EVIDENCE PLAN
Qualification: Unit of Competency COMPUTER HARDWARE SERVICING NC II Install Computer Systems and Networks questioningObservation with oral QuestioningDemonstration with

The evidence must show that the candidate


Prepares and performs installation as indicated in the plan to ensure that safety measures, policies and procedures followed. Consults Technical personnel to ensure that the work are coordinated effectively with others involved on the worksite Obtains computer systems and network devices in accordance with the established procedures and to comply with requirements Determines location where devices and systems to be installed are based from job requirements Determines appropriate materials to complete the work obtained in accordance with established procedures and checked against job requirements Obtains tools, equipment and testing devices needed to carry out the installation work in accordance with established procedures and checked for correct operation and safety Checks preparatory work to ensure that no unnecessary damage has occurred and that work complies with requirements Follows occupational health and safety policies and procedures in installing computer systems , network devices, and peripherals Installs computer systems, network devices and peripherals in accordance with the established procedures and complies with requirements * Observes appropriate procedures in installing computer systems, network devices and peripherals achieve in accordance with requirements without damage or distortion to the surrounding environment and services *

Prepared and Submitted by: ALLAN Q. VENUS TESDA Albay Provincial Office

questioningWritten Exam/Oral

Ways in which evidence will be collected: [tick the column]

TRAINERS METHODOLOGY I Training Output # 9

CAT COLLEGE November 3, 2008

EVIDENCE PLAN
Carries out test variations to devices/systems installation in accordance with the customer/clients requirements * Responds to unplanned events or conditions in accordance with established procedures Obtains approval in accordance with established procedures from appropriate personnel before any contingencies implemented Undertakes ongoing checks of the quality of work in accordance with the established procedures Checks circuits and systems as being isolated where necessary using specified testing procedures Removes parts or connections of the installation or service in order to conduct the test stored to protect against loss or damage and in accordance with established procedures Terminates devices/systems and/or installation tested in accordance with the industry requirements Undertakes final inspections to ensure that the installed devices/systems conforms to clients requirements * Forwards documents in relation to the test to appropriate personnel and/or authority in accordance with requirements

NOTE: *Critical Aspects of Competency Prepared by: Checked by: ALLAN Q. VENUS Date : Date : 10/30/08

Prepared and Submitted by: ALLAN Q. VENUS TESDA Albay Provincial Office