Beruflich Dokumente
Kultur Dokumente
153517
Description
PLANT
DISCIPLINE/AREA
LEVEL
-
SEQUENCE NUMBER
-
FE
Rev. No
Revision Description
Date
Originator
Approvals
CA
PC
BQN
Table of Contents
Section No.
Page
1.0
SCOPE OF WORK ................................................................................................................................... 3
1.1
Description of the Scope of Work ............................................................................................... 3
2.0
ENGINEERING ......................................................................................................................................... 3
2.1
Engineering Drawings: ................................................................................................................. 3
2.2
Standards & Specifications: ........................................................................................................ 5
2.3
Tagged Items ................................................................................................................................. 5
2.4
Quality Surveillance Requirements ............................................................................................ 6
2.5
Subcontractor Drawings and Data and Data Submittal Requirements ................................... 6
2.6
Hold List ......................................................................................................................................... 6
2.7
Recommended Spare Parts/Temporary Materials ..................................................................... 6
2.8
Site Preparation & Earthwork Requirements ............................................................................. 6
2.9
Client Supplied Equipment and Materials .................................................................................. 7
2.10
Copies of POs and Related Vendor Information ....................................................................... 7
3.0
MANPOWER ............................................................................................................................................. 7
3.1
Estimated Manpower Requirements ........................................................................................... 7
3.2
Density Calculations..................................................................................................................... 7
4.0
MATERIALS ............................................................................................................................................. 7
4.1
Bill of Materials Matrix (Client, engineer, vendor, contractor, fabricator supplied) .............. 7
4.2
Required at Site Dates .................................................................................................................. 7
4.3
Special Transportation Arrangements ....................................................................................... 8
4.4
Total Quantities ............................................................................................................................. 8
5.0
SAFETY .................................................................................................................................................... 8
5.1
Safe Work Plans or High Level Job Hazard Assessment ......................................................... 8
5.2
Training Requirements ................................................................................................................. 8
5.3
PPE Requirements ........................................................................................................................ 8
5.4
Safety Equipment .......................................................................................................................... 8
6.0
QUALITY ................................................................................................................................................... 9
6.1
Inspection and Test Plans ........................................................................................................... 9
6.2
Welding Procedures ..................................................................................................................... 9
6.3
Survey Requirements ................................................................................................................... 9
6.4
Templates for Turn Over Binders ................................................................................................ 9
Uncontrolled if Printed
Issue Date:
Page 1 of 11
153517
Description
PLANT
DISCIPLINE/AREA
LEVEL
-
SEQUENCE NUMBER
-
7.0
REGULATORY APPROVALS & PERMITS ............................................................................................. 9
7.1
Regulatory Approval Requirements ........................................................................................... 9
7.2
Permit Schedule ............................................................................................................................ 9
8.0
SUB-CONTRACTS ................................................................................................................................... 9
8.1
Sub Contract Schedule ................................................................................................................ 9
9.0
VENDOR PACKAGE & SUPPORT .......................................................................................................... 9
9.1
Vendor Equipment List Requiring Support ................................................................................ 9
9.2
Purchase Order Schedule ............................................................................................................ 9
9.3
Vendor Contact Information ...................................................................................................... 10
10.0 CRANES & RIGGING STUDIES ............................................................................................................ 10
10.1
Lift Plan ........................................................................................................................................ 10
10.2
Lifting Studies ............................................................................................................................. 10
10.3
Lift Schedule ............................................................................................................................... 10
11.0 SCAFFOLDING ...................................................................................................................................... 10
11.1
Scaffold Plan ............................................................................................................................... 10
11.2
Scaffold Material Estimate ......................................................................................................... 10
11.3
Scaffold Labor Estimate ............................................................................................................. 10
12.0 CONSTRUCTION EQUIPMENT, TOOLS AND CONSUMABLES ........................................................ 10
12.1
Construction Equipment Estimate ............................................................................................ 10
12.2
Construction Equipment Schedule ........................................................................................... 10
12.3
Special Tools ............................................................................................................................... 10
12.4
Consumables .............................................................................................................................. 10
13.0 WASTE MANAGEMENT ........................................................................................................................ 10
13.1
Waste Management Plan ............................................................................................................ 10
13.2
Waste Estimate ........................................................................................................................... 11
14.0 RISK REGISTER .................................................................................................................................... 11
14.1
Risk and Mitigation ..................................................................................................................... 11
15.0 WORKFORCE PLANNING..................................................................................................................... 11
15.1
Field Installation Work Package List and Schedule ................................................................ 11
16.0 PROJECT CONTROLS .......................................................................................................................... 11
16.1
Integrated Schedule.................................................................................................................... 11
16.2
Budget .......................................................................................................................................... 11
16.3
Progress Measurement .............................................................................................................. 11
16.4
Performance Requirements ....................................................................................................... 11
17.0 COMPLETION & TURNOVER PLAN ..................................................................................................... 11
17.1
Turn Over Document Matrix ...................................................................................................... 11
17.2
Redline Markups ......................................................................................................................... 11
17.3
CWP Close Out Requirements .................................................................................................. 11
18.0 ATTACHMENTS ..................................................................................................................................... 11
18.1
Level 3 Schedule pending to be developed ............................................................................. 11
18.2
Plot Plan for Scope Identification ............................................................................................. 11
Uncontrolled if Printed
Issue Date:
Page 2 of 11
153517
Description
PLANT
DISCIPLINE/AREA
SEQUENCE NUMBER
-
1.1
LEVEL
SCOPE OF WORK
Proper coordination to perform the work with other on-going activities on site is imperative to avoid
changes and delays in the overall construction activities and completion of any parts of the work on the
project.
The civil earthworks shall conform to all applicable industrial codes, standards and specifications listed
in this document.
Maintaining the working area in a clean, safe, and acceptable condition during construction and at
mobilization as required in the scope of work or construction activities.
2.0
ENGINEERING
Engineering drawings, specifications and quality documents will be managed through iDOCS.
A listing of all applicable drawings/data required to perform the work outlined in this CWP has been
included below:
2.1
Engineering Drawings:
Document Number
Uncontrolled if Printed
Title
Rev
Issue Date:
Page 3 of 11
153517
Description
Document Number
Uncontrolled if Printed
PLANT
DISCIPLINE/AREA
LEVEL
-
SEQUENCE NUMBER
-
Rev
Issue Date:
Page 4 of 11
153517
Description
PLANT
DISCIPLINE/AREA
SEQUENCE NUMBER
-
Document Number
2.2
LEVEL
Title
Rev
Document Number
Title
Rev
PGGP-EH-SSPDS-009901
PGHU-CV-SPSAF-000003
PGHU-CV-SPSAF-000005
PGHU-CV-QPPAC-0000002
Quality Plan
PGHU-CV-SPSAF-000001
PGGP-EH-QSPDS-000104
PG-PDS 04-99-09
PG-PDS 04-99-06
PG-PDS 04-99-11
PG-PDS 04-99-04
2.3
Tagged Items
Not Applicable
Uncontrolled if Printed
Issue Date:
Page 5 of 11
153517
Description
PLANT
DISCIPLINE/AREA
LEVEL
-
SEQUENCE NUMBER
-
2.4
2.5
2.6
Not Applicable
Hold List
The following documents and/or data required to complete the work outlined in this CWP are on hold.
Document
Expected Release
Date
N/A
N/A
2.7
2.8
Uncontrolled if Printed
Issue Date:
Page 6 of 11
153517
Description
PLANT
DISCIPLINE/AREA
LEVEL
-
SEQUENCE NUMBER
Sediment control ponds shall be excavated in accordance to PG-PDS 04-99-04Specification for Site
Preparation and Earthwork.
2.9
2.10
3.0
3.1
MANPOWER
3.2
Density Calculations
Maximum density at optimum moisture content shall be determined in accordance with AS 1289 5.1.1,
standard compaction method
Field density shall be determined in accordance with AS 1289 5.3.1 or 5.3.2 as appropriate.
For cohesionless materials, minimum and maximum dry densities shall be determined in accordance
with AS 1289 5.5.
The density index shall be determined in accordance with AS 1289 5.6.1.
The field moisture content and field dry density shall be determined in accordance with AS 1289 5.8.1
4.0
4.1
MATERIALS
Material
Client
CV
Equipment
4.2
Vendor
Fabricator
Contractor
Uncontrolled if Printed
Issue Date:
Page 7 of 11
153517
Description
PLANT
DISCIPLINE/AREA
SEQUENCE NUMBER
-
4.3
4.4
Total Quantities
5.0
5.1
LEVEL
SAFETY
5.2
Training Requirements
A Project Training Matrix identifying the minimum SHE related training for all Project roles will be
maintained for the lifecycle of the project. As a minimum the following project roles will be defined in the
training matrix:
Project Management Team
Field supervision
Craft personnel
General labourers
Equipment operators
There are three basic types of training that will be delivered on the project:
SHE-MS awareness
Task specific training
Regulatory-required
Personnel shall be advised and/or trained in specific procedures prior to commencing their respective
task(s). This training may occur during prestart meetings and toolbox Meetings, be included within a
JHA, be conducted on the job or through a specific training session, as required.
All other Training Requirements are described in the document PGHU-CV-SPSAF-000003 Site
Specific Safety Plan.
5.3
PPE Requirements
PPE Requirements will be identified as part of JHA Part 1 and coordinated according to the document
PGHU-CV-SPSAF-000003 Site Specific Safety Plan.
5.4
Safety Equipment
Not Applicable
Uncontrolled if Printed
Issue Date:
Page 8 of 11
153517
Description
PLANT
DISCIPLINE/AREA
SEQUENCE NUMBER
-
6.1
LEVEL
QUALITY
6.2
Welding Procedures
Not Applicable
6.3
Survey Requirements
6.4
7.0
7.1
7.2
Permit Schedule
To be provided in later revisions
8.0
8.1
SUB-CONTRACTS
9.1
9.2
Uncontrolled if Printed
Issue Date:
Page 9 of 11
153517
Description
9.3
PLANT
DISCIPLINE/AREA
LEVEL
-
SEQUENCE NUMBER
-
10.1
Lift Plan
Not Applicable
10.2
Lifting Studies
Not Applicable
10.3
Lift Schedule
Not Applicable
11.0
11.1
SCAFFOLDING
Scaffold Plan
Not Applicable
11.2
11.3
12.1
12.2
12.3
Special Tools
12.4
Consumables
13.0
13.1
WASTE MANAGEMENT
Uncontrolled if Printed
Issue Date:
Page 10 of 11
153517
Description
PLANT
DISCIPLINE/AREA
LEVEL
-
SEQUENCE NUMBER
-
All organic material, including trees, stumps, roots and brush shall be burned or removed from the
Clients property as directed by the Client. When instructed by the Clients engineer, felled trees shall
be moved to an agreed location on site to allow harvesting of the logs by local land Clients.
13.2
Waste Estimate
14.0
14.1
RISK REGISTER
15.1
WORKFORCE PLANNING
16.1
PROJECT CONTROLS
Integrated Schedule
A level 3 project schedule will be included with this CWP.
16.2
Budget
16.3
Progress Measurement
16.4
Performance Requirements
17.0
17.1
17.2
Redline Markups
17.3
18.0
ATTACHMENTS
18.1
18.2
Uncontrolled if Printed
Issue Date: