Please Select from Dropdown list Fill Data Manually Note1 1 LOT Please put notes at bottom of of table

with indication in remarks column For writing 1 LOT please use custom format as shown in picture Please write in numbers in manhour column. It wont take alphanumeric values Sheet "FEED" is for Manhours of Concept Endorsement and FEED Execution Sheet "EI" for Engineered Items Procurement You can insert any number of rows for deliverables. But you cant delete rows Dont use any formula in cells. Its already been done for you List of Deliverables has been given in sheet "Deliverable List". This is for your reference and copy paste only Incase of any problem please contact manoj.singh@woodgroup.com Please fill data in FEED and EI sheet

Main Heading must be in Bold with Font 12 Sub Heading must be in Bold font 10 Sub to Subheading in regular font of 10 Please dont add any formulas Dont Add or summarize any Heading by summation

Client / Proj Here


CLIENT/PROJECT

TCO/DSP/PEN/ Ref No Here


Proposal Ref Number

FEED / Detailed Design


CTR Title

Rev 0
Revision

Instrumentation
DISCIPLINE GEOFF RADFORD Resp. Person GEOFF RADFORD CTR Originator

Please Select Descipline

Sunday, May 12, 2013

Date: Saturday, June 01, 2013


Activity start Saturday, November 30, 2013 Activity Finish

26
Concept endorsement No of Weeks

CTR Scope Definition CTR Information Requirements


Quantity Normative of Hours for Deliverable One s or Deliverable Activities or Activity 1 LOT 0 35.00 5.00 0 1 1 1 1 1 1 1 5.00 4.00 3.00 3.00 1.00 1.00 1.00 Principal Engineer Senior Engineer Junior Engineer Principal Designer Senior Designer Junior Designer

Lead Engineer

Engineer

Lead Designer

Designer

TOTAL HOURS Remarks E N TOTAL

Item Ref

S.No.

Deliverable

CE 1 CE 1 CE 1 CE 5 CE 5 CE 5 CE 5 CE 5 CE 5 CE 5 CE 5 CE 5 CE 5 CE 5 CE 5 CE 5 CE 6 CE 7 FD 7 FD 6 CE 1 FD 2 CE 1 CE 1 CE 1

1 a b 2 a b c d e f g h i) ii) iii) i 3 4 a

Conceptual Design Data Assessment


Review of Technical Documentation received from Company Review list of applicable Codes and Standards

0.00 0.00 0.00 0.00 5.00 4.00 3.00 3.00 1.00 1.00 1.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 5.00 4.00 3.00 3.00 1.00 1.00 1.00 0.00

Instrumentation and Control Systems Design Philosophy


Overall instrument architecture Control and Safety System Design Philosophy Instrument Design Philosophy Control and Safety System Philosophy Control and Safety System Architecture Control and Safety Functions Shutdown and Logic Philosophy Package Philosophy absc jdjdjd fefref UPS

1.00 2.00 1.00 0.00 1 1 LOT 165 60 0 0 5.00 50.00 80.00 80.00 10.00 165.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 165.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Note 1

Site survey (Lump sum cost shall including travel & accomodation) Additional activities not covered by ADS
Preliminary Instrumentation and Control Systems

Note 2

Conceptual Design Data Assessment Utilities Design Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment

0 0 0 0 0

149035418.xlsx.ms_office FEED

Page4 of 115

CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1

Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment

0 0 0 0 0 0 0 0 0 0 0 0

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

149035418.xlsx.ms_office FEED

Page5 of 115

CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1 CE 1

Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment Conceptual Design Data Assessment TOTAL MANHOURS FOR CTR 10

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 225 117.00 0.00 0.00 0.00 80.00 0.00 0.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 243.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 243.00

149035418.xlsx.ms_office FEED

Page6 of 115

Client / Proj Here


CLIENT/PROJECT

TCO/DSP/PEN/ Ref No Here


Proposal Ref Number

FEED / Detailed Design


CTR Title

Rev 0
Revision

civil / Structural
DISCIPLINE Resp. Person CTR Originator

Please Select Descipline

Sunday, May 12, 2013 Date: Saturday, June 01, 2013


Activity start

Saturday, November 30, 2013


Activity Finish

26
Concept endorsement No of Weeks

CTR Scope Definition CTR Information Requirements


Quantity Normative of Hours for Deliverable One s or Deliverable Activities or Activity 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Principal Engineer Senior Engineer Junior Engineer Principal Designer Senior Designer Junior Designer

Lead Engineer

Engineer

Lead Designer

Designer

TOTAL HOURS

Item Ref

S.No.

Deliverable

Activities

TOTAL

EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02

H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package

Reply to technical queries Documentation for contract/order award Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions

1.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

149035418.xlsx.ms_office EI

Page7 of 115

EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02 EI 02

H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package H2S polishing package TOTAL MANHOURS FOR CTR

Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions Requisitions 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

149035418.xlsx.ms_office EI

Page8 of 115

Remarks Note 1 Note 2 Note 3 Note 4 Note 5 Note 6 Note 7 Note 8 Note 9 Note 10 Note 11

149035418.xlsx.ms_office EI

Page9 of 115

149035418.xlsx.ms_office EI

Page10 of 115

Code Conceptual Endorsement CE 1 CE 2 CE 3 CE 4 CE 5 CE 6 CE 7 CE 8 CE 9 Conceptual Design Data Assessment

Defination

Conceptual Process Review and Optimisation Process Design Philosophy Electrical Design Philosophy Instrumentation and Control Systems Design Philosophy Site survey (Lump sum cost shall including travel & accomodation) Additional activities not covered by ADS Project Management Project services

FD 1

Process Design

FD 2 FD 3 FD 4 FD 5 FD 6 FD 7 FD 8 FD 9 FD 10 FD 11 FD 12 FD13 FD 14 FD 15 FD 16 FE 1 FE 2 FE 3 FE 4 FE 5 FE 6 FE 7 FE 8 FE 9 FE 10 FE 11 FE 12 FE 13

Utilities Design Preliminary Machinaries Design Package Philosophy and Duties Preliminary Mechanical Design Preliminary Electrical Design Preliminary Instrumentation and Control Systems Safety Systems Design Plants General Arrangement Piping design Civil works & structures design Buildings Architectural Design Initial HAZOP & SIL review Additional activities not covered by ADS Project Management Project services Extended Process design Utilities Extended Process Design Piping Design Machinery Design - General Specifications Machinery Design - Process and Utility Pumps Machinery Design - Compressors Machinery Design - Diesel Engines Mechanical Design - Pressure Vessels, Columns and Traps Mechanical Design - Heat Exchangers Mechanical Design - Tanks Mechanical Design - Flares Mechanical Design - Miscellaneous Equipment Instrumentation Design - Metering System

FE 14 FE 15 FE 16 FE 17 FE 18 FE 19 FE 20 FE 21 FE 22 FE 23 FE 24 FE 25 FE 26 FE 27 FE 28 FE 29 FE 30 FE 31 FE 32 FE 33 FE 34 FE 35 FE 36 FE 37 FE 38 FE 39 FE 40 FE 41 FE 42 FE 43 FE 44 FE 45 FE 46

Instrumentation Design - Power supply Instrumentation Design - Control System and Safety System Instrumentation Design - Control Rooms Arrangement and General layout Instrumentation Design - Field Instrumentation and Instrument Requirements Instrumentation Design -Instrumentation and Automation Interface design Instrumentation Design - F & G and Emergency Shutdown System Instrumentation Design - Reliability and Safety Integrity Level Requirements Instrumentation Design - Field Instrumentation Instrumentation Design - Instrumentation and Control Systems Instrumentation Design - Telecommunication & IT Systems Design Electrical Design - Electrical Distribution Electrical Design - Electrical Load Demand Electrical Design - Electrical Design Calculations and Studies Electrical Design - Electrical Equipment Sizing Electrical Design - General Electrical Layouts Electrical Design - Specifications for Electrical Switchboards Electrical Design - Specifications for Emergency Generators Electrical Design - Specifications for Transformers and Neutral Earthing Resistors Civil and structural design - Technical Specifications for Civil Works and Structures Civil and structural design - Civil Design for Early Civil Works Civil and structural design - Foundation Design Civil and structural design - Structural Design Civil and structural design - Technical Buildings Architectural Design Civil and structural design - Layouts and Arrangements Construction Specifications Layout Design Safety Systems Design Final HAZOP & SIL review Incorporation HAZOP & SIL findings Issue of Close out report Additional activities not covered by ADS Project Management Project services

EI 01 EI 02 EI 03 EI 04 EI 05 EI 06 EI 07 EI 08 EI 09 EI 10 EI 11

Booster & inlet compressors H2S polishing package Modification to gas plant & LPG pumps module Oil pre treatment facilities Water injection pumps Water injection pumping system Initial filtration & deaeration unit Produced water treatment Foam system for new storage tanks Oil circulation & transfer pumps SWIS pumping system

EI 12 EI 13 EI 14 EI 15 EI 16 EI 17

Additional hot water heaters & pumps Electric distribution system for DGU area Electric distribution systems for South plant Water and foam fire fighting package Project Management Project services

Scope

Deliverable

Table 4.7 CE 6

Input

Deliverable

Table 5.1 FD 1

Input

Scope

Deliverable

Table 5.3 FD 2

Input

Scope

Deliverable

Table 5.4 FD 3

Input

Scope

Deliverable

Table 5.5 FD 4

Input

Scope

Deliverable

Table 5.6 FD 5

Input

Scope

Deliverable

Table 5.7 FD 6

Input

Scope

Deliverable

Table 5.8 FD 7

Input

Scope

Deliverable

Table 5.9 FD 8

Input

Scope

Deliverable

Table 5.10

FD 9

Input

Scope

Deliverable

Table 5.11 FD 10

Input

Scope

Deliverable

Table 5.12 FD 11

Input

Scope

Deliverable

Table 5.13 FD 12

Input

Scope

Deliverable

Table 6.3 EIP 1

Deliverable

Table 6.4 EIP 2

Deliverable

Table 6.5 EIP 3 Input

Deliverable

Table 6.6 EIP 4 Input

Table 7.2 FE 1

Table 7.3 FE 2

Table 7.4 FE 3

Table 7.5 FE 4

Table 7.6 FE 5

Table 7.7 FE 6

Table 7.8 FE 7

Table 7.9 FE 8

Table 7.10 FE 9

Table 7.11 FE 10

Table 7.12 FE 11

Input

Scope

Deliverable

Table 7.13 FE12

Input

Scope

Deliverable

Table 7.14 FE13

Input

Scope

Deliverable

Table 7.15 FE 14

Input

Scope

Deliverable

Table 7.16 FE15

Input

Scope

Deliverable

Table 7.17 FE 16

Input

Scope

Deliverable

Table 7.18 FE 17

Input

Scope

Deliverable

Table 7.19 FE 18

Input

Scope

Deliverable

Table 7.20 FE 19

Input

Scope

Deliverable

Table 7.21 FE20

Input

Scope

Deliverable

Table 7.22 FE21

Input

Scope

Deliverable

Table 7.23 FE22

Input

Scope

Deliverable

Table 7.24

FE23

Input

Scope

Deliverable

Table 7.25 FE24

Input

Scope

Deliverable

Table 7.26 FE25

Input

Scope

Deliverable

Table 7.27 FE26

Input

Scope

Deliverable

Table 7.28 FE27

Input

Scope

Deliverable

Table 7.29 FE28

Input

Scope

Deliverable

Table 7.30 FE29

Input

Scope

Deliverable

Table 7.31 FE30

Input

Scope

Deliverable

Table 7.32 FE 31

Input

Scope

Deliverable

Table 7.33 FE 32

Input

Scope

Deliverable

Table 7.34 FE 33

Input

Scope

Deliverable

Table 7.35 FE 34

Input

Scope

Deliverable

Table 7.36 FE 35

Input

Scope

Deliverable

Table 7.37 FE 36

Input

Scope

Deliverable

Table 7.38 FE 37

Input

Scope

Deliverable

Table 7.39 FE 38

Input

Scope

Deliverable

Table 7.40 FE 39

Input

Scope

Deliverable

Table 7.41 FE 40

Input

Scope

Deliverable

Deliverable Table Table 4.2 : CE 1 Input 1 2 3

1 1 3 4

Scope 1 2 3 4 5 6 7 8 9 1 2

Deliverable

Table 4.3 CE 2 Input

1 2 1 2 3 4 5 6 1

Scope

Deliverable

Table 4.4 CE 3

Input

1 2 3 4 5

Scope

Deliverable

1 2 3 4 5 6 7 8 1

Table 4.5 CE 4 Input

1 2 3 4

Scope

1 2 3 4 5 1 2 3 4

Deliverable

Table 4.6

CE 5 1 2 3 4 5

Input

Scope

Deliverable

1 2 3 4 5 6 7 8 9 10 1

Table 4.7 CE 6

Input

1 2 3 4 5 1 2 3 4 5 1

Scope

Deliverable

Table 5.1 FD 1

: Activity Description List 1 2 3

Input

1 Scope 2 3 4 5 6 7 8 9 10

11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Deliverable

Table 5.3 FD 2

: Activity Description List 1

Input

2 3 4

Scope

1 2 3 4

5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Deliverable

Table 5.4 FD 3

: Activity Description List 1 2 3 4 5

Input

Scope

1 2 3 4 5 6 7 1 2 3

Deliverable

Table 5.5 FD 4

: Activity Description List 1 2 3 4 5 6 7

Input

Scope

1 2 3 4 5 1 2 3

Deliverable

Table 5.6 FD 5

: Activity Description List 1 2 3 4

Input

1 2 Scope 3 4 5 6 1 2 3

Deliverable

Table 5.7 FD 6

: Activity Description List 1 2 3 4 5

Input

Scope

1 2 3 4

Deliverable

5 6 1 2

Table 5.8 FD 7

: Activity Description List 1 2 3 4

Input

1 2 Scope 3 4 5 1 2 3 4 5 6

Deliverable

Table 5.9 FD 8

: Activity Description List 1 2 3 4 5

Input

1 2 Scope 3 4 5 1 2 3 4 5

Deliverable

Table 5.10

: Activity Description List

FD 9 1 2 3 4 5

Input

1 Scope 2

1 2 Deliverable

Table 5.11 FD 10

: Activity Description List 1 2 3 4 5 6 7 8

Input

1 Scope 2 1 2

Deliverable

Table 5.12 FD 11

: Activity Description List 1 2 3 4 5 6 7 8

Input

1 2 Scope 3 4 Deliverable 1

Table 5.13 FD 12

: Activity Description List 1 2 3 4 5 6 7 8 9

Input

1 2 Scope 3 4 5 6

1 2 3 4 5

Deliverable

Table 6.3 EIP 1 Input

: ACTIVITY DESCRIPTION SHEET 1 2

Scope

1 2 3 4 5

Deliverable

Table 6.4 EIP 2 Input

1 2

Scope

Deliverable

1 2 3 4 5 1

Table 6.5 EIP 3 Input Scope

1 1

Scope Deliverable

2 1

Table 6.6 EIP 4 Input

1 1 2

Scope 3 4 5 1 2

Deliverable

Table 7.2 FE 1 Input

1 2 3 4

Scope

1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5

Deliverable

Deliverable

6 7 8 9 10 11 12 13 14 15 16 17

Table 7.3 FE 2 Input

1 2 3 4

1 2 3 Scope 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 10 11 12

Deliverable

13 14

Table 7.4 FE 3

Input

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 1 2 3 4

Scope

Deliverable

Table 7.5 FE 4

Input

Scope

Scope

Deliverable

Table 7.6 FE 5

Input

1 2 3 4 5 6 1 2 3 4 5 6 7 1 2 3 4 5 1 2 3 4 5

Scope

Deliverable

Table 7.7 FE 6

Input

1 2 3

Input

4 5 6 1 2 3 4 5 6

Scope

Deliverable

7 8 9 1 2 3 4 5 1 2 3 4 5

Table 7.8 FE 7

Input

1 2 3 4 5 6

Scope

1 2 3 4 5 6 1 2 3 4 5

Deliverable

1 2 3 4 5

Table 7.9 FE 8

Input

1 2 3 4 5 6

Scope

1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6

Deliverable

Table 7.10 FE 9

Input

1 2 3 4 5 6

1 2 3 Scope 4 5 6 1 2 3 4 5 1 2 3 4 5 6

Deliverable

Table 7.11 FE 10

Input

1 2 3 4 5 6

1 2 3 4 5 1 2 3 4 5 1 2 3

Scope

Deliverable

Deliverable

4 5 6

Table 7.12 FE 11

: Activity Description List 1 2 3 4 5 6

Input

Scope

1 2 3 4

Deliverable

5 1 2 3 4 5 6 7

Table 7.13 FE12

: Activity Description List 1 2 3 4 5 6

Input

Scope

1 2 3 4 5

Deliverable

Table 7.14 FE13

: Activity Description List 1 2 3 4 5 6 7

Input

Scope

1 2 1 2

Deliverable

Table 7.15 FE 14

: Activity Description List 1 2 3

Input

4 5 6 7

Scope 1 1 2

Deliverable

Table 7.16 FE15

: Activity Description List 1 2 3 4 5 6 7

Input

Scope 1 2 1 2 3 4 5

Deliverable

Table 7.17 FE 16

: Activity Description List 1 2 3 4 5

Input

Scope

1 1 2 3 4

Deliverable

Table 7.18 FE 17

: Activity Description List 1 2 3 4 5 6 7

Input

Scope 1 1 2 3 4 5 6 7

Deliverable

Table 7.19 FE 18

: Activity Description List 1 2 3 4 5 6 7

Input

Scope

1 2 1

Deliverable

Table 7.20 FE 19

: Activity Description List 1 2 3 4 5 6 7 8

Input

Scope 1 2 1 2 3

Deliverable

Table 7.21 FE20

: Activity Description List 1 2 3 4 5 6 7

Input

Scope 1 2 1

Deliverable

Table 7.22 FE21

: Activity Description List 1 2 3 4 5 6 7

Input

Scope 1

Deliverable

1 2 3 4

Table 7.23 FE22

: Activity Description List 1 2 3 4 5 6 7

Input

1 Scope 2 3 4 1

Deliverable

Table 7.24

: Activity Description List

FE23 1 2 3 4 5

Input

Scope

1 2 3 4 1

Deliverable

Table 7.25 FE24

: Activity Description List

Input

1 Scope

1 2

3 4 5 6 7

Deliverable

Table 7.26 FE25

: Activity Description List

Input

Scope 1

2 Deliverable

Table 7.27 FE26

: Activity Description List

Input

1 Scope

Deliverable

Table 7.28 FE27

: Activity Description List

Input

1 Scope

2 3

Deliverable

Table 7.29 FE28

: Activity Description List

Input

Scope

Deliverable

Table 7.30 FE29

: Activity Description List

Input

Scope

Deliverable

Table 7.31 FE30

: Activity Description List

Input

Scope

Deliverable

Table 7.32 FE 31

: Activity Description List 1 2 3 4 5

Input

Scope

Deliverable

1 2 3 4 5 1

Table 7.33 FE 32

: Activity Description List 1 2 3 4 5 6 7 8

Input

Scope

1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9

Deliverable

Table 7.34 FE 33

: Activity Description List 1 2 3 4 5 6

Input

Scope

Deliverable

1 2 3 4 5 6 7 1 2 3 4 5 6

Table 7.35 FE 34

: Activity Description List 1 2 3 4 5 6 7 8 9

Input

1 2

Scope

3 4 5 1 2 3

Deliverable

Table 7.36 FE 35

: Activity Description List 1 2 3 4 5 6 7 8 9

Input

Scope

Deliverable

1 2 3 4 5 6 7 1 2 3

Table 7.37 FE 36

: Activity Description List 1 2 3 4 5 6 7 8 9

Input

1 2 Scope 3 4 5 6 1 2 3 4 5

Deliverable

Table 7.38 FE 37

: Activity Description List 1 2 3 4 5 6 7 8 9 10

Input

Scope

1 2 3 4 5 6 7 8 9 10 1 2 3

Deliverable

4 5 6 7 8

Table 7.39 FE 38

: Activity Description List 1 2 3 4 5

Input

Scope

Deliverable

Table 7.40 FE 39

: Activity Description List 1 2 3 4 5 6 7 8 9 10

Input

Scope

Deliverable

1 2 1 2 3 4

Table 7.41 FE 40

: Activity Description List 1 2 3 4

Input

1 2 Scope 3 4 5 1 2 3 4 5 6 7

Deliverable

CE1 Conceptual Design Data Assessment ACTIVITY DESCRIPTION SHEET Conceptual Design Data Assessment - Contract Technical Documentation - Company Basis of Design (BoD) - Environmental data Definition of the data and information to be used by the Contractor as basis for the basic engineering design relevant to the process and systems The following activities are foreseen: Review of the Technical Documentation received from Company Review list of applicable Codes and Standards identifying/confirming those to be adpoted for the design of proposed facilities Review of the BoD for consistency and completeness Preparation of the Design Premises Reports relevant to the process plants and systems to be used as basis for the FEED Design activities Preparation of the preliminary Functional & Interface Specification for the Plants. The information contained in these preliminary specifications shall essentially be the data supplied by Company. This data shall include. But not necessarily be limited to: list of interfaces outlet streams conditions inlet streams conditions battery limits battery limit conditions voltage and frequency for electrical power available utility data requirements for uniform and consistent equipment design philosophy for contol. relief and blowdown. Telecomm. Interfaces - Design Premises report for the plant process and systems - Functional and Interface specification for the plants

CE2 Conceptual Process Review and Optimisation ACTIVITY DESCRIPTION SHEET Conceptual Process Review and Optimisation - Contract Technical Documentation - BoD Review proposed process configuration vis a vis with products specifications Clearly identify areas to be modified or further optimised Complete conceptual optimisation of the systems in order to slect a flexible and cost effective configuration for the design of facilities. Preparation of Process Block Diagramm and PFD's Prepare Utility Flow Diagrams ( UFD's) Prepare ESD and blow-down philosophy - Concept Endorsement Reports

CE3 Process Design Philosophy ACTIVITY DESCRIPTION SHEET Process Design Philosophy - Technical Contract Documentation - Design Premises Report - Process & Utility Requirements - BoD - Functional & Interface Specification for the plant Prepare the Process Design Philosophy, which define the basis for the eventual design of the process and each utility system, In the Process Design Philosophy the following items shall be identified: feed conditions capacities major items of equipment process and utility control operating requirements process and utility balances process flow diagrams utility flow diagrams - Process Design Philosophy

CE4 Electrical Design Philosophy ACTIVITY DESCRIPTION SHEET Electrical Design Philosophy - Technical Contract Documentation - Design Premises Report - Process & Utility requirements - Functional & Interface Specification for the plants Development of design philosophy and architecture of the electrical distribution systems of the plants.The following activities are foreseen: the review of the proposed systems ( if any ) the definition of technical data and plant design requirements the development of fit for purpose distribution systems configuration the preliminary definition of the load demand for the various operating conditions ( i.e. design, emergency, start-up, etc. ) the preparation of the hazard area classification general specification distribution systems philosophy general one line diagrams preliminary Electrical Load Lists for the various operating conditions and Load Summary hazardous area classification specification

CE5 Instrumentation and Control System Design Philosophy ACTIVITY DESCRIPTION SHEET

Instrumentation and Control System Design Philosophy - Technical Contract Documentation - Design Premises Report - Process & Utility Requirements - Functional & Interface Specification for the plants - PFD's and UFD's Development of the instrumentation and control system philosophy of the plants. The following activities are foreseen. Overall instrument architecture of the plant Contol and safety system design philosophy Instrument design philosophy Control and safety system philosophy Control and safety system architecture SCADA(if required) requirement, architecture and design philosophy Control and safety functions Shutdown and logic philosophy Package philosophy UPS - Project instrumentation and control system philosophy

CE5 Site Survey ACTIVITY DESCRIPTION SHEET Site Survey - Technical Contract Documentation - Design Premises Report - Process & Utility Requirements - Functional & Interface Specification for the plants - PFD's and UFD's Execution of a site survey to: get aquainted with the Dunga Facilities familiarize with operating conditions and operationasl critera Identify and review tie in points Collect additional inforation and data needed for FEED activities any other activity, identified by the contractor, needed for FEED activities - Survey report

FD1 Process Design Activity Description List Process Design Design Premises Report for the plant process Conceptual design review Functional and Interface specification for the plants

The process design shall comprise the review of the proposed process, the execution of all the required optimisation and the development of the FEED activities for the identified process systems of the plants inclusive of normal operations (including expected daily and seasonal variations over field life) and alternative operations (including start-up, controlled emergency shut-downs, operating requirements requirements). The following activities are foreseen. Perform process simulations Prepare H&MB for the entire plant process, taking into account the requirements imposed by the export lines Review and freeze sparing and stand by philosophy Preparation of Process Block Diagram and PFD's Sizing of main process equipment Preparation of the major equipment process data sheets Assesment of ESD and blow-down philosophy Assesment of instrumentation and control requirements and philosophy Preliminary HAZOP & SIL performance Material selection for main process equipment and lines Defenition of the input data for sizing of the major process utilities, including electrical power, steam, condensate, boiler feel water, fuel, cooling water, process water, plant air, etc. Preliminary identification of effluent streams produced by plants process and their associated utilities Release source identification for hazardous area classification Preparation of functional specifications for process units. Process Block Diagrams Plant Process Reports Sparing and standd by Philosophy Material Selection Report and MFD's PFD's P&ID's Main Equipment list Long Lead Items list and process data sheets Main equipment and machinery process data sheets Process Utility Consumption and Electrical Load list Functional specifications of process units Instrumentation and control requirement (input to instr. & control philosophy and architecture) ESD, Relief and Blowdown Philosophy (co-ordinated with utilities) Preliminary instrument list Specialist design input reports (e.g. for special/licensed technology) Narrative reports covering optemisation studies/analyses

FD2 Utilities Design Activity Description List Utilities design Technical Contract documentation

Design Premises report Process Utility Consumption List Functional & Interface Specification for the plant The process design shall comprise the review of the proposed systems, the execution of all the required optimisation and the development of the basic engineering activities for all utility systems of the plant. The activity will include: Review, develop and optimise utility systems Definition of the input data for sizing the main process utility systems Review and freeze sparing and stand by philosophy Prepare utility Block Diagrams Preare Consumption summary for the entire plant, taking into account the requirement of main utility systems (i.e. blow-down system, cooling water system, ect. Prepare Utility Flow Diagrams (UFD's) material Selection for main equipment and special service lines sizing of all major utility equipment Preparation of utility main equipment list Preparation of process data sheets for all the main utility equipment Preparation of process functional specifications for main utility systems Identification of additional effluent treatment facilities required Utility Block Diagrams Utility system report discription (normal and alternative operations) including, as appropriate simulations and calculations utility consumption for utility systema Utility Electrical Load list Consumption Summary Sparing and stand-by Philosophy (co-ordinated with process systems) Material Selection Report and MFD's Utility Flow Diagrams (UFD's) P&ID's Main Equipment List Long Lead Items list data sheets Main Utility Equipment data sheets Instrument and control requirements and philosophy (co-ordinated with process) ESD, Blowdown and Relief Philosophy (co-ordinated by process) Narrative reports coveing optimisation studies/analyses

FD3 Preliminary Machineries Design Activity Description List Package Machinery Design Technical Contract documentation Design Premises report Process & utility requirements Functional & Interface Specification for the plants Machinery process data-sheets

The design shall comprise the development of the engineering activities for the main machinery (e.g. compressors, pumps, act.) of the plants. The following activities are foreseen: the review of the proposed systems (if any) the definition of technical data and plant design requirements the definition of type, number, and charachteristics of the required machinery machinery preliminery sizing (weights and dimensions) identification of the minimum requirements including Codes and Standarts for skidmounted equipment preparation of main equipment list identification , for lay-out purposes, of the expected location and size of main equipment Machinery preliminary sizing (weights and dimensions) Main equipment list Preliminary plot plans and lay-outs

FD4 Package Philosophy & Duties Activity Description List Package Philosophy and Duties Technical Contract documentation Design Premises report Process & utility requirements Electrical requirements instrumentation and control requirements General safety requirements functional & interface Specification for the plants The Design shall comprise the development of the engineering activities for th main packages of the planys. The following activities are foreseen: the review of the proposed systems the definition of technical data and plant design requirements the definition of the package units philosophy preparation of main equipment list identification for lay-out purposes, of the expected location and size of main equipment plant package philosophy main equipment list preliminary plot plans and lay-outs

FD5 Preliminary Mechanical Design Activity Description List Preliminary Mechanical Design Technical Contract documentation Design Premises report Process & utility requirements Functional & interface Specification for the plants

The design shall comprise the development of the engineering activities for the main mechanical equipment (I.e. vessels, exchangers, columns, ect.) of the Plants. The following activities are foreseen: the review of the proposed systems (if any) the definition of technical data and plant design requiremen definition of type, number and characteries of the required machanical equipment main equipment preliminary sizing ( weights and dimensions). main equipmet list and weight report identification for lay-out purposes of the expected location and size of main equipment main equipment preliminary sizing (weights and dimensions) main equipment list preliminary plot plans and lay-outs

FD6 Preliminary Electrical Design Activity Description List Preliminary Electrical Design Technical Control Documentation Design Premises Report Process & Utility Requirements Functional & Interface Specification for the plants Electrical philosophy The design shall comprise the development of the engineering activities for the electrical generation and distribution systems of the plants. The following activities are foreseen: The review of the proposed systems (if any) The definition of technical data and plant and OHL design requirements The identification of all the main electrical equipment and systems Main equipment preliminary sizing (weights and dimensions) Identification for lay-out purposes, of the expected location and size of main electrical equipment (i.e. generators and switchgear/electrical rooms, OHL & substation) Preparation of main equipment list and weight report Main equipment list Plot plans and lay-outs

FD7 Preliminary instrument and Control Design Activity Description List Preliminary instrument and Control Design Technical Contract documentation Design Premises report Process & utility requirements Functional & interface Specification for the plants

PFD's, P&ID's and UFD's The design shall comprise the development of the engineering activities for the instrumentation and control systems of the plants. The following activities are foreseen: the definition of the technical data and designrequirements the review of proposed system and design philosophies provided by Company (if any) preparation of fit for proposed systems and design architecture of the control systems identification of SCADA requirements, architecture and design philosophy Identification of lay-out purposes of the expected location and size of control room (s) Control SystemArchitetecture Instrumentaion and control philosophy SCADA requirements, architecture and design philosophy Preliminary location and size of control room(s) main equipment list preliminary plot plans and lay-outs

FD8 Safety Systems Design Activity Description List Safety Systems Design Technical Contract documentation Design basis & Philosphy Functional & interface Specification general Safety Criteria and Reports

The safety systems design shall comprise the development of the engineering activities for the definition of the safety systems inside the planets. The fiollowingactivities are foreseen: definition of evacuation /detection criteria for the Fire and Gas Detection System of the plant alarms and personnel safety requirements Definition of the Plant Fire Risk Areas Definition of the plant firefightning requirements including fire protection design basis and system descriptions Preparation of safety System Plot Plans showing the preliminary locations of the firefightning systems Identification of the Fire Hazardous Maps for Fireproofing requirements Fire and Gas Detection Specification Firefightning System Specification Escape routets, safe havens, ect. General arrangements Safety Systems Plot Plan (firefightning system) Fire Hazardous Area Maps

FD9 Plants General Arrangement Activity Description List

Plants General Arrangement Technical Contract documentation Design Premises report Process & utility requirements Environmental Data Functional & interface Specification Development of the engineering activities to prepare the layout general project specifications for plants prepare Plant layout arramgement and piping philosophy Prepare for the proposed systems an outline dimensioned lay-out and preliminary plot plans of the plant areas

Outline dimensioned lay-outs Preliminary plot plans

FD10 Preliminary Piping Design Activity Description List Piping Design Technical Contract documentation design Basis Piping design philosophy Functional & interface Specification General Safety Criteria PFD's and UFD's Process and Utility P&ID's Corrosion requirements

The development of the front-end engineering activities to prepare the piping and layout general project s[pecifications for the plants the following activities are foreseen: definition of project dedign - piping project specifications (pipr, valve and fittings) -piping material general specification - piping design and fabrication -plant lay-out design acording to external coating insulation and protection requirements, prepare: -planting and coating specifications - piping protection specifications - piping insulation specifications Project general specifications for piping and plant lay-out design Standard piping classes

FD11 Preliminary Civil Works & Structural Design Activity Description List Civil Works & Structural Design Technical Contract documentation Design Basis nd Philosophies Functional & interface Specification Site Survay General Safety Criteria Plot Plans Control Room Layout Electrical Equipment Arrangement Drawings Development of front-end engineering design activities to prepare the general project specifications for the civil works and technical building. The activities will include: Review general safety Requirements Review of design requirements for civil works and structures Definition of design criteria for civil, structures, air conditioning/ventilation with reference to codes, standards and project specification Preparation of General Design Specifications (including list of applicable Codes and Standards) for civil works and structures Project General Design Specifications for civil works and structures

FD12 Preliminary Buildings Architectural Design Activity Description List Buildings Architectural Design Technical Contract documentation Design Basis nd Philosophies Functional & interface Specification Project general specification Project Technical specification General Safety Criteria Plot Plan Control Room Layout Electrical Equipment Arrangement Drawings Development of the architectural design related to technical buildings The activities will include: define the required technical buildings prepare architectural general specification elaborate of functional and destributive plot plans of buildings with location and dimentions prepare architectural design drawings for all technical buildings including plans, elevations, facade and details (scale 1:100,1:20) describe the finishing material and prepare schedule and technical specification of fishing materials identifying the required fur

architectural general design specification architectural design drawings for all technical buildings including plans, elevations, faade, and details (scale 1:100, 1:20) technical spesification for fishing material schedule of finishing preliminary furniture list and relevant technical specifications

EIP1Requisitions for Engineered Items ACTIVITY DESCRIPTION SHEET Requisitions for Engineered Items - FEED Design activities - ITT Packages Prepare technical section of inquiry packages, reflecting the number and type of equipment for identified Engineered Items including: technical description data-sheets drawings inspection data-sheets documentation requirements (from vendors) Asssemble Requests for Quotation (RFGs) for direct use by Company to obtain cost, delivery and technical information. Company will provide the commercial section and the list of Company's preferred manufacturers. - Technical Requisition for the Long Lead Item ITT Package

EIP2 Cost estimate for engineered items ACTIVITY DESCRIPTION SHEET Cost estimate for engineered items - FEED Design activities - ITT Packages Prepare a cost estimate for each engineered item package covering the define scope of work. The cost estimate shall be a level 3 with and accuracy of not less than -15% +20%. The estimate shall have the following breakdown: itemized equipment and tagged item cost bulks cost cost engineering & management cost indirect cost packing, shipping and freight cost - Cost estimate report

EIP3 Reply to technical queries ACTIVITY DESCRIPTION SHEET Reply to technical queries - Bidders queries Prepare replies to bidders queries coming from bidders during the tendering process

Provide additional engineering work ar required to provide clear replies and input to bidders - Reply to technical queries

EIP4 Documentation for contract/order award ACTIVITY DESCRIPTION SHEET Documentation for contract/order award - Bidders documentation Participate in any technical bid evaluation necessary for clarification or equalisation of proposal Prepare technical evaluation of proposals and recommend which meet the technical requisites for inclusion in the commercial evaluation Assist Company in commercial evaluations,if requested Upgrade enquiry specifications to purchase specifications Prepare purchase requisitions ain a form prescribed by Company - technical evaluation report - Documentation for contract award

FE1 Extended Process Design ACTIVITY DESCRIPTION SHEET Extended Process deesign Contract Technical Documentation FEED Definition Design Documents Process Design Philosphy Design Basis The process design shall comprise the development of the front-end engineering activities for the process systems of the plants The following activities are foreseen: Sizing of all process equipment and main process pipework Preparation of process general specifications Preparation of the tagged equipment process data sheets Blow-down calculations Update/complete of process P&ID's Update/complete, according to engineering development,equipment list,material selection,MFD's,utility consumption's,electrical load lists HAZOP performance Definition of the input data to allow sizing of the major control valves,ESDV's and PSV's Identification of all effluent streams produced and its associated process and utility systems,and definition of their flow rate and composition Release source identification for hazardous area classification Definition of procedures for pre-commissioning and commissioning Process P&ID's Equipment List,MFD's,Utility consumption's,Electrical load lists General Specifications for process equipment Specifications for tagged or ingineered items Equipment and Machinery Process Data Sheets for all tagged items

Miscellaneous Equipment process data sheets Process Data Sheets for control valves,flow orifices and relief valves Process Data Sheets for Instruments Package Systems Duty Specifications Blow-down Calculation reports Blowdown Relief Rates and Blowdown Summary List of effluent streams (tabulating liquid and gaseous effluents requiring further treatment before disposal) Shutdown Logic Block Diagram and list of alarms and trip setting Process line list (process data) Proceduresfor pre-commissioning and commissioning Process Safeguarding Flow Scheme PSFS (simplified flow scheme with the indication of all SDV's and BDV's) Design calcualtion documents

FE2 Utilities Extended Process Design ACTIVITY DESCRIPTION SHEET Utilities Extended Process Design Contract Technical Documentation FEED Definition Design Documents Process Design Philosophy Design Basis Delelopment of the front-end engineering activities for the utility systems of the plants. These activity will include: Preparation of process P&ID's for each utility system Sizing of all utility equipment and related pipework Flare radiation stury and gas dispersion analysis Update/complete,according to engineering development,equipment list,material selection,MFD's,utility consumption's,utility electrical load lists,consumption summary Preparation of process general specifications Preparation of process specifications for tagged or engineered items Preparation of all utility tagged equipment process data sheets Preparation of the utility packages duty specifications dentification of the utility equipment commissioning guidelines P&ID's (process level only) Equipment List,MFD's,Utility consumption's,Utility Electrical load lists.Consumption Summary Utility equipment & Machinery Process Data Sheets Process Data sheets for main utility control valves,flow orifices and relief valves Process data sheets for main instrumentation Utility package duty specifications Blowdown relief rates and Blowdown Summary Flare radiation and gas despersion report Shutdown Logic Block Diagram and list of alarms and trip setting Utility line list (process) data) Procedures for pre-commissioning and commissioning General specifications for utility equipment

Specifications for tagged or engineered items Design calculation documents

FE3 Piping Design ACTIVITY DESCRIPTION SHEET Piping Design FEED Definition Design Documents Design Basis Piping design philosophy Functional & Interface Specification General Safety Criteria PFDs and UFDs Process and Utility P&ID's Equipment & Machinery Process Data Sheets Package Units Process Duty Specifications Preliminary Electrical Equipment Arrangement Drawings Development of the front-end engineering design activities for the piping systems of the plants. The following activities are foreseen: Piping material estimate Definition of critical piping material,as far as delivery time is concerned Mechanisation of the process P&ID Preparation af data sheets and specifications for tagged or engineered items (piping) Data-sheets and specifications for tagged or engineered items (piping) Equipment Lists (piping) Preliminary Piping material take-off Standard piping classes

FE4 Machinery Design - General Specifications ACTIVITY DESCRIPTION SHEET Machinery Design - General Specifications FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Machinery Process Data Sheets Plot Plans Development of the front-end engineering design activities to prepare general design specifications for the machinery (e.g. compressors,pumps, ets) of the plant. The following activities are foreseen: Preparation of machinery General Design Specifications (including list of applicable Codes and Standards)

Definination of noise control criteria and preparation of general specification for noise control, and requirements for noise studies to be carried-out during detail design phase Machinery General Design Specifications for each type of machinery (e.g. compressors,pumps,etc.) General specification for skid mounted equipment General specification for equipment noise limits General specification for packaged equipment Workshop minimum requirement specification

FE5 Machinery Design - Process & Utility Pumps ACTIVITY DESCRIPTION SHEET Machinery Design - Process and Utility Pumps FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Machinery Process Data Sheets Plot Plans Development of the front-end engineering design activities for the process and utility pumps of the plant. The following activities are foreseen: Definition of type,number and characteristics of the required machinery Pumps preliminary sizing ( weights and dimensions) Identification of the minimum requirements for skid mounted pumps Selcetion of mechanical seals Preparation of Technical Specifications for tagged or engineered process and utility pumps including: technical description data-sheets drawings inspection data-sheets documentation requirements ( from vendors) Technical Specifications for tagged or engineered pumps Data sheets for tagged or engineered pumps Equipment List (machinery) Pumps design documentation Input for Layouts and plot plans

FE6 Machinery Design - Compressors ACTIVITY DESCRIPTION SHEET Machinery Design - Compressors FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification

General Safety Criteria Machinery Process Data Sheets Plot Plans Development of the front-end engineering design activities for the compressors of the plants. The following activities are foreseen: Definition of type,number and characteristics of the reguired machinery Compressors preliminary sizing (weights and dimensions) Identification of the minimum requirements for skid mounted compressors Identification of requirements for workshops definition Technical-economic analysis and selction of seals type (dry gas seals vfs.oil seals) for main gas compressors Preparation of data sheets Preparation of Technical Specifications for compressors including: technical description data-sheets drawings inspection data-sheets documentation requirements (from vendors) Technical Specifications for compressors Data sheets Equipment List (machinery) Compressors design documentation Input for layouts and plot plans

FE7 Machinery Design - Diesel Engines ACTIVITY DESCRIPTION SHEET Machinery Design - Diesel Engines FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Machinery Process Data Sheets Plot Plans Development of the front-end engineering design activities for the diesel engines of the plant. The following activities are foreseen: Definition of type,number and characteristics of the required machinery Turbines preliminary,sizing (weights and dimensions) Identification of the minimum requirements for skid mounted diesel engines Idenification of requirements for workshops definition Preparation of data sheets Preparation of Technical Specifications for diesel engines including: technical description data-sheets drawings inspection data-sheets documentation requirements (from vendors)

Technical Specifications for diesel engines Dqata sheets Equipment List (machinery) Diesel engines design documentation Input for layuts and plot plans

FE8 Mechanical Design - Pressure Vessels,Columns & Traps ACTIVITY DESCRIPTION SHEET Mechanical Design - Pressure Vessels,Columns and Traps FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Equipment Process Data Sheets Plot Palns Development of the front-end engineering design activities for the pressure vessels,columns and traps of the plants. The following activities are foreseen: Preparation of general specification for pressure vessels,columns and traps Definition of type,number and characteristics of the required equipment Technical/economic evaluation of the minimum thickness Equipment sizing (weights and dimensions) Preparation of data sheets Preparation of Technical Specifications for pressure vessels,columns and traps,including: technical description data-sheets drawings inspection data-sheets documentation requirements (from vendors) General specifications for pressure vessels,columns and traps Technical Specifications for pressure vessels,columns and traps Data sheets for pressure vessels,columns and traps Equipment List (mechanical) Input for layouts and plot plans Pressure vessels,columns and traps mechanical design documentation

FE9 Mechanical Design - Heat Exchangers ACTIVITY DESCRIPTION SHEET Mechanical Design - Heat Exchangers FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Equipment Process Data Sheets Plot Palns

Development of the front-end engineering design activities for heat exchangers of the plants. The following activities are foreseen: Preparation of general specifications for heat exchangers Definition of type,number and characteristics of the required heat exchangers Perform technical/economic evaluation to define the TEMA configuration (AES,CFU, etc.) to improve operability and maintainability Equipment sizing (weights and dimensions|) Preparation of data sheets Preparation of Technical Specifications for heat exchangers including: technical description data-sheets drawings inspection data-sheets documentation requirements (from vendors) General specifications for heat exchangers Technical Specifications for heat exchangers Data sheets for heat exchangers Equipment List (mechanical) Input for layouts and plot plans Heat exchangers mechanical design documentation

FE9 Mechanical Design - Tanks ACTIVITY DESCRIPTION SHEET Mechanical Design - Tanks FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Equipment Process Data Sheets Plot Palns Development of the front-end engineering design activities for tanks of the plants. The following activities are foreseen: Preparation of general specifications for tanks (floating roof,fixed roof,spheres,sumps,etc) Definition of type,number and characteristics of the required tanks Equipment sizing (weights and dimensions) Preparation of data sheets Preparation of Technical Specifications for tanks including: technical description data-sheets drawings inspection data-sheets documentation requirements (from vendors) General specifications for tanks Technical Specifications for tanks Data sheets for tanks

Equipment List (mechanical) Input for layouts and plot plans Tanks mechanical design documentation

FE11 Mechanical Design-Flares Activity Description List Mechanical Design-Flares FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Equipment Process data sheets Plot pLan Development of the front-end engineering design activities for flares of the plants. The following activities are foreseen: Preparation of general specifications of the required flares Flare tip noise study Equipment sizing (weights and demensions) Preparation of data sheets Preparation of technical Specifications for flares including: - technichal discription - data sheets - drawings - inspection data-sheets - documentation requirements (from vendors) General specifications for flares technical Specifications for flares data sheets for flares Equipment List (mechanical) Input forlayout and plot plans Flares mechanical design documentation Flare tip noise study reports

FE12 Mechanical Design - Miscellaneous Equipment Activity Description List Mechanical Design - Miscellaneous Equipment FEED Definition Design Documents Design Basis & Philosophies Functional & Interface Specifications General Safety Criteria Equipment Process Data Sheets Plot Plans Development of the front-end engineering design activities for the miscellaneous mechanical equipment of the plants The following activities are foreseen:

Preparation of general specifications for miscellaneous mechanical equipment Definition of type, number and characteristics of the required miscellaneous mechanical equipment Equipment sizing (weights and dimensions) Preparation of data sheets Preparation of Technical Specifications for tagged or engineered miscellaneous mechanical equipment including: - technical description - data-sheets - drawings - inspection data-sheets - documentation requirements (from vendors) - General specifications for miscellaneous mechanical equipment - Technical specifications for tagged or engineered miscellaneous mechanical equipment - Data sheets for tagged or engineered miscellaneous mechanical equipment - Equipment list (mechanical) -Input for layouts and plot plans - Mechanical design documentation

FE13 Instrumentation Design -Metering System Activity Description List Instrumentation Design - Metering System FEED Definition Design Documents Design Basis & Philosophies Functional & Interface Specifications General Safety Criteria Process P&IDs Shut-down logic Block Diagram Instrumentation and Control System Philosophy Development of the basic and front-end engineering activities for the instrumentation and control systems The following activities are foreseen: Definition of the philosophy, architecture and technical requirements of the metering system Mechanisation of the P&ID - System specifications - Input to the equipment list and weight report

FE14 Instrumentation Design - Power Supply Activity Description List Instrumentation Design-Power Supply FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specifications

General Safety Criteria Process P&IDs Shut-down logic Block Diagram Instrumentation and Control System Philosophy Development of the basic and front-end engineering activities for the instrumentation and control systems The following activities are foreseen: Definition of the philosophy, architecture and technical requirements of the instrumentation power supply System specifications System Block Diagrams

FE15 Instrumentation Design - Control & Safety Systems Activity Description List Instrumentation Design - Control & Safety Systems FEED Definition Design Documents Conceptual Design & philosophies Functional & Interface Specifications General Safety Criteria Process P&IDs Shut-down logic Block Diagram Instrumentation and Control System Philosophy Development of the basic and front-end engineering activities for the instrumentation and control systems The following activities are foreseen: Definition of the philosophy, architecture and technical requirements of the plants control system Mechanisation of the P&ID Overall system block diagram System specifications Control and safety system architecture Input to the equipment list and weight report I/O summary list

FE16 Instrumentation Design - Control Room Arrangement &General Layout Activity Description List FE16 Instrumentation Design - Control Room Arrangement &General Layout FEED Definition Design Documents Design Basis & philosophies General Safety Criteria Instrumentation and Control System Specification Instrumentation and Control System Philosophy Development of the basic and front-end engineering activities for the instrumentation and control systems The following activities are foreseen:

Study and definition of the instrumentation and control room(s) arrangements (Layout, equipment sizes, cable ducts, etc) Control room (s) and panel layout Distributed control room(s) in the plant layout Main instrument cable routing layout Telecomm/public address layout and intercom system Instruments data sheets and list

FE17 Instrumentation Design - Field Instrumentation & Instrument Requirements Activity Description List Instrumentation Design-Field Instrumentation & Instrument Requirements FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specifications General Safety Criteria Process P&IDs Shut-down logic Block Diagram Instrumentation and Control System Philosophy Development of the basic and front-end engineering activities for the instrumentation and control systems The following activities are foreseen: Definition of the philosophy, architecture and technical requirements of the field instrumentation and instrument requirements for package units Field instrumentation general specification Instruments data sheets and list Instruments installation criteria specification Instruments interconnection criteria specification Input to the equipment list and weight report Instrument package specification and intallation Instrumentation earthing principle specification/layout

FE18 Instrumentation Design - Instrumentation & Automation Interface Design Activity Description List Instrumentation Design-Instrumentation & Automation Interface Design FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specifications General Safety Criteria Process P&IDs Shut-down logic Block Diagram Instrumentation and Control System Philosophy Development of the basic and front-end engineering activities for the instrumentation and control systems The following activities are foreseen:

Definition of the philosophy and technical requirements of the instrumentation, electrical systems and package interfaces Mechanisation of the P&ID Instrument, electrical and automation interface documentation

FE19 Instrumentation Design-F&G & ESD System Activity Description List Instrumentation Design - F&G & Emergency Shutdown System FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specifications General Safety Criteria Safety System Design Process P&IDs Shut-down logic Block Diagram Instrumentation and Control System Philosophy Development of the basic and front-end engineering activities for the instrumentation and control systems The following activities are foreseen: Definition of the philosophy and technical requirements of the metering system Mechanisation of the P&ID System specifications System Block Diagrams Mechanised P&ID

FE20 Instrumentation Design-Reliability and Safety Integrity Level Requirements Activity Description List Instrumentation Design-Reliability and Safety Integrity Level Requirements FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specifications General Safety Criteria Process P&IDs Shut-down logic Block Diagram Instrumentation and Control System Philosophy Development of the basic and front-end engineering activities for the instrumentation and control systems The following activities are foreseen: Definition of the philosophy, architecture and technical requirements of the Safety integrity level Mechanisation of the P&ID Reliability and safety integrity level requirement specification

FE21 Instrumentation Design - Field Instrumentation Activity Description List Instrumentation Design-Field Instrumentation FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specifications General Safety Criteria Process P&IDs Shut-down logic Block Diagram Instrumentation and Control System Philosophy Development of the basic and front-end engineering activities for the instrumentation and control systems The following activities are foreseen: Definition of the technical requirements of the field indtrumentation - Field indtrumentation general specification - Instruments data sheets and list Control valves specification and data sheets Safety valves specification and data sheets Flow mesurement specification and data sheets Calculation sheets

FE22 Instrumentation Design - Instrumentation & Control System Activity Description List Instrumentation Design - Instrumentation & Control System FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specifications General Safety Criteria Process P&IDs Shut-down logic Block Diagram Instrumentation and Control System Philosophy The basic design shall comprise the development of the conceptual activities for the instrumentation and control systems of the plants. The following activities are foreseen: The definition of technical data and design requirements The review of the proposed systems and design philosophies provided by Company (if any) Preparation of fit for purpose architecture of the control systems Definition of SCADA requirements, architecrure and design philosophy Project Instrumentation and control system philosophy and architecture specification

FE23 Instrumentation Design - Instrumentation - Telecomm & IT Systems Design Activity Description List

Instrumentation Design-Instrumentation-Telecommunication & IT Systems Design FEED Definition Design Documents Project Telecomm System Philosophy and Architecture Design Basis & philosophy Functional & Interface Specification General Safety Criteria Development of the front-end engineering activities for: The overall telecommunication, telephone and IT systems to connect all the Project areas according to the general project requirements The telephone and field communication facilities The IT system network facilities The following activities are foreseen: Preparation of specifications and data sheets for main systems Specifications and data sheets for main systems

FE24 Electrical system - Electrical Distribution Activity Description List Electrical design-Electrical Distribution - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot Plans - Electrical Philosophy and Design Criteria Development of the front-end engineering design activities to define the electrical distribution system configuration and design criteria to be adopted during detail design for the plants. The following activities are included: Prepare, according to the updated electrical load lists and electrical philosophy: - General one line diagrams - Protective relaying one line diagram The diagram shall have all the information's (metering, relays, equipment characterstic, etc) to permit the detail engineering contractor to understand and complete them when the information will be available from vendors: Prepare general electrical project specifications including but not limited to: Electrical report describing for each plant, the whole elctrical system, indicating the detailed philosophy, load balance, equipment characterestic, etc. electrical substations electrical emergency generators OHL electrical motors Prepare the electrical system design criteria specification describing requirements for electrical system detail design - General one line diagrams

- protective relaying one line diagrams - main and emergency generators control and monitoring block diagrams - General electrical Project specifications - Project Specification for electrical system design

FE25 Electrical System - Electrical Load Demand Activity Description List Electrical Design-Electrical Load Demand - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot plans - Electrical phylosophy and design criteria Development of the front-end engineering activities for the electrical systems of the plant to define the electrical load demand. The following activities are included: Definition of the load demand for the various operating conditions (i.e. design, emergency, start-up, etc.) collecting data form various including process, utilities, safety, lighting, miscellaneous users, support facilities and infrastructures the load balance will be done according to the load list keeping into considertaion the load factor, diversity factor, powers losses,contingency, etc. - Electrical load lists and load summary - Electrical load balances

FE26 Electrical System-Electrical Design Calculation & Studies Activity Description List Electrical Design-Electrical Design Calculation & Studies - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot plans - Electrical phylosophy and design criteria Development of the front-end engineering design activities for the electrical systems of the plant including: Electrical systems studies design calculation documents including: - preliminary short circuit calculation and stability study - preliminary selectivity study - main cables voltage drops calculations

- preliminary lighting study - preliminary earthing system calculations - miscellaneous studies and analyses Hazardous area classification report - preliminary short circuit calculation and stability study - preliminary selectivity study - main cables voltage drops calculations report - preliminary lighting study - preliminary earthing system calculations report - miscellaneous studies and analyses to support load analyses and equipment sizing - Hazardous area classification report

FE27 Electrical System-Electrical Equipment Sizing Activity Description List Electrical Design-Electrical Equipment Sizing - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot plans - Electrical phylosophy and design criteria Development of the front-end engineering design activities for sizing the electrical systems of the plant. The following activities are foreseen: Definition of all the main electrical items, including but not limited to: - Battery, battery charger, DC Power supply and UPS - Emergency Power Generation System - Power distribution systems including OHL - Transformers (power, auxilary, ighting) - Electrical system protective devices - Emergency and Stand-by Systems - Electric motors - Main controlcentres - Electrical control desk - PLC architecture, power management and load shedding - Cathodic protection - Cables ladder/tray Identification of electrical requirements for package units Preparation of data-sheets for tagged or engineered items - Electrical equipment sizing - Data sheets for tagged or engineered items (electrical) - Equipment list (electrical) - Electrical requirements for package units - Input for layouts and plot plans

FE28 Electrical System-General Electrical Layout Activity Description List Electrical Design-General Electrical Layouts - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot plans - Electrical phylosophy and design criteria Development of the front-end engineering design activities to define the general layout of the electrical substation and main systems of the plant. The following activities are included according to type and size of electrical equipment determine the size of electrical switchgear rooms and produce layouts showing main equipmenr location and arrangement including special requirements to integrate other services and allow easy maintenance: produce general layouts for motive power, lighting and earthing with the relevant electrical distribution layout for all installations - Switchgera rooms layout - Central control room layout - Transformer room - Turbogenerator lay-out - Emergency generator layout - Electrical equipment layout - Flood light tower layout - Cable ladder/tray layout - Hazardous area classification layout

FE29 Electrical System-Specification for Electrical Switchboards Activity Description List Electrical Design-Specifications for Electrical Switchboards - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot plans - Electrical phylosophy and design criteria Development of the front-end engineering design activities to prepare the technical specifications for the tagged or engineered switchboards of the plants including: - technical description

- data-sheets - drawings - inspection data-sheets - documentation requirements (from vendors) - Technical specifications for MV switchboards - Technical specifications for LV switchboards - Technical specifications for main LV Lighting / auxiliary panel boards - Technical specifications for electrical control panels - Technical specifications for PLC architecture, power management and load shedding - Power factor correction panel boards (if necessary) - Battery, battery charger panel boards - AC UPS panel boards - Cathodic protection panels - Protection panel boards

FE30 Electrical System-Specification for Emergency Generators Activity Description List Electrical Design-Specification for Emergency Generators - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot plans - Electrical phylosophy and design criteria Development of the front-end engineering design activities to prepare the electrical section of technical specifications for emergency generators of the plants including: - technical description - data-sheets - drawings - inspection data-sheets - documentation requirements (from vendors) - Emergency generator/s technical specifications

FE31 Electrical System-Specifications for Transformers Activity Description List Electrical System-Specifications for Transformers and Neutral Eathing Resistors FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Process P&ID's

Electrical Philosophy and Design Criteria Develop the front-end engineering design activities to prepare the technical specifications for the tagged or engineered transformers and neutral eathing resistors of the plants including: technical description data-sheets drawings inspection data-sheets documentation requirements (from vendors) Technical specifications

Civil&Structural Design-Technical Specifications for Civil Works and Structures Activity Description List Civil&Structural Design-Technical Specifications for Civil Works and Structures FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Plot Plans Project General Specification Control Room layout Electrical Equipment Arrangement Drawings Develop the front-end engineering design activities to prepare the technical specifications for civil and technical buildings. The activities will include: Prepare project technical specifications for structures Prepare project technical specifications for foundations Prepare project technical specifications for technical buildings Prepare project technical specifications for HVAC Prepare project technical specifications of ducting for cables, pipes, drainage, ect, and crossing Study the impact of high/low temperature (freezing) on supporting structures and foundations Prepare project technical specifications for special supporting structures (exposed to high/low temperature) Study the crossing with roads and prepare the relevant specification Prepare a schedule of protection material defining the area to be protected and the psecification of the protection material Project technical specification for structures Project technical specification for foundations Project technical specification for technical buildings and relevant facilities Project technical specification for HVAC Project technical specification for ducting for cables, pipes, drainage, ect, crossing Project technical specification for special support structures (exposed to high/low temperature) Project technical specification for road crossing Project technical specification for protection material Schedule of protection material & protected areas

FE33 Civil & Structural Design for Early Civil Works Activity Description List Civil & Structural Design - Civil Design for Early Civil Works Design premises FEED Definition Design Documents Site Surveys General Safety Criteria Design Basis & philosophies Architectural design Develop the front-end engineering design activities for the civil works related to Ealry Civil Works. The following activities are foreseen: prepare general design specifications for civil works identify the water distribution system identifying the preliminary sizing the sewerage collectiong system identifying the site preparation works identifying the fire fightning system identifying the moisture and heat barrier discription of building material general design specifications for civil works site preparation requirements and technical specification preliminary water system design and technical specification civil work material technical specification preliminary bil of quantity building material specification

FE34 Civil & Structural Design - Foundation Design Activity Description List Civil & Structural Design - Foundation Design FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Project General Specification Project technical Specification Plot Plans Technical Building Architectural Design Electrical Equipment Arrangement Drawings Develop the front-end engineering design activities related to preliminary design of foundations for main equipment, process towers, pipe racks, supporting structure, technical buildings, tanks foundations and ect. The activities will include: Preliminary sizing of foundation of the major equipment, process towers, pipe racks and supporting structure Study the impact of foundation design on the relevant distances in-between equipment in the plant lay-out design (no overlap of foundation is permitted)

Identify the design systems for technical buildings study the trackd foundations requirements and specifications sizin the foundations member and the ring beams preliminary foundation design for the major equipment, process towers, Pipe racks and supporting structure preliminary foundation design for technical buildings preliminary foundation design for tanks

FE35 Civil & Structural Design-Structural Design Activity Description List Civil & Structural Design-Structural Design FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Project General Specification Project technical Specification Plot Plans Technical Building Architectural Design Electrical Equipment Arrangement Drawings Develop the front-end engineering design activities related to preliminary design of piperacks, supporting structures, technical buildings structures, tanks, cranes and other. The activities will include: Identifying the location, size and number of pipe racks and supproting structure Design the configuration of the pipe racks and supporting structure Preliminary defining the structural members sections and sizes Preliminary sizing the supporting structures Preliminary defining of water intake structure Identifying the structural systems for technical buildings Preliminary analysis of the structural systems and calculating member size preliminary pipe racks degign preliminary supporting structures designs preliminary structural design of technical buildings

FE36 Civil&Structural Design-Technical Buildings archtectural Desing Activity Description List Civil&Structural Design-Technical Buildings archtectural Desing FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Project General Specification Project Technical Specification Plot Plans Control room Layout Electrical Equipment Arrangement Drawings

Development of the architectural front-end engineering design activities related to technical buildings. The activities will include: define the required technical buildings prepare architectural general design specificaion elaboration of functional and distributive plot plans of buildings with location and dimentions prepare architectural design drawings for all technical buildings including plans, elevations,faade and details (scale1:100, 1:20) describe the finishing material and prepare schedule and technical specification of finishing material indentifying the required furniture and prepare the relevant technical specifications architectural general design specification architectural design drawings for all technical buildings including plans, elevations, facade and details (scale 1:100, 1:20) technical specifications for finishing material schedule of finishing preliminary furniture list and relevant technical specifications

FE37 Civil&Structural Design-Layout & Arrangements Activity Description List Civil and Structural Design-Layout and Arrangements FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Technical Buildings Archtectural Design Project General Specification Project Technical Specification Plot Plans Control room Layout Electrical Equipment Arrangement Drawings Development of front-end engineering design activities to finalise the layouts and general arrangements for the civil works and technical buildings. The activities will include: Review the requirements for safety and utility systems study the drinage of the area Study the sewerage system Study the water use and identify the network, required storage and treatment Study and identify the water intake building and structure Study and ducts requirements for running cables and services Study the crossing with roads Identify the required paved area, roads and walk ways Identify safety walls Identify the civil work for all technical buildings Preliminary design of drinage system Preliminary design of sewerage system Preliminary design of water network

Preliminary design of water intake building Preliminary design of major ducts and crossings Plot plan showing all paved area Preliminary design of walls Preliminary design of civil works for technical building

FE38 Construction Specifications Activity Description List Construction Specifications FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria Facility design data Prepare construction specifications covering the applicable crafts, descipline or categories of work at each location, and include specification of general items such as quality assurance/control, safety, hygiene, sp. Securyty, clean up, meterial handling, protection and presentation of materials and equipment during storage, liftinh, ect. Construction specifications

FE39 Layout Design Activity Description List Layout Design FEED Definition Design Documents Desing Basis Piping design philosphy Functional & Interface Specification General Safety Criteria PFD's and UFD's Process and Utility P&ID's Equipment & Machinery Process Data Sheets Package Units Process Duty Specifications Preliminary Electrical Equipment Arrangement Drawings Development of the pront-end engineering activities for the layput design of the plants. The following activities are foreseen: Design of general and unit plot plans Prepare major (6" and larger) piping lay-outs general Plot Plan Unit Plot Plan Equipment Arrangement and location Major (6" and larger) piping layouts

FE40 Safety System Design Activity Description List Safety System Design FEED Definition Design Documents Design Basis & philosophies Functional & Interface Specification General Safety Criteria and reports The safety systems shall comprise the development of the basic and front-end engineering activities for the definition of the safety systems inside the plants. The following activities are foreseen: Definition of elevation/detection criteria for the Fire and Gas Detection System, of the plant alarms and personnel safety requirements Definition of the Plant Fire Risk Area Definition of the plant Firefightning requirements including fire protection design basis and system describtions Preparation of Safety System Plot Plans showing the locations of the firefightning systems Identification of the Fire Hazardous Maps for fireproofing requirements Fire and Gas Detection Specification Firefightning Sysytem Specification Specifications for main firefightning equipment Data Sheets for main firefightning equipment Escape route, safe haven, ect, generaql arrangement Safety Systems Plot Plans (firefightning system) Fire Hazardous Area Maps