Purpose In cases of new customer, product SKU, or location will exists, new CVCs should be created. This report will support Demand Planner to check whether new CVC has been maintained correctly or not. This simulation will show you the basic steps to generate a CVC check report for Planning Area 1. Trigger Perform this procedure when you need to check CVC report for planning area 1. Menu Path Use the following Business Explorer Application menu path(s) to begin this procedure: Open > Queries > U2AA INFO AREA > U2AA DP INFO AREA > U2AA DP REMOTE CUBES > DP PA U2AADPPA01 > CVC Check Report For Planning Area 1.
1/14
Work Instruction
Screen Flow
2/14
Work Instruction
Procedure 1. Start the procedure using the Business Explorer Application menu path.. Microsoft Excel
. .
3/14
Work Instruction
5. Double-click the U2AA INFO AREA node 6. Double-click the U2AA DP INFO AREA node 7. Double-click the U2AA DP REMOTE CUBES node . 8. Double-click the DP PA U2AADPPA01 node
Thursday, July 16, 2009 APO_APO.BEX_ID_CVC Check Report for Planning Area 1_JPN.udc
.
4/14
Work Instruction
5/14
Work Instruction
10 Click the Sales Org (*) operand drop-down list . 11 Click the "=" list item . . .
6/14
Work Instruction
R/O/C Description
7/14
Work Instruction
14 Click the Week Range (*) operand drop-down list . 15 Click the "=" list item . . .
17 As required, complete/review the following fields: . Range of R/O/C dates that restricts the condition in rolling running rate report. Field Example: 1.2008 R Week Range (*) 18 Click the Week Range (*) To edit field . . Description
19 As required, complete/review the following fields: . Ending R/O/C date when specifying a week range.We
Thursday, July 16, 2009
Description
8/14
Work Instruction
ek range is the range of dates that restricts the condition in rolling running rate report. Field Example: 12.2008 R Week Range (*) To
9/14
Work Instruction
10/14
Work Instruction
11/14
Work Instruction
12/14
Work Instruction
13/14
Work Instruction
Scenario Instructions In this simulation you are required to: Run CVC Check Report for Planning Area 1 in SAP SCM 5.00. Required Data This section provides the field data required to complete this exercise. Refer to this data sheet as necessary while performing the exercise. 12.2008 1.2008 Field Week Range To Week Range 9001 Sales Org Value