Sheet 1 OF 15
Shade Corporation
Segment C Jed-Mad Railway Underpass STA.443+387.00 ( Harmain HS Rail)
System
QR730-8
Sheet 2 OF 15
Temp = 1.414
25 25
36 + 36 41 0.878 0.771
16
C2 0.3 OPC/RHPC/SRPC with any admixture except a retarder H 11.42 Kicker (mm) 150 (Note: only enter Yellow cell values)
Pressure = D[C1x(R)^0.5 + C2xKx(H-C1x(R)^0.5)^0.5] D 24.5 C1 R^ C2 K H 1 1.414 0.3 0.77 11.42 1.414 0.231 10.01 10.01 24.5 1.414 0.231 3.163 24.5 1.414 2.146 Max.Pressure = 52.57 0.732 C1 1 R^ 1.414 1.414
Design Pressure = 52.57 The Equivalent Fluid head Pressure = Density of Conc. 52.57 = 24.5 2.15 = m
2.15
Pressure
QR730-8
Sheet 3 OF 15
Plywood Calculation Titles: Form Face Calculation Basis Formwork Guide to Good Practice 2nd Edition - Load case 58 Material: Canadian 19mm Douglas Fir 5, 6 or 7 ply sanded Trade Names: None specified Thickness(t) = 18.5 mm Weight = 10.9 kg/m2 Face grain - Parallel to Span EI = 3.26 kN/m2/m Wall Formwork - Load Duration Factor = 1.5 Applied load = 52.57 kN/m2 Span(L) = 0.305 Support width(b) = 70
RESULTS: (Permissible values in brackets) Load W = Applied x L = 52.57 x 0.305 = Maximum Bending Moment = 0.095 WL Maximum Shear = 0.525((L-b-t)/L)W = = 0.525 = Maximum Reaction 1.0W= Sag Deflection 0.0066((WL^3)/EI) = 0.00660 x ( 0.305 0.07 0.305 5.976 kN/m =
0.019 ) x
= 0.949 mm
1 321.4 th span
1 270
T1 Ply
QR730-8
Drg
CALCULATION SHEET
Sheet 4 of 15
Rev.
S-150 Dual Beam Beam (Calc.) Max.Load applied on Secondary = Pressure x spacing = 52.57 x 0.305 = 16.03 kN/m Beam Length Moment of Inertia Elastic Modulus APPLIED LOADING Distributed Loads End1 16.03 REACTIONS (+ve Up) 15.88 kN .... 16.22 kN .... 15.99 kN .... 15.99 kN .... 16.22 kN .... 15.88 kN .... 6.00 m 356.00 cm4 68900 N/mm2
End2 6.000 m
at at at at at at
m m m m m m
MAXIMUM LOADS & DEFLECTIONS Max. Max. Max. Max. Max. Max. Reaction Sag BM Hog BM Shear Force Sag Deflection Hog Deflection 16.22 kN .... at 4.500 m 0.72 kN.m .... at 1.000 m 1.62 kN.m .... at 0.450 m 8.66 kN .... at 0.450 m 0.40 mm .... at 0.000 m 0.03 mm .... at 5.650 m
Allowable Values
L / 270 L / 270
Sec.1-1
QR730-8
Drg
CALCULATION SHEET
Sheet 5 of 15
Rev.
Sec.1-2
QR730-8
Drg
CALCULATION SHEET
Sheet 6 of 15
Rev.
Mk2 Normal Soldier Calculations ( Primary ) Max.reaction from Secondary = Pressure 16.22 x spacing kN = 16.22 / Max.Load Applied On Soldier = 53.18 kN/m
0.305
Distributed Loads End1 53.18 53.18 REACTIONS (+ve Up) 39.22 kN .... 52.41 kN .... 45.27 kN .... 52.98 kN .... 54.54 kN .... 47.98 kN .... 48.48 kN .... 45.29 kN .... 56.14 kN .... 58.83 kN .... 39.97 kN ....
End2 End1 53.18 kN/m .... at 0.150 0.00 kN/m .... at 9.250
at at at at at at at at at at at
0.45 1.40 2.30 3.20 4.25 5.20 6.10 7.00 7.90 9.05 10.25
m m m m m m m m m m m
MAXIMUM LOADS & DEFLECTIONS Max. Reaction 58.83 kN .... at 9.050 m Max. Sag BM 3.51 kN.m .... at 8.450 m Max. Hog BM 6.27 kN.m .... at 10.250 m Max. BM at joint 4.12 kN.m .... at 9.90 m Max. Shear Force 30.99 kN .... at 9.050 m Max. Sag Deflection 0.72 mm .... at 11.400 m Max. Hog Deflection 0.04 mm .... at 0.000 m
Allowable Values 90.0 kN Tie Rod 38.0 kN.m 38.0 kN.m 10.0 kN.m 75.0 kN 3.5 mm L / 270 3.5 mm L / 270
Prim.1-1
QR730-8
Drg
CALCULATION SHEET
Sheet 7 of 15
Rev.
Prim.1-2
QR730-8
Drg
CALCULATION SHEET MAK/12/018/91 & 92
Rev.
Formwork Ht.
11.42
Formwork Height Max.Shutter Length No.of shoring per Shutter Wind Moment
Ht.=
12.0 m
= = = =
6 1.2
(Factor Of Safety)
Loading in Shoring
(Radian)
Anchorage Calculation The Anchorage for each shoring required to resist the design force as follows = 33.75 x Sin 60 = 33.75 x Sin 1.047 (Radian) = 33.75 x 0.866 = 29.23 kN Horizontal = 16.88 kN These Values to be restrained at the Anchorage. Vertical
Shoring-1-2
QR730-8
Drg
CALCULATION SHEET
Sheet 9 of 15
Rev.
MAK/12/018/91 & 92
Prepared by : SBU Site Date : 12/3/2013 Segment C Jed-Mad Railway Underpass STA.443+387.00 ( Harmain HS Rail) Shade Corporation
Customer
Case A London and Home Counties (V = 42 m/s) Force Wm (kN) 1.09 1.48 1.90 2.33 2.79 3.28 3.8 4.35 4.9 5.40 Moment (kNm) 1.64 3.00 4.89 7.26 10.25 13.92 18.34 23.37 29.65 35.64
Case B England and Wales (V = 48 m/s) Force Wm (kN) 1.81 2.47 3.18 3.94 4.75 5.65 6.60 7.59 8.63 9.72
3 4 5 6 7 8 9 10 11 12
Case C Great Britain and Ireland (Exc. Outer Islands) (V = 54 m/s) Moment Force Moment Wm (kN) (kNm) (kNm) 2.72 2.31 3.47 5.03 3.15 6.41 8.22 4.05 10.46 12.40 5.00 15.68 17.67 6.02 22.31 24.42 7.14 30.70 32.50 8.34 40.90 41.91 9.6 52.87 52.21 10.86 64.51 64.15 12.12 78.54
Force Wm (kN) 0.84 1.12 1.40 1.68 1.96 2.24 2.52 2.8 3.08 3.36
Moment (kNm) 1.26 2.24 3.50 5.04 6.86 8.96 11.34 14 16.94 20.16
Table # 20 : Formwork A Guide to good practice-Concrete Society-2nd Edition 1995 (Page # 104)
Table
Drg
CALCULATION SHEET
Rev.
Date : 12/3/2013
350
52.4 4
52.4 4
Tan
11420
mm Wall ht.
= = =
mm kN/m2 mm
Pressure acts @ 90 to the surface. Horizontal Loads are taken out by ties. Resultant of vertical loads need to be anchored.
.26 56 4 2.1
P1 = P2 =
26.286 52.57
x x
2.14 9.45
= =
56.26155 496.8521
6.8 49
5 9.4
Uplift (2)
QR730-8
Drg
CALCULATION SHEET MAK/12/018/91 & 92
Rev.
P1 + 56.26 + = 553.1 kN
P2 496.9
553
4 .1 1
PV PH
PH
= = = = = = = =
P Cos 553.1 Cos 553.1 x 545 kN P Sin 553.1 Sin 553.1 x 94.66 kN
PV
The Uplift to be resisted = 94.657 kN for every 1 meter length of wall It is allowable to deduct the weight of Formwork Approx. 0.5 kN/m 2 Weight of Shutter Per lm for full ht. = 0.5 x 11.42 5.71 kN Uplift to be Resisted = 94.66 5.71 = 88.95 kN Max.Uplift @ each Soldier = = = Uplift Per lm 88.95 93.394 kN x x soldier Distance 1.05
Uplift (3)
QR730-8
Drg
CALCULATION SHEET
Sheet
Rev.
Prepared by : SBU Site Date : 12/3/2013 Segment C Jed-Mad Railway Underpass STA.443+387.00 ( Harmain HS Rail) Shade Corporation
Customer
MK2
Drg
CALCULATION SHEET
Sheet
Rev.
Prepared by : SBU Site Date : 12/3/2013 Segment C Jed-Mad Railway Underpass STA.443+387.00 ( Harmain HS Rail) Shade Corporation
Customer
S-150
Drg
CALCULATION SHEET
Sheet
Rev.
Prepared by : SBU Site Date : 12/3/2013 Segment C Jed-Mad Railway Underpass STA.443+387.00 ( Harmain HS Rail) Shade Corporation
Customer
Tie System
Drg
CALCULATION SHEET
Sheet
Rev.
Prepared by : SBU Site Date : 12/3/2013 Segment C Jed-Mad Railway Underpass STA.443+387.00 ( Harmain HS Rail) Shade Corporation
Customer
wind Table