Scenario 1d

Elementary Junior High High School


+150 Borlaug Elementary Coralville Central Elem. Garner Elementary Hills Elementary Hoover Elementary North Central Junior High

VISION Facilities Master


Planning

+1,200 New High School

ELEMENTARY SCHOOLS (K-6) Five new elementary schools, three on new sites and the remaining two on Man and Longfellow Elementary Schools site are proposed. Hoover Elementary School is retired to accomodate City High expansion and two addtions of 100 and 150-students are proposed at existing elementary schools. Penn Elementary School receives a classroom addition to seat an additional 100 students. JUNIOR HIGH SCHOOLS (7-8) North Central and South East Junior High Schools receive classroom additions and renovations are completed at Northwest Junior High School.

Horn Elementary

Kirkwood Elementary

Lemme Elementary

Lincoln Elementary

+400 New/Renovated Longfellow Elementary

Northwest Junior High

West High School

HIGH SCHOOLS (9-12) A new third comprehensive high school (capacity 1,200) is proposed, along with a classroom addition to City High School to mirror the current capacity of West High School. West High School receives renovation.
Projected Enrollment 15,372 15,549 $250.1 M $3,147 M $96.6 M 2,440,515 85.8 199.5 Capacity First Costs Lifecycle Costs Average Annual Operating & Staff Costs Total Square Footage Educational Adequacy Score Cost Benet Ratio

+400 Lucas Elementary New/Renovated Mann Elementary

+100 Penn Elementary Shimek Elementary Twain Elementary

+165 South East Junior High

+300 City High School

+500 Van Allen Elementary Weber Elementary Wickham Elementary Wood Elementary New East Iowa City Elementary Renovate Addition +500 New South Iowa City Elementary +500 New North Johnson County Elementary +150 Addition to Existing Elem. +100 Addition to Existing Elem. New Construction Retire TREC Tate High School

PROS t Clear feeder system t New elementary schools and junior high school additions located in areas of growth/need t City HS can accomodate growth t Rebuilds or renovates Longfellow and Mann Elementary Schools on current site CONS t Retires Hoover Elementary School.

Iowa City Community School District Facilities Master Planning - Steering Committee Meeting #6

Scenario 1d
Renovate
(See Physical Needs Assessment Report for complete description of renovations)

Addition

DESCRIPTION OF WORK

New Const.

Retire

GRADE CAPACITY ALIGNMENT

(in millions of dollars)

TOTAL COST

ELEMENTARY SCHOOLS BORLAUG ELEM. GARNER ELEM. HILLS ELEM. HOOVER ELEM. HORN ELEM. KIRKWOOD ELEM. LEMME ELEM. LINCOLN ELEM. LONGFELLOW ELEM. LUCAS ELEM. MANN ELEM. PENN ELEM. SHIMEK ELEM. TWAIN ELEM. VAN ALLEN ELEM. WEBER ELEM. WICKHAM ELEM. WOOD ELEM. NEW ELEM. NEW ELEM. NEW ELEM. ADDITION TO EXIST. ELEM. ADDITION TO EXIST. ELEM. JUNIOR HIGH SCHOOLS NORTH CENTRAL JH NORTHWEST JH SOUTH EAST JH HIGH SCHOOLS CITY HS TATE HS TREC WEST HS NEW HS Addition includes 12 classrooms, cafeteria and library expansion. Renovations include accessibility renovations, IT upgrades, geothermal heat pump system, and roof replacement. Minor repairs. Masonry repair, VAV rooftop HVAC system and water source heat pump, plaster repair. Accessibility renovations, roof replacement, IT upgrades, HVAC system revisions & upgrades, electrical upgrades, window wall system replacement. New 1,200 student high school. 2022-23 Projected K-12 Enrollment = 15372 9-12 9-12 9-12 9-12 9-12 1,593 119 126 1,684 1,200 $21.8 $0.08 $3.2 $16.5 $56.1 Addition includes 6 classrooms, library and cafeteria expansions. Renovations include roof replacement, IT upgrades, interior lighting upgrades and VAV air handling unit HVAC system. Addition includes 7 classrooms. Renovations include accessibility renovations, HVAC system renovations, interior lighting upgrades, locker replacement, and roof replacement. 7-8 7-8 7-8 786 806 929 $5.4 $10.2 $13.1 Minor repairs. Playground sod replacement, minor repairs. Multipurpose room addition. New water source heat pump HVAC system, new ceilings, casework, interior lighting upgrades. Discontinued use as a school. Demolition costs shown. Accessibility renovations, interior lighting upgrade, classroom door replacement. Rooftop AHU VAV System and roong replacement. Multipurpose room addition. Window replacement and IT upgrades. Multipurpose room addition. Accessibility renovations, roof replacement, fan coil unit HVAC system, window replacement. New 400 student elementary built on site or renovated building with addition. Interior lighting upgrades, water source heat pump HVAC system, ceiling replacement, window wall replacement. New 400 student elementary built on site or renovated building with addition. Addition includes 4 classrooms and multipurpose room. Renovations include HVAC system upgrade, carpet replacement, and IT upgrades. Multipurpose room addition. Renovations include roof replacement and water source heat pump HVAC system. Multipurpose room addition. Renovations include accessibility renovations, water source heat pump HVAC system, and window wall replacement. Clerestory window water inltration repairs, minor repairs. IT upgrades, interior lighting upgrades. IT upgrades, gym oor repairs. Fan coil unit HVAC system, roof replacement. New 500 student elementary. New 500 student elementary. New 500 student elementary. Addition to an existing elementary school providing capacity for an additional 150 students. Addition to an existing elementary school providing capacity for an additional 100 students. K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 410 306 351 187 400 381 400 487 239 252 464 396 428 408 500 500 500 150 100 451 362 445 189 $0.008 $4.8 $0.1 $3.8 $0.5 $1.0 $3.9 $1.9 $3.5 $12.9 $4.1 $12.9 $8.1 $3.6 $5.3 $0.4 $0.8 $1.2 $3.4 $14.5 $14.5 $14.5 $4.7 $3.4 CORALVILLE CENTRAL ELEM. Accessibility renovations, masonry tuckpointing, rooftop HVAC replacement.

Total

15,549

$250.1

Iowa City Community School District Facilities Master Planning - Steering Committee Meeting #6

Scenario 2c
Elementary Junior High High School
+1,500 New High School

VISION Facilities Master


Planning

+290 Borlaug Elementary Coralville Central Elem. Garner Elementary Hills Elementary Hoover Elementary North Central Junior High

ELEMENTARY SCHOOLS (K-5) This plan features one new 500-student elementary school, a classroom addition to Penn Elementary School, and a 100-student capacity addition to another existing elementary school. Hills Elementary School is retired. The remaining elementary schools are renovated and multipurpose rooms are built at buildings that lack a second assembly space. JUNIOR HIGH SCHOOLS (6-8) A classroom addition is proposed at all three existing junior high schools, as well as a new 900-student junior high school.

Horn Elementary

Kirkwood Elementary

Lemme Elementary

Lincoln Elementary

Longfellow Elementary

+120 Northwest Junior High

West High School

HIGH SCHOOLS (9-12) A new third comprehensive high school with a capacity of 1,500 students is proposed. City and West High Schools receive renovations.
Projected Enrollment Capacity First Costs 15,372 15,419 $238.9 M $3,197 M $98.6 M 2,447,892 82.9 190.5

+150 Lucas Elementary Mann Elementary Penn Elementary Shimek Elementary Twain Elementary

+165 South East Junior High City High School

Lifecycle Costs Average Annual Operating & Staff Costs Total Square Footage Educational Adequacy Score Cost Benet Ratio

+500 Van Allen Elementary Weber Elementary Wickham Elementary Wood Elementary New Elementary (Site Undetermined)

+900 New Junior High Tate High School

PROS t Reduces construction need at elementary level by going to K-5 t Lowest initial construction cost t Least amount of new construction t Can be either Junior High or Middle School CONS t Does not give capacity at areas of growth/need - no clear feeder. t City High School cannot accomodate growth t Retires Hills Elementary School t Highest annual operating/staff costs t Lowest Cost Benet Ratio

Renovate Addition +100 Addition to Existing Elem. New Construction Retire TREC

Iowa City Community School District Facilities Master Planning - Steering Committee Meeting #6

Scenario 2c
Renovate
(See Physical Needs Assessment Report for complete description of renovations)

Addition

DESCRIPTION OF WORK

New Const.

Retire

GRADE CAPACITY ALIGNMENT

(in millions of dollars)

TOTAL COST

ELEMENTARY SCHOOLS BORLAUG ELEM. GARNER ELEM. HILLS ELEM. HOOVER ELEM. HORN ELEM. KIRKWOOD ELEM. LEMME ELEM. LINCOLN ELEM. LONGFELLOW ELEM. LUCAS ELEM. MANN ELEM. PENN ELEM. SHIMEK ELEM. TWAIN ELEM. VAN ALLEN ELEM. WEBER ELEM. WICKHAM ELEM. WOOD ELEM. NEW ELEM. ADDITION TO EXIST. ELEM. JUNIOR HIGH SCHOOLS NORTH CENTRAL JH NORTHWEST JH SOUTH EAST JH NEW JH HIGH SCHOOLS CITY HS TATE HS TREC WEST HS NEW HS Accessibility renovations, IT upgrades, geothermal heat pump system, roof replacement. Minor repairs. Masonry repair, VAV rooftop HVAC system and water source heat pump, plaster repair. Accessibility renovations, roof replacement, IT upgrades, HVAC system revisions & upgrades, electrical upgrades, window wall system replacement. New 1,500 student high school. 2022-23 Projected K-12 Enrollment = 15,372 9-12 9-12 9-12 9-12 9-12 1,293 119 126 1,684 1,500 $11.0 $0.08 $3.2 $16.5 $65.3 Addition includes 12 classrooms and multipurpose room, library and cafeteria expansions. Addition includes 5 classrooms and cafeteria expansion. Renovations include roof replacement, IT upgrades, interior lighting upgrades and VAV air handling unit HVAC system. Addition includes 7 classrooms. Renovations include accessibility renovations, HVAC system renovations, interior lighting upgrades, locker replacement and roof replacement. New 900 student junior high. 6-8 6-8 6-8 6-8 926 926 929 900 $10.6 $12.4 $13.1 $30.3 Minor repairs. Playground sod replacement, minor repairs. Discontinued use as a school. Multipurpose room addition. Accessibility renovations, water source heat pump HVAC system, window replacement. Accessibility renovations, water source heat pump HVAC system, window replacement. Rooftop AHU VAV system, roong replacement. Multipurpose room addition. Window replacement, IT upgrades. Multipurpose room addition. Accessibility renovations, roof replacement, fan coil unit HVAC system, window replacement. Multipurpose room addition. Accessibility renovations, basement waterproong, fan coil unit HVAC system with ventilation AHU, ceiling replacement, plaster repair. Interior lighting upgrades, water source heat pump HVAC system, ceiling replacement, window wall replacement. Multipurpose room addition. Accessibility renovations, basement waterproong, fan coil unit HVAC system, plaster repair. Addition includes 6 classrooms and multipurpose room. Renovations include HVAC system upgrade, carpet replacement, IT upgrades. Multipurpose room addition. Roof replacement, water source heat pump HVAC system, ceiling replacement, interior lighting upgrades. Multipurpose room addition. Accessibility renovations, IT upgrades, water source heat pump HVAC system, window wall system replacement. Clerestory window water inltration repairs, minor repairs. IT upgrades, interior lighting upgrades. IT upgrades, gym oor repairs. Fan coil unit HVAC system, roof replacement. New 500 student elementary. Addition to an existing elementary school providing capacity for an additional 100 students. K-5 K-5 K-5 K-5 K-5 K-5 K-5 K-5 K-5 K-5 K-5 K-5 K-5 K-5 K-5 K-5 K-5 304 410 306 351 187 258 381 237 537 239 252 464 396 428 408 500 100 $5.1 $1.0 $3.9 $1.9 $3.5 $5.0 $4.1 $4.8 $9.6 $3.6 $5.3 $0.4 $0.8 $1.2 $3.4 $14.5 $3.4 K-5 K-5 K-5 451 362 445 $0.008 $4.8 $0.1 CORALVILLE CENTRAL ELEM. Accessibility renovations, masonry tuckpointing, rooftop HVAC replacement.

Total

15,419

$238.9

Iowa City Community School District Facilities Master Planning - Steering Committee Meeting #6

Scenario 3d
Elementary Junior High High School
+1,500 New High School

VISION Facilities Master


Planning

+290 Borlaug Elementary Coralville Central Elem. Garner Elementary Hills Elementary Hoover Elementary North Central Junior High

ELEMENTARY SCHOOLS (K-6) Five new elementary schools, three on new sites and the remaining two on Mann and Longfellow Elementary Schools site are proposed. Hills Elementary School is retired and Hoover Elementary School is retired to accomodate City High expansion and two addtions of 150 and 200-students are proposed at existing elementary schools. Lincoln and Penn Elementary Schools receive classroom additions. JUNIOR HIGH SCHOOLS (7-8) A large classroom addition is proposed at North Central Junior High School. Northwest and South East Junior High Schools receive renovations.

+150 Horn Elementary Kirkwood Elementary Lemme Elementary Lincoln Elementary

+400 New/Ren. Longfellow Elementary

Northwest Junior High

West High School

HIGH SCHOOLS (9-12) A new third comprehensive high school with a capacity of 1,500 students is proposed. City High School receives a classroom addition while West High School is renovated.
Projected Enrollment 15,372 15,885 $266.3 M $3,202 M $97.8 M 2,502,424 86.2 202.2 Capacity First Costs Lifecycle Costs Average Annual Operating & Staff Costs Total Square Footage Educational Adequacy Score Cost Benet Ratio

Lucas Elementary

+400 New/Ren. Mann Elementary

+100 Penn Elementary Shimek Elementary Twain Elementary South East Junior High

+300 City High School

Van Allen Elementary

Weber Elementary

Wickham Elementary

Wood Elementary

+500 New East Iowa City Elementary

Tate High School

Renovate Addition +500 New South Iowa City Elementary +500 New North Johnson County Elementary +150 Addition to Existing Elem. +200 Addition to Existing Elem. New Construction Retire TREC

PROS t Rebuilds or renovates Longfellow and Mann Elementary Schools on current site t Works towards making all elementary schools similar in size t Clear feeder system t Surplus HS capacity for growth beyond 10 year projections. CONS t Highest initial construction cost t Retires Hills and Hoover Elementary Schools

Iowa City Community School District Facilities Master Planning - Steering Committee Meeting #6

Scenario 3d
Renovate
(See Physical Needs Assessment Report for complete description of renovations)

Addition

DESCRIPTION OF WORK

New Const.

Retire

GRADE CAPACITY ALIGNMENT

(in millions of dollars)

TOTAL COST

ELEMENTARY SCHOOL BORLAUG ELEM. GARNER ELEM. HILLS ELEM. HOOVER ELEM. HORN ELEM. KIRKWOOD ELEM. LEMME ELEM. LINCOLN ELEM. LONGFELLOW ELEM. LUCAS ELEM. MANN ELEM. PENN ELEM. SHIMEK ELEM. TWAIN ELEM. VAN ALLEN ELEM. WEBER ELEM. WICKHAM ELEM. WOOD ELEM. NEW ELEM. NEW ELEM. NEW ELEM. ADDITION TO EXIST. ELEM. ADDITION TO EXIST. ELEM. JUNIOR HIGH SCHOOLS NORTH CENTRAL JH NORTHWEST JH SOUTH EAST JH HIGH SCHOOLS CITY HS TATE HS TREC WEST HS NEW HS Addition includes 12 classrooms, cafeteria and library expansion. Renovations include accessibility renovations, IT upgrades, geothermal heat pump system, and roof replacement. Minor repairs. Masonry repair, VAV rooftop HVAC system and water source heat pump, plaster repair. Accessibility renovations, roof replacement, IT upgrades, HVAC system revisions & upgrades, electrical upgrades, window wall system replacement. New 1,500 student high school. 2022-23 Projected K-12 Enrollment = 15,372 9-12 9-12 9-12 9-12 9-12 1,593 119 126 1,684 1,500 $21.8 $0.08 $3.2 $16.5 $65.3 Addition includes 12 classrooms and multipurpose room expansion. Roof replacement, IT upgrades, interior lighting upgrades, VAV air handling unit HVAC system. Accessibility renovations, HVAC system renovations, interior lighting upgrades, locker replacement, roof replacement. 7-8 7-8 7-8 926 806 764 $10.6 $10.2 $10.1 Minor repairs. Playground sod replacement, minor repairs. Discontinued use as a school. Discontinued use as a school. Demolition costs shown. Accessibility renovations, interior lighting upgrade, classroom door replacement. Rooftop AHU VAV System and roong replacement. Multipurpose room addition. Window replacement, IT upgrades. Addition includes 6 classrooms and multipurpose room (pending property acquisition). Renovations include accessibility renovations, roof replacement, fan coil unit HVAC system, window replacement. New 400 student elementary built on site or renovated building with addition. Interior lighting upgrades, water source heat pump HVAC system, ceiling replacement, window wall replacement. New 400 student elementary built on site or renovated building with addition. Addition includes 4 classrooms and multipurpose room. Renovations include HVAC system upgrade, carpet replacement, and IT upgrades. Multipurpose room addition. Renovations include roof replacement, water source heat pump HVAC system. Multipurpose room addition. Renovations include accessibility renovations, IT upgrades, and water source heat pump HVAC system. Clerestory window water inltration repairs, minor repairs. IT upgrades, interior lighting upgrades. IT upgrades, gym oor repairs. Fan coil unit HVAC system, roof replacement. New 500 student elementary. New 500 student elementary. New 500 student elementary. Addition to an existing elementary school providing capacity for an additional 150 students. Addition to an existing elementary school providing capacity for an additional 200 students. K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 410 306 351 337 400 381 400 487 239 252 464 396 428 408 500 500 500 150 200 $0.5 $1.0 $3.9 $1.9 $9.0 $12.9 $4.1 $12.9 $8.1 $3.6 $5.3 $0.4 $0.8 $1.2 $3.4 $14.5 $14.5 $14.5 $4.7 $6.4 K-6 K-6 K-6 451 362 445 $0.008 $4.8 $0.1 CORALVILLE CENTRAL ELEM. Accessibility renovations, masonry tuckpointing, rooftop HVAC replacement.

Total

15,885

$266.3

Iowa City Community School District Facilities Master Planning - Steering Committee Meeting #6

Scenario 4c
Elementary Junior High High School
+1,200 New High School

VISION Facilities Master


Planning

+150 Borlaug Elementary Coralville Central Elem. Garner Elementary Hills Elementary Hoover Elementary North Central Junior High

ELEMENTARY SCHOOLS (K-6) Five new elementary schools, three on new sites and the remaining two on Mann and Longfellow Elementary Schools site are proposed. Hills, Hoover, and Lincoln Elementary Schools are retired and three 200-student capacity additions are built onto existing elementary schools, while Penn Elementary School receives a classroom addition to seat an additional 100 students. JUNIOR HIGH SCHOOLS (7-8) North Central and South East Junior High Schools receive classroom additions, while renovations are completed at Northwest Junior High School.

Horn Elementary

Kirkwood Elementary

Lemme Elementary

Lincoln Elementary

+400 New/Renovated Longfellow Elementary

Northwest Junior High

West High School

HIGH SCHOOLS (9-12) A new third comprehensive high school (capacity 1,200) is proposed, along with a classroom addition to City High School to increase its capacity to mirror the current capacity of West High School. West High School receives renovations.
Projected Enrollment Capacity First Costs Lifecycle Costs Average Annual Operating & Staff Costs Total Square Footage Educational Adequacy Score Cost Benet Ratio 15,372 15,523 $254.1 M $3,117 M $95.4 M 2,433,217 87.0 203.8

Lucas Elementary

+400 New/Renovated Mann Elementary

+100 Penn Elementary Shimek Elementary Twain Elementary

+165 South East Junior High

+300 City High School

Van Allen Elementary

Weber Elementary

Wickham Elementary

Wood Elementary

+500 New East Iowa City Elementary

Tate High School

Renovate Addition +500 New South Iowa City Elementary +500 New North Johnson County Elementary +200 Addition to Existing Elem. +200 Addition to Existing Elem. +200 Addition to Existing Elem. New Construction Retire TREC

PROS t Highest Cost Benet Ratio t Lowest annual Operating/Staff Cost t Works toward making all elementary schools similar in size t City High School can accomodate growth t Clear feeder system. t Highest educational adequacy score. CONS t Retires Hoover, Hills, and Lincoln Elementary Schools.

Iowa City Community School District Facilities Master Planning - Steering Committee Meeting #6

Scenario 4c
Renovate
(See Physical Needs Assessment Report for complete description of renovations)

Addition

DESCRIPTION OF WORK

New Const.

Retire

GRADE CAPACITY ALIGNMENT

(in millions of dollars)

TOTAL COST

ELEMENTARY SCHOOLS BORLAUG ELEM. GARNER ELEM. HILLS ELEM. HOOVER ELEM. HORN ELEM. KIRKWOOD ELEM. LEMME ELEM. LINCOLN ELEM. LONGFELLOW ELEM. LUCAS ELEM. MANN ELEM. PENN ELEM. SHIMEK ELEM. TWAIN ELEM. VAN ALLEN ELEM. WEBER ELEM. WICKHAM ELEM. WOOD ELEM. NEW ELEM. NEW ELEM. NEW ELEM. ADDITION TO EXIST. ELEM. ADDITION TO EXIST. ELEM. ADDITION TO EXIST. ELEM. JUNIOR HIGH SCHOOLS NORTH CENTRAL JH NORTHWEST JH SOUTH EAST JH HIGH SCHOOLS CITY HS TATE HS TREC WEST HS NEW HS Addition includes 12 classrooms, cafeteria and library expansion. Renovations include accessibility renovations, IT upgrades, Geothermal Heat Pump System, and roof replacement. Minor repairs. Masonry repair, VAV rooftop HVAC system and water source heat pump, plaster repair. Accessibility renovations, roof replacement, IT upgrades, HVAC system revisions & upgrades, electrical upgrades, window wall system replacement. New 1,200 student high school. 2022-23 Projected K-12 Enrollment = 15,372 9-12 9-12 9-12 9-12 9-12 1,593 119 126 1,684 1,200 $21.8 $0.08 $3.2 $16.5 $56.1 Addition includes 6 classrooms, library and cafeteria expansions. Renovations include roof replacement, IT upgrades, interior lighting upgrades, and VAV air handling unit HVAC system. Addition includes 7 classrooms. Renovations include accessibility renovations, HVAC system renovations, interior lighting upgrades, locker replacement, and roof replacement. 7-8 7-8 7-8 786 806 929 $5.4 $10.2 $13.1 Minor repairs. Playground sod replacement, minor repairs. Discontinued use as a school. Discontinued use as a school. Demolition costs shown. Accessibility renovations, interior lighting upgrade, classroom door replacement. Rooftop AHU VAV system, roong replacement. Multipurpose room addition. Window replacement, IT upgrades. Discontinued use as a school. New 400 student elementary built on site or renovated building with addition. Interior lighting upgrades, water source heat pump HVAC system, ceiling replacement, window wall replacement. New 400 student elementary built on site or renovated building with addition. Addition includes 4 classrooms and multipurpose room. Renovations include HVAC system upgrade, carpet replacement, and IT upgrades. Multipurpose room addition. Renovations include roof replacement, water source heat pump HVAC system. Multipurpose room addition. Renovations include accessibility renovations, IT upgrades, and water source heat pump system. Clerestory window water inltration repairs, minor repairs. IT upgrades, interior lighting upgrades. IT upgrades, gym oor repairs. Fan coil unit HVAC system, roof replacement. New 500 student elementary. New 500 student elementary. New 500 student elementary. Addition to an existing elementary school providing capacity for an additional 200 students. Addition to an existing elementary school providing capacity for an additional 200 students. Addition to an existing elementary school providing capacity for an additional 200 students. K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 K-6 400 381 400 487 239 252 464 396 428 408 500 500 500 200 200 200 $12.9 $4.1 $12.9 $8.1 $3.6 $5.3 $0.4 $0.8 $1.2 $3.4 $14.5 $14.5 $14.5 $6.4 $6.4 $6.4 K-6 K-6 K-6 410 306 351 $0.5 $1.0 $3.9 $1.9 K-6 K-6 K-6 451 362 445 $0.008 $4.8 $0.1 CORALVILLE CENTRAL ELEM. Accessibility renovations, masonry tuckpointing, rooftop HVAC replacement.

Total

15,523

$254.1