SUMMARY OF WORK SKILLS Capable of creating cable routing drawings for H.V.

cables and associated ladders, tray work and brackets from design stage to construction throughout to as built stages. Drawing and amending schematic, electric and mechanical drawings using AutoCAD LT, 2002 and Microstation. Creating and drawing electrical schematic diagrams from existing pumping station and water treatment works, external lighting, floodlighting, internal lighting, MCCs , small power, fire alarms, access control and LV switch rooms Supervising the safe and correct installation of electrical L.V. power, lighting, data, and fire circuits within various construction projects, water industry, petro-chemical plants and power plants. Responsible for the carrying out and writing reports on the condition of electrical systems utilising Thermograph equipment. Liasing with management and clients on the progress of works within the workshop. General day to day office administration (time sheets, product quotes and purchase orders). Co-ordinating of deliveries on site materials, machinery and allocation of labour force as well as quality assurance. Testing and inspecting circuits, switchboards, MCC, rotating machines and transformers. Produced and issued MTOs, purchase orders etc Compiling reports on various types and sizes of rotating machines. Co-ordinating and implementing the companys ISO 9000 requirements within the electrical workshop and office. EMPLOYMENT HISTORY Duties Design of electrical systems for new Cabmi Thermal Hydrolysis system for Anglian Water at Cotton Valley and Whitlingham Wastewater treatment work. These works include:- up-grading the existing 11kV ring main, and main electrical switchgear. - the installation of 2x1000kVA transformers for the new Thermal Hydrolysis MCC and new 2500kVA step-up transformer for new 1.75MVA CHP. - the modification of existing MCCs with new starters, feeders, modification to PLC software, HMI and associated Instrument. - writing electrical specifications, control philosophy, motor schedule, feeder schedules, motorized valve schedules, instrument schedules, cable schedules, electrical drawings. Technical review of contractors quotes, drawings, FSD, liasing with site on electrical design. KBR May 2005-Oct 2006 Design of electrical systems on site for Aspire defence project at Aldershot, working as part of MEP design team on various Ministry of defence site including Tidworth, Perham Down and Bulford. Writing electrical scope of works cable schedules, electrical drawings, lighting calculations, building regulation calculations and electrical calculations using Hevacomp for various building types. The building ranged from officers mess, pubs, and fitness suites. From concept design, schematic and detail design. Working with an in-house design team including architects, structure engineers, utility engineers and landscape architects. JACOBS ENGINEERING March 2004 May 2005 Electrical Engineer

Duties Design of electrical systems on site for Eli Lilly Pharmaceuticals at Basingstoke, Including writing Basis of design, electrical scope of works, man-hours estimates, deliverables, cable schedules, electrical drawings and electrical calculations using Amtech for various projects on site. These project range from refurbishment of existing buildings to installation of new building services for office and installation of new plant equipment and Pharmaceutical production equipment. From concept design, schematic, detail design, construction and commissioning stages. SOUTHAMPTON CITY COUNCIL December 2002 Feb 2004 Electrical Design Engineer

Duties Design of electrical systems for education department for Southampton city council, Including preliminaries, tender and construction drawings. Lighting design calculations and cable cables using Hevacomp 19 and Amtech 2003, Writing preliminaries, specification and CDM . Project management of several refurbishment of schools during summer holidays. SNAMPROGETTI June 2000 July 2000 Design Electrical Engineer

Duties Review and checking design of trace heating on Karachaganak project, Producing and issuing MTOs for Karachaganak project. BP (via HOARE LEA & Ptnrs) Jan 2000 - June 2000 Electrical Engineer

Duties Working within BP Sunbury Redevelopment design team on electrical design for BP Head offiice at Sunbury. MOTT MACDONALD April 1999 - Dec 2000 Lighting Engineer

Duties To write reports on the condition of street lighting for the highways agency on various routes within the area 3 (south east England major routes).including lighting calculations and cable calculations for these reports. BALFOUR KIRPATRIK Nov 1998 - April 1999 Electrical Design Draughter

Duties Working with Amec design team and other mechanical companies to design and create construction drawing for a new R&D facility for Pizer at Sandwich in Kent , working on 3D model to create 2D working Drawings. EME Jan 1998 - Oct 1998 Electrical Supervisor

Duties Working within the Caribbean basin supervising the installation of electrical systems in new hotels including Atlantis Bahamas and Sandy lane hotel in Barbados. Ordering and receiving materials from USA and dealing with local customs. Checking construction drawings and issuing working instruction to local foremen. PIRELLI CONSTRUCTION LTD May 1997 - Jan 1998 Electrical Draughter

Duties To create and amend electrical/mechanical drawings using mircostation drawing package and CAD/CAM database management systems for the jubilee line extension project, Showing H.V. cable routes and associated ladders, tray works and brackets from design stage to construction through to as builts. SOUTHERN WATER August 1996 to March 1997 AutoCAD Technician

Duties To create and draw electrical schematic diagrams from existing pumping station and water treatment works, within the Southern Water Hampshire area using Auto-Cad 13 and LT. This part of the works package relates to the distribution and the installation of the system as required by the current regulations. ABB INDUSTRIAL AND BUILDING SYSTEMS LTD

Sept. 1994 - July 1996 Electrical Service Technician Duties Carrying out Thermograph inspections and compiling reports on the condition of Electrical systems on various buildings and installations throughout Hong Kong. Preparing electrical service department for IS 9002s accreditation awarded in November 1995. Reporting to management and clients on the condition and progress of rotating machines in the workshop and in main land China. Amending schematic drawings using AutoCad 11 for submission to the electrical and mechanic services department. Final inspection and commissioning of Conghau power plant and variable speed drive for a fresh water pumping system in times square. Quality assurance within the workshop and on site. RANGE ELECTRICS Sept. 1993 to June 1994 Supervisor

Duties Supervision of refurbishment of lighting system within Associated British Ports (ABP), Quayside lighting and research facility , Southampton. M F KENT May 1992 to Sept 1993 Electrician/foreman

Duties Supervising the installation of control and power systems within an ethylene cracker plant, Quality assurance and inspecting and testing electrical equipments. DEESIDE AUTOMATION March 1991 to May 1992 Approved Electrician

Duties Installation and commissioning of automatic lift drop on main production line. ALLISION SITE SERVICES Feb. 1990 to March 1991 Site Electrician

Duties Installation and testing of site electrics in and around London and the home counties. G G STRONG Jan 1984 to Feb. 1990 Apprentice Electrician

Duties Assisting electrician with domestic, commercial and industrial installation as well as attending college and skill training centre.