Detailed Estimate
Data
Room
L
B
15.25
7.60
Wall Thickness
0.23
Door
2x
1.05
Window
8x
1.20
Ver
L
15.25
B
1.50
Ver Roof Ht
3.65
Height of Room
3.65
Plinth Ht from GL
0.60
Sl No
Items
No
L(M)
1 ) Earth work in HS in excavation of foundation
No of Columns in length
6
No of Columns in Bredth
4
No of Columns in Ver
6
Columns
22 x
1.20
Between Columns(L/W)
10 x
1.90
Between Columns(C/W)
6x
1.41
Ver
5x
1.90
Ver sides
2x
0.30
Steps
2x
1.65
Add 10%
2 ) Filling sand in F&P well watered
Columns
Between Columns(L/W)
Between Columns(C/W)
Ver
Ver sides
Steps
Room
Ver
3 ) CC(1:4:8) using 4 cm size HBG metal
Columns
Between Columns(L/W)
Between Columns(C/W)
Ver
Ver sides
Steps
22
10
6
5
2
2
1
1
22
10
6
5
2
2
x
x
x
x
x
x
x
x
x
x
x
x
x
x
1.20
1.90
1.41
1.90
0.30
1.65
15.03
14.73
1.20
2.35
1.86
2.35
0.75
1.65
x
x
1.95
1.2
B(M)
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
15.03 x
14.73 x
1.2
0.75
0.75
0.75
0.75
0.9
1.2
0.75
0.75
0.75
0.75
0.9
7.38
0.94
1.2
0.75
0.75
0.75
0.75
0.9
H(M)
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
7.38 x
0.94 x
1.2
0.75
0.75
0.75
0.75
0.3
0.15
0.15
0.15
0.15
0.15
0.15
0.5
0.5
0.15
0.15
0.15
0.15
0.15
0.15
Contents Area/Qty.
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.1 =
0.1 =
38.02
10.67
4.76
5.33
0.34
0.89
6.00
66.00
66.00
4.75
2.13
0.95
1.07
0.07
0.45
55.46
6.92
71.80
71.80
4.75
2.64
1.26
1.32
0.17
0.45
10.58
10.58
11.09
1.38
12.48
5 ) RRHG Stone masonry in cm(1:6)
Between Columns(L/W)
Between Columns(C/W)
Ver
Ver sides
Steps
Plinth
Between Columns(L/W)
Between Columns(C/W)
Ver
Ver sides
10
6
5
2
2
x
x
x
x
x
2.80
2.31
2.80
0.75
1.65
x
x
x
x
x
0.6
0.6
0.6
0.6
0.9
x
x
x
x
x
0.3
0.3
0.3
0.3
0.3
=
=
=
=
=
5.03
2.49
2.52
0.27
0.89
10
6
5
2
x
x
x
x
2.80
2.31
2.80
1.09
x
x
x
x
0.45
0.45
0.45
0.45
x
x
x
x
0.45
0.45
0.45
0.45
=
=
=
=
5.66
2.81
2.83
0.44
22.95
22.95
7.29
2.67
1.19
1.47
3.84
5.67
1.62
0.88
2.90
4.00
0.45
0.59
13.38
2.40
48.35
48.35
11.88
7.92
19.54
37.82
77.16
77.16
6.97
9.20
133.84
24.02
174.03
174.03
12.48
8
1
1
1
22
1
4
1
x
x
x
x
x
x
x
x
x
x
x
x
1.20
0.90
0.60
0.30
0.23
63.04
46.88
16.62
63.04
7.60
1.66
17.52
16.01
16.01
4.00
4.00
4.00
63.04
1.66
17.52
16.01
16.01
4.00
16.62
7.60
63.04
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
1.2
0.9
0.6
0.3
0.23
0.3
0.23
0.23
0.23
0.23
0.45
0.45
8.36
1.5
0.9
0.6
0.3
0.3
0.525
0.525
8.36
1.5
0.23
0.69
1.373
0.63
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
0.23
0.15
0.15
0.74
3.30
0.30
0.15
0.23
0.2
0.572
0.075
0.075
0.1
0.1
0.15
0.15
0.74
1.00
1
1
1
1
3.30
1
1
1
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
66.79
11.47
41.75
39.72
( d ) Lintel
lintel
Door
Window
8 ) Cutting Bending binding MS rods
Qty.
9 ) CB brick masonry in cm(1:6)
L/W
C/W
Ver sides
Ver front
Ver front Over Beam
Steps
Deductions
Door
Window
Columns
10 ) 12 mm thick cp in cm(1:6)
L/W
C/W
Ver sides
Ver front
Ver front Over Beam
11 ) 16 mm thick cp in cm(1:6)
L/W
C/W
Ver sides
Ver front
Ver front Over Beam
Plinth
Steps
Deductions
Door
Window
12 ) 2.5 thick A.S. Flooring in cc(1:2:4)
Room
Ver
Steps
13 ) 20mm thick grading CP in cm(1:4)
14 ) Providing fixing Iron D&W
15 ) Painting two coats with appd paint
1x
2x
8x
2
2
2
0
1
2
x
x
x
x
x
x
2x
8x
16 x
2
2
2
0
1
2
2
2
0
1
1
4
x
x
x
x
x
x
x
x
x
x
x
x
2x
8x
1x
1x
4x
46.88 x
1.05 x
1.20 x
15.71
7.60
1.27
0.35
13.41
1.65
x
x
x
x
x
x
1.05 x
1.20 x
0.23 x
15.71
8.06
1.27
0.58
15.71
15.25
7.60
1.27
0.58
15.25
63.04
0.90
x
x
x
x
x
x
x
x
x
x
x
x
1.05 x
1.20 x
15.25 x
15.25 x
1.65 x
2x
0.23 x
0.23 x
0.23
0.23
0.23
0.23
0.23
1.8
x
x
x
x
x
x
0.23 x
0.23 x
0.23 x
1
1
1
1
1
1
1
1
1
1
1
0.5
x
x
x
x
x
x
x
x
x
x
x
x
1x
1x
7.6 x
1.5 x
0.9 x
0.15 =
1=
1=
3.30
3.30
2.22
1.95
1.47
0.15
159.72
159.72
14.06
0.48
2.21
16.76
16.76
43.511
43.51
=
=
=
=
=
=
23.85
11.54
1.30
0.00
4.53
0.89
1.95 =
1.2 =
3.30 =
-0.94
-2.65
-2.79
35.72
35.72
114.68
58.84
6.22
0.00
26.71
206.45
206.45
3.65
3.65
2.45
1.95
1.7
3.65
3.65
2.45
1.95
1.7
0.6
0.45
=
=
=
=
=
=
=
=
=
=
=
=
111.33
55.48
6.22
0.00
25.93
37.82
0.81
1.95 =
1.2 =
-4.10
-11.52
221.97
221.97
115.90
22.88
5.94
144.72
157.86
665.55
144.72
157.86
665.55
1=
1=
1=
Door
Window
16
17
18
19
20
21
22
23
24
25
26
27
28
)
)
)
)
)
)
)
)
)
)
)
)
)
2x
8x
1.05 x
1.20 x
1.95 x
1.2 x
2.25 =
2.75 =
Cost of paint
White washing two coats
Cement washing two coats
Cost of cement paint
Distempering two coats
Cost of Distemper
Other unforseen items
Project pillar etc
Provision for installation of Computers
Provision for fitting of AC 2 Nos
Provision for Sanitary fittings
Electrification
Contigencies
9.21
31.68
40.89
5.11172
602.45
228.257
28.5321
221.97
55.493
40.89
5.11
602.45
228.26
28.5321
221.97
55.49
Asst. Engineer
Technically sanctioned for Rs.
Rupees Ten Lakh only.
ga College, Loisinga
cum
50.45
3330.03
cum
160.69
11537.57
cum
1763.64
18660.46
cum
1610.41
20092.65
cum
1190.67
27321.09
cum
2886.72
139560.01
sqm
64.63
4986.62
sqm
208.11
36216.73
sqm
269.98
43121.58
sqm
147.17
2465.89
qtl
5360.01
233219.44
cum
1641.91
58651.96
sqm
41.62
8592.19
sqm
56.56
12554.80
sqm
sqm
Kg
107.92
64.85
55.00
15617.29
10236.63
36605.25
sqm
ltr
sqm
sqm
kg
sqm
kg
24.33
145.00
5.22
4.27
35.00
9.98
50.00
Total
994.82
741.20
3142.89
974.02
998.62
2215.10
2774.65
4797.71
1300.00
100000.00
50000.00
70070.92
70070.92
10000.00
1000851.04
Junior Engineer
1000851 (/-)
Project Director(Tech)
DRDA, Bolangir
Name of Work:______________________________________________________
Lead Statement and Cost of Materials
Sl.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Items
Lead by Truck in Km.Unit Cost in Rs.
Conveyance inRayalties
Rs.
in Rs.
Stone (Granite)
5
Cum
177.00
102.00 50.40
Stone (Other than Granite)
5
cum
143.00
102.00 50.40
4cm size crusher broken metal
20
cum
537.00
198.00 50.40
4cm size Granite hand broken metal
5
cum
424.00
102.00 50.40
12mm size granite crusher chips
20
cum
775.00
198.00 50.40
12mm size granite hand broken chips
5
cum
593.00
102.00 50.40
Sand for mortar
5
cum
39.00
102.00 14.00
1000n
CB Bricks(23x11x8)
10
1700.00
329.60 28.34
CBBrick Khoa
10
cum
207.00
134.00
Soling Stones
5
cum
164.00
102.00 50.40
Gravel
5
cum
40.00
102.00 14.00
Metal 4-9cm size
5
cum
370.00
102.00 50.40
Cement
5
Qtl
400.00
10.70
M.S.Rod
5
Qtl
4500.00
10.70
1000n
KB Bricks(25x12x8)
30
3000.00
702.00 28.34
Sand Rough
5
cum
35.00
102.00 14.00
Granite stone chips 6.7 mm size
20
cum
572.00
198.00 50.40
20mm granite chips
20
cum
743.00
198.00 50.40
10 mm granite chips
20
cum
736.00
198.00 50.40
Transportation
a)
b)
c)
5kms
102.00
679.00
10.70
High skilled
Skilled
beyond 50 km
6.40
29.00
0.64
100.00 Semiskilled
90.00 Unskilled
Certified that the lead provided is correct and minimum to the best of my knowledge and belief.
Block Dev.Officer
Loisinga Block
Asst. Engineer
Loisinga Block
______
beyond 50 km
4.30
22.50
0.53
(If NREGS
80.00
70.00
Multiply with
1.0000000
for others ignore
Junior Engineer
Loisinga Block
OH @10%
Sl.
0.1
Item
Rate
(Rs.)
1) Earth Work in Excavation in Hard soil and laying in layers
Labour: U/S
0.43
70
T & P @ 2%
30.1
0.02
OH @10%
30.1
0.1
Total for 1 cum
3) Earth work in slushy soil
Labour: U/S
T & P @ 2%
OH @10%
Total for 1 cum
qty.
0.44
30.8
30.8
70
0.02
0.1
1
0.34
0.8151
0.35
1.41
3.17
900.1
900.1
329.4
155
410.7
100
90
70
0.1
0.1
Analysis of Rates
Amount
Sl.
Item
qty.
Rate
(Rs.)
(Rs.)
2) Earth Work in Excavation in Hard soil for foundation
30.1
Labour: U/S
0.516
70
0.602
T & P @ 2%
36.12
0.02
3.01
OH @10%
36.12
0.1
33.71
Total for 1cum
30.80
0.47
3.08
34.35
553.344
74.4
706.404
16.2
273
0.00
140.30
1763.64
329.4
52.7
334.76157
35
126.9
221.9
0.00
90.01
0.041
2.87
2.87
70
0.02
0.1
1
0.24
1.41
2.47
451.2
451.2
295.4
151
90
70
0.023
0.012
0.075
0.103
0.36
83.793
83.793
1023.4
155
410.7
100
70
0.1
0.1
1190.67
400
0.28
0.672
0.35
1.05
2.96
1296.42
1296.42
2.057936
155
410.7
100
90
70
0.1
1641.91
823.1744
43.4
275.9904
35
94.5
207.2
0.00
129.64
33.00
921.06
69.75
1326.561
61.2
322
0
239.025
2939.60
2939.60
155
410.7
90
70
2.325
14.70306
12.6
8.4
0.1
3.59
41.62
991.4
984.4
155
410.7
90
80
70
161
240
0.1
43300.745 0.0666667
155
410.7
90
70
0.1
0.023
0.012
0.0858
0.13
0.36
90.813
90.813
155
410.7
90
70
3.255
23.4099
14.4
16.8
0.1
7.02
64.89
1023.40
155.00
410.70
100.00
70.00
23.54
1.86
35.24
13.00
25.20
0.00
9.0813
107.92
0.1
576.4
90
70
0.1
1
0.1236
8.65
8.652
64.63
208.11
147.17
269.98
215.06
151
70
0.02
0.1
80.70
4.50
26.60
9.05
0.00
120.84
0.054
1.49
0.5
2.52
0.5
16828
100
90
80
70
1364.31
1364.312
0.02
0.1
1
3
310
310
100
70
0.02
0.1
151.00
8.65
0.17
0.87
160.69
471.18
29.70
23.10
10.48
52.40
586.86
20959.36
908.71
149.00
45.00
201.60
35.00
25.00
27.29
136.43
1528.03
1025.52
100.00
210.00
6.20
31.00
347.20
155
410.7
90
70
0.1
100
80
70
4510.7
60
0.1
820.4
155
410.7
100
70
0.1
70
0.02
70
70
0.02
0.1
29685
90
70
0.02
0.1
0.054
1.49
0.5
2.52
0.5
46507
100
90
80
70
2966.98
2966.978
0.02
0.1
1.5
2
290
290
100
70
0.02
0.1
For 1 Sqm
33) White washing 2 coats
Lime : 18.66Kg
18.66
16
Labour : Skilled : 1
1
90
Mulia : 0.75
0.75
70
T & P @2%
441.06
0
OH @10%
441.06
0.1
Total for 93 sqm
For 1 sqm
35) Priming 1 coat
Labour: Painter-I :0.5
0.5
100
Mulia
:0.5
0.75
70
T & P @2%
102.50
0.02
OH @10%
102.5
0.1
Total for 9.3 sqm
For 1 sqm
37) Rough Stone packing in aprons ans revetments
Stone : 1 cum
1
295.4
Labour : Mason-I : 0.17
0.17
100
Semiskill : 0.35
0.35
80
Mulia
: 1.04
1.04
70
T & P @2%
260.8
0
OH @10%
260.8
0.1
Total for 1 cum
39) Conveying from stacks & spreading morum
Labour: Mulia : 2.5
2.5
70
PRR: Rs.2152x2.83/425
0.006659
2152
T & P @2%
189.3298
0.02
OH @10%
189.3298
0.1
Total for 2.83 cum
For 1 cum
0.353357 212.0494
41) Stone pitching
Stone : 1 cum
1
295.4
Labour:
0.4
80
1
70
T & P @2%
245
0.02
OH @10%
245
0.1
Total for 1 cum
43) Rigid Smooth centring & shuttering
(i) Plinth Hire charges of wood
Carpenter -II
0.5
Semiskilled Mulia
0.5
Sundries & T&P
0.02
OH @10%
587.5187
Total for 10 sqm
for 1 sqm
646.27
90
80
587.5187
0.1
0.1
90
80
1030.814
0.1
2.75
2.75
0.02
960.1036
90
80
960.1036
0.1
1075.32
0.2
B.D.O. Loisinga
0.238095
37.33
298.56
90.00
52.50
0.00
44.11
485.17
5.22
50.00
52.50
2.05
10.25
114.80
12.34
295.40
17.00
28.00
72.80
0.00
26.08
439.28
175.00
14.33
3.79
18.93
212.05
74.93
295.40
32.00
70.00
4.90
24.50
426.80
502.52
45.00
40.00
58.75
646.27
64.63
563.31
247.50
220.00
103.08
1133.90
269.98
492.60
247.50
220.00
19.20
96.01
1075.32
215.06
For 1 Sqm
34) White washing 3 coats
Lime : 23.32Kg
23.32
16
Labour : Skilled : 1.5
1.5
90
Mulia : 1.0
1
70
T & P @2%
578.12
0
OH @10%
578.12
0.1
Total for 93 sqm
For 1 sqm
36) Painting 2 coats
Labour: Painter-I :1.25
1.25
100
Mulia
:1.1
1.1
70
T & P @2%
202.00
0.02
OH @10%
202
0.1
Total for 9.3 sqm
For 1 sqm
38) Rough Stone dry masonry
Stone : 1 cum
1
295.4
Labour : Mason-II : 0.52
0.52
90
Semiskill : 0.52
0.52
80
Mulia
: 0.87
0.87
70
T & P @2%
292.3
0
OH @10%
292.3
0.1
Total for 1 cum
40) Conveying from stacks & spreading metal
Labour: Mulia : 4.0
4
70
PRR: Rs.2152x2.83/42
0.067381
2152
T & P @2%
425.00381
0.02
OH @10%
425.00381
0.1
Total for 2.83 cum
For 1 cum
0.3533569 476.00427
42) Blinding Road Surface withsand
Labour Unskilled
0.0032258
70
T&P 2%
0.2258065
0.02
OH @10%
0.2258065
0.1
For 1 sqm
(ii) Roof Slab & Chajja : HC of Wood
Carpenter -II
2.75
90
Semiskilled Mulia
2.75
80
Sundries & T&P
0.02 1702.7011
OH @10%
1702.7011
0.1
Total for 9 sqm
for 1 sqm
1872.97 0.1111111
(iv) Lintel (for 7.8 sqm)
Hire charges of wood
Carpenter -II
Semiskilled Mulia
Sundries & T&P
OH @10%
Total for 7.80 sqm
for 1 sqm
44 Distempering wo coats
Painter
M/M
T&P 2%
OH @10%
Total for 1 sqm
45 Cement washing two coats
Painter
M/M
T&P 2%
OH @10%
Total for 1 sqm
Asst. Engineer,Loisinga
1.25
90
1.25
80
0.02 1043.5942
1043.5942
0.1
1147.95 0.1282051
0.052
0.053
8.91
8.91
100
70
0.02
0.1
0.022
0.023
3.81
3.81
100
70
0.02
0.1
J.E.,Loisinga
921.06
69.75
1761.903
61.2
322
0
148.624
3284.54
0.00
3284.54
5.4
4.48
0.988
10.87
47.75
58.62
18.85
32.63
2.00
5.35
58.82
2.33
26.45
13.50
7.70
4.75
54.73
6.6
61.33
0.2737
0.013
0.216
0.55
0.216
410.70
155.00
100.00
80.00
70.00
0.081
0.0715
0.325
0.76
0.325
410.70
155.00
100.00
80.00
70.00
0.05
0.057
90.00
70.00
0.02
0.8
50.66
B.D.O. Loisinga
491.00
135
45
0.63
90.00
70.00
5193.48
4566.30
143.10
51.08
63.00
90.00
280.00
5193.48
558.44
1023.40
703.40
155.00
410.70
100.00
70.00
0.1
70.00
70.00
0.02
0.1
121.52 0.1075269
Asst. Engineer,Loisinga
100.00
70.00
0.02
0.1
0.1
J.E.,Loisinga
Amount
(Rs.)
36.12
0.7224
3.612
40.45
2.87
0.0574
0.287
3.21
553.344
74.4
940.503
16.20
273.00
0.00
163.10
2020.54
295.40
36.24
126.9
172.9
0.00
45.12
676.56
23.5382
1.86
30.8025
10.3
25.2
8.3793
0.00
100.08
8030.34
5315.76
1046.25
21397.47
135
68.8
1400
966
1440
3501.125
43300.745
2886.716333
2.79
17.6601
14.4
16.8
4.91
56.56
3.255
30.3918
14.4
16.8
6.16
64.85
553.34
74.40
566.77
16.20
273.00
0.00
126.696
1610.41
30.00
3.52
56.00
4736.24
48.00
486.252
5360.01
13.86
2.62
49.61
10.30
25.20
0.00
9.41
111.01
205.80
4.12
58.80
266.00
6.50
53.06
594.27
831.18
29.70
23.10
17.68
88.40
990.06
35359.2
2511.38
149.00
45.00
201.60
35.00
25.00
59.34
296.70
3323.02
2230.21
150.00
140.00
5.80
29.00
324.80
34.92
373.12
135.00
70.00
0.00
57.81
635.93
6.84
125.00
77.00
4.04
20.20
226.24
24.33
295.40
46.80
41.60
60.90
0.00
29.23
473.93
280.00
145.00
8.50
42.50
476.00
168.20
0.226
0.005
0.02
0.25
1235.20
247.50
220.00
170.27
1872.97
208.11
831.09
112.50
100.00
104.36
1147.95
147.17
5.20
3.71
0.18
0.89
9.98
2.20
1.61
0.08
0.38
4.27
112.41
2.02
21.60
44.00
15.12
195.14
33.27
11.08
32.50
60.80
22.75
160.40
4.5
3.99
0
8.49
40.528
49.02
15.67
24.95
1.00
4.16
45.79
18.42
12.66
2.79
52.86
16.50
70.56
16.1382
189.93
98
10.5
2.17
10.85
121.52
13.07
0.188
0.004
0.02
0.21
35.12544803
54.000
44.800
1.976
9.88
110.66
11.07