LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Length Capacity (Ckt - km) (MVA)

Voltage Ratio (kV)

Code

Tentative Tentative Cost in Rs completion lac Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

400 kV Works 1 400 kV Kirori (Hisar) 3x315 2x100 1x10/16 23 400/220 220/132 132/11 4N0940* 10300.00 2009-10 REC 350041 Yes

400 kV double circuit line from Hisar TPS (Khedar) to proposed 400 kV substation Kirori (Hisar) with 85C conductor design. 400 kV double circuit line from Hisar TPS to 400 kV substation Fatehabad PGCIL. Provision of Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation Kirori (Hisar) Daultabad (Gurgaon)

4L0874*

1250.00

2009-10

REC 350041

Yes

3 4

90

4L0875* 4G0877*

4500.00

2009-10

REC 350039 REC 350041

Yes Included in the cost of substation Covered under Sr. No. 1

3x315

400/220 4N0997*

7539.68

2010-11

REC 350044

Yes

400 kV D/C line from Jhajjar TPS to Daultabad (Gurgaon) with twin moose conductor with 85 C conductor design. Ceation of 400 kV D/C line from Daultabad (Gurgaon) - 400 kV substation Sector 72, Gurgaon (PGCIL) with quad moose conductor in place of earlier approval of creation of this line with twin Moose conductor with 850C conductor design. Two 400 kV bays at 400 kV GIS substation Sector-72 Gurgaon (PGCIL) by PGCIL at HVPNL cost. 400 kV Nawada

140

4L0998*

7000.00

2010-11

REC 350045

Yes

48

4L1308* 4L1063A

2400.00

2010-11

REC 350045

Yes

4D1064*

300.00

2010-11

REC 350045

Yes

2x315 2x100 1x100 1x1

400/220 4N1124* 220/66 220/33 33/0.4

8200.00

2010-11

World Bank

Yes

150277783.xls.ms_office

Page 1 of 175

400 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Length Capacity (Ckt - km) (MVA)

Voltage Ratio (kV)

Code

Tentative Tentative Cost in Rs completion lac Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Covered under Sr. No. 9

10 Provision of a Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation Nawada 11 LILO of 400 kV Samaypur - G. Noida line at proposed 400 kV substation Nawada (Faridabad) 12 400 kV Nuhiyawali 4

4G1054*

Included in cost of substation

4L1241*

200.00

2010-11

Yet to be posed

By PGCIL as deposit work of HVPNL. Lower capacity 132/11 kV transformer can also be provided in place of 16/20 MVA transformer if available

Yes

2x315 2x100 1x16/20 170

400/220 4N1071* 220/132 132/11 4L1072*

7500.00

2010-11

World Bank

Yes

13 LILO of one circuit of 400 kV D/C Hisar TPS- Fatehabad line at proposed 400 kV substation Nuhiyawali. 14 Provision of a Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation Nuhiyawali. 15 Creation of two 400 kV bays at 400 kV substation Fatehabad (PGCIL) by PGCIL at HVPNL cost for 400 kV Hisar TPS Fatehabad D/C line with LILO of one circuit at Sirsa. 16 Creation of two no. 400 kV bays at Dhanonda (Mohindergarh) HVPNL substation to receive Adani Power. 17 Creation of 400 kV Mohindergarh (Dhanonda) - Daultabad quad moose conductor D/C line. 18 Creation of two no. 400 kV bays at Daultabad HVPNL substation to receive 400 kV Mohindergarh (Dhanonda) Daultabad quad D/C line.

7500.00

2010-11

World Bank

Yes

4G1073*

Included in cost of substation

Covered under Sr. No. 12

4B1074*

300.00

2009-10

REC 350039

Yes

4B1317*

1000.00

2011-12

No

140

4B1318*

12250.00

2011-12

Being executed under PPP mode

Yes

4B1319*

1000.00

2011-12

Covered under Sr. No. 17

150277783.xls.ms_office

Page 2 of 175

400 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Length Capacity (Ckt - km) (MVA)

Voltage Ratio (kV)

Code

Tentative Tentative Cost in Rs completion lac Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

19 Construction of Mohindergarh (Adani HVDC) - Mohindergarh (Dhanonda) HVPNL 400 kV D/C line with triple moose conductor as a dedicated transmission line to be constructed by M/s Adani Power Ltd.

HPPC to convey to M/s Adani Not required to Power Ltd. The decision of be covered 26th standing committee under meeting that for the power Investment over and above the power to Plan be supplied to Haryana, connectivity with CTU network through LILO of one circuit of Bhiwadi - Moga 400 kV D/C line could be considered. For tying-up connectivity and open access to CTU network, Adani Power would need to seek open access from CTU.HPPC to be informed to convey the above decision to M/s Adani.

20 Deepalpur

2x315 2x100 1x16/20 2x2

400/220 220/132 132/33 33/0.4

4N1334*

10000.00

2011-12

Being executed under PPP mode

Yes

21 Provision of a Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation Deepalpur 22 Creation of 400 kV D/C line from Jhajjar TPS (Case 2) - Rohtak (400kV) Deepalpur with quad moose conductor 23 LILO of one circuit of 400 kV Abdullapur Bawana line at Deepalpur 24 Dhanonda 170

4G1335*

Covered under sr. No. 20

4G1336*

11900.00

2011-12

Being executed under PPP mode Being executed under PPP mode Posed to PFC

Yes

4L1337*

200.00

2011-12

Yes

3x315

400/220

4N1338*

8000.00

2011-12

Yes

150277783.xls.ms_office

Page 3 of 175

400 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Length Capacity (Ckt - km) (MVA)

Voltage Ratio (kV)

Code

Tentative Tentative Cost in Rs completion lac Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Covered under sr. No. 24

25 Provision of a Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation Dhanonda 26 Creation of Jhajjar TPS (Case-2) Dhanonda 400 kV D/C line with twin moose conductor 27 To cancel earlier approval of LILO of one circuit of 400 kV Moga - Bhiwadi line at 400 kV substation Dhanonda 28 Arrangement for meeting the precommissioning testing & start-up power requirement to CLP thermal power project by LILO of one circuit of 400 kV D/C Jharli (Aravali) - Daultabad line at CLP thermal power plant Jharli. 29 Rohtak area 2x315 400/220 80

4G1339*

Posed to PFC

Cost included in substation

4L1340*

4000.00

2011-12

Posed to PFC

Yes

60

4L1341A

4L1443*

300.00

2010-11

Yet to be posed

No

4N1342*

10000.00

2011-12

Being executed under PPP mode

Enroute 400 kV Jhajjar Deepalpur quad D/C line. The exact requirement of 220/132 kV and/ or 220/33 kV transformers at 400 kV substation Rohtak will be finalised after identification of land and underlying transmission system. Cost included in substation

Yes

30 Provision of a Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation in Rohtak area. 31 400 kV D/C Bhiwani - Rohtak line with twin moose conductor matching with commissioning of 765 kV PGCIL substation at Bhiwani. 80

4G1343*

Covered under sr. No. 29

4L1344*

4000.00

2011-12

Yet to be posed

To establish connectivity with 765 kV substation to be constructed by PGCIL in Bhiwani area.

No

150277783.xls.ms_office

Page 4 of 175

400 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Length Capacity (Ckt - km) (MVA)

Voltage Ratio (kV)

Code

Tentative Tentative Cost in Rs completion lac Schedule 1000.00 2011-12

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 No

32 2 no. 400 kV bays at 765 kV substation Bhiwani for 400 kV D/C Bhiwani - Rohtak line

4B1345*

Yet to be posed

By PGCIL as deposit work of HVPNL on cost plus basis at applicable consultancy fees on the final actual executed cost of the work alongwith the applicable service tax on consultancy fee.

33 400 kV D/C Kirori (Hisar) - Jind line with twin moose conductor matching with commissioning of 400 kV PGCIL substation at Jind. 34 2 No. 400 kV bays at 400 kV substation Kirori for 400 kV D/C Kirori - Jind line. 35 2 No. 400 kV bays at 400 kV substation Jind PGCIL for 400 kV D/C Kirori - Jind line

80

4B1346*

4000.00

2011-12

Yet to be posed

No

4B1347* 4B1348*

1000.00 1000.00

2011-12 2011-12

Yet to be posed Yet to be posed By PGCIL as deposit work of HVPNL on cost plus basis at applicable consultancy fees on the final actual executed cost of the work alongwith applicable service tax on consultancy fee.

No No

Total (400 kV)

1089

126639.68

150277783.xls.ms_office

Page 5 of 175

400 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

220 kV Works 1 Bhuna 2x100 1x8 220/132 132/11 2N0448* 1N0449* 2020.12 2009-10 REC 350031 Substation commissioned with 1x100 MVA 220/132 kV transformer on 14.10.2008. 1x8 MVA 132/11 kV transformer commissioned on 17.10.2008. REC 350030 REC 350036 Yes

2 3

Construction of YTPP - Nilokheri 220 kV D/C Construction of 220 kV D/C line with 0.4 ACSR/ AAAC from 220 kV Cheeka to 220 kV substation Durala Creation of two No. 220 kV bay at 220 kV substation Cheeka for accommodating 220 kV D/C line from 220 kV Cheeka to 220 kV substation Durala 220 kV Isharwal

140 106

2L0454* 2L0742*

2503.20 2385.00

2009-10 2009-10

Yes Yes

2B0743*

200.00

2009-10

REC 350036

Covered under Sr. No. 3

1x100 1x20/25 1x10/16

220/132 132/33 132/11

2N0734* 1N0735* 1N0736*

2600.00

2009-10

REC 350033 Substation commissioned with 1x100 MVA 220/132 kV transformer on 04.03.2009. 1x10/16 MVA 132/11 kV transformer commissioned on 05.03.2009. 1x20/25 MVA 132/33 kV T/F commissioned on 27.05.09 REC 350042 For meeting the consumption demand substation. auxuiliary of the

Yes

1x20/25

132/33

1A0939*

220 kV D/C line with 0.4 ACSR from 400 kV substation Mayyar (Hisar) to 220 kV substation Isharwal

106

2L0737*

2385.00

REC 350033 Reqiuired two No. 220 kV emanating bays would be provided by PGCIL while erecting 3rd transformer. 2nd ckt commissioned on 28.01.2009

Yes

150277783.xls.ms_office

Page 6 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 No

Stringing of 2nd Ckt. of Badshahpur (220 kV) - IMT Manaser (220 kV), 220 kV line on D/C towers. 220 kV bay one number at Badshahpur

11.6

2L0432*

104.05

2009-10

2B0433*

100.00

2009-10

For accomodating 2nd 220 kV Ckt. between Badshahpur and IMT Manaser For accomodating 2nd 220 kV Ckt. between Badshahpur and IMT Manaser NCRPB Being carried our by PGCIL as a regional work. Revised approval conveyed vide memo No. R 600/Ch.161/HSS-152/ Bhiwadi dated 09.03.2009. Suitable spare bays to be provided for further expansion both for transformers and lines.1x4 MVA T/F for auxiliary supply and supply to village Bastra.

No

220 kV bay one number at IMT Manesar substation

2B0434*

100.00

2009-10

No

10 2 Nos 220 kV line bays at 400 kV substation Bhiwadi by PGCIL.

2B0848A

No

11 220 kV Bastra (Gharaunda)

2x100 1x4

220/132 132/11

2N0837*

2880.49

2010-11

JICA through REC 350051 HR-IC-DIS035-2009100845 JICA through REC 350053 HR-IC-DIS035-2009100847 JICA through REC 350061 HR-IC-DIS035-2009100855 JICA through REC 350049 HR-IC-DIS035-2009100843

Yes

12 Construction of a new 220 kV D/C line with 0.4 sq ACSR from PTPP to proposed 220 kV substation Bastra 13 2 No. 220 kV bays at 220 kV PTPP yard for PTPP-Bastra line

50

2L0838*

1250.00

2010-11

Yes

2B0839*

214.00

2010-11

Yes

14 220 kV Sampla (Upgradation of 132 kV substation Sampla)

2x100

220/132

2N0948*

2421.88

2010-11

Yes

150277783.xls.ms_office

Page 7 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

15 220 kV Samalkha (Upgradation of 132 kV substation Samalkha)

2x100

220/132

2N0949*

2268.78

2010-11

JICA through REC 350049 HR-IC-DIS035-2009100843

Additional land to be taken from Gram Panchayat on payment. The cost of replacement of equipment of 5 no. 220 kV bays of HVPNL at BBMB substation Panipat including erection, testing & commissioning and interconnection with Control Room & any work incidental thereto, shall be fully borne by HVPNL. The cost of replacement of equipment of 1 No. 220 kV bay of PGCIL at BBMB substation Panipat including erection, testing & commissioning and interconnection with Control Room & any work incidental thereto, shall not be charged to common pool. The issue of bearing this cost shall be taken up with PGCIL by HVPNL and in case PGCIL does not agree to bear this cost, the same shall be borne by HVPNL.

150277783.xls.ms_office

Page 8 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

16 220 kV Chhajpur

2x100 1x4

220/132 132/11

2N0950*

2748.44

2010-11

JICA through REC 350051 HR-IC-DIS035-2009100845

Land to be taken from Gram Panchayat on DC rates. The study for Residual Life Assessment of 220 kV breakers and associated equipment to be replaced shall be got done by BBMB at the cost of HVPNL. Accordingly, HVPNL shall pay, for the said study and for the residual life left at present day cost minus depreciation for the service period, to BBMB and the cost of new equipment and interconnection with Control Room towards this replacement shall be charged to the common pool.

The cost of 220 kV breakers and associated equipment already procured by BBMB, if any, shall be charged to HVPNL or PGCIL/HVPNL or to the common pool as per approval. All the equipment and material required for creation of proposed bays (two no. 220 kV and one no. 400 kV substation ) and for their interconnection with Control Room shall be supplied by HVPNL after getting their technical specification approved from BBMB.

150277783.xls.ms_office

Page 9 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

The expenditure on other additions/alterations/rearrangement etc. incidental to the construction of the proposed bays at BBMB Sewah shall be borne by HVPNL.

The expenditure for future replacement and annual O&M charges in respect of proposed bays at BBMB Sewah shall be borne by HVPNL. BBMB shall, however, go ahead with procurement/ replacement of equipment at HVPNLs cost, wherever necessary on technical grounds, the cost of which would be borne by HVPNL. The expenditure on account of dismantlement/ shifting of existing structures/ features of any bay at BBMB Sewah, if any required to make way for the proposed bays, shall be borne by HVPNL. All other related works outside BBMB substation Panipat shall be carried out by HVPNL at their cost. The load shall be restricted to the present load drawn from the BBMB substation Panipat.

150277783.xls.ms_office

Page 10 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

After disbanding 33 kV system at 400 kV substation BBMB Panipat the possibility to use two No. 220/66-33 kV, 60 MVA transformers alongwith associated equipment, thus rendered spare, in BBMB system shall be explored by BBMB, otherwise it shall be obligatory for HVPNL to take them at present day cost minus depreciation for the service period.

17 LILO of 220 kV D/C RohtakBahadurgarh line at 220 kV proposed substation Sampla.

47

2L0951*

1175.00

2010-11

JICA through REC 350052 HR-IC-DIS035-2009100845 JICA through REC 350052 HR-IC-DIS035-2009100846

Yes

18 Construction of a new 220 kV D/C line with 0.5 Sq. inch ACSR from proposed 220 kV substation Sampla to proposed 220 kV substation Samalkha. {The line is 220 kV Sampla - Mohana - Smalkha}

56

2L0952*

1512.00

2010-11

Yes

19 220 kV Mohana (Sonepat)

1x100 1x100 2x0.2

220/132 220/33 33/0.4

2N1125*

3762.19

2010-11

JICA through REC 350049 HR-IC-DIS035-2009100843

Provision of 10 No. 33 kV bays at 220 kV substation Mohana. However initially only 6 No. 33 kV bays will be constructed. for auxiliary supply

Yes

150277783.xls.ms_office

Page 11 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

20 Erection of 220 kV D/C line with 0.5 Sq ACSR conductor from 400 kV substation Jajjy (PGCIL) to 220 kV substation Mohana. 21 The already approved new 220 kV D/C line with 0.5 Sq. ACSR from proposed 220 kV substation Sampla to proposed 220 kV substation Samalkha will be LILOed at 220 kV substation Mohana. 22 Construction of a new 220 kV D/C line with 0.4 Sq. inch ACSR from proposed 220 kV substation Samalkha to 220 kV substation Chhajpur. 23 Construction of a new 220 kV D/C line with 0.4 Sq. inch ACSR from proposed 400 kV substation BBMB Sewah to 220 kV substation Chhajpur.

2L1126*

90.00

2010-11

Posed to NCRPB

2L1127*

Covered under Sr. No. 18

Yes

48

2L0953*

1200.00

2010-11

JICA through REC 350053 HR-IC-DIS035-2009100847 JICA through REC 350053 HR-IC-DIS035-2009100847 JICA through REC 350061 HR-IC-DIS035-2009100885 JICA through REC 350051 HR-IC-DIS035-2009100845

Yes

32

2L0954*

800.00

2010-11

Yes

24 Creation of two no. 220 kV bay at 400 kV substation BBMB Sewah to receive 220 kV D/C line from Chhajpur to be carried out by BBMB. 25 220 kV Kaul (Upgradation of 132 kV substation) 2x100 220/132

2B0955*

200.00

2009-10

Yes

2N0975*

2540.19

2010-11

Yes

150277783.xls.ms_office

Page 12 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

26 Construction of a new 220 kV D/C line with 0.4 Sq. inch ACSR from 220 kV substation Pehowa to proposed 220 kV substation Kaul. 27 Creation of 2 No. 220 kV bays at 220 kV substation Pehowa for PehowaKaul line.

40

2L0976*

1000.00

2010-11

JICA through REC 350053 HR-IC-DIS035-2009100847 JICA through REC 350061 HR-IC-DIS035-2009100855

2B0977*

200.00

2010-11

Yes

28 Demolition of existing 17 Nos. residential structures in the colony at 132 kV substation Kaul for utilizing space to facilitate upgradation of 132 kV substation Kaul to 220 kV level. 29 Demolition of existing control room at 132 kV substation Kaul after making the new control room functional at 220 kV substation Kaul. 30 Construction of a new 220 kV D/C line with 0.4 Sq. inch ACSR from 220 kV substation Bastra to proposed 220 kV substation Kaul. 31 Creation of 2 No. 220 kV bays at 220 kV substation Bastra for Bastra - Kaul line. 32 220 kV Sector-72 Gurgaon 2x100 1x100 2x0.2 220/66 220/33 33/0.4 100

1G0986*

2010-11

Not required to be included in Investment Plan Not required to be included in Investment Plan JICA through REC 350053 HR-IC-DIS035-2009100847 JICA through REC 350051 HR-IC-DIS035-2009100845 JICA through REC 350059 HR-IC-DIS035-2009100853 Yes

1G0987*

2010-11

2L0978*

2500.00

2010-11

2B0979*

200.00

2010-11

Covered under Sr. No.11 Yes

2N1083*

3000.00

2010-11

150277783.xls.ms_office

Page 13 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

1. Wherever needed multi circuit towers will be used to take out 220 kV & 66 kV lines from 220 kV substation sector-72 Gurgaon in view of Right of Way constraints. 2. Out of six circuits equivalent to 0.5 sq ACSR being provided by PGCIL for HVPNL use, four 220 kV circuits will directly feed 220 kV substation sector-72 Gurgaon bus. The remaining two circuits will be taken from 400 kV substation PGCIL to proposed 220 kV substation Kankerkheri (Nuh). Provision of 10 no. 33 kV bays at 220 kV substation sector-72 Gurgaon to enable DHBVNL to take out 10 no. 33 kV outgoing feeders to meet ultimate load requirement in surrounding area

33 220 kV Kherikanker (Nuh)

1x100 1x100 2x0.2

220/66 220/33 33/0.4

2N1116*

2500.00

2011-12

Yet to be posed

Provision of 10 No. 33 kV bays at 220 kV substation Kheri Kanker (Nuh) to enable DHBVNL to take out 10 No. 33 kV outgoing feeders to meet their ultimate load requirement in surrounding area.

Yes

150277783.xls.ms_office

Page 14 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

In view of scarcity of land around Sohna a part of the land offered by village Panchayat Kher Kanker (Approx. 32 acre) will be used for construction of 220 kV substation and the remaining land will be kept reserved for creation of a new 400 kV substation in future keeping in view the development of load along KMP expressway and surrounding area. 34 220 kV Chormar 1x100 1x100 2x0.2 220/132 220/33 33/0.4 2N1130* 2500.00 2010-11 JICA through REC 350055 HR-IC-DIS035-2009100849 7 nos. 220 kV bays, 6 nos. 132 kV bays and 5 nos. 33 kV bays. However, provision will be made for 10 nos. each 220 kV , 132 kV and 33 kV bays keeping the scope for future expansion. 2x0.2 T/F for auxiliary supply To allow DHBVN to connect proposed 33 kV S/Stn. Pipli (1x10 MVA) with approx. 9 Kms new 33 kV line from Chormar to Pipli & proposed 33 kV S/S Khokhar (1x10 MVA) with approx. 16 kms new 33 kV line from Chormar to Khokhar 35 Construction of 220 kV D/C Fatehabad (400 kV)-Chormar line with 0.5 sq. inch ACSR 192 2L1131* 5760.00 2010-11 JICA through REC 350057 HR-IC-DIS035-2009100851 Not Required Not to be executed .Covered under Chormar - Rania line via Nuhiyawali. Yes Yes

36 Construction of 220 kV D/C Nuhiyanwali (400 kV)-Chormar line with 0.5 sq. inch ACSR

32

2L1132*

960.00

2010-11

150277783.xls.ms_office

Page 15 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

37 Construction of 2 nos. 220 kV bays at 400 kV substation Nuhiyanwali (Sirsa) for 220 kV D/C Nuhiyanwali (400kV)Chormar line

2B1133*

200.00

2010-11

No separate funds required. Covered under 400 kV substation Nuhiyawali under World Bank project.

38 Erection of following three 220 kV lines from proposed 220 kV substation sector-72 Gurgaon:-

Wherever needed multi circuit towers will be used to take out 220 kV & 66 kV lines from 220 kV substation sector-72 Gurgaon in view of Right of Way constraints. 48 2L1084* 1440.00 2010-11 JICA through REC 350048 HR-IC-DIS035-2009100842 JICA through REC 350048 HR-IC-DIS035-2009100842 JICA through REC 350048 HR-IC-DIS035-2009100842 Yes

a)

220 kV D/C sector 72 Sector 20 (0.5 Sq ACSR)

b)

220 kV D/C sector 72 Sector 56 (0.5 Sq ACSR)

21

2L1085*

630.00

2010-11

Yes

c)

220 kV D/C sector 72 Sector 52 A (0.5 Sq ACSR)

25

2L1086*

750.00

2010-11

Yes

150277783.xls.ms_office

Page 16 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

39 Provision of two 220 kV bays at sector 56 Gurgaon

2B1089*

200.00

2010-11

JICA through REC 350061 HR-IC-DIS035-2009100855 JICA through REC 350061 HR-IC-DIS035-2009100855 REC 350064 Line test charged on 19.05.09

40 Provision of two 220 kV bays at sector 52 A Gurgaon

2B1090*

200.00

2010-11

Yes

41 220 kV double circuit with 0.5 ACSR from 400 kV substation Kirori (Hisar) to proposed 220 kV substation Hansi area (Masudpur). 42 220 kV A-4 Faridabad (Upgradation of 66 kV substation) GIS 43 Construction of a new 220 kV D/C line with 0.5 Sq. inch ACSR from proposed 400 kV substation Nawada to 220 kV substation A-5 Faridabad. 44 Creation of two 220 kV bays at A-3 Palla substation for 220 kV D/C A-3 Palla to A-5 Faridabad line. 45 Construction of a new 220 kV D/C line with 0.5 Sq. inch ACSR from A-3 Palla to A-5 46 220 kV A-5 Faridabad (Upgradation of 66 kV level) 47 LILO of one circuit of 220 kV D/C A-3 Palla to A-5 line at proposed 220 kV substation A-4 Faridabad.

48

2L0879*

1271.00

2009-10

Yes

2x100

220/66

2U1056*

8500.00

2010-11

World Bank

Yes

10

2L1057*

300.00

2010-11

World Bank

Yes

2B1058*

200.00

2010-11

Yet to be posed World Bank In place of already approved 66 kV D/C A-3 Palla to A-5 line.

Covered under Sr. No. 45 Yes

30

2L1059* 6L0915A 2x100 220/66 2U1055* 2L1060*

900.00

2010-11

3000.00

2010-11 2010-11

World Bank World Bank

Yes Yes

150277783.xls.ms_office

Page 17 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

48 Loop in of Jind - Hisar IA 220 kV double circuit at 400 kV substation Kirori (Hisar) making it Jind Kirori double circuit line. 49 Construction of link between proposed 220 kV substation Hansi to the LILO point of Jind - Hisar IA line in order to complete Hansi - Hisar IA line. 50 Creation of 220 kV double circuit with 0.5 ACSR from 400 kV substation Kirori (Hisar) to under construction 220 kV substation Bhuna. 51 Creation of two 220 kV line bays at 220 kV substation Bhuna (under construction) to receive 220 kV D/C line from proposed 400 kV substation Kirori. 52 220 kV Sector-56 Gurgaon {Upgradation from 66 kV level} 53 LILO of 220 kV D/C Palli-sector-52A Gurgaon line at proposed 220 kV substation Sector-56 Gurgaon. 54 220 kV Rangala (Firozpurzirka) Rajpur

25

2L0878*

750.00

2009-10

REC 350064 Line work completed on 01.04.2009

2L0880*

240.00

2009-10

REC 350064 Line test charged on 19.05.09

Yes

50

2L0881*

1250.00

2009-10

REC 350039 Line test charged on 31.03.2009

Yes

2B0941*

200.00

2009-10

REC 350039

Covered under Sr. No.50

2x100

220/66

2U0903*

2803.00

2009-10

REC 350043

Yes

2L0904*

45.00

2009-10

REC 350043

Yes

1x100 1x100 2x0.2

220/66 220/33 33/0.4

2N1139*

3000.00

2010-11

World Bank

To make provision of 10 Nos. 220 kV bays including 3 no. spare bays, 10 nos. 66 kV bays including 5 no. spare bays & 10 no. 33 kV bays including 4 no. spare bays at 220 kV substation Rangala Rajpur (Firojpur Zirka).

Yes

150277783.xls.ms_office

Page 18 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

55 220 kV D/C Kheri Kanker (Nuh) Rangala Rajpur (Firozpurzirka) with 0.4 Sq. ACSR conductor.

104

2L1140*

2600.00

2010-11

World Bank

Out of six circuits equivalent to 0.5 sq ACSR being provided by PGCIL for HVPNL use, four 220 kV circuits will directly feed 220 kV substation sector-72 Gurgaon bus. The remaining two circuits will be taken from 400 kV substation PGCIL to proposed 220 kV substation Kankerkheri (Nuh).

56 220 kV D/C Palwal Rangala Rajpur (Firojpurzirka ) with 0.4 Sq ACSR conductor. 57 Creation of 2 no. 220 kV bays at 220 kV substation Kheri Kanker (Nuh) for new 220 kV D/C Kheri Kanker) Rangala Rajpur line. 58 Creation of 2 No. 220 kV bays at 220 kV substation Palwal for new 220 kV D/C Palwal Rangala Rajpur line. 59 Mau (Dharuhera)

110

2L1141*

2750.00

2010-11

World Bank

Yes

2B1142*

200.00

2011-12

Yet to be posed

Covered under Sr. No. 33

2B1143*

200.00

2010-11

Yet to be posed

Covered under Sr. No. 56 2x0.2 MVA 33/0.4 kV transformer for auxiliary supply with total provision of 10 no. 33 kV bays to provide supply to upcoming 33 kV substations of DHBVNL in nearby area. Yes Yes

1x100 1x100 2x0.2 1x100

220/66 220/33 33/0.4 220/66

2N1149*

5200.00

2010-11

JICA through REC 350059 HR-IC-DIS035-2009100853

2A1218* 2L1150* 1000.00 2010-11 JICA through REC 350048 HR-IC-DIS035-2009100842 Yet to be posed

60 220 kV D/C 0.5 Sq" ACSR line from 220 kV substation Daultabad to 220 kV substation Mau

40

61 220 kV D/C 0.5 Sq" ACSR line from proposed 220 kV substation Kheri kanker to 220 kV substation Mau

60

2L1151*

1500.00

2011-12

Yes

150277783.xls.ms_office

Page 19 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

62 LILO of one circuit of 220 kV D/C Badshahpur-Rewari line at 220 kV substation Mau on D/C towers.

24

2L1152*

600.00

2010-11

JICA through The second circuit can be LILOed in REC 350057 future. HR-IC-DIS035-2009100851 Yet to be posed

63 Creation of 2 no. 220 kV bays at 220 kV substation Kheri Kanker to accommodate 220 kV Mau - Kheri Kanker line. 64 Creation of 2 no. 220 kV bays at 220 kV substation Daultabad to accommodate 220 kV Mau Daultabad line.

2B1153*

200.00

2011-12

Covered under Sr. No. 33 Yes

2B1154*

200.00

2010-11

JICA through REC 350061 HR-IC-DIS035-2009100855

65 Erection of 6 no. 33 kV bays at 220 kV substation Mau

3B1157*

2010-11

Covered under Sr. No. 59 JICA through REC 350062 HR-IC-DIS035-2009100856 2x0.2 MVA 11/.4 kV transformers for auxiliary supply. Advising DHBVNL that proposal of 2x25/31.5 MVA 66/11 kV transformers has been agreed subject to condition that high capacity connectivity is used by DHBVNL for all 11 kV feeders so that the number of panels is kept to a minimum. Yes

66 Sector-20 Gurgaon (GIS)

2x100 2x25/31.5 2x0.2

220/66 66/11 11/0.4

2N1158*

9400.00

2010-11

150277783.xls.ms_office

Page 20 of 198

220 kV

66

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

Space will be kept reserved for creation of a 400 kV GIS substation at Sector-20 Gurgaon in future depending upon the availability of ROW for feeding 400 kV line. 67 220 kV substation Samain (Tohana) 2x100 1x100 2x0.2 220/33 220/132 33/0.4 2N1162* 3500.00 2010-11 World Bank 2x0.2 MVA 33/0.4 kV transformers for auxiliary supply One 100 MVA 220/33 kV transformer shall be installed in the first instance while the second shall be installed as per load requirement in future for which space shall be provided in the switchyard. To make provision of 10 nos. 220 kV bays including 3 nos. spare bays, 5 nos. 132 kV bays including 1 no. spare bay and 10 nos. 33 kV bays including 4 nos. spare bays at 220 kV substation Samain (Tohana). 68 220 kV D/C line from the proposed 400 kV substation Kirori to proposed 220 kV substation Samain (Tohana) with 0.5 Sq" ACSR conductor. 69 220 kV D/C line from the proposed 220 kV substation Samain (Tohana) to proposed 220 kV substation Masudpur (Hansi) with 0.5 Sq" ACSR conductor. 80 2L1163* 2000.00 2010-11 World Bank To allow DHBVNL to connect the proposed and already approved new 33 kV substation Bithmara with the proposed 220 kV substation Samain (Tohana). Yes Yes

100

2L1164*

2500.00

2010-11

World Bank

Yes

150277783.xls.ms_office

Page 21 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

70 Lula Ahir (Rewari)

1x100 1x100 2x0.2

220/132 220/33 33/0.4

2N1165*

3500.00

2010-11

JICA through REC 350060 HR-IC-DIS035-2009100854

2x0.2 MVA 33/0.4 kV transformers for auxiliary supply, in the first instance, in the 24 acre land offered by Gram Panchayat of Lula Ahir

To allow DHBVNL to connect existing 33 kV substations Jharoda (16 MVA) with approx. 3 km new 33 kV line, Khushpura (9MVA) with approx. 3 km new 33 kV line and Bishowa (8 MVA) with approx. 10 km new 33 kV line by extending 33 kV line from Jharoda to Bishowa respectively from proposed 220 kV substation Lula Ahir ( Rewari). To make provision of 10 no. 220 kV bays including 3 no. spare bays, 10 nos. 132 kV bays including 5 nos. spare bays and 10 nos. 33 kV bays including 4 nos. spare bays at 220 kV substation Lula Ahir. Additional 100 MVA 220/132 kV or 220/33 kV transformer will be installed in future as per load requirement for which space shall be provided in the switchyard. 71 LILO of 220 kV S/C Charkhi DadriRewari line at the proposed 220 kV substation Lula Ahir with 0.4 sq inch ACSR. 30 2L1166* 514.00 2010-11 JICA through REC 350057 HR-IC-DIS035-2009100851 Yes

150277783.xls.ms_office

Page 22 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

72 Dhanonda

1x100 1x100 2x0.2

220/132 220/33 33/0.4

2N1168*

3400.00

2010-11

JICA through REC 350060 HR-IC-DIS035-2009100854

2x0.2 MVA 33/0.4 kV transformers for auxiliary supply in the first instance in the 34 acre land offered by Gram Panchayat of Dhanonda.

To make provision of 10 no. 220 kV bays including 3 no. spare bays, 10 nos. 132 kV bays including 5 nos. spare bays and 10nos. 33 kV bays including 4 nos. spare bays at 220 kV substation Dhanonda (Mohindergarh) Additional 100 MVA 220/132 kV or 220/33 kV transformer will be installed in future as per load requirement for which space shall be provided in the switchyard 73 220 kV D/C line with 0.5 Sq" ACSR from the proposed 220 kV substation Lula Ahir (Rewari) to the proposed 220 kV substation Dhanonda (Mohindergarh) 74 Masudpur (Hansi ) 40 2L1169* 1080.00 2010-11 JICA through REC 350057 HR-IC-DIS035-2009100851 World Bank 2x0.2 MVA 33/0.4 kV transformers for auxiliary supply in the first instance, in the 17 acre land offered by Gram Panchayat of Masudpur. Approval revised to provide one each transformer of 220/132 kV and 220/33 kV rating in place of both of 220/132 kV rating Yes

1x100 1x100 2x0.2

220/132 220/33 33/0.4

2N1175* 2N0882A

3000.00

2010-11

Yes

150277783.xls.ms_office

Page 23 of 198

220 kV

74

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

Additional 100 MVA 220/132 kV or 220/33 kV transformer will be installed in future as per load requirement for which space shall be provided in the switchyard To make provision of 10 no. 220 kV bays including 3 no. spare bays, 10 nos. 132 kV bays including 5 nos. spare bays and 10 nos. 33 kV bays including 4 nos. spare bays at 220 kV substation Masudpur (Hansi) . 75 220 kV D/C Chormar-Rania line with 0.5 Sq. inch ACSR via the proposed 400 kV substation Nuhiyanwali (Sirsa). 90 2L1180* 2430.00 2010-11 JICA through REC 350057 HR-IC-DIS035-2009100851 JICA through REC 350062 HR-IC-DIS035-2009100856 Yes

76 Sector-57 Gurgaon (GIS)

1x100 1x100 2x0.2

220/66 220/33 33/0.4

2N1197*

8500.00

2010-11

Erection of 10 no. 33 kV bays including 4 no. spare bays for feeding upcoming 33 kV substations of DHBVN in sector-49, 62 and Faridabad Road area. 2x0.2 MVA 33/0.4 kV transformers for auxiliary supply The third transformer whether 220/66 kV or 220/33 kV can be decided later on as the system develops. Space would be reserved for installation of the same.

Yes

150277783.xls.ms_office

Page 24 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

77 LILO of proposed 220 kV D/C Sector 72 (220 kV) - Sector 52A Gurgaon line (on multi circuit towers) at 220 kV substation Sector 57 Gurgaon using 0.5 Sq" ACSR conductor. 78 Gignow (Loharu)

2L1198*

27.00

2010-11

JICA through REC 350048 HR-IC-DIS035-2009100842 World Bank To make provision of 15 nos. 220 kV bays including spare, 12 nos 132 kV bays including spare and 10 nos. 33 kV bays including spare at proposed 220 kV substation Gignow. Provision of space shall be made to accommodate 3rd 100 MVA transformer, if required, in future. To allow DHBVNL to connect 33 kV substations Singhani (10 MVA), Baralu (10 MVA), Kari Dharni (10 MVA), Sohansara (10 MVA) and Bishalwas (10 MVA) besides any other existing/ proposed 33 kV substation with proposed 220 kV substation Gignow. The left out 33 kV substations Budhera (10 MVA) and Chahar Kalan (10 MVA) shall be fed from 132 kV substation Digawan Jattan after shifting of earlier substations Baralu and kari Dharni.

1x100 1x100 2x0.2

220/132 220/33 33/0.4

2N1205*

3000.00

2010-11

Yes

2x0.2 MVA 33/0.4 kV transformers for auxiliary supply

150277783.xls.ms_office

Page 25 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

Permission for clearance of trees at site for 220 kV substation Gignow shall have to be arranged from Forest Department. Advising DHBVNL to create new 33 kV substations matching their completion with the commissioning of feeding 220 kV or 132 kV substation. 79 Construction of 220 kV D/C line with 0.5 Sq" ACSR from proposed 220 kV substation Dhanonda (Mohindergarh) to proposed 220 kV substation Gignow (50 km) 80 Construction of 220 kV D/C line with 0.5 Sq" ACSR from proposed 220 kV substation Isharwal (under construction) to proposed 220 kV substation Gignow (30 km) 81 Sagwan (Near Tosham) 100 2L1206* 2700.00 2010-11 World Bank Yes

100

2L1207*

1620.00

2010-11

World Bank

Yes

1x100 1x100 2x0.2

220/132 220/33 33/0.4

2N1212*

3000.00

2010-11

World Bank

To make provision of 15 nos. 220 kV bays including spare, 12 nos. 132 kV bays including spare and 10 nos. 33 kV bays including spare at 220 kV substation Sagwan. Provision of space to be made to accommodate 3rd 100 MVA transformer, if required, in future.

Yes

150277783.xls.ms_office

Page 26 of 198

220 kV

81

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

To allow DHBVNL to connect 33 kV substations Baliyali (10 MVA), Dhani Mau (10 MVA), Bapora (10 MVA), Nigana Canal (16.3 MVA) and any other existing/ proposed 33 kV substation with proposed 220 kV substation Sagwan.

Advising DHBVNL to create new 33 kV substations matching their completion with the commissioning of feeding 220 kV or 132 kV substation. 2x0.2 MVA 33/0.4 kV transformers for auxiliary supply 82 LILO of both circuits of existing 220 kV D/C Hisar (400 kV substation Mayyar of PGCIL) - Isharwal line at the proposed 220 kV substation Sagwan by erecting about 40 km 220 kV D/C line (20 km either way) with 0.4 Sq" ACSR. 40 2L1213* 2000.00 2010-11 World Bank Yes

83 Dadhi Bana

1x100+ 1x100+ 2x.200

220/132+ 220/33+ 33/.4

2N1419*

2500.00

2011-12

Yet to be posed Subject to finalisation of land at village Dadhi Bana. 220 kV Dadhi Bana aproved in place of earlier approval of upgradation of existing 132 kV substation Jhojju Kalan to 220 kV level conveyed vide R 543 daed 2.9.08 with 2x100 MVA 220/132 kV transformers.

Yes

2U1269A

150277783.xls.ms_office

Page 27 of 198

220 kV

83

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

To make provision of 12 no. 220 kV bays including spare bays, 12 no. 132 kV bays including spare bays and 15 no. 33 kV bays including spare bays at proposed 220 kV substation Dadhi Bana. To allow DHBVNL to feed following new 33 kV substations: i) Khudana (10 MVA) from proposed 220 kV substation Dadhi Bana in place of earlier approved (R 567 dated 03.11.2008) from 132 kV substation Jhojju Kalan. Ii) Mandola (10 MVA) and Changrod (10 MVA) from proposed 220 kV substation Dadhi Bana in place of earlier approved (R 543 dated 02.09.2008) from proposed 132 kV substation Makrani. iii) Dhareru (10 MVA) from 132 kV substation dadri-II matching with shifting of load of 33 kV substation Makrana from 132 kV substation Dadri II to proposed 132 kV substation Makrani.

84 Construction of 220 kV D/C Dhanonda Dadhi Bana line with 0.5 Sq" ACSR conductor

38

2L1426* 2L1270A 2L1420A

1140.00

2011-12

Yet to be posed

Yes

85 Construction of 220 kV D/C Dadhi Bana - Gignow line with 0.5 Sq" ACSR conductor

40

2L1427*

1200.00

2011-12

World Bank

Yes

150277783.xls.ms_office

Page 28 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

86 Batta

1x100 1x100 2x0.2

220/132 220/33 33/0.4

2N1277*

3000.00

2010-11

Yet to be posed Yet to be posed Informing Hon'ble CM Haryana about change in site and voltage level i.e. creating 220 kV substation Batta in place of upgradation of 33 kV Kalayat to 132 kV level. 1x12.5/16 MVA 66/11 kV transformer for auxiliary supply Additional 100 MVA 220/66 kV or 220/33 kV transformer shall be installed in future as per load requirement for which space shall be provided in the switchyard. 33 kV yard shall not be created at this stage but space shall be kept for the same. To make provision of 15 no. 220 kV bays including spare bays, 15 nos. 66 kV bays including spare bays and 10 nos. 33 kV bays including spare bays at proposed 220 kV substation Raiwali.

87 LILO of 220 kV Narwana Kaithal double circuit line at proposed 220 kV substation Batta.

2L1278*

2010-11

Yes

88 Raiwali

2x100 1x12.5/16

220/66 66/11

2N1322*

2500.00

2010-11

World Bank

89 LILO of one circuit of 220 kV D/C Tepla - Madanpur line with 0.4 ACSR at proposed 220 kV substation Raiwali.

10

2L1323*

225.00

2010-11

World Bank

Yes

150277783.xls.ms_office

Page 29 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 Yes

90 Construction of 220 kV D/C line with 0.5 sq ACSR from 400 kV substation PGCIL (to be constructed near Barwala) to proposed 220 kV substation Raiwali. 91 Cancellation of earlier approved feeding of 220 kV substation Sector 20 Gurgaon by creation of Daultabad Sector 20 Gurgaon line with 220 kV D/C quad moose conductor as provided at Sr. No. 6 of approval issued by CE/ Planning HVPNL Panchkula vide memo No. R. 563/Ch23/HSS-348 dated 30.10.2008. 92 Sector-3 Gurgaon (GIS)

20

2L1324*

550.00

2010-11

World Bank

The execution shall be in the time frame matching with commissioning of 400 kV PGCIL substation.

2L1320A

Not required to be included in Investment Plan

In principle approval for creation of 220 kV GIS substation at sector3 Gurgaon subject to allotment of land for the same by HUDA

No

93 Sector-2 Gurgaon (GIS)

In-principle approval for upgradation of existing 66 kV substation sector-2 Gurgaon to 220 kV GIS substation in case suitable land is not made available by HUDA in adjoining sector-3 Gurgaon subject to suitability of spare land at 66 kV substation sector-2 Gurgaon for the purpose of upgradation.

No

150277783.xls.ms_office

Page 30 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 No

94 220 kV D/C overhead line with twin moose AAAC conductor with total line length of 6.5 km approx. from Daultabad to Railway line. 95 220 kV D/C line with power cable equivalent to twin moose AAAC conductor with total line length of 2.5 km approx. from Railway line to proposed 220 kV GIS substation sector2 or 3 Gurgaon.

13

390.00

2011-12

2L1444*

1500.00

2011-12

No

96 220 kV D/C line with power cable equivalent to single moose AAAC conductor with total line length of 6.5 km approx. from proposed 220 kV GIS substation sector 2 or 3 Gurgaon to proposed 220 kV substation sector-20 Gurgaon. 97 Rampur Kamboan

13

3900.00

2011-12

No

1x100 MVA 1x100 MVA 2x0.2 MVA

220/66 220/33 33/0.4

2N1370*

3501.00

2010-11

PFC 03403021 220kV substation Rampur Kamboan approved in place of Malikpur Bangar approved vide R574 dated 8/12/08 Additional 100 MVA 220/66 transformer shall be installed future as per load requirement which space shall be provided in switchyard. kV in for the

Yes

2N1235A

150277783.xls.ms_office

Page 31 of 198

220 kV

97

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10

To make provision of 15 nos. 220 kV bays including spare bays, 15 no. 66 kV bays including spare bays and 10 no. 33 kV bays including spare bays at 220 kV substation Rampur Kamboan To allow UHBVNL to feed 33 kV substations Rampur Kamboj (proposed 10 MVA), Malikpur Banger (proposed 10 MVA), Dhimo (proposed 10 MVA), Ledi (proposed 10 MVA) and Taharpur (proposed 10 MVA) from proposed 220 kV substation Rampur Kamboan. 98 LILO of one circuit of 220 kV D/C YTPP - Abdullapur line with 0.5 sq" ACSR at proposed 220 kV substation Rampur Kamboan. It is likely to construct 220 kV D/C line from 400 kV PGCIL substation (to be constructed near Barwala) to proposed 220 kV substation Rampur Kamboan via another proposed 220 kV ss being planned at village Sarawan 99 Erection of 220 kV D/C Sector 72 Badshahpur line with 0.5 Sq inch ACSR 100 Shifting of a portion of exisitng overhead 66 kV D/C Badshahpur Sohna line passing through 220 kV substation Badshahpur yard with 66 kV XLPE underground cable to provide space for erection of 220 kV bay. 40 2L1371* 2L1236A 1500.00 2010-11 PFC 03403021 Yes

10

2L1381*

300.00

2009-10

To be Posed

No

6G1382*

2009-10

To be posed

No

150277783.xls.ms_office

Page 32 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Length (Ckt km)

Transformer Voltage Capacity Ratio (MVA) (kV)

Code

Tentative Cost in Rs lac

Tentative completion Schedule

Funds Arrangement

Remarks

Works covered under Investment Plan 2009-10 No

101 Erection of 2 no. 220 kV bays at 220 kV substation Sector 72 Gurgaon for accomodating 220 kV D/C Sector 72Badshahpur line. 102 2 no. 220 kV bays at 220 kV substation Badshahpur for acomodating 220 kV D/C Sector 72 - Badshahpur line Total (220 kV) 2347.22

2B1383*

200.00

2009-10

To be posed

2B1384*

200.00

2009-10

To be posed

No

169186.34

150277783.xls.ms_office

Page 33 of 198

220 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10

132 kV Works A Works to be executed with financial assistance from REC 1 Jakhal 2x10/16 132/11 1U0467* 431.00 2009-10 REC 350023 One No 10/16 MVA, 132/11 kV T/F would be installed in the 1st instance and the 2nd susequently, as load grows REC 350023 Proposed 132 kV S/S Jakhal would be constructed in the available space in the existing 33 kV substation Jakhal. Space for one 132 kV bay at 132 kV Jakhal shall be provided for future expansion/ use. REC 350031 REC 350031 Yes

2 132 kV S/C line from proposed 220 kV substation Bhuna to 132 kV substation Jakhal in place of earlier approved Tohana - Jakhal line

25

1L0468*

369.00

2009-10

Yes

3 Arya Nagar (Hissar) 4 Stringing of 2nd. ckt. of Beer (132 kV)-to T-off point (Tower No.45) on already erected D/C Towers & Const. of 132 kV line bay at Beer (132 kV substation) 5 132 kV S/C line on D/C towers from Location No. 45 (T-off point) to 132 KV Arya Nagar S/S with associated bays at Arya Nagar 6 Stringing of 2nd. ckt. from Hisar I.A to Arya Nagar (direct). 7 132 kV bay one number at Hissar I.A substation. 16 3

1x10/16

132/11

1U0480* 1L0481*

633.00 17.00

2009-10 2009-10

Yes Yes

20

1L0482*

496.00

2009-10

REC 350031

Yes

38

1L0483* 1B0484* 1L0485*

211.00

2009-10 2009-10

REC 350031 REC 350031 REC 350029

Yes Yes Yes

Dadri- Jhojjukalan S/C ine with 0.2 Sq" ACSR in place of earlier approved 2nd Ckt. of Dadri-Atela line 7 b One 132 kV bay at Dadri 7 c Two 132 kV bays at Jhojjukalan

254.00

2009-10

1B0486* 1B0487*

86.00 86.00

2009-10 2009-10

REC 350029 REC 350029 One bay covered in the scheme

Yes Yes

150277783.xls.ms_office

Page 34 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

8 132 kV S/C line from 220 kV Pehowa to 132 kV Malikpur and connecting it to present 132 kV Malikpur - Ismailabad line just beyond Malikpur.

17

1L0493*

270.00

2009-10

REC 350029 I) Vacation of 132 kV bay at 132 kV Malikpur currently feeding 132 kV Ismailabad. II) First few spans of this line will be constructed with D/C towers to preserve the right of way for any new 132 kV emanating from adjacent bay to take care of future load growth requirement of the area. REC 350031 REC 350031 Commissioned on 20.05.09 REC 350031

LILO of Tohana - Dharsul S/C line at 220 kV substation Bhuna

38 19 25

1L0497* 1L0498* 1L0511*

577.00 425.00 427.00

2009-10 2009-10 2009-10

Yes Yes Yes

10 LILO of 132 kV Dharsul - Telewara S/C line at 220 kV substation Bhuna 11 132 kV S/C line from 220 kV proposed substation Bhuna to 132 kV substation Uklana 12 one No. 132 kV bay at 132 kV substation Uklana for accommodating Bhuna line 13 LILO of 132 kV Karnal - Indri S/C line at 220 kV Nilokheri. 14 Nagla Megha

1B0512*

56.00

2009-10

REC 350031

Yes

20 2x10/16 132/11

1L0505* 1U0506*

280.00 712.00

2009-10 2009-10

REC 350030 REC 350030 Commissioned with 1st T/F on 10.04.09 & 2nd T/F Commissioned on 24.04.09 REC 350030 Commissioned on 9.3.09 REC 350030 Commissioned on 9.3.09

Yes Yes

15 132 kV Madhuban to Nagla Megha S/C line. 16 132 kV bay at 132 kV substation Madhuban for accommodating Nagla Megha line -1 No 17 Halluwas (Dadri Road Bhiwani)

1L0507* 1L0508*

111.00 56.00

2009-10 2009-10

Yes Yes

10/16

132/11

1N0522*

531.00

2009-10

REC 350028 At 6 acre land given by Gram Panchayat free of cost.

Yes

150277783.xls.ms_office

Page 35 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

18 Feeding 132 kV Halluwas from 220 kV substation Dadri by utilising idle portion of 132 kV S/C Dadri Bhiwani line. *Refurbishing of 132 kV bay at 220 kV substation Dadri for Halluwas 19 Additional 132 kV S/C line from the end of existing portion of DadriBhiwani line upto the site of proposed 132 kV substation Halluwas with 0.2 Sq" ACSR. 20 Bhutan Kalan

1L0523*

17.50

2009-10

REC 350028 Earlier work of augmentation of 220 kV substation Bhiwani with additional 1x10/16 MVA 132/11 kV transformer vide memo No. R. No. 298 / Ch.151/408/K-35 dated 8.4.2005 be treated as cancelled.

1B0524* 1 1L0525*

20.00 16.00

2009-10 2009-10 REC 350028 Yes

2x20/25

132/33

1U0533*

954.00

2009-10

REC 350031 To feed / connected to 33 kV substaions Bhutan, Bhuna and Bhirdana etc. REC 350031 REC 350031 For auxiliary load of 220 kV Bhuna

Yes

1x5 21 132 kV S/C line on D/C towers from 220 kV substation Bhuna to proposed 132 kV substation Bhutan Kalan with 0.2 Sq" ACSR 22 Kirmich (Upgradation from 33 kV level) 15

33/11

1N0534* 1L0535* 372.00

2009-10 2009-10

Yes

1x20/25

132/33

1U0761*

940

2009-10

33/11

1U0762*

REC 350035 With double bus arrangement to provide connectivity with both 220 kV Nissing and 220 kV Nilokheri matching with REC 350035 commissioning of 220 kV substation Nilokheri and shifting of 132 kV substation Amin on 220 kV substation Nilokheri. 1x20/25 MVA 132/33 kV transformer being proposed at 132 kV substation Kirmitch would feed existing 33 kV substation Kirmitch and any future/ proposed nearby substation by UHBVN.

Yes

23 LILO of 132 kV Sagga Amin line at 132 kV substation Kirmitch.

48

1L0763*

760

2009-10

REC 350035

Yes

150277783.xls.ms_office

Page 36 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

24 132 kV S/C line on D/C tower from 220 kV substation Nilokheri to proposed 132 kV substation Kirmitch 25 Seka

18

1L0764*

465

2009-10

REC 350035

2x20/25 1x4

132/33 33/11

1N0812* 3N0813* 1L0814*

1020.00

2009-10 2009-10

26 132 kV S/C line on D/C tower with 0.4 sq ACSR from 220 kV substation Narnaul to proposed 132 kV substation Seka. 27 One No. 132 kV bay at 220 kV substation Narnaul for accommodating Narnaul Seka 132 kV line 28 132 kV S/C line with 0.2 sq ACSR from 132 kV substation Ateli to 132 kV substation Mundia Khera. 29 132 kV S/C line with 0.2 sq ACSR from proposed 132 kV substation Seka to 132 kV substation Ateli. 30 Habri

10

300.00

2009-10

REC 350035 2x20/25 MVA 132/33 kV transformer being proposed at 132 kV substation Seka would REC 350035 feed 33 kV substations Shobhapur, Bhungarka and Bhilwara and any future/ REC 350035 proposed nearby substation by DHBVN.

Yes

Yes

60.00

2009-10

REC 350035

Yes

11

1L0815*

210

2009-10

20

1L0816*

380

2009-10

REC 350035 Creation of two No. 132 kV bays at 132 kV substation Ateli and one No. bay at 132 kV substation Mundia Khera for accommodating of Seka Ateli and Ateli Mundia Khera 132 kV lines REC 350035

Yes

Yes

1x20/25

132/33

1N0822*

930.00

2009-10

REC 350035 Matching with the augmentation of 220 kV substation Nissing with additional 1x100 MVA 220/132 kV transformer. 1x20/25 MVA 132/33 kV transformer being proposed at 132 kV substation Habri would feed load of existing 33 kV substation Habri (16 MVA) and proposed new 33 kV substation Deeg (10 MVA)

Yes

150277783.xls.ms_office

Page 37 of 201

132 kV

30

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10

1x20/25

132/33

1A0829*

2009-10

REC 350035 To facilitate feeding of proposed new 33 kV substation Barsana (10 MVA) REC 350035 Yes

31 132 kV S/C line on D/C towers with 0.2 sq ACSR from 132 kV substation Rasina to proposed 132 kV substation Habri. 32 132 kV bays at 132 kV substation Rasina for accommodating S/C line on D/C towers from 132 kV substation Rasina to proposed 132 kV substation Habri. 33 Stringing of 3rd 132 kV circuit between 220 kV substation Bhiwani and 132 kV substation Jui. i 132 kV bay at 220 kV Bhiwani - For connecting to Jui (One No.) 132 kV bay at 132 kV Jui - For connecting to Bhiwani (One No.)

12

1L0823*

310.00

2009-10

1B0824*

80.00

2009-10

REC 350035

Covered under Sr. No. 31

29

1L0783*

171

2009-10

REC 350036

Yes

1B0784*

60

2009-10

REC 350036

Covered under Sr. No. 33 Covered under Sr. No. 33 Yes

ii

1B0785*

60

2009-10

REC 350036

34 132 kV S/C line from 220 kV substation Isharwal to 132 kV substation Jui with 0.2 sq" ACSR. 35 132 kV S/C line 220 kV substation Isharwal to Miran with 0.2 sq" ACSR. 36 132 kV S/C line 220 kV substation Isharwal to Tosham with 0.2 sq" ACSR.

36

1L0779*

660

2009-10

REC 350033

12.5

1L0780*

242

2009-10

REC 350033

Yes

28

1L0781*

517

2009-10

REC 350033

Yes

150277783.xls.ms_office

Page 38 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

37 132 kV S/C line 220 kV substation Isharwal to Behal with 0.2 sq" ACSR. 38 132 kV bays substations: i at following

21

1L0782*

393

2009-10

REC 350033

132 kV Jui - For connecting to Isharwal (One No.) 132 kV Miran - For connecting to Isharwal (One No.)

1B0786*

65

2009-10

Construction of 33 kV bays (two per transformer of 132/33 kV rating) as and when required to meet the load requirement REC 350033 in the area.

ii

1B0787* 1B0788* 1B0789*

65 65 65

2009-10 2009-10 2009-10

REC 350033 REC 350033 REC 350033

Covered under Isherwal substation Covered under Isherwal Covered under Isherwal Covered under Isherwal substation Yes

iii 132 kV Tosham - For connecting to Isharwal (One No.) iv 132 kV Behal - For connecting to Isharwal (One No.) 39 Bhusthala 2x20/25 132/33

1N0765*

800

2009-10

REC 350036 At the land being provided by gram Panchayat free of cost. REC 350036 This substation will also cater to the load demand of Ajrana and surrounding area. REC 350036

2x200 kVA

33/0.4

3N0766*

2009-10

40 132 kV D/C line from 220 kV substation Durala to 132 kV substation Bhusthala with 0.4 sq. inch ACSR 41 132 kV S/C line on D/C towers from 132 kV substation Bhusthala to 132 kV substation Ismailabad with 0.4 sq. inch ACSR 42 One no.132 kV bay at 132 kV substation Ismailabad for accommodating above line.

25

1L0767*

375

2009-10

Yes

12

1L0768*

300

2009-10

REC 350036

Yes

1B0769*

60

2009-10

REC 350036

Yes

150277783.xls.ms_office

Page 39 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

43 Adhon

2x20/25 2x200 kVA

132/33 33/0.4

1N0770* 3N0771*

800

2009-10 2009-10

REC 350036 At the land being provided by gram Panchayat free of cost. REC 350036 This substation will also cater to the load demand of Jhansa Road Kurukshetra and REC 350036 surrounding area.

44 132 kV S/C line on D/C towers from 220 kV substation Durala to 132 kV substation Adhon with 0.4 sq. inch ACSR 45 Lukhi (Up gradation from 33 kV level) 46 132 kV S/C line on D/C towers from 220 kV substation Durala to 132 kV substation Lukhi with 0.4 sq. inch ACSR 47 LILO of 132 kV Pehowa Bhore line at 132 kV substation Lukhi. 48 Bodhni (Up gradation from 33 kV level) 49 LILO of S/C line 220 kV Pehowa 132 kV Ismailabad line at 132 kV substation Bodhni. 50 Provisison of double bus arrangement at existing 132 kV Bahadurgarh facilitating exchange of power on both 220 kV substation Narela & 220 kV substation Bahadurgarh side

1L0772*

75

2009-10

Yes

2x20/25 2x200 kVA 9

132/33 33/0.4

1U0773* 3U0774* 1L0775*

800

2009-10

REC 350036 This substation will also cater to the load demand of Lukhi, Jyotisar and surrounding area. REC 350036

Yes

225

2009-10

Yes

23 2x20/25 2x200 kVA 15 132/33 33/0.4

1L0776* 1N0777* 3U0811* 1L0778*

345 800

2009-10 2009-10

REC 350036 REC 350037

Yes Yes

225

2009-10

REC 350037

Yes

1G0473*

35

2009-10

NCRPB

No

150277783.xls.ms_office

Page 40 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

51 LILO of 132 kV RohtakDadri line at 132 kV substation Kalanaur in place of present T-off arrangement

1L0536*

32.00

2009-10

NCRPB

52 Stringing of 2nd ckt of RohtakMDUSampla 132 kV line with 0.2 sq. inch ACSR.

21

1L0537*

124.00

2009-10

NCRPB

132 kV bays four numbers i.e. one No. each at 220 kV substations Rohtak & 132 kV substations Sampla and two Nos. at 132 kV substation MDU Rohtak for accommodating of stringing of 2nd ckt of Rohtak -MDU Sampla 132 kV line At the land offered free of cost by Gram Panchayat Sataundi adjacent to existing 33 kV substation. Only one 132/33 kV T/F shall be commissioned in the first instance. The second T/F shall be added as the load grows. The existing 33 kV substation sataundi will continue to be fed from proposed 132 kV Sataundi which will also feed proposed 33 kV substations Bastra and raipur Jattan.

Yes

53 132 kV Sataundi {Upgradation from 33 kV level}

2X20/25

132/33

1N0845*

1000

2009-10

World Bank

Yes

54 LILO of one circuit of Bastra-Jundla line at proposed 132 kV substation Sataundi.

12

1L0846*

268.00

2009-10

REC 350065 The route of bastra-Sataundi-Jundla line shall be selected in such a way that D/C line from Bastra reaches Sataundi and then proceeds to Jundla but only one of the circuits enters Sataundi; the other circuit by passes. Second circuit can be connected in future when required. JICA through REC 350050 HR-IC-DIS035-2009100844 Yes

55 Beholi

2x20/25 2x500 kVA

132/33 33/0.4

1N0958*

1000.00

2010-11

150277783.xls.ms_office

Page 41 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

56 Bega

2x20/25 2x500 kVA

132/33 33/0.4

1N0959*

800.00

2010-11

JICA through REC 350050 HR-IC-DIS035-2009100844 JICA through REC 350050 HR-IC-DIS035-2009100844 JICA through REC 350054 HR-IC-DIS035-2009100848 JICA through REC 350054 HR-IC-DIS035-2009100848 JICA through REC 350054 HR-IC-DIS035-2009100848 JICA through REC 350054 HR-IC-DIS035-2009100848

57 Naultha

1x20/25 2x500 kVA

132/33 33/0.4

1N0960*

800.00

2010-11

Yes

58 132 kV S/C line on D/C towers with 0.4 Sq. inch ACSR from SamalkhaBeholi line.

1L0962*

280.00

2010-11

Yes

59 132 kV S/C line on D/C towers with 0.2 Sq. inch ACSR from SamalkhaNaultha line.

16

1L0963*

448.00

2010-11

Yes

60 132 kV S/C line on D/C towers with 0.2 Sq. inch ACSR from Samalkha to Bega.

12

1L0964*

336.00

2010-11

Yes

61 LILO of 132 kV S/C line from 400 kV substation Sewah to 132 kV substation Israna at 132 kV substation Naultha.

1L0965*

40.00

2010-11

Yes

150277783.xls.ms_office

Page 42 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

62 132 kV S/C line on D/C towers with 0.4 Sq. inch ACSR from Beholi to Chhajpur.

13

1L0966*

455.00

2010-11

JICA through REC 350054 HR-IC-DIS035-2009100848 Posed to NCRPB on 05.05.2009 Posed to NCRPB on 05.05.2009

63 LILO of 132 kV S/C ChandoliChhajpur line at 220 kV substation Chhajpur. 64 132 kV S/C line on D/C tower with 0.4 Sq. inch ACSR from 220 kV substation Chhajpur to 132 kV substation Sector-29, Panipat. 65 One no.132 kV bay at 132 kV substation Sector-29, Panipat for accommodating line from 220 kV substation Chhajpur. 66 132 kV Kairu 67 LILO of 132 kV Isharwal-Jui S/C line at 132 kV substaion Kairu 68 132 kV Khurana

1L0968*

17.53

2010-11

Yes

9.7

1L0969*

331.06

2010-11

Yes

1B0970*

55.32

2010-11

Posed to NCRPB on 05.05.2009

Covered under sr. No. 64

1x20/25

132/33

1N1037* 1L1038* 1N1043*

800.00

2010-11

World Bank World Bank REC 350066 Matching with augmentation of 220 kV substation Cheeka by providing additional 1x100 MVA 220/132 kV transformer. REC 350066 Initially 1x20/25 MVA 132/33 kV transformer would be installed at 132 kV substation Khurana to feed existing 33 kV substation Siwan gate Kaithal and Kawartan.

Yes Yes Yes

2x20/25

132/33

1000.00

2009-10

2x200 kVA

33/0.4

2nd 20/25 MVA 132/33 kV transformers would be installed at 132 kV substation Khurana matching with creation of new 33 kV substation by UHBVN to be proposed in the area for which the UHBVN may be asked to create new 33 kV substations.

150277783.xls.ms_office

Page 43 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Covered under Sr. No. 68

69 2 Nos 33 kV bays at 132 kV subatation Khurana to accommodate 33 kV lines for feeding existing 33 kV substations Siwan gate Kaithal and Kwartan. 70 LILO of 132 kV Kaithal Sewan line at 132 kV substation Khurana. 71 132 kV S/C line on D/C tower with 0.2 sq ACSR from upcoming 132 kV substation Kheri Gulam Ali to proposed 132 kV substation Khurana. 72 132 kV line bay at 132 kV substation Kheri Gulam Ali for accommadating above line. 73 132 kV Dablain 74 LILO of 132 kV Narwana Uklana line at proposed 132 kV substation Dablain. 75 Two numbers 33 kV bays at proposed 132 kV substation Dablain to feed existing 33 kV substation Dhanoda (9 MVA) and the already approved 33 kV substation Lochab (8 MVA) from it 76 LILO of 132 kV S/C Sirsa - Odhan line at proposed 400 kV substation Nuhiyawali. 16 2 1x16/20 132/33 20 10

3B1044* 3B1045*

75.00

2009-10

Included in the cost of subsstation

1L1046* 1L1047*

350.00 280.00

2009-10 2009-10

REC 350066 REC 350066

Yes Yes

1B1048*

120.00

2009-10

Included in the cost of subsstation REC 350064 REC 350064

Covered under Sr. No. 77 Yes Yes

1N1078* 1L1079*

800.00 50.00

2009-10 2009-10

3B1080* 3B1081*

50.00

2009-10

REC 350064

Covered under Sr. No. 73

1L1075*

280.00

2009-10

JICA through REC 350058 HR-IC-DIS035-2009100852

Yes

150277783.xls.ms_office

Page 44 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

77 Kheri Gulam Ali

1x20/25 1x200 kVA

132/33 33/0.4

1N0934*

800.00

2009-10

REC 350064 Matching with the commissioning of 3rd 100 MVA 220/132 kV transformer at 220 kV substation Cheeka to feed existing 33 kV substation Kheri Gulam Ali. REC 350064 Matching with the commissioning of 3rd 100 MVA 220/132 kV transformer at 220 kV substation Cheeka.

78 132 kV S/C line on D/C towers with 0.4 sq. inch ACSR from 220 kV substation Cheeka to the proposed 132 kV substation Kheri Gulam Ali 79 One number 132 kV bay at 220 kV substation Cheeka for accommodating Cheeka (220 kV) Kheri Gulam Ali, 132 kV S/C line on D/C towers. 80 2nd 20/25 MVA 132/33 kV transformers proposed at 132 kV substation Kheri Gulam Ali 81 Conversion of existing 132 kV main and transfer bus into double bus at 132 kV substation Safidon 82 To provide Double bus arrangement at 132 kV substation Jui 83 LILO of 132 kV S/C line between Gharaunda and Madhuban at 220 kV substation Bastra. 84 132 kV D/C line with 0.4 sq ACSR from propopsed 220 kV substation Bastra to 132 kV substation Naglamegha.

25

1L0935*

875.00

2009-10

Yes

1B0936*

60.00

2009-10

REC 350064

Covered under Sr. No. 78

1A0937*

200.00

2009-10

1G0491*

35.00

2008-09

REC 350064 Matching with commissioning of proposed 33 kV substation Naagal (Lader Keena), Serta and Atela/Budha Khera by UHBVN for which the proposal from UHBVN is still awaited. Yet to be Work completed and commissioned. posed

Yes

No

1G0492*

35.00

2008-09

Yet to be posed REC 350065

No

10

1L0840*

175.30

2009-10

Yes

30

1L0841*

668.00

2009-10

REC 350065

Yes

150277783.xls.ms_office

Page 45 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

85 Two No. 132 kV bays at 132 kV substation Naglamegha for BastraNaglamegha line. 86 132 kV D/C line with 0.4 sq ACSR from proposed 220 kV substation Bastra to 132 kV substation Jundla via Sataundi. 87 Two 132 kV bays at 132 kV substation Jundla for Bastra-Jundla line. 88 Replacement of conductor between 132 kV substation Rohtak and 132 kV Sec-3, Sonepat Road Rohtak from existing 0.15 sq ACSR to maximum current carrying capacity conductor physically in the same range and which can be accommodated on the existing tower structures without requiring mid span installation (5.5 km.). 11 44

1B0842*

110.64

2009-10

REC 350065

1L0843*

980.00

2009-10

REC 350065

Yes

1B0844*

110.64

2009-10

REC 350065

Covered under Sr. No. 86 Yes

1E0749*

55.00

2009-10

Yet to be posed

89 132 kV S/C line with 0.2 Sq" ACSR from 132 kV substation Jalmana to 132 kV substation Assandh a) 132 kV bay at 132 kV Jalmana - For connecting to Assandh (One No.)

14

1L0854*

280.00

2009-10

REC 350042

Yes

1B0855*

80.00

2009-10

REC 350042

Covered under sr. No. 89 Covered under sr. No. 89

b) 132 kV bay at 132 kV Assandh - For connecting to Jalnama (One No.)

1B0856*

80.00

2009-10

REC 350042

150277783.xls.ms_office

Page 46 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

90 Nidana

1x20/25

132/33

1N0860*

953.00

2009-10

REC 350065 With double bus arrangement matching with the augmentation of 220 kV substation Nissing with 1x100 MVA 220/132 kV transformer REC 350065 1x20/25 MVA 132/33 kV transformer being proposed at 132 kV substation Naraina would feed load of existing 33 kV substation Taraori (16 MVA) and proposed 4 MVA 33/11 kV transformer at proposed 132 kV substation Naraina. REC 350065 4 MVA 33/11 kV transformer is proposed to be provided for feeding village Naraina as land is being offered free of cost by local Panchayat for proposed 132 kV substation. Therefore, it will ensure an independent feeder to the concerned village and also to provide auxiliary supply. Included in the cost of subsstation REC 350039 2nd circuit shall be strung subsequently as per system requirement

1x4

33/11

3N0861*

2009-10

91 LILO of existing 132 kV idle line from 132 kV Karnal to 220 kV Nissing at proposed 132 kV substation Nidana

12

1L0862*

211.00

2009-10

Yes

92 One 33 kV bay at 132 kV substation Nidana for feeding the existing 33 kV substation Taraori. 93 132 kV S/C line on D/C towers with 0.4 ACSR from 400 kV substation Kirori (Hisar) to 132 kV substation Barwala. 94 Creation of one 132 kV line bay at 132 kV substation Barwala to receive 132 kV line from proposed 400 kV substation Kirori. 20

3B0863*

25.00

2009-10

Covered under sr. No. 91 Yes

1L0943*

700.00

2009-10

1B0944*

60.00

2009-10

REC 350039

Covered under sr. No. 93

150277783.xls.ms_office

Page 47 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

95 132 kV S/C line with 0.4 Sq" ACSR from 400 kV substation Kirori (Hisar) to 132 kV substation Adampur. First few spans from Kirori (2-3 km) shall be on double circuit tower. 96 One 132 kV line bay at 132 kV substation Adampur to receive 132 kV line from proposed 400 kV substation Kirori. 97 Double bus arrangement at 132 kV substation Adampur making it capable to receive power from both Fatehabad and Kirori side. 98 Double bus arrangement at 132 kV substation Barwala making it capable to receive power from both Uklana and Kirori side.

25

1L0942*

875.00

2009-10

REC 350039

1B0945*

60.00

2009-10

REC 350039

Covered under Sr. No. 95

1G0946*

25.00

2009-10

REC 350039

No

1G0947*

25.00

2009-10

REC 350039

No

150277783.xls.ms_office

Page 48 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

99 132 kV Sector-29, Part-II, Panipat

1x16/20

132/11

1N0912*

1400.00

2009-10

3x20/25

132/33

1N0914*

REC 350047 With double bus arrangement.Initially 1x16/20 MVA 132/11 kV transformer be installed to feed the load of dye chemical units due to feeding constraints. Load management may be carried out during real peak hours by the local HVPN and UHBVN authorities. 3x20/25 MVA 132/33 kV transformers be installed matching with ultimate feeding of proposed 132 kV substation Sector-29, Part-II Panipat from proposed 220 kV substation Chhajpur. REC 350047 3x20/25 MVA 132/33 kV transformer to be installed at 132 kV substation sector 29 Panipat would be utilize to feed the 33 kV substations Industrial area, Sewah & Sanoli Road, Panipat as proposed by Superintending Engineer/ TS Rohtak vide Memo No. Ch-5/ TSR-146 dated 25.6.2006. To initially feed the 132 kV substation Sector-29, Part-II, Panipat. Ultimate feeding of proposed 132 kV substation Sector-29, Part-II Panipat would be from proposed 220 kV substation Chhajpur.

100 LILO of 132 kV line from 400 kV substation Sewah to 132 kV substation Samalkha at proposed 132 kV substation Sector-29, PartII, Panipat

1L0913*

32.00

2009-10

Yes

101 132 kV S/C line with 0.2 Sq. inch ACSR from 220 kV substation Sampla to 132 kV substation Beri. 102 One 132 kV bay at 132 kV substation Beri for 132 kV SamplaBeri line.

22

1L0956*

435.38

2009-10

Posed to NCRPB on 05.05.2009 Posed to NCRPB on 05.05.2009

Yes

1B0957*

60.00

2009-10

Covered under Sr. No. 101

150277783.xls.ms_office

Page 49 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

103 132 kV Hisar (TPS)

2x16/20

132/11

1N1023*

1000.00

REC 350039 The above two works shall be carried out at HVPNL cost in case the same is allowed by HERC, alternatively the cost shall be borne by HPGCL. Substation commissioned on 12.12.2008 with 1x16/20 MVA 132/11 kV transformer. 2nd 16/20 MVA transformer commissioned on 14.12.2008.

104 LILO of one circuit of already approved 132 kV Kirori (400 kV) Barwala D/C line at proposed 132 kV substation Hisar TPS. 105 Kabri

16

1L1024*

280.00

REC 350039 To execute the work departmentally for speedy execution. Barwala - Khather line commissioned on 03.12.2008.

Yes

1x20/25 2x500 kVA

132/33 33/0.4

1N0961*

800.00

2009-10 2009-10

World Bank World Bank World Bank

Yes

106 LILO of one circuit of 132 kV D/C PTPS-Chandoli line at 132 kV substation Kabri. 107 132 kV D/C line with 0.2 Sq. inch ACSR from 220 kV substation Kaul to 132 kV substation Dhand. 108 Provision of 2nd 132 kV bus at 132 kV substation Dhand. 109 2 No. 132 kV bays at 132 kV substation Dhand for Kaul-Dhand line. 110 132 kV S/C line on D/C towers with 0.2 Sq. inch ACSR from 220 kV substation Kaul to 132 kV substation Habri.

1L0967*

87.50

2009-10

Yes

16

1L0980*

280.00

2009-10

REC 350042

Yes

1G0981* 1B0982*

25.00 120.00

2009-10 2009-10

REC 350042 REC 350042

No Covered under Sr. No. 107 Yes

20

1L0983*

560.00

2009-10

REC 350042

150277783.xls.ms_office

Page 50 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Covered under Sr. No. 110 No

111 One 132 kV bay at 132 kV substation Habri for 132 kV KaulHabri line. 112 Provision of 2nd 132 kV bus at 132 kV substation Habri. 113 132 kV Hisar Road Rohtak 2x20/25 132/33

1B0984*

60.00

2009-10

REC 350042

1G0985*

25.00

2009-10

REC 350042

1N1034*

1000.00

2009-10

REC 350047 To feed existing 33 kV substations IDC (18 MVA), existing 33 kV substation Jhajjar Road (18 MVA) and proposed 33 kV substation New Grain Market Rohtak (10 MVA) as proposed by UHBVN. REC 350047 For auxiliary supply

Yes

1X200 kVA 114 Loop in loop out of 132 kV Rohtak Kalanaur line at 132 kV substation Hisar Road Rohtak. 1

33/0.4 1L1035* 40.00 2009-10

REC 350047 Permanent feeding of 33 kV substation Senior Secondary School Rohtak from 132 kV substation Khokharakot Rohtak instead of 132 kV substation Hisar Road Rohtak after shifting of load of 33 kV substation IDC to 132 kV substation Hisar Road Rohtak.

Yes

115 132 kV S/C link line on double circuit towers between 132 kV substations staundi and Munak with 0.4 Sq" ACSR. The conductor to be provided on one side of tower to avoid shutdown in any eventuality. 116 Two 132 kV bays one each at 132 kV substation Staundi & Munak for interconnectivity of both substations as detailed above

1L1097*

307.17

2009-10

REC 350065

Yes

1B1098* 1B1099*

110.64

2009-10

REC 350065

Covered under Sr. No. 115

150277783.xls.ms_office

Page 51 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

117 132 kV Khairkan

2x20/25

132/33

1N1109*

1000.00

2009-10

JICA through REC 350056 HR-IC-DIS035-2009100850 JICA through REC 350058 HR-IC-DIS035-2009100852 The creation of 132 kV substation Khairekan earlier approved vide memo No. R. No. 496/Ch-38/HSS-304 dated 28-3-08 matching with creation of 400 kV substation Nuhiyanwali (Sirsa) now amended as matching with creation of 220 kV substation Chormar in view of its earlier commissioning w.r.to 400 kV substation Nuhiyanwali Sirsa)

118 LILO of Nuhiyawali- Sirsa 132 kV S/C line at 132 kV substation Khairekan, matching with creation of 220 kV substation at Chormar and LILO of 132 kV Sirsa- Odhan S/C line at 400 kV substation Nuhiyawali

1L1110*

105.00

2009-10

Yes

119 Erection of following 132 kV lines from proposed 220 kV substation Mohana: i) 132 kV D/C Mohana-Mundlana line with 0.2 Sq ACSR conductor. 42 1L1128* 736.26 2009-10 Posed to NCRPB on 05.05.2009 Posed to NCRPB on 05.05.2009 Yes

ii) LILO of existing 0.15 Sq ACSR 132 kV S/C Harsana Kalan-Kharkhoda line at 220 kV substation Mohana with augmentation of 132 kV S/C Sonepat-Harsana Kalan-Kharkhoda line (17 Kms) with 0.15 Sq all alloy aluminum conductor (AAAC) to improve its current carrying capacity. The LILO portion will also be constructed with similar AAAC conductor.

34

185.24

2009-10

Yes

150277783.xls.ms_office

Page 52 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Covered under Sr. No. 119 Covered under Sr. No. 19 of 220 kV works

120 2 No. 132 kV bays at 132 kV substation Mundlana to receive power from 132 kV D/C MohanaMundlana line. 121 Provision of 10 No. 33 kV bays at 220 kV substation Mohana. However initially only 6 No. 33 kV bays will be constructed. 122 LILO of 132 kV Sirsa-Dabwali S/C line at proposed 220 kV substation Chormar 123 132 kV S/S Dhudhianwali 6

1B1129*

110.64

2009-10

Posed to NCRPB on 05.05.2009

250.00

2009-10

1L1134*

105.18

2009-10

REC 350065

Yes

1x20/25

132/33

1N1135*

800.00

2009-10

JICA through REC 350056 HR-IC-DIS035-2009100850

With 3 nos. 33 kV bays, one for connecting existing 33 kV S/S Keharwala, second for connecting the proposed 33 kV S/S Mohmadpura and the third for future expansion. To allow DHBVN to connect existing 33 kV S/S Keharwala with approx. 7 Km new 33 kV line from proposed 132 kV S/S Dhudhianwali to Keharwala and proposed 33 kV S/S Mohamadpura with approx. 11.5 Km new 33 kV line from proposed 132 kV S/S Dhudhianwali to Mohamadpura

Yes

124 132 kV S/C line on D/C towers with 0.4 sq inch ACSR from 400 kV substation Nuhiyanwali (Sirsa) to Dhudhianwali.

20

1L1136*

700.00

2009-10

JICA through REC 350058 HR-IC-DIS035-2009100852

Yes

150277783.xls.ms_office

Page 53 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

125 132 kV S/S Kurangawali

2x20/25

132/33

1N1137*

1000.00

2009-10

JICA through REC 350056 HR-IC-DIS035-2009100850

With 2x20/25 MVA 132/33 kV T/F with 3 No. 33 kV bays, one for connecting existing 33 kV S/S Kalanwali, second for connecting the existing 33 kV S/S Rori and the third for future expansion. To allow DHBVN to connect existing 33 kV S/S Kalanwali with approx. 2 km new 33 kV line from proposed 132 kV S/S Kurangawali to Kalanwali and existing 33 kV S/S Rori with approx. 2 Km new 33 kV line from proposed 132 kV S/S Kurangawali to Rori

126 132 kV S/C line on D/C towers with 0.4 Sq ACSR from proposed 220 kV substation Chormar to Kurangawali

25

1L1138*

875.00

2009-10

JICA through REC 350058 HR-IC-DIS035-2009100852 REC 350047 Posed to NCRPB on 05.05.2009

Yes

127 Procurement of one No. 16/20 MVA 132/11 kV Mobile substation 128 132 kV S/C line on D/C towers with 0.4 sq inch ACSR from proposed 220 kV substation Lula Ahir to existing 132 kV substation Kosli. 129 Nangal Mohanpur 130 132 kV S/C line on D/C towers with 0.4 Sq" ACSR from the proposed 220 kV substation Dhanonda to the proposed 132 kV substation NangalMohanpur. 131 Pali 10 13

1G1115*
X 1L1167*

1131.00 443.69

2009-10 2010-11

Yes Yes

2x20/25 1x4

132/33 33/11

1N1170* 1L1171*

1150.00 400.00

2010-11 2010-11

World Bank World Bank

Yes Yes

2x20/25 1x4

132/33 33/11

1N1172*

1100.00

2010-11

World Bank

Yes

150277783.xls.ms_office

Page 54 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

132 132 kV S/C line on D/C towers with 0.4 Sq" ACSR from the proposed 220 kV substation Dhanonda to the proposed 132 kV substation Pali 133 Extension of existing 132 kV S/C line Dadri - Bahu line upto proposed 220 kV substation Dhanonda to enable feeding of existing 132 kV substation Bahu from the proposed 220 kV substation Dhanonda. 134 LILO of existing 132 kV S/C Hansi Narnaund line at proposed 220 kV substation Masudpur (Hansi). 135 Bibipur

10

1L1173*

400.00

2010-11

World Bank

15

1L1174*

297.00

2010-11

Posed to REC on 30.4.09

Yes

36

1L1176*

630.00

2010-11

World Bank

Yes

1x10/16

132/11

1N1177*

638.84

2009-10

REC 350064 matching with already approved augmentation of 220 kV substation Jind by installing 3rd 100 MVA 220/132 kV transformer and shifting of 132 kV feeding of 132 kV substation Narnaund from 220 kV substation Jind to proposed 220 kV substation Masudpur (Hansi). REC 350064

Yes

136 LILO of 132 kV S/C Jind-Narnaund line at proposed 132 kV substation Bibipur. 137 Sitamai

14

1L1178*

250.00

2009-10

Yes

2x20/25

132/33

1N1186*

1100.00

2009-10

REC 350064 To allow UHBVNL to feed existing 33 kV substation Jamba (14.3 MVA), Nigdu (8 MVA) and the proposed 33 kV substation Sitamai (8 MVA) from 132 kV substation Sitamai through new 33 kV lines. REC 350064

Yes

138 132 kV S/C line on D/C towers with 0.4 Sq" ACSR from 220 kV substation Kaul to the proposed 132 kV substation Sitamai.

11

1L1187*

380.00

2009-10

Yes

150277783.xls.ms_office

Page 55 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10

139 One no. additional 132 kV bay at 220 kV substation kaul for feeding line for 132 kV substation Sitamai 140 Gangaicha Jat (Rewari) 2x20/25 1x0.2 132/33 33/0.4

1B1188*

56.00

2009-10

REC 350064

1N1190*

1542.00

2009-10

Posed to NCRPB on 05.05.2009

The land required for construction of substation will be acquired at government rates from Panchayat of village Gangaicha Jat by SE/ TS HVPNL Gurgaon. 1x0.2 MVA 33/0.4 kV transformer for auxiliary supply

Yes

141 LILO of one circuit of 132 kV Rewari - Kosli line at 132 kV substation Gangaicha Jat. 142 132 kV D/C Lula Ahir - Gangaicha Jat line with 0.4 Sq" ACSR conductor. 143 2 number 132 kV bays at 220 kV substation Lula Ahir for giving supply to 132 kV substation Gangaicha Jat. 144 To make provision of 10 nos 33 kV bays (including 4 no. spare bays) at 132 kV substation Gangaicha Jat to supply power to existing 33 kV substations Palhawas & Jatusana and proposed 33 kV substations Guruwara, Kaluwas & Kakoria and others to be created by DHBVNL in future.

1L1191*

105.18

2009-10

Posed to NCRPB on 05.05.2009 Posed to NCRPB on 05.05.2009

Yes

60

1L1192*

1763.60

2009-10

Yes

1B1193*

112.00

2009-10

Yes

3B1194*

2009-10

Posed to NCRPB on 05.05.2009

Covered under Sr. No. 140

150277783.xls.ms_office

Page 56 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10

145 LILO of existing 132 kV S/C line from 220 kV substation BBMB, Narela to 132 kV substation Bahadurgarh at 132 kV traction substation of Railways Asaudha (near Bahadurgarh) to provide two phase power supply for Shakur Basti Rohtak Railway line electrification.

24

1L1195*

768.00

2009-10

The LILO line will be constructed by HVPNL No required to up to Asaudha traction substation of be covered Railways as a deposit work and the bay under arrangement for LILO in the Railway Investment substation will be constructed by the Plan Railways. The equipment installed in the Railway premises for LILO arrangement will be operated and maintained by Railway authorities. The equipment for LILO arrangement in the Railway traction substation will be provided as per specification of HVPNL by Railways. a) The metering arrangement for traction will be finalized by CE/ S.O.& Comml. HVPNL, Panchkula. b) SE/ TS, HVPNL, Rohtak will inform the Railways about the cost to be deposited with HVPNL for construction of LILO line. Necessary tripartite agreement will be executed between Railways, UHBVNL& HVPNL before commencement of work.

146 LILO of existing 132 kV S/C Jui Digwan Jattan line at 220 kV substation Gignow with 0.2 Sq" ACSR 147 132 kV S/C line on D/C towers with 0.4 Sq" ACSR from proposed 220 kV substation Gignow to existing 132 kV substation Loharu (8 km)

30

1L1208*

525.90

2009-10

Posed to REC on 30.4.09

Yes

1L1209*

273.04

2009-10

Posed to REC on 30.4.09

Yes

150277783.xls.ms_office

Page 57 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Covered under Sr. No. 147

148 132 kV bay at existing 132 kV substation Loharu to accommodate 132 kV Gignow - Loharu line.

1B1210*

55.32

2009-10

Posed to REC on 30.4.09

149 Provision of double bus arrangement at 132 kV substation Loharu 150 Khanak 2x20/25 1x0.2 132/33 33/0.4

1G1211*

44.00

2009-10

REC 350065

No

1N1214*

1150.00

2010-11

REC 350064

To allow DHBVNL to connect 33 kV substations Khanak (18 MVA), Baganwala (10 MVA) and Pinjokhera (10 MVA) with the proposed 132 kV substation Khanak. 1x0.2 MVA 33/0.4 kV transformer for auxiliary supply

Yes

151 132 kV D/C line with 0.4 Sq" ACSR from proposed 220 kV substation Sagwan to proposed 132 kV substation Khanak (5 km) 152 Berla

10

1L1215*

240.00

2010-11

REC 350064

Yes

2x20/25

132/33

1N1422* 1N1271A

1100.00

2010-11

PFC 03403022 Matching with commissioning of 220 kV substation Dadhi Bana subject to permission of clearance of standing trees by forest department. To allow DHBVNL to feed 33 kV substations Dokha Dina (proposed 10 MVA) from 132 kV substation Atela. To allow DHBVNL to feed 33 kV substations Berla (existing 15 MVA), Nandha (existing 14 MVA), Mandhi (existing 13 MVA), Kadma (existing 15 MVA) and Chandwas (proposed 10 MVA) from proposed 132 kV substation Berla.

Yes

150277783.xls.ms_office

Page 58 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

153 132 kV double circuit line with 0.4 Sq ACSR conductor from proposed 220 kV substation Dhadhi Bhana to the proposed 132 kV substation Berla.

44

1L1423* 1L1272A

990.00

2010-11

PFC 03403022

154 Makrani

1x20/25

132/33

1N1424* 1N1273A

1377.46

2009-10

Posed to REC To allow DHBVNL to feed 33 kV substations on 30.4.09 Makrana (existing 15 MVA) from proposed 132 kV substation Makrani in place of earlier approval (R 543 dated 02.09.2008) with 2x20/25 MVA 132/33 kV transformer which were to feed 33 kV substations Makrana, Changrod and Mandola. 2nd 20/25 MVA 132/33 kV transformer will be installed as and when load grows in the Makrani area. Posed to REC on 30.4.09

Yes

155 Loop in loop out of 132 kV single circuit Dadri Bahu line at the proposed 132 kV substation Makrani. 156 Biana

1L1274*

140.24

2009-10

Yes

2x20/25 1x0.2 30

132/33 33/0.4

1N1275*

1205.41

2009-10

REC 350065 To feed 33 kV substations Gheer (existing 12 MVA), Biana (existing 8 MVA) and Rindle (proposed 8 MVA). REC 350065 This section will come into existence after LILO of 132 kV S/C Karnal - Indri line at 220 kV substation Nilokheri. REC 350065 Matching with the commissioning of 220 kV substation Nilokheri. REC 350065

Yes

157 LILO of 132 kV Karnal - Nilokheri S/C line section at proposed 132 kV substation Biana. 158 Rambha (Upgradation of 33 kV substation Rambha) 159 Cancellation of LILO of existing 132 kV Karnal - Nilokheri S/C line at proposed 132 kV substation Rambha.

1L1276*

525.00

2009-10

Yes

2x20/25 1x0.2 10

132/33 33/0.4

1U1289*

1320.00

2009-10

Yes

1L1290A

150277783.xls.ms_office

Page 59 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10

160 LILO of existing S/C Karnal - Biana section of existing 132 kV S/C Karnal - Indri line) at proposed 132 kV substation Rambha. 161 Ballah

1L1415*

112.50

2x20/25 1x0.2 26

132/33 33/0.4

1N1291*

1178.00

2009-10

162 132 kV S/C line on D/C towers with 0.4 Sq" ACSR from proposed 132 kV substation Ballah to 132 kV substation Sataundi. 163 Ghoghrian 164 Provision for 2nd 20/25 MVA 132/33 kV transformer for future load growth of the area.

1N1292*

888.00

2009-10

REC 350065 With provision of 3rd 20/25 MVA 132/33 kV transformer matching with the commissioning of 132 kV substation Sataundi REC 350065

Yes

Yes

1x20/25 1x10/16

132/33 132/11

1N1295*

1217.78

2009-10

REC 350065 To allow UHBVNL to feed To allow UHBVNL to feed proposed 33 kV substation Badana (proposed 10 MVA) and existing 33 kV substation Chattar (Second connectivity) from proposed 132 kV substation Ghoghrian. Provision for future connectivity to other 33 kV.

Yes No

165 LILO of 132 kV Jind (O) - Uchana S/C line at proposed 132 kV substation Ghoghrian.

11

1L1296*

192.83

2009-10

166 Dabri

2x20/25 1x0.2 12

132/33 33/0.4

1N1309*

1100.00

2009-10

REC 350065 To feed 33 kV substations NDRI Ram Nagar (Existing 16 MVA), Kachhwa (existing 16 MVA), Dabri (proposed 10 MVA) and Hansi Road Karnal (Proposed 10 MVA). PFC 03403021 In place of earlier proposed at NDRI Karnal

Yes

No

167 LILO of 132 kV Karnal - Nissing line at proposed 132 kV substation Dabri. 168 132 kV D/C Mundlana - Israna line with 0.2 Sq" ACSR conductor.

1L1310*

210.00

2009-10

PFC 03403021

No

30

1L1304*

525.00

2009-10

Yet to be posed

No

150277783.xls.ms_office

Page 60 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 No

169 2 no. 132 kV bays at 132 kV substation Mundlana for accommodating Mundlana - Israna D/C line 170 2 no. 132 kV bays at 132 kV substation Israna for accommodating Mundlana - Israna D/C line 171 132 kV double bus-bar arrangement at 132 kV substation Israna along with provision of 132 kV bus coupler to have flexibility of operation. 172 Barsi 2x20/25 1x0.2 132/33 33/0.4

1B1305*

100.00

2009-10

Yet to be posed

1B1306*

100.00

2009-10

Yet to be posed

No

1G1307*

50.00

2009-10

No

1N1386*

1309.63

2010-11

Posed to REC To allow DHBVNL to feed following 33 kV on 30.04.2009 substations: Mundhal (existing 12 MVA), Bawani Khera (existing 14 MVA), Mandhana (Proposed 10 MVA) and Barsi (proposed 10 MVA) with proposed 132 kV substation Barsi Majra (new 10 MVA) & Kheri Lochab (new 10 MVA) with proposed 220 kV substation Masudpur Posed to REC on 30.04.2009

No

173 132 kV D/C line with 0.4 Sq" ACSR from proposed 220 kV substation Masudpur to proposed 132 kV substation Barsi. 174 2 nos. 132 kV bays at 220 kV substation Masudpur to accommodate 132 kV D/C masudpur - Barsi line.

60

1L1387*

1324.80

2010-11

No

1B1388*

100.00

2010-11

No

150277783.xls.ms_office

Page 61 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 No

175 Two nos. new 33 kV bays at 220 kV substation Masudpur to accommodate feeding lines for new 33 kV substations Majra and Kheri Lochab. 176 Chander Khurd 2x20/25 1x0.2 132/33 33/0.4

3B1389* 3B1390*

2010-11

1N1393*

1309.63

2010-11

Posed to REC 1x0.2 MVA 33/0.4 kV transformer for on 30.04.2009 auxiliary supply Provision of space for one additional power transformer shall be kept at proposed 132 kV substation Chander Khurd. To allow DHBVNL to feed following 33 kV substations: Chander Khurd (proposed 10 MVA) and Bawan (proposed 10 MVA) from proposed 132 kV substation Chander Khurd. Nangla (proposed 10 MVA) from proposed 220 kV substation Samain. Posed to REC Advising DHBVNL to create new 33 kV on 30.04.2009 substations Chander Khurd, Bawan and Nangla matching their completion with commissioning of proposed 132 kV substation Chander Khurd as well as proposed 220 kV substation Samain.

No

177 Plinth for 2nd Power transformer at proposed 132 kV substation Chander Khurd be made in the first instance.

1G1394*

2010-11

No

178 132 kV D/C line with 0.4 sq ACSR from proposed 220 kV substation Samain to proposed 132 kV substation Chander Khurd.

24

1L1395*

530.00

2010-11

No

179 2 nos. 132 kV bays at 220 kV substation Samain to accommodate 132 kV D/C Samain Chander Khurd line. 180 2nd 132 kV Bus Bar at 132 kV substation Jundla in view of connectivity with 220 kV substations Nissing and Bastara (under construction)

1B1396* 1B1397*

100.00

2010-11

No

1G1400*

53.61

2010-11

PFC 03403022

No

150277783.xls.ms_office

Page 62 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 No

181 Assaudha

1x20/25 1x0.2 10

132/33 33/0.4

1N1408*

912.65

2010-11

Posed to NCRPB on 05.05.2009 Posed to NCRPB on 05.05.2009

182 LILO of existing 132 kV S/C 0.2 Sq" ACSR line from 220 kV substation BBMB Narela to 132 kV substation Bahadurgarh at 132 kV substation Assaudha 183 132 kV D/C (two phase) line with 0.2 sq" ACSR conductor from 132 kV substation Assaudha to 132 kV traction substation of Railways at Assaudha as a deposit work of Railways. 184 2 no. 132 kV bays at 132 kV substation Assaudha for providing power supply to traction substation of Railways as a deposit work of Railways.

1L1409* 1L1195*

175.30

2010-11

No

1D1410*

2010-11

The metering arrangement for traction Not required supply to Railways will be finalised by CE/ to be covered SO Comml. HVPNL Panchkula. under Investment Plan SE/TS HVPNL Rohtak will inform the Not required Railways about the cost to be deposited to be covered with HVPNL after getting the estimate under sanctioned from the competent authority Investment Plan Necessary tripartite agreement will be executed between Railways, UHBVN & HVPN before commencement of work.

1D1411*

2010-11

185 Patti Khot at Sirta Road Bye Pass on Padla Road (Kaithal)

2x20/25 1x0.2

132/33 33/0.4

1N1417*

1000.00

2010-11

Yet to be posed

For auxiliary supply. To allow UHBVN to feed 33 kV unmanned substations Chandana Gate (10 MVA), Bidkyar Lake (10 MVA) and Sirta Road Bye-Pass in Kaithal (10 MVA) from proposed 132 kV substation Patti Khot at Sirta Road Bye Pass on Padla Road Kaithal.

No

186 LILO of existing S/C 132 kV Kaithal Siwan line at proposed 132 kV substation Patti Khot.

1L1418*

112.50

2010-11

Yet to be posed

No

150277783.xls.ms_office

Page 63 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. No.

Name of substation or line section

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 No

187 132 kV D/C line from 220 kV substation Dadhi Bana to 132 kV substation Jhojju Kalan with 0.4 sq" ACSR conductor. 188 To demolish 2 nos. Type III quarters and 4 nos. type II quarters at 132 kV substation Jundla infringing in making provision of 2nd bus bar arrangement and associated line connectivity. The work shall be executed in phases as per site requirement. 189 To demolish the HVPNL building occupied by SDO (Operation), DHBVNL at 132 kV substation Adampur for making provision of 132 kV 2nd bus bar arrangement . 190 Machhrauli

12

1L1421*

270.00

2010-11

Yet to be posed

2010-11

Not required to be covered under Investment Plan

2010-11

Not required to be covered under Investment Plan Yet to be posed 1x0.2 MVA 33/0.4 kV transformer for auxiliary supply. In the first instance onlt one transformer of 20/25 MVA 132/33 kV will be provided. The second transformer of similar capacity may be provided later on depending upon load growth in the area. The existing 33 kV substations at Machhrauli (16 MVA), Kunjiya (8 MVA) and Babepur (9 MVA) will be fed from 132 kV substation Machhrauli for which separate proposals will be submitted by UHBVNL for concurrence of HVPNL. No

2x20/25 1x0.2

132/33 33/0.4

1N1445*

1000.00

2010-11

191 LILO of existing S/C Jhajjar - Rewari line with 0.2 sq" ACSR at 132 kV substation Machhrauli. Total (132 kV)

1L1446*

45.00

2010-11

No

1675.2

84956.58

150277783.xls.ms_office

Page 64 of 201

132 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10

66 kV Works Y.Nagar 220 KV to Jathlana 66 kV S/C line (0.2, ACSR) disbanding LILO of Yamunanagar - Radaur line at Jathlana LILO of Badshahpur - Sector 56 Dundahera, 66 kV D/C line at 220 kV substation Sector-52A Gurgaon with 0.4 Sq" ACSR instead of earlier approved 0.15 sq" ACSR IMT Manaser (220 kV) - Harsaru 66 kV D/C line with 0.2 Sq" ACSR 66 kV bay at IMT Manaser 220 kV S/S - 2 Nos for accommodating IMT Manesar - Harsaru D/C line. Daultabad (220 kV) - Sector 10 Gurgaon, 66 kV D/C line with 0.15 Sq" ACSR

15

6L0538*

113.00

2009-10

PFC 03403019 Work to be carried out departmentally.

Yes

16

6L0544*

49.00

2009-10

REC 350014

Yes

3 4

30

6L0545* 6B0546*

196.00 59.00

2009-10 2009-10

REC 350014 REC 350014

Yes Covered under Sr. No. 3 Yes

26

6L0550*

158.00

2009-10

REC 350014 i) SE/Const O&M HVPN Gurgaon will use already errected towers / stubs of the line section of Sector 10 - Sector 23A Gurgaon for the above line ii) SE/TS HVPN Gurgaon will obtain approval from competent authority, in case some of the already errected stubs and errected towers can not be utilized for constructing Daultabad (220 kV) Sector 10 Gurgaon D/C line

66 kV bay at Sector-10 Gurgaon - 2 No. for accommodating 66 kV D/C Daultabad (220 kV) - Sector 10 line. Sector-15 HUDA Jagadhari LILO of one circuit of 66 kV WYC Yamunanagar D/C line at proposed 66 kV substation Sector-15 Jagadhari. 0.16 2x12.5/16 66/11

6B0551*

59.00

2009-10

REC 350014 Cost of 66 kV line bays at Daultabad Covered included in cost estimates of Daultabad under Sr. No. substation. 5 REC 350028 REC 350028 Yes Yes

7 8

6N0608* 6L0609*

738.00 2.00

2009-10 2009-10

150277783.xls.ms_office

Page 65 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes Yes

66 kV Mohra 6

1x12.5/16

X 6N0835* 66/11

600 85

2009-10 2009-10

REC 350035 On the land alrady in possession of HVPN REC 350035

10 LILO of one circuit of Dukheri Layalpur Basti (Circuit other than feeding 66 kV Sonda) at proposed 66 kV substation Mohra with 0.2 Sq" ACSR. 11 Upgradation of Badshahpur Dundahera 66 kV D/C line from existing 0.15 sq" to 0.4 sq" 12 Upgradation of Badshahpur Mehrauli Road 66 kV D/C line from existing 0.15 sq" to 0.4 sq" 13 66 kV Nimoth

6L0836*

36

6E0598*

720.00

NCRPB

Line commissioned on 02.02.2009

Yes

24

6E0599*

360.00

NCRPB

Line commissioned on 08.02.2009

Yes

1x12.5/16

66/11

6N1007*

800

2009-10

Posed to NCRPB on 01.04.2009

Matching with shifting of load of 66 kV Dhauj on 220 kV substation Palli on commissioning of 66 kV D/C line from 220 kV substation Palli to 66 kV substation Dhauj with 0.4 Sq ACSR conductor.

Yes

14 LILO of 66 kV line from Ballabgarh to Sohna at proposed 66 kV substations Nimoth with 0.2 Sq ACSR. 15 Sector-15 II Gurgaon 16 LILO of 66 kV D/C line from Badshahpur to Mehrauli Road at the site proposed 66 kV substation Sector-15 II Gurgaon 17 Sector-3 Gurgaon

3.5

6L1008*

43.75

2009-10

Posed to NCRPB on 01.04.2009

Yes

2x16/20 2

66/11

6N0603* 6L0604*

750.00 35.00

2009-10 2009-10

REC 350047 Commissioned with 1x16/20 MVA 66/11 kV T/F on 18.05.09 REC 350047

Yes Yes

1x25/31.5

66/11

6N0605*

600.00

2009-10

To be posed

Yes

150277783.xls.ms_office

Page 66 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

18 LILO of 66 kV D/C line from 220 kV substation Rohtak Road Delhi to 66 kV substation Mehrauli Road at the proposed 66 kV substation Sector-3 Gurgaon. 19 LILO of 2nd circuit of BadshahpurDundahera 66 kV line at 66 kV substation "Q" block, Gurgaon. 20 Stringing 2nd ckt of Sector 23A Dundahera, 66 kV line. 21 66 kV bays - 1 No. for accomodating Dundahera line at Sector - 23A Gurgaon 66 kV bays - 1 No. for accomodating Sector 23 A line at Dundahera Gurgaon

X 6L0606*

50.00

2009-10

To be posed

6L0573*

44.00

2009-10

Yes

22

6L0574* 6B0575*

93.00 34.00

2009-10 2009-10

To be posed To be posed

Yes Covered under Sr. No. 20 Covered under Sr. No. 20 No For diverting the load of Nagina Substation from Badshahpur 220 KV Substation to Palwal 220 KV Substation No

6B0576*

34.00

2009-10

To be posed

22 One bay at Nuh 66 kV substation Connecting Sohna - Nagina line with Mandkola - Nuh line

6B0577A 6L0578*

32.00

2009-10 2009-10

To be posed To be posed

23 Replacement of RCC structures with steel structures and refurbishment of A-2 substation Faridabad 24 Stringing of 2nd circuit of 66 kV S/C on D/C towers from Manesar to Pataudi T-off point at tower location No. 32 (for Bhorekalan) to Pataudi 5

6G0579*

300.00

2009-10

To be posed

No

6L0584*

20.00

2009-10

To be posed

To continue feeding Bhoerkalan on S/C 66 kV line by solid tap (at tower location No. 32) on one circuit of 66 kV D/C Manesar-Pataudi line. To feed Part load of 66 kV Dharuhera from BadshahpurPataudi-Manaser route and the remening load on Badshahpur-SohnaDharuhera route.

No

150277783.xls.ms_office

Page 67 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 No

66 kV bay one number at 66 kV substation Pataudi

X 6B0585*

50.00

2009-10

To be posed

25 Rearrangement of 66 kV system in 220 kV substation (BBMB) khera to i) Vacate bus No. 1 for BBMB use by vacating two 66 kV bays. ii) Gobindpuri - II ckt and 45/60 MVA 132/66 kV transformer to operate one unit. iii) Take off point for Gobindpuri ckt to be shifted to bay no. 15 by extending bus. 26 66 kV Lohara - Babain S/C line. 27 66 kV bay at Babain - 1 No. 10

6G0595*

2009-10 2009-10 2009-10

To be posed To be posed To be posed

Work in BBMB yard to be carried out by BBMB as deposit work of HVPN while the same outside BBMB yard to be carried out by HVPN.

No

2009-10

To be posed

To utilise bay No. 9 in 220 kV substation Khera for supply to 66 kV substations Mullana / Saha. Yes Covered under Sr. No. 26 No

6L0596* 6B0597*

200.00 90.00

2009-10 2009-10

REC 350034 REC 350034

28 Modification in the bus arrangement at 66 kV substation Gobindpuri.- To provide isolators in the spare bay for connecting 66 kV bus at Gobindpuri substation to the 66/11 kV transformers for flexible operation.

6G0607*

25.00

2009-10

To be posed

29 Hathin - Punhana 66 kV S/C line 30 One number 66 kV bay at 66 kV substation Hathin for accommodating Hathin - Punhana 66 kV S/C line

28

6L0610* 6B0611*

497.00 38.00

2009-10 2009-10

NCRPB NCRPB

Yes Covered under Sr. No. 29

150277783.xls.ms_office

Page 68 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

31 Up gradation of old 66 kV Mehrauli Road Gurgaon - Pataudi circuit on Hrail pole having 0.1 Sq ACSR to D/C 0.4 Sq ACSR on tower line in the section between 66 kV substation Harsaru and 66 kV substation Pataudi and connecting with 66 kV substation Harsaru and 66 kV substation Pataudi by creating two Nos 66 kV bays at both the substations. 32 Sector-2 Gurgaon

40

X 6E0890*

800.00

2009-10

NCRPB

The detailed proposal for utilization of balance portion of old 66 kV Mehrauli Road Gurgaon - Pataudi (upto Harsaru) circuit on H-rail pole having 0.1 Sq ACSR would be submitted separately by SE/ TS, HVPN, Gurgaon for further strengthening of Gurgaon area.

2x25/31.5

66/11

6N0895*

1000.00

2009-10

REC 350043 The cost to be borne by HUDA would be decided by SE/ TS, HVPN, Gurgaon in consultation with SE/ Op, DHBVN, Gurgaon. Commissioned on 28.04.09 with 1x25/31.5 MVA 66/11 kV transformer. REC 350043 In place of LILO of one ckt of 66 kV D/C line from Daultabad to Sector 23 at proposed 66 kV substation Sector-2 Gurgaon with 0.4 Sq ACSR REC 350047

Yes

33 LILO of 66 kV D/C line from Daultabad to Sector 23 at proposed 66 kV substation Sector-2 Gurgaon with 0.4 Sq ACSR. 34 66 kV D/C link with 0.4 Sq ACSR from 220 kV substation Palli to 66 kV substation Dhauj. 35 Two 66 kV bays at 220 kV substation Palli for Palli - Dhauj D/C line. 36 Two 66 kV bays at 66 kV substation Dhauj for Palli - Dhauj D/C line.

6L0896A 6L1016*

80.00

2009-10

Yes

16

6L0909*

184.00

2009-10

Yes

6B0910*

80.00

2009-10

REC 350047

6B0911*

80.00

2009-10

REC 350047

Covered under Sr. No. 34 Covered under Sr. No. 34

150277783.xls.ms_office

Page 69 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10

To approach BBMB for providing two 66 kV bays at 220 kV substation Ballabgarh for taking out two underground feeders to existing 66 kV substations. 37 66 kV Rattangarh 38 LILO of old Jorian Radaur 66 kV S/C H-pole line at proposed 66 kV substation Rattangarh with 0.2 Sq ACSR. 39 66 kV Ugala 40 66 kV D/C line from 220 kV substation Tepla to 66 kV substation Ugala with 0.2 Sq ACSR. 41 To retain LILO of old Jorian - Radaur 66 kV S/C line at 66 kV substation Jathlana. 42 One No. 66 kV bay at 66 kV substation Jathlana for accommodating newly constructed Jorian Jathlana 66 kV S/C line. 43 2nd 66 kV bus arrangement at 66 kV substation Pataudi. 44 66 kV Sector-51 Gurgaon (GIS) 2x25/31.5 52 0.5 1x12.5/16

The construction, operation and maintenance of both bays shall be at HVPNL cost.

66/11

6N0916* 6L0917*

700.00 6.00

2009-10 2009-10

REC 350042 REC 350042

Yes Yes

2x12.5/16

66/11

6N0918* 6L0919*

1000.00 600.00

2009-10 2009-10

REC 350040 Matching with augmentation of 220 kV substation Tepla with 3rd (additional) REC 350040 1x100 MVA 220/66 kV transformer.

Yes Yes

No

6B0922*

40.00

2009-10

No

6G0924*

25.00

2009-10

Yet to be posed REC 350043 With GIS technology matching with the augmentation of 220 kV substation rd Sector-52A Gurgaon with 3 100 MVA 220/66 kV transformer.

No

66/11

6N0991*

2500

2009-10

Yes

150277783.xls.ms_office

Page 70 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

45 66 kV D/C line from 220 kV substation Sector-52A Gurgaon to proposed 66 kV substation Sector-51 Gurgaon with 0.4 Sq ACSR conductor .

X 6L0992*

86

2009-10

REC 350043 Construction of 66 kV D/C line from proposed 220 kV substation Sector-72 Gurgaon to proposed 66 kV substation Sector 51 Gurgaon would be considered while approving 220 kV substation sector-72 Gurgaon.

46 Two No. 66 kV bays at 220 kV substation Sector-52A Gurgaon for accommodating of 66 kV D/C line from 220 kV substation Sector-52A Gurgaon to proposed 66 kV substation Sector-51 Gurgaon. 47 66 kV Sector-43 Gurgaon (GIS) 2x25/31.5 66/11

6B0993*

120

2009-10

REC 350043 The cost to be borne by HUDA would be Covered decided by SE/ TS, HVPN, Gurgaon in under Sr. No. consultation with SE/ Op, DHBVN, 45 Gurgaon.

6N0994*

2500

2009-10

REC 350043 with GIS technology matching with the up gradation of 66 kV substation 56 Gurgaon to 220 kV level and up gradation of 66 kV Badshahpur sector 56 DLF line from 0.15 sq to 0.4 Sq conductor. REC 350043 The cost to be borne by HUDA would be decided by SE/ TS, HVPN, Gurgaon in consultation with SE/ Op, DHBVN, Gurgaon. REC 350066

Yes

48 LILO of 66 kV D/C Badshahpur sector 56 DLF line with 0.4 Sq ACSR at proposed 66 kV substation Sector-43 Gurgaon 49 Replacement of the existing 0.15 sq ACSR conductor from Madanpur (220 kV) Barwala - ShahzadpurNaraingarh 66 kV line with AAAC wolf on existing towers. 50 To augment the 66 kV conductor in Faridabad ring main to improve the power supply position in Faridabad by enhancing current carrying capacity of the ring main after augmentation.

3.5

6L0995*

75.25

2009-10

Yes

42

6E1028*

500.00

2008-09

Yes

102

6E1030*

2500.00

2009-10

REC 350047 (Part funding) and PFC 03403021 (Part funding)

Yes

150277783.xls.ms_office

Page 71 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 No

51 2nd 66 kV bus arrangement at 66 kV substation Harsaru.

X 6G1049*

35.00

2008-09

Yet to be posed

The modification required, if any, in the switch yard of 66 kV substation Harsaru, may be got done by SE/ TS, HVPN, Gurgaon after getting the GELO approved from Design wing HVPN, Panchkula

52 66 kV D/C line with 0.4 Sq. inch ACSR from proposed 400 kV substation Nawada to 66 kV substation Fatehpur Biloch. 53 Two 66 kV bays at Fatehpur Biloch substation for receiving 66 kV D/C line from 400 kV substation Nawada. 54 Two 66 kV bays at 220 kV substation BBMB Ballabgarh at the cost of HVPNL for taking out one 66 kV underground cable connection each to existing 66 kV substations Hyderabad Asbestos and Globe Steel. 55 To provide four single core cable connection (one core spare) for both 66 kV circuits i.e. 220 kV Ballabgarh to 66 kV Hyderabad Asbestos and 220 kV Ballabgarh to 66 kV Globe Steel. 56 One 66 kV bay each at 66 kV substation Hyderabad Asbestos and 66 kV substation Globe Steel for receiving cable connection mentioned above. 57 Erection of following 66 kV lines from proposed 220 kV substation sector72 Gurgaon:-

18

6L1061*

405.00

2009-10

Posed to NCRPB on 01.04.2009 Posed to NCRPB on 01.04.2009 Posed to NCRPB on 01.04.2009

Yes

6B1062*

80.00

2009-10

Covered under sr. No. 52 Yes

6B1065* 6B1066*

80.00

2009-10

6L1067* 6L1068*

200.00

2009-10

Posed to NCRPB on 01.04.2009

Yes

6B1069* 6B1070*

80.00

2009-10

Posed to NCRPB on 01.04.2009

Yes

150277783.xls.ms_office

Page 72 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

a)

66 kV D/C sector 72 sector 51 (0.4 Sq ACSR) LILO of existing 66 kV (0.15 Sq) D/C line Badshahpur sector 34 sector 10 line at sector-72 Gurgaon. Augmentation of Badshahpur sector 72 sector 34 sector 10 line with higher capacity INVAR conductor so that maximum amount of power can be transported by this line from 220 kV substation sector72 Gurgaon to both sides.

17

X 6L1087*

382.50

2009-10

Posed to NCRPB on 01.04.2009 Posed to NCRPB on 01.04.2009 Wherever needed multi circuit towers will be used to take out 220 kV & 66 kV lines from 220 kV substation sector-72 Gurgaon in view of Right of Way constraints.

b)

6L1088*

122.00

2009-10

Yes

58 Provision of two 66 kV bays at sector 51 Gurgaon 59 Erection of following 66 kV lines from proposed 220 kV substation at village Kheri Kanker (Nuh) with 0.4 Sq" ACSR: a) b) 66 kV D/C Kheri Kanker - Taoru line. 66 kV D/C Kheri Kanker - Sohna line. 66 kV D/C Kheri Kanker - Nagina line with LILO of one circuit at 66 kV substation Nuh. 40 16

6B1091*

80.00

2009-10

Posed to NCRPB on 01.04.2009

Covered under Sr. No. 57

2009-10

6L1117* 6L1118*

800.00 320.00

2009-10 2009-10

Yet to be posed Yet to be posed Yet to be posed Yet to be posed This 66 kV line will be constructed on 220 kV towers.

Yes Yes

c)

6L1119*

40.00

2009-10

Yes

60 Provision of 2 No. 66 kV bays at 66 kV substation Taoru

6B1120*

80.00

2009-10

Covered under Sr. No. 59 a)

150277783.xls.ms_office

Page 73 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Covered under Sr. No. 59 c) Covered under Sr. No. 59 b) Covered under Sr. No. 59 c)

61 Provision of 2 No. 66 kV bays at 66 kV substation Nagina

X 6B1121*

80.00

2009-10

Yet to be posed

62 Provision of 2 No. 66 kV bays at 66 kV substation Sohna 63 Provision of 2 No. 66 kV bays at 66 kV substation Nuh 64 Erection of following 66 kV D/C lines with 0.4 Sq. inch ACSR conductor. a) 66 kV D/C Rangala Rajpur - Nagina line. 66 kV S/C Rangala Rajpur Punhana line on D/C towers 36

6B1122*

80.00

2009-10

Yet to be posed Yet to be posed

6B1123*

80.00

2009-10

6L1144* 6L1145*

810.00

2010-11

Posed to NCRPB on 01.04.2009 Posed to NCRPB on 01.04.2009 Posed to NCRPB on 01.04.2009 Posed to NCRPB on 01.04.2009 Posed to NCRPB on 01.04.2009

Yes

b)

80

1800.00

2010-11

Yes

65 2 No. 66 kV bays at 66 kV substation Nagina for 66 kV D/C Rangala Rajpur Nagina line. 66 1 No. 66 kV bays at 66 kV substation Punhana for 66 kV D/C Rangal Rajpur Punhana line. 67 66 kV S/C Mandkola Nuh line with 0.2 Sq ACSR on D/C towers along with connected 66 kV bays at 66 kV substations Mandkola and Nuh 68 Augmentation of 66 kV S/C Sohna Nuh Nagina line from 0.1 Sq ACSR to 0.15 Sq All Aluminium Alloy conductor (AAAC)

6B1146*

85.00

2010-11

Covered under Sr. No.64 a) Covered under Sr. No.64 b) Yes

6B1147*

85.00

2010-11

6L1107*

2009-10

6E1108*

2009-10

Posed to NCRPB on 01.04.2009

Yes

150277783.xls.ms_office

Page 74 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes Yes

69 Procurement of one No. 16/20 MVA 66/11 kV Mobile substation 70 LILO of existing 0.15 Sq ACSR 66 kV S/C Tarau-Dharuhera line at Mau. 71 LILO of existing 0.15 Sq ACSR 66 kV S/C Pataudi-Dharuhera line at Mau. 72 Underground cable connection at 66 kV level (double circuit nature with one core spare) from proposed 220 kV substation Sector-20 Gurgaon to 66 kV substation Phase- IV Dundahera. 73 Underground cable connection at 66 kV level (double circuit nature with one core spare) from proposed 220 kV substation Sector-20 Gurgaon to 66 kV proposed substation Sector-17 Gurgaon 74 Underground cable connection at 66 kV level (double circuit nature with one core spare) from proposed 220 kV substation Sector-20 Gurgaon to 66 kV proposed substation HLF (Ambience). 75 Company Bagh Ambala City 76 LILO of one circuit of 66 kV D/C Dukheri - Layalpur Basti line at 66 kV substation Company Bagh Ambala City on D/C towers. 12 22

X 6G1114*

1088.00 259.93

2009-10 2010-11

REC 350047 Posed to NCRPB on 05.05.2009 Posed to NCRPB on 05.05.2009 To be posed

6L1155*

6L1156*

70.89

2010-11

Yes

6L1159*

300.00

2010-11

Yes

20

6L1160*

800

2010-11

To be posed

Yes

6L1161*

300.00

2010-11

Not required to be included in Investment Plan

1x12.5/16

66/11

6N1183* 6L1184*

586.05 25.00

2009-10 2009-10

REC 350064 REC 350064

Yes Yes

150277783.xls.ms_office

Page 75 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

77 Laying of cable in the portion between point where LILO line crosses railway line and 66 kV substation Company Bagh Ambala City (distance less than 800 m) 78 66 kV double circuit line from 220 kV substation Sector-57 Gurgaon to proposed 66 kV substation Ardee City Gurgaon.

0.8

6L1185*

40.00

2009-10

6L1199*

140

2010-11

The supply will be given through Not required underground cables or overhead system to be included equivalent to 0.4 Sq ACSR conductor in Investment as per availability of RoW and the Plan proportionate cost will be recovered from concerned agency/ developers by SE/TS HVPNL Gurgaon as per merits of the case. The supply will be given through underground cables or overhead system equivalent to 0.4 Sq ACSR conductor as per availability of RoW and the proportionate cost will be recovered from concerned agency/ developers by SE/TS HVPNL Gurgaon as per merits of the case.. Yes

79 66 kV double circuit line from 220 kV substation Sector-57 Gurgaon to proposed 66 kV substation Sector-45 Gurgaon.

6L1200*

300

2010-11

80 66 kV double circuit line from 220 kV substation Sector-57 Gurgaon to proposed 66 kV (DMRC) Metro.

12

6L1201*

420

2010-11

The supply will be given through Not required underground cables or overhead system to be included equivalent to 0.4 Sq ACSR conductor in Investment as per availability of RoW and the Plan proportionate cost will be recovered from concerned agency/ developers by SE/TS HVPNL Gurgaon as per merits of the case. To be posed Yes

81 Sector-17 Gurgaon (GIS)

2x25/31.5 1x0.2

66/11 11/0.4

6N1202*

2500.00

2010-11

150277783.xls.ms_office

Page 76 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

82 Baliyar Kalan

2x16/20 1x0.2

X 6N1219* 66/11 11/0.4

864.06

2010-11

Posed to NCRPB on 05.05.2009 Posed to NCRPB on 05.05.2009 Being posed to NCRPB

1x0.2 MVA 11/0.4 kV T/F for auxiliary supply

83 66 kV D/C Mau - Baliyar Kalan line with 0.4 Sq" ACSR 84 2 No. 6 kV bays at 220 kV substation Mau for providing feeding arrangement for 66 kV substation Baliyar Kalan. 85 D/C Mau - Bhora Kalan line with 0.4 Sq" ACSR 86 2 No. 6 kV bays at 220 kV substation Mau for providing feeding arrangement to 66 kV substation Bhora Kalan 87 2 No. 6 kV bays at 66 kV substation Bhora Kalan for receiving power supply from 220 kV substation Mau through D/C line. 88 2 No. 6 kV bays at 220 kV substation Mau to provide feeding arrangement for 66 kV substation Pachgaon in future. 89 Sector-64 Ballabgarh

28

6L1220*

577.22

2010-11

Yes

6B1221*

80.00

2010-11

Covered under Sr. No. 83

16

6L1223*

336.00

2010-11

Posed to NCRPB on 01.04.2009

Yes

6B1224*

80.00

2010-11

Covered under Sr. No. 85 Posed to NCRPB on 01.04.2009 Covered under Sr. No. 85

6B1225*

80.00

2010-11

6B1226*

80.00

2010-11

Covered under Sr. No. 59 of 220 kV works Posed to NCRPB on 01.04.2009 Posed to NCRPB on 01.04.2009 Yes

2x12.5/16 1x0.2 20

66/11 11/0.4

6N1265*

800.00

2010-11

90 66 kV D/C line with 0.4 Sq ACSR conductor from 400 kV substation Nawada to 66 kV substation Sector64 Ballabgarh.

6L1266*

420.00

2010-11

Yes

150277783.xls.ms_office

Page 77 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Yes

91 LILO of one circuit of 66 kV D/C A-1 (BBMB) A/5 line at proposed 66 kV substation Sector 64 Ballabgarh. 92 2 Nos 66 kV bays at 400/220 kV substation Nawada for 66 kV D/C Nawada - Sector 64 Ballabgarh line. 93 Sector-5 Panchkula (GIS) 94 Augmentation of existing 66 kV Sector 1 - Sector 3 Panchkula S/C line from 0.15 Sq" ACSR to 0.4 Sq" ACSR by putting mid span towers wherever necessary (with coordination/ consent of HUDA) 95 LILO of 66 kV Sec 1- Sec 3 Panchkula S/C line at the proposed 66 kV GIS sec 5 with 0.4 sq ACSR. 96 Augmentation of both circuits of under construction 66 kV Madanpursec 3, Panchkula S/C line on D/C towers from 0.2 sq to 0.4 sq ACSR by putting mid span towers wherever necessary (with coordination/ consent of HUDA). 97 Provision of double bus arrangement at 66 kV substation Sector 3 Panchkula in place of present single bus arrangement.

10

6L1267*

210.00

2010-11

Posed to NCRPB on 01.04.2009

6B1268*

80.00

2010-11

Covered under sr. No. 9 of 400 kV works World Bank For auxiliary supply Both circuits of lines shall be strung with 0.4 sq: ACSR wherever these lines are running on D/C towers and even if the other circuit forms a part of other lines. Yes Yes

2x25/31.5 1x0.2 2.5

66/11 11/0.4

6N1279* 6E1280*

2500.00 75.00

2009-10 2009-10 2009-10

6L1281*

21.00

2009-10

Yes

5.5

6E1282*

165.00

2009-10

Yes

6G1283*

40.00

2009-10

PFC 03403022

No

150277783.xls.ms_office

Page 78 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10

98 Providing one number 66 kV bay each at 220 kV substation Sector 52A and Sector 57 Gurgaon for giving power supply to 66 kV DMRC receiving receiving substation at sector-29 Sushant Lok Gurgaon. 99 Santokhi 100 66 kV D/C line from proposed 220 kV substation Raiwali to proposed 66 kV substation Santokhi with 0.4 ACSR. 101 Berkheri 60 2x12.5/16

X 6B1301* & 6B1302*

250.00

2010-11

The Government of Haryana may be Not required approached to advise about the name of to be included agency from which the cost of above in Investment mentioned 2 no. 66 kV bays is to be Plan charged by HVPNL.

66/11

6N1325* 6L1328*

800.00 1260.00

2010-11 2010-11

PFC 03403022 PFC 03403022

No No

1x12.5/16

66/11

6N1326*

600.00

2010-11

PFC 03403022

No

102 66 kV D/C line from proposed 66 kV substation Santokhi to proposed 66 kV substation Berkheri with 0.4 ACSR. 103 66 kV D/C line from proposed 220 kV substation Raiwali to existing 66 kV substation Barwala with 0.4 ACSR. 104 2 nos 66 kV bays at existing 66 kV substation Barwala for accommodating 66 kV D/C line (0.4 sq" ACSR) from proposed 220 kV substation Raiwali. 105 66 kV D/C line from proposed 66 kV substation Berkheri to existing 66 kV substation Naraingarh with 0.4 ACSR.

50

6L1329*

1050.00

2010-11

PFC 03403022

No

20

6L1327*

420.00

2010-11

PFC 03403022

No

6B1353* 6B1354*

68.64

2010-11

PFC 03403022

No

20

6L1330*

420.00

2010-11

PFC 03403022

No

150277783.xls.ms_office

Page 79 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 No

106 2 nos 66 kV bays at existing 66 kV substation Naraingarh for accommodating 66 kV D/C line (0.4 sq" ACSR) from proposed 66 kV substation Berkheri. 107 66 kV D/C line from existing 66 kV substation Naraingarh to existing 66 kV substation Raipur Rani with 0.4 ACSR. 108 2 nos 66 kV bays at existing 66 kV substation Naraingarh for accommodating 66 kV D/C line (0.4 sq" ACSR) from existing 66 kV substation Raipur Rani. 109 2 nos 66 kV bays at existing 66 kV substation Raipur Rani for accommodating 66 kV D/C line (0.4 sq" ACSR) from existing 66 kV substation Naraingarh. 110 66 kV D/C line from existing 66 kV substation Raipur Rani to proposed 220 kV substation Raiwali with 0.4 ACSR. 111 2 nos 66 kV bays at existing 66 kV substation Raipur Rani for accommodating 66 kV D/C line (0.4 sq" ACSR) from proposed 220 kV substation Raiwali. 112 66 kV S/C line from existing 66 kV substation Shahzadpur to existing 66 kV substation Naraingarh with 0.4 ACSR. 10 40 36

X 6B1355* 6B1356*

68.64

2010-11

PFC 03403022

6L1331*

756.00

2010-11

PFC 03403022

No

6B1357* 6B1358*

68.64

2010-11

PFC 03403022

No

6B1360* 6B1361*

68.64

2010-11

PFC 03403022

No

6L1332*

840.00

2010-11

PFC 03403022

No

6B1362* 6B1363*

68.64

2010-11

PFC 03403022

No

6L1333*

350.00

2010-11

PFC 03403022

No

150277783.xls.ms_office

Page 80 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 No

113 1 no 66 kV bay at existing 66 kV substation Naraingarh for accommodating 66 kV S/C line (0.4 sq" ACSR) from existing 66 kV substation Shahzadpur. 114 1 no 66 kV bay at existing 66 kV substation Shahzadpur for accommodating 66 kV S/C line (0.4 sq" ACSR) from existing 66 kV substation Naraingarh. 115 66 kV D/C line with 0.4 sq" ACSR between 220 kV substation Rampur Kamboan and 66 kV substation Chhachharauli. 116 66 kV D/C line with 0.2 sq" ACSR between 220 kV substation Rampur Kamboan and 66 kV substation Bilaspur 117 66 kV D/C line with 0.2 sq" ACSR between 220 kV substation Rampur Kamboan and 66 kV substation Sadhaura 118 2 nos. 66 kV bays at 66 kV substation Chhachharauli for connectivity with proposed 220 kV substation Rampur Kamboan. 119 2 nos. 66 kV bays at 66 kV substation Bilaspur for connectivity with proposed 220 kV substation Rampur Kamboan. 40

X 6B1359*

34.32

2010-11

PFC 03403022

6B1364*

34.32

2010-11

PFC 03403022

No

6L1372* 6L1237A

716.60

2010-11

PFC 03403021

Yes

25

6L1373* 6L1238A

287.45

2010-11

PFC 03403021

Yes

30

6L1374* 6L1239A

344.94

2010-11

PFC 03403021

Yes

6B1375*

68.64

2010-11

PFC 03403021

Covered in Sr. No. 115

6B1376*

68.64

2010-11

PFC 03403021

Covered in Sr. No. 116

150277783.xls.ms_office

Page 81 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 No

120 3 nos. 66 kV bays (two nos. for 66 kV lines and one no. for bus coupler) at 66 kV substation Sadhaura for connectivity with proposed 220 kV substation Rampur Kamboan. 121 2nd 66 kV bus bar arrangement at 66 kV substation Sadhaura to facilitate4 handling of different existing supplies (220 kV BBMB substation Khera, 220 kV substation Madanpur and 220 kV substation Jorian and proposed 220 kV substation Rampur Kamboan) 122 2nd 66 kV bus bar arrangement at 66 kV substation Bilaspur 123 2nd 66 kV Bus Bar at 66 kV substation Babain in view of connectivity with 220 kV substations Shahbad and Salempur 124 2nd 66 kV Bus Bar at 66 kV substation Raipur Rani in view of connectivity with 66 kV substation Barwala and proposed 220 kV substation Raiwali.

X 6B1377* 6B1378*

68.64

2010-11

PFC 03403021

6G1379*

45.90

2010-11

PFC 03403021

No

6G1380*

45.90

2010-11

PFC 03403021

No

6G1399*

43.79

2010-11

PFC 03403022

No

6G1412*

45.00

2010-11

Yet to be posed

No

150277783.xls.ms_office

Page 82 of 189

66 kV

LIST OF WORKS (66 kV AND ABOVE) 2009-10

Sr. Name of substation or line section No.

Line Transformer Voltage Length Capacity Ratio (Ckt - km) (MVA) (kV)

Code

Tentative Tentative Funds Cost in Rs completion Arrangements lac Schedule

Remarks

Works covered under Investment Plan 2009-10 No

125 To feed proposed 66 kV substations MES and Air Force at Ambala Cantt. as a temporary measure by charging them from 66 kV S/C Dhulkote-Babyal-IOC line through solid T-off from its tower location no. 80. The proposed 66 kV substations will ultimately be fed from 220 kV substation Tepla as per original approval bearing no. R 304 dated 17.05.2005.

X 6G1425*

2009-10

150277783.xls.ms_office

Page 83 of 189

66 kV

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule

Remarks

Works covered under Investment Plan 2009-10

66 kV AUGMENTATIONS 1 Sector-9 Gurgaon 2 Sector 10 Gurgaon 3 Sector-34 Gurgaon 4 Oswal Steel Faridabad 5 Nalvi 6 Pataudi 7 Ford Faridabad 8 Dharuhera (Gurgaon) 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/33 1x25/31.5 2x16/20 12.5/16 12.5/16 12.5/16 12.5/16 12.5/16 2x12.5/16 3x12.5/16 16/20 16/20 8.5 16 16 16 16 16 16 6N0560* 6G0670* 6G0671* 6G0674* 6G0675* 6G0673* 6A0680* 200.00 250.00 250.00 250.00 250.00 250.00 250.00 2009-10 2009-10 2009-10 2009-10 2009-10 2009-10 REC 350025 REC 350025 REC 350025 REC 350025 REC 350025 NCRPB a) Subject to management of load on the feeding line within the line capacity by the field office b) To shift 1x12.5/16 MVA 66/11 kV Yet to be posed transformer removed from 66 kV substation Maruti to 66 kV substation Dharuhera to replace sick & overloaded 10/12.5 MVA 66/11 kV transformer Spare power transformers along with bays Spare power transformers along with bays Spare power transformers along with bays Spare power transformers along with bays Spare power transformers along with bays Yes No No No No No Yes

66/11 66/11

12.5/16 10/12.5

12.5/16 12.5/16 3.5 6A0687* 150.00 2009-10

Yes

9 Yamunanagar

66/11 66/11 66/11

2x10/12.5 2x10/12.5 1x6 1x8 1x6 1x10/12.5 4.5 16 6A0908* 40.00 250.00 2009-10 2009-10 Yet to be posed Yet to be posed Matching with the up gradation of old 66 kV Mehrauli Road Gurgaon - Pataudi circuit on Hrail pole having 0.1 Sq ACSR to D/C 0.4 Sq ACSR on tower line in the section for connecting 66 kV substation Harsaru and 66 kV substation Pataudi. REC 350042 subjected to shifting of complete load of 66 kV substation Ladwa to 220 kV substation Salempur. 1x8 MVA 66/11 kV T/F commissioned on 29.12.2008 Yes Yes

10 Pataudi

66/11

2x12.5/16 3x12.5/16

11 Jathlana

66/11

1x12.5/16 2x12.5/16

16

6A0990*

250.00

2009-10

150277783.xls.ms_office

Page 84 of 177

66 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 250.00 2009-10 REC 350047

Remarks

Works covered under Investment Plan 2009-10 Yes

12 Dabriwala

66/11

1x12.5/16 2x12.5/16

16

6A0996*

The cost to be borne by any developers, HUDA etc, if any, would be decided by SE/ TS, HVPNL, Faridabad and SE/ Op, DHBVNL, Faridabad. The consumer M/s BSL (P) Ltd. Faridabad shall be required to deposit the share cost for providing additional 12.5/16 MVA 66/11 kV transformer at 66 kV substation Dabriwala with its controlling bay along with full cost of 66 kV lines, metering CTs and other protection equipments etc. required to be augmented to facilitate extension of load as per cost estimate to be prepared by SE/ TS HVPNL Faridabad.

13 Naraingarh

66/11

2x12.5/16 3x12.5/16

16

6A1029*

250.00

2009-10

REC 350042 Matching with the replacement of the existing 0.15 sq ACSR conductor from Madanpur (220 kV) Barwala ShahzadpurNaraingarh 66 kV line with AAAC wolf. along with its controlling 66 kV bay.

Yes

14 Nagina

66/11 66/33 66/33 66/33

1x7.5 1x10 1x6

1x7.5 1x10 1x6 1x8 8 16 6A1106* 6A1102* 50.00 250.00 2009-10 2009-10
Posed to NCRPB on 01.04.2009 Posed to NCRPB on 01.04.2009 Posed to NCRPB on 01.04.2009

Yes Yes

15 Aurangabad

66/11

1x12.5/16 2x12.5/16

16 Bhagola

66/11

1x12.5/16 2x12.5/16

16

6A1103*

250.00

2009-10

Yes

17 Chandhut

66/11

1x12.5/16 2x12.5/16

16

6A1104*

250.00

2009-10

Yes

18 Palwal (220 kV)

66/11

1x12.5/16 2x12.5/16

16

6A1105*

250.00

2009-10

Posed to NCRPB Suitable modification of existing 66 kV bus on 01.04.2009 coupler bay at 220 kV substation Palwal to

Yes

provide additional 12.5/16 MVA 66/11 kV transformer.

150277783.xls.ms_office

Page 85 of 177

66 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 150.00 2009-10

Remarks

Works covered under Investment Plan 2009-10 Yes

19 Universal Steel Alloy (USA) Faridabad 20 Manesar 21 Chhachharauli

66/11

1x10/12.5 1x12.5/16

3.5

6A0869*

Proportionate cost of installation of 1x12.5/16 MVA 66/11 kV transformer would be shared by NHPC.
Posed to NCRPB on 09.03.2009

66/11 66/33

1x12.5/16

1x25/31.5 1x8

15.50 8.00

6A1181* 6A1182*

300.00 75.00

2009-10 2009-10

Yes Temporarily arrangement to enable UHBVNL to release the pending LT/HT industrial connections from 33 kV substation Bilaspur during off period of rural feeders till such time the underlying system to be connected with 220 kV substation Chhachharauli (Malikpur Bangar) is finally approved/ decided. Subject to and matching with the up gradation of Badshahpur - Sector 56 section of 66 kV D/C line from existing 0.15 sq" to 0.4 sq" ACSR which is in progress. Yes

22 Sector-56 Gurgaon

66/11 66/11

1x12.5/16 1x12.5/16 1x12.5/16 1x25/31.5 15.5 6A1203* 300.00 2009-10 Posed to NCRPB on 09.03.2009 REC 350066

Yes

23 Barwala

66/11

1x8

1x12.5/16

6A1204*

200.00

2009-10

Subject to restriction of current on 66 kV Madanpur - Barwala D/C line to 600amp. Till such time its proposed augmentation of existing 0.15 Sq" ACSR to equivalent AAAC on existing towers is completed. To concur for creation of 33 kV substation at village Bahin by DHBVNL with installed capacity of 1x10 MVA 33/11 kV transformer to be fed from 66 kV substation Hathin. To concur erection of approximately 14 km 33 kV line by DHBVN from existing 66 kV substation Hathin to proposed 33 kV substation Bahin as proposed by DHBVN.

Yes

24 Hathin

66/33

1x8

8.00

6A1216*

80.00

2009-10

Yes

Erection of required 66 kV bay at 66 kV substation Hathin for controlling the 8 MVA 66/33 kV transformer.

6B1217*

40.00

2009-10

150277783.xls.ms_office

Page 86 of 177

66 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule

Remarks

Works covered under Investment Plan 2009-10 Proposal cancelled

25 Nagina (Cancellation of approval)

66/33

1x6

1x8

6A1006A

Cancellation of earlier approved augmentation of 6 MVA 66/33 kV transformer to 8 MVA 66/33 kV transformer at 66 kV substation Nagina as mentioned at Sr. No. 3 of approval conveyed vide this office memo No. R. 453/ Ch-146/408/K-43 dated 02.01.2008. 20.00 2009-10

Erection of 33 kV outgoing bay by HVPNL for feeding proposed 33 kV substation Bahin. 26 Bhore Kalan 66/11 2x12.5/16 2x25/31.5 31

3B1240*

6A1222*

300.00

2009-10

Posed to NCRPB on 09.03.2009 To load all the three 66/11 kV transformers at 66 kV substation Oswal and keep one number 66/11 kV transformer at 66 kV substation Dabriwala, however the above decision is subject to the condition that: 1. This is without prejudice to court orders issued in respect of power infrastructure in the area. No court order is to be violated. 2. There should be no additional burden financially to HVPNL with this arrangement. The commercial aspect thus needs to be looked into before executing the proposal in field.

Yes

27 Dabriwala

66/11

1X12.5/16 (As Hot T/F)

200.00

2009-10

Yes

28 Oswal Steel Faridabad

66/11 66/11

1x10

1x10 15.5 6A1250* 300.00 2010-11 Posed to NCRPB on 09.03.2009 Subject to laying of 66 kV XLPE underground cables from 220 kV substation BBMB Ballabgarh to both 66 kV substation Globe Steel and 66 kV substation Hydrabad Asbestos Subject to laying of 66 kV XLPE cables from 220 kV substation BBMB Ballabgarh to 66 kV substation Hydrabad Asbestos. Yes

1x12.5/16 1x25/31.5

29 Hydrabad Asbestos

66/11

2x12.5/16 2x25/31.5

31

6A1251*

600.00

2010-11

Posed to NCRPB on 09.03.2009

Yes

150277783.xls.ms_office

Page 87 of 177

66 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 300.00 2010-11 Posed to NCRPB on 09.03.2009

Remarks

Works covered under Investment Plan 2009-10 Yes

30 NH-3 Faridabad

66/11

1x10

1x25/31.5

21.5

6A1252*

Subject to providing 100 MVA 220/66 kV transformer at 220 kV substation Pali.

66/11 31 Sector-46 Faridabad 66/11

1x12.5/16 1x25/31.5 1x12.5/16 1x25/31.5

15.5 15.5 6A1253*

300.00 300.00

2010-11 2010-11 Posed to NCRPB on 09.03.2009 Subject to replacement of 66 kV ring main conductor with INVAR conductor and upgradation of existing 66 kV substations A-4 and A-5 to 220 kV level along with creation of 400 kV substation Nawada. Subject to providing 100 MVA 220/66 kV transformer at 220 kV substation Pali and providing INVAR conductor in the 66 kV ringmain of Faridabad. Yes

32 Sector-31 Faridabad

66/11

1x12.5/16 1x12.5/16

Yes

66/11

1x12.5/16 1x25/31.5

15.5

6A1254*

300.00

2010-11

Posed to NCRPB on 09.03.2009 Subject to upgradation of existing 66 kV substations A-4 and A-5 to 220 kV level and creation of 400 kV substation Nawada.

33 Palla (220 kV)

66/11

1x12.5/16 1x12.5/16

66/11 66/11

1x10/12.5 1x10/12.5 1x12.5/16 1x25/31.5 15.5 6A1256* 300.00 2009-10 Posed to NCRPB on 09.03.2009 Subject to providing 100 MVA 220/66 kV transformer at 220kV substation Pali. 2010-11 Posed to NCRPB on 09.03.2009 Subject to provision of INVAR conductor in the 66 kV ring-main of Faridabad and upgradation of existing 66 kV substations A-2 and A-5 to 220 kV level as well as creation of 400 kV substation Nawada. Subject to upgradation of existing 66 kV substation A-2 to 220 kV level (provision of bays for connectivity is under consideration with BBMB authorities). Yes Yes

34 Pali (220 kV) 35 Northern India Faridabad

66/11 66/11

1x7.5

1x12.5/16

8.5 15.5

6A1255* 6A1257*

200.00 300.00

1x12.5/16 1x25/31.5

36 A-2 Faridabad

66/11

2x12.5/16 2x12.5/16

Yes

150277783.xls.ms_office

Page 88 of 177

66 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 300.00 2010-11 Posed to NCRPB on 09.03.2009

Remarks

Works covered under Investment Plan 2009-10

66/11

1x12.5/16 1x25/31.5

15.5

6A1258*

37 A-4 (Sector-18) Faridabad

66/11 66/11

1x12.5/16 1x12.5/16 1x12.5/16 1x25/31.5 15.5 6A1259* 300.00 2010-11 Posed to NCRPB on 09.03.2009 Posed to NCRPB on 01.04.2009 Subject to augmentation of existing 66 kV substation A-4 to 220 kV level and creation of 400 kV substation Nawada. Subject to provision of INVAR conductor in the 66 kV ring-main Faridabad and augmentation of existing 66 kV substation A5 to 220 kV level as well as creation of 220 kV substation Nawada.

Yes

38 Fatehpur Biloch

66/11 66/11

1x8

1x8 1x12.5/16

16

6A1260*

200.00

2010-11

Yes

39 A-5 Faridabad

66/11 66/11

1x12.5/16 1x12.5/16 1x12.5/16 1x25/31.5 15.5 6A1261* 300.00 2010-11 Posed to NCRPB on 09.03.2009 Subject to augmentation of 66 kV substation A-5 to 220 kV level and laying of 66 kV underground XLPE cable from 220 kV substation BBMB Ballabgarh to 66 kV substation Globe Steel and 66 kV substation Hydrabad. With its controlling 66 kV bay Subject to provision of INVAR conductor in the 66 kV ring-main of Faridabad and upgradation of existing 66 kV substation A-2 to 220 kV level (provision of bays for connectivity is under consideration with BBMB authorities). Along with its controlling 66 kV bay. Subject to provision of INVAR conductor in the 66 kV ring-main of Faridabad and upgradation of existing 66 kV substation A-5 to 220 kV level. Yes

40 Escort-II Faridabad 66/11 1x12.5/16 2x12.5/16 16 6A1262* 250.00 2010-11 Posed to NCRPB on 01.04.2009

Yes

41 Badrola

66/11

1x12.5/16 2x12.5/16

16

6A1263*

250.00

2010-11

Posed to NCRPB on 01.04.2009

Yes

150277783.xls.ms_office

Page 89 of 177

66 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 250.00 2010-11 Posed to NCRPB on 01.04.2009

Remarks

Works covered under Investment Plan 2009-10 Yes

42 Chhainsa

66/11

1x12.5/16 2x12.5/16

16

6A1264*

Along with its controlling 66 kV bay. Subject to provision of INVAR conductor in the 66 kV ring-main of Faridabad and upgradation of existing 66 kV substation A-5 to 220 kV level.

43 Jalkheri

66/11

1x12.5/16 2x12.5/16

16

6A1405*

250.00

2009-10

Yet to be posed

Yes

44 Sector-2 IMT Manesar

66/11

1x12.5/16 2x12.5/16

16

6A1435*

250.00

2010-11

Yet to be posed To be done by HVPNL. One No. 66 kV transformer controlling bay at 66 kV substation Sector-2 IMT Manesar will be created by HVPNL. Yet to be posed To be done by HVPNL. One No. 66 kV transformer controlling bay at 66 kV substation Sector-4 IMT Manesar will be created by HVPNL.

No

45 Sector-4 IMT Manesar

66/11

1x12.5/16 2x12.5/16

16

6A1436*

250.00

2010-11

No

46 Raipur Rani

66/11

1x12/4/8

1x12/4/8

66/11

1x7.5

1x12.5/16

8.5

6A1440*

115.00

2010-11

Yet to be posed To allow UHBVNL to augment 33 kV substation Morni from 2 MVA to 4 MVA 33/11 kV transformer subject to 80% loading of its feeding transformer. NCRPB Substation commissioned on 05.07.08 with 1x12.5/16 MVA 66/11 kV T/F.

No

47 Escort-1

66/11

1x12.5/16 2x12.5/16

16 595.00

6U0588*

250.00 11470.00

2009-10

Yes

Total (66 kV Augmentation)

150277783.xls.ms_office

Page 90 of 177

66 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule

Remarks

Works covered under Investment Plan 2009-10

132 kV AUGMENTATIONS 1 MDU Rohtak 132/33 1x16/20 + 1x20/25 1x10/16 1x16/20 2x20/25 5 1A0624* 87.00 2009-10 Yes

2 Ding

132/11 132/33

1x10/16 1x16/20

To utilise 12.5 MVA 132/33 kV transformer available at Ismailabad, the same shall be installed for the time being. 16 1A0644* 182.00 2009-10 REC 350029 1x12.5 MVA 132/33 kV Commossioned on 28.12.2007 T/F Yes

132/33

1x10/16

3 Ellenabad

132/11

1x10/16

1x10/16

i) Installation of 16/20 MVA, 132/33 kV T/F alongwith 132 kV & 33 kV bays will be executed departmently out of Nigam funds. 20 1A0645* 182.00 2009-10 REC 350029 ii) 33 kV line from 132 kV S/S Ellanabad to connect existing Ellanabad - Bhuratwala 33 kV line with 0.1 Sq" ACSR about 3 Km will be constructed by DHBVN. 1x10/16 MVA 132/33 kV T/F commissioned on 30.01.2008 Allow UHBVN to feed new 33 kV substation Didwara with installed capacity of 8 MVA 33/11 kV transformer from 220 kV substation Safidon by making LILO arrangement of 33 kV Safidon Jalmana S/C line at 33 kV proposed substation Didwara matching with the augmentation of 220 kV substation Safidon by replacing 1x16/20 MVA 132/33 kV transformer by 20/25 MVA transformer. Yes

132/33

1x16/20

4 Safidon (220 kV)

132/33

16/20

20/25

1A0792*

200.00

2009-10

REC 350034

Yes

150277783.xls.ms_office

Page 91 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule

Remarks

Works covered under Investment Plan 2009-10

UHBVN shall work out the time frame for execution of creation of 33 kV substation Didwara keeping in view the time taken by HVPN to augment 220 kV substation Safidon. 5 Adampur 132/33 1x20/25 25 1A0793* 200.00 REC 350034 Allow DHBVN to feed new 33 kV substations Nangthala (1x6.3/8 MVA) and Modakhera (1x6.3/8 MVA). 33 kV new substation Modakhera will be fed through 33 kV Siswal Modakhera line and 33 kV new substation Nangthala will be fed through T-off from 33 kV Adampur - Agroha line. 1x20/25 MVA T/F commissioned on 27.02.2009 Yes

6 Satnali

132/33

1x20/25

25

1A0794*

200.00

2008-09

REC 350034

Allow DHBVN for shifting the 2 Nos. 33 kV substations Zerpur (6.3/8 MVA) and Barda (6.3 MVA) from 220 kV substation Mohindergarh to 132 kV substation Satnali. Creation of 2 Nos. 33 kV bays at 132 kV substation Satnali to accommodate the lines feeding the 33 kV substations Zerpur and Barda. The relief available and bay vacated at 220 kV substation Mohindergarh after shifting of above 2 Nos. 33 kV substations Zerpur and Barda to 132 kV substation Satnali, would be utilized for feeding of new proposed 33 kV substations Budeen (6.3/8 MVA) and Sehlang (5 MVA).

Yes

150277783.xls.ms_office

Page 92 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 250.00 2008-09 REC 350034

Remarks

Works covered under Investment Plan 2009-10 Yes

Ateli

132/33

20/25

25

1A0817*

Transformer T-2 of 10/16 MVA 132/11 kV may be shifted on the new bay which can be created at the entrance side in the yard so that new transformer of 20/25 MVA can be installed at the present location of T-2 as proposed by SE/ TS, HVPN, Gurgaon. Allow DHBVN to feed new 33 kV substation Mandola with installed capacity of 6.3/8 MVA 33/11 kV transformer from 132kV substation Charkhi-Dadri-II. Allow DHBVN to feed new 33 kV substation Kheri Butter with installed capacity of 6.3/8 MVA 33/11 kV transformer from 132kV substation Charkhi-Dadri-II. Creation of one 33 kV bay at 132 kV substation Charkhi-Dadri-II for feeding the new 33 kV substation Kheri Butter. Allow DHBVN to augment 33 kV substation Sanjarwas from 2x4 + 1x6.3 MVA, 33/11 kV to 1x 4 + 1x6.3 + 1x6.3/8 MVA, 33/11 kV transformers. Both the 20/25 MVA T/F commissioned on 5.5.2008 & 31.5.2008 respectively.

8 Dadri-II

132/33

2x10/16

2x20/25

18

1A0795*

400.00

REC 350034

Yes

150277783.xls.ms_office

Page 93 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 200.00 REC 350021

Remarks

Works covered under Investment Plan 2009-10 Yes

9 Dhanauri (Amendment approval)

132/33 of earlier

1x20/25

25

1U0759*

REC Scheme No.350021 (Rs. 6.03 Crore) Creation of 132 kV substation Dhanouri with 1x20/25 MVA 132/33 kV + 1x10/16 MVA 132/11 kV transformers against already approved capacity of 2x10/16 MVA 132/11 kV transformers. T/F commissioned on 18.10.2008 REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Commissioned with 1x10/16 MVA 132/11 kV T/F on 30.5.2006 REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Spare power transformers along with bays. Commissioned on 20.04.09

10 Rasina

132/11

1x10/16

2x10/16

16

1U0517*

250.00

2009-10

REC 350025

Yes

11 Kaul

132/11

1x10/16

16

1G0636*

250.00

2009-10

REC 350025

No

12 Uklana

132/11

1x10/16

16

1G0638*

250.00

2009-10

REC 350025

REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Spare power transformers along with bays REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Spare power transformers along with bays

No

13 Bhiwani

132/11

1x10/16

16

1G0639*

250.00

2009-10

REC 350025

No

14 Sonepat (220 kV)

132/11 132/33 132/11

1x10/16 1x20/25 1x10/16 1x20/25

1x10/16 1x20/25 1x10/16 1x10/16 1x20/25 1x20/25 25 1A0658* 315.00 2009-10 NCRPB Commissioned on 13.04.2009 Yes 16 1A0657* 250.00 NCRPB No

15 Murthal

132/11 132/33 132/33

150277783.xls.ms_office

Page 94 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 250.00 2009-10 NCRPB

Remarks

Works covered under Investment Plan 2009-10 Yes

16 Kosli

132/11

10/16

16

1A0818*

Augmentation of 132 kV substation Kosli by installation of 10/16 MVA 132/11 kV transformer in place of existing (2x5 + 1x4) MVA 33/11 kV transformer matching with commissioning of additional 1x50 MVA 220/132 kV transformer at 220 kV substation Rewari. No additional 11 kV feeders would be allowed to DHBVN from this substation and subject to load management by HVPN and DHBVN field officers/ official during real peak time.

17 132 kV Rai (HSIDC)

132/11

1x10/16

16

1A0867*

250.00

2009-10

NCRPB

Installation of 1x10/16 MVA 132/11 kV transformer at upcoming 132 kV substation Rai (HSIDC) at the cost of HVPN to take care the load of the area other than that of HSIDC. Installation of additional 1x10/16 MVA 132/11 transformer approved at 132 kV substations Rai vide this office Memo No. R.No.346/Ch-9/407/K-190 dated 31.03.2006 may be deleted from the list of works of HVPN for the year 2006-07 (1A0659A)

Yes

18 132 kV HSIIDC Kundli

132/11

1x10/16

16

1N0865*

250.00

2009-10

NCRPB

Creation of 132 kV substation HSIDC Kundli with installed capacity of 1x16/20 MVA 132/11 kV transformer by HSIDC at their own cost. 1x10/16 MVA 132/11 kV transformer would be installed at this substation by HVPN at HVPN cost to take care the load of the area other than that of HSIDC.

Yes

150277783.xls.ms_office

Page 95 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule

Remarks

Works covered under Investment Plan 2009-10

Installation of additional 1x10/16 MVA 132/11 kV transformer approved at 132 kV substations Kundli vide this office Memo No. R.No.346/Ch9/407/K-190 dated 31.03.2006 may be deleted from the list of works of HVPN for the year 2006-07 (1A0660A) 19 Pehowa (220 kV) 132/33 1x16/20 or 20 -20 One of 16/20 or 20 MVA transformer to be removed after commissioning of 132 kV Dhand. 1A0799* 140.00 2008-09 1x10/16 MVA 132/33 kV transformer being spared on augmentation of 132 kV substation Dadri-II subject to load managements during peak hours by the local HVPN personnel. Allow UHBVN to augment 33 kV substation Sasroli from 2x4 MVA 33/11 kV transformers to (4 + 6.3) MVA transformers matching with augmentation of 132 kV substation Mattanhail. The sick transformer of 8/4/4 MVA 132/33/11 kV rating may be utilized after repair during emergency in system. 1A0886* 250.00 2009-10 REC 350042 Matching with the commissioning of 220 kV substation Bastra and LILO of 132 kV S/C line between Gharaunda and Madhuban at 220 kV substation Bastra. Yes Yes

20 Mattanhail

132/33

1x10/16

16

132/33/11

8/4/4

-8

21 Gharaunda

132/33

20/25

25

150277783.xls.ms_office

Page 96 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 2009-10

Remarks

Works covered under Investment Plan 2009-10

Creation of 2 Nos. 33 kV bays at 132 kV substation Gharaunda to accommodate the lines feeding the 33 kV substations Kamla and Kalram.

3B0887* & 3B0888*

Allow UHBVN for feeding the 2 Nos. 33 kV substation Kamla (10 MVA) and Kalram (10 MVA) from 132 kV substation Gharaunda matching with the commissioning of 220 kV substation Bastra and LILO of 132 kV S/C line between Gharaunda and Madhuban at 220 kV substation Bastra. to feed 33 kV substations Sekhupur and Chochra subject to completion of 132 kV Assandh Jalmana S/C line.

22 132 kV Jalmana

132/11

1x10/16

1x10/16

132/33

1x20/25

25

1A0972*

250.00

2009-10

REC 350042

Creation of two 33 kV bays at 132 kV substations Jalmana to feed the new 33 kV substations Sekhupur and Chochra. Cancellation of already approved installation of additional 1x10/16 MVA 132/11 kV and 1x8 MVA 132/33 kV transformers at 132 kV substation Kharkhoda vide this office Memo No. R.No.346/Ch-9/407/K-190 dated 31.3.2006 and to delete these works from the list of works of HVPN for the year 2007-08. Augmentation of 132 kV substation Kharkhoda with installation of additional 1x20/25 MVA 132/33 kV transformer.

Yes

23 132 kV Kharkhoda

132/33

1x20/25

25

1A1001*

250.00

2009-10

REC 350047

Yes

150277783.xls.ms_office

Page 97 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule

Remarks

Works covered under Investment Plan 2009-10

To allow UHBVN to feed proposed new 33 kV substations Sisana (8 MVA), Kharkhoda (8 MVA) and Firozpur Bangar (8 MVA) from 132 kV substation Kharkhoda subject to above augmentations. Creation of three Nos. 33 kV bays at 132 kV substation Kharkhoda to accommodate the line feeding 33 kV substation Kharkhoda, Sisana and Firozpur Bangar. 24 132 kV Digwan Jattan 132/33 1x20/25 25 1A1009* 250.00 2009-10 350042 matching with the shifting of load of 132 kV substation Behal from 220 kV substation Bhiwani to upcoming 220 kV substation Isharwal. Allow DHBVN to feed new 33 kV substations Kari Dharni and Baralu with installed capacity of 10MVA 33/11 kV transformer each from 132 kV Dighawan Jattan matching with above. Creation of two nos. 33 kV bay at 132 kV substation Dighawan Jattan to feed 33 kV substations Kari Dharni and Baralu matching with above matching with the creation of 220 kV substation Sampla and shifting of feeding of 132 kV substations Sampla & MDU Rohtak from 220 kV substation Rohtak to 220 kV substation Sampla. Yes Yes

132/11

2x10/16

2x10/16

132/33

1x16/20

1x16/20

25 132 kV Gohana

132/11

2x10/16

2x10/16

150277783.xls.ms_office

Page 98 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 200.00 2009-10 REC 350047

Remarks

Works covered under Investment Plan 2009-10

132/33

1x16/20

1x20/25

1A1017*

Allow UHBVN for the augmentation of 33 kV substation Khanpur-Kalan from (1x6.3/8 + 4) MVA 33/11 kV to 2x6.3/8 MVA 33/11 kV transformers matching with above. Advising UHBVN to create a 33 kV line from 132 kV Mundlana to 33 kV Khanpur Kalan for reliability and alternative source. HVPN shall provide necessary bay at feeding end on receipt of confirmation from UHBVN.

26 132 kV Chajjpur

132/33

1x12.5

1x20/25

12.5

1A1014*

200.00

2009-10

REC 350047

matching with the creation of 220 kV substation Chhajpur and shifting of feeding source of 132 kV substation Chhajpur from 220 kV substation PTPS Panipat to 220 kV substation Chhajpur Allow UHBVN for feeding the 33 kV substation Jalalpur (10 MVA) from 132 kV substation Chhajpur matching with above. Creation of 1 Nos. 33 kV bays at 132 kV substation Chhajpur to accommodate the lines feeding the 33 kV substation Jalalpur matching with above.

Yes

150277783.xls.ms_office

Page 99 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule Cancelled

Remarks

Works covered under Investment Plan 2009-10 Proposal cancelled

27 132 kV Badhra

132/33 132/11 132/33 132/33

1x10/16 1x10/16 1x10/16

1x20/25 1x10/16 1x10/16 1x20/25

1A1012A

25

1A1406*

250.00

REC 350042

Matching with shifting of enough load of 132 kV substation Behal/ Miran/ Jui/ Tosham from 220 kV substatioin Bhiwani to upcoming 220 kV substation Isharwal. Subject to commissioning of 220 kV substation Isharwal. Concurring proposal for creation of new 33 kV substation Hassan (2x6.3/8 MVA) with approximately 12 km 33 kV Miran - Hassan line by DHBVN. Concurring proposal for creation of new 33 kV substation Bhera (1x6.3/8 MVA) by erecting 7.5 km T-off line from existing 33 kV Miran - Isharwal line with feeding from 132 kV substation Miran opening from Isharwal side by DHBVN. Concurring proposal for augmentation of 33 kV substation Siwani from 5+6.3 MVA to 6.3/8+6.3 MVA 33/11 kV by DHBVN.

Yes

28 132 kV Miran

132/33 132/11

1x20/25 1x8

2x20/25 1x8

25

1A1031*

250.00

2009-10

REC 350042

Yes

Creation of one No. 33 kV bay at 132 kV substation Miran for 33 kV Miran - Hassa line proposed.

3B1032*

2009-10

Utilisation of existing bay and 33 kV Miran - Isharwal line by extending in between by 7.5 km for Miran - Bhera 33 kV line.

150277783.xls.ms_office

Page 100 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 250.00 2009-10 REC 350042

Remarks

Works covered under Investment Plan 2009-10 Yes

29 132 kV Nautch

132/33

1x20/25

25

1A1041*

1) Matching with the commissioning of 220 kV substation Kaul and shifting of load of 132 kV substation Kaul (32 MVA) and Pundri (69.5 MVA) from 220 kV substation Kaithal to 220 kV substation Kaul. Concurrence to create new 33 kV substation Jagdishpura (10 MVA) with approxomately 13 km 33 kV line from 132 kV substation Nautch matching with as above (1). Concurrence to augment 33 kV substation Kawartan from 2x4 MVA to 4+10 MVA 33/11 kV with 33 kV feeding from 132 kV Nautch by utilising the existing 33 kV bay and Nautch - Kawartan - Sewan line also matching with as above

Creation of 1 No. 33 kV bay at 132 kV substation Nautch to accommodate 33 kV feeding line for 33 kV substation Jagdishpura. 30 132 kV Madhosinghana 132/11 2x10/16 2x10/16

3B1042*

2009-10

Allow DHBVN to shift 2 nos. 33 kV substations Sahidanwali (8MVA) & Titukhera/ Dhani kahan singh (8 MVA ) from 220 kV substation Sirsa to 132 kV substation MadhoSinghana through above mentioned 132/33 kV transformer. 25 1A1076* 250.00 2009-10 REC 350066 No

132/33

1x20/25

150277783.xls.ms_office

Page 101 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 2009-10

Remarks

Works covered under Investment Plan 2009-10

Creation of one no. 33 kV bay at 132 kV substation Madhosinghana to accommodate the 33 kV line feeding 33 kV substations Sahidanwali & Titukhera/Dhani kahan singh. 31 Mohindergarh 132/11 1x12.5 1x10/16 3.5

3B1077*

Allow DHBVN to create new 33 kV substation Ahmadpur Road Sirsa (8MVA) with feeding from 220 kV substation Sirsa by utilizing idle 33 kV Sirsa-Ram Nagaria line and 33 kV bay at 220 kV substation Sirsa

1A1092*

125.00

2009-10

REC 350066

As per HVPNL policy 16/20 MVA 132/11 kV transformers shall br procured in place of 10/16 MVA 132/11 kV transformers for the above works.

Yes

132/11 132/33 132/33 32 Kanina Khas 132/11 33/11 132/33 33 Mundia Khera 132/11

1x10/16 2x10/16 1x12.5 1x10/16 1x6.3 1x16/20 1x10/16

1x10/16 2x10/16 1x12.5 2x10/16 9.7 1A1093* 200.00 2009-10 As per HVPNL policy 16/20 MVA 132/11 kV transformers shall br procured in place of 10/16 MVA 132/11 kV transformers for the above works. As per HVPNL policy 16/20 MVA 132/11 kV transformers shall br procured in place of 10/16 MVA 132/11 kV transformers for the above works. 1A1094* 250.00 2009-10 REC 350066 Yes Yes

1x16/20 1x10/16

132/33

1x20/25

150277783.xls.ms_office

Page 102 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 2009-10

Remarks

Works covered under Investment Plan 2009-10

Construction of 2 No. 33 kV bays at 132 kV substation Mundia Khera one of the existing 33 kV Nangal Sirohi line and other for 33 kV line for connecting 5 No. NB PHs (by providing approximately 2.5 km 33 kV link line by DHBVNL) 34 Narnaund 132/11 132/33 2x10/16 2x10/16 1x20/25 25

3B1095* 3B1096*

1A1179*

250.00

2009-10

REC 350066

With shifting of 132 kV feeding of 132 kV substation Narnaund from 220 kV substation Jind to proposed 220 kV substation Masudpur(Hansi). Matching with installation of 2nd 100 MVA 220/132 kV transformer at 220 kV substation Rania To allow DHBVNL to feed already approved loads of 33 kV substations Keharwala (9 MVA with proposed augmentation to 15.3 MVA), Mohamadpuria (8 MVA), Mastangarh (10 MVA) and Haripura (10 MVA) from 132 kV substation Jiwan Nagar and feed 33 kV loads of existing Ellenabad (18.3 MVA), proposed Kuttabad (8 MVA), Bhuratwala (9 MVA likely to be augmented to 15 MVA) and newly identified 33 kV Dholpalia (10 MVA) from 132 kV substation Ellenabad.

Yes

35 Ellenabad (Mithisurera)

132/11

1x10/16

1x10/16

132/33

1x10/16

1x10/16

132/33

1x20/25

25

1A1189*

250.00

2009-10

REC 350066

150277783.xls.ms_office

Page 103 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule

Remarks

Works covered under Investment Plan 2009-10

36 Hisar Road Rohtak Creation of one number 132 kV bay at 132 kV substation Hisar Road Rohtak for controlling 16/20 MVA 132/11 kV transformer. 37 Rewari (220 kV) Creation of new 132 kV bay for providing additional 20/25 MVA 132/33 kV transformer at 220 kV substation Rewari.

132/33 132/11

2x20/25

2x20/25 1x16/20

20

1A1242* 1B1243*

200.00 50.00

2009-10 2009-10

Yes

132/33

2x20/25

3x20/25

25

1A1245* 1B1246*

250.00

2009-10

SE/ TS, HVPNL Gurgaon will create the necessary bay space by dismantlement of transformer plinth and equipment foundation of abandoned 66 kV substation at 220 kV substation Rewari and shifting of existing 33 kV Jonawas line and 11 kV capacitor bank for which the necessary estimate will be got sanctioned before start of work.

Yes

38 Kaithal (Titram) 220 kV

132/33

1x20/25

25

1A1288*

250.00

2009-10

PFC 03403021

Construction of one no. 132 kV bay for shifting of existing 10/16 MVA 132/11 kV transformer from its existing plinth at 220 kV substation Kaithal (Titran) The additional 20/25 MVA 132/33 kV transformer shall be installed on the bay spared by shifting of existing existing 10/16 MVA 132/11 kV transformers.

1B1287*

50.00

2009-10

To request UHBVNL to take out 33 kV feeders through under ground cable in view of space constraints for right of way.

Yes

150277783.xls.ms_office

Page 104 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule

Remarks

Works covered under Investment Plan 2009-10

39 Bawal (HSIIDC)

132/11 132/33

1x16/20

1x16/20 1x20/25 25 1A1247* 409.20 2009-10 Posed to NCRPB on 05.05.2009

The 4.5 MVA load of M/s IOCL will be released by DHBVNL from 1x20/25 MVA 132/33 kV T/F to be provided at 132 kV substation HSIIDC Bawal by HVPNL. However the proportionate cost of 20/25 MVA 132/33 kV T/F and other allied equipments for release of 4.5 MVA load will be got deposited by SE/TS HVPNL Gurgaon from M/s IOCL before execution of work. A necessary tripartite agreement will also be executed by M/s IOCL with HVPNL and DHBVNL before release of their connection. Providing relief to overloaded 66 kV substation Dharuhera by shifting the existing 8.5 MVA load of 33 kV substation ACCIL Bawal from 66 kV substation Dharuhera to 132 kV substation HSIIDC Bawal. The load of 33 kV substation Mohanpur (1x10 MVA) being proposed by DHBVN will also be fed from 132 kV substation HSIIDC Bawal. Due to RoW problem the 33 kV outgoing lines from 132 kV substation HSIIDC Bawal will be taken out through underground 33 kV cable.

Yes

Creation of one no. 132 kV bay for 132 kV substation HSIIDC Bawal for controlling 20/25 MVA 132/33 kV transformer.

1B1248*

50.00

2009-10

Creation of 1 No. incoming and 3 no. outgoing 33 kV bays at 132 kV substation HSIIDC Bawal to feed 33 kV substations proposed by DHBVNL.

3B1249*

20.00

2009-10

150277783.xls.ms_office

Page 105 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 250.00 2009-10 PFC 03403022

Remarks

Works covered under Investment Plan 2009-10 Yes

40 Jui

132/33

1x20/25

25

1A1284*

To allow DHBVN to feed 33 kV substations: Nangla and Pohkarwas from 132 kV substation Jui matching with the commissioning of additional 1x20/25 MVA 132/33 kV transformer at 132 kV substation Jui. 2) Gopalwas and mandoli Khurd (in place of already approved 33 kV substations Jhumpa and Pataudi) from 220 kV substation Isherwal.

41 Kheri Gulam Ali 42 Naultha 43 Kirmitch 44 Israna 45 Teliwara 46 Creation of one no. 132 kV bay for accommodating transformer as above and 2 nos. 33 kV bays to connect proposed 33 kV substations Chando Khurd and nanheri at 132 kV substation Teliwara. 47 Atela (132 kV)

132/33 132/33 132/33 132/33 132/33

1x20/25

2x20/25 1x20/25 1x20/25 1x20/25 1x20/25

25 25 25 25 25

1A1285* 1A1293* 1A1294* 1A1303* 1A1311* 3B1312*, 3B1313*

250.00 250.00 250.00 250.00 250.00 40.00

2009-10 2009-10 2009-10 2010-11 2009-10 2009-10 To allow DHBVN to connect proposed 33 kV substations Chando Khurd (10 MVA) and Nanheri (10 MVA) matching with the augmentation of 132 kV substation Teliwara.

132/11 132/33 132/33

2x10/16 1x10/16

2x10/16 1x10/16 1x20/25 1x20/25 5 1A1407* 1A1431* 250.00 200.00 2009-10 2009-10 PFC 03403022 Matching with completion of S/C 132 kV Dadri - Jhojju Kalan line. No

48 Kaithal (132 kV)

132/33

1x16/20

150277783.xls.ms_office

Page 106 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition

Code

Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule 200.00 2009-10

Remarks

Works covered under Investment Plan 2009-10 Yes

49 Bhagal (132 kV)

132/33

1x10/16

1x20/25

1A1413*

Subject to commissioning of already approved 3rd 100 MVA 220/132 kV transformer at 220 kV substation Cheeka. Allow UHBVNL to augment 33 kV substation Paprala from 1x8 + 1x6.3 MVA to 2x8 MVA 33/11 kV transformers (fed from 132 kV susbatation Bhagal) matching with augmentation of 132 kV substaion Bhagal To allow UHBVNL to feed proposed 33 kV substation Balbera (20 MVA) from 132 kV substation Bhagal matching with augmentation of 132 kV subsation Bhagal

Creation of one 33 kV bay at 132 kV substation Bhagal to accommodate 33 kV line for proposed 33 kV substation Balbera (20 MVA)

3B1414*

50 Bahadurgarh 51 Khurana 52 Nautch 53 Dhand

132/33 132/33 33/0.4 132/11

1x16/20

1x20/25 1x20/25 1x0.2

5 25

1A1447* 1A1441* 1G1385*

200.00 250.00 4.00 200.00

2010-11 2010-11 2009-10 2009-10 REC 350027 Substation commissioned 1x10/16 MVA 132/11 transformer on 23.12.2008 with kV

No No No Yes

1x10/16

2x10/16

16

1U0474*

54 Bhadson

132/11

1x10/16

2x10/16

16

1U0503*

200

2009-10

REC 350030

Commissioned with 1x10/16 MVA T/F on 10.02.2009 One transformer will be installed in the first instance while the second will be added as the load grows. Substation commissioned on 26.6.2008 with 1x10/16 MVA 132/11 kV transformer.

Yes

55 Dahina

132/11

1x10/16

2x10/16

16

1U0509*

200.00

2009-10

NCRPB

Yes

150277783.xls.ms_office

Page 107 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10


55 Sr. No. Name of substation Voltage Capacity in MVA Ratio (kV) Existing Proposed Net Addition Funds Tentative Tentative Arrangements Cost in Rs completion lac Schedule Remarks Works covered under Investment Plan 2009-10

Code

Advising HVPN field officers about 132 kV Dahina to be normally fed from Mohindergarh side with facility to feed it from Rewari side in case of emergency / exigency including routine maintenance. Total (132 kV Augmentation) 859 12354.20

150277783.xls.ms_office

Page 108 of 170

132 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Ratio (kV)

Capacity in MVA Existing Proposed Net Addition

Code

Tentative Tentative Cost in Rs completion lac Schedule

Funds Arrangements

Remarks

Works covered under Investment Plan 2009-10

220 kV AUGMENTATIONS 1 Pehowa 2 Nissing Aug. of 132 kV bus bar conductor from twin Zebra to Twin tarantulla at 220 kV substation Nissing. Dismantlement of 5 Nos category III residences and their reconstruction at suitable place within 220 kV substation Nissing as identified by SE/ TS, HVPN, Karnal.

220/132 220/132

2x100+50 2x100

3x100 3x100

50 100

2A0791 * 2A0819 * 1G0820*

400.00 500.00

2009-10 2009-10 2009-10

REC 350034 REC 350034

Commissioned on 28.04.09

Yes Yes

2G0821*

2009-10

3 Palli

220/66

1x100

100

2G0617 *

644.00

2009-10

REC 350025

REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Spare power transformers along with bays REC No.350025.(Rs.51.05 procurement of T/Fs power transformers bays REC No.350025.(Rs.51.05 procurement of T/Fs power transformers bays Scheme Cr)- Under only. Spare along with Scheme Cr)- Under only. Spare along with

No

4 Sirsa

220/132

1x100

100

2G0618 *

534.00

2009-10

REC 350025

No

5 Karnal

220/132

1x100

100

2G0619 *

534.00

2009-10

REC 350025

No

6 IMT Manaser 7 Jind 8 Cheeka

220/66 220/132 220/132

1x100 2x100 2x100

2x100 3x100 3x100

100 100 100

2A0620 * 2A0889* 2A0900*

500.00 625.00 625.00

2009-10 2009-10 2009-10

Yet to be posed REC 350042 REC 350042

Yes Yes Yes

150277783.xls.ms_office

Page 109 of 170

220 kV Augmentations

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

Sr. No.

Name of substation

Voltage Ratio (kV)

Capacity in MVA Existing Proposed Net Addition

Code

Tentative Tentative Cost in Rs completion lac Schedule

Funds Arrangements

Remarks

Works covered under Investment Plan 2009-10

9 Isherwal

220/132

1x100

3x100

200

10 Rohtak 11 Rewari

220/132 220/132

1x50 2x100

1x100 2x100

50

2A0938 * 2A1039 * 2A1036*

1300.00

2009-10 2009-10 2009-10

REC 350042

Yes

400.00

No SE/ TS, HVPNL Gurgaon will create the necessary bay space by dismantlement of transformer plinth and equipment foundation of abandoned 66 kV substation at 220 kV substation Rewari and shifting of existing 33 kV Jonawas line and 11 kV capacitor bank for which the necessary estimate will be got sanctioned before start of work.

220/132 12 Daultabad 220/66

1x50 2x100

1x100 3x100

50 100

2A1244* 2A1433*

550.00 600.00

2009-10 2010-11

Yet to be posed Yet to be posed Provision of one no. 220 kV bay on primary side of additional 100 MVA transformer at 220 kV substation Daultabad. Provision of one no. 66 kV bay on secondary side of additional 100 MVA transformer at 220 kV substation Daultabad. Provision of one no. 220 kV bay on primary side of additional 100 MVA transformer at 220 kV substation Nuna Majra. Provision of one no. 132 kV bay on secondary side of additional 100 MVA transformer at 220 kV substation Nuna Majra.

Yes

13 Nuna Majra (Bahadurgarh)

220/132

2x100

3x100

100

2A1434*

550.00

2010-11

Yet to be posed

No

Total (220 kV Augmentation)

950

7762.00

150277783.xls.ms_office

Page 110 of 170

220 kV Augmentations

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 1 2 3 4 5 6 7 Bhatgaon Teak Safidon/Hatt City Railway Stn. Bhiwani Pataudi M.C.III Pump House Rudrol 132 kV Harsana Kalan 132 kV Thana 132 kV Safidon 132 kV Bhiwani 132 kV Miran 132 kV Kanina Khas 132 kV Jhojju Kalan 132 kV Adampur 132 kV Munak 132 kV Samalkha 132 kV Nilokheri 132 kV Gannaur 132 kV Cheeka 132 kV Newal 132 kV Kosli 132 kV Kosli 132 kV Sector-3 Rohtak 132 kV Sampla 132 kV Sampla 132 kV Kharkhoda 132 kV Kalanaur Matching with the upgradation of 33 kV substation Beri to 132 kV level. One no. 33 kV bay at 132 kV substation Cheeka is spared on upgradation of 33 kV Baghal to 132 kV level Two nos bays at 132 kV substation Newal to facilitate feeding of 33 kV substations Nalipur & Gheer. Matching with Kanina Khas - MCD-III Pump House 33 kV line. Matching with 2nd 33 kV Ckt. between Jhojju Kalan & Rudrol Remarks Code

For out going feeder from 132 kV S/S Harsana Kalan to 33 kV Bhatgaon Matching with augmentation of 132/33 kV T/F at 132 kV S/S Thana Matching with 33 kV 2nd Ckt. between Safidon 132 kV S/S and Safidon 33 kV S/S.

3B0713* 3B0714* 3B0715* 3B0716* 3B0717* 3B0718* 3B0719* 3B0720* 3B0721* 3B0722* 3B0723* 3B0725* 3B0726* 3B0727* 3B0728* 3B0729* 3B0730* 3B0731* 3B0732* 3B0733* 3B0804*

8 Siswal 9 Budhanpur 10 UHBVN consumers 11 Shamgarh 12 Sardana 13 Mahmoodpur 14 Gheer & Nalipur 15 Bishowa 16 Behrampur 17 Sector 6/3 Rohtak 18 Hassangarh 19 Rohand 20 Ferozpur Banger 29 Banyani

Creation of 33 kV bay in space available between capacitor bank and control room to feed UHBVN consumer loads through one feeder.

150277783.xls.ms_office

Page 111 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 30 Zerpur 31 Barda 32 Kheri Butter 132 kV Satnali 132 kV Satnali 132 kV Charkhi Dadri-II Remarks Code

Matching with installation of 20/25 MVA 132/33 kV T/F at 132 kV S/S Satnali. Bay 3B0805* vacated at 220 kV substation Mohindergarh after shifting of 33 kV substations Zerpur and Barda to 132 kV substation Satnali would be utilized for feeding of new proposed 3B0806* 33 kV substations Budeen and Sehlang. Matching with the augmentation of 132 kV substation Charkhi Dadri-II with installation 3B0807* of 2x20/25 MVA 132/33 kV transformers in place of existing 2x10/16 MVA 132/33 kV transformers. Matching with the augmentation of 132 kV substation Pundri with installation of 3B0808* additional 20/25 MVA 132/33 kV transformer. Matching with the augmentation of 132 kV substation Padla with installation of 3B0809* additional 20/25 MVA 132/33 kV transformer. 3B0810* new 33 kV substation Deeg (10 MVA) 33 kV substation Barsana (10 MVA) . 33 kV substation Kiloi with installed capacity of 8 MVA 132/33 kV transformer 33 kV substation Sampla Road Jhajjar with installed capacity of 8 MVA 132/33 kV transformer 33 kV new substation Jaitpura with installed capacity of 10 MVA, 33/11 kV transformer 3B0831* 3B0832* 3B0833*

33 Mundri 34 Guhna 35 Kurar 36 Deeg 37 Barsana 38 Kiloi 39 Sampla Road Jhajjar 40 Jaitpura 41 Shobhapur 42 Bhungarka 43 Bhilwara 44 Bichpari

132 kV Pundri 132 kV Padla 132 kV Padla 132 kV Habri 132 kV Habri 132kV Jhajjar 132kV Jhajjar 132 kV Bhusthala 132 kV Seka 132 kV Seka 132 kV Seka 132 kV Mundlana

To allow UHBVN to feed 33 kV new substation Bichpari with installed capacity of 10 3B0834* MVA 33/11 kV transformer in place of already approved 33 kV substation Khanpur Khurad from 132 kV substation Mundlana matching with the commissioning to 132 kV substation Mundlana.

150277783.xls.ms_office

Page 112 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 45 Remarks Code

To allow UHBVN to feed 33 kV new substation Karora with installed capacity of 1x8 MVA, 33/11 kV transformer by making Tee off from existing 33 kV line from 132 kV substation Pai to 33 kV substation Rajound matching with the commissioning of 132 kV substation Rajound and shifting of all load of existing 33 kV substation Rajound to 132 kV substation Rajound. To allow UHBVN to feed 33 kV new substation KDB near Brahm Sarover, Kirmitch with installed capacity of 10 MVA, 33/11 kV transformer Kirmitch by making Tee Off from existing 33 kV line from 220 kV substation BBMB, Kurukshetra to 33 kV substation Kirmitch with ensuring its feeding from 132 kV substation Kirmitch matching with the commissioning to 132 kV substation Kirmitch. 132 kV Sagga 132 kV Sagga Allow UHBVN to feed new 33 kV substation Dabarthala with installed capacity of 8 3B0852* MVA 33/11 kV transformer from 132kV substation Sagga. Allow UHBVN to feed new 33 kV substation Shahpur with installed capacity of 10 MVA 3B0853* 33/11 kV transformer from 132kV substation Sagga. Allow UHBVN to augment 33 kV substation Nigdu from 1x8 MVA 33/11 kV transformer to (1x8 + 1x5) MVA 33/11 kV transformers.

46

47 Dabarthala 48 Shahpur

49 Kakrod 50 Chhattar 51 Dubal Dhan

132kV Uchana 132kV Uchana 132 kV Beri

Allow UHBVN to feed new 33 kV substations Kakrod and Chhattar with installed 3B0857* capacity of 10 MVA 33/11 kV and 8 MVA 33/11 kV transformer respectively from 3B0858* To allow UHBVN to feed 33 kV new substation Dubal Dhan with installed capacity of 8 3B0859* MVA, 33/11 kV transformer from 132 kV substation Beri matching with upgradation of 33 kV substation Beri to 132 kV level. The existing 33 kV substation Jahazgarh would continue to be fed from 132 kV substation Jhajjar.

150277783.xls.ms_office

Page 113 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 52 Remarks Code

Allow UHBVN to feed new 33 kV substation Brass with installed capacity of 8 MVA 33/11 kV transformer from 220 kV substation Nissing by erecting a new 33 kV line 3.5 km in length to be tapped off at a distance 5.5 km from Nissing on existing 33 kV Nissing- Rasina line subject to load management by field officers during real peak hours as and when required Allow UHBVN to feed new 33 kV substation Kharawar with installed capacity of 8 MVA 33/11 kV transformer from 132 kV substation MDU, Rohtak by erecting a new 33 kV line from 132 kV substation MDU, Rohtak to proposed site of 33 kV substation Kharawar. 33 kV bay available at 132 kV substation MDU Rohtak as intimated by Superintending Engineer/ TS, HVPN, Rohtak vide Memo No. Ch-15/WM-227 dated 18.9.06 (Ch-92) may be utilized to feed 33 kV substation Kharawar.

53

54 Bhogipur

132kV Murthal

Allow UHBVN to feed new 33 kV substation Bhogipur with installed capacity 1x8 MVA 3B0870* 33/11 kV transformer from 132kV substation Murthal matching with the augmentation of 132 kV substation Murthal by installation of additional 1x20/25 MVA 132/33 kV transformer. Allow UHBVN to augment existing 33 kV substation Sugar Mill Sonepat from 6.3/8 MVA to 2x8 MVA 33/11 kV transformer Allow UHBVN to feed new 33 kV substation Manoharpur with installed capacity 1x10 MVA 33/11 kV transformer from 132kV substation Kheri Taloda Taloda by making TOff from existing 33 kV line from 132 kV Jind to Kheri Taloda by ensuring its energization from 132 kV substation Kheri Taloda matching with the augmentation of 132 kV substation Kheri Taloda by installation of additional 1x20/25 MVA 132/33 kV transformer.

55

150277783.xls.ms_office

Page 114 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 56 Sector-10 Rewari 220 kV Rewari Remarks Code

Linked with augmentation of 220 kV substation Rewari by installation of 20/25 MVA 132/33 kV transformer in place of existing 8 MVA 132/33 kV transformer matching with commissioning of additional 1x50 MVA 220/132 kV transformer. Linked with augmentation of 132 kV substation Ateli by installation of additional 20/25 MVA 132/33 kV transformer.

57 Ahrod. 58 Baraguda 59 Bahri 60 Popra 61 Dighal 62 Gangoli

132 kV Ateli 132 kV Odhan 132 kV Alewa 132 kV Alewa 132 kV Beri 132 kV Kheri Taloda

63 Brahman Majra

132 kV Matlauda

Linked with installation of 132/33 kV 20/25 MVA additional transformer at 132 kV substation Kheri Taloda to feed the loads of 33 kV substations Kheri Taloda, Gangoli and others proposed by UHBVN in future. Allow UHBVN to feed new 33 kV substations Brahman Majra and Dahar with installed 3B0884* capacity of 10 MVA 33/11 kV transformer each from 132kV substation Matlauda matching with the installation of 1x20/25 MVA, 132/33 kV transformer at 132 kV substation Matlauda. Creation of 2 Nos 33 kV bays at 132 kV substation Matlauda for feeding the new 33 kV 3B0885* substations Brahman Majra and Dahar matching with the installation of 1x20/25 MVA, 132/33 kV transformer at 132 kV substation Matlauda. Allow UHBVN for feeding the 2 Nos. 33 kV substation Kamla (10 MVA) and Kalram (10 3B0887* MVA) from 132 kV substation Gharaunda matching with the commissioning of 220 kV substation Bastra and LILO of 132 kV S/C line between Gharaunda and Madhuban at 220 kV substation Bastra. Creation of 2 Nos. 33 kV bays at 132 kV substation Gharaunda to accommodate the 3B0888* lines feeding the 33 kV substations Kamla and Kalram.

64 Dahar

132 kV Matlauda

65 Kamla

132 kV Gharaunda

66 Kalram

132 kV Gharaunda

150277783.xls.ms_office

Page 115 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 67 Jindran 132 kV Jassia Remarks Code

1x20/25 MVA 132/33 kV transformer proposed at 132 kV substation Jassia would be utilized to feed new 33 kV substation Jindran as proposed by UHBVN and any other 33 kV substations proposed by UHBVN in this area in future. Creation of 33 kV level at 132 kV substation Naguran by installation of additional 20/25 3B0898* MVA 132/33 kV transformer matching with the commissioning of 3rd 100 MVA 220/132 kV transformer at 220 kV substation Jind. Allow UHBVN for feeding the 2 Nos. 33 kV substation Songri Gulana (10 MVA) and 3B0899* Samdo (8 MVA) from 132 kV substation Naguran matching with creation of 33 kV level at 132 kV substation Naguran by installation of additional 20/25 MVA 132/33 kV transformer and commissioning of 3rd 100 MVA 220/132 kV transformer at 220 kV substation Jind. Creation of 2 Nos. 33 kV bays at 132 kV substation Naguran to accommodate the lines feeding the 33 kV substations Songri Gulana and Samdo.

68 Songri Gulana

132 kV Naguran

69 Samdo

132 kV Naguran

70 Neemwala

132 kV Bhagal

Allow UHBVN for feeding the 33 kV substation Neemwala (10 MVA) from 132 kV 3B0906* substation Bhagal matching with the augmentation of 132 kV substation Bhagal by providing additional 1x20/25 MVA 132/33 kV transformer and commissioning of 3rd 100 MVA 220/132 kV transformer at 220 kV substation Cheeka. Allow UHBVN to feed new 33 kV substation Sec-6 Rohtak with installed capacity 1x8 MVA 33/11 kV transformer in place of earlier approved 33 kV substation Sec-3 Rohtak vide Memo No. R. No.342/ Ch-10/ 407/ K-187 dated 02.03.2006 from 132kV substation Sec-3 Rohtak. Creation of 1 no. 33 kV bay at 132 kV substation Sec-3 Rohtak for feeding the new 33 3B0923* kV substation Sec-6 Rohtak in place of 33 kV substation sector 3 Rohtak and keeping provision for sufficient number of 33 kV bays to shift the load of 33 kV substations Bhalout (10 MVA) and Kansala (8 MVA) from 132 kV substation Khokharakot to 132 kV substation sec-3 Rohtak.

71 Sec-6 Rohtak

132 kV Sector-3 Rohtak

150277783.xls.ms_office

Page 116 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 72 Sekhupur 132 kV Jalmana Remarks Code

Augmentation of 132 kV substation Jalmana from 1x10/16 MVA 132/11 kV transformer 1A0972* to 1x10/16 MVA 132/11 kV + 1x20/25 MVA 132/33 kV transformers to feed 33 kV substations Sekhupur and Chochra subject to completion of 132 kV Assandh Jalmana S/C line. Creation of two 33 kV bays at 132 kV substations Jalmana to feed the new 33 kV substations Sekhupur and Chochra. Allow UHBVN to create 33 kV substation Sirta (1x10 MVA) from 132 kV Padla matching with the installation of additional 1x20/25 MVA 132/33 kV transformer at 132 kV substation Padla. Creation of one No. 33 kV bay at 132 kV substation Padla to accommodate the line feeding 33 kV substation Sirta. 3B0973* & 3B0974*

73 Chochra. 74 Sirta

132 kV Jalmana 132 kV Padla

3B0988*

75 Sanoli Road Panipat, Industrial Area Panipat and Sewah 76 Deora

132 kV Sector-29 Panipat 132 kV Nautch Allow UHBVN to create 33 kV substation Deora (1x8 + 1x6.3) MVA 33/11 kV 3B0989* transformers from upcoming 132 kV substation Nautch. Creation of one No. 33 kV bay at 132 kV substation Nautch to accommodate the line feeding 33 kV substation Deora. Cancellation of already approved installation of additional 1x10/16 MVA 132/11 kV and 3B1002* 1x8 MVA 132/33 kV transformers at 132 kV substation Kharkhoda vide this office Memo No. R.No.346/Ch-9/407/K-190 dated 31.3.2006 and to delete these works from the list of works of HVPN for the year 2007-08. Augmentation of 132 kV substation Kharkhoda with installation of additional 1x20/25 3B1003* MVA 132/33 kV transformer. To allow UHBVN to feed proposed new 33 kV substations Sisana (8 MVA), Kharkhoda 3B1004* (8 MVA) and Firozpur Bangar (8 MVA) from 132 kV substation Kharkhoda subject to above augmentation of 132 kV Kharkhoda.

77 Kharkhoda

132 kV Kharkhoda

78 Sisana 79 Firozpur Bangar

132 kV Kharkhoda 132 kV Kharkhoda

150277783.xls.ms_office

Page 117 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. Remarks Code

Creation of three Nos. 33 kV bays at 132 kV substation Kharkhoda to accommodate the line feeding 33 kV substation Kharkhoda, Sisana and Firozpur Bangar.

80 Kari Dharni and Baralu

132 kV Dighawan Jattan

Allow DHBVN to feed new 33 kV substations Kari Dharni and Baralu with installed capacity of 10MVA 33/11 kV transformer each from 132 kV Dighawan Jattan matching with the augmentation of 132 kV Dighawan Jattan by providing additional 1x20/25 MVA 132/33 kV T/F Creation of two nos. 33 kV bay at 132 kV substation Dighawan Jattan to feed 33 kV 3B1010* substations Kari Dharni and Baralu matching with the augmentation of 132 kV & Dighawan Jattan by providing additional 1x20/25 MVA 132/33 kV T/F 3B1011*

81 Kakroli sardara

132 kV Badhra

Augmentation of 132 kV substation Badhra from 1x10/16 MVA 132/33 kV to 1x20/25 1A1012* MVA 132/33 kV transformer matching with the shifting of enough load of 132 kV substation Behal/ Miran/ Jui/ Tosham from 220 kV substation Bhiwani to upcoming 220 kV substation Isharwal. Allow DHBVN to feed new 33 kV substation Kakroli Sardara with installed capacity of 2x5 MVA 33/11 kV transformer from 132 kV Badhra matching with the augmentation of 132 kV substation Badhra Creation of one number 33 kV bay at 132 kV substation Badhra to feed 33 kV 3B1013* substation Kakroli Sardara matching with the augmentation of 132 kV substation Badhra Allow DHBVN to feed new 33 kV substation Kagdana with installed capacity of 10 MVA 33/11 kV transformer from 132 kV Shahpur Begu, by extending the existing 33 kV line from 132 kV substation Begu to 33 kV substation Nathusari upto proposed 33 kV substation Kagdana.

82 Kagdana

132 kV Begu

150277783.xls.ms_office

Page 118 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 83 Jalalpur 132 kV Chajjpur Remarks Code

Augmentation of 132 kV substation Chhajpur by providing 1x20/25 MVA 132/33 kV 1A1014* transformer in place of existing 1x12.5 MVA 132/33 kV transformer matching with the creation of 220 kV substation Chhajpur and shifting of feeding source of 132 kV substation Chhajpur from 220 kV substation PTPS Panipat to 220 kV substation Chhajpur Allow UHBVN for feeding the 33 kV substation Jalalpur (10 MVA) from 132 kV substation Chhajpur matching with the augmentation of 132 kV substation Chhajpur Creation of 1 Nos. 33 kV bays at 132 kV substation Chhajpur to accommodate the 3B1015* lines feeding the 33 kV substation Jalalpur matching with the augmentation of 132 kV substation Chhajpur

84 Dadlana

132 kV Munak

Augmentation of 10/16 MVA 132/33 kV transformer at 132 kV substation Munak to 1A1018* 20/25 MVA 132/33 kV transformer thereby raising the existing capacity of the substation from 10/16 MVA 132/11 kV + (10/16 + 20/25) MVA 132/33 kV to 10/16 MVA 132/11 kV + 2x20/25 MVA 132/33 kV transformers to enable both 20/25 MVA 132/33 kV transformers run in parallel and share the load equally. To allow UHBVNL to create 33 kV substation Dadlana with 1x8 MVA 33/11 kV transformer with feeding from 132 kV substation Munak through approximately 7.5 km 33 kV line from Munak to Dadlana. Erection of one no. new 33 kV bay at 132 kV substation Munak for the above proposed 3B1019* 33 kV substation Dadlana

85 Bagthala

132 kV Lukhi

To allow UHBVN to feed 33 kV new substation Bagthala with installed capacity of 1x8 3B1020* MVA, 33/11 kV transformer from 132 kV substation Lukhi matching with the commissioning to 132 kV substation Lukhi. To allow UHBVN to feed 33 kV existing substation Lukhi with installed capacity of 2x8 3B1021* MVA, 33/11 kV transformer from 132 kV substation Lukhi matching with the commissioning to 132 kV substation Lukhi

86 Lukhi

132 kV Lukhi

150277783.xls.ms_office

Page 119 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. Remarks Code

Creation of 2 nos. 33 kV bays at 132 kV substation Lukhi to feed the new 33 kV substation Bagthala and existing 33 kV substation Lukhi. 87 Sirsla 132 kV Adhaun To allow UHBVN to feed 33 kV new substation Sisrla with installed capacity of 2x8 MVA, 33/11 kV transformer from 132 kV substation Adhon matching with the commissioning to 132 kV substation Adhon. To allow UHBVN to feed 33 kV existing substation Jhansa Road Kurukshetra with installed capacity of 1x8 MVA, 33/11 kV transformer from 132 kV substation Adhon matching with the commissioning to 132 kV substation Adhon Creation of 1 No. 33 kV bay at 132 kV substation Adhon to feed the new 33 kV 3B1022* substation Sisrla

88 Kuttabad

132 kV Ellenabad (Meethi To allow DHBVNL to create 33 kV substation Kuttabad with 1x6.3/8 MVA 33/11 kV Surera) transformer with feeding from 132 kV substation Ellenabad (Meethi Surera) through approx. 5 km 33 kV line from Ellenabad to Kuttabad subject to installation of 132/33 kV transformer at 132 kV substation Ellenabad (Meethi Surera) already approved (reference this office memo No. R. No. 196 Ch. 42/ 407/K-100 dated 27.08.2002). Creation of 33 kV bay at 132 kV substation Ellenabad (Meethi Surera) to feed 3B1027* proposed 33 kV substation Kuttabad

89 Hassan & Bhera

132 kV Miran

Concurring proposal for creation of new 33 kV substation Hassan (2x6.3/8 MVA) with 3B1032* approximately 12 km 33 kV Miran - Hassan line by DHBVN. Concurring proposal for creation of new 33 kV substation Bhera (1x6.3/8 MVA) by erecting 7.5 km T-off line from existing 33 kV Miran - Isharwal line with feeding from 132 kV substation Miran opening from Isharwal side by DHBVN. Concurring proposal for augmentation of 33 kV substation Siwani from 5+6.3 MVA to 6.3/8+6.3 MVA 33/11 kV by DHBVN.

150277783.xls.ms_office

Page 120 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. Remarks Code

90 Dhani Batota

132 kV Seka

Creation of one No. 33 kV bay at 132 kV substation Miran for 33 kV Miran - Hassa line proposed. Concurrence of proposal for creation of new 33 kV substation Dholera (1x10 MVA) with feeding from 220 kV substation Narnaul by making T-off from existing Narnaul-Dhani Batota 33 kV line after shifting of 33 kV substation Dhani Batota (5x10 MVA) load from 220 kV substation Narnaul to 132 kV substation Seka by DHBVN. Construction of additional 33 kV bay at already approved 132 kV substation Seka for 3B1033* feeding load of 33 kV substation Dhani Batota.

91 Existing 33 kV IDC, Existing Jhajjar Road and Proposed 33 kV Grain Market Rohtak 92 Umed Garh (Sonepat)

132 kV Hisar Road Rohtak (3 No. Bays)

To feed existing 33 kV substations IDC (18 MVA), existing 33 kV substation Jhajjar Road (18 MVA) and proposed 33 kV substation New Grain Market Rohtak (10 MVA) as proposed by UHBVN. Concurrence of proposal for creation of new 33 kV substation Umedgarh (1x8 MVA) with feeding through approx. 12 km new 33 kV line from proposed 132 kV substation Bega to 33 kV substation Umedgarh matching with creation of 132 kV substation Bega with installed capacity of 1x20/25 MVA 132/33 kV transformer. Creation of 1 No. 33 kV bay at 132 kV substation Bega to accommodate the lines 3B1040* feeding the 33 kV substation Umedgarh.

132 kV Bega

93 Jagdishpura

132 kV Nautch

Concurrence to create new 33 kV substation Jagdishpura (10 MVA) with approxomately 13 km 33 kV line from 132 kV substation Nautch matching with the augmentation of 132 kV substation Nautch with 2nd 20/25 MVA 132/33 kV T/F Creation of 1 No. 33 kV bay at 132 kV substation Nautch to accommodate 33 kV 3B1042* feeding line for 33 kV substation Jagdishpura.

150277783.xls.ms_office

Page 121 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 94 Existing 33 kV Siwan Gate Kaithal and Kwartan 132 kV Khurana Remarks Code

Creation of 2 No 33 kV bays at 132 kV substation Khurana to accommodate 33 kV 3B1044* lines for feeding existing 33 kV substations Siwan Gate Kaithal and Kwartan. & 3B1045* Concurrence to create 33 kV substation by UHBVNL at village Kathwar with 1x10 MVA 33/11 kV transformer by erecting 8 km new 33 kV line from 132 kV substation Khurana to proposed 33 kV substation Kathwar To utilise one 33 kV bay at 132 kV substation Khurana out of two 33 kV bays already approved to accommodate 33 kV lines for feeding existing 33 kV substations Sewan Gate Kaithal and Kawartan for the proposed 33 kV substation Kathwar.

95 Existing 33 kV Sirla and Mithi 96 Jhansa Road Kurukshetra

132 kV Kairu 132 kV Adhon To allow UHBVN to augment 33 kV substation Jhansa Road, Kurukshetra from 1x6.3/8 MVA to 1x6.3/8 + 1 x10 MVA, 33/11 kV transformers and connect it with 132 kV substation Adhon by erecting approx. 9 Km new 33 kV line from 132 kV substation Adhon to the site of existing 33 kV substation Jhansa Road Kurukshetra, matching with creation of 132 kV substation Adhon with installed capacity of 2x20/25 MVA , 132/33 kV transformer. Creation of 1 No. new 33 kV bay at 132 kV substation Adhon to feed existing 33 kV 3B1050* substation Jhansa Road Kurukshetra.

97 Rajpur (Sonepat)

132 kV Murthal

Allow UHBVN to create new 33 kV substation Rajpur with 10 MVA 33/11 kV with approximately 10 km 33 kV line from 132 kV substation Murthal matching with the commissioning of additional 20/25 MVA 132/33 kV transformer at 132 kV substation Murthal Creation of 1 No. 33 kV bay at 132 kV substation Murthal to accommodate 33 kV 3B1051* feeding line for 33 kV substation Rajpur

150277783.xls.ms_office

Page 122 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 98 33 kV Sahidanwali & Titukhera/Dhani kahan singh. 132 kV Madhosinghana Remarks Code

Allow DHBVN to shift 2 nos. 33 kV substations Sahidanwali (8MVA) & Titukhera/ Dhani kahan singh (8 MVA ) from 220 kV substation Sirsa to 132 kV substation MadhoSinghana through above mentioned 132/33 kV transformer. Creation of one no. 33 kV bay at 132 kV substation Madhosinghana to accommodate the 33 kV line feeding 33 kV substations Sahidanwali & Titukhera/Dhani kahan singh. Allow DHBVN to create new 33 kV substation Ahmadpur Road Sirsa (8MVA) with feeding from 220 kV substation Sirsa by utilizing idle 33 kV Sirsa-Ram Nagaria line and 33 kV bay at 220 kV substation Sirsa

99 Existing Dhanoda and proposed 132 kV Dablain (2 No. Lochab bays)

Creation of two numbers 33 kV bays at proposed 132 kV substation Dablain to feed 3B1080* existing 33 kV substation Dhanoda (9 MVA) and the already approved 33 kV & substation Lochab (8 MVA) from it. 3B1081* Provision of 10 no. 33 kV bays at 220 kV substation sector-72 Gurgaon to enable DHBVNL to take out 10 no. 33 kV outgoing feeders to meet ultimate load requirement in surrounding area. Construction of 2 No. 33 kV bays at 132 kV substation Mundia Khera one of the 3B1095* existing 33 kV Nangal Sirohi line and other for 33 kV line for connecting 5 No. NB PHs & (by providing approximately 2.5 km 33 kV link line by DHBVNL) 3B1096*

220 kV Sector-72 Gurgaon

100 Existing 33 kV Nangal Sirohi line 132 kV Mundia Khera and other for 33 kV line for connecting 5 No. NB PHs

101 existing 33 kV substation Panjuana and proposed 33 kV substation Bansudhar & for future expansion

132 kV Khairekan (3 No. To allow DHBVN to connect existing 33 kV substation Panjuana (22.3 MVA) with 3B1111* bays) approximately 3 km 33 kV line from proposed 132 kV substation Khairekan to 3B1112* Panjuana and proposed 33 kV substation Bansudhar (10 MVA) with approximately 5 3B1113* km 33 kV line from proposed 132 kV substation Khairekan to Bansudhar.

150277783.xls.ms_office

Page 123 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 102 220 kV Kheri Kanker (Nuh) Remarks Code

Provision of 10 No. 33 kV bays at 220 kV substation Kheri Kanker (Nuh) to enable DHBVNL to take out 10 Nos 33 kV outgoing feeders to meet their ultimate load requirement in surrounding area. Provision of 10 No. 33 kV bays at 220 kV substation Mohana. However initially only 6 No. 33 kV bays will be constructed. To allow DHBVN to connect proposed 33 kV S/Stn. Pipli (1x10 MVA) with approx. 9 Kms new 33 kV line from Chormar to Pipli & proposed 33 kV S/S Khokhar (1x10 MVA) with approx. 16 kms new 33 kV line from Chormar to Khokhar Provision of 5 No. 33 kV bays at 220 kV substation Chormar.

103

220 kV Mohana

104

220 kV Chormar

105 Existing 33 kV S/S Keharwala, proposed 33 kV S/S Mohmadpura

132 kV Dhudhianwali

With 3 nos. 33 kV bays, one for connecting existing 33 kV S/S Keharwala, second for connecting the proposed 33 kV S/S Mohmadpura and the third for future expansion. To allow DHBVN to connect existing 33 kV S/S Keharwala with approx. 7 Km new 33 kV line from proposed 132 kV S/S Dhudhianwali to Keharwala and proposed 33 kV S/S Mohamadpura with approx. 11.5 Km new 33 kV line from proposed 132 kV S/S Dhudhianwali to Mohamadpura To allow DHBVN to connect existing 33 kV S/S Kalanwali with approx. 2 km new 33 kV line from proposed 132 kV S/S Kurangawali to Kalanwali and existing 33 kV S/S Rori with approx. 2 Km new 33 kV line from proposed 132 kV S/S Kurangawali to Rori

106 existing 33 kV S/S Kalanwali and existing 33 kV S/S Rori

132 kV Kurangawali

107 108

220 kV Rangala Rajpur (Firozpurzirka) 400 kV Nawada

To make provision of 10 no. 33 kV bays including 4 no. spare bays at 220 kV substation Rangala Rajpur (Firojpur Zirka). To make provision of 10 no. 33 kV bays including 4 no. spare bays at 400 kV substation Nawada for feeding proposed 33 kV substations at Sector75-76, Sector 77, Sector 79-80

150277783.xls.ms_office

Page 124 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 109 Police Line Rohtak {unmanned substation} 110 Kathura (Augmentation) Remarks Code

Allow UHBVN to feed new 33 kV unmanned substation Police Line Rohtak with installed capacity 1x8 MVA 33/11 kV transformer from 132kV substation Khokharakot Rohtak by T-off of existing 33 kV line. Allow UHBVN to augment existing 33 kV substation Kathura, Madina and Balout from 2x4 MVA to 4+6.3 MVA 33/11 kV, 1x6.3 MVA to 4+6.3 MVA 33/11 kV and 1x5 MVA to 2x5 MVA 33/11 kV transformers. The work will be carried out matching with the commissioning of new 132 kV substations Jassia and Sec-3 Rohtak and shifting of load of 33 kV substations Bhalout (10 MVA) and Kansala (8 MVA) to 132 kV substation sec-3 Rohtak and 14.3 MVA load of 33 kV subs To allow UHBVNL to create 33 kV substation Mandi Sardana to be fed from 132 kV substation Sewan by T-off of idle 33 kV Sewan-Kangthali line matching with creation of new 132 kV substation Kheri Gulam Ali and shifting of complete load of 33 kV substation Kheri Gulam Ali to 132 kV substation Kheri Gulam Ali. Allow DHBVN to create new 33 kV substation Panihari with installed capacity of 1x6.3/8 MVA 33/11 kV transformer by erecting 6.54 km 33 kV line by making T-off from the existing 33 kV Farwain Darbi line subject to shifting of load of 33 kV substation Darbi (5+4 MVA) and 33 kV substation Rasulpur Theri (6.3/8MVA) on 10/16 MVA,132/33 kV transformer under commissioning at 132 kV substation Sikanderpur by erecting about 3.7 Km 33 kV line from 33 kV substation Rasulpur Theri to 33 KV substation Darbi i.e.after realignment of 33 kV loads on 220 kV substation Sirsa and 132 kV substation Sikanderpur. Creation of one 33 kV bay at 132 kV substation Bahu to feed construction power to M/s 3B1300* China Light Power at 33 kV level (Load 6 MVA). HPGCL to intimate before execution of work, keeping in view the provisions of PPA, whether the cost of following works is recoverable from M/s China Light Power or UHBVNL or DHBVNL.

111 Madina (Augmentation)

112 Mandi Sadran

113 Panihari.

114 M/s China Light Power

132 kV Bahu

150277783.xls.ms_office

Page 125 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. Remarks Code

To share the proportionate cost of augmentation of 132 kV Bahu substation with 1x10/16 MVA 132/33 kV transformer with M/s APCPL in the ratio of sanctioned contract demands. Creation of 33 kV bay at 132 kV substation Bahu to feed construction power to M/s China Light Power at 33 kV level (load 6 MVA). The cost of dismantlement after the disconnection by M/s China Light Power. UHBVNL/ DHBVNL to explore the possibility of utility of creating one 33 kV bay at 132 kV substation Bahu after the utilisation of temporary connection to M/s China Light Power. 115 Siwan Gate Kaithal To allow UHBVNL to augment 33 kV substation Siwan Gate Kaithal from 4+6.3/8 MVA to 2x6.3/8 MVA 33/11 kV with 33 kV feeding from existing 132 kV substation Kaithal temporarily till the commissioning of already approved 132 kV substation Khurana . The feeding of 33 kV substation Sewan Gate Kaithal shall be shifted from 132 kV substation Kaithal to 132 kV substation Khurana after commissioning of 132 kV substation Khurana. To allow UHBVNL to augment 33 kV substation Pehowa Chowk Kaithal from 2x6.3 MVA to 6.3+10 MVA 33/11 kV with 33 kV feeding from existing 132 kV substation Kaithal. To allow UHBVNL to change already approved feeding of 33 kV substation Manas (8 MVA) from 132 kV substation Kaithal to 132 kV substation Padla temporarily through already existing 33 kV line from 132 kV substation Kaithal to 132 kV substation Padla. The 33 kV feeding of 33 kV substation Manas (8 MVA) shall be shifted back from 132 kV substation Padla to 132 kV substation Kaithal, after shifting back the feeding of 33 kV substation Sewan Gate Kaithal from 132 kV substation Kaithal to 132 kV substation Khurana as per S. no. 1 above.

150277783.xls.ms_office

Page 126 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. Remarks Code

To allow UHBVNL to feed the already proposed 33 kV substation Sirta (10 MVA) temporarily from 132 kV substation Kheri Gulam Ali till such time the feeding of 33 kV substation Manas (8 MVA) is shifted back on 132 kV substation Kaithal as per S.No. 3 above. The feeding of 33 kV substation Sirta (10 MVA) shall be shifted back on already approved 132 kV substation Padla. 116 To allow DHBVNL to feed already approved loads of 33 kV substations Keharwala (9 MVA with proposed augmentation to 15.3 MVA), Mohamadpuria (8 MVA), Mastangarh (10 MVA) and Haripura (10 MVA) from 132 kV substation Jiwan Nagar and feed 33 kV loads of existing Ellenabad (18.3 MVA), proposed Kuttabad (8 MVA), Bhuratwala (9 MVA likely to be augmented to 15 MVA) and newly identified 33 kV Dholpalia (10 MVA) from 132 kV substation Ellenabad. To allow UHBVNL to augment 33 kV substation Rahra from 1x6.3/8 MVA to 2x6.3/8 MVA 33/11 kV with shifting of its 33 kV feeding from the present 132 kV substation Pai to 132 kV substation Assandh by erecting approx. 11 km new 33 kV line from 132 kV substation Assandh to 33 kV substation Rahra and shifting of 33 kV load of 33 kV substation Alewa (16 MVA) from 132 kV substation Assandh to 132 kV substation Alewa after its commissioning. Creation of new 33 kV bay at 132 kV substation Assandh for feeding existing 33 kV 3B1196* substation Rahra. To allow UHBVNL to create new 33 kV substation Sisla Sismore (8 MVA) with feeding from 132 kV substation Pali by erecting approximately 7 km new 33 kV line from 132 kV substation Pai to the proposed 33 kV substation Sisla Sismore, subject to commissioning of 132 kV substation Rajound and shifting of load of 33 kV substation Rajound (14.3 MVA) from the present 132 kV substation Pai to 132 kV substation Rajound. The 33 kV bay at 132 kV substation Pai for 33 kV substation Rahra will now be used for feeding proposed 33 kV substation Sisla Sismore.

117

150277783.xls.ms_office

Page 127 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 118 Remarks Code

To concur UHBVN proposal for augmentation of existing 33 kV substation Bupania from (4+6.3) to (6.3+10) MVA 33/11 kV transformers along with erection of independent 33 kV line (7.5 km approximately) with 130 mm2 ACSR conductor from 132 kV substation Bahadurgarh to 33 kV substation Bupania. The augmentation is subject to shifting of 33 kV load of 33 kV substation MIE Bahadurgarh from 132 kV substation Bahadurgarh to 132 kV substation MIE Bahadurgarh. The existing 33 kV bay at 132 kV substation Bahadurgarh feeding 33 kV substation MIE Bahadurgarh can later on be used for feeding 33 kV substation Bupania after erection of new 33 kV line. To concur creation of new 33 kV substation at village Khanda near Sonepat with 1x10 MVA 33/11 kV transformer to be fed from 220 kV substation Mohana along with erection of 15 km new 33 kV line with 130 mm2 ACSR from 220 kV substation Mohana to proposed 33 kV substation at village Khanda. The proposal is subject to commissioning of 1x100 MVA 220/33 kV transformer at 220 kV substation Mohana. To allow UHBVN to create new 33 kV substation at Old Power House Colony Rohtak with 1x10 MVA 33/11 kV transformer to be fed from 132 kV substation MDU Rohtak along with erecting connected line by Tee-off from existing 33 kV MDU Rohtak Jhajjar Road Rohtak line. The concurrence of HVPNL is subject commissioning of 132 kV substation Hisar Road Rohtak and consequent shifting of 18 MVA load of 33 kV substation Jhajjar Road, Rohtak from 132 kV substation MDU Rohtak to 132 kV substation Hisar Road Rohtak. To allow UHBVN to create new 33 kV substation at officers colony Delhi Road Rohtak with 1x10 MVA 33/11 kV transformer to be fed from 132 kV substation MDU Rohtak with erection of connected 33 kV line from 132 kV substation MDU Rohtak. The concurrence of HVPNL is subject commissioning of 132 kV substation Hisar Road Rohtak and consequent shifting of 18 MVA load of 33 kV substation Jhajjar Road, Rohtak from 132 kV substation MDU Rohtak to 132 kV substation Hisar Road Rohtak.

119

120

150277783.xls.ms_office

Page 128 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 121 Remarks Code

To allow UHBVNL to connect 33 kV substations Rampur Kamboj (10 MVA), Malikpur Banger (10 MVA), Dhimo ( 10 MVA), Ledi (10 MVA), HSIDC Complex Manakpur (10 MVA), Taharpur (10 MVA) and shifting of 33 kV substation Bhudkalan (13 MVA) from 66 kV substation Chhachharauli to 220 kV substation Malikpur Banger. Allow DHBVNL to connect 33 kV substation Nangal Pathani (10 MVA) from already approved 220 kV substation Lula Ahir after its commissioning. DHBVNL is advised to match execution of 33 kV substation in such a way that both substations are commissioned simultaneously. The tentative date of commissioning of proposed 220 kV substation Lula Ahir is March 2010. Allow DHBVNL to connect 33 kV substation Bajaar (10 MVA) from 132 kV substation Ateli. To regularize the connectivity of 33 kV substation Ahrod from 132 kV substation Barauli instead of 132 kV substation Ateli already approved vide this office memo No. R-374/Ch-86/407/K-39 dated 30.11.2006. Installation of 10 MVA instead of 8 MVA 33/11 kV power transformers at following 33 kV substatons Kalayat from 2x8 MVA to 2x10 MVA 33/11 kV transformers. Rahra from 1x8 MVA to 1x10 MVA 33/11 kV transformer. Naraina from 2x8 MVA to 2x10 MVA 33/11 kV transformers. Sector-1 Rohtak from 2x8 MVA to 2x10 MVA 33/11 kV transformers. Siwan Gate Kaithal from 1x8 MVA to 1x10 MVA 33/11 kV transformers. Dadlana from 1x8 MVA to 1x10 MVA 33/11 kV transformers. Umedgarh from 1x8 MVA to 1x10 MVA 33/11 kV transformers. Sisla Sismore from 1x8 MVA to 1x10 MVA 33/11 kV transformers.

122

123

124

150277783.xls.ms_office

Page 129 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 125 Remarks Code

To allow UHBVN to augment 33 kV substation KUK from 2x6.3 MVA to 2x10 MVA, 33/11 kV transformer with 33 kV feeding from 132 kV substation Bhore, subject to shifting of load of 33 kV substation Lukhi (16 MVA) from 132 kV substation Bhore to 132 kV substation Lukhi and already approved shifting of 18 MVA load of 33 kV substation Jhansa Road Kurukshetra (after augmentation from 1x6.3/8 MVA to 6.3/8+10 MVA) from 132 kV substation Bhore to 132 kV substation Adhon. To allow UHBVNLto augment 33 kV substation Naraina from 2x5 MVA to 2x8 MVA 33/11 kV capacity matching with the creation of 132 kV substation Beholi and shifting of 33 kV load of Beholi and Dikadla from 132 kV substation Samalkha to 132 kV substation Beholi as per approval conveyed vide R. No. 438 / Ch-30 / HSS-318 dated 08.10.2007. To allow DHBVN to feed 33 kV substations: Nangla and Pohkarwas from 132 kV substation Jui matching with the commissioning of additional 1x20/25 MVA 132/33 kV transformer at 132 kV substation Jui. 2) Gopalwas and mandoli Khurd (in place of already approved 33 kV substations Jhumpa and Pataudi) from 220 kV substation Isherwal. 132 kV substation Kheri To allow UHBVNL to feed new/ proposed 33 kV substations from 132 kV substation Gilam Ali Kheri Gulam Ali including substations already approved/ under consideration viz: Kher Gulam Ali (Existing 14.3 MVA), Serta (Temporarily 10 MVA), LanderKeema (Proposed 20 MVA), Budha Khera (Proposed 10 MVA), Harnola (Proposed 10 MVA), To install both 20/25 MVA 132/33 kV transformers at 132 kV substation Kheri Gulam Ali. To create new necessary 33 kV bay(s) at 132 kV substation Kheri Gilam Ali to 3B1286* accommodate feeding line for 33 kV substation Harnola/ Budha Khera.

126

127

128 33 kV substation Harnola/ Budha Khera.

129

To allow UHBVNL to feed proposed 33 kV substations Kutubpur (10 MVA) and Chandana (10 MVA) from 220 kV substation Kaithal (Titram) matching with commissioning of additional 20/25 MVA 132/33 kV transformer. To request UHBVNL to take out 33 kV feeders through under ground cable in view of space constraints for right of way.
150277783.xls.ms_office Page 130 of 201 33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 130 Remarks Code

To allow UHBVNLto augment 33 kV substation Mastgarh from 2x6.3 MVA to (1x6.3+10) MVA 33/11 kV capacity to be fed from 132 kV substation Cheeka To allow UHBVNLto augment 33 kV substation Pindara from 5+8 MVA to 2x10 MVA 33/11 kV capacity to be fed from 132 kV substation Jind (N)

131

To allow DHBVNL to connect proposed 33 kV substations Budana (10 MVA) and Thurana (10 MVA) with 132 kV substation Narnaund matching with commissioning of already approved 1x20/25 MVA 132/33 kV transformer and shifting of 132 kV feeding of 132 kV substation Narnaund from 220 kV substation Jind to proposed 220 kV substation Masudpur (Hansi). substation To create two numbers new 33 kV bays at 132 kV substation Narnaund to 3B1314*, accommodate feeding line for new 33 kV substations Budhana and Thurana 3B1315* To concur creation of 33 kV substation by UHBVNL at BPS Mahila Vishwavidyalya Khanpur Kalan with installed capacity of 1x10 MVA 33/11 kV transformer to be fed from approved 132 kV substation Mundlana. To concur erection of 10 km new 33 kV line with 130 mm2 ACSR conductor from 132 kV substation Mundlana to the site of proposed 33 kV substation at BPS Mahila Vishwavidyalya Khanpur Kalan

132 33 kV substations Budhana and 132 kV Thurana Narnaund 133

134 33 kV substation at BPS Mahila 32 kV Vishwavidyalya Khanpur Kalan Mundlana 135

substation Erection of 33 kV bay by HVPNL at 132 kV substation Mundlana for feeding 33 kV 3B1316* substation at BPS Mahila Vishwavidyalya Khanpur Kalan To allow UHBVNL to feed proposed 33 kV substation Badana (proposed 10 MVA) and existing 33 kV substation Chattar (Second connectivity) from proposed 132 kV substation Ghoghrian. Provision for future connectivity to other 33 kV. To concur for creation of 33 kV substation at village Dondal by DHBVNL with installed capacity of 1x5 MVA 33/11 kV transformer to be fed from proposed 220 kV substation Rangla Rajpur (Forozpur Zhirka)

136

150277783.xls.ms_office

Page 131 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. Remarks Code

To concur erection of approximately 17.2 km 33 kV line by DHBVNL from proposed 220 kV substation Rangla Rajpur (Firozpur Zhirka) to proposed 33 kV substation Dondal. To concur for creation of 33 kV substation at village Dakia by DHBVNL with installed capacity of 1x10 MVA 33/11 kV transformer to be fed from proposed 220 kV substation Mau (Dharuhera). To allow DHBVN to connect proposed 33 kV substations Chando Khurd (10 MVA) and Nanheri (10 MVA) matching with the augmentation of 132 kV substation Teliwara. 137 Erection of 6 no. 33 kV bays at 220 kV substation Mau with total provision of 10 no. 33 kV bays to provide supply to upcoming 33 kV substations of DHBVNL in nearby area. To make provision of 10 nos 33 kV bays (including 4 no. spare bays) at 132 kV 3B1194* substation Gangaicha Jat to supply power to existing 33 kV substations Palhawas & Jatusana and proposed 33 kV substations Guruwara, Kaluwas & Kakoria and others to be created by DHBVNL in future. To concur for providing additional power transformer of 10 MVA 33/11 kV at 33 kV substation Jonawas by DHBVNL subject to the following conditions: i) Augmentation of 50 MVA 220/132 kV transformer to 100 MVA 220/132 kV transformer at 220 kV substation Rewari. Commissioning of new 132 kV substation Gangaicha Jat thereby shifting of load of 3 no. 33 kV substations namely Pallawas, Jatusana & Kaluwas from 220 kV substation Rewari to 132 kV substation Gangaicha Jat. Commissioning of 3rd 20/25 MVA 132/33 kV power transformer at 220 kV substation Rewari. Shifting of existing 33 kV line and feeding arrangement of 33 kV substation sector-10 Rewari from 33 kV Jonawas line to independent 33 kV line from 220 kV substation Rewari as proposed by DHBVN.

138

139

150277783.xls.ms_office

Page 132 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. Remarks Code

Augmentation of existing conductor of 33 kV Jonawas line with required size of conductor as proposed by DHBVNL. 140 Construction of 33 kV bay at proposed 132 kV substation Khanak to feed proposed 33 3B1391* kV substation Jamalpur (10 MVA) To allow DHBVNL to connect proposed 33 kV substation Jamalpur (10 MVA) with proposed 132 kV substation Khanak. Advising DHBVNL to create new 33 kV substation Jamalpur matching their completion with commissioning of proposed 132 kV substation Khanak as well as proposed 220 kV substation Sanwan. 141 To allow DHBVNL to create new 33 kV substation Aalampur (10 MVA) with feeding from 132 kV substation Tosham matching with shifting of load of 33 kV substation Khanak on already approved 132 kV substation Khanak. 3B1392* substation To construct one no. 33 kV bay at 132 kV substation Tosham

33 kV substation Aalampur (10 MVA) 142

132 kV Tosham

To allow DHBVNL to connect proposed 33 kV substation Jamalpur Shekhon (10 MVA) with 132 kV substation Tohana matching with shifting of load of 33 kV substation Jakhal (15.3 MVA) to 132 kV substation Jakhal. Advising DHBVNL to create new 33 kV substation Jamalpur Shekhon matching their completion with commissioning of 132 kV substation Jakhal and shifting load of 33 kV substation Jakhal to 132 kV substation Jakhal.

143

To allow DHBVNL to connect proposed 33 kV substation Dhabi Kalan (5 MVA) with 132 kV substation Fatehabad subject to load management by DHBVNL. Formal approval to already connected 33 kV substation Hazarwan Kalan (10 MVA) by DHBVNL with 132 kV substation Fatehabad subject to load management by DHBVNL.

150277783.xls.ms_office

Page 133 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 144 132 kV substation Atela Kalan Remarks Code

33 kV substations Creation of two nos. 33 kV bays at 132 kV substation Atela Kalan to connect 33 kV 3B1402* Pichhopa Kalan (5 MVA) substations Pichhopa Kalan (5 MVA) and Chhappar (10 MVA). 3B1403* and Chhappar (10 MVA) Formal approval to already connected 33 kV substations Pichhopa Kalan (5 MVA) and Chhappar (10 MVA) by DHBVNL with 132 kV substation Atela Lakan subject to load management by DHBVNL. 132 kV substation Bhutan Construction of 33 kV bay at under construction 132 kV substation Bhutan Kalan to 3B1404* Kalan feed proposed 33 kV substation Nadhori (10 MVA). To allow DHBVNL to connect proposed 33 kV substation Nadhori (10 MVA) with under construction 132 kV substation Bhutan Kalan Advising DHBVNL to create new 33 kV substation Nadhori matching their completion with commissioning of 132 kV substation Bhutan Kalan.

145 33 kV substation Nadhori (10 MVA)

146

Allow UHBVNL to augment 33 kV substation Dacher from 5+8 MVA to 10+8 MVA 33/11 kV transformers from 220 kV substation Nissing matching with the shifting of load of 33 kV substation Habri to under construction 132 kV substation Habri

147

148

To allow DHBVNL to feed proposed 33 kV substation Chamar Khera (10 MVA) from 132 kV substation Uklana. Advising DHBVNL to create new 33 kV substation Chamar Khera matching its completion with commissioning of 132 kV substation Bhuthan Kalan and shifting load of 33 kV substation Bhuna to 132 kV substation Bhuthan Kalan. To concur creation of 33 kV substation by UHBVNL at village Chhadia with installed capacity of 2x8 MVA 33/11 kV transformer to be fed from 132 kV substation Samalkha. To concur erection of about 9.5 km new 33 kV line with 130 mm2 ACSR conductor by UHBVNL from 132 kV substation Samalkha to the site of proposed 33 kV substation Chhadia.

150277783.xls.ms_office

Page 134 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. Remarks Code

149 33 kV substation Balbera (20 MVA) 150

132 kV Bhagal

The creation of 33 kV substation at village Chhadia is subject to shifting of 33 kV load of 33 kV substation Beholi (16.6 MVA) and 33 kV substation Dikadla (17.6 MVA) from 132 kV substation Samalkha to proposed 132 kV substation Beholi after the same is bay commissioned by after HVPNL. The 33 kV to be spared shifting the load of 33 kV Dikadla/ Beholi from 132 kV Samalkha to 132 kV substation Beholi may be used for feeding new 33 kV substation at village Chhadia. substation Creation of one 33 kV bay at 132 kV substation Bhagal to accommodate 33 kV line for 3B1414* proposed 33 kV substation Balbera (20 MVA)
To concur for augmentation of 33 kV substation Bapoli from (1x6/8+1x5) MVA to (1x6.3/8+1x10) MVA 33/11 kV transformers and continue to be fed from 132 kV substation Chhajpur. To concur for augmentation of 7.4 km existing 33 kV feeding line from 132 kV substation Chajjpur to 33 kV substation Bapoli from 0.1 Sq" to 130 mm2 ACSR. The above work are subject to augmentation of capacity at 132 kV substation Chajjpur from 1x12.5 MVA 132/33 kV transformer to 1x20/25 MVA 132/33 kV transformer.

151

To concur for augmentation of 33 kV substation Sector-1 HUDA Rohtak from 6.3+4 MVA to 6.3+10 MVA 33/11 kV transformer being fed from 132 kV substation MDU Rohtak. To concur for erection of 1.4 km new 33 kV underground line with 3x400 mm2 cable from 132 kV substation MDU Rohtak to 33 kV substation Model Town Rohtak. Creation of one no. 33 kV bay by HVPNL at 132 kV substation MDU Rohtak for new 33 3B1415* kV underground line from 132 kV substation MDU Rohtak to 33 kV substation Model Town Rohtak.

150277783.xls.ms_office

Page 135 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. Remarks Code

The above proposal is subject to shifting the load of 33 kV substation Jhajjar Road Rohtak (18 MVA) from 132 kV substation MDU Rohtak to 132 kV substation HSIIDC Rohtak along with erection of one no. 33 kV bay by HVPNL at 132 kV substation MDU Rohtak mentioned at sr. no. 3 above for feeding the second 33 kV undergrpound line from 132 kV substation MDU Rohtak to 33 kV substation Model Town Rohtak. 152 Creation of one no. 33 kV bay by HVPNL at 132 kV substation MDU Rohtak for new 33 3B1416* kV underground line from 132 substation MDU Rohtak to 33 kV substation Model Town Rohtak. 1) To concur for creation of 33 kV substation by UHBVNL at village Kheri Gujjar near Ganaur with installed capacity of 1x8 MVA 33/11 kV transformer to be fed from 132 kV substation Ganaur. 2)To concur for creation of about 6 km new 33 kV line with 130 mm2 ACSR from 132 kV substation Ganaur to the site of proposed 33 kV substation Kheri Gujjar. 3)The existing 33 kV bay at 132 kV substation Ganaur feeding 33 kV substation Bega will be utilised by UHBVNL for providing power line to proposed 33 kV substation Kheri Gujjar after the load of 33 kV substation Bega is shifted to 132 kV substation Bega. 4)The proposal is subject to creation and commissioning of 132 kV substation Bega with installed capacity of 1x20/25 MVA 132/33 kV transformer and shifting of the load of 33 kV substation Bega to 132 kV substation Bega after upgradation. 154 1)To concur creation of new 33 kV substation in sector2 Bahadurgarh with 1x10 MVA 33/11 kV transformer to be fed from 132 kV substation Bahadurgarh. 2)To concur erection of new 1.5 km 33 kV line with 130 mm2 ACSR from 132 kV substation Bahadurgarh to the proposed site of 33 kV substation sector-2 Bahadurgarh.

153

150277783.xls.ms_office

Page 136 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. Remarks Code

3)The 33 kV bay to be spared at 132 kV substation Bahadurgarh after shifting the load of 33 kV substations Jassore Kheri & Bamnouli from 132 kV substation Bahadurgarh to 132 kV substation Assaudha will be utilised by UHBVNL for feeding 33 kV substation sector-2 Bahadurgarh. The above proposal is subject to shifting of 33 kV load of 33 kV substations Jassore Kheri (10.3 MVA) and Bamnouli (8 MVA) from 132 kV substation Bahadurgarh to 132 kV substation Assaudha after its commissioning by HVPNL. 155 To concur for augmentation of 33 kV substation Bharawas from (1x6.3+1x4) MVA 33/11 kV to (1x6.3+1x5) MVA 33/11 kV transformer to be fed from existing 220 kV substation Rewari. The above augmentation is subject to commissioning of 3rd 20/25 MVA 132/33 kV transformer at 220 kV substation Rewari. 156 Construction of 33 kV bay at 132 kV substation Kurangawali to accommodate feeding 3B1429* line to proposed 33 kV substation Panjamala. To allow DHBVNL to feed proposed 33 kV substation Panjamala (10 MVA) from 132 kV substation Kurangawali matching with commissioning of 132 kV substation Kurangawali. To advise DHBVNL to create new 33 kV substation Panjamala matching with commissioning of 132 kV substation Kurangawali. 157 Creation of 33 kV bay at 220 kV substation Chormar to accommodate 33 kV line to 3B1428* proposed 33 kV substation Jandwala Jattan. To allow DHBVNL to feed proposed 33 kV substation Jandwala Jattan (10 MVA) from 220 kV substation Chormar matching with commissioning of 220 kV substation Chormar. To Advise DHBVNL to create new 33 kV substation Jandwala Jattan matching with commissioning of 220 kV substation Chormar.

150277783.xls.ms_office

Page 137 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 158 Remarks Code

To allow UHBVNL to feed proposed 33 kV substation Balerkha (10 MVA) from 132 kV substation Narwana (old) matching with the shifting of the load of 33 kV substations Dhanoda (9 MVA) and Lochab (8 MVA) on commissioning of 132 kV substation Dablain. Advising UHBVNL to create new 33 kV substation Balerkha (10 MVA) matching as per above.

159

To allow UHBVNL to augment 33 kV substation Pehowa from 2x6.3+1x5 MVA to 2x6.3+1x10 MVA 33/11 kV transformer matching with shifting of load of 33 kV substation Dhand from 220 kV substation Pehowa to 132 kV substation Dhand. 132 kV Kirmich substation To allow UHBVNL to feed 33 kV substation Hathira (10 MVA) from under construction 3B1432* 132 kV substation Kirmich matching with the commissioning of 2nd 20/25 MVA 132/33 kV transformer at 132 kV substation Kirmich. construction of 33 kV bay at 132 kV substation Kirmich to feed 33 kV substation Hathira

160 33 kV Hathira

161

REC Scheme No.350021 (Rs. 6.03 Crore) Allow UHBVN to create 33 kV substation Sangan with installed capacity of 2x8 MVA 33/11 kV transformers with its feeding from 132 kV substation Dhanouri.. To allow DHBVNL to augment 33 kV Pump Houses MC-3, MC-4 and MC-5 from 2x3.5 MVA 33/3.3 kV to 2x3.5 MVA 33/3.3 kV + 4 MVA 33/11 kV each matching with shifting of 33 kV load of Zerpur and Barda from 132 kV substation Mohindergarh to 132 kV substation Satnali. The load shall be restricted to installed capacity of the 132/33 kV transformer.

162

150277783.xls.ms_office

Page 138 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 163 Remarks Code

To allow UHBVNL to create new 33 kV substation Khurana (10 MVA) with feeding from 132 kV substation Khurana (under construction) matching with installation of 2nd 20/25 MVA 132/33 kV transformers at 132 kV substation Khurana. 33 kV Khurana 132 kV Khurana Creation of one no. 33 kV bay at 132 kV substation Khurana to accommodate 3B1442* proposed 33 kV substation Khurana.

To cancel connectivity of 33 kV substation Kawartan from 132 kV substation Khurana. 33 kV substation Kawartan (14 MVA) being nearer to 132 kV substation Nautch will continue to be fed from 132 kV substation Nautch. 164 To concur for creation of new 33 kV substation at village Sargathal under operation circle Sonepat with installation of 1x10 MVA 33/11 kV transformer to be fed from approved 220 kV substation Mohana subject to commissioning of 1x100 MVA 220/33 kV transformer proposed at 220 kV substation Mohana by HVPNL.. To concur for creation of new 33 kV line (16 km) from approved 220 kV substation Mohana to the proposed site of 33 kV substation Sargathal with 130 mm2 ACSR conductor subject to commissioning of 1x100 MVA 220/33 kV transformer proposed at 220 kV substation Mohana by HVPNL. 33 kV Sargathal 220 kV Mohana Creation of one no. 33 kV bay at 220 kV substation Mohana for feeding the load of new 3B1455* 33 kV substation Sargathal subject to commissioning of 1x100 MVA 220/33 kV transformer proposed at 220 kV substation Mohana by HVPNL.

150277783.xls.ms_office

Page 139 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. 165 Remarks Code

To concur for augmentation of 33 kV substation Kunjiya from 1x6.3/8 MVA to 1x6.3/8 MVA + 1x10 MVA 33/11 kV transformer being fed from 132 kV substation Jhajjar subject to augmentation of conductor of 33 kV Jhajjar - Kosli line up to T-off point along with creation of new 132 kV substation Machhrauli and shifting of entire load of 33 kV substation Machhrauli from 132 kV substation Jhajjar to 132 kV substation Machhrauli. The UHBVN authorities may also consider feeding of 33 kV Kunjiya from 132 kV substation Machhrauli after its commissioning. To concur for augmentation of conductor of 22 km 33 kV Jhajjar - Kosli line up to T-off point for 33 kV substation Kunjiya from 0.075 sq" to 130 sq mm ACSR conductor subject to augmentation of conductor of 33 kV Jhajjar - Kosli line up to T-off point along with creation of new 132 kV substation Machhrauli and shifting of entire load of 33 kV substation Machhrauli from 132 kV substation Jhajjar to 132 kV substation Machhrauli. The UHBVN authorities may also consider feeding of 33 kV Kunjiya from 132 kV substation Machhrauli after its commissioning.

166

To concur for augmentation of 33 kV substation old Bahadurgarh from 2x6.3 MVA to 2x10 MVA 33/11 kV transformer being fed from 132 kV substation Bahadurgarh. To concur for augmentation of conductor of 5 km existing 33 kV line from 132 kV substation Bahadurgarh to old Bahadurgarh from 0.1 sq" to 130 mm2 ACSR conductor. To concur for augmentation of 33 kV substation Surya Roshni from 6.3/8 + 7.5 MVA 33/11 kV transformer to 10+7.5 MVA 33/11 kV transformer being fed from 132 kV substation Bahadurgarh. To concur for augmentation of 33 kV substation Badli from 6.3/8 MVA to 6.3/8+5 MVA 33/11 kV transformer being fed from 132 kV substation Bahadurgarh.

150277783.xls.ms_office

Page 140 of 201

33 kV Bays

ANNEXURE-1

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN, Sr. Bay required for feeding new Name of substation, No. 33 kV substation. where bay is to be constructed. Remarks Code

The above augmentation of 33 kV substation old Bahadurgarh, 33 kV substation Surya Roshni and 33 kV Badli are subject to augmentation of 132 kV substation Bahadurgarh by HVPNL from 2x20/25 MVA + 1x16/20 MVA 132/33 kV transformer to 3x20/25 MVA 132/33 kV transformer and shifting of load of 33 kV substation Jassor Kheri (10.3 MVA) and Bamnoli (8 MVA) from 132 kV substation Bahadurgarh to 132 kV substation Assaudha.

i) ii)

Availability of space for accommodating the above-mentioned 33 kV bays at HVPN substations will be ensured by Superintending Engineer/ Design HVPNL, Panchkula before processing the purchase of material by CE/ MM, HVPNL Panchkula. Chief Engineer/ MM, HVPN, Panchkula will initiate the procurement of material for the above works after receiving firm completion schedule from UHBVN/ DHBVN in respect of connected 33 kV substation and 33 kV lines. Chief Engineer/ PD&C UHBVN & Chief Engineer/ PD&C DHBVN, will ensure submission of completion schedule of 33 kV substations and 33 kV lines after getting it duly approved from their respective M.D/ Director/ Projects to Chief Engineer/ MM, HVPN, Panchkula. Chief Engineer/ PD&C UHBVN amd C.E/ P&D, DHBVN, will ensure completion/ commissioning of 33 kV substations and 33 kV lines matching with the completion/ commissioning of 33 kV bays, so as to ensure that the 33 kV bay/ Bay-material do not remain unutilized.

iii)

150277783.xls.ms_office

Page 141 of 201

33 kV Bays

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

Note :- Deposit works of UHBVN & DHBVN to be carried out after deposit of actual cost as per WTDs' decision dated 7.3.2001 circulated vide letter No. R.No. 150/Ch.117/304/K-166/Vol.III, dated 31.3.2001. 220 kV Works 1 Erection of 220 kV over head line 220 kV substation BBMB, Hisar to M/s Jindal Stainless Ltd for providing independent 220 kV feeder to the firm. 1 2D0802* The entire work shall be carried out by M/s Jindal Stainless Ltd. at their cost subject to approval of design and other details drawing by HVPN. The work shall be executed under the supervision of SE/ TS HVPN Hisar for ensuring and maintaining quality of work. The supervision charge and all expenditure relating to demolishing of building and other structure in BBMB substation and their reconstruction shall be borne by M/s Jindal Stainless Ltd. The work in the BBMB yard will be carried out by BBMB as deposit work. M/s Jindal shall deposit the necessary cost or supply the requisite material as directed by BBMB. 2 i) Augmentation of 220 kV substation Madanpur (Panchkula) by installation of additional 1x100 MVA 220/66 kV transformer as a deposit work of HSIIDC. ii) Shifting of the existing 220 kV bus coupler from bay No. A-2 to A-7 (spare bay) to accommodate 3rd proposed 100 MVA 220/66 kV transformer in 220 kV bay No. A-2 at 220 kV substation Madanpur as deposit work of HSIIDC. 1x100 220/66 2D0928* The proportionate cost of augmentation would be borne by HSIIDC.

2D0930*

The proportionate cost of work would be borne by HSIIDC.

Deposit works 150277783.xls.ms_office Page 142 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

iii) Provision of fire protection walls on both sides of all the three 100 MVA 220/66 kV transformers at 220 kV substation Madanpur as deposit work of HSIIDC.

2D0931*

The proportionate cost of work would be borne by HSIIDC.

3 One No. 100 MVA 220/132 kV transformer shall be diverted by HVPNL to APCPL plant site at Jhajjar. The full cost of this transformer shall be initially born by APCPL and it can be later handed over back to HVPNL at depreciated cost. 4 220 kV Tee-off Charkhi Dadri - Rewari line upto APCPL switch yard will be constructed by HVPNL. The entire cost of erection and dismantlement of this teeoff arrangement will be executed as a deposit work of APCPL The 220 kV system beyond APCPL switch yard gantry toward plant shall be undertaken by APCPL. All works including civil works and erection etc. required for 220/132 kV transformer shall be under taken by APCPL. HVPNL shall provide supervision of installation and testing & commissioning.

Deposit works 150277783.xls.ms_office Page 143 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

132 kV Works 1 132 kV substation Rai (HSIDC) 1x16/20 132/11 1D0692* The work of creation of 132 kV substation Rai will be carried out by HSIDC while the line works will be deposit work of HSIDC to be executed by HVPN The terms and conditions as laid down in this office letter No. Ch. 70 / 407 / K-107 dated 04.04.2002 addressed to Superintending Engineer / Electrical, HSIDC, Gurgaon shall apply in general. To forward estimate framed by Executive Engineer / TS Division HVPN, Panipat vide memo No. Ch.6/CW-241 dated 30.07.2005 for construction of LILO of Sonepat Rai 132 kV S/C line to HSIDC. 3 132 kV substation HSIDC Kundli 1x16/20 132/11 1N0864* Creation of 132 kV substation HSIDC Kundli with installed capacity of 1x16/20 MVA 132/11 kV transformer by HSIDC at their own cost. 1x10/16 MVA 132/11 kV transformer would be installed at this substation by HVPN at HVPN cost to take care the load of the area other than that of HSIDC. The responsibility of providing right of way either through HSIDC land or in vicinity of HSIDC land will rest on HSIDC. HSIDC will arrange clearance from HUDA/ CEI and any other agency involved during construction/ commissioning. Capacitors Banks of required capacity will have to be installed by HSIDC along with transformer at their cost. Installation of Capacitor Banks forms a part of substation equipment. Installation of 1x10/16 MVA 132/11 kV transformer at upcoming 132 kV substation Rai (HSIDC) at the cost of HVPN to take care the load of the area other than that of HSIDC (1A0867*)

2 LILO of Sonepat (220 kV) Rai (132 kV), 132 kV S/C line at 132 kV substation Rai of HSIDC.

1D0693*

4 As a temporary arrangement, LILO of 132 kV S/C line from 132 kV substation Kundli to 132 kV substation Rai at proposed 132 kV substation HSIDC Kundli as a deposit work of HSIDC to be executed by HVPN. However, the final feeding of proposed 132 kV substation Kundli (HSIDC) would be from proposed 220 kV substation Rai (HSIDC), which would also be carried out at the cost of HSIDC.

1L0866*

Deposit works 150277783.xls.ms_office Page 144 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

The substation after commissioning will be handed over by HSIDC to HVPN at no cost. HSIDC will transfer the title of land in favour of HVPN at no cost. Additional transformers as and when required as per system requirement would be installed by HVPN at proposed 132 kV substation Kundli (HSIDC) to cater the load of surrounding area other than that of HSIDC at HVPN cost.

Lay out plan & Design drawings, equipment specification etc. will have to be got approved by HSIDC from CE/ D&P, HVPN, Panchkula. Installation of additional 1x10/16 MVA 132/11 transformer approved at 132 kV substations Rai vide this office Memo No. R.No.346/Ch-9/407/K-190 dated 31.03.2006 may be deleted from the list of works of HVPN for the year 2006-07 (1A0659A) Installation of additional 1x10/16 MVA 132/11 kV transformer approved at 132 kV substations Kundli vide this office Memo No. R.No.346/Ch-9/407/K-190 dated 31.03.2006 may be deleted from the list of works of HVPN for the year 2006-07 (1A0660A)

5 Bahadurgarh (HSIIDC)

1x16/20

132/11

1D0871*

With its feeding from 220 kV substation Bahadurgarh (Nuna Majra) at the land offered by HSIIDC. The work at Sr. No. 5 will be carried out by HSIIDC while works at Sr. No. 6 & 7 will be deposit work of HSIIDC to be executed by HVPN. Matching with the commissioning of 2nd 100 MVA 220/132 kV transformer at 220 kV substation Bahadurgarh at the cost of HSIIDC.

Deposit works 150277783.xls.ms_office Page 145 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV) 5

Code

Remarks

6 Construction of new 132 kV S/C line on D/C towers with 0.2 sq. inch ACSR from 220 kV substation Bahadurgarh to the proposed 132 kV substation Bahadurgarh (HSIIDC) at the cost of HSIIDC. 7 Creation of 132 kV bay at 220 kV substation Bahadurgarh to accommodate the above line at the cost of HSIIDC.

1D0872*

The responsibility of providing right of way either through HSIIDC land or in vicinity of HSIIDC land will rest on HSIIDC. HSIIDC will arrange clearance from HUDA/ CEI and any other agency involved during construction/ commissioning.

1D0873*

Capacitors Banks of required capacity will have to be installed by HSIIDC along with transformer. Installation of Capacitor Banks forms a part of substation equipment. The substation including land and equipment will be taken over for operation after HSIIDC transfers the title of land and assign the equipment in favour of HVPNL at zero cost. Additional transformers as and when required as per system requirement would be installed by HVPN at proposed 132 kV substation Bahadurgarh (HSIIDC) to cater the load of surrounding area other than that of HSIIDC at HVPN cost. Lay out plan & Design drawings, equipment specification etc. will have to be got approved by HSIIDC from CE/ D&P, HVPN, Panchkula.

8 132 kV substation Bahu (Augmentation) 9 Creation of one 33 kV bay at 132 kV substation Bahu to feed construction power plant of M/s Aravali Power Company Private Limited at 33 kV level (peak load 4 MVA) as a deposit work of M/s Aravali Power Company Private Limited.

1x20/25

132/33

1D1025*

Or lower capacity transformer, if available, at the time of execution as a deposit work of M/s Aravali Power Company Private Limited. Allow M/s Aravali Power Company Private Limited to feed construction power plant at 33 kV level (peak load 4 MVA) from 132 kV substation Bahu matching with the Sr. No.8 above

3D1026*

Deposit works 150277783.xls.ms_office Page 146 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

10 Allow M/s Aravali Power Company Private Limited to feed construction power plant at 33 kV level (peak load 4 MVA) from 132 kV substation Mattenhail by Tap off from 33 kV Mattenhail Sasroli line matching with the augmentation of 132 kV Mattenhail by providing 1x10/16 MVA 132/33 kV transformer in place of 3 winding 1x8/4/4 MVA 132/33/11 kV transformer. However, the M/s Aravali Power Company Private Limited shall be required to deposit the share cost, if any, for augmentation along with associated control & switching and other equipment etc. as per the prevalent instructions of HVPN & UHBVN and to be decided by SE/ TS, HVPN Rohtak & SE/ OP, UHBVN, Rohtak.

33 kV lines would be constructed by M/s Aravali Power Company Private Limited at their cost.

Full cost of above works at Sr. No. 8 & 9 and share cost as per Sr. No. 10, if any, are required to be got deposited from M/s Aravali Power Company Private Limited in advance before undertaking the work. M/s Aravali Power Company Private Limited will install suitable metering equipment at sending and receiving end as per specification of HVPNL at their cost. The utility of creating 33 kV level at 132 kV substation Bahu after the utilization of temporary construction load of M/s Aravali Power Company Private Limited to be supplied by DHBVN

The generating plant will be a consumer of the Discom and will hand over 33 kV line to the Discom for operation and maintenance,

Deposit works 150277783.xls.ms_office Page 147 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

11 To allow UHBVNL to extend existing load of 1099 kW to 1784 kW for additional facilities at LPG bottling plant of IOC at village Gudha through independent 33 kV feeder from 132 kV substation Munak, matching with already approved augmentation of 132 kV substation Munak from 10/16 MVA 132/11 kV + (10/16 + 20/25) MVA 132/33 kV to 10/16 MVA 132/11 kV + 2x20/25 MVA 132/33 kV transformers and UHBVNL actually restricting total drawl at 33 kV level as per safety standards. 12 IMT Rohtak (HSIIDC)

3B1148*

Erection of 1 No. new 33 kV bay at 132 kV substation Munak at the cost of M/s IOC, for connecting the feeding 33 kV line for 33 kV substation of the consumer.

3x20/25 1x0.2

132/33 33/0.4

1D1368*

1x0.2 MVA 33/0.4 kV T/F for auxiliary supply. Out of three 20/25 MVA transformer, one 20/25 MVA 132/33 kV transformer to be provided by HVPNL in future while others to be provided by HSIIDC. The ownership of land/ building/ equipment of 132 kV substation IMT Rohtak will be handed over/ transferred by HSIIDC to HVPNL immediately after construction of substation is completed.

13 Proposed 132 kV substation HSIIDC IMT Rohtak will be initially commissioned by LILO of one circuit of 132 kV MDU Rohtak - Sampla D/C line. The cost of LILO arrangement will be borne by HSIIDC. Finally, the substation shall be fed from additional D/C line from a new 220 kV substation to be created in the area.

1D1369*

HSIIDC will provide at least 10 nos. 33 kV bays at 132 kV substation HSIIDC IMT Rohtak while executing the substation. The scope, feeding arrangement and other details for 220 kV substation to be created by HSIIDC in the area shall be decided separately.

Deposit works 150277783.xls.ms_office Page 148 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

66 kV Works. 1 Installation of 4th 12.5/16 MVA, 66/11 kV transformer at Q Block with all the associated equipment including bus coupler and extension of control room or any other relocation of equipment needed for this purpose along with civil works as per approved specifications of HVPN (DLF) 2 Complete arrangement for 2nd bus bar including all associated equipment needed for this purpose along with civil works, foundations etc. (DLF) 3 Creation of 66 kV bay at 66 kV substation Sector-46 Faridabad including metering equipment specifications to be approved by C.E / D&P, HVPN, Panchkula. 1x12.5/16 (Additional) 66/11 6D0705A This T/F shall be energised only after shifting the load of 66 kV S/S Sector 23 Gurgaon from Badshahpur-Sector 56 Gurgaon-Q Block-Dundahera 66 kV D/C line

6D0803*

Amendement of earlier approval conveyed vide Memo. No. R. No. 231/ Ch-96/ 406/ K-147/ Vol.I dated 12.6.2003 M/s DLF and HVPN shall bear the expenses relating to 2nd bus in 3:1 ratio i.e. a) DLF shall bear three fourth expenses relating to 2nd bus arrangement. b). HVPN shall bear one fourth expenses relating to 2nd bus arrangement. The work will be executed by HVPN as deposit work of M/s Jotindra Steels & Tubes Ltd. Faridabad. requisite material or its cost could be supplied by the firm as mutually agreed. 66 kV substation will be created by the firm. The GELO shall be approved by C.E / D&P, HVPN Panchkula. Construction of 66 kV S/C line from 66 kV substation Sector-46 Faridabad by the firm with route plan to be approved by C.E/D&P, HVPN Panchkula. Assistance of HVPN in execution of work could be availed on payment basis. Before / while execution of works, the following issues need to be attended to:Agreement to be signed among DHBVN, firm and HVPN regarding commercial aspects involving security, contract demand, deposit work cost, ACD, revenue collection, joint meter reading on regular basis, maximum / minimum load on feeder, extent use of system / feeder at present or in future at all.

6D0706A

6D0707*

Deposit works 150277783.xls.ms_office Page 149 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

Firm will arrange clearance / ROW from HUDA CE / and any other agency involved / during construction / commissioning / operation of system. 4 66 kV substation DLF Phase-V Sector43, Gurgaon 2x20 66/11 6D0708* To allow M/s DLF to construct a 66 kV substation at the site proposed by them in phase-V sector-43 Gurgaon with 2x20 MVA 66/11 kV transformers in the first instance with the provision to add two similar transformers in future by HVPN. The GELO will be approved by CE / D&P, HVPN, Panchkula. All transformer bays and allied equipment shall be suitable to accommodate 25/31.5 MVA 66/11 kV transformers if required to be installed in place of now planned. Four incoming bays, two outgoing bays, four transformer bays and at least one spare bay besides bays for bus coupler and may be capacitors need to be considered while finalising GELO. The busbar be strung with 0.5 sq inch twin ACSR while the number of 11 kV breakers per transformer would also be double of normal setup. LILO of Sector-56 - Q block section of 66 kV D/C Badshahpur Sector 56 - Q Block - Dundahera line on 2xD/C line with higher conductor size (0.4 sq inch ACSR) at 220 kV substation sector52A passing through 66 kV DLF substation proposed above. One circuit to be LILOed at 66 kV DLF substation in the first instance and the second circuit in future as the system conditions demand. To change from overhead to underground connectivity in the concerned zone, in case right of way is not available at the time of actual execution of work. Capacitor banks and metering equipment should be a part of initial setup of substation.

Deposit works 150277783.xls.ms_office Page 150 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

To sign a tripartite agreement among DLF, DHBVN and HVPN persuading DLF to bear the cost of 100 MVA transformer besides making this substationalongwith associated lines described above. persuading M/s DLF to construct this substation with GIS technology in case of shortage of space. Works to be executed by M/s DLF and transferred to HVPN free of cost. 5 66 kV substation HLF Ambience Project Sector-24, Gurgaon 2x16/20 66/11 6D0709* Construction of 66 kV substation in Ambience Project (sector-24, Gurgaon) with provision of following 66 kV bays: a) 2 No. bays for 66 kV Incoming circuits. b) 2 No. bays for 66 kV ongoing circuits. c) 2 No. bays for 16/20 MVA 66/11 kV transformers by HLF. d) 2 No. bays sfor 12.5/16 mVA 66/11 kV transformers by HVPN. e) 1 No. bay for bus coupler f) Double bus arrangement with twin 0.5 sq.inch ACSR. Construction of 66 kV double circuit line with 0.4 Sq. inch ACSR from 220 kV substation sector 52-A to the proposed 66 kV substation. In case of prosblem for right of way for overhead line underground cable connections should be adopted. Construction of 2 No. 66 kV bays at 220 kV sector 52-A Gurgaon for above line. This work will be carried out by HVPN as deposit work of M/s HLF. Provision of suitable right of way for uanderground 11 kV connections from this substation to HVPN loads.

Deposit works 150277783.xls.ms_office Page 151 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

The colonizer shall enter into an agreem,ent with DHBVN and HVPN for construction of substation and handling it over to HVPN free of cost. Construction of 66 kV D/C line with 0.4 Sq.inch ACSR from proposed 66 kV substation to proposed 220 kV substation sector 20, Gurgaon or any other suitablef load location as an additional or alternative connection. In this case also, underground connectivity shall be resorted to in case of problem in right of way for overhead line. The colonizer will arrange requisite clearance / approvals from concerned departments like HUDA for executing above works wherever required. i) Construction of 66 kV substaiton at Air Force site in Ambala Cantt, by Air Force authorities at their own cost with installation of 2x8 or 1x12.5/16 MVA 66/11 kV transfrormer. ii) Construction of 66 kV substaiton at MES (Army) site in Ambala Cantt, by MES (army) authorities at their own cost with installation of 2x8 or 1x2.5/126 MVA 66/11 kV transfrormer. iii) Construction of 66 kV S/C line with 0.2 sq.inch ACSR from 220 kV substation Tepla to 66 kV proposed substation MES Ambala Cantt. iv) Construction of 66 kV S/C line with 0.2 sq.inch ACSR from 220 kV substation Tepla to 66 kV proposed Air Force substation, Ambala Cantt. v) Construction of 66 kV S/C line with 0.2 sq.inch ACSR from 66 kV substation MES (army) Ambala Cantt to 66 kV substation Air Force, Ambala Cantt. vi) Construction of 66 kV substaiton mentioned at Sr.No. i) & ii) shall be carried out by Air Force & MES authorities respectively.

6 66 kV substaiton at Air Force site in Ambala Cantt 7 66 kV substaiton at MES (Army) site in Ambala Cantt

2x8 or 1x12.5/16 2x8 or 1x12.5/16

66/11

6D0710*

66/11

6D0711*

Deposit works 150277783.xls.ms_office Page 152 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

vii) Construction of 66 kV substaiton mentioned at Sr.No.iii),iv) & v) shall be carried out as two circuits of a D/C line all along the route with the line terminating at farther substation and LILO of one circuit at the other substation enroute. viii) Construction of 2 No. 66 kV bays at 220 kV substation Tepla as a deposit work (one bay each for line to MES and Air Force substation) for feeding two substations mentioned at Sr.No.i) & ii). ix) Installation of metering equipment both at consumer end and sending end (both as main and check meters) for proper energy accounting since Air Force and MES authorities shall remain consumers of UHBVN with energy supplied directly from HVPN substation. x) All these parties (Air Force, MES, UHBVN, and HVPN) shall enter into a formal agreement specifying all technical and commercial clauses for supply, maintenance, operation of transmission works and energy accounting of power handled. xi) Construction of works at Sr.No. iii),iv),v),vi) & ix) shall be carried out by HVPN as a joint deposit work of MES and Air Force authorities to be shared equally by them. 8 Allowing 66 kV connection to M/s Starwire by providing a 66 kV bay at 66 kV substation Globe Steel Faridabad. 9 66 kV bay at 66 kV substation Globe Steel and line section to their works will be at the cost of M/s Starwire. The works in HVPN substation will be deposit work of the consumer by HVPN. 6D0850* All construction activity both in HVPN and consumers premises shall be as per design and specifications approved by CE/ D&P, HVPN. Consumer will be responsible for any clearance required from CEI, HUDA or any other agency. Capacitor bank, metering equipment shall be part of initially set up of consumer substation.

Deposit works 150277783.xls.ms_office Page 153 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL


66 kV bay at 66 kV substation Globe Steel and line section to their works will Sr. be at the Name Lines cost ofofM/s Starwire. The No. works in HVPN substation will be deposit work of the consumer by HVPN.

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

To enter into tripartite agreement between consumer M/s Starwire, DHBVN and HVPN clearly spelling out details of commercial issues like security, contract demand, deposit work cost, ACD, revenue collection, joint meter readings, maximum/ minimum load on feeder, extent use of feeder at present/ in future, energy accounts, meters/ check meters etc. M/s Starwire will remains consumer of DHBVN with energy directly supplied by HVPN. Partial load of 11 kV feeders from 66 kV substations Pratap Steel, N India and Idgah shall be shifted to 66 kV substations Globe Steel to uitlise capacity spared by M/s Starwire on 11 kV. 10 To allow M/s Laser Shaving Products Pvt. Ltd. to construct 66 kV substation in their premises for a load of 10.5 MVA to be fed over underground cable connection from 66 kV substation Jharsetly. 11 Entire work of substation, cable laying, sending end bay and associated works shall be carried out by the consumer at its own cost or by HVPN as deposit work of the consumer. 6D0826* The GELO of substation, route of cable and all other technical specifications & design shall be approved by the CE/ D&P, HVPN, Panchkula.

6D0827*

Work to be taken up only after signing tripartite agreement among M/s Laser Shaving Product Pvt. Ltd., DHBVN & HVPN covering issues like security, contract demand, deposit work cost, ACD, revenue collection, joint meter reading on regular basis, maximum/ minimum load on feeder, use of system in future etc. Capacitor bank and metering equipment shall be a part of initial set up of the substation. Consumer shall arrange all clearances required from different agencies like HUDA, CEI etc. The consumer shall remain consumer of DHBVN with energy supplied directly by HVPN

Deposit works 150277783.xls.ms_office Page 154 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

12 The request of M/s RICO Auto Industries i) Ltd for extension of load from 9000 kW to 18000 kW with a corresponding increase in contract demand from 10 MVA to 20 MVA, may be allowed by DHBVNL from 66 kV substation Mehrauli Road Gurgaon as a temporary arrangement in view of SE/TS Gurgaon recommendation conveyed by memo No. Ch-36/Load dated 23.12.2005 subject to management of load by the field office within the capacity of feeding line. The final arrangement shall be as under: 12 Construction of 66 kV S/C line on D/C ii) towers from 66 kV substation Sector 38 Gurgaon to M/s RICO Auto Industries Ltd. With 0.2 sq" ACSR by the firm (M/s RICO Auto Industries Ltd.) The part route of proposed 66 kV line from sector38 Gurgaon to M/s RICO Auto will follow the same route presently feeding from Mehrauli Road to RICO, implies that M/s shall have to augment present feeding arrangement on single rail pole to tower structure with 0.2 sq" ACSR from T-point (connectivity from sector-38 substation) upto the firm's premises.

Before/ while execution of works, M/s RICO shall attend the following issues: i) Agreement to be signed among DHBVN, firm and HVPN regarding commercial aspects involving security, contract demand, deposit work cost, ACD, revenue collection, joint meter reading on regular basis, maximum/ minimum load on feeder, extent of use of system/ feeder at present or in future et all. ii) M/s RICO will arrange clearance, right of way from HUDA, CEI and any other agency involved / during construction/ commissioning/ operation of system. iii) Assistance of HVPN on execution of works can be availed by the firm on payment basis. iv) Assistance of HVPN in execution of works can be availed by the firm on payment basis.

Deposit works 150277783.xls.ms_office Page 155 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

12 Creation of one number 66 kV bay at 66 iii) kV substation Sector-38 Gurgaon for accommodating above line as deposit work of M/s RICO Auto Industries Ltd.

12 The above approved works shall be iv) executed by the firm matching with the commissioning of 66 kV substation sector-38 Gurgaon, targetted in June 2006. 13 Installation of 1x10/12.5 MVA 66/33 kV transformer along with associated control & switching and other equipment, bay etc. and 33 kV feeding line to the site of M/s RPS Associates at the cost of M/s RPS associates to feed their load of 10.5 MVA. 33 kV substation at its premises of the firm & 33 kV line would be constructed by M/s RPS Associates. Full cost of 1x10/12.5 MVA 66/33 kV transformer at 66 kV substation USA Faridabad along with associated control & switching and other equipment, bay etc. and 33 kV feeding line to site of M/s RPS Associates is required to be got deposited from M/s RPS Associates in advanced before undertaking the work. 1x10/12.5 66/33 6D0868* As recommended by SE/ TS, HVPN, Faridabad vide Memo. No. Ch-130/ S-31 dated 4.12.2006, for maintaining the continuity of power supply first new transformers shall be energized with the new control room & yard. The existing 1x10/12.5 MVA 66/11 kV transformer shall be dismantled thereafter.

Deposit works 150277783.xls.ms_office Page 156 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

14 Creation of new control room and new switch yard by dismantlement of four houses of category II and two houses of Category III (six numbers residential quarters) as recommended by SE/ TS, HVPN, Faridabad vide Memo. No. Ch130/ S-31 dated 4.12.2006 to accommodate new control room building & Yard at 66 kV substation USA, Faridabad. 15 Installation of 1x12.5/16 MVA 66/11 kV transformer at 66 kV substation Universal Steel Faridabad (USA) to enable to release 3 MVA load to NHPC 16 Allocation of alternate accommodation on priority for the staff residing in the colony of 66 kV substation USA Faridabad. 1x12.5/16 66/11 6A0869*

The proportionate civil cost of new control room , new switch yard , dismantlement works, system comprising of sump pit, pumpmotor and pump to drain out the rainy water from switchyard and other misc. works etc. to be borne by M/s RPS associates would be decided by CE/ D&P, HVPN in consultation with CE/ TS, HVPN, Hisar. This amount is also required to be got deposited from M/s RPS Associates in advanced before undertaking the work. Allocation of alternate accommodation on priority for the staff residing in the colony of 66 kV substation USA Faridabad. Proportionate cost of installation of 1x12.5/16 MVA 66/11 kV transformer would be shared by NHPC.

The cost of civil works exclusively carried out for releasing the connection of M/s RPS Associates would be borne by M/s RPS.

The cost of civil works which are required for common purpose i.e. for the use of M/s RPS as well as for HVPNL (including NHPC) would be borne proportionately with respect to the MVA capacity of the transformer by the respective user. The cost of electrical works including cost of material and equipments exclusively to be used by M/s RPS Associates would be borne by M/s RPS. The electrical works, material and electrical equipments which are required to be used for common purpose between M/s RPS Associates and HVPNL (including NHPC) would be shared in the ratio of their MVA capacity of the transformer of each user.

Deposit works 150277783.xls.ms_office Page 157 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV) 3x16/20 66/11

Code

Remarks

17 Construction of 66 kV substation with i) 3x16/20 MVA 66/11 transformers with space for fourth transformer to be installed in future in South City-II (Sector47 Gurgaon) at the site to be given by colonizer (M/s Unitech) as a deposit work of coloniser M/s Unitech. The title of site and other associated assets including equipment, residential/ non-residential buildings shall be got transferred by the developer to HVPN free of cost without any rider 17 Construction of 66 kV double circuit line ii) with 0.4 ACSR from 220 kV substation Badshahpur to proposed 66 kV substation in South City-II Gurgaon as a deposit work of coloniser M/s Unitech. 17 Construction of two 66 kV bays at 220 iii) kV substation Badshahpur for accommodating outgoing 66 kV double circuit line at Sr. No. 17 ii) as a deposit work of coloniser M/s Unitech.. 17 Carrying out works at Sr. No.17 i) to 17 iv) iii) as deposit work of colonizer M/s Unitech. 17 South City-II v)

6D0892*

6D0893*

6D0894*

To enter into tripartite agreement between M/s Unitech, DHBVNL & HVPNL after concurrence of its contents from Legal Wing to accept land and residential & non-residential buildings along with substation, line and bays mentioned at Sr. No. 17 i) to 17 iii) from the colonizer for operation and maintenance as asset of HVPN as per normal procedure in vogue. Total load of 59.9 MVA shall be allowed to the colonizer as follows. Load not exceeding 33.6 MVA through two transformers at this substation shall be for area developed by M/s Unitech while the other two transformers (one to be installed in first instance and the other to be added later) shall be for use by HVPNL/ DHBVNL for general consumption by its consumers. Load not exceeding 26.3 MVA in lieu of spare 1x16/20 MVA transformer being installed by colonizer shall be supplied to M/s Unitech or its associates by HVPNL/ DHBVNL from other substations of HVPN wherever feasible as per system conditions and margins available but no new substation shall specially be constructed by HVPN exclusively for this purpose. If the unified load of colonizer exceeds 75 MVA at any stage then the colonizer would construct 220 kV substation or shall share the cost of 220 kV substation as per rates/ norms fixed by HVPN.

Deposit works 150277783.xls.ms_office Page 158 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV) 2x12.5/16 66/11

Code

Remarks

18 Creation of 66 kV GIS substation at IT Park, Sector-22 Panchkula (HSIIDC) by HSIIDC at their own cost and land with 2x12.5/16 MVA 66/11 kV transformers matching with the commissioning of 3rd 100 MVA 220/66 kV transformer at 220 kV substation Madanpur 19 Lying of 66 kV D/C underground cable from 220 kV substation Madanpur to proposed 66 kV substation at IT park, Sector-22 Panchkula by HSIIDC at their cost. 20 Creation of two numbers 66 kV bays at 220 kV substation Madanpur for accommodating of Madanpur (220 kV) IT park, Sector-22 Panchkula (66 kV), 66 kV D/C underground cable as deposit work of HSIIDC by HVPN.

6D0925*

Capacitors Banks of required capacity will have to be installed by HSIIDC at 66 kV substation sector 22 Panchkula. Installation of Capacitor Banks forms a part of substation equipment.

6D0926*

The responsibility of providing right of way either through HSIIDC land or in vicinity of HSIIDC land will rest on HSIIDC. HSIIDC will arrange clearance from HUDA/ CEI and any other agency involved during construction/ commissioning. The substation and associated line after commissioning will be handed over by HSIIDC to HVPN at no cost. HSIIDC will transfer the title of land in favour of HVPN at no cost. Additional transformers and lines as and when required as per system requirement would be installed by HVPN at proposed 66 kV substation IT park, Sector-22 Panchkula (HSIIDC) to cater the load of surrounding area other than that of HSIIDC at HVPN cost. Lay out plan & Design drawings, equipment specification etc. will have to be got approved by HSIIDC from SE/ Design, HVPN, Panchkula.

6D0927*

21 Augmentation of both 66 kV bus bar from Twin Zebra ACSR to twin Tarantula Conductor to have interchangeability of load on both the buses at 220 kV substation Madanpur to carry the additional load of proposed 3rd 100 MVA 220/66 kV transformer as deposit work of HSIIDC. The proportionate cost of work would be borne by HSIIDC

6D0999*

Deposit works 150277783.xls.ms_office Page 159 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

22 Shifting of the existing 66 kV incomer for 100 MVA 220/66 kV transformer (T-2) from bay no. C-5 to C-6 to accommodate incoming 66 kV bay of proposed 3rd 100 MVA 220/66 kV transformer in 66 kV bay no. C-5 at 220 kV substation Madanpur as deposit work of HSIIDC. 23 Shifting of existing 66 kV capacitor bank from bay No. C-6 to C-3 (spare bay) in place of from bay No. C-6 to C-9 (spare bay) to avoid crossing of 66 kV incomers at 220 kV substation Madanpur as deposit work of HSIIDC. The proportionate cost of work would be borne by HSIIDC. This will facilitates the erection of two nos 66 kV outgoing circuits for IT park from bays C-8 and C9. 24 Extension of load at 66 kV level by M/s BSL (P) Ltd. Faridabad from 4000 kW to 6500 kW with CD 4444 kVA to 7222 kVA.

6D0932*

The proportionate cost of work would be borne by HSIIDC.

6D1000*

Before execution of the work, the consumer will enter into fresh tripartite agreement with HVPNL/ DHBVNL as per the new terms and conditions of supply imposed by HVPNL/ DHBVNL for granting the approval for extension of load.

Deposit works 150277783.xls.ms_office Page 160 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

25 The consumer shall be required to deposit the share cost for providing additional 12.5/16 MVA 66/11 kV transformer at 66 kV substation Dabriwala with its controlling bay along with full cost of 66 kV lines, metering CTs and other protection equipments etc. required to be augmented to facilitate extension of load as per cost estimate to be prepared by SE/ TS HVPNL Faridabad.

Deposit works 150277783.xls.ms_office Page 161 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

26 M/s Crown Buildtech may be allowed to avail contract demand of 6 MVA with augmentation from 8 MVA to 20 MVA 66/33 kV transformer at 220 kV substation Palla after the connectivity of 66 kV substation NH-3 with 66 kV ring main, facilitating the injection of additional power from 220 kV Palli. However, the consumer shall be required to deposit the share cost for augmentation with new transformer along with associated control & switching and other equipment etc. as per the prevalent instructions of HVPN & DHBVN and to be decided by SE/ TS, HVPN, Faridabad & SE/ OP, DHBVN, Faridabad. M/s Crown Buildtech would bear full cost of 33 kV bay to feed their load of 6 MVA. 33 kV substation at its premises of the firm & 33 kV line would be constructed by M/s Crown Buildtech. The above cost is required to be got deposited from M/s Crown Buildtech in advance before undertaking the work. Further the consumer will execute the required tripartite agreement with DHBVN and HVPN and they will install suitable metering equipmially be constructed by HVPN exclusively for this purpose.

6A1005*

Deposit works 150277783.xls.ms_office Page 162 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

27 The 10/16 MVA 66/33 kV transformer at present lying spare at 66 kV substation Badraula after commissioning of 66 kV substation Fatehpur Biloch may be utilized at 220 kV substation Palla in place of existing 8 MVA 66/33 kV transformer till transformer of 20 MVA capacity is arranged by the Nigam. 28 The 8 MVA 66/33 kV transformer which shall be spared at 220 kV substation Palla after aforesaid augmentation may be utilized at 66 kV substation Nagina in place of existing 6 MVA 66/33 kV transformer after augmentation to set off overloading of T/F at Nagina. 29 Creation of 66 kV substation by M/S i) Sunbeam Auto Limited Gurgaon at their cost facilitating extension of load from 7000 KW to 9000 KW and contract demand from 7500 KVA to 10000 KVA. The necessary supervision charges will be paid by the firm to HVPNL. 29 HVPNL will construct one bay at 66 kV ii) substation Sector-34 Gurgaon as a deposit work of M/S Sunbeam Auto Limited to provide 66 kV take out arrangement for M/S Sunbeam Auto Limited. 6D1227* 6A1006* The 12.5 MVA 66/33 kV transformer going to be spared at 66 substation A-4 Faridabad with the augmentation of 33 substation Escort-I to 66 kV level may be utilized at 66 substation USA to provide approved capacity of 12.5 MVA at kV level. kV kV kV 66

Deposit works 150277783.xls.ms_office Page 163 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

29 The proposed 66 kV substation of M/S iii) Sunbeam will be fed by 66 kV S/C line with 0.4 Sq ACSR conductor erected on D/C towers from 66 kV substation Sector34 Gurgaon to 66 kV substation Sunbeam to be constructed by HVPNL. The firm will bear proportionate cost of 66 kV S/C line on D/C towers.

6D1228*

29 M/S Sunbeam will make available one iv) no. 66 kV bay space at their S/S to HVPN for take out arrangement for further connectivity to other 66 kV S/S. 29 The firm will provide 1x12.5/16 MVA, v) 66/11 kV T/F in their substation for feeding their load. 29 The firm will provide help in securing vi) ROW for the feeding line with concerned government agencies. 29 The firm will carry out O&M of 66 kV vii) substation at their own cost after commissioning of the same. The applicable supervision charges for O&M will be paid by the firm to HVPNL. 29 The firm will pay for underground XLPE viii) power cable wherever ROW is not feasible for erecting 66 kV overhead feeding line. 6D1229*

Deposit works 150277783.xls.ms_office Page 164 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

29 The firm will enter into detailed tripartite ix) agreement with DHBVNL and HVPNL for construction of the substation by them before start of work. 30 Creation of 66 kV substation for M/S i) Vipul Limited for their residential colony at Vipul World in Sector-71 Gurgaon to be constructed by HVPNL as a deposit work of the firm. A provision of 9 no. 66 kV bays will be made in the 66 kV substation at the cost of firm which will include one no. bay for future expansion. 30 To provide 2x16 MVA, 66/11 kV ii) transformers for M/S Vipul Limited which includes 1x16 MVA, 66/11 kV spare transformer for future upcoming projects for which load requirement will be submitted by the firm separately. Similarly 2x16 MVA, 66/11 kV transformer will be provided for use by HVPNL and 1x0.2 MVA, 11/0.4 kV transformer will be provided for auxiliary supply. 6D1230* 6A1231*

Deposit works 150277783.xls.ms_office Page 165 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

30 The proposed 66 kV substation of M/S iii) Vipul Limited will be fed by 66 kV S/C line with 0.4 Sq ACSR conductor from 220 kV substation Sector-72 Gurgaon to 66 kV substation of M/S Vipul Limited erected on multi circuit towers. The proportionate cost of 66 kV S/C line will be borne by the firm. The firm will also pay the cost of 66 kV underground XLPE power cable wherever ROW is not feasible for providing overhead towers.

6D1232*

30 The proposed 66 kV substation of M/S iv) Vipul Limited will also be supplied power by LILO of one circuit of 66 kV Badshahpur-Sector 72-Sector-34 line with 0.15 Sq INVAR conductor. The total cost of this LILO line will be borne by the firm. 30 The proportionate cost of 66 kV bay of v) feeding line at 220 kV substation Sector72 Gurgaon will also be borne by M/S Vipul Limited. 30 The residential accommodation for 8 no. vi) O&M staff (Class-III) shall be provided by the firm at 66 kV substation of M/S Vipul Limited. 30 The ROW for all the 66 kV lines in their vii) land will be provided by M/S Vipul Limited.

6D1233*

6D1234*

Deposit works 150277783.xls.ms_office Page 166 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

30 The firm will enter into detailed tripartite viii) agreement with DHBVNL and HVPNL for construction of the substation. The firm will deposit the cost for construction of 66 kV substation to be intimated by SE/TS HVPNL Gurgaon before the start of work. 31 Creation of 66 kV Substation by M/S i) Star Wire (India) Limited at their cost for availing load of 5859.936 kW with CD 6000 KVA for their plant-II at village Chhainsa Tehsil Ballabgarh (Faridabad). The necessary supervision charges, if any, will be paid by the firm to HVPNL. 31 The proposed 66 kV Substation of M/S ii) Star Wire (India) Limited for Plant-II at village Chhainsa will be fed by 66 kV underground connection consisting of 4 no. single core XLPE cables or 400 sq mm size. The cables will be laid by firm at their own cost and the ROW will also be arranged by the firm. 31 The firm will provide space for a bay in iii) their substation for additional 66 kV connectivity to some other substation of HVPNL in nearby area in future. 6D1297*

6D1298*

The firm will bear all the expenses for construction of 66 kV outgoing bay at 66 KV substation Chhainsa required for release of their load at 66 KV level.

Deposit works 150277783.xls.ms_office Page 167 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

31 The firm will provide 1x20 MVA, 66/11 iv) kV transformer in their substation for feeding their load with future provision for 1x20 MVA, 66/11 KV transformer depending upon increased requirement of load in future. 31 The firm will carry out O&M of their 66 v) kV Substation at their own cost after commissioning of the same. The applicable supervision charges will be paid by the firm to HVPNL. 31 The required metering equipment along vi) with CTs of matching capacity will be provided by the firm at their own cost as per specification and design of Nigam at both sending end and receiving end 66 KV substation. 31 The firm will enter into tripartite vii) agreement with HVPNL & DHBVNL for construction of substation by them before start of work. 32 Approval for re-alignment of a portion of 66 kV S/C Gurgaon - Manesar - Pataudi line which is passing through the area of group housing society in sector-1 IMT Manesar. 33 HSIIDC authorities will rpovide 4 no. S/C 630 mm2 XLPE cables for re-alignment work at their own cost and all the work will be carried out by HSIIDC.

6D1299*

Deposit works 150277783.xls.ms_office Page 168 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

34 The re-alignment work will be carried out in the land of HSIIDC in sector-1 IMT Manesar and the concerned drawings/ specifications for lying the 66 kV underground cables will be got approved by HSIIDC from design wing of CE/MM, HVPNL, Panchkula before execution of work. 35 66 kV substation by M/s Canton Buildwell Pvt. Ltd. New Delhi 36 Construction of a new 66 kV D/C line with 0.4 Sq" ACSR from 220/66 kV substation sector-56 Gurgaon at the cost of the firm to feed the proposed 66 kV substation. 37 Construction of a 2 no. 66 kV bays by HVPN at 220/66 kV substation sector-56 Gurgaon as a deposit work of M/s Canton Buildwell Pvt. Ltd. To accommodate 66 kV D/C outgoing feeders to the proposed substation. 6D1365* For establishment of SEZ at Gawal Pahari on Gurgaon-Faridabad Road Gurgaon at their own cost. Necessary supervision charges will be paid by the firm to HVPNL. The cost of feeding line from proposed 220 kV substation Sector56 Gurgaon to the proposed 66 kV substation (of SEZ developer) shall be borne by the firm. The firm will also bear the cost of underground XLPE power cable equivalent to 0.4 Sq" ACSR conductor wherever RoW is not feasible for construction of overhead line. The firm will make available space for future 2 no. 66 kV bays at their substation to HVPNL for providing arrangement for future connectivity to other 66 kV substations.

6D1366*

6D1367*

The firm will provide and utilise (1x25/31.5 + 1x16/20 ) MVA 66/11 kV transformers in this substation for feeding their load. HVPNL will provide and utilise 1x16/20 MVA, 66/11 kV transformer for its use at the 66 kV substation being created by the firm. Further capacity addition shall be planned as the load grows. The firm will hand over the 66 kV substation to HVPNL for operation & Maintenance purpose after its construction.

Deposit works 150277783.xls.ms_office Page 169 of 199

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

Sr. No.

Name of Lines

Route Length km.

T/F Capacity Voltage Ratio (MVA) (kV)

Code

Remarks

The firm will enter into tripartite agreement with DHBVNL & HVPNL for construction of the substation & associated issues before start of work. The share cost of 220/66 kV transformer to be installed at 220 kV substation Sector-56 Gurgaon shall be borne by the firm. The builder SEZ shall supply an affidavit on NJSP to the effect that they would develop power load as per actual requirement shown in their proposal. To allow the creation of 66 kV substation Sector-8 IMT Manesar with 2x16/20 MVA 66/11 kV transformers by HSIIDC subject to the finalization of feeding connectivity of this substation by HVPNL.

38 Sector-8 IMT Manesar

2x16/20

66/11

Deposit works 150277783.xls.ms_office Page 170 of 199