Beruflich Dokumente
Kultur Dokumente
Measure Code
ACC-1 WCC-1 WCC-2 WCC-3 WCC-4
Size
(Nominal Tons)
Minimum Efficiency
Full load: 9.8 EER Part Load: 13.3 EER Full load: 0.72 kW/ton IPLV: 0.59 kW/ton Full load: 0.64 kW/ton IPLV: 0.49 kW/ton Full load: 0.64 kW/ton IPLV: 0.53 kW/ton Full load: 0.59 kW/ton IPLV: 0.52 kW/ton
Additional Incentive
($/Ton)
30 & 100 30 & < 150 150 & < 300 30 & < 150 150 & < 300
$5/ton for each 0.1 EER IPLV above criteria $8/ton for each 0.01 kW/ton IPLV below criteria $2/ton for each 0.01 kW/ton IPLV below criteria $8/ton for each 0.01 kW/ton IPLV below criteria $2/ton for each 0.01 kW/ton IPLV below criteria
Notes: 1. Only units that meet both minimum requirements are eligible for incentives. 2. Equipment efficiency criteria based on ARI standards using non-CFC refrigerant. 3. Tons should be ARI net capacity, not gross capacity. 4. Equipment using CFC as refrigerant is not eligible.
5. Efficiency ratings for full load (EER or kW/ton) and IPLV (kW/ton) must be calculated at ARI Standard 550/590-98 rating conditions: a. 44F; leaving chilled water; 2.5 gpm/ton (air-cooled and water-cooled chillers) b. 95F; entering condenser air (air-cooled chillers only) c. 85F; entering condenser water (water-cooled chillers only); 3.0 gpm/ton
Full Load Based Bonus: Chillers surpassing the centrifugal standard of ASHRAE 90.1 2007 [Addendum m] Path A Full Load kW/ton by at least 3% (in addition to the NPLV kW/ton by at least 2%) are eligible for a Full Load Based Bonus. The Full Load Based Bonus is calculated by multiplying the difference between the chillers Full Load rating and the ASHRAE Path A Full Load requirement by the tonnage of the chiller, then multiplying that number by a bonus incentive rate of $1,400 per kW.
(ASHRAE 90.1 2007 Path A Full Load kW/ton - Full Load kW/ton of chiller) tonnage of chiller $1,400/kW
NPLV Based Bonus: Chillers surpassing the centrifugal standard of ASHRAE 90.1 2007 [Addendum m] Path B
NPLV kW/ton by at least 12.5% (in addition to the Full Load kW/ton by at least 2%) are eligible for a NPLV Based Bonus. The NPLV Based Bonus is calculated by multiplying the difference between the chillers NPLV rating versus ASHRAEs Path B NPLV requirement by the tonnage of the chiller, then multiplying that number by a bonus incentive rate of $1,000 per kW.
(ASHRAE 90.1 2007 Path B NPLV kW/ton - NPLV kW/ton of chiller) tonnage of chiller $1,000/kW
*Value listed in Table 6.8.1C of ASHRAE 90.1 2007 [Addendum m] is the IPLV value which is conditions of 3 gpm/ton Condenser Flow Rate with 44F Leaving Chiller Water Temperature and 85 Entering Condenser Water Temperature.
Ineligible Chillers or Projects: Electric chillers that do not surpass both the ASHRAE 90.1 2007 [Addendum m]
Full Load (Path A) and Net Part Load Value (Path B) requirements by at least 2% are ineligible for incentives. The following fuel conversion projects are also ineligible for funding: Electric-to-Natural Gas or Steam Steam-to-Natural Gas Natural Gas-to-Steam Steam-to-Steam (Steam Retention)
Please see the next page for the formulas that have been incorporated into the Super Efficient Chiller Bonus Estimator. If you have additional questions, please contact us toll free at (866) NYSERDA (866-697-3732) (choose ext. 0, and ask to speak with an Existing Facilities Project Coordinator), or email us at efpoutreach@nyserda.org
Reference Material/Tables:
These formulas compute the minimum ASHRAE 90.1 2007 [Addendum m] efficiencies, as well as the reference kW/ton values at ARI Standard 550/590 test conditions of 44F leaving chilled-water temperature and 85F entering condenser water temperature with 3 gpm/ton condenser water flow rate. Adjusted maximum full load kW/ton rating = (full load kW/ton from Table 6.8.1C) / Kadj
Adjusted maximum NPLV rating = (IPLV from Table 6.8.1C) / Kadj
where
Kadj = 6.174722 0.03668(X) + 0.00629466(X)2 0.000045780(X)3
X = DTstd + LIFT
DTstd = (24 + (full-load kW/ton from Table 6.9.1C) 6.83)/Flow
Flow = Condenser water flow (gpm) / Cooling full-load capacity (tons)
LIFT = CEWT CLWT
CEWT = Full-load condenser water temperature (F)
CLWT = Full-load leaving chilled-water temperature (F)
The adjusted full-load and NPLV values are only applicable over the following full-load design ranges: Minimum leaving chilled-water temperature: 38F Maximum condenser entering water temperature: 102F Condenser water flow: 1 to 6 gpm/ton X 38F and 60F Table 6.8.1C (excerpt): ASHRAE 90.1 2007 [Addendum m] [ARI 550/590 Test Procedure] Path A Capacity 300 tons < 600 tons 600 tons Full Load kW / ton 0.576 0.570 IPLV kW / ton 0.549 0.539 Full Load kW / ton 0.600 0.590 Path B IPLV kW / ton 0.400 0.400
Example: Path A - 600 Ton Centrifugal Chiller: Table 6.8.1C efficiencies: Full Load = 0.570 kW/ton IPLV = 0.539 kW/ton CEWT = 80F CLWT = 42F Flow = 2.5 gpm/ton
LIFT = 80 42 = 38F DT = (24 + 0.570 6.83)/2.5 = 11.16F X = 38 + 11.16 = 49.16F Kadj = 6.174772 0.303668(49.16) + 0.00629466(49.16)2 - 0.00004578(49.16)3 = 1.020 Adjusted Full Load = 0.570/1.020 = 0.559 kW/ton NPLV = 0.539/1.020 = 0.528 kW/ton
This table is provided for reference purposes only. Values are at ARI Conditions: Path A Bonus Path or Eligibility Check? Capacity 300 tons and < 600 tons 600 tons Full Load Bonus 3% Full Load kW/ton 0.55872 0.5529 Eligibility Check 2% IPLV kW/ton 0.53802 0.52822 Path B Eligibility Check 2% Full Load kW/ton 0.588 0.5782 IPLV Bonus Path 12.5% IPLV kW/ton 0.35 0.35
EESEFP-fs-TG 4/11