AL-Balqa Applied University Faculty of Engineering Technology Training Report Summer semester 2010-2011 Company name: Waled subeh

Engineering Office Office Supervisor: ENG.Badeaa Degbag Faculty supervisor: DR.Nafea Abdurrahman Prepared by: Mohammed Ahmed Ben Mohammed Yousef 30815021541
1

-Waled Subeh Engineering Office


This office is defined as an office for architect and civil -construction designe , and for supervision of projects .

Its located in Jordan Amman dowar sweleh

And its own and headed by : Eng . waled subeh.

Office staff : 1- architect engineers : 3 2- construction manager : 1 3 civil and construction chief : 2 4- The office manager : 1 5- civil engineering construction manager : 1 6- electrecal engeneering: 2 7- mechnecal engineering: 1

-Date schedule:

Date of start training

12/6/2011

Date of finish training

30/7/2011

Morning hours training

8.30 AM-1 PM

Evening hours training

2 PM-6 PM

Site of training in office

Dwar Sweleh

Site of training in site

Abu nessir

-Site & office works :

In office:
In first 2weeks training I was trained in the office , I had learned on AutoCAD . I had been learned to draw architect drawings and structural drawings. By eng :lura amarah and ahlam alagury.

And I had learned to calculate and design of structural of buildings to design of parts of the construction . By eng : waled subeh.

In site
Then after 2weeks training in office , I go to site to supervision of an a construction building of ( Mohammed AL-gzar company ) , the structure is residential building : its have of4 floors and 2 basement floors.

-What I do in training :
1 take a jobs and requests from the engineer to receive and measuring of column and walls and beams , and check it if parallel and perpendicular 2 - Calculate the quantities of structural materials contained in the project from the rebar and concrete. 3 - Sampling of the project, as these samples are the words of cubes. 4 read the drawings and translate them and know the define and symbols that they contain 5 - Take the results and laboratory analysis and by the conclusions. 6 - Go to the site, accompanied by the supervising engineer to study the Engineering project. 7 - The technical acceptance of the sub-contractor.

Conclusions:

learns to patient when I dealing of handlers and other directions . I had learned from training in terms of information value, which he described as the supervising engineer, where there was a good relationship between the engineer and trainee.I had an experience to carrying out og project from drawing to ground . Among the benefits of field training is the link between information theory (which we receive in university lectures) and practical side on the ground. On the subject of field training suggest that there is a practical application in each semester starting from the level of the third year and to consolidate the best of information theory-step by step And also suggested that there be a headquarters and training contains a number of trainers and trainees where access to the best of the trainee in terms of experience and speed to get the information needed to qualify trainees to become engineers active in the future. And recommended that the role of the academic supervisor more effectively with the trainees in terms of visits to trainees in the training sites and guidance of the correct information. Since I started training I went to the company for the time desk where Therein beginning as reading the diagrams and explanations of the crisis understanding of these schemes then we started to calculate quantities for a project of rebar and cement, with the help of engineer computer for the quantities present in the office where a 2-weeks from the start of training. Then I started training in the field have started supervising engineer guide us to the site where the site was close to the completion of stage bone witnessed the last node, and guided us to the engineer how to receive a node in terms of mechanism to develop the materials as required. Then I saw how to cast the knot in terms of machinery and equipment and materials used and asked us to engineer taking a sample and a full
7

examination in the competent authorities (the Royal Scientific Society). Then gave me some advice and guidance on how to cast nodes, and followup technically so that the monument water in the morning and evening, and should not be congratulated undo form works only after at least 14 days after the completion of concrete placement. He then asked the engineer supervising the process of plastering in the manner of delivery that we saw: 1 - Receiving in geed. 2 - Receiving light. 3 - Delivery thread. Then we informed the engineer how to be plastering do not contain granules and be smooth.

-Parts of training :
1- Put concrete by using handmade method .

2- Walls and columns building

You can see in pictures the walls and column and steel , how it made and make a formwork of it .

3- Making of retaining wall

We make retaining wall because the level floor under street level , its have a 2 direction and doubly steel .

4- Structural parts be ready

The all of building become ready slabs . beams , column , footing , and walls

10

5- Finishing of construction

The finishing the building by making the walls and column and ceiling be soft by put cement and mortar.

11