SEKUR HOLDINGS INC. Date of Issuance : JUNE 2003 Revision No. :0 Chapter No.

: 10

SQ&E Management System Manual Issued by : SQM Approved by : Managing Director Ch. 10 Form No. MAR 1

SUMMARY OF DECK EQUIPMENT INSPECTION AND MAINTENANCE VESSEL: BLIDA Report No. 02/09 Inspection was carried out by: Ch/Officer During the inspection which was carried out by the undersigned following results were recorded: HULL Is the paint coating in good condition? 1. Main Deck 2. Forecastle 3. Accommodation Decks 4. External Hull 5. Hatch Coming 6. Hatch Covers BALLAST TANKS

DATE OF INSPECTION: 31.05.2009

PORT: SEA

Yes

No

Rust % 55 20 10 10 15 10

If feasible, examine superficially one or two ballast tanks and report on:
Yes No

1. Is the paint coating complete? 2. Approximate Coating Breakdown : 90% 3. Approximate wastage of anodes : 30% 4. Is there any distortion in primary structural members? (If yes give details below)
5.

Condition of Cleanliness :

6. The Condition of the steelworks is :

Clean Water Residues Light Sludge Heavy Sludge Good free from rusting Light loose rusting Rusted Heavy Rusted

7. State which tanks examined : TST # 1,2, 3,4, 5


8. List Defects with Ballast Tanks :

Page 1

SEKUR HOLDINGS INC. Date of Issuance : JUNE 2003 Revision No. :0 Chapter No. : 10

SQ&E Management System Manual Issued by : SQM Approved by : Managing Director Ch. 10 Form No. MAR 1

CARGO HATCH COVERS & COAMINGS All cargo hatch covers and coamings to be superficially examined and report on:
Yes No

1. 2. 3. 4. 5. 6.

Name and type of Hatch Covers - Mc. Gregor with pulling wire Are pressure surfaces straight and free from distortion / damage? Are wedges and QAC complete, without damage? Is Rubber packing in good condition and without damage? Is there any indication that covers are leaking? Are hatch coaming support brackets, tripping brackets carriers, battens, lashings, gaskets, dogs in good condition? 7. Date of last hose test and by whom it was carried out - Jan. 2008 by BV 8. List damages and deficiencies and recommended actions to be taken by crew / subcontractors

EXAMINATION OF CARGO HOLDS Total Number of Holds : 5 Is the general condition of the holds : Number of Holds Examined : 5

Excellent Fair Bad Very Bad Is the paint coating of the holds : Complete Partially Broken Down Completely Broken Down Is the holds overall Structure including frames, brackets, web frames in Good condition With corrosion problems With stevedore damages Yes No

If topside tanks are fitted is there any indication that they are not in good condition?

Is there any evidence of leakage from the topside tanks? The hold bilge wells were examined and found Clean & Dry Dirty with residues / water

Page 2

SEKUR HOLDINGS INC. Date of Issuance : JUNE 2003 Revision No. :0 Chapter No. : 10

SQ&E Management System Manual Issued by : SQM Approved by : Managing Director Ch. 10 Form No. MAR 1

Is there any sign of existence of insects and rats? The condition of the Twin Deck Hatch Covers is N/A Very Good Good Fair Bad

Is the Hold bilge system functioning properly? List deficiencies of each hold H/1 DBT top deck rusty 45%, H/2 50%, H/3 50%, H/4 60%, H/5 60%

CLOSING APPLIANCES, AIR AND SOUNDING PIPES


Yes No

Are watertight covers and doors well maintained with gaskets in good condition? Are air pipe headers and sounding pipe caps free from damage? List defects with air pipe headers, access hatch lids, watertight doors, and steps to be taken by crew to correct any deficiency. Some sounding pipes closed with plastic plugs, instead of brass plugs

CARGO GEAR (CRANES / DERRICKS) All cargo gear to be superficially examined and report on: Are all cranes / derricks in good working condition ? Are all cranes / derricks well maintained and painted? Are all cranes / derricks riggings in good condition? Are crane cabins in good condition and watertight? Are crane machinery spaces clean and dry? List Deficiencies observed and counter action required : Yes No

Page 3

SEKUR HOLDINGS INC. Date of Issuance : JUNE 2003 Revision No. :0 Chapter No. : 10

SQ&E Management System Manual Issued by : SQM Approved by : Managing Director Ch. 10 Form No. MAR 1

All Cranes have breakdown during cargo operation Crane N2 maximum weight lifting 8 MT

WINDLASS / ANCHORS / CHAINS / MOORING WINCHES / CAPSTANS Yes Is all above-mentioned equipment in good working order and condition? List Deficiencies observed and counter action required : Nil No

NEKHOUL
----------------------------------------------Signature of responsible Officer ----------------------------------MASTER