Sie sind auf Seite 1von 6

Name Qualification ( India) Calcutta

: D. Swaminathan : Chartered Mechanical Engineer through Institution of Engineers Master of Business Administration (MBA) IRCA Lead auditor ISO 9000-2008 QMS

NDT Qualification Spectrometer Helium Exchangers, vessels and Professional Membership Passport Detail Permanent Address Contact detail Date of Birth

Level II in RT/UT/MPT/PT/VT/ Special Training obtained for Mass Leak deduction system of both positive/vacuum methods for other critical pressure equipments/pipelines/valves. Member Institution of Engineers (India) Member Indian Institute of Welding (India) J 4722732 valid up to 2021. Old No: 24/2 New No: 32/2 Cee Dee Yes Garden Apartments Cart Track Road Velachery Chennai 600042 - India Emil: dswami54@gmail.com, Phone: 0091 44 22450488 Mobile: 0091 9043413251. 3-11-1954

SKILLS AND EXPERTISE ( More than 25 years in various type of industries) a). Employed as Lead QA Engineer for major EPC oil and Gas sector which includes provide technical support for entire project in line with FEED, Detail engineering in terms of Project QA aspects, approval of vendor documents Material requisition, Supplier Quotation, Design documents and ensure all Quality requirements are properly addressed, Approval of vendors, based on comparison statement, Ensure compliance with Quality Requirements in all Data sheets in line with FEED and Detail engineering, Provide technical QA advisory to suppliers /contractors, including visits to monitor and Periodic site audit . Complete review of Contract and advice inspection classification Regulatory Certification, Review approval of Inspection and Test Plan NDT , PWHT, Hydro test procedures, welding Documents such as WPS/PQR which are relevant to the project/material and weld maps. In addition to any new WPS PQR is required the same to be prepared and approved according to the relevant codes and standards, Complete Control of vendors and ensure QA/QC activities are well implemented through out the execution. . b) Vendor source inspection /Approval of all Static and Rotating equipments like Column, Pressure Vessels, Heat Exchanger, Air cooled Exchangers , Fired Heaters , HRSG Package Boilers , Centrifugal pumps, Air and Gas Compressors, Turbines, Fans , agitators, all Types of valves such as on off, control valve both pneumatic and electrical, safety relief valves, Pipes as per API B36.10 and API 5L Pipe and seamless, fabricated, forged pipe fittings. All inspection will be carried out according to Approved QA Plan, Relevant Codes and Standards, Project Specification and Performance Test codes In addition to sound inspection knowledge in GRE/GRP RTR piping and pipefitting qualification checks as per ISO 14692 for sea water desalination / chlorine plants.

c) Expediting of all project orders, co ordination with supplier/ Sub supplier , other agencies , client, and ensure timely completion of fabrication, testing, dispatch to site through high level meeting with all who involved this project. Expediting is planned weekly, bi weekly, monthly depends up on the criticality and expediting report will be prepared And circulated to all concerned. d) Employed as Lead QA Engineer of on-shore pipeline projects both underground and above ground controlling civil, staion piping, pipeline, Mechanical, Instrumentation and Electrical activities, Preparation of ITP, weld book, spool fabrication, field welds, NDT, PWHT, preparation and approval of Pipe book, Hydro testing, HDPE lining, coating of FBE, line completion as per plot diagram, external painting, In addition to erection of Booster pumps, Gas compressor stations, its installation alignment and piping activities. All construction carried out according to ASME B 31.4 and B31.8. Carried out walk down inspection, preparation of punch list and closing and mechanical completion. e) Employed as Head QA/QC of Greenfield EPC Construction projects of Oil and Gas, Power Plant both Gas & Steam Turbines, Boiler, Gas turbine erection, Desalination plants. Capable of working with multiple discipline like Civil Mechanical, Instrumentation Familiar with erection of static, rotating equipments and alignments, high pressure Boiler steam piping fabrication and installation as per Isometric & P&ID, Control of PWHT, NDT, as per piping classification, Installation of FRP/GRP/GRV/GRE/ RTR piping fabrication preparation Test packages, Hydro test, reinstatement, Preparation of punch- list & closing hand over to commissioning which includes control of NDT team, welding team, Insulation contractors PWHT Team and ensure QA/QC activities are performed according to the planned target. Complete control of Documentation part /sign off reports of each activity. All refinery piping as per B 31-3 and High pressure steam piping as per B 31.1. f) Knowledge in Design of Pressure Vessel, Shell and Tube Exchangers, Air fin Coolers as per ASME Section VIII Division 1. Review of design documents from Code ware, PV Elite, HTRI, and Thermal design. Review Vessel calculations with ASME/PD 5500/Project/other code Specifications and comments / approve both calculations and Drawings. g) Employed as Plant Inspection Engineer for Shut down/on stream inspection of Refinery ,Power ,Petro chemical plants . Vessels, Columns, Heat exchangers both Shell &Tube and Air cooled Exchangers, Catalysts reactors, Storage tanks Boilers, Fired Heaters, according to API 510 and modification of Tank according to API 653. Scope of inspections are Corrosion and crack inspection of vessels , weld joints, thickness inspection to ensure no deterioration.

Experience Details ( Project wise details) 1) Pipeline Project: Produced water treatment, degassing and Boosting Project Phase II Qatar Petroleum. Dukhan. Total 42 KM pipeline project of Pipe size 12 & 16 with HDPE liner and station piping with FBE coated

Employed as Lead QA/QC Engineer in charge of multi discipline duties such as civil, electrical , instrumentation, Mechanical. Main Responsibilities are Civil : All civil related jobs such as construction of sub station, pipeline culvert, Asphalt road works Fencing, cable trench, back filling, construction of pump house, HVAC building . grouting of all foundation as per drawing. Electrical : Erection of switchgear, transformer, and field testing, cabling, motor erection ,energizing, solo run test, Hvac electrical system. Control panel erection and testing. Instrumentation : Impulse piping, instrumentation panel erection, mounting and calibration of Pressure, temperature flow, level Transmitter with HART protocol 4-20 MA output and DCS connection. Calibration of control valves and Control instrumentation, HVAC system instrumentation, field analyzer, Erection and testing of cathodic protection systems connection with TR units and Reference cell. Mechanical : (Piping) Approval of WPS/PQR, daily weld log, NDT, preparation of pipe book, Hydro test, FBE coating Box up for all station piping Pipeline: Approval of WPS/PQR, daily field weld log , NDT, Preparation of pipeline book with each KM Wise, Pipeline cleaning, Pigging with Gauge plate, Hydro test of entire pipeline, cleaning, HDPE liner Inspection, liner insertion into the pipe, pigging ,final hydro testing after HDPE lining, painting, punch Listing, mechanical clearance and final commissioning. Period of employment : 22-7-2011 to 20-5-2012 2) Name of the company : Abudhabi Gas Company ( GASCO) Habshan Project. Position Held : Inspection Engineer Nature of Job : Employed as Client Inspection Engineer for Flue Gas extraction Project inspection of Additional piping of Large Dia 56 Tie in with existing system , coordination with EPC contractors of CCC Abudhabi and Hyundai/Punj Lloyd. Shutdown Inspection of of Vessels ,Heat exchangers, fired Heaters , Boilers of both HRSG &Package boiler Repair of tubes, inspection and certification of Steam drum, Hydro test & safety valve Certification. Period of Employment : 5-1-2011- 04-04-2011 4 months 3) Name of the company: Saudi Kayan Petro chemical Company Al Jubail, Saudi Arabia ( A unit of SABIC group of company) Position Held : QA Engineer Rotating Equipment. Project Management Team. . Nature of Job Centrifugal Pumps Exchangers which Grouting clearance, Controlling all Phenolics, plants and Delim, and : Complete QC activities of Rotating equipments such as Gas Compressor, Turbines and related accessories, Fans for Boilers, Fan for Air cooled Heat includes Civil foundation clearance, Installation of equipments Alignment, solo run test, coupling alignment, sample feed Trial run, Hot alignment, etc. rotating equipment erection of Olefin, Polypropylene, HDPE, EO&EG, coordinating with leading EPC Construction group such as KBR, Samsung, CTCI,

Flour. All Activities performed according to API 686. In addition to, FAT witnessing of all approvals. Period of employment : 2-6-2009 to 10-10-2010. 4) Name of the company : Consolidated Contractors International LLC Abudhabi.( One of the EPC contractors in Gulf) Position Held : Senior Inspection Engineer ( Vendor ) EPC Project Handled : a) Al Khafji FDP Joint operation ( A joint venture project of Saudi Aramco & KOC) b) Khafji Crude oil Project Client Saudi Armaco c) Qatar Petroleum Ras laffan Water cooling project Phase 1&2 ( Technip & CCC) Nature of job Maps/ ITP Inspection at South 16 high value : Vendor source inspection control such as Chair person of Pre Inspection meeting, approval of all procedures, welding book such as WPS/PQR/ Weld approvals and Expediting of high value equipments. Witnessing of all Critical points and provide final clearance for dispatch to site. Deputed at Six months Korea to carryout inspection and expediting activities and controlling around equipment suppliers. Some details of the equipment and vendor Ref where inspection was carried out . 1. S&T Corporation Changwon- Air cooled Heat exchanger of 144 bundle Assembly of CS/SS A203E Materials and tubes with Fan, Motors, Structures . 2. Daebong Acrotec Ltd Ulsan - 54 Pressure vessel of CS/A203E. 3. Hyundai Industrial Machinery Gyuon;ju Pohang : Pipe Rack Structural , Equipment Platforms Total tonnage Fabrication appro 2500 T/Month 4) 3Z corporation Lubricated Plug valves from 2to 24of both CS&SS 5) Samwoo KJS Ltd (changwon) Gate/Globe/Check valves of CS/LCS/SS 224 -750 No 6) Hyundai RB Hysco API 5L SAW pipe from 24to 44size -18,000 M 7) Hyundai Valves Ltd Gimhe Gate/Globe/Check from to 24 size -875 no 8) John Pickle Middle East Kuwait Inspection of Pressure vessel of higher wall thickness (110 mm) ( Division of Kuwait pipes and 9 No and 3 No of 35 Meter column with 70 Tray support Oil company. Safat.Kuwait) made out of A 203E & Low Alloy Steels 9) FBM-KNM Jebel Ali (Dubai) - Heat exchanger with floating head design and Kettle type design with A 203E/SS316 material 14 No. 10) Virgo Valves & Controls Ltd Both soft seated and metal seated ball valves range from (Pune) 0.75 to 20 size of floating /trunion mounted. Qty- 830. Valve with Pneumatic Actuators / 24V DC supply with solenoid with P/I converters .Total qty 184 from 1 size to 16. 11) Saudi Pumps Ltd (Riyad) -Centrifugal pumps for water and critical services qty 36 nos Carried out from Raw materials checks to shop trail run tes t. 12 Mitsubishi heavy industries Japan : Inspection of Gas compressor, steam turbine , compressor trains as per Approved ITP and witness FAT. Period of employment : 1-8-2007 to 31-4-2009 Rotating equipments at vendor shop and ensure design requirements and

5) Name of the Company : Consolidated Contractors International LLC OMAN (EPC) Position Held : Inspection Engineer EPC project Handled : Oman Refinery Company Muscat a Unit of PDO Nature of Job : Vendor source inspection control and expediting of high value equipments such as

Storage tanks, Pressure vessels, Heat Exchangers, Air cooled Exchangers, Pumps Valves and controlling around 32 vendors in India, Gulf Region, Italy, Japan etc .

a. NPCCAbudhabi Total 5 columns (U stamped ) Low Alloy with PWHT 60 row internal
tray supports b. FBM HUDSON (Jebel Ali Dubai) : Total 6 Heat exchangers (U stamped) c. MIS Sharjah - 9 critical pressure vessel with HIC+Clad+PWHT requirements (U stamped) d. Born Canada (GMMOS- Dubai) Fired Heater package with coil, stack, transition-5 units e. ISGEC India - Low alloy high pressure reactors & Heat Exchangers. f. Vijay Tank Sharjah - Fabrication of Two big storage tanks of 25 x 30 H g. Godrej & Boyce : Total 27 heat exchangers of various material like SS316,LAS (U Stamped) h. GEI-Hamman &Pahrapur Cooling Towers - Fin Fan Coolers Total 26 module (U stamped) i. Fisher/Control Control valves more than 250 installations range from 1to 12 size . j Various Valve Manufacturers: Inspection carried out from to 24 valves Qty ( 3000 nos) k. Sulzer Pumps : Performance testing of Centrifugal pumps l . Mitshubushi Heavy engineering : Compressor with Gear Trains /turbines m. Titanium equipment Corp : Titanium Heat exchangers 4 nos. Period of employment : 1-9-2005 to 31-6-2007 6) Name of the company : Lahoud Engineering Company LLC Dubai Position Held : QA/QC Head Project Detail ; a) Erection of combined cycle power plant of 2 x 130 MW Gas turbine + Erection of HRSG Boiler+Steam turbine+Transformers at Dubai Aluminium Limited LLC Jabil Ali Dubai UAE Project by GE/Alstom/Mott Macdonald b) Erection of 1 x 130 MW power plant Boiler + Steam turbine + transformer with Desalination Plant at Dubai Electricity and Water Authority Jebel Ali. Dubai Project by Project by Hyundai Heavy Engineering/ Areva Nature of Job : Civil foundation clearance, equipment erection , grouting clearance, Piping fabrication of both at yard/site erection , NDT, check with P&ID, Hydro test ,reinstatement, Punch list preparation. Punch list closing. Pump erection, Pump alignments, installation of all instrumentation panels, Coordination with client inspection authority and carried out all pre commissioning and post commissioning activities. Period of employment 7) Name of the Company Position Held Nature of Job Heat exchangers inspection of Period of Employment 8) Name of the Company Position Held Nature of Job 32 Vendors 9) : 2-1-2004 to 15-7-2005 : Saudi Aramco Riyad Refinery & Ras tanura Saudi Arabia : Plant Inspection Engineer : Shut down inspection of all static equipments such as column, Vessels, Both Shell and tube, Air cooled , Fired Heaters, Boilers, and complete Amine Plant ( High corrosive) . : 1-9-2003 to 20-12-2003. : Kevenar Power Gas Limited Mumbai ( EPC consultant for Petro Chemical) : TPI Inspection Engineer for Southern Region : Vendor source inspection at southern region four states controlling around Period of Employment : 1/12/2002 to 30/7/2003.

Name of the Company : Titannium Tantalum Products Limited ( Manufacturing unit of pressure vessel

Heat exchangers, Centrifugal Pumps , cathodic protection made out of Such as Titanium, Tantalum, Zirconium, DSS, Ni base alloys) Position Held : QA/QC Manager and MR of ISO 9001 QMS Period of Employment : 10-1-1999 to 15-11-2002. Responsibility : All day to day QA/QC activities of fabrication shop , client and TPI co ordination ISO activities, chair person of Management Review meeting, Plan and schedule internal Audits , review customer complaint and improvement. 10) Name of the Company ; Reliance Petrochemical Ltd . Employed through Alphine Inspection Position Held : Sr .Inspection Engineer ( Construction & Vendor) Period of Employment : 10-8-1994 to 26-12-1998 11) Name of the Company : Sanmar Engineering Corporation ( Manufacturer of Mechanical Seals, Rupture Disc, Control valve, plug, safety. Solenoid valves) Position Held : Executive Manager (Quality Control) Period of employment : 16-6-1982 to 1-8-1994 12 Name of the company : Beardsell Engineering Ltd ( Manufacturer of Heat Exchangers, Coal handling systems for Power plants, Cement, Steel, Minerals such as Conveyors, Bucket Elevators, feeders, ash Handling systems.) . Position Held : Foreman Period of employment : 1.1.76 to 31.5.1982. Regards D.Swaminathan exotic materials

Das könnte Ihnen auch gefallen