Beruflich Dokumente
Kultur Dokumente
21,NOV,12 06,NOV,12
S.Y.KIM S.Y.KIM
T.W.KIM T.W.KIM
T.M.KWON T.M.KWON
14,May,12
FOR REVIEW
REFLECT COMMENT
M.S.SEO
T.W.KIM
T.M.KWON
FOR REVIEW
M.S.SEO
T.W.KIM
T.M.KWON
B REV.
12 ,JAN,12 DATE
th
M.S.SEO PREPARED BY
T.W.KIM CHECKED BY
T.M.KWON APPROVED BY
Owner
RABIGH POWER PLANT NO.2 PROJECT UNITS # 01, 02, 03 & 04 Contract # 31021001/00
OWNERS ENGINEER
MAIN CONTRACTOR
SUB CONTRACTOR
DOCUMENT TITLE
DATE
21, NOV,12 21, NOV,12 21, NOV,12
DOCUMENT NO.
Approval/Certification Information Doc No.: PB-10195 Rev.: v1 No. of Pages 13 Rev. No. 0
31021001/00-Z-RPP2-WE001308
DOCUMENT STATUS:
Table of Content
3~ 10
11~12 13
Doc :WE-001308
Rev.0
3/13
PASS / ACCEPTANCE CRITERIA * The inspection results shall be satisfied with approved specification and drawings.
2.
3.
Ratio check(Ro)
1. The voltage ratio shall be measured by means of transformer turns ratio(TTR) test set and on single phase, phase by phase. 2. The applied voltage to HV winding will be about 120(V). 3. The test shall be made on all windings and all tap positions. 1. The phase relationship shall be checked at rated voltage tap connection. 2. Three phase 220(V) will be applied to HV winding and the voltage shall be measured between terminals. 3. Vector diagram will be drawn and confirmed. 1. The test shall be made between HV and LV1 winding, HV and LV2 winding, LV1and LV2 winding, HV winding and earth, LV1winding and earth, LV2 winding and earth with 5000(V) megger tester. 2. The test shall be made on 15Sec,1min. and 10 minutes. 3. Core to earth, clamp to earth, core+clamp to earth for one minute with 3500V megger. 1. The test shall be made each winding to ground and between the windings with Doble tester. 2. IEEE C57.12.90 table 4 method II is prefered. 3. Test voltage shall be from 2kV to 12kV in steps of 2kV.
4.
5.
* PI : Min. 1.3
6.
Insulation power factor and capacitance measurement(Ro) (Before and after dielectic tests)
Doc :WE-001308
Rev.0
4/13
* No-load loss & excitation current No-load loss Excit. Current(%) 70% 79KW 0.24% 100% 120KW 2.40% 110% 120KW 2.40% 120% * Tolerance of excitation current : +30%
Doc :WE-001308
Rev.0
5/13
PASS / ACCEPTANCE CRITERIA * % imped. and load loss at 75, principal tap Load loss % Imp.(60MVA) HV-LV1:16.0% 185KW HV-LV1, 60MVA HV-LV2:16.0% 185KW HV-LV2, 60MVA 370KW HV-(LV1+LV2), 120MVA HV-(LV1+LV2) of %imp. (120MVA, 75) : 18% Tol of %imp. : +7.5% * refer to data sheet for other %imp values.
11
* Oil temperature rise : 40 * Winding temperature rise : 45 * Hot spot temperature rise : 48 At end of overload, The following hot spot temp. shall not be exceed. Base on Max. ambient temp. of 50. * Top oil temp. : 115 * Winding hot spot temp./metalic parts : <140 at 50 amb. * Oil exponent X=0.8 at ON cooling Winding exponent Y=1.3 at ON and OF cooling. Hotspot factor H=1.3
Doc :WE-001308
Rev.0
6/13
12.
Impulse tests(Ro) (Just after temp. rise test, hot condition) Lightning impulse test
* To be withstood
Dielectric test sequence lightning impulse--> neutral lightning --> separate source AC -->ACSD--> ACLD--> capacitance&tan delta
Doc :WE-001308
Rev.0
7/13
14
* To be withstood
15
1. The test shall be made at rated frequency between the line terminals and the neutral. 2. The zero sequence impedance shall be measured on the rated and extrem tap positions. 3. Sketch showing the magnetic core and the disposition of windings shall be enclosed with the report. 4. The measuring current must not be higher than 30% of the nominal current. 1. Single phase voltage 220380V 60Hz be applied to each phase of HV or LV1 or LV2 line terminals by turn and voltage induced in the other phases are to be measured. 1. Operation test With the tap changer fully assembled on the transformer, following sequence of operations shall be performed without failure; a) with transformer un-energized, 8 complete cycles of operation at no load, 1 complete cycle of operation. b) with transformer un-energized, and with the auxiliary voltage reduced to 85% of its rated * Not to be abnormal condition
16
17
Doc :WE-001308
Rev.0
8/13
18
Oil leakage and pressure test(Ro) (In-process stage test before FAT)
19
* The inspection results shall be satisfied with approved specification and drawings.
20
Routine tests with IEC 60044-1 and test report shall be submitted. 1. Polarity test 2. Insulation resistance 3. Powerfrequency test 4. Inter-turn overvoltage test 5. current error and phase displacement 6. secondary winding resistance
Doc :WE-001308
Rev.0
9/13
21
22
23
* Review of test reports. Break down volt.(IEC 60156) : 70kV, Water content (IEC 60814) : <10ppm * Shall not exceed 60 microns at any point of the main tank.
24
Vibration test(S)
25
SFRA test(Ro)
1. SFRA(10 ~ 2) shall be preformed on each transformer. 2. Test equipment : Doble M5100 or M5200 3. Test method : Doble recommended method or SEC Recommended method(refer to the attached SFRA test) 4. Test tap : pincipal tap and Max. voltage tap 5. Test condition : with oil and bushings 6. Open circuit tests : H1-H2, H2-H3, H3-H1, X1-X0, X2-X0, X3-X0
Doc :WE-001308
Rev.0
10/13
26
27
28
Tests on Bushing(Ro)
29
Type & special test to be carried out on one unit only of the same type. Routine test to be carried out for all units.
Doc :WE-001308
Rev.0
11/13
SEC
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Phase 1U-1N 1V-1N 1W-1N 1U-2U 1V-2V 1W-2W 1U-3U 1V-3V 1W-3W 1U-2U (1N, 2V : Ground) 1V-2V (1N, 2W : Ground) 1W-2W (1N, 2U : Ground) 1U-3U (1N, 3V : Ground) 1V-3V (1N, 3W : Ground) 1W-3W (1N, 3U : Ground) 1U-1N (2U-2V : Short) 1V-1N (2V-2W : Short) 1W-1N (2W-2U : Short) 1U-1N (3U-3V : Short) 1V-1N (3V-3W : Short) 1W-1N (3W-3U : Short) 1U-1N (2U-2V, 3U-3V : Short) 1V-1N (2V-2W, 3V-3W : Short) 1W-1N (2W-2U, 3W-3U : Short)
connection
11
11
open
Inter winding
Short
Doc :WE-001308
Rev.0
12/13
2U
1W
1V
2W
CH4 CH7 CH3
2V
2U CH2
1W
1V
2W
2V
CH4
CH3
Doc :WE-001308 Applicable Code IEC 60076-2(2000) IEC 551(1987) MFR Standard IEC 60076-1(2000) Clause 10.7 MFR Standard Approved drawings IEC 60076-1(2000) Clause 10.2 IEC 60076-1(2000) Clause 10.3 IEC 60076-1(2000) Clause 10.3 IEEE C57.12.90, 2006 CL 10.11 IEC 60076-1(2000) Clause 10.1.3,i) IEC 60076-1(2000) Clause 10.1.3,i) IEC 60076-1(2000) Clause 10.5 IEC 60076-1(2000) IEC 60076-3(2000) Clause 13.14 IEC 60076-3(2000) Clause 11 IEC 60076-3(2000) Clause 12 MFR Standard IEC 60076-1(2000) Clause 10.8 MFR Standard Approved drawings IEC 44-1(1996) IEC 44-1(1996) MFR Standard IEC 60296 (2003) MFR Standard MFR Standard MFR Standard IEC 137
Rev.0
13/13
Routine Test