Sie sind auf Seite 1von 1

Canan Sites Estate Primary School

Site

WINDOW SCEDULES NTS


Label W1
1200 400 400 700 600 700

W2

W3
300

Elevation.
1600 1200 1600 1600 1200

1600

1600

2000

1600

900

400

400

600
2.3km from the main road Merryland high school 2.0km from the main road

600

600
Aluminium window top hung, Single panel with permanent vent above 900 08 WCs, Study room & store

900

2000

0 20 16

Aluminium window side hung, 2No. panels with permanent vent above 900 18 All other windows Aluminium frame, primed and painted complete with fixing lugs. Clear 5mm glazing and 400mm fixed, painted Aluminium louvre vents. Brass window fastener 2No and horizontal pivot hinges 4No per window

Cill height. Quantity. Location.


Skyland Internal school

500 33 All curved corners

0 10 31

17,046

Pane & Opening Description.

Smooth lawn

Aluminium window side hung, Single panel with permanent vent above

00 1,0

7 18,63
5 15,59
A 01
IC

IC

Frame. Glazing & vents. Iron Mongery.

Aluminium frame, primed and Aluminium frame, primed and painted complete with fixing lugs. painted complete with fixing lugs. Clear (frost for WCs) 5mm glazing Clear (frost for WCs) 5mm glazing and 400mm fixed, painted Aluminium and 400mm fixed, painted louvre vents. Aluminium louvre vents. Brass window fastener 1No and Brass window fastener 1No and vertical pivot hinges 2No per window horizontal pivot hinges 3No per window

Smooth lawn
D E

Amry Detach 0.6km from the main road

8,1 04
IC

Smooth lawn

Parking

02

GT

01

43 2,0

02

7,6 30

Drive way

6 ,20 12
03 04

2,158

19,2 49

Parking Walk way


05

03 04

PROPOSED MAIN HOUSE

Winners Chaple

Walk way

2,497

2,497

Label
700
Green bar valley

D1
2100 700 700 700

D2
1400 700 300

D3

D4

GT IC

06
IC
GT

IC

Kitchenette

1000 300

900
0 S 60 S 39 CE

Verandah
Bedroom 01
40 2,0
2,107

Elevation.

WC
IC

2100

2100

Indu Indian Tempo

Site layout Plan (1:200)

Bedroom 02
2,040

2400

2400

2400

2400

2400

2400

2400

2400

40 2,0

700

700

700

700

700

1000
Steel casement side hung door with permanent vent above 14 All other doors Steel frame, primed and painted complete with fixing lugs. Clear 5mm glazing and 300mm fixed, painted steel louvre vents.

900
solid core wooden door with mahogany veneer 06 WCs & SHRs Wood frame, Varnished & finished, complete with fixing lugs. No Glazing, with no permanent vent above Brass door lock and handle 1No each side and horizontal pivot hinges 3No per door

3,307

Pane & opening Description

9 2,13

Steel casement, three free slide leaves as shown. 01 Living room Steel frame, primed and painted complete with fixing lugs. Clear 5mm glazing. Brass door lock and handle 1No each side per leaf and Vertical slide rails on top & bottom per door

Steel casement, two free slide leaves 03 Balconies Steel frame, primed and painted complete with fixing lugs. Clear 5mm glazing.

Wavamuno road To Entebbe Town

Quantity.

2.7km

Location plan N.T.S


To Entebbe

Location Frame Glazing & vents Iron Mongery

Mayor's garden

Brass door lock and handle 1No each Brass door lock and handle side per leaf and Vertical slide rails on 1No each side and horizontal top & bottom per door pivot hinges 3No per door

To Entedbbe Town

General Notes:

CLIENT:
Mr & Mrs Sam & Rose Angura P.O.Box ...... ...
DRAWING TITLE:

PROJECT:

PROPOSED RESIDENCE AT PLOT

37800

DOOR SCEDULES NTS

43 2,0
Smooth lawn

05 06
GT

IC

2,080

AC

RO AD
64 22,7

00 1,0

BLOCK

ENTEBBE.

DESIGNED BY : DRAWING BY :

PATRICIA K R : K. R

Date: Scales:

April 2013

Project No:

LOCATION PLAN, SITE LAY-OUT AND DOOR & WINDOW SCHEDULES

AS SHOWN

Dwg. No.2

Das könnte Ihnen auch gefallen