JOB No.

0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

3-

GEOMETRY & OUTLINE

OF

45

JOB No. 0-3850-20


4-

CALCULATIONS
4.1-

DESIGN DATA
MATERIAL

gsteel

3
77.0 KN/m

gconc
gsoil
gwater

3
24.0 KN/m

gfluid
gsub

19

KN/m3

10

KN/m3

10

KN/m3

9.2

KN/m3

ALLOWABLE BEARING CAPACITY OF SOIL

Surcharge

2
10.00 KN/m

(B. C)long

2
250.0 KN/m

(B. C)short

2
332.5 KN/m

LOADING

Live Load
Empty Wt. of equipment
Erection Wt. of equipment
Operating Wt. of equipment
Test load of equipment
Thickness of Chequered plate
Weight of Each Pump
No. Of Pumps
Total Weight of Pump

=
=
=
=
=
=

3.60

0.0060
10.00
2
20.00

KN/m2
KN
KN
KN
KN
m
KN
KN

DOC No. C-667-1316-001<00A>


SHEET
6
OF
45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.2-

LOADING CALCULATIONS

4.2.1-

Dead Loads :

Structural
Units

Walls

Slab

Dimensions
m
X
Y
Z

Description
W-1 & W-2
W-3 & W-4
W-5
W-6 & W-7
W-8
W-9 & W-10
W-11
Baffle Wall-1
Baffle Wall-2
TS-1
TS-2
BS-1
BS-2
BS-3
Baffle Slab-1

13.30 0.60
3.40 0.40
0.40 5.40
0.40 5.00
5.80 0.40
0.30 2.20
2.25 0.40
0.20 5.00
1.50 0.25
3.00 5.40
5.50 2.50
13.45 6.50
3.55 6.50
6.10 2.75
1.62 1.00

Sum of conc volume

Volume
3

7.00
7.00
7.00
7.00
5.00
5.00
5.00
1.00
1.00
0.25
0.25
0.50
0.50
0.40
0.20

111.72
19.04
15.12
28.00
11.60
6.60
4.50
1.00
0.38
4.05
3.44
43.71
11.54
6.71
0.32

69.77

1674.52

6425.44

KN
m2

12.5

62.5

Weight of chequered plate

62.5

0.006

77

Channel weight

20.3 Kg/m

0.20

KN/m

Length of channel

95.0 m

Total weight of channel

0.20

95

18.92

KN

118.6

3.60

427.0

Live Load :

2
118.62 m

KN

Fluid Load :
140.87 m3

1408.73

Total Weight =

KN

Test Load
=

Maximum Volume of water in the pit =


Total Weight =

206

10

206.19 m3

2061.94

KN

Uplift (Buoyancy) Of Water:


Volume of water displaced

4.2.5-

2
2
1
2
1
2
1
1
1
1
1
1
1
1
1

Maximum Volume of fluid in the pit =

4.2.4-

Nos

Area of chequered plate

Live load on Top slab

4.2.3-a

KN

4750.92

267.40 m

Area of top slab (Including area of steel cover)

4.2.3-

Qty

197.96

Total Dead Load

4.2.2-

Weight

0.0 x gwater

0.00 m

=
=

KN

971

KN

Weight Of Soil Over The Projected Slab Portion:


Total Weight

29

KN

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.34.3.1-

STABILITY CHECKS
Check Against Bearing Capacity :
( During draw down of Water upto Base Slab)

a:

Test Condition (Short term)


(LCE2)
Total Load = Dead load + Live Load +Weight of Pump+ Test Load+Steel weight(channel + chequered plate)
=

6425

8555

KN

Base Area

17.00

Stress

8555

b:

20.00

2062 +

18.92

110.5

m2

6.50

28.9

110.5
2

<

332.50

KN / m2

O.K Satisfied

Operational Load
Total Load =

Dead load + Live Load + Weight of pump + Operation Load + Wt of soil over projected slab

6425.44

9251.79 KN

Stress

427.03 +

20.00

1409 +

250.00

KN / m2

970.60

2
110.50 m

Base Area =
=

9251.79

83.73 KN / m

4.3.2-

77.42 KN / m

0.0

110.50
2

<

O.K Satisfied

Check Against Uplift (Buoyancy) :

( Water Table at highest Level, with only Dead Loads and the weight of soil over projected slab portions)
Total Load
= Dead load + Weight of Pump+ Weight of soil over projected slab portion
Downward Loads = 1569
+
20.00
+
318 = 1908 KN
Uplift

F.O.S

KN

There is no uplift pressure so factor of safety is very large.


O.K Satisfied

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.4-

DESIGN OF SLABS
4.4.1-

Design Of Top Slab (TS-1)

ly = Width of Slab
h = Thickness of slab

=
=

5.8
250

m
mm

cc = Clear Cover
d = h-cc-(dia bar/2)

=
=

75
167

mm
mm

fy = Yield strength of steel


fc' = Conc. cylinder strength

420

MPa

28

MPa

1.4 / fy =

0.00333

0.00180

1000

ly / lx

1.71

r min

rt

lx =

3.4

rmax

0.02125

mm

ly
Area

2
19.72 m

Wt of slab
Live Load
Weight Of Pump
Weight of Walls

=
=
=
=

97.2
71.0
20.0
0.0

Total Factored Load

254.23

W=

M= CF x W x Lx2
Q=CF x W x Lx

qload

=
=
=

KN
KN
KN
KN

Not Applicable
KN

Total Factored Load / Slab Area


254.23 / (
3.40
x
5.80 )
2
12.89 KN/m

Where CF= Moment Coefficient taken from the slab graph (SEE SKETCH -2)
CF = Shear coefficient taken from the slab graph (SEE SKETCH -2)
W= Total factored load in KN

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Rectangular Loading:Mx1 (-ve)


Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1
Mu

=
=
=
=
=
=

CF
0.0800
0.0375
0.5200
0.0570
0.0100
0.4700

x
x
x
x
x
x

W
12.89
12.89
12.89
12.89
12.89
12.89

Lx2
11.56
11.56
3.40
11.56
11.56
3.40

x
x
x
x
x
x

11.92
5.59
22.79
8.49
1.49
20.60

=
=
=
=
=
=

KN-m
KN-m
KN
KN-m
KN-m
KN

11.92 KN-m

fc '
fy

0.85 x

1-

0.00114

1.33r =

2 x Mu
0.85 x 0.9 x fc' x b x d2

1-

<

0.00333

So use :-

0.00152

0.00152

As

rxbxd

2
253.8 mm /m

Ast

rtxbxh

2
450 mm /m

Bar Dia =
As (provided)

16

No. of Bars
=

mm

804.25

<===== GOVERNS

=
2

4
>

Pitch =

450.00

mm

Therefore
D16

@ 250 mm

C/C Top & Bottom Both ways

@ 200 mm

C/C Top & Bottom Both ways

Reinforcement Used in drawing:D16

Shear Check:
Vu =
f Vc =

22.79 KN

0.85 x (fc')1/2 x b x d
6
=
125.19
KN

>

22.79

KN

O.K Satisfied

250.0

OK

10

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.4.2-

Design Of Top Slab (TS-2)

ly = Width of Slab
h = Thickness of slab

=
=

6.1
250

m
mm

cc = Clear Cover
d = h-cc-(dia bar/2)

=
=

75
169

mm
mm

420

MPa

28

MPa

1.4 / fy =

0.00333

0.00180

1000

ly / lx

2.35

fy = Yield strength of steel


fc' = Conc. cylinder strength

r min

rt

(Designed as small panels)

rmax

0.02125

mm

lx = 2.600 m

ly
Area

2
15.86 m

Wt of slab
Live Load
Weight Of Pump
Weight of Walls

=
=
=
=

95.2
57.1
0.0
0.0

Total Factored Load

205.55

W=

M= CF x W x Lx2
Q=CF x W x Lx

qload

=
=
=

KN
KN
KN
KN

Not Applicable
KN

Total Factored Load / Slab Area


205.55 / (
2.60
x
6.10 )
2
12.96 KN/m

Where CF= Moment Coefficient taken from the slab graph (SEE SKETCH -1)
CF = Shear coefficient taken from the slab graph (SEE SKETCH -1)
W= Total factored load in KN

11

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Rectangular Loading:=


=
=
=
=
=

CF
0.0000
0.1300
0.5200
0.0000
0.0120
0.5500

x
x
x
x
x
x

11.39

KN-m

0.85 x

fc '
fy

1-

Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1
Mu

0.001065

1.33r =

W
12.96
12.96
12.96
12.96
12.96
12.96

Lx2
6.76
6.76
2.60
6.76
6.76
2.60

x
x
x
x
x
x

KN-m
KN-m
KN
KN-m
KN-m
KN

2 x Mu
0.85 x 0.9 x fc' x b x d2

1-

<

0.00
11.39
17.52
0.00
1.05
18.53

=
=
=
=
=
=

0.003333

So use :-

0.001416

0.001416

As

rxbxd

2
239.4 mm /m

Ast

rtxbxh

2
450 mm /m

Bar Dia =
As (provided)

12

No. of Bars
=

mm

565.49

<===== GOVERNS

>

450.00

Pitch =
mm

200.0

OK

Therefore
D12

@ 200 mm

C/C Top & Bottom Both ways

@ 200 mm

C/C Top & Bottom Both ways

Reinforcement Used in drawing:D12

Shear Check:
Vu =
f Vc =

18.53 KN

0.85 x (fc')1/2 x b x d
6
=
126.69
KN

>

18.53 KN

O.K Satisfied

12

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.4.3-

Design Of Bottom Slab (BS-1)

lx = Width of Slab
h = Thickness of slab

=
=

5.6
500

m
mm

cc = Clear Cover
d = h-cc-(dia bar/2)

=
=

75
415

mm
mm

fy = Yield strength of steel


fc' = Conc. cylinder strength

420

MPa

28

MPa

1.4 / fy =

0.00333

0.00180

1000

ly / lx

2.30

r min

rt

ly =

rmax

0.02125

mm

12.90 m

lx

Area

2
72.24 m

Wt of Steel
Live Load
Weight Of Pump
Weight of Walls

=
=
=
=

47.8
260.1
0.0
3386.3

Total Factored Load

4536.99

W=

M= CF x W x Lx2
Q=CF x W x Lx

qload

=
=
=

KN
KN
KN
KN
KN

Total Factored Load / Slab Area


4536.99 / (
12.9
x
5.6
2
62.804 KN/m

Where CF= Moment Coefficient taken from the slab graph (SEE SKETCH -2)
CF = Shear coefficient taken from the slab graph (SEE SKETCH -2)
W= Total factored load in KN

13

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Rectangular Loading:Mx1 (-ve)


Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1
Mu

=
=
=
=
=
=

CF
0.0830
0.0410
0.5200
0.0570
0.0105
0.4600

163.47 KN-m

fc '
fy

0.85 x

Ast

1-

x
x
x
x
x
x

<

Lx2
31.4
31.4
5.6
31.4
31.4
5.6

=
=
=
=
=
=

163.47
80.75
182.89
112.26
20.68
161.78

KN-m
KN-m
KN
KN-m
KN-m
KN

2 x Mu
0.85 x 0.9 x fc' x b x d2

1-

0.002569

1.33r =
As

W
62.804
62.804
62.804
62.804
62.804
62.804

x
x
x
x
x
x

0.003333

So use :-

0.003417

0.003417

rxbxd

rtxbxh

Bar Dia =
As (provided)

2
1418.1 mm /m

900 mm /m

20

No. of Bars
=

<===== GOVERNS

1570.80

mm

>

1418.13

Pitch =
mm

200.0

OK

Therefore
D20

@ 200 mm

C/C Top & Bottom Both ways

@ 200 mm

C/C Top & Bottom Both ways

Reinforcement Used in drawing:D20

Shear Check:
Vu =
f Vc =

182.9 KN

0.85 x (fc')1/2 x b x d
6
=
311.10
KN

>

182.9 KN

O.K Satisfied

14

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.4.4-

Design Of Bottom Slab (BS-2)

ly = Width of Slab
h = Thickness of slab

=
=

5.8
500

m
mm

cc = Clear Cover
d = h-cc-(dia bar/2)

=
=

75
415

mm
mm

fy = Yield strength of steel


fc' = Conc. cylinder strength

420

MPa

28

MPa

1.4 / fy =

0.00333

0.00180

1000

ly / lx

1.71

r min

rt

lx =

3.40

rmax

0.02125

mm

Area

2
19.72 m

ly

Wt of TS-1
Live Load
Weight Of Pumps
Weight of Walls

=
=
=
=

97.2
71.0
20.0
1155.8

Total Factored Load

1641.24

W=

M= CF x W x Lx2
Q=CF x W x Lx

qload

=
=
=

KN
KN
KN
KN
KN

Total Factored Load / Slab Area


1641.24 / (
3.4
x
5.8
2
83.227 KN/m

Where CF= Moment Coefficient taken from the slab graph (SEE SKETCH -2)
CF = Shear coefficient taken from the slab graph (SEE SKETCH -2)
W= Total factored load in KN

15

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Rectangular Loading:Mx1 (-ve)


Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1
Mu

=
=
=
=
=
=

CF
0.0800
0.0410
0.5250
0.0570
0.0100
0.4600

x
x
x
x
x
x

Lx2
11.6
11.6
3.4
11.6
11.6
3.4

=
=
=
=
=
=

76.97
39.45
148.56
54.84
9.62
130.17

KN-m
KN-m
KN
KN-m
KN-m
KN

76.97 KN-m

fc '
fy

0.85 x

W
83.227
83.227
83.227
83.227
83.227
83.227

x
x
x
x
x
x

1-

1-

0.0011948871

1.33r =

<

2 x Mu
0.85 x 0.9 x fc' x b x d2

0.0033333

So use :-

0.0015892

0.0015892

As

rxbxd

2
659.52 mm /m

Ast

rtxbxh

2
900 mm /m

Bar Dia =
As (provided)

20

No. of Bars
=

1256.64

<===== GOVERNS
=

mm2

>

900.00

Pitch =
mm2

250.0

OK

Therefore
D20

@ 250 mm

C/C Top & Bottom Both ways

@ 200 mm

C/C Top & Bottom Both ways

Reinforcement Used in drawing:D20

Shear Check:
Vu =
f Vc =

148.6 KN

0.85 x (fc')1/2 x b x d
6
=
311.10
KN

>

148.6 KN

O.K Satisfied

16

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.4.5-

Design Of Bottom Slab (BS-3)

ly = Width of Slab
h = Thickness of slab

=
=

5.5
400

m
mm

cc = Clear Cover
d = h-cc-(dia bar/2)

=
=

75
315

mm
mm

fy = Yield strength of steel


fc' = Conc. cylinder strength

420

MPa

28

MPa

1.4 / fy =

0.00333

0.00180

1000

ly / lx

2.12

r min
rt

rmax

0.02125

mm

lx = 2.600 m

ly

Area

2
14.3 m

Wt of top slab
Live Load
Weight Of Pump
Weight of Walls

=
=
=
=

82.5
51.5
0
873.6

Total Factored Load

1253.7

W=

M= CF x W x Lx2
Q=CF x W x Lx

qload

=
=
=

KN
KN
KN
KN
KN

Total Factored Load / Slab Area


1253.69 / (
2.600
x
5.5
2
87.67 KN/m

Where CF= Moment Coefficient taken from the slab graph (SEE SKETCH -2)
CF = Shear coefficient taken from the slab graph (SEE SKETCH -2)
W= Total factored load in KN

17

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Rectangular Loading:Mx1 (-ve)


Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1
Mu

=
=
=
0.06
0.01
0.46

CF
0.0830
0.0530
0.5200
0.0570
0.0100
0.4600

W
87.67
87.67
87.67
87.67
87.67
87.67

x
x
x
x
x
x

Lx2
6.8
6.8
2.6
6.8
6.8
2.6

x
x
x
x
x
x

=
=
=
=
=
=

49.19
31.41
118.53
33.78
5.93
104.85

KN-m
KN-m
KN
KN-m
KN-m
KN

49.19 KN-m

fc '
fy

0.85 x

1-

0.001327

1.33r =

2 x Mu
0.85 x 0.9 x fc' x b x d2

1-

<

0.003333

So use :-

0.001765

0.001765

As

rxbxd

2
556 mm /m

Ast

rtxbxh

2
720 mm /m

Bar Dia =
As (provided)

20

No. of Bars
=

1256.64

mm

<===== GOVERNS
=

4
>

720.00

Pitch =
mm

250.0

OK

Therefore
D20

@ 250 mm

C/C Top & Bottom Both ways

@ 200 mm

C/C Top & Bottom Both ways

Reinforcement Used in drawing:D20

Shear Check:
Vu =
f Vc =

118.5 KN
0.85 x (fc')1/2 x b x d
6
=
236.13
KN

>

118.5 KN

O.K Satisfied

18

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.5-

Design Of Walls
4.5.1-

gsoil
gwater

Design Of Walls (W-1 & W-2)


=
=

Soil Density
Water Density

=
=

19
10

KN/m3
KN/m3

Surcharge

10.00

KN/m2

37

=
=

7.00
600

m
mm

=
=
=

75
512.5
487.5

mm
mm
mm

=
=

420
28

MPa
MPa

q = Angle of internal Friction


Ix

H = Height of Wall
h = Thickness of wall
cc = Clear Cover
d1 for ver-dir = h-cc-dia bar/2
d2 for hor-dir = h-cc-dia bar-dia bar/2
fy = Yield strength of steel
fc' = Conc. cylinder strength

a-

Ko =
Ka =

=
1 - sin q
tan2 ( 45o - f / 2) =

=
r min
r min vert-dir
r min hor-dir

0.00150

0.00250

ly / lx

1.84

Soil Height Hs =

0.00333

6.600

rmax

0.02125

1000

mm

( Only submerged density and ground water pressure.)


ly = 12.90 m

Soil

Surcharge

lx

qs

100.4
93.4
100

Top of Wall
Bot of Wall
Ground

0.40
0.25

1.4 / fy =

Empty Condition

Degrees

qq
qs

Ka x gs x Hs

31.2

KN/m2

qq

Ka x Surcharge

2.49

KN/m2

Wv

Total Factored Triangular Load = (1.6 x q s)

1.6

31.2 =

49.9 KN/m2

Wu

Total Factored Uniform Load = (1.6 x qq)

1.6

2.49 =

3.98 KN/m2

m
m
m
m

19

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Triangular Loading:( Due to soil)


Where
CF = Moment coefficient taken from the wall with 3 sides fixed graph
M= CF x W v x H2
CF = Shear coefficient taken from the wall with 3 sides fixed graph
Q= CF x W v x H
W v= Total factored trinagular load in KN
Mx1 (-ve)

=
=
=
=
=
=

Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

0.070
0.015
0.430
0.050
0.023
0.170

x
x
x
x
x
x

49.9
49.9
49.9
49.9
49.9
49.9

x
x
x
x
x
x

49.0
49.0
7.0
49.0
49.0
7.0

=
=
=
=
=
=

171.1 KN-m

36.7 KN-m
150.1 KN
122.2 KN-m

56.2 KN-m
59.4 KN

For Rectangular Loading:( Due to surcharge)


Where
2
CF = Moment coefficient taken from the wall with 3 sides fixed graph
M= CF x W u x H
CF = Shear coefficient taken from the wall with 3 sides fixed graph
Q= CF x W u x H
W u= Total factored Rectangular load in KN
Mx1 (-ve)
=
0.177
x
4.0
x
49.0
=
34.5 KN-m
Mx2 (+ve)
=
0.022
x
4.0
x
49.0
=
4.3 KN-m
Qx1
My1 (-ve)
My2 (+ve)
Qy1

=
=
=
=

0.760
0.255
0.091
0.920

x
x
x
x

4.0
4.0
4.0
4.0

x
x
x
x

7.0
49.0
49.0
7.0

=
=
=
=

=
=
=
=
=
=

171.1
36.7
150.1
122.2
56.2
59.4

+
+
+
+
+
+

34.5
4.29
21.2
49.7
17.7
25.6

=
=
=
=
=
=

205.6
40.9
171.3
171.9
73.9
85.0

KN-m
KN-m
KN
KN-m
KN-m
KN

21.2
49.7
17.7
25.6

KN
KN-m
KN-m
KN

Total Net Moments:


Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1
b-

Test Condition

( Pit filled with water and no back fill)


ly = 12.90 m
Water

lx

qw
qw
Wv

gwater x H

Total Factored Triangular Load =

=
1.6 x q w

70

KN/m2
=

112

KN/m2

20

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Triangular Loading:( Due to water )


Where
CF = Moment coefficient taken from the wall with 3 sides fixed graph
M= CF x W v x H2
CF = Shear coefficient taken from the wall with 3 sides fixed graph
Q= CF x W v x H
W v= Total factored triangular load in KN
Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

=
=
=
=
=
=

0.070
0.015
0.430
0.050
0.023
0.170

=
=
=
=
=
=

384.2
82.3
337.1
274.4
126.2
133.3

x
x
x
x
x
x

112.0
112.0
112.0
112.0
112.0
112.0

x
x
x
x
x
x

49.0
49.0
7.0
49.0
49.0
7.0

=
=
=
=
=
=

=
=
=
=
=
=

384.2
82.3
337.1
274.4
126.2
133.3

KN-m
KN-m
KN
KN-m
KN-m
KN

384.2
82.3
337.1
274.4
126.2
133.3

KN-m
KN-m
KN
KN-m
KN-m
KN

Total Net Moments:


Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

Controlling Mx Moment
Controlling My Moment
Controlling shear

=
=

384.2 KN-m =
274.4 KN-m =
337.1 KN
=

1-

1-

384160000
274400000
337.1 KN

N-mm
N-mm

Consider 1m strip:-

0.85 x

fc '
fy

2 x Mu
0.85 x 0.9 x fc' x b x d2

rx
ry

0.00401

>

0.00333

So use :-

0.00401

0.00283

<

0.00333

So use :-

0.00333

1.33r x

0.00533

1.33r y

0.00377

As (req) (x-dir)

Ast (min) (x-dir)

As (req) (y-dir)

Ast (min) (y-dir)

r x b x d1
r minx b x h

r x b x d2
r minx b x h

2
2056 mm /m
2
1500 mm /m
2
1625 mm /m
2
mm
/m
900

<===== GOVERNS

<===== GOVERNS

21

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

REINFORCEMENT PROVIDED IN X- DIRECTION= VERTICAL

Bar Dia =

25

As (provided)

No. of Bars =
=

mm2

2454.37

5
>

2055.78

Pitch =
mm2

200

OK

REINFORCEMENT PROVIDED IN Y- DIRECTION =HORIZONTAL


Bar Dia =
As (provided)

25

No. of Bars =
=

mm

1963.50

4
>

1625.00

Pitch =
mm

250

OK

Therefore
Providing D25 @ 200
Providing D25 @ 250

C/C In Vertical Direction Both Faces


C/C In Horizontal Direction Both Faces

Reinforcement Used in drawing:D25


D25

C/C In Vertical Direction Both Faces


C/C In Horizontal Direction Both Faces

@ 200 mm
@ 200 mm

Shear Check:
Vu(max) =

337.1 KN

f Vc =

.85 x (fc')1/2 x b x d
6
=

384.19

KN

>

337.1 KN

O.K Satisfied

22

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.5.2-

Design Of Walls (W-3 & W-4)

gsoil
gwater

=
=

Soil Density
Water Density

=
=

19
10

KN/m3
KN/m3

Surcharge

10.00

KN/m2

37

=
=

7.00
400

m
mm

=
=
=

75
312.5
287.5

mm
mm
mm

=
=

420
28

MPa
MPa

q = Angle of internal Friction


Iy

H = Height of Wall
h = Thickness of wall
cc = Clear Cover
d1 for ver-dir = h-cc-dia bar/2
d2 for hor-dir = h-cc-dia bar-dia bar/2
fy = Yield strength of steel
fc' = Conc. cylinder strength

a-

Ko =
Ka =

=
1 - sin q
tan2 ( 45o - f / 2) =

=
r min
r min vert-dir
r min hor-dir

0.00150

0.00250

ly / lx

2.06

Soil Height Hs =

0.00333

0.02125

1000

mm

( Only submerged density and ground water pressure.)

Surcharge

ly

qs

6.6

rmax

lx = 3.40 m
Soil

100.4
93.4
100

Top of Wall
Bot of Wall
Ground

0.40
0.25

1.4 / fy =

Empty Condition

Degrees

qq

qs

Ka x gs x Hs

31.2

KN/m2

qq

Ka x Surcharge

2.49

KN/m2

Wv

Total Factored Triangular Load = (1.6 x q s)

1.6

31.2 =

49.9 KN/m2

Wu

Total Factored Uniform Load = (1.6 x qq)

1.6

2.49 =

3.98 KN/m2

m
m
m
m

23

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Triangular Loading:( Due to soil)


Where
CF = Moment coefficient taken from the wall with 4 sides fixed graph
M= CF x W v x H2
CF = Shear coefficient taken from the wall with 4 sides fixed graph
Q= CF x W v x H
W v= Total factored trinagular load in KN
Mx1 (-ve)

=
=
=
=
=
=

Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

0.042
0.020
0.360
0.046
0.012
0.400

x
x
x
x
x
x

49.9
49.9
49.9
49.9
49.9
49.9

x
x
x
x
x
x

11.6
11.6
3.4
11.6
11.6
3.4

=
=
=
=
=
=

24.2
11.5
61.0
26.5
6.9
67.8

KN-m
KN-m
KN
KN-m
KN-m
KN

For Rectangular Loading:( Due to surcharge)


Where
2
CF = Moment coefficient taken from the wall with 4 sides fixed graph
M= CF x W u x H
CF = Shear coefficient taken from the wall with 4 sides fixed graph
Q= CF x W u x H
W u= Total factored Rectangular load in KN
Mx1 (-ve)
=
0.083
x
4.0
x
11.6
=
3.8 KN-m
Mx2 (+ve)
=
0.040
x
4.0
x
11.6
=
1.8 KN-m
Qx1
=
0.520
x
4.0
x
3.4
=
7.0 KN
My1 (-ve)
=
0.057
x
4.0
x
11.6
=
2.6 KN-m
My2 (+ve)
=
0.010
x
4.0
x
11.6
=
0.5 KN-m
Qy1
=
0.460
x
4.0
x
3.4
=
6.2 KN

Total Net Moments:


Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1
b-

=
=
=
=
=
=

24.2
11.5
61.0
26.5
6.9
67.8

Test Condition

+
+
+
+
+
+

3.82
1.84
7.03
2.62
0.46
6.22

=
=
=
=
=
=

28.0
13.4
68.1
29.1
7.4
74.1

KN-m
KN-m
KN
KN-m
KN-m
KN

( Pit filled with water and no back fill)


lx =

3.4

Water

ly

qw
qw
Wv

gwater x H

Total Factored Triangular Load =

=
1.6 x q w

70

KN/m2
=

112

KN/m2

24

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Triangular Loading:( Due to water )


Where
CF = Moment coefficient taken from the wall with 4 sides fixed graph
M= CF x W v x H2
CF = Shear coefficient taken from the wall with 4 sides fixed graph
Q= CF x W v x H
W v= Total factored triangular load in KN
Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

=
=
=
=
=
=

0.042
0.020
0.360
0.046
0.012
0.400

=
=
=
=
=
=

54.4
25.9
137.1
59.6
15.5
152.3

x
x
x
x
x
x

112.0
112.0
112.0
112.0
112.0
112.0

x
x
x
x
x
x

11.6
11.6
3.4
11.6
11.6
3.4

=
=
=
=
=
=

=
=
=
=
=
=

54.4
25.9
137.1
59.6
15.5
152.3

KN-m
KN-m
KN
KN-m
KN-m
KN

54.4
25.9
137.1
59.6
15.5
152.3

KN-m
KN-m
KN
KN-m
KN-m
KN

Total Net Moments:


Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

Controlling Mx Moment
Controlling My Moment
Controlling shear

=
=

54.4 KN-m =
59.6 KN-m =
152.3 KN
=

1-

1-

54378240
59557120
152.3 KN

N-mm
N-mm

Consider 1m strip:-

0.85 x

fc '
fy

2 x Mu
0.85 x 0.9 x fc' x b x d2

rx
ry

0.00149

<

0.00333

So use :-

0.00199

0.00164

<

0.00333

So use :-

0.00218

1.33r x

0.00199

1.33r y

0.00218

As (req) (x-dir)

r x b x d1

2
620 mm /m

Ast (min) (x-dir)

r minx b x h

2
1000 mm /m

As (req) (y-dir)

Ast (min) (y-dir)

r x b x d2
r minx b x h

2
626 mm /m
2
600 mm /m

<===== GOVERNS
<===== GOVERNS

25

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

REINFORCEMENT PROVIDED IN X- DIRECTION= HORIZONTAL

Bar Dia =

25

As (provided)

No. of Bars =
=

mm2

1963.50

4
>

1000.00

Pitch =
mm2

250

OK

REINFORCEMENT PROVIDED IN Y- DIRECTION =VERTICAL


Bar Dia =
As (provided)

25

No. of Bars =
=

mm

1963.50

4
>

625.97

Pitch =
mm

250

OK

Therefore
Providing D25 @ 250
Providing D25 @ 250

C/C In Horizontal Direction Both Faces


C/C In Vertical Direction Both Faces

Reinforcement Used in drawing:D25


D25

C/C In Horizontal Direction Both Faces


C/C In Vertical Direction Both Faces

@ 200 mm
@ 200 mm

Shear Check:
Vu(max) =

152.3 KN

f Vc =

0.85 x (fc')1/2 x b x d
6
=

234.26

KN

>

152.3 KN

O.K Satisfied

26

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.5.3-

gsoil
gwater

Design Of Walls (W-5 , W-6 & W-7)


=
=

Soil Density
Water Density

=
=

19
10

KN/m3
KN/m3

Surcharge

10.00

KN/m2

q = Angle of internal Friction =

37

Iy

H = Height of Wall
h = Thickness of wall
cc = Clear Cover
d1 for ver-dir = h-cc-dia bar/2
d2 for hor-dir = h-cc-dia bar-dia bar/2
fy = Yield strength of steel
fc' = Conc. cylinder strength

a-

=
=

7.00
400

m
mm

=
=
=

75
315
295

mm
mm
mm

=
=

420
28

MPa
MPa

Ko =
Ka =

=
1 - sin q
tan2 ( 45o - f / 2) =

=
r min
r min vert-dir
r min hor-dir

0.00150

0.00250

ly / lx

1.21

100.4
93.4
100

Top of Wall
Bot of Wall
Ground

Soil Height Hs =

0.00333

rmax =

1000

0.02125

mm

( Only submerged density and ground water pressure.)


lx = 5.80 m

Soil

Surcharge

ly

qs

6.6

0.40
0.25

1.4 / fy =

Empty Condition

Degrees

qq
qs

Ka x gs x Hs

31.2

KN/m2

qq

Ka x Surcharge

2.49

KN/m2

Wv

Total Factored Triangular Load = (1.6 x q s)

1.6

31.2 =

49.9 KN/m2

Wu

Total Factored Uniform Load = (1.6 x qq)

1.6

2.49 =

3.98 KN/m2

m
m
m
m

27

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Triangular Loading:( Due to soil)


Where
CF = Moment coefficient taken from the wall with 3 sides fixed graph
M= CF x W v x H2
CF = Shear coefficient taken from the wall with 3 sides fixed graph
Q= CF x W v x H
W v= Total factored trinagular load in KN
Mx1 (-ve)

=
=
=
=
=
=

Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

0.015
0.008
0.065
0.036
0.009
0.050

x
x
x
x
x
x

49.9
49.9
49.9
49.9
49.9
49.9

x
x
x
x
x
x

33.6
33.6
5.8
33.6
33.6
5.8

=
=
=
=
=
=

25.2
13.4
18.8
60.4
15.1
14.5

KN-m
KN-m
KN
KN-m
KN-m
KN

For Rectangular Loading:( Due to surcharge)


Where
2
CF = Moment coefficient taken from the wall with 3 sides fixed graph
M= CF x W u x H
CF = Shear coefficient taken from the wall with 3 sides fixed graph
Q= CF x W u x H
W u= Total factored Rectangular load in KN
Mx1 (-ve)
=
0.085
x
4.0
x
33.6
=
11.4 KN-m
Mx2 (+ve)
=
0.041
x
4.0
x
33.6
=
5.5 KN-m
Qx1
My1 (-ve)
My2 (+ve)
Qy1

=
=
=
=

0.470
0.057
0.010
0.042

x
x
x
x

4.0
4.0
4.0
4.0

x
x
x
x

5.8
33.6
33.6
5.8

=
=
=
=

10.8
7.6
1.3
1.0

=
=
=
=
=
=

25.2
13.4
18.8
60.4
15.1
14.5

+
+
+
+
+
+

11.4
5.49
10.8
7.63
1.34
0.97

=
=
=
=
=
=

36.5
18.9
29.6
68.0
16.4
15.4

KN-m
KN-m
KN
KN-m
KN-m
KN

KN
KN-m
KN-m
KN

Total Net Moments:


Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1
b-

Test Condition

( Pit filled with water and no back fill)


lx = 5.80 m
Water

ly

qw
qw
Wv

gwater x H

Total Factored Triangular Load =

=
1.6 x q w

70

KN/m2
=

112

KN/m2

28

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Triangular Loading:( Due to water )


Where
CF = Moment coefficient taken from the wall with 3 sides fixed graph
M= CF x W v x H2
CF = Shear coefficient taken from the wall with 3 sides fixed graph
Q= CF x W v x H
W v= Total factored triangular load in KN
Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

=
=
=
=
=
=

0.036
0.008
0.065
0.015
0.009
0.050

=
=
=
=
=
=

135.6
30.1
42.2
68.0
33.9
32.5

x
x
x
x
x
x

112.0
112.0
112.0
112.0
112.0
112.0

x
x
x
x
x
x

33.6
33.6
5.8
33.6
33.6
5.8

=
=
=
=
=
=

=
=
=
=
=
=

135.6
30.1
42.2
68.0
33.9
32.5

KN-m
KN-m
KN
KN-m
KN-m
KN

135.6
30.1
42.2
56.5
33.9
32.5

KN-m
KN-m
KN
KN-m
KN-m
KN

Total Net Moments:


Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

Controlling Mx Moment
Controlling My Moment
Controlling shear

=
=

135.6 KN-m =
68.0 KN-m =
42.2 KN
=

1-

1-

135636480
68028076
42.2 KN

N-mm
N-mm

Consider 1m strip:-

0.85 x

fc '
fy

2 x Mu
0.85 x 0.9 x fc' x b x d2

rx
ry

0.003740

>

0.00333

So use :-

0.00374

0.001844

<

0.00333

So use :-

0.00245

1.33r x

0.00497

1.33r y

0.00245

As (req) (x-dir)

Ast (min) (x-dir)

As (req) (y-dir)

Ast (min) (y-dir)

r x b x d1
r minx b x h

=
=

2
1178 mm /m
2
1000 mm /m

r x b x d2
r minx b x h

2
723 mm /m

2
600 mm /m

<===== GOVERNS

<===== GOVERNS

29

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

REINFORCEMENT PROVIDED IN X- DIRECTION= HORIZONTAL

Bar Dia =

20

As (provided)

No. of Bars =
=

mm2

1256.64

4
>

1178.00

Pitch =
mm2

250

OK

REINFORCEMENT PROVIDED IN Y- DIRECTION =VERTICAL


Bar Dia =
As (provided)

20

No. of Bars =
=

mm

1256.64

4
>

723.39

Pitch =
mm

250

OK

Therefore
Providing D20 @ 250
Providing D20 @ 250

C/C In Horizontal Direction Both Faces


C/C In Vertical Direction Both Faces

Reinforcement Used in drawing:D20


D20

C/C In Horizontal Direction Both Faces


C/C In Vertical Direction Both Faces

@ 200 mm
@ 200 mm

Shear Check:
Vu(max) =

42.2 KN
0.85 x (fc')1/2 x b x d

f Vc =

6
=

236.13

KN

>

42.2 KN

O.K Satisfied

30

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.5.4-

gsoil
gwater

Design Of Wall (W-8)


=
=

Soil Density
Water Density

=
=

19
10

KN/m3
KN/m3

Surcharge

10.00

KN/m2

q = Angle of internal Friction =


H = Height of Wall
h = Thickness of wall

37
Ix

cc = Clear Cover
d1 for ver-dir = h-cc-dia bar/2
d2 for hor-dir = h-cc-dia bar-dia bar/2

Degrees

=
=

5.00
400

m
mm

=
=
=

75
315
295

mm
mm
mm

=
=

420
28

MPa
MPa

100.15
95.15
100

Top of Wall
Bot of Wall
Ground

Soil Height Hs =

4.85

x
fy = Yield strength of steel
fc' = Conc. cylinder strength

a-

Ko =
Ka =

=
1 - sin q
tan2 ( 45o - f / 2) =

=
r min
r min vert-dir
r min hor-dir

=
=

ly / lx

1.10

0.40
0.25
0.00333

1.4 / fy =

rmax =

0.02125

0.00150
0.00250

Empty Condition

1000

mm

( Only submerged density and ground water pressure.)


ly = 5.50 m
Soil

Surcharge

lx

qs

qq

qs

Ka x gs x Hs

22.9

KN/m2

qq

Ka x Surcharge

2.49

KN/m2

Wv

Total Factored Triangular Load = (1.6 x q s)

1.6

Wu

Total Factored Uniform Load = (1.6 x qq)

1.6

36.7 KN/m2

2.486 =

3.98 KN/m2

m
m
m
m

31

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Triangular Loading:-

( Due to soil)

Where
M= CF x W v x H2
Q= CF x W v x H

CF = Moment coefficient taken from the wall with 3 sides fixed graph
CF = Shear coefficient taken from the wall with 3 sides fixed graph
W v= Total factored trinagular load in KN

Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

=
=
=
=
=
=

0.014
0.008
0.050
0.036
0.008
0.330

x
x
x
x
x
x

For Rectangular Loading:-

36.7
36.7
36.7
36.7
36.7
36.7

x
x
x
x
x
x

25.0
25.0
5.0
25.0
25.0
5.0

=
=
=
=
=
=

12.8
7.3
9.2
33.0
7.3
60.5

KN-m
KN-m
KN
KN-m
KN-m
KN

( Due to surcharge)

Where
M= CF x W u x H2
Q= CF x W u x H
Mx1 (-ve)

=
=
=
=
=
=

Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

CF = Moment coefficient taken from the wall with 3 sides fixed graph
CF = Shear coefficient taken from the wall with 3 sides fixed graph
W u= Total factored Rectangular load in KN
0.085
x
4.0
x
25.0
=
8.5 KN-m
0.042
0.510
0.057
0.010
0.400

x
x
x
x
x

4.0
4.0
4.0
4.0
4.0

x
x
x
x
x

25.0
5.0
25.0
25.0
5.0

=
=
=
=
=

12.8
7.3
9.2
33.0
7.3
60.5

+
+
+
+
+
+

8.45
4.18
10.1
5.67
0.99
7.95

=
=
=
=
=
=

21.3
11.5
19.3
38.7
8.3
68.4

KN-m
KN-m
KN
KN-m
KN-m
KN

4.2
10.1
5.7
1.0
8.0

KN-m
KN
KN-m
KN-m
KN

Total Net Moments:


Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1
b-

=
=
=
=
=
=

Test Condition

( Pit filled with water and no back fill)


ly = 5.50 m
Water

lx

qw
qw
Wv

gwater x H

Total Factored Triangular Load =

=
1.6 x q w

50

KN/m2
=

80 KN/m2

32

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Triangular Loading:( Due to water )


Where
CF = Moment coefficient taken from the wall with 3 sides fixed graph
M= CF x W v x H2
CF = Shear coefficient taken from the wall with 3 sides fixed graph
Q= CF x W v x H
W v= Total factored triangular load in KN
Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

=
=
=
=
=
=

0.014
0.008
0.050
0.036
0.008
0.330

=
=
=
=
=
=

28.0
16.0
20.0
72.0
16.0
132.0

x
x
x
x
x
x

80.0
80.0
80.0
80.0
80.0
80.0

x
x
x
x
x
x

25.0
25.0
5.0
25.0
25.0
5.0

=
=
=
=
=
=

=
=
=
=
=
=

28.0
16.0
20.0
72.0
16.0
132.0

KN-m
KN-m
KN
KN-m
KN-m
KN

28.0
16.0
20.0
72.0
16.0
132.0

KN-m
KN-m
KN
KN-m
KN-m
KN

Total Net Moments:


Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

Controlling Mx Moment
Controlling My Moment
Controlling shear

=
=

28.0 KN-m =
72.0 KN-m =
132.0 KN
=

1-

1-

28000000
72000000
132.0 KN

N-mm
N-mm

Consider 1m strip:-

0.85 x

fc '
fy

2 x Mu
0.85 x 0.9 x fc' x b x d2

rx
ry

0.00075

<

0.00333

So use :-

0.00100

0.00195

<

0.00333

So use :-

0.00260

1.33r x

0.00100

1.33r y

0.00260

As (req) (x-dir)

Ast (min) (x-dir)

As (req) (y-dir)

Ast (min) (y-dir)

r x b x d2
r minx b x h
r x b x d1
r minx b x h

2
295 mm /m
2
600 mm /m

2
818 mm /m

2
1000 mm /m

<===== GOVERNS

<===== GOVERNS

33

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

REINFORCEMENT PROVIDED IN X- DIRECTION= VERTICAL

Bar Dia =

20

As (provided)

No. of Bars =
=

mm

1256.64

4
>

600.00

Pitch =
mm

250

OK

REINFORCEMENT PROVIDED IN Y- DIRECTION =HORIZONTAL


Bar Dia =
As (provided)

20

No. of Bars =
=

mm

1256.64

4
>

1000.00

Pitch =
mm

250

OK

Therefore
Providing D20 @ 250
Providing D20 @ 250

C/C In Vertical Direction Both Faces


C/C In Horizontal Direction Both Faces

Reinforcement Used in drawing:D20


D20

C/C In Vertical Direction Both Faces


C/C In Horizontal Direction Both Faces

@ 200 mm
@ 200 mm

Shear Check:
Vu(max) = 132.0 KN
0.85 x (fc')1/2 x b x d

f Vc =

6
=

236.13

KN

>

132.0 KN

O.K Satisfied

34

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

4.5.5-

gsoil
gwater

Design Of Walls (W-9 & W-10)


(Designing the most critical wall among these three which is wall W-7)
= Soil Density
=
19
KN/m3
= Water Density
=
10
KN/m3
Surcharge

10.00

q = Angle of internal Friction =

37

Iy

H = Height of Wall
h = Thickness of wall
cc = Clear Cover
d1 for ver-dir = h-cc-dia bar/2
d2 for hor-dir = h-cc-dia bar-dia bar/2
fy = Yield strength of steel
fc' = Conc. cylinder strength

a-

Degrees

=
=

5.00
300

m
mm

=
=
=

75
217
201

mm
mm
mm

=
=

420
28

MPa
MPa

Ko =
Ka =

=
1 - sin q
tan2 ( 45o - f / 2) =

=
r min
r min vert-dir
r min hor-dir

0.00150

0.00250

ly / lx

1.92

KN/m2

Soil Height Hs =

4.85

0.40
0.25
0.00333

1.4 / fy =

rmax =

Empty Condition

100.15
95.15
100

Top of Wall
Bot of Wall
Ground

0.02125

1000

mm

( Only submerged density and ground water pressure.)


lx = 2.600 m
Soil

Surcharge

ly

qs

qq

qs

Ka x gs x Hs

22.9

KN/m2

qq

Ka x Surcharge

2.49

KN/m2

Wv

Total Factored Triangular Load = (1.6 x q s)

1.6

22.9 =

36.7 KN/m2

Wu

Total Factored Uniform Load = (1.6 x qq)

1.6

2.49 =

3.98 KN/m2

m
m
m
m

35

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Triangular Loading:( Due to soil)


Where
CF = Moment coefficient taken from the wall with 3 sides fixed graph
M= CF x W v x H2
CF = Shear coefficient taken from the wall with 3 sides fixed graph
Q= CF x W v x H
W v= Total factored trinagular load in KN
Mx1 (-ve)

=
=
=
=
=
=

Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

0.008
0.005
0.040
0.046
0.095
0.385

x
x
x
x
x
x

36.7
36.7
36.7
36.7
36.7
36.7

x
x
x
x
x
x

6.8
6.8
2.6
6.8
6.8
2.6

=
=
=
=
=
=

2.0
1.2
3.8
11.4
23.5
36.7

KN-m
KN-m
KN
KN-m
KN-m
KN

For Rectangular Loading:( Due to surcharge)


Where
2
CF = Moment coefficient taken from the wall with 3 sides fixed graph
M= CF x W u x H
CF = Shear coefficient taken from the wall with 3 sides fixed graph
Q= CF x W u x H
W u= Total factored Rectangular load in KN
Mx1 (-ve)
=
0.083
x
4.0
x
6.8
=
2.2 KN-m
Mx2 (+ve)
=
0.042
x
4.0
x
6.8
=
1.1 KN-m
Qx1
=
0.510
x
4.0
x
2.6
=
5.3 KN
My1 (-ve)
=
0.058
x
4.0
x
6.8
=
1.6 KN-m
My2 (+ve)
=
0.012
x
4.0
x
6.8
=
0.3 KN-m
Qy1
=
0.400
x
4.0
x
2.6
=
4.1 KN

Total Net Moments:


Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1
b-

=
=
=
=
=
=

2.0
1.2
3.8
11.4
23.5
36.7

Test Condition

+
+
+
+
+
+

2.23
1.13
5.27
1.56
0.32
4.14

=
=
=
=
=
=

4.2
2.4
9.1
13.0
23.9
40.8

KN-m
KN-m
KN
KN-m
KN-m
KN

( Pit filled with water and no back fill)


lx = 2.600 m
Water

ly

qw
qw
Wv

gwater x H

Total Factored Triangular Load =

=
1.6 x q w

50

KN/m2
=

80 KN/m2

36

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

For Triangular Loading:( Due to water )


Where
CF = Moment coefficient taken from the wall with 3 sides fixed graph
M= CF x W v x H2
CF = Shear coefficient taken from the wall with 3 sides fixed graph
Q= CF x W v x H
W v= Total factored triangular load in KN
Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

=
=
=
=
=
=

0.008
0.005
0.040
0.046
0.095
0.385

=
=
=
=
=
=

4.3
2.7
9.1
24.9
51.4
80.1

x
x
x
x
x
x

80.0
80.0
80.0
80.0
80.0
80.0

x
x
x
x
x
x

6.8
6.8
2.6
6.8
6.8
2.6

=
=
=
=
=
=

=
=
=
=
=
=

4.3
2.7
9.1
24.9
51.4
80.1

KN-m
KN-m
KN
KN-m
KN-m
KN

4.3
2.7
8.3
24.9
51.4
80.1

KN-m
KN-m
KN
KN-m
KN-m
KN

Total Net Moments:


Mx1 (-ve)
Mx2 (+ve)
Qx1
My1 (-ve)
My2 (+ve)
Qy1

Controlling Mx Moment
Controlling My Moment
Controlling shear

=
=

4.3 KN-m =
51.4 KN-m =
80.1 KN
=

4326400
51376000
80.1 KN

N-mm
N-mm

Consider 1m strip:-

rx
ry
1.33r x

0.85 x

fc'

<

0.00333

So use :-

0.00032

0.00296

<

0.00333

So use :-

0.00333

0.00032

1.33r y

1-

2 x Mu
0.85 x 0.9 x fc' x b x d2

1fy
0.00024

0.00394

As (req) (x-dir)

Ast (min) (x-dir)

As (req) (y-dir)

Ast (min) (y-dir)

r x b x d1
r minx b x h

r x b x d2
r minx b x h

2
70.3 mm /m
2
750 mm /m
2
670 mm /m
2
mm
/m
450

<===== GOVERNS
<===== GOVERNS

37

OF

45

JOB No. 0-3850-20

DOC No. C-667-1316-001<00A>


SHEET

REINFORCEMENT PROVIDED IN X- DIRECTION= HORIZONTAL

Bar Dia =

16

As (provided)

No. of Bars =
=

mm2

804.25

4
>

750.00

Pitch =
mm2

250

OK

REINFORCEMENT PROVIDED IN Y- DIRECTION =VERTICAL


Bar Dia =
As (provided)

16

No. of Bars =
=

mm

804.25

4
>

670.00

Pitch =
mm

250

OK

Therefore
Providing D16 @ 250
Providing D16 @ 250

C/C In Horizontal Direction Both Faces


C/C In Vertical Direction Both Faces

Reinforcement Used in drawing:D16


D16

C/C In Horizontal Direction Both Faces


C/C In Vertical Direction Both Faces

@ 200 mm
@ 200 mm

Shear Check:
Vu(max) =

80.1 KN
0.85 x (fc')1/2 x b x d

f Vc =

6
=

162.67

KN

>

80.1 KN

O.K Satisfied

38

OF

45

JOB No. 0-3850-20


4.6-

REINFORCEMENT

DOC No. C-667-1316-001<00A>


SHEET
39
OF 45 .

JOB NO. 0-3850-20

DOC NO. C-667-1316-001<00A>


SHEET
40
OF 45 .

JOB No. 0-3850-20


4.7-

ATTACHMENT (MOMENT GRAPHS).


4.7.1-

DOC No. C-667-1316-001<00A>


SHEET
41
OF 45 .

JOB No. 0-3850-20


4.7.2-

DOC No. C-667-1316-001<00A>


SHEET
42
OF 45 .

JOB No. 0-3850-20


4.7.3-

DOC No. C-667-1316-001<00A>


SHEET
43
OF 45 .

JOB No. 0-3850-20

4.7.4-

DOC No. C-667-1316-001<00A>


SHEET
44
OF 45 .

JOB No. 0-3850-20

4.7.5-

DOC No. C-667-1316-001<00A>


SHEET
45
OF 45 .

Das könnte Ihnen auch gefallen