Cost
(millions)
29.08 29 08 15.59 2.86 15.92 3.71 9.19 3.36 2.04 0.30 4.36 86.41
Station Improvements p
Project Fullerton Parking Structure (810) Orange Parking Structure (800) Tustin Parking Structure (825) Laguna Niguel/Mission Viejo (LN/MV) Station Amenities and Parking Lots (500) Fullerton Video Surveillance System (VSS) Santa Ana VSS Tustin VSS Tustin Pedestrian Walkway TOTAL Schedule 2009 2010 2011 2012 2013 Notes $ $ $ $ $ $ $ $ $ Cost
(millions)
Fullerton Parking Stucture Tustin Pedestrian Walkway Orange Parking Structure Tustin Parking Structure LN/MV Station/Parking Improvements Fullerton VSS Santa Ana VSS Tustin VSS
City lead design/build contract - IFB issued in May 2010 Completion date May 2010 City lead RFP for design issued June 2010 IFB issued June 2010 - NTP expected in Sept. MOU approved by Board in September 2009 City lead design/build contract RFP expected June 2010 Design/build g contract RFP issued May y 2010 Design/build contract RFP expected June 2010
Cost
(millions)
$ $ $ $ $ $ $ $ $
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Current Status
Environmental Clearance Initiated with the City as Lead Agency Architectural & Engineering g g Underway y ARTIC and California High-Speed Train Project Teams Coordinating Design Efforts to Ensure Seamless Integration of Both Projects Next Major Milestone: Notice of Intent/Notice of Preparation
Schedule
Right-of-Way
Construction
Env Clear Final Design Construction
Anaheim Fixed-Guideway
Facilities Engineering g g
Project Ana GG Ana, GG, SA Bases - Workers Fall Protection Ana, GG, Irv SC Bases - Steam Clean Area Vehicle Lifts Ana, GG, Irv CC, Irvine SC Bases - Security Upgrades PEROW - Drainage Improvements Ana, GG, Irv SC Bases - Elevator Upgrades A Ana B Base - P Pavement R Reconstruction i Irv SC Base - Workers Fall Protection Irv SC Base - Bus Wash Building Modifications Ana, GG, Irv SC, SA Bases - EVR Phase II Upgrades TOTAL RFP OCTA Facility Legend: Ana GG Irv CC Irv SC SA GWTC PEROW Anaheim Bus Base Garden Grove Bus Base Irvine Construction Circle Bus Base Irvine Sand Canyon Bus Base Santa Ana Bus Base Golden West Transportation Center Pacific Electric Right-of-Way Preliminary Design $ $ $ $ $ $ $ $ $ $ Cost (millions) 0 70 0.70 0.70 1.50 0.40 0.40 0 07 0.07 0.05 0.25 0.13 4.20 Final Design Construction 2009 Schedule 2010 2011