DIVISION 1 - GENERAL REQUIREMENTS SECTION 01400 - QUALITY CONTROL PART 1 - GENERAL 1.

01 DESCRIPTION This Section covers providing all WORK as per SAUDI ARAMCO Standard, SAES-M-100 and SAUDI ARAMCO Engineering Procedure, SAEP-1023 and all other applicable Engineering material Standards, CONTRACTORs QA/QC requirements. A. B. Related WORK: CONTRACTOR shall be responsible for establishing and executing a quality control program. WORK Specified In This Section: 1. Testing and Inspection shall be include, but not be limited to: a. b. c. d. e. f. g. h. i. j. k. 2. C. All sampling, testing of cement, water and aggregates. Design of concrete mixes. Company Representative's inspections and tests. Manufacturer's representatives on-site inspections. Compaction test. Reinforcing steel tests. Systems tests (Roof, Electrical, HVAC, Plumbing, etc.). Asphalt tests. Structural Steel Tests. Precast Concrete Tests. Concrete Strength Tests.

Layout and measurements.

Testing All testing, including requests, reports, etc., are the responsibility of the CONTRACTOR, or an approved agency, employed by the CONTRACTOR. Company Representative reserves the right to verify the tests with SAUDI ARAMCO testing laboratory or independent agency. SECTION 01400

CONSTRUCTION SPECIFICATIONS

DOC

SABG GIRLS ELEMENTARY SCHOOL AND BOYS INTERMEDIATE SCHOOL MUBARRAZ AND HOFUF

089/ 090

A 2050

BE-315756

1 of 4

1.02

INSPECTION AND INSPECTORS Company Representative or other persons or firms appointed by SAUDI ARAMCO for this purpose will periodically inspect the WORK and the CONTRACTOR shall provide facilities and access to the WORK at all times as required to facilitate this inspection, as required by SAUDI ARAMCO Engineering Procedure SAEP-1023.

1.03

GENERAL REQUIREMENTS A. B. Standards: Sampling, preparation of samples and testing shall conform to applicable ASTM methods, unless otherwise specified. Reports: Two (2) copies shall be furnished to Company Representative summarizing the results of each test and inspection. Each report shall clearly distinguish the type of test, location, the material tested and whether an original (first) test or a retest, and other related information. Notification: Company Representative and if applicable, SAUDI ARAMCO testing laboratory or agency, shall be notified 48 hours in advance of any WORK requiring testing or inspection. Cooperation: Testing Laboratory shall prepare, cure, store, etc., all job-made samples. Identification: Materials passing test shall be marked or tagged by the Testing Laboratory and shall thereafter be kept separate and stored so as to facilitate identification. Any such material not identifiable by Company Representative shall be rejected and removed from storage location or the Site. Non-conformance: Where a test or inspection reveals non-conformance or failure to meet requirements, Company Representative shall immediately be notified, verbally and subsequently by a written report or letter.

C.

D. E.

F.

1.04

SCHEDULE OF TESTS WORK Earthwork Asphalt Concrete Paving Reinforcement Cement Aggregates Concrete Mix Concrete Strength Type of Test or Inspection Compaction per Section-02221 Per Section-02513 Per Section-03200 As required by Section-03300 As required by Section-03330 Per Section-03300 Slump Test per Section-03300 SECTION 01400

CONSTRUCTION SPECIFICATIONS

DOC

SABG GIRLS ELEMENTARY SCHOOL AND BOYS INTERMEDIATE SCHOOL MUBARRAZ AND HOFUF

089/ 090

A 2050

BE-315756

2 of 4

Concrete Batching Structural Steel Sprayed Fireproofing Roof Plumbing Electrical System Air Conditioning 1.05

Per Section-03300 Per Section-05100 Per Section-07256 Per Section-07531 Per Division 15 Per Division 16 Per Division 18

INSPECTION BY COMPANY REPRESENTATIVE A. Inspection Notification: In addition to tests and inspections called for in this Section, CONTRACTOR shall notify Company Representative for inspection and testing of various parts of the WORK as called for in applicable Sections of the Specifications. Notify 48 hours in advance to assure inspection prior to covering up or closing in of the WORK involved. Required Inspection (see applicable Sections of Specifications for details): 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Layout of Building Foundation excavation before forms are started. Concrete forms and reinforcing steel, prior to concrete placement. All concrete pouring. Asphalt concrete paving. Installation of damp-proofing membranes and vapor barriers. Finish Site grading. Backfill. Steel and wall framing prior to enclosure. Roof surface prior to insulation and roof water proofing WORK. Floor surface prior to tile and carpet WORK. Prior to enclosure of any walls, locations of outlets and fixtures. Any other items specifically requested by Company Representative. SECTION 01400

B.

CONSTRUCTION SPECIFICATIONS

DOC

SABG GIRLS ELEMENTARY SCHOOL AND BOYS INTERMEDIATE SCHOOL MUBARRAZ AND HOFUF

089/ 090

A 2050

BE-315756

3 of 4

1.06

LAYOUT AND MEASUREMENTS A. B. Verify dimensions before layout and request clarification of discrepancies or be responsible for correction. Verify all measurements prior to ordering of fabricated items. END OF SECTION

SECTION 01400
CONSTRUCTION SPECIFICATIONS
DOC

SABG GIRLS ELEMENTARY SCHOOL AND BOYS INTERMEDIATE SCHOOL MUBARRAZ AND HOFUF

089/ 090

A 2050

BE-315756

4 of 4