Internship Weekly Report

Name: MUHAMMAD IZZAT FAKHRI B. SULAIMAN June 24, 2013 to June 28, 2013 Department: Engineering

Report Period:

Report Date:

28 June 2013

th

TASKS GIVEN AND COMPLETED JUNE 24, 2013 st Orientation on 1 day of internship o Greet and meet session with Ms. Amy. o Gathered in training room to be briefed about all the things that are important in working area. o o First briefing is given by Mr. Jack Gadong, the safety officer of Sun Edison about the first priority that we should take account is safety. o Second briefing is given by Mr. Chan Yu Chin about the LEAN production. He is head of Lean Department. o On the afternoon, we get our Personal Protective Equipment (PPE) from Mr. Jack Gadong. o Next we had our tour on second floor so we will familiar with the surrounding.

JUNE 25, 2013 Conduct 5S element on the slicing cabinet and the area around it. o We do susun or sort the item to its suitable place,simpan or store the equipment on its own place, and sapu or sweep the floor around the cabinet area. The alcohol is use to clean the stain on the cabinet surface.

JUNE 26, 2013 Cleaning the exhaust pipe on the Wire Saw Machine (WSM) Mr. Ting o 8 exhaust pipes on the WSM need to be clean. The exhaust pipe can be taken off from the machine. o Clean the inner exhaust pipe and make sure the silicon sediment have already been remove. o Install back the exhaust pipe after been clean with Mr. Ting o Check the speed reading of the air flo;w through the exhaust pipe after finish installing it. If the reading above 8.5 m/s, the cleaning task is done.

Internship Weekly Report


JUNE 27, 2013 Observe Equipment Team changing/removing the pipe on WSM013. o There had done experiment on WSM013. The hose that connect the PCW to the heat exchanger had 13 c while the hose connect to the coolant tank from DRM had 11 c. Both hose is place side by side thus its effect the water temperature on the DRM hose. o Thus, the connect DRM hose direct to the coolant tank without pass through side by side with the PCW hose.

JUNE 28, 2013 Observe the workers handling and cleaning the WSM after cutting. o For 1 complete cutting require 4 hours. o After finish cutting, the workers need to clean the wire guide roller. It is to make sure there are no silicon sediment attach at the wire guide or the coating wire. This is to make sure the good quality of solar welfare is produce.

INCOMPLETE TASK No Subject Reason Completion New Target Date

NEW TASK FOR NEXT WEEK No 1 2 3 4 What Replacing and installing the wire guide roller. Cleaning the exhaust pipe on WSM.