BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
1 of 30
TABLE OF CONTENTS
Change Control Management Endorsement 4.0 System Summary (4.10) 4.1 Organization (4.1) 4.2 Quality System 4.3 Documentation Control (4.3) 4.4 Contract Review (4.4) 4.5 Design Control 4.6 Purchasing 4.7 Control of Customer Supplied Product 4.8 Product Identification and Traceability 4.9 Process Control 4.10 Inspection and Testing 4.11 Control of Inspection Measuring and Test Equipment 4.12 Inspection and Test Status 4.13 Control of Nonconforming Product (4.9) 4.14 Corrective and Preventive Action (4.11) (4.12) 4.15 Handling, Storage, Packaging, and Delivery 4.16 Control of Quality Records (4013) 4.17 Quality Audits (4.14) 4.18 Training 4.19 Servicing 4.20 Statistical Techniques 4.21 Agency Approvals 3 4 5 6 7 8 10 11 12 13 14 15 18 19 20 21 22 23 24 25 26 27 28 29
* Items in parentheses are cross referencing NIST Handbook 150 Checklist sections. NOTE: Hyperlinks within this document are available internal to Burns Engineering only and are active based on the network access of the person opening the document. Contact the Quality Manger if question or issues regarding hyperlinks. NOTE: For additional information refer to the Calibration Laboratory Quality Manual.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
2 of 30
Change Control Procedure The Management Team is responsible for making changes to the Quality Manual. Suggestions for changes are presented to the Engineering & Quality Manager for incorporation into the document. All changes are reviewed and approved by the President and the Burns Engineering Management Team. Date 1-25-01 Rev Description A New Release Revised Design Control and added Formal Process Training Program Added Design Control, Manufacturing, Capital Equipment, and PC Support procedures, and revised Management Review paragraph on page 6 All sections revised for Syteline updates and other process changes NVLAP changes JWB 6-13-06 F G H Added detail to paragraph 4.3 regarding change control of SOPs. Update conflict statement for clarity and repair all hyperlinks Update document review, document retention times and Org. Chart references.. WHB LJK JDB N/A
President
Approvals
Eng Mgr Controller Mfg Mgr Sales/Mkt Mgr
JWB 8-9-01 B
WHB
LJK
JDB
KE
JWB
WHB
LJK
JDB
KE
C 6-26-02
JWB
WHB
LJK
JDB
KE
9-13-04
JWB
WHB
LJK
JDB
N/A
4-19-05
JWB JWB
WHB CJB
LJK LJK
JDB JDB
ST ST
3-31-08 6-21-10
JWB
CJB
JWB
JDB
CJB
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
3 of 30
Management Endorsement
Management supports all efforts required to comply with this Quality Manual. The documentation of our quality system in this manual is Burns Engineerings commitment to implement and achieve customer satisfaction, continuous improvement and employee empowerment.
Jim Burns
President
J.D. Burns
Manufacturing Manager
Chuck Bragg
Engineering & Quality Manager
Chuck Bragg
Sales & Marketing Manager
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
4 of 30
Organization All personnel manage, perform, and verify work that affects quality. Their responsibility, authority, and interrelation is defined and documented by the Burns Organization Charts and individual job descriptions. Details of responsibilities for each position listed are maintained and stored on the Burns network drive in the HR folder. These documents are available upon request. Management Representative The Engineering & Quality Manager has been granted authority by the President to: Ensure that a quality system is established, implemented, and maintained. Report on the performance of the quality system to the Burns Engineering Management Team for review and as a basis for improvement of the quality system. Management Review The Burns Engineering Management Team performs a monthly operations review including a review of the quality system to ensure continuing suitability and effectiveness in satisfying customer requirements, and conformance to the Burns Engineering quality policy and objectives. The Controller maintains records of the operations review.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
5 of 30
4.1 Organization
Organization All personnel manage, perform, and verify work that affects quality. Their responsibility, authority, and interrelation is defined and documented by the Burns Organization Charts and individual job descriptions. Details of responsibilities for each position listed are maintained and stored on the Burns network drive in the HR folder. These documents are available upon request.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
6 of 30
Procedures
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
7 of 30
RIPs, FIPs,IPIPs Burns Network; Inspection Plans Approved Drawings Burns Network; Approved Drawings Other Burns Network; Quality System
4.3.3 Document Review and Obsolete Documents will be reviewed biennially for suitability and revised as necessary per SOP G108 Document Review Procedure. Obsolete revisions of documents will be removed from the active areas and moved to a location identified for old or obsolete documents. 4.3.4 Calibration Documents Quality system documents generated in the Cal Lab shall be uniquely identified and include the following; Date of issue Revision identification Page numbering Total number of pages Issuing authority
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
8 of 30
4.3.5 Documentation Changes Documentation changes shall be evaluated and approved in the same manner the original review was done or as otherwise documented. Changes being proposed will be communicated to authorizing personnel. To prevent unauthorized changes to SOPs, the on-line SOPs shall be located in a secure folder that is read-only for all users except those that are authorized by management to make changes. Anyone may request a change to an SOP but the only positions authorized by management to make and approve these changes are Metrology and Design Engineer, Design Engineering Supervisor, Manufacturing Engineer, and the Engineering and Quality Manager. Any changes made to quality documentation shall comply with the requirements of the Quality Manual. 4.3.6 Software Software shall be approved and issued prior to use. Appropriate individuals shall review the release to verify proper operation. Testing will be done as necessary to determine the proper operation. New releases shall be made available to users. 4.3.7 Software Changes Software changes shall be evaluated and approved in the same manner the original review was done or as otherwise controlled. Changes being proposed will be communicated to authorizing personnel. Testing will be done as necessary to verify continued proper operation. Obsolete or old versions will be removed from service and stored in a location to prevent accidental usage and archived for future reference if significant revisions were made. 4.3.8 Drawings Drawings shall be created and revised per the ECO procedure.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
9 of 30
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
10 of 30
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
11 of 30
4.6 Purchasing
4.6.1 General The following describes the process for purchasing at Burns.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
12 of 30
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
13 of 30
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
14 of 30
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
15 of 30
are stored in binders in the Engineering office area with current copies maintained on the Production floor.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
16 of 30
Process control of standard products - Element 4.9 Contact with customer or representative
7.) Shop
12.) Shipping
Reference element 4.12 for rejected product. 1.) Customer service - customer service personnel answer questions, take orders, pass orders to order entry 2.) Applications - Applications engineers answer questions, work on special applications, take orders, pass orders to order entry 3.) Order entry - Order entry personnel enter the order into the database 4.) Job processing - job processing personnel take order off database and print out the production package, work up pick lists for special jobs 5.) Element room - element room personnel manufacture elements per SOP's for each production package 6.) Stockroom - Stockroom attendant gathers up necessary pieces specified in production package 7.) Shop - Shop personnel manufacture subassemblies using SOP's as required in production package 8.) Production floor - Production floor personnel assemble subassemblies and pieces per SOP's 9.) Calibration Lab - Calibration technicians perform necessary procedures per SOP's as required in production package. 10.) Final Assembly - Final assemblers perform necessary procedures per SOP's as required in production package. 11.) Final Inspection - Quality technician performs necessary inspections per FIP's 12.) Shipping - Shipping clerk documents, packages, and ships product.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
17 of 30
Shop
Production Floor
failed in-process
In Process Inspection
Stockroom
Final Inspection
use as is
Shipping
18 of 30
4.10.2 Calibration Laboratory The calibration lab technicians perform the calibration lab procedures. The calibration lab is organized per ANSI/NCSL Z-540 and NVLAP Handbook 150. Calibration procedures are documented in SOP's. Calibration certifications are stored in the fire safe cabinet. Typical certifications stored are for resistors, ASL Bridge, and SPRT data. Customer equipment calibrations include items such as probes, transmitters, etc. 4.10.3 Final Inspection The Quality Assurance Technician performs final inspection. Final inspection is done per FIP's, requirements on the job package drawing, part number drawing, and Customer Acknowledgement sheet. Non-conformances and defects are documented in the Syteline or documented in the Inspection Defect Database. 4.10.4 Receiving Inspection The Quality Assurance Technician performs receiving inspection. Inspection is performed per RIP's, SOP's, and drawing specifications. If a RIP is required, the RIP number is specified on the PO Receiving List. Inspection stores hard copies of electropolish certifications, material certifications, and test information for platinum wire, elements, thermocouple wire, and MI cable. The calibration lab stores the raw data on the server of tests performed as required per the incoming inspection SOP's. 4.10.5 In-Process Inspection In process inspection is done by both QA and the Calibration Lab per SOP's, IPIP's and per the route sheet. The production package has checklists of dated and signed-off processes and in-process and final inspections. 4.10.6 Records made and storage of records Production job packages are stored in Customer Service area files for one year. After this, they are stored in archive boxes in the cage.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
19 of 30
4.11.1 General The following describes the general process for controlling inspection and test equipment used at Burns. The Burns Calibration Quality Manual adds additional detail for equipment used in the Lab. 4.11.2 Measurement Inspection, measuring and test equipment (including test software) shall be controlled, calibrated, and maintained to assure conformance of material and product to the specified requirements. The calibration system is designed to meet the requirements of ANSI/NCSL Z-540 and NVLAP Handbook 150. The system is open for customer verification and audit. 4.11.3 Traceability Probes and equipment shall be traceable directly back to NIST or by a report from the calibration vendor or internal calibration process. 4.11.4 Identification Equipment requiring calibration shall be identified by a calibration sticker or engraved number or similar identification mark and referenced to the tool calibration software. The tool software program on the computer system maintains the calibration schedule and uses the tool identification number. Any new equipment that requires calibration shall be added to the computer system. 4.11.5 Out-of-Calibration Assessment A periodic review or report shall be run to maintain calibration of tools. Tools identified on the report shall be recalibrated as necessary. If tools are found out-of-calibration they shall identified as out of calibration and isolated if possible to prevent use until recalibrated. Calibrations shall be done internally per SOP's or by external calibration service companies. 4.11.6 Environmental Control Temperature and humidity in the Calibration Lab shall be monitored, recorded, and kept on file in the Calibration Lab. (see Calibration Quality Manual for more details) The environment of other areas shall be maintained to minimize, any measurement inaccuracy or adversely affect the quality of the measurement. 4.11.7 Records and Storage of Records Equipment Calibration Certifications shall be filed and stored per section 4.16 or section 12 of the Calibration Quality Manual.
20 of 30
4.12.1 General The following describes the process for Inspection of products and services at Burns. A checklist on the job package identifies inspection and test status of production parts. Nonconforming parts are labeled with a tag indicating the problem. Rejected parts shall placed on the; reject shelf in Production, Cal Lab and the MRB shelf in QA. The reject information shall be entered into the business system. Anyone can reject a part, typically production personnel, quality technician, or calibration technician.
21 of 30
4.13.1 General The following describes the process for 4.13.2 Responsibility for Review/Disposition of Nonconforming Product RMA Team and MRB Team along with the QA Manager shall have the responsibility and authority for review and disposition of nonconforming product. Periodically, annually at a minimum, a review of reject data shall be done and take action as appropriate to resolve problems. 4.13.3 Identification, Documentation, Evaluation, Segregation, and Disposition of Nonconforming Products Reject/Rework from Production floor Parts rejected shall be labeled with tag or segregated. A reject number may be assigned and parts placed on reject shelves in Production or Calibration area. The reject shall be reviewed by designated Engineering representative to determine disposition in a timely manner. A reject job may be entered with parts required list created. The rework package sent to shop. Customer returns Products returned from customers shall be processed per the RMA Procedures. Customer approval shall be obtained for out-of-warranty products that are reworked, repaired, or scrapped. Product returns having a potential product safety concern are brought to the attention of the quality manager for appropriate action. 4.13.4 Records made and storage of records Reject data shall be stored on the computer system. Records of the rework jobs are stored in business system as any other job. RMA data is entered and stored on business system. See section 4.16 for additional details on records.
22 of 30
4.14.1 General The following describes the process for preventative and corrective actions at Burns. 4.14.2 PCAR System Preventive and Correction Action Request (PCAR) Form #347 shall be used to record and assign action items as required to resolve the problem. Forms are filled out as specified in PCAR Procedure. QA manager or designee shall be responsible for ensuring PCAR is completed. 4.12.3 Records Made and Storage of Records Completed forms are assigned a number and filed. Action taken is at discretion of the QA manager.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
23 of 30
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
24 of 30
Calibration
Calibration computer and backed up on server. Electronic copy of report also on server. Purchasing area file cabinet (Data also stored in computer system) Cabinet in Engineering area
Indefinite
Receiving Inspection
Min. 5yrs
3 Years
Cabinet in Engineering area (Data also stored in computer system) Purchasing area file cabinet (Data also stored in computer system) Fire safe in Engineering area Final Inspection area
Engineering Change Order Test & Measurement Calibration (Non-calibration equipment) Agency Approvals, FM, CSA, UL Closed jobs In-process/Final Inspection Alpha Data from Element Room HR Records Financial Time Cards
5 Years 5 Years
Fire safe in Engineering area Computer system Computer system Computer system Human Resources office Accounting Office Accounting Office (Data also stored in computer system)
25 of 30
Periodically, approximately 2 year period, records will be evaluated for disposal per the above retention periods. Electronic records will be deleted. Hard copy documents will be removed and destroyed in an appropriate manner.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
26 of 30
4.18 Training
4.18.1 General The following describes the process for training of personnel at Burns. 4.18.2 Training A formal process-training program is used to train employees and to maintain their proficiency. Regular audits of each employee shall be performed to insure proficiency and currency with processes. Human Resources and the relevant department supervisor or manager administers the training program and insures that each employee is properly trained. 4.18.3 Records Made and Storage of Records Upon satisfactory completion of training a Certificate of Achievement is issued. Master copy is issued to the trainee and a copy is filed with Human Resources. Successful completion of an audit is noted on the master and Human Resources copy of the Certificate of Achievement. Training documents are stored on the computer system and a hard copy is stored by Human Resources.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
27 of 30
4.19 Servicing
4.19.1 General The following describes the process for service support by Burns. Servicing consists of items returned to Burns Engineering Inc. for calibration or returned for other reasons. 4.19.2 Returned Material Procedure Parts returned from customers shall be handled according to the RMA procedure located on the computer system. Return numbers and return information are maintained through the Syteline system on the server. Username and password control access to the Syteline system and information in the policy and procedure controls who may issue RMAs. 4.19.3 Probes Returned for Calibration Probes returned for calibration are handled with the same RMA method. However a separate Recalibration procedure covers the process as it arrives on the dock at Burns. 4.19.4 Records Made and Storage of Records Records of returns are stored on the server and are backed up daily by the computer system. Calibration information is retained as specified in section 4.11 and 4.16. The Quality Manager reviews return information periodically.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
28 of 30
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
29 of 30
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED
30 of 30