Sie sind auf Seite 1von 9

Job: Sharon Hills

Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008
Check by: Date

TSS Removal For : POND #1

TSS
Removal Amount Remaining
Best Management Practice (BMP) Rate Starting TSS Load(1) Removed Load

Deep Sump Catch Basins 25% 100% 25% 75%

Downstream Defender 60% 75% 45% 30%

Extended Detention Basin 50% 30% 15% 15%


Total TSS Removal = 85%
(1) Equals remaining load from previous BMP
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008
Check by: Date

TSS Removal For : POND #5

TSS
Removal Amount Remaining
Best Management Practice (BMP) Rate Starting TSS Load(1) Removed Load

Deep Sump Catch Basins 25% 100% 25% 75%

Downstream Defender 60% 75% 45% 30%

Extended Detention Basin 50% 30% 15% 15%


Total TSS Removal = 85%
(1) Equals remaining load from previous BMP
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008
Check by: Date

TSS Removal For : POND #6

TSS
Removal Amount Remaining
Best Management Practice (BMP) Rate Starting TSS Load(1) Removed Load

Deep Sump Catch Basins 25% 100% 25% 75%

Downstream Defender 60% 75% 45% 30%

Extended Detention Basin 50% 30% 15% 15%


Total TSS Removal = 85%
(1) Equals remaining load from previous BMP
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008
Check by: Date

TSS Removal For : POND #7

TSS
Removal Amount Remaining
Best Management Practice (BMP) Rate Starting TSS Load(1) Removed Load

Deep Sump Catch Basins 25% 100% 25% 75%

Downstream Defender 60% 75% 45% 30%

Extended Detention Basin 50% 30% 15% 15%


Total TSS Removal = 85%
(1) Equals remaining load from previous BMP
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008
Check by: Date

TSS Removal For : Recharge Area 1

TSS
Removal Amount Remaining
Best Management Practice (BMP) Rate Starting TSS Load(1) Removed Load

Deep Sump Catch Basins 25% 100% 25% 75%

Downstream Defender 60% 75% 45% 30%

Infiltration 80% 30% 24% 6%


Total TSS Removal = 94%
(1) Equals remaining load from previous BMP
Note: >40% removal prior to infiltration
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008
Check by: Date

TSS Removal For : Recharge Area 2

TSS
Removal Amount Remaining
Best Management Practice (BMP) Rate Starting TSS Load(1) Removed Load

Deep Sump Catch Basins 25% 100% 25% 75%

Isolator Row 80% 75% 60% 15%

Infiltration 80% 15% 12% 3%


Total TSS Removal = 97%
(1) Equals remaining load from previous BMP
Note: >40% removal prior to infiltration
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008
Check by: Date

TSS Removal For : Recharge Area 3

TSS
Removal Amount Remaining
Best Management Practice (BMP) Rate Starting TSS Load(1) Removed Load

Deep Sump Catch Basins 25% 100% 25% 75%

Isolator Row 80% 75% 60% 15%

Infiltration 80% 15% 12% 3%


Total TSS Removal = 97%
(1) Equals remaining load from previous BMP
Note: >40% removal prior to infiltration
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008
Check by: Date

TSS Removal For : P33

TSS
Removal Amount Remaining
Best Management Practice (BMP) Rate Starting TSS Load(1) Removed Load

Deep Sump Catch Basins 25% 100% 25% 75%

Downstream Defender 70% 75% 53% 23%


Total TSS Removal = 78%
(1) Equals remaining load from previous BMP
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008
Check by: Date

TSS Removal For : AF1 (P22)

TSS
Removal Amount Remaining
Best Management Practice (BMP) Rate Starting TSS Load(1) Removed Load

Deep Sump Catch Basins 25% 100% 25% 75%

Aquafilter 80% 75% 60% 15%


Total TSS Removal = 85%
(1) Equals remaining load from previous BMP

Das könnte Ihnen auch gefallen