Sie sind auf Seite 1von 4

Questions on Shipbuilding

1) How shipbuilding process commence with a) By means of contract b) By means of production process c) By means of bid proposal d) By means of infrastructure 2) What is IHOP in shipbuilding process a) Combined hull, outfitting & painting b) It is classification supporting body c) Combination of navigation & piping d) It is advance system in ship building process 3) What is nesting plan in shipbuilding process a) It is a grouping of all departments b) It is computerised planning & positioning of prefabricated item on a single plate for cutting. c) It is a function of planning department d) None of these 4) Procurement department function is a) To plan the shipbuilding process b) To plan the production sequences c) To raise to invoice & store the materials d) Both b & c 5) Sending of drawing to class approval after the design is accepted by owner is a) Production department b) Planning department c) Production planning department d) Design department 6) After receiving raw material (steel) from steel storage yard send to a) Blasting & painting

b) Directly used for cutting c) Quality inspection d) Block fabrication 7) The part which is used to support the panel at top or bottom running parallel to the centre line is called a) Girders b) Intercoastals c) Longitudinals d) Beams 8) All machineries, cable laying, outfit items, hull integrated, painting which is done on what stage? a) On board outfitting stage b) Unit fitting stage c) On block stage d) Both a & b 9) Launching cannot be done by one of this method a) Through slipways b) Through trailers c) Through shiplift d) Through anchoring 10) In shipbuilding process what is the role of production planning department a) To make maintenance check list b) To make renewal of contract c) To make production check list d) To make production scheduling planning 11) Shipss can be transfererred from one location to another location by means of a) Ship transporter b) Shiplift c) Trailers d) All the above

12) Who designs and plans the superstructure and hull of a ship before construction? a) Civil engineers b) Marine engineers c) Naval architects d) Ship owners 13) What statement is not true regarding ship building? a) Ship building begins at the design office b) Ships are built either on the sloping ways or in dry docks c) Naval architects design the superstructure, hull of a ship. d) The hull is painted after launching 14) What is dry dock? a) It is submerged vessel b) It is a floating vessel c) Both a & b d) It is a transporting vessel 15) How IHOP system will enhance the production in shipbuilding process? a) Decreases production time b) Simplifies the production activities c) Production rate increases d) All the above 16) How basin trial test method will helpful for a ship during sea trial test? a) Minimizes the error of sailing ship b) Actual ship can be built to float on water as per the basin test methods c) Useful during sea trial test d) None of these

17) Which test is indicating the ships turning ability under the action of environmental effects during sea trial? a) Sea keeping test b) Maneuverability test c) Endurance test d) Both a & c 18) Following is not the mode of ship launching? a) Shiplift launching b) Side launching c) End launching d) Drop launching 19) How shipyard infrastructure will useful in shipbuilding processes? a) For transportation b) Time required for loading & unloading of things minimizes, thus increase the production. c) a & b d) to some extent 20) Drydocking is required for all vessels for how long? a) 12 Months b) 18 Months c) 24 Months d) 36 Months

Das könnte Ihnen auch gefallen