Test Specification(Panel)

A. READ -- read data input key B. TEST -- Test key C. DUMP -- the keys for looking date D.LIST -- the list control key E.ISOL -- insulation set key F.L.C.D -- the screen font 20x 2 G.POWER -- the power indicator light H.PASS -- test correctly indicating lamp I.FAIL -- test error indicating lamp J.INIT--this indicator is the use of function expansion reserve K.SGLE

2.Back panel

A. PRINTER OUTPUT --- list-machine interface socket B. Vents C. VOLUME --- volume adjustment button D. PIN FIND --- to find the point jack E. The FUSE 1A --- fuse F. The ON / OFF --- Power Switch G. AC 220V --- power outlet

3 Double-headed test
A.Turn on the power display SELF TEST PASSED soon ,Its means that the normal function is good..Take a standard cable into the left and right sides of the fixture, doubleclick the secondary "READ" key According to the first subtitle RD ST LC RC HR 64P 64P 100K B,Take a sample into the fixture.Such as like follow: Note: If the standard line for measuring the D-TYPE 26Pin on the D-TYPE 26Pin wire, then the machine microcomputer read the information of the standard line, subtitles show:

1. L01 + R01 represents the number of wire connection. 002:026mesns This cable has 26 wires and this cable is the Double-head. 2. Push the Data show keys (DUMP) than to check the date which the machine

learned is right or not.. 3. If the date is right.Press the test button (TEST) to enter the automatic continuous scan test ,the subtitle display OK. And two sound and green LED (PASS) . 5 Button (ISOL), the insulation values set depending on the quality requirements of the wire insulation resistance. (1K.100K.200K.500K.1M.2M.5M) 6.This machine has entered the state of the automatic test, no longer operate any buttons, just to test wire plug in to.the fixture. 7. Whenever the test, if the wire is good, the screen will appear OK, and accompanied by trumpets sound, its green light is illuminated. Such test to any wire is defective, there are shortcomings,For example: the misallocation of open circuit, short circuit, poor insulation (leakage). FAIL Red LED lights, and horn rapid intermittent chirping, and the screen immediately displays the fault location points.

4.Single-head test.
1.Turn on the power supply, The measured subtitle display SELF TEST PASSED so, that means the machine as ok. 2. Take the fixture into the left Then push the READ key twice, wait about 2 seconds, until the LCD display :PLUG IN LEFT 3.take the standard line, plug in the fixture to the left, press the READ key, about two seconds, the LCD can read the standard information as follow displayed: (If your sample is the 7 wires.) L1 L2 L3 L4 L5 L6 L7

For example: test 7 wire screen display 4. Such as test wire contact of more than 8:wires,We should push the key DUMP (data looking for points) will show the other points, and so on. 5. Then push the TEST key, which automatically scans the test status, such as good screen will display OK. 6.This machine has entered the state of the automatic test, no longer operate any buttons, just to test wire plug in to.the fixture.

5.The error information


1. L01 + R02 This point of the L01 and R01 short circuit on the right side. 2. OL03-R03 Circuit in the test line of the defective products, L03 and R03 on the left side in OL03 0 for the open direction, that is the location. 3. L04 OR04

Circuit in the test line of the defective products L04 and OR04,OR04 means as follows: The line has opened at the point 4 on the right.. 5 L05 I L06 Bad product test line L05 and R06 insulation (leakage) Note: The "+" ---- short-circuit The "-" ---- open Circuit "O" ---- circuit direction position (indicating the point of open, and instructed the off position) "I" ---- bad insulation (leakage) "L" ---- the left "R" ---- the right

128-d CABLE TESTER simple instructions