Project Ideas: The distribution system of the Reclamation substation was evaluated using the synergee software to determine

and evaluate the existing system with regard to voltage and load profile. Among the problems identified after the simulation are as follows: No. 1 2 3 4 Problem Description Overloaded Distribution Transformer Unbalanced Distribution Transformer Loading Undersized Secondary Line Substandard Primary Distribution Line Problem Type Power Quality/System Loss Power Quality Power Quality Safety

Problem Description Project Ideas (Solutions) 1. Replacement and splitting of loads of DTs on RF1 2. Replacement and splitting of loads of DTs on RF3 Problem Description Project Ideas (Solutions) 1. Balancing of loads per phase of DTs on RF2 2. Balancing of loads per phase of DTs on RF3 Problem Description Project Ideas (Solutions) 1. Reconductoring of DTs secondary wires on RF1 2. Reconductoring of DTs secondary wires on RF3 Problem Description

1. Overloaded Distribution Transformers on Reclamation Feeders 1 and 3 Classification 21-138, 21-158, 21-081, 21-169, 21-163 Stand alone 21-090, 21-093, 21-094, 21-122, 21-162 21-005, 21-006, 21-007, 21-074, 21-051 21-034, 21-048, 21-013, 21-001 23-026, 23-033, 23-059, 23-134, 23-041 Stand alone 23-042, 23-025, 23-135, 23-057, 23-099 23-068 2. Unbalanced Loading of Distribution Transformer on Reclamation Feeders 2 and 3 Classification 23-122, 23-124, 22-010, 23-011 Stand alone 23-099 ,23-036, 23-066, 23-043, 23-029 23-033 Stand alone

3. Undersized secondary lines on Reclamation Feeders 1 and 3 Classification 21-163, 21-090, 21-007, 21-034, 21-048 Stand alone 21-013 23-041, 23-025, 23-057, 23-059, 23-068 Stand alone

4. Absence of Overhead Grounding Wire (OHGW) and rusted pole line materials on RF4 Project Ideas (Solutions) Classification 1. Installation of OHGW on RF4, 500 meters from the substation primary Stand alone line take off to SM City metering pole 2. Replacement of rusted pole line materials for safety purposes Stand alone

Solutions to Problems Relative to the identified problems on the reclamation substation feeders, it is imperative that proper action should be taken so as to address the problem at hand. These identified problems on the reclamation substation feeders are all classified as stand-alone hence, solutions can be done independently. 1. Overloaded Distribution Transformers on Reclamation Feeders 1 and 3 Project Discription: From To A. Replacement & splitting of loads of DTs on RF3 A.1 Uprating of DX 23-026 25kva 50kva A.2 Uprating of DX23-033 2-37.5kva 3-15kva A.3 Extension of primary line and replacement of 100kva 2-25kva and DX23-059 1-37.5kva A.4 Extension of primary line and splitting of loads 37.5kva 1-37.5kva and of DX23-134 1-50kva A.5 Extension of primary line and splitting of loads 25kva 2-37.5kva of DX23-041 A.6 Uprating of DX23-042 3-25kva 3-37.5kva A.7 Extension of primary line, splitting of loads and 37.5kva 1-37.5kva and reconductoring of sec. line 1-50kva A.8 Splitting of loads of DX23-135 1-50kva 1-37.5kva and 1-50kva A.9 Splitting of loads of DX 23-057 and 1-75kva 1-75kva and reconductoring of sec. line 1-50kva A.10 Uprating of DX 23-099 1-10kva 1-25kva A.11 Uprating of DX 23-068 1-37.5kva 1-50kva Project Discription: B. Replacement & splitting of loads of DTs on RF1 B.1 Splitting of loads of DX21-001 and reconductoring of sec. line B.2 Uprating of DX21-138 B.3 Extension of primary line and splitting of loads of DX21-158 B.4 Replacement of underloaded DX21-081 B.5 Extension of primary line and splitting of loads of DX21-169. Reconductoring of sec. line B.6 Extension of primary line and splitting of loads of DX21-163. Reconductoring of sec. line B.7 Splitting of loads of underloaded DX21-090 and reconductoring of sec. line B.8 Replacement and splitting of loads of DX21-093 and DX21-094 From 1-100kva 1-25kva 1-50kva 1-50kva 1-50kva 1-75kva 1-50kva 1-37.5kva and 1-10kva To 2-50kva 1-37.5kva 2-50kva and 1-37.5kva 1-15kva 1-37.5kva and 1-25kva 1-75kva and 2-50kva 1-25kva and 1-15kva 2-25kva Problem Discription

B.9 Splitting of loads of DX21-122 and relocation to load center B.10 Uprating of DX21-162 and splitting of loads B.11 Uprating of DX21-005 B.12 Uprating of DX21-006 B.13 Replacement and splitting of loads of underloaded DX21-007 and reconductoring of sec. line B.14 Uprating of DX21-074 B.15 Uprating of DX21-051 B.16 Splitting of loads of DX21-034 and reconductoring of sec. line B.17 Extension of primary line and splitting of loads of DX21-048. Reconductoring of sec. line B.18 Extension of primary line and splitting of loads of DX21-013. Reconductoring of sec. line Problem Discription

1-50kva 1-50kva 2-25kva 1-15kva 1-37.5kva 1-25kva 1-25kva 1-50kva 1-50kva 1-50kva

1-25kva and 1-50kva 1-100kva and 1-167kva 2-75kva 1-25kva 2-50kva and 1-15kva 1-50kva 1-50kva 1-50kva and 3-25kva 1-50kva and 1-25kva 1-37.5kva and 1-15kva

2. Unbalanced Loading of Distribution Transformers on Reclamation Feeders 2 and 3 Project Discription: System Performance Balancing of loads per phase of DTs on RF2 and With Project Without Project RF3 1. Transfer of loads from one phase to another phase Improved Power Poor Power Quality to balance transformer loading on DT; Quality 23-122, 23-124, 22-010, 23-011, 23-099, 23-036, 23-066, 23-043, 23-029, 23-033 Problem Discription 3. Undersized secondary lines on Reclamation Feeders 1 and 3 Project Discription: System Performance Reconductoring of DTs secondary wires on RF1 With Project Without Project and RF3 1. Replacement of undersized secondary wire on Improved Power Poor Power Quality DT: Quality 21-163, 21-090, 21-007, 21-034, 21-048, 21-013, 23-041, 23-025, 23-057, 23-059, 23-068