. Slurry Contract #4 Divisadero St. & Franklin St. Guerrero St. & Market St. 20th Ave. and Lincoln Blvd. Pine, Sacramento, Stockton St. Balboa Avenue Cesar Chavez Boulevard Folsom Street Great Highway
Streetscape
Alemany Street
Silver Avenue
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
Maintain safe, clean and clear path of travel at various job sites
envista
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1D: Enhance the attractiveness and utility of public rights-of-way Activating the rights-of-way
Destinations
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
1D: Enhance the attractiveness and utility of public rights-of-way Activating the rights-of-way
Destinations
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
Thank You
Ajay Kumar Carla Short Dmitriy Lashkevich Eddy Ching Fernando Cisneros Iqbal Dhapa John Kwong Lesley Wong Lynn Fong Melissa Dagdagan Nancy Lynch Nick Elsner Nicky Woo Richard Lee Ramon Kong
Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way
Goal 2 Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
2A: Design, build and renovate facilities to meet and exceed intended uses Landscape architecture projects completed or under construction: FY 2012-13
Pier 43 Bay Link Project Brannan Street Wharf Heron's Head Park North Beach Library Betty Ong Chinese Rec Center Potrero Hill Community Garden Retaining Wall Cayuga Playground and Clubhouse Renovation Alamo Square Restrooms McCoppin Hub Plaza Soma West Alleys MTA Public Plaza at Phelan & Ocean
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Visitacion Valley Greenway Native Plan Garden
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Pier 27 Cruise Ship Terminal Park
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Parks and playgrounds
Mission Playground
Lafayette Park
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Stairways and paths Buena Vista Path
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Stairways and paths Glen Canyon Park: saddle area staircase
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses Architecture and engineering projects Completed or under construction: FY 2012-13
Pier 43 Bay Link Project Brannan Street Wharf Heron's Head Park North Beach Library Sunset Recreation Center Alta Plaza Jefferson Park Palega Playground Renovation Retaining Wall Cayuga Playground and Clubhouse Renovation Cabrillo Playground and Clubhouse Phelan Bus Loop Rossi Playground Restrooms Alamo Square Restrooms McCoppin Hub Plaza Soma West Alleys MTA Public Plaza at Phelan & Ocean South of Market Alleys
Lafayette Park
Glen Canyon Park Improvements Betty Ong Chinese Rec Center Potrero Hill Community Garden
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Ortega Library
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Anza Library
LEED Gold
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Merced Library
LEED Gold
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Visitacion Valley Library
LEED Gold
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Sunset Recreation Center
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Bayview Library
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Betty Ong Recreation Center
LEED Gold
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
San Francisco General Hospital Learning Center
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Calaveras Valley Damn Intake Center
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
War Memorial Veterans Building
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Parkside
Mountain Lake, Larsen Park Restroom Cabrillo Playground and Clubhouse Renovation Calaveras Valley Intake Center
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
North Beach Branch Library
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Brannan Street Wharf
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Lafayette Park
Cabrillo Playground
Cayuga Playground
Fulton Playground
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
LEED Gold
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
San Francisco General Hospital
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Client satisfaction survey
Average 3.96 rating out of 5.0 (79%)
Department heads
Measurement goal:
Achieve 75% or higher rating from client satisfaction surveys
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Client satisfaction survey
Average 4.0 rating out of 5.0 (80%)
Project managers
Measurement goal:
Achieve 75% or higher rating from client satisfaction surveys
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Client satisfaction survey
Average 3.5 rating out of 5.0 (70%)
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
DPW University
Measurement Goal:
Achieve 75% or higher Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities rating from client satisfaction surveys
2A: Design, build and renovate facilities to meet and exceed intended uses
DPW University
To be Scheduled in June:
Constructability Review Training
Ethics in Construction Projects
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
DPW lessons learned sessions
IDC provided seven lessons learned sessions for various paving & curb ramp projects
To be Scheduled:
Betty Ong Chinese Recreation Center (Architecture/Landscape) All-staff report on Ortega Library
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
DPW lessons learned sessions
Those who cannot learn from history are doomed to repeat it - George Santayana,
philosopher
Experience is simply the name we give our mistakes
2A: Design, build and renovate facilities to meet and exceed intended uses
Quality Control / Quality Assurance
Strategic goal:
Conduct at least two Quality Assurance audits per year for each discipline
QA audits completed
BDC- Architecture completed two audits. BDC-Landscape will have completed two audits before end of Fiscal Year 2012-13 IDC completed four audits
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
Good enough for government work
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
This is NOT what the phrase should mean:
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
It should mean this:
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2A: Design, build and renovate facilities to meet and exceed intended uses
and this:
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2B: Provide services and maintain City facilities to ensure long-term sustainability
2B: Provide services and maintain City facilities to ensure long-term sustainability
Bureau of Building Repair
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2B: Provide services and maintain City facilities to ensure long-term sustainability
Support citywide facility sustainability through on active facility inspection program that includes maintenance
Met with 12 clients and client usage increased from 80% to 87%
100%
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2B: Provide services and maintain City facilities to ensure long-term sustainability City Hall fixture retrofit completed
Replaced 69 toilets and 17 urinals Under budget Ahead of schedule
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2B: Provide services and maintain City facilities to ensure long-term sustainability Water efficiency
Old
5 to 7 gallons gallons per flush per flush (GPF)
New
1.25 gallons gallons per flush per flush (82% reduction)
Toilets
5.0 +
1.25 +
Existing Toilets
2B: Provide services and maintain City facilities to ensure long-term sustainability Water efficiency
Toilets
2B: Provide services and maintain City facilities to ensure long-term sustainability Water efficiency
Old
New
Urinals
2B: Provide services and maintain City facilities to ensure long-term sustainability Water efficiency
Urinals
2B: Provide services and maintain City facilities to ensure long-term sustainability San Francisco City Hall indoor water consumption
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2B: Provide services and maintain City facilities to ensure long-term sustainability Water efficiency
200 new faucets with aerators will use: 0.5 gallons per minute
Faucets
2B: Provide services and maintain City facilities to ensure long-term sustainability Water efficiency
Faucets
2B: Provide services and maintain City facilities to ensure long-term sustainability
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2B: Provide services and maintain City facilities to ensure long-term sustainability
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
2C: Establish DPW as the service provider of choice Improving the way we estimate our repair projects
Bureau of Building Repair increased projects that were within 10% of estimate from 25% to 55%
30%
20% 10% 0% FY 2012 Q1 Q2 Q3 Q4
Correctives Projects
Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities
3A: Retain, develop and recruit a capable, motivated and diverse workforce
3A: Retain, develop and recruit a capable, motivated and diverse workforce Prevention: Good for the worker, good for DPW, good for the City
DPW injuries and preventable motor vehicle accidents Fiscal Year 2008-09 to Fiscal Year 2012-13
3A: Retain, develop and recruit a capable, motivated and diverse workforce Prevention: Good for the worker, good for DPW, good for the City
DPW workers' compensation costs Fiscal Year 2008-09 to Fiscal Year 2012-13
3A: Retain, develop and recruit a capable, motivated and diverse workforce Making workplace safety a top priority
Training for new employees, supervisors and front-line employees
3A: Retain, develop and recruit a capable, motivated and diverse workforce Implementing a smart and effective return-to-work program
DPW health fair
3A: Retain, develop and recruit a capable, motivated and diverse workforce Education and prevention
Incorporating stretching into the workday routine
DPWStat
Goal 3 Deliver world-class service
Projects dashboards
October 2012: 567 projects in Enterprise Project Management (EPM) 54% of active projects with unknown phase
Projects dashboards
April 2013 (six months later): 767 projects in EPM (33% increase) 2% of active projects with unknown phase
Streetscape map
3C: Communicate effectively Communications: Getting our message out Press releases
Our target by June 30: 48 Where we are today: 48
plain speak
Use language that is clear, effective and accessible
IDC
SSR
IDC
SSR
CBD
LEED
BBR
WBE
IDC
SSR
CBD
LEED
BBR
WBE
GSA
IDC
SSR
CBD
LEED
BBR
WBE
GSA
IDC
SSR
CBD
LEED
BBR
CAC
WBE
GSA
IDC
SSR
CBD
LEED
BBR
CAC
WBE
GSA
IDC
SSR
CBD
LEED
BBR
CAC
WBE
GSA
BLIP
IDC
SSR
CBD
LEED
BBR
CAC
WBE
GSA
BLIP
IDC
SSR
CBD
LEED
BBR
BUF
CAC
WBE
GSA
BLIP
IDC
SSR
CBD
LEED
BBR
ICS
BUF
CAC
WBE
GSA
BLIP
IDC
SSR
CBD
DPW
LEED
BBR
ICS
BUF
CAC
WBE
GSA
BLIP
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
Apprentice programs
1. Pre-apprentice 2. Stationary engineer 3. Environmental service worker
4. Cement mason
5. Horticultural/ Gardener
6. Asphalt
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4A: Provide training opportunities for San Francisco residents Horticultural/Gardener apprentice program
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4A: Provide training opportunities for San Francisco Residents Cement mason apprentice program
for 6 positions
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4A: Provide training opportunities for San Francisco Residents More apprentice programs coming soon to DPW
carpenter
arborist
electrician
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4B: Ensure San Francisco residents and businesses are employed on DPW contracts
4B: Ensure San Francisco residents and business are employed on DPW contracts
Bayview Library
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4B: Ensure San Francisco residents and business are employed on DPW contracts
Bayview Library
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4B: Ensure San Francisco residents and business are employed on DPW contracts Freddie Carter, Bayview Library contractor
"Oftentimes, local contractors only get to look through the fence at what's being built," Carter said. "This demonstrates that if given the opportunity to succeed, local contractors can."
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4B: Ensure San Francisco residents and business are employed on DPW contracts San Francisco General Hospital - $650 million 151 LBE contracts =
$63 million to local companies
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4B: Ensure San Francisco residents and business are employed on DPW contracts Jefferson Street and Great Highway streetscapes
Jefferson Street
LBE goal: 25% Current: 39%
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4B: Ensure San Francisco residents and business are employed on DPW contracts
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4B: Ensure San Francisco residents and business are employed on DPW contracts
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4B: Ensure San Francisco residents and business are employed on DPW contracts
$56,000
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4B: Ensure San Francisco residents and business are employed on DPW contracts
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4B: Ensure San Francisco residents and business are employed on DPW contracts
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4B: Ensure San Francisco residents and business are employed on DPW contracts
Phoenix Day
4C: Use DPW resources to improve blighted areas and spur economic growth
4C: Use DPW resources to improve blighted areas and spur economic growth
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4C: Use DPW resources to improve blighted areas and spur economic growth
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4C: Use DPW resources to improve blighted areas and spur economic growth
4C: Use DPW resources to improve blighted areas and spur economic growth
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
4C: Use DPW resources to improve blighted areas and spur economic growth
Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents
Got questions?