Beruflich Dokumente
Kultur Dokumente
07.05.13 09:28:26
132kV Elbd Khdn 7SA522 / Folder / 7SA522 V4.6 MLFB: 7SA52255CB005EF5 Parameter set version: V04.63.04 Device path: C:\Siemens\Digsi4\D4PROJ\132kV_El\P7DI\GV\SD\00000001 Author: Amir Razaq (Asst. Manager) Creation date: 10.06.09 10:02:06 Last modified: 07.05.13 09:24:17 Operating mode: Offline Comment: Checked By: Atif Mujeeb Usmani (Addl. Manager) Approved By: M. Shafiq (Addl. CE) Setting values in: Secondary value description
PRINT - CONTENTS
1 Device Configuration 2 General Device Settings 2.1 Group Device 3 Power System Data 1 3.1 Group Power System Data 1; Group Transformers 3.2 Group Power System Data 1; Group Power System 3.3 Group Power System Data 1; Group Breaker 4 Settings groups 4.1 Group Power System Data 2; Group Power System 4.2 Group Power System Data 2; Group Line Status 4.3 Group Distance protection, general settings; Group General 4.4 Group Distance protection, general settings; Group Earth faults 4.5 Group Distance protection, general settings; Group Time Delays 4.6 Group Distance zones (quadrilateral); Group Zone Z1 4.7 Group Distance zones (quadrilateral); Group Zone Z1B-exten. 4.8 Group Distance zones (quadrilateral); Group Zone Z2 4.9 Group Distance zones (quadrilateral); Group Zone Z3 4.10 Group Distance zones (quadrilateral); Group Zone Z4 4.11 Group Distance zones (quadrilateral); Group Zone Z5 4.12 Group Instantaneous HighSpeed SOTF Overcurrent 4.13 Group Demand Measurement Setup; Group Measurement 4.14 Group Min/Max Measurement Setup; Group Measurement 4.15 Group Measurement Supervision; Group Balance / Summ. 4.16 Group Measurement Supervision; Group Fuse Fail. Mon. 4.17 Group Measurement Supervision; Group VT mcb 4.18 Group Measurement Supervision; Group Load Angle 4.19 Group Fault Locator 2 3 3 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 7 8 8 8 8 8 9 9 9
Page 1 of 9
SIMATIC
07.05.13 09:28:26
1 Device Configuration
No. 0110 Trip mode 0112 Phase Distance 0113 Earth Distance 0121 Teleprotection for Distance prot. 0122 DTT Direct Transfer Trip 0125 Weak Infeed (Trip and/or Echo) 0126 Backup overcurrent 0131 Earth fault overcurrent 0132 Teleprotection for Earth fault overcurr. 0135 Synchronism and Voltage Check 0136 Over / Underfrequency Protection 0137 Under / Overvoltage Protection 0138 Fault Locator 0140 Trip Circuit Supervision Function Scope Disabled 3pole only Quadrilateral Quadrilateral Disabled Disabled Disabled Disabled Disabled Disabled Disabled Disabled Disabled Enabled Disabled 0103 Setting Group Change Option
Page 2 of 9
SIMATIC
07.05.13 09:28:26
Page 3 of 9
SIMATIC
07.05.13 09:28:26
0237 Setting format for zero seq.comp. format Zero seq. comp. factors RE/RL and XE/XL All
Page 4 of 9
SIMATIC
07.05.13 09:28:26
4 Settings groups
4.1 Group Power System Data 2; Group Power System
No. Settings 600 A 81 81 not reversed 27.4 km 1.03 0.62 Value Group A A A A A A A A A A 1103 Measurement: Full Scale Voltage (100%) 132.0 kV 1104 Measurement: Full Scale Current (100%) 1105 Line Angle 1211 Angle of inclination, distance charact. 1107 P,Q operational measured values sign 1110 x' - Line Reactance per length unit 1111 Line Length 1116 Zero seq. comp. factor RE/RL for Z1 1117 Zero seq. comp. factor XE/XL for Z1
0.0392 Ohm / km A
1118 Zero seq. comp.factor RE/RL for Z1B...Z5 1.03 1119 Zero seq. comp.factor XE/XL for Z1B...Z5 0.62
1140A CT Saturation Threshold 1150A Seal-in Time after MANUAL closures 1151 1152 Manual CLOSE COMMAND generation
Page 5 of 9
SIMATIC
07.05.13 09:28:26
1207A 3I0>-pickup-stabilisation (3I0> /Iphmax) 0.10 1209A criterion of earth fault recognition 1221A Loop selection with 2Ph-E faults
Page 6 of 9
SIMATIC
07.05.13 09:28:26
Page 7 of 9
SIMATIC
07.05.13 09:28:26
7 day(s) A
2.50 A A 0.50 A A
Page 8 of 9
SIMATIC
07.05.13 09:28:26
0.25 A A
Page 9 of 9