QUALITY ASSURANCE PLAN FOR FLUE DUCT GAS PIPING FOR CHIMNEY
R A C TE R ST
S l . N o .
C S
C H A
CL A
SS IF
COMPONENT/ POINTS
ICA AS TION S /
A TI
CL
Agency
CLASS OF CHECKS
TYPE OF RECORD
Witness Sort
Contractor
Supplier (NWPC)
REMARKS
1.0
RAW MATERIAL
Raw Material Inspection(For IS 2062 E 250 BR, IS 2062 E 350 BR) Identification Dimension Chemical composition & Mechanical properties Chemical composition & Mechanical properties Identification Major (B) Major (B) Visual, Measurement 100% Inward Reciept Report MTC W P I R I
1.1
1.2
Verification of MTC
Randomly
The material confirms to the specified dimensions and tolerances as per IS : 1852
MTC-Mill Test Certificate if available/required TC-Test Cerificate/ Batch Certificates.If required TC-Test Cerificate/ Batch Certificates.If required
1.3
Welding consumable
100%
As per AWS Classification/Refer ASME Sec II Part C Applicable paint specifications as in painting scheme & Manufacturer Data Sheet
1.4
Paints
100%
2.0
INPROCESS CONTROL
Welding Procedure Specification(WPS) Welder/Machine Performance Qualification Qualification of Welding Procedure Specification Qualification Of Welder/Machine Performance Major (B) Major (B) Verification Each & Every Procedure Each Welder/ Machine ASME Section IX(See QW 200.1 ) WPS W P R P R
2.1
2.2
Verification
WQT
INSPECTION CODE "A" "B" "C" Criticial Major Minor "P" "R" "I" Perform Review Random Inspection "W" "H" Witness Client Hold Point
AXON CONSTRUCTIONS PVT. LTD. Project : RKM Powergen Pvt. Ltd.(Coal Fired 4x360 MW,Thermal Power Project, Uchhapinda,Chhattisgarh)
QUALITY ASSURANCE PLAN FOR FLUE DUCT GAS PIPING FOR CHIMNEY
C S
SS IFI C CL AT AS ION S /
Agency
CLASS OF CHECKS QUANTUM OF CHECK REFERENCE ACCEPTANCE TYPE OF DOCUMENT CRITERIA RECORD
TPI (TCE/ SGS) Customer/ Client (RKM/ AXON)
R A C TE R ST
Sl.No.
COMPONENT/ POINTS
A TI
C H A
2.3
Pre-Welding Opereation
CL A
Witness Sort
Contractor
Supplier (NWPC)
REMARKS
Major (B)
Visual,Template, Measurement
100%
2.4
Dye Penetration
Weld Quality
Major (A)
Visual(By DP Kit)
100%
Batch Certificate
3.0
REPAIR WELDING
3.1
Weld Repair
Critical (A)
INSPECTION CODE "A" "B" "C" Criticial Major Minor "P" "R" "I" Perform Review Random Inspection "W" "H" Witness Client Hold Point
AXON CONSTRUCTIONS PVT. LTD. Project : RKM Powergen Pvt. Ltd.(Coal Fired 4x360 MW,Thermal Power Project, Uchhapinda,Chhattisgarh)
QUALITY ASSURANCE PLAN FOR FLUE DUCT GAS PIPING FOR CHIMNEY
C S
Agency
R A C TE R ST
C H A
CL A
SS IF
Sl.No.
COMPONENT/ POINTS
IC Cla ATIO ss N/
A TI
CLASS OF CHECKS
QUANTUM OF CHECK
Witness Sort
Contractor
Supplier (NWPC)
REMARKS
3.2
Confirmance to Requirements
Major (B)
100%
4.0
PAINTING
Surface Preparation by Power Tool Cleaning by Sand Blasting Degree of Cleanliness Major (B) Visual 100% Free from all dust,oil,grease,rust,scale, weld slag,flux deposit,foreign particles etc/As per SA 2.5 Specifications Applicable Painting Scheme/As per Standard Tech. Spec.(Confirming to IS 12944 5 & IS 19840) and Drawings. Applicable Painting Scheme/As per Standard Tech. Spec.(Confirming to IS 12944 5 & IS 19840) and Drawings Internal Record Register/ Protocol Internal Record Register/ Protocol Internal Record Register/ Protocol H P I R I
4.1
4.2
Application of PRIMER-(Inorganic Zinc Primer) Application of Under Coat-Epoxy RedLead Anti Corrosive Paint)
Major (B)
100%
4.3
Major (B)
100%
INSPECTION CODE "A" "B" "C" Criticial Major Minor "P" "R" "I" Perform Review Random Inspection "W" "H" Witness Client Hold Point
AXON CONSTRUCTIONS PVT. LTD. Project : RKM Powergen Pvt. Ltd.(Coal Fired 4x360 MW,Thermal Power Project, Uchhapinda,Chhattisgarh)
QUALITY ASSURANCE PLAN FOR FLUE DUCT GAS PIPING FOR CHIMNEY
C S
Agency
IC Cla ATIO ss N/
R A C TE R ST
SS IF
Sl.No.
COMPONENT/ POINTS
A TI
CLASS OF CHECKS
QUANTUM OF CHECK
C H A
CL A
Witness Sort
Contractor
Supplier (NWPC)
REMARKS
4.4
Major (B)
100%
Applicable Painting Scheme/As per Standard Tech. Spec.(Confirming to IS 12944 5 & IS 19840) and Drawings
4.5
Major (B)
100%
Applicable Painting Scheme/As per Standard Tech. Spec.(Confirming to IS 12944 5 & IS 19840) and Drawings
4.6
Major (B)
100%
Applicable Painting Scheme/As per Standard Tech. Spec.(Confirming to IS 12944 5 & IS 19840) and Drawings
*2 Coat -50M
INSPECTION CODE "A" "B" "C" Criticial Major Minor "P" "R" "I" Perform Review Random Inspection "W" "H" Witness Client Hold Point
AXON CONSTRUCTIONS PVT. LTD. Project : RKM Powergen Pvt. Ltd.(Coal Fired 4x360 MW,Thermal Power Project, Uchhapinda,Chhattisgarh)
QUALITY ASSURANCE PLAN FOR FLUE DUCT GAS PIPING FOR CHIMNEY
C S R A C TE R ST
COMPONENT/ POINTS
ICA T ss ION/
A TI
Cla
Agency
Sl.No.
C H A
CL A
SS IF
CLASS OF CHECKS
Witness Sort
Contractor
Supplier (NWPC)
REMARKS
5.0
FINAL INSPECTION
Marking & Identification Hard Stamping/ Nomenclature By Paint Major (B) Visual 100% Each Shell shall be Marked as Per Drg. Or As Specified by Client Internal Record Register/ Record Internal Record Register/ Protocol/ All Final Documentation W P R R I
5.1
5.2
Confirmance of Requirements
Critical (A)
Visual
100%
5.3
Documentation
Critical (A)
Review
100%
Protocol
Required for each and every Protocol for verification should be submitted