EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-144 26 May 2013 25 May 2013 8.00-24.00


21.00 C 22.00 C 23.00 C

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 C 9.00 C 10.00 C Symbols Yesterday = 11.00 C 12.00 C 13.00 C Cloudy (C), 14.00 C 15.00 C 16.00 C 17.00 C 18.00 C

Working Date Working Time


19.00 C 20.00 C

24.00 C

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 10 11 Grinding M/C 4" Grinding M/C 7" Activities (Yesterday) Install Fire Proof Structure 02E003A Install Fire Proof Structure 03D020 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Fit-up and welding Pipe 304H 28" Install Expension Joint 66" Chipping Fireproof Reactor 03R001 Install Steel Structure For 04E014 Install Scaffolding For 03R003 Torque Bolt Chiller 05X007 Fit-up and welding Hopper Area 02 03B 03B 03B 03B 03B 03B 04 05 05 Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Set Joint Set Set Set Set Set Joint Q'ty 8 16 12 Q'ty 1 1 1 1 1 1 1 1 1 1 2 No. 4 5 6 No. 1 2 3 4 5 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Install Scaffolding For 03R003 Fit-up and welding Pipe 304H 28" Fit-up and welding Expension Joint 66" Fit-up and welding Hopper Area 03B 03B 03B Shop Unit Set Set Joint Set Joint Q'ty 1 1 1 1 2 No. 1 2 3 4 5 6 7 8 9 10 Activities (Tomorrow) Install Fire Proof Structure 02E003A Install Fire Proof Structure 03D020 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Fit-up and welding Pipe 304H 28" Chipping Fireproof Reactor 03R001 Install Steel Structure For 04E014 Torque Bolt Chiller 05X007 Fit-up and welding Hopper Area 02 03B 03B 03B 03B 03B 04 05 Shop Unit Set Set Set Set Joint Set Set Set Set Joint Q'ty 1 1 1 1 1 1 1 1 1 2 Install Scaffolding For Trim Cooler 03E006A 03A 3 1 6 12 2 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 9 13 45 21 10 2 9 5 72 104 360 168 80 16 72 40 24 8 48 96 16 2 1 6 2 2 3 5 4 26 7 3 2 15 28 78 21 9 6 13 6 3 18 6 10 9 13 45 21 10 2 9 5 3 1 6 12 2 160 87 132 438 189 89 22 72 53 30 11 66 102 26 1,538 Description 2 3 2 5 Indirect 1 1 4 2 1 1 8 8 32 16 8 8 16 24 16 40 1 2 1 3 1 4 2 1 3 12 6 3 3 6 3 9 1 1 4 2 1 1 2 3 2 5 8 11 44 22 11 8 19 30 19 49 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 3 1 No. 7 8 9 Crane 130T. Crane 25T. Trailer Description 1 2 1 2 2 9 2 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 3 4 26 24 32 208 16 16 72 16 8 16 8 3 4 26 2 2 9 2 1 2 1 62 Unit ea ea ea 24 32 208 16 16 72 16 8 16 8 496 Q'ty 1 1 3 1 1 1 2 1 1 Indirect 8 16 8 8 8 8 24 1 2 1 1 1 1 3 8 16 8 8 8 8 24

EQUIPMENT AND MACHINERY REPORT

Fit-up and welding Expension Joint 66" 03B

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /

Page 1 of 1