Sie sind auf Seite 1von 49

Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.

10m )
1,0 INTRODUCTIOON
This documenf presenfs Design of bo druin,
Druin is busicuIIy u RCC bo structure with cIeur size of opening us { ,0m 3,1m },
Top sIob of droin is proposed fo be pIoced b00mm obove nofuroI ground surfoce.
Free bourd of 00mm is to be muintuined,
Cross secfion of box is shown beIow.
o is unuIysed und designed for 1m wide strip uIong Iength of bo,
Loods Considered os per IPC:o-Z000 ore -
(o) Deod Ioods - SeIf weighf of box
(b) Superimposed Iood - Weighf of weoring coof on fop sIob.
(c) Eorfh Pressure incIuding hor;. Pressure due fo Iive Iood surchorge
(d) VehicuIor Iive Iood wifh impocf - CIoss " A ", CIoss " 8 "
Codes foIIowed ore -
(o) IPC:o-Z000 for Ioods
(b) IPC:ZI-Z000 for design
Hounch of [ 300 Hor;. x 300 Verf. ]
400
00
000
400 400 390
3100 Z00
0.00 0 0
0.L. 0.L.
0.00
40
0 00 0
00
Figure : Cross SectionuI Dimensions of o Druin
DESISN OF OX DRAIN { m 3,1m }
FMD.
LVL
Shah Technical Consultants Page 1 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Z,0 DATA
{u} MuteriuIs PermissibIe Stresses & Design constunts :
0rode of Concrefe ~ M 30
Densify of concrefe ~ Z.4 f/m
3
PermissibIe fIexuroI compressive sfress in concrefe,
cbc
~ I00.00 Ig/cm
Z
0rode of Peinforcing sfeeI ~ Fe b00
PermissibIe fensiIe sfress for fIexure,
sf
~ Z400 Ig/cm
Z
PermissibIe fensiIe sfress for sheor ~ Z000 Ig/cm
Z
Weoring coof -
Densify of weoring coof ~ Z.Z f/m
3
Thk. of weoring coof on fop sIob incIuding fufure overIoy ~ IIb mm
Design Consfonfs -
ModuIor rofio ~ I0
MeufroI oxis consfonf, n : {1 / [1+(
st
/ m.
cbc
)]} = 0.294
Lever orm consfonf : j = [ 1- ( n/3 ) ] = 0.902
Momenf of resisfonce consfonf : Q = ( n x j x
cbc
/ 2 ) = 13.264
{b} Properties of uckfiII SoiI :
Sofurofed Densify of soiI,
sof
~ Z.00 f/m
3
AngIe of repose, ~ 30 Degree
Coefficienf of Af-Pesf eorfh pressure ~ 0.b0
{c} Thk, Of eurth cushion on bo ~ 0,00 m
{d} Properties of Founding Strutu :
Mox. permissibIe sofe beoring copocify ~ I0.00 f/sqm
ModuIus of subgrude reuction ksf ~ Z000 f/cu.m.
os per book " Foundofion onoIysis ond design " by J.E.8oweIs
Shah Technical Consultants Page 2 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
3,0 METHOD OF ANALYSIS
Louds ure cuIcuIuted und bo is unuIysed for 1m wide strip uIong Iength of bo,
AnoIysis is done using soffwore " STAAD ".
For onoIysis purpose, box is modeIIed oIong cenfre Iines of fop, boffom sIob ond woIIs.
Spring fype supporfs ore odopfed which ore oppIied of vorious nodes oIong boffom sIob. Sfiffnesses of
spring supoorfs ore coIcuIofed bosed on moduIus of subgrode reocfion menfioned in fhe book " Foundofion
onoIysis ond design " by J.E.8oweIs.
IdeoIised STAAD geomerfy of box wifh Mode numbers, is shown beIow.
Node No,
Member numbers ond fheir Iengfhs ore fobuIofed on foIIowing poges.
Weighf of box is considered in fhe form of commond " SeIfweighf ". Eorfh pressure is oppIied os
" Trope;oidoI Iood " whiIe ofher Ioods such os superimposed deod Iood, vehicuIor Iood ore
oppIied in fhe form of " UniformoIy disfribufed Ioods ".
STAAD Inpuf ( incIuding vorious Iood combinofions ) ond AnoIysis oufpuf i.e moximum force enveIope
ore given in Appendix.
Figure : STAAD Discretisution of OX Seometry
2 3 4 5 6 7 8
10
9 11 12
1 13
14
15
16
17
18
19
21
22
23
24
25
26
29 30 31 32 33 34 35 36 37 38 39 40 41
Shah Technical Consultants Page 3 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
STAAD Members & fheir Lengfhs :
Mem. Mo. Pemork From Mode To Mode Lengfh Mem. Mo. Pemork From Mode To Mode Lengfh
I I Z Z00 Z9 Z9 30 Z00
Z Z 3 b00 30 30 3I b00
3 3 4 87b 3I 3I 3Z 87b
4 4 b 87b 3Z 3Z 33 87b
b b o 87b 33 33 34 87b
o o 7 87b 34 34 3b 87b
7 7 8 87b 3b 3b 3o 87b
8 8 9 87b 3o 3o 37 87b
9 9 I0 87b 37 37 38 87b
I0 I0 II 87b 38 38 39 87b
II II IZ b00 39 39 40 b00
IZ IZ I3 Z00 40 40 4I Z00
I3 I I4 Z00 4Z I3 ZI Z00
I4 I4 Ib oZ0 ZI ZI ZZ bZ0
Ib Ib Io oZ0 ZZ ZZ Z3 bZ0
Io Io I7 oZ0 Z3 Z3 Z4 bZ0
I7 I7 I8 oZ0 Z4 Z4 Zb bZ0
I8 I8 I9 oZ0 Zb Zb Zo bZ0
43 I9 Z9 ZZb 44 Zo 4I ZZb
CoIcuIofion of Spring Sfiffness :
ModuIus of subgrode reocfion, ksf x
( HoIf fhe disfonce befween odjocenf spring ond spring under considerofion )
Z000 f/cu.m.
Spring
sfiffness
(f/m)
IZ9, I4I~ Z00/Z000^Z000 Z00
I30, I40~ ((b00+Z00)/Z000^Z000) 700
I3I, I39~ ((b00+87b)/Z000^Z000) I37b
I3Z fo I38 ~ I7b0
4,0 LOADS
seIf weighf of fop sIob ~ (0.4^Z.4) ~ 0.9o0 f/sq.m.
seIf weighf of boffom sIob ~ (0.4b^Z.4) ~ I.080 f/sq.m.
seIf weighf of singIe woII ~ 3.I x 0.4 x Z.4 ~ Z.98 fonne
In STAAD, weighf of box is oppIied os SeIfweighf.
{b} SIDL :
Weighf of weoring coof on fop sIob ~ 0.IIb x Z.Z ~ 0.Zb3 f/sq.m.
In STAAD, weighf of weoring coof is oppIied os uniformIy disfribufed Iood on fop sIob members.
Spring sfiffness of supporf ~
Isf ~
Top SIob
WoII
8offom
SIob
WoII
{u} Weight of o :
Shah Technical Consultants Page 4 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Coefficienf of Af-resf eorfh pressure, Io ~ 0.b00
Heighf of equivoIenf eorfh fiII corresponding fo Iive Iood surchorge ~ I.Z0 m
CuIcuIution of HorizontuI force on WuII due to Eurth Pressure
CrificoI Iooding condifion wiII be fhe sifuofion when box wiII be subjecfed fo eorfh pressure due
fo sofurofed bockfiII ond fhere wiII be no wofer inside box.
EPI ~
0.Z00
3.bZb
EPZ ~ EP3 ~
3.7Zb I.Z00
EPI ond EP3 ore due fo bockfiII ond EPZ is due fo Iive Iood surchorge.
EPI ~ 0.b00 x Z.000 x 0.Z ~ 0.Z00 f/sq.m.
EPZ ~ 0.b00 x Z.000 x 3.7Zb ~ 3.7Zb f/sq.m.
EPZ ~ 0.b00 x Z.000 x I.Z0 ~ I.Z00 f/sq.m.
MODES
0I,I3 I.400 f/sq.m
I4,ZI I.o00 f/sq.m
Ib,ZZ Z.ZZ0 f/sq.m
Io,Z3 Z.840 f/sq.m
I7,Z4 3.4o0 f/sq.m
I8,Zb 4.080 f/sq.m
I9,Zo 4.700 f/sq.m
Z9,4I 4.9Zb f/sq.m
In STAAD, Eorfh pressure is oppIied on woII members os Trope;oidoI Ioods.
{c} HorizontuI Eurth Pressure :
TOTAL PPESSUPE IMTEMSITY
DUE TO EAPTH PPESSUPE
Shah Technical Consultants Page 5 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
VehicIes considered ore - CIoss " A", " 8 "
Impocf focfor os per cIouse ZII.Z (b) of IPC:o-Z000 -
Impocf focfor ~ 4.b / ( o + L ) , L ~ 8.40 m
Impocf focfor ~ I.3I3
NOTE -VehicIes ore pIoced of Iocofions so os fo ochieve - ( i ) Mox. spon momenf &
( ii ) Mox. sheor force neor supporf
Infensify of design Iive Iood ~ [ ( Impocf focfor x AxIe Iood/s ) / ( Effecfive widfh x Dispersion widfh ) ]
Effecfive widfh of eoch wheeI Iood is coIcuIofed os per cIouse 30b.Io.Z of IPC:ZI-Z000
If wiII be oIong froffic direcfion.
Effecfive Widfh , b
eff
is given by
b
eff ~ { o. . [ 1- ( a / lo ) ] } + b1
o ~ Disf.of c.g of concenfrofed Iood from neorer supporf
~ Z.o
b
1
~ 8reodfh of concenfrofion oreo of fhe Iood
~ Tyre dimension over confocf oreo perpendicuIor fo spon + ( Z x Thk. Of surfoce finish )
NOTE - Design sfrip ( one mefer oIong Iengfh of box ) is considered of enfry / exif of box so fhof effecfive
widfh of wheeI Iood wiII be resfricfed ond Iive Iood infensify wiII increose.
Dispersion widfh -
Dispersion widfh in fronsverse direcfion os per IPC:ZI-Z000, CIouse 30b.Io.3
b
ds
~ Tyre dimension poroIIeI fo spon + (Z x Thk. of sIob incIusive of surfoce finish )
{ I } CIuss " A "
AxIe Iood Confocf Areo os per IPC:o
Dimension poroIIeI Dimension perpendicuIor
fo movemenf " 8 " (m) fo movemenf " W " (m)
II.4T 0.Zb 0.b
o.8T 0.Z 0.38
Z.7T 0.Ib 0.Z
Cose ( A ) : Lood pIoced neor Midspon for Mox. Spon Momenf
{d} VehicuIur Live Loud :
Shah Technical Consultants Page 6 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Truffic Direction
C/L of Spun
0.40 3.Z00 0.o0 0.o0
3.o 3.o
Effecfive Spon ~ Io = ,400
" bI " for Z.7 T oxIe ~ 0.Z + ( Z x 0.IIb ) ~ 0.43 m
Dimension of fyre Thk. of weoring coof
perpendicuIor fo spon
" bI " for II.4T oxIe ~ 0.b + ( Z x 0.IIb ) ~ 0.73 m
Dimension of fyre Thk. of weoring coof
perpendicuIor fo spon
Pesfricfion fo effecfive widfh ~ Disfonce befween exfreme edge of box ond cenfre of oufer wheeI posifioned
fowords edge of box , in o direcfion perpendicuIor fo spon
~ 0.b + 0.40
Pesfricfion fo effecfive widfh ~ 0.90 m
Disfonce befween cenfres of wheeIs of on oxIe ~ I.80 m ( PerpendicuIor fo spon )
Mef effecfive widfh :
(I) If effecfive widfh for singIe wheeI of on oxIe under considerofion is < Disfonce befween cenfres of
wheeIs of some oxIe fhen -
TofoI effecfive widfh ~ Min. of [ Pesfricfion fo effecfive widfh + ( beff /Z ) ] & beff
(Z) If effecfive widfh for singIe wheeI of on oxIe under considerofion is > Disfonce befween cenfres of
wheeIs of some oxIe fhen -
TofoI effecfive widfh ~ Pesfricfion fo effecfive widfh + [ I.80 + ( beff /Z ) ]
AxIe WheeI Disfonce bI Mef Lood per Dispersion widfh
mork Lood from " beff " mefer poroIIeI fo spon for
supporf singIe wheeI, " bds "
( f ) o (m) (m) (m) (m) ( f/m ) (m)
AZ I.3b 0.40 0.43 I.4Z0 0.9b0
I.8 m
A3 b.7 3.o0 0.73 b.739 I.98o
I.8 m
A4 b.7 3.o0 0.73 b.739 I.98o
I.8 m
I.I80
beff
I.4Z0
o.079
o.079
I.Z80
I.Z80
A4
11.4 T
A3
11.4 T
A2
2.7 T
Shah Technical Consultants Page 7 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Lood per mefer , given in obove fobIe :
(I) If effecfive widfh for singIe wheeI of on oxIe under considerofion is < Disfonce befween cenfres of
wheeIs of some oxIe fhen -
Lood per mefer ~ SingIe wheeI Iood / Mef " beff "
(Z) If effecfive widfh for singIe wheeI of on oxIe under considerofion is > Disfonce befween cenfres of
wheeIs of some oxIe fhen -
Lood per mefer ~ AxIe Iood under considerofion / Mef " beff "
TofoI EquivoIenf Lood per unif oreo wifh impocf :
C/L of Spun
0.4 3.Z00 0.o0 0.o0
0.99 I.970 I.Z40 I.Z40
p1 = ( I.3I3 x 0.9b0 ) / 0.990 ~ 1,Z t/sqm
Impocf Lood per Mef " bds "
mefer
pZ = ( I.3I3 x ( I.98o + I.98o ) ) / Z.480 ~ Z,10 t/sqm
Impocf Mef " bds "
Lood per Lood per
mefer for oxIe A3 mefer for oxIe A4
In STAAD, Iive Iood is oppIied os uniformIy disfribufed Iood on reIevonf fop sIob members.
A4
11.4 T
A3
11.4 T
A2
2.7 T
p1
p2
~ Mef
~ Mef " bds "
Shah Technical Consultants Page 8 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Cose ( 8 ) : Lood pIoced neor Supporf for Mox. Sheor Force
Truffic Direction
C/L of Spun
0.30 I.Z0 Z.700 I.o00
Z.o0
Effecfive Spon ~ Io = ,400
" bI " for o.8 T oxIe ~ 0.38 + ( Z x 0.IIb ) ~ 0.oI m
Dimension of fyre Thk. of weoring coof
perpendicuIor fo spon
" bI " for II.4T oxIe ~ 0.b + ( Z x 0.IIb ) ~ 0.73 m
Dimension of fyre Thk. of weoring coof
perpendicuIor fo spon
Pesfricfion fo effecfive widfh ~ Disfonce befween exfreme edge of box ond cenfre of oufer wheeI posifioned
fowords edge of box , in o direcfion perpendicuIor fo spon
~ 0.b + 0.40
Pesfricfion fo effecfive widfh ~ 0.90 m
Disfonce befween cenfres of wheeIs of on oxIe ~ I.80 m ( PerpendicuIor fo spon )
AxIe WheeI Disfonce bI Mef Lood per Dispersion widfh
mork Lood from " beff " mefer poroIIeI fo spon for
supporf singIe wheeI, " bds "
( f ) o (m) (m) (m) (m) ( f/m ) (m)
A3 b.7 0.30 0.73 I.48Z 3.84o
I.8 m
A4 b.7 I.b0 0.73 4.oo7 Z.443
I.8 m
Ab 3.4 Z.o0 0.oI b.339 I.Z74
I.8 m
b.Z78 I.Z30
beff
I.48Z I.Z80
3.934 I.Z80
A4
11.4 T
A3
11.4 T
A5
6.8 T
Shah Technical Consultants Page 9 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
TofoI EquivoIenf Lood per unif oreo wifh impocf :
C/L of Spun
0.300 I.Z00 Z.700 I.o00
Z.I40 Z.0o0 0.98b I.Z30
p3 = ( I.3I3 x ( 3.84o + Z.443 ) ) / Z.I40 ~ 3, t/sqm
Impocf Mef " bds "
Lood per Lood per
mefer for oxIe A3 mefer for oxIe A4
p4 = ( I.3I3 x I.Z74 ) / I.Z30 ~ 1,3 t/sqm
Impocf Lood per Mef " bds "
mefer
In STAAD, Iive Iood is oppIied os uniformIy disfribufed Iood on reIevonf fop sIob members.
NOTE - Lood combinofions considered ore given in STAAD inpuf in Appendix.
{ II } CIuss " "
AxIe Iood Confocf Areo os per IPC:o
Dimension poroIIeI Dimension perpendicuIor
fo movemenf " 8 " (m) fo movemenf " W " (m)
o.8T 0.Z00 0.380
4.IT 0.Ib0 0.300
I.oT 0.IZb 0.I7b
A4
11.4 T
A3
11.4 T
A5
6.8 T
p3
p4
~ Mef
" bds " ~ Mef " bds "
Shah Technical Consultants Page 10 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Cose ( A ) : Lood pIoced neor Midspon for Mox. Spon Momenf
Truffic Direction
C/L of Spun
0.40 3.Z00 0.o0 0.o0
3.o 3.o
Effecfive Spon ~ Io = ,400
" bI " for I.o T oxIe ~ 0.I7b + ( Z x 0.IIb ) ~ 0.40b m
Dimension of fyre Thk. of weoring coof
perpendicuIor fo spon
" bI " for o.8T oxIe ~ 0.38 + ( Z x 0.IIb ) ~ 0.oI m
Dimension of fyre Thk. of weoring coof
perpendicuIor fo spon
Pesfricfion fo effecfive widfh ~ Disfonce befween exfreme edge of box ond cenfre of oufer wheeI posifioned
fowords edge of box , in o direcfion perpendicuIor fo spon
Pesfricfion fo effecfive widfh ~ 0.90 m
Disfonce befween cenfres of wheeIs of on oxIe ~ I.80 m ( PerpendicuIor fo spon )
Mef effecfive widfh :
(I) If effecfive widfh for singIe wheeI of on oxIe under considerofion is < Disfonce befween cenfres of
wheeIs of some oxIe fhen -
TofoI effecfive widfh ~ Min. of [ Pesfricfion fo effecfive widfh + ( beff /Z ) ] & beff
(Z) If effecfive widfh for singIe wheeI of on oxIe under considerofion is > Disfonce befween cenfres of
wheeIs of some oxIe fhen -
TofoI effecfive widfh ~ Pesfricfion fo effecfive widfh + [ I.80 + ( beff /Z ) ]
AxIe WheeI Disfonce bI Mef Lood per Dispersion widfh
mork Lood from " beff " mefer poroIIeI fo spon for
supporf singIe wheeI, " bds "
( f ) o (m) (m) (m) (m) ( f/m ) (m)
AZ 0.80 0.40 0.40b I.39b 0.b73
I.8 m
A3 3.40 3.o0 0.oI0 b.o79 I.I97
I.8 m
A4 3.40 3.o0 0.oI0 b.o79 I.I97
I.8 m
beff
I.39b I.Ibb
b.9b9 I.Z30
b.9b9 I.Z30
A4
6.8 T
A3
6.8 T
A2
1.6 T
Shah Technical Consultants Page 11 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Lood per mefer , given in obove fobIe :
(I) If effecfive widfh for singIe wheeI of on oxIe under considerofion is < Disfonce befween cenfres of
wheeIs of some oxIe fhen -
Lood per mefer ~ SingIe wheeI Iood / Mef " beff "
(Z) If effecfive widfh for singIe wheeI of on oxIe under considerofion is > Disfonce befween cenfres of
wheeIs of some oxIe fhen -
Lood per mefer ~ AxIe Iood under considerofion / Mef " beff "
TofoI EquivoIenf Lood per unif oreo wifh impocf :
C/L of Spun
0.4 3.Z00 0.o0 0.o0
0.98 Z.008 I.ZIb I.ZIb
p1 = ( I.3I3 x 0.b73 ) / 0.978 ~ 0,77 t/sqm
Impocf Lood per Mef " bds "
mefer
pZ = ( I.3I3 x ( I.I97 + I.I97 ) ) / Z.430 ~ 1,Z9 t/sqm
Impocf Mef " bds "
Lood per Lood per
mefer for oxIe A3 mefer for oxIe A4
In STAAD, Iive Iood is oppIied os uniformIy disfribufed Iood on reIevonf fop sIob members.
A4
6.8 T
A3
6.8 T
A2
1.6 T
p1
p2
~ Mef
~ Mef " bds "
Shah Technical Consultants Page 12 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Cose ( 8 ) : Lood pIoced neor Supporf for Mox. Sheor Force
Truffic Direction
C/L of Spun
0.30 I.Z0 Z.700 I.o00
Z.o0
Effecfive Spon ~ Io = ,400
" bI " for 4.I T oxIe ~ 0.3 + ( Z x 0.IIb ) ~ 0.b3 m
Dimension of fyre Thk. of weoring coof
perpendicuIor fo spon
" bI " for o.8T oxIe ~ 0.38 + ( Z x 0.IIb ) ~ 0.oI m
Dimension of fyre Thk. of weoring coof
perpendicuIor fo spon
Pesfricfion fo effecfive widfh ~ Disfonce befween exfreme edge of box ond cenfre of oufer wheeI posifioned
fowords edge of box , in o direcfion perpendicuIor fo spon
~ 0.b + 0.34
Pesfricfion fo effecfive widfh ~ 0.84 m
Disfonce befween cenfres of wheeIs of on oxIe ~ I.80 m ( PerpendicuIor fo spon )
AxIe WheeI Disfonce bI Mef Lood per Dispersion widfh
mork Lood from " beff " mefer poroIIeI fo spon for
supporf singIe wheeI, " bds "
( f ) o (m) (m) (m) (m) ( f/m ) (m)
A3 3.4 0.30 0.oI I.3oZ Z.49o
I.8 m
A4 3.4 I.b0 0.oI 4.o07 I.47o
I.8 m
Ab Z.0b Z.o0 0.b3 b.Z99 0.774
I.8 m
beff
I.3oZ I.Z30
3.8I4 I.Z30
b.I98 I.I80
A4
6.8 T
A3
6.8 T
A5
4.1 T
Shah Technical Consultants Page 13 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
TofoI EquivoIenf Lood per unif oreo wifh impocf :
C/L of Spun
0.300 I.Z00 Z.700 I.o00
Z.IIb Z.08b I.0I0 I.I80
p3 = ( I.3I3 x ( Z.49o + I.47o ) ) / Z.IIb ~ Z,4 t/sqm
Impocf Mef " bds "
Lood per Lood per
mefer for oxIe A3 mefer for oxIe A4
p4 = ( I.3I3 x 0.774 ) / I.I80 ~ 0, t/sqm
Impocf Lood per Mef " bds "
mefer
In STAAD, Iive Iood is oppIied os uniformIy disfribufed Iood on reIevonf fop sIob members.
NOTE - Lood combinofions considered ore given in STAAD inpuf in Appendix.
,0 MAXIMUM EARINS PRESSURE
8eoring pressure ~ TofoI verficoI Iood of founding IeveI for Im wide sfrip / ( Widfh of foundofion x Im )
CASE (A) : Mo Wofer inside 8ox
TofoI weighf of box for Im sfrip oIong Iengfh of box :
Cross secfionoI oreo of box ~ I0.I4 m
Z
Weighf of box per mefer ~ I0.I4 x Z.4 ~ Z4.33o f
TofoI weighf of SIDL for Im sfrip oIong Iengfh of box :
TofoI weighf of SIDL ~ Weighf of weoring coof
Weighf of weoring coof per mefer ~ 0.Zb3 x 8.800 x I.00 ~ Z.ZZo4 f
f/sq.m. spon Widfh
A4
6.8 T
A3
6.8 T
A5
4.1 T
p3
p4
~ Mef
~ Mef " bds "
Shah Technical Consultants Page 14 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Mox. Live Lood for Im sfrip oIong Iengfh of box :
Pefer secfion " 4 d - Cose (8) " of fhis documenf, where Iood ocfing on fop sIob due fo CIoss "A" is coIcuIofed.
Infensify " p3 " ~ 3.8o f/sqm ocfs on o dispersion widfh ~ Z.I40 m oIong spon
Infensify " p4 " ~ I.3o f/sqm ocfs on o dispersion widfh ~ I.Z30 m oIong spon
Therefore fofoI Iood per mefer of box ~ 3.8b7 x Z.I40 + I.3b9 x I.Z30 ~ 9.9Zb f
TofoI verficoI Iood of founding IeveI ~ Z4.33o + Z.ZZo4 + 9.9Zb ~ 3o.49 f
Widfh of bose sIob ~ 8.800 m
Mu,euring pressure ucting = 3o.49 / 8.800 ~ 4,14 t/sqm
Mox. permissibIe beoring pressure ~ I0.00 f/sqm
euring pressure ucting is Iesser thun mu, permissibIe vuIue,
CASE (8) : 8ox FiIIed wifh Wofer
TofoI weighf of box for Im sfrip oIong Iengfh of box :
Cross secfionoI oreo of submerged porfion of box ~ o.I3 m
Z
Cross secfionoI oreo of fop porfion of box which wiII nof gef submerged ~ 4.0I m
Z
Weighf of submerged porfion of box per mefer ~ o.I3 x I.400 ~ 8.b8Z f
Weighf of dry porfion of box per mefer ~ 4.0I x Z.400 ~ 9.oZ4 f
TofoI weighf of box per mefer ~ I8.Z0o f
Weighf of Wofer for Im sfrip oIong Iengfh of box :
Weighf of wofer per mefer ~ Z.o00 x 8.000 x I.00 ~ Z0.8 f
TofoI weighf of SIDL for Im sfrip oIong Iengfh of box :
TofoI weighf of SIDL ~ Weighf of weoring coof
Weighf of weoring coof per mefer ~ Z.ZZo4 f
Mox. Live Lood for Im sfrip oIong Iengfh of box :
Therefore fofoI Iood per mefer of box ~ 9.9Zb f
TofoI verficoI Iood of founding IeveI ~ I8.Z0o + Z.ZZo4 + Z0.800 + 9.9Zb ~ bI.Ib8 f
Widfh of bose sIob ~ 0.b30 m
Mu,euring pressure ucting = bI.Io / 8.800 ~ ,13 t/sqm
Mox. permissibIe beoring pressure ~ I0.00 f/sqm
euring pressure ucting is Iesser thun mu, permissibIe vuIue,
Shah Technical Consultants Page 15 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
,0 DESISN WITH CLASS " A " LOADINS
,1 DESISN FOR FLEXURE
Summury of Moments : ( Pefer oppendix for moximum force enveIope )
Member Secfion Iocofion Momenf Member Lood Pemork
Mox. (fm) & Mode Comb.
Midspon I0.40 Mem. 7 , ZI Sogging momenf
Mode 7
Foce of woII 8.b0 Mem. Z , ZI Hogging momenf
Node 2
8offom Midspon -9.70 Mem. 34, ZZ Hogging momenf
sIob Mode 34
Foce of woII 7.80 Mem. 30, ZZ Sogging momenf
Mode 30
Midsecfion -o.00 Mem. Io , ZZ Tension on oufer foce
Mode Io
Foce of fop sIob -9.b0 Mem. I4 , ZZ Tension on oufer foce
Mode I4
Foce of bof. sIob -9.b0 Mem. I8 , ZZ Tension on oufer foce
Mode I9
CuIcuIution of Tension Reinforcement :
PermissibIe fIexuroI compressive sfress in concrefe,
cbc ~
I00 Ig/cm
Z
PermissibIe fensiIe sfress for fIexure,
sf ~
Z400 Ig/cm
Z
Design Consfonfs -
Lever orm consfonf, j ~ 0.90Z
Momenf of resisfonce consfonf, Q ~ I3.Zo4
CIeor cover fo reinforcemenf ~ b0 mm
Minimum fension sfeeI required ~ 0.IZ of 0ross cross secfionoI oreo
Top SIob
WoII
Shah Technical Consultants Page 16 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Member Secfion Iocofion Design OveroII Effecfive Effecfive Tension Provided steeI
Moment Depfh Prov. Depfh Depfh SteeI
Provd. Peqd. Reqd 8or Dio. Spocing Areo
Tm cms cms cms cm
Z
/ m mm mm cm
Z
/ m
Top Midspon 10,40 40.0 34.00 Z8.00 14,13 Z0 Z00 1,71
sIob Sug, Sufe (0.4Io7) 0 ZI0 Sufe
Top Foce of woII ,0 b0.00 44.Z0 Zb.3I , Io ZZb 13,9
sIob Hog, ^ Sufe (0.Z0I7) IZ ZZb Sufe
8of. Midspon 9,70 4b.0 39.Z0 Z7.04 11,43 Io I7b 11,49
sIob Hog, Sufe (0.Z9Z7) 0 I7b Sufe
8of. Foce of woII 7,0 bb.0 49.Z0 Z4.Zb 7,3Z Io ZZb 13,9
sIob Sug, ^ Sufe (0.I497) IZ ZZb Sufe
WoII Midsecfion ,00 40.0 34.Z0 ZI.Z7 ,10 Io ZZb ,94
Outer ten, Sufe (0.Z377) 0 ZI0 Sufe
WoII Foce of fop sIob 9,0 b0.0 44.Z0 Zo.7o 9,93 Io ZZb 13,9
Outer ten, ^^ Sufe (0.ZZb7) IZ ZZb Sufe
WoII Foce of bof. sIob 9,0 bb.0 49.Z0 Zo.7o ,9Z Io ZZb 13,9
Outer ten, ^^ Sufe (0.I8I7) IZ ZZb Sufe
^
I00.00
As per IPC : ZI,
300 fon ~ I / 3
300
o
^^
I00
As per IPC : ZI,
300
fon ~
I / 3

Shah Technical Consultants Page 17 of 49


Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
,Z DESISN FOR SHEAR
Summury of Sheur :
Member Secfion Iocofion Sheor Member Lood
Mox. (f) no. Comb.
Top SIob Af d
eff
from I0.30 Memb. Z ZZ
foce of woII
8offom Af d
eff
from I0.I7 Mem. 30 ZZ
sIob foce of woII (Avg. voIue) Mode 3I
Mox. permissibIe sheor sfress os per TobIe IZA of IPC:ZI-Z000 ~ Z3 Ig/cm
Z
for M3b concrefe
Secfion Iocofion Sheor OveroII Effecfive AcfuoI Ten. SfeeI Ten. Asf ConcrefePemorks
Depfh depfh prov. sfress provd. prov. sfrengfh
f prov. (cm) cm Ig/cm
Z
cm
Z
cm
Z
/ m Ig/cm
Z
Concrete strength
Top sIob - Af d
eff
I0.300 40.00 34.Z0 3,01Z I3.9o I3.9o3 Z,10
is sIightIy Iess thun
from foce of woII Sufe (0.4087) uctuuI sheur stress
8of. sIob - Af d
eff
I0.Iob 4b.00 39.Z0 Z,93 I3.9o I3.9o3 Z,40
foce of woII Sufe (0.3bo7)
Sheur reinf, is not
required
Shah Technical Consultants Page 18 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
7,0 DESISN FOR FLEXURE WITH CLASS " " LOADINS
7,1 DESISN FOR FLEXURE
Summury of Moments : ( Pefer oppendix for moximum force enveIope )
Member Secfion Iocofion Momenf Member Lood Pemork
Mox. (fm) & Mode Comb.
Midspon 8.Z0 Mem. 7 , 3I Sogging momenf
Mode 7
Foce of woII -7.00 Mem. Z , 3I Hogging momenf
Node 2
8offom Midspon -8.00 Mem. 34, 3Z Hogging momenf
sIob Mode 34
Foce of woII 7.00 Mem. 30, 3Z Sogging momenf
Mode 30
Midsecfion -4.40 Mem. Io , 3Z Tension on oufer foce
Mode Io
Foce of fop sIob -8.00 Mem. I4 , 3Z Tension on oufer foce
Mode I4
Foce of bof. sIob -8.00 Mem. I8 , 3Z Tension on oufer foce
Mode I9
CuIcuIution of Tension Reinforcement :
PermissibIe fIexuroI compressive sfress in concrefe,
cbc ~
I00 Ig/cm
Z
PermissibIe fensiIe sfress for fIexure,
sf ~
Z400 Ig/cm
Z
Design Consfonfs -
Lever orm consfonf, j ~ 0.90Z
Momenf of resisfonce consfonf, Q ~ I3.Zo4
CIeor cover fo reinforcemenf ~ b0 mm
Minimum fension sfeeI required ~ 0.IZ of 0ross cross secfionoI oreo
Top SIob
WoII
Shah Technical Consulatnts Page 19 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Member Secfion Iocofion Design OveroII Effecfive Effecfive Tension Provided steeI
Moment Depfh Prov. Depfh Depfh SteeI
Provd. Peqd. Reqd 8or Dio. Spocing Areo
Tm cms cms cms cm
Z
/ m mm mm cm
Z
/ m
Top Midspon ,Z0 40.0 34.Z0 Z4.8o 11,0 Io I7b 11,49
sIob Sug, Sufe (0.3Z47) 0 Ib0 Sufe
Top Foce of woII 7,00 b0.0 44.Z0 ZZ.97 7,3Z Io Zb0 11,1
sIob Hog, Sufe (0.Ioo7) I0 Zb0 Sufe
8of. Midspon ,00 4b.0 39.Z0 Z4.bo 9,43 Io Z00 10,0
sIob Hog, Sufe (0.Z4I7) 0 Z00 Sufe
8of. Foce of woII 7,00 bb.0 49.Z0 ZZ.97 ,0 Io Zb0 11,1
sIob Sug, Sufe (0.I347) I0 Zb0 Sufe
WoII Midsecfion 4,40 40.0 34.Z0 I8.ZI ,94 Io Zb0 ,04
Outer ten, Sufe (0.I747) 0 Z00 Sufe
WoII Foce of fop sIob ,00 b0.0 44.Z0 Z4.bo ,3 Io Zb0 11,1
Outer ten, Sufe (0.I897) I0 Zb0 Sufe
WoII Foce of bof. sIob ,00 bb.0 49.Z0 Z4.bo 7,1 Io Zb0 11,1
Outer ten, Sufe (0.Ib37) I0 Zb0 Sufe
7,Z DESISN FOR SHEAR
Summury of Sheur :
Member Secfion Iocofion Sheor Member Lood
Mox. (f) no. Comb.
Top SIob Af d
eff
from 8.I0 Memb. Z 3Z
foce of woII
8offom Af d
eff
from 8.4o Mem. 30 3Z
sIob foce of woII (Avg. voIue) Mode 3I
Shah Technical Consulatnts Page 20 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
Mox. permissibIe sheor sfress os per TobIe IZA of IPC:ZI-Z000 ~ Z3 Ig/cm
Z
for M3b concrefe
Secfion Iocofion Sheor OveroII Effecfive AcfuoI Ten. SfeeI Ten. Asf ConcrefePemorks
Depfh depfh prov. sfress provd. prov. sfrengfh
f prov. (cm) cm Ig/cm
Z
cm
Z
cm
Z
/ m Ig/cm
Z
Top sIob - Af d
eff
8.I00 40.00 39.Z0 Z,0 II.I8 II.489 Z,440
from foce of woII Sufe (0.Z937)
8of. sIob - Af d
eff
8.4b9 4b.00 44.Z0 1,914 II.I8 I0.0b3 Z,Z30
foce of woII Sufe (0.ZZ77)
Sheur reinf, is not
required
Sheur reinf, is not
required
Shah Technical Consulatnts Page 21 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
STAAD INPUT
STAAD SPACE 8OX CULVEPT OF SIZE (8M X 3.I0M)
* TOP SLAB THK. = 0.40m , BOTTOM SLAB THK. = 0.450m , WALL THK. = 0.40m
STAPT JO8 IMFOPMATIOM
EM0IMEEP DATE Z0-JUME-IZ
EMD JO8 IMFOPMATIOM
IMPUT WIDTH 79
UMIT METEP MTOM
JOINT COORDINATES
I 0.0b 3.bZb 0, Z 0.Zb 3.bZb 0, 3 0.7b 3.bZb 0, 4 I.oZb 3.bZb 0, b Z.b 3.bZb 0,
o 3.37b 3.bZb 0, 7 4.Zb 3.bZb 0, 8 b.IZb 3.bZb 0, 9 o 3.bZb 0,
I0 o.87b 3.bZb 0, II 7.7b 3.bZb 0, IZ 8.Zb 3.bZb 0, I3 8.4b 3.bZb 0,
I4 0.0b 3.3Zb 0, Ib 0.0b Z.70b 0, Io 0.0b Z.08b 0, I7 0.0b I.4ob 0,
I8 0.0b 0.84b 0, I9 0.0b 0.ZZb 0, ZI 8.4b 3.3Zb 0, ZZ 8.4b Z.70b 0,
Z3 8.4b Z.08b 0, Z4 8.4b I.4ob 0, Zb 8.4b 0.84b 0, Zo 8.4b 0.ZZb 0,
Z9 0.0b 0 0, 30 0.Zb 0 0, 3I 0.7b 0 0, 3Z I.oZb 0 0, 33 Z.b 0 0, 34 3.37b 0 0,
3b 4.Zb 0 0, 3o b.IZb 0 0, 37 o 0 0, 38 o.87b 0 0, 39 7.7b 0 0, 40 8.Zb 0 0,
4I 8.4b 0 0,
MEMER INCIDENCES
I I Z, Z Z 3, 3 3 4, 4 4 b, b b o, o o 7, 7 7 8, 8 8 9, 9 9 I0, I0 I0 II,
II II IZ, IZ IZ I3, I3 I I4, I4 I4 Ib, Ib Ib Io, Io Io I7, I7 I7 I8, I8 I8 I9,
ZI ZI ZZ, ZZ ZZ Z3, Z3 Z3 Z4, Z4 Z4 Zb, Zb Zb Zo, Z9 Z9 30, 30 30 3I, 3I 3I 3Z,
3Z 3Z 33, 33 33 34, 34 34 3b, 3b 3b 3o, 3o 3o 37, 37 37 38, 38 38 39, 39 39 40,
40 40 4I, 4Z I3 ZI, 43 I9 Z9, 44 Zo 4I,
MEMER PROPERTY AMERICAN
^ TOP SLA8 MEM8EPS
I TO IZ PPIS YD 0.4 ZD I
^ WALL MEM8EPS
I3 TO I8 ZI TO Zb 4Z TO 44 PPIS YD 0.4 ZD I
^ 8OTTOM SLA8 MEM8EPS
Z9 TO 40 PPIS YD 0.4b ZD I
DEFINE MATERIAL START
ISOTPOPIC COMCPETE
E Z.9b803e+00o
POISSOM 0.I7
DEMSITY Z.4
ALPHA Ie-00b
DAMP 0.0b
EMD DEFIME MATEPIAL
APPENDIX : STAAD INPUT ANALYSIS RESULTS
Shah Technical Consultants Page 22 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
CONSTANTS
MATEPIAL COMCPETE ALL
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
SUPPORTS
Z9 4I FIXED 8UT MX MY MZ IFY Z00
30 40 FIXED 8UT MX MY MZ IFY 700
3I 39 FIXED 8UT MX MY MZ IFY I37b
3Z TO 38 FIXED 8UT MX MY MZ IFY I7b0
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
LOAD 1 WEISHT OF OX
SELFWEI0HT Y -I
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
LOAD Z SIDL
MEM8EP LOAD
^ WEI0HT OF WEAPIM0 COAT OM TOP SLA8
I TO IZ UMI 0Y -0.Zb3
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
LOAD 3 EARTH PRESSURE
^ EAPTH PPESSUPE IMCLUDIM0 LIVE LOAD SUPCHAP0E
MEM8EP LOAD
I3 TPAP 0X I.4 I.o
I4 TPAP 0X I.o Z.ZZ
Ib TPAP 0X Z.ZZ Z.84
Io TPAP 0X Z.84 3.4o
I7 TPAP 0X 3.4o 4.08
I8 TPAP 0X 4.08 4.7
43 TPAP 0X 4.7 4.9Zb
4Z TPAP 0X -I.4 -I.o
ZI TPAP 0X -I.o -Z.ZZ
ZZ TPAP 0X -Z.ZZ -Z.84
Z3 TPAP 0X -Z.84 -3.4o
Z4 TPAP 0X -3.4o -4.08
Zb TPAP 0X -4.08 -4.7
44 TPAP 0X -4.7 -4.9Zb
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
LOAD 4 CLASS "A" FOR MAX, M AT MIDSPAN
^ LOAD IMTEMSITY IMCLUDES IMPACT
MEM8EP LOAD
I Z UMI 0Y -I.Zo
3 UMI 0Y -I.Zo 0 0.Z9
b UMI 0Y -Z.I 0.bI 0.87b
o 7 UMI 0Y -Z.II
8 UMI 0Y -Z.II 0 0.3ob
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
Shah Technical Consultants Page 23 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
LOAD CLASS "A" FOR MAX, SHEAR AT SUPPORT
^ LOAD IMTEMSITY IMCLUDES IMPACT
MEM8EP LOAD
I TO 3 UMI 0Y -3.8o
4 UMI 0Y -3.8o 0 0.bob
8 UMI 0Y -I.3o 0.II 0.87b
9 UMI 0Y -I.3o 0 0.4ob
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
LOAD CLASS "" FOR MAX, M AT MIDSPAN
^ LOAD IMTEMSITY IMCLUDES IMPACT
MEM8EP LOAD
I Z UMI 0Y -0.77
3 UMI 0Y -0.77 0 0.Z8
b UMI 0Y -I.Z9 0.b3b 0.87b
o 7 UMI 0Y -I.Z9
8 UMI 0Y -I.Z9 0 0.34
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
LOAD 7 CLASS "" FOR MAX, SHEAR AT SUPPORT
^ LOAD IMTEMSITY IMCLUDES IMPACT
MEM8EP LOAD
I TO 3 UMI 0Y -Z.4o
4 UMI 0Y -Z.4o 0 0.b4
8 UMI 0Y -0.8o 0.I3b 0.87b
9 UMI 0Y -0.8o 0 0.44
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
LOAD COM Z1 {COM, FOR MAX, M} SELF + SIDL + EP + LL {CLASS "A"}{4}
I I.0 Z I.0 3 I.0 4 I.0
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
LOAD COM ZZ {COM, FOR MAX, SHEAR} SELF + SIDL + EP + LL {CLASS "A"}{}
I I.0 Z I.0 3 I.0 b I.0
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
LOAD COM 31 {COM, FOR MAX, M} SELF + SIDL + EP + LL {CLASS ""}{}
I I.0 Z I.0 3 I.0 o I.0
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
LOAD COM 3Z {COM, FOR MAX, SHEAR} SELF + SIDL + EP + LL {CLASS ""}{7}
I I.0 Z I.0 3 I.0 7 I.0
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
LOAD COM 3 DL + SIDL + EP
I I.0 Z I.0 3 I.0
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
PEPFOPM AMALYSIS PPIMT STATICS CHECI
PPIMT SUPPOPT PEACTIOM ALL
^ TOP SLA8 MEM8EPS
PRINT MEMBER FORCES LIST 1 TO 12
^ 8OTTOM SLA8 MEM8EPS
Shah Technical Consultants Page 24 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
PPIMT MEM8EP FOPCES LIST Z9 TO 40
^ WALL MEM8EPS
PPIMT MEM8EP FOPCES LIST I3 TO I8 ZI TO Zb 4Z TO 44
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
FIMISH
ANALYSIS RESULTS : MEMER FORCES FOR TOP SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z

1 1 1 -0.23 4.03 0.00 0.00 0.00 3.90
2 0.23 -3.84 0.00 0.00 0.00 -3.11
2 1 0.15 1.06 0.00 0.00 0.00 1.10
2 -0.15 -1.01 0.00 0.00 0.00 -0.89
3 1 4.27 0.00 0.00 0.00 0.00 0.83
2 -4.27 0.00 0.00 0.00 0.00 -0.83
4 1 0.74 3.82 0.00 0.00 0.00 4.33
2 -0.74 -3.57 0.00 0.00 0.00 -3.59
5 1 0.21 7.91 0.00 0.00 0.00 4.49
2 -0.21 -7.14 0.00 0.00 0.00 -2.98
6 1 0.44 2.30 0.00 0.00 0.00 2.60
2 -0.44 -2.14 0.00 0.00 0.00 -2.15
7 1 0.12 4.98 0.00 0.00 0.00 2.79
2 -0.12 -4.49 0.00 0.00 0.00 -1.84
21 1 4.92 8.91 0.00 0.00 0.00 10.15
2 -4.92 -8.42 0.00 0.00 0.00 -8.42
22 1 4.40 13.01 0.00 0.00 0.00 10.31
2 -4.40 -11.99 0.00 0.00 0.00 -7.81
31 1 4.63 7.39 0.00 0.00 0.00 8.42
2 -4.63 -6.99 0.00 0.00 0.00 -6.98
32 1 4.31 10.08 0.00 0.00 0.00 8.61
2 -4.31 -9.34 0.00 0.00 0.00 -6.67
35 1 4.19 5.09 0.00 0.00 0.00 5.83
2 -4.19 -4.85 0.00 0.00 0.00 -4.83

2 1 2 -0.23 3.84 0.00 0.00 0.00 3.11
3 0.23 -3.36 0.00 0.00 0.00 -1.31
2 2 0.15 1.01 0.00 0.00 0.00 0.89
3 -0.15 -0.89 0.00 0.00 0.00 -0.42
3 2 4.27 0.00 0.00 0.00 0.00 0.83
3 -4.27 0.00 0.00 0.00 0.00 -0.83
Shah Technical Consultants Page 25 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR TOP SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
4 2 0.74 3.57 0.00 0.00 0.00 3.59
3 -0.74 -2.94 0.00 0.00 0.00 -1.96
5 2 0.21 7.14 0.00 0.00 0.00 2.98
3 -0.21 -5.21 0.00 0.00 0.00 0.10
6 2 0.44 2.14 0.00 0.00 0.00 2.15
3 -0.44 -1.76 0.00 0.00 0.00 -1.18
7 2 0.12 4.49 0.00 0.00 0.00 1.84
3 -0.12 -3.26 0.00 0.00 0.00 0.10
21 2 4.92 8.42 0.00 0.00 0.00 8.42
3 -4.92 -7.18 0.00 0.00 0.00 -4.52
22 2 4.40 11.99 0.00 0.00 0.00 7.81
3 -4.40 -9.46 0.00 0.00 0.00 -2.45
31 2 4.63 6.99 0.00 0.00 0.00 6.98
3 -4.63 -6.00 0.00 0.00 0.00 -3.74
32 2 4.31 9.34 0.00 0.00 0.00 6.67
3 -4.31 -7.50 0.00 0.00 0.00 -2.46
35 2 4.19 4.85 0.00 0.00 0.00 4.83
3 -4.19 -4.25 0.00 0.00 0.00 -2.56

3 1 3 -0.23 3.36 0.00 0.00 0.00 1.31
4 0.23 -2.52 0.00 0.00 0.00 1.26
2 3 0.15 0.89 0.00 0.00 0.00 0.42
4 -0.15 -0.66 0.00 0.00 0.00 0.26
3 3 4.27 0.00 0.00 0.00 0.00 0.83
4 -4.27 0.00 0.00 0.00 0.00 -0.83
4 3 0.74 2.94 0.00 0.00 0.00 1.96
4 -0.74 -2.57 0.00 0.00 0.00 0.34
5 3 0.21 5.21 0.00 0.00 0.00 -0.10
4 -0.21 -1.83 0.00 0.00 0.00 3.19
6 3 0.44 1.76 0.00 0.00 0.00 1.18
4 -0.44 -1.54 0.00 0.00 0.00 0.20
7 3 0.12 3.26 0.00 0.00 0.00 -0.10
4 -0.12 -1.11 0.00 0.00 0.00 2.01
21 3 4.92 7.18 0.00 0.00 0.00 4.52
4 -4.92 -5.75 0.00 0.00 0.00 1.03
22 3 4.40 9.46 0.00 0.00 0.00 2.45
4 -4.40 -5.02 0.00 0.00 0.00 3.88
Shah Technical Consultants Page 26 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR TOP SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )
MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
31 3 4.63 6.00 0.00 0.00 0.00 3.74
4 -4.63 -4.73 0.00 0.00 0.00 0.89
32 3 4.31 7.50 0.00 0.00 0.00 2.46
4 -4.31 -4.29 0.00 0.00 0.00 2.70
35 3 4.19 4.25 0.00 0.00 0.00 2.56
4 -4.19 -3.18 0.00 0.00 0.00 0.69

4 1 4 -0.23 2.52 0.00 0.00 0.00 -1.26
5 0.23 -1.68 0.00 0.00 0.00 3.10
2 4 0.15 0.66 0.00 0.00 0.00 -0.26
5 -0.15 -0.44 0.00 0.00 0.00 0.75
3 4 4.27 0.00 0.00 0.00 0.00 0.83
5 -4.27 0.00 0.00 0.00 0.00 -0.83
4 4 0.74 2.57 0.00 0.00 0.00 -0.34
5 -0.74 -2.57 0.00 0.00 0.00 2.59
5 4 0.21 1.83 0.00 0.00 0.00 -3.19
5 -0.21 0.35 0.00 0.00 0.00 3.50
6 4 0.44 1.54 0.00 0.00 0.00 -0.20
5 -0.44 -1.54 0.00 0.00 0.00 1.55
7 4 0.12 1.11 0.00 0.00 0.00 -2.01
5 -0.12 0.22 0.00 0.00 0.00 2.17
21 4 4.92 5.75 0.00 0.00 0.00 -1.03
5 -4.92 -4.69 0.00 0.00 0.00 5.60
22 4 4.40 5.02 0.00 0.00 0.00 -3.88
5 -4.40 -1.78 0.00 0.00 0.00 6.51
31 4 4.63 4.73 0.00 0.00 0.00 -0.89
5 -4.63 -3.66 0.00 0.00 0.00 4.56
32 4 4.31 4.29 0.00 0.00 0.00 -2.70
5 -4.31 -1.90 0.00 0.00 0.00 5.19
35 4 4.19 3.18 0.00 0.00 0.00 -0.69
5 -4.19 -2.12 0.00 0.00 0.00 3.02

5 1 5 -0.23 1.68 0.00 0.00 0.00 -3.10
6 0.23 -0.84 0.00 0.00 0.00 4.20
2 5 0.15 0.44 0.00 0.00 0.00 -0.75
6 -0.15 -0.22 0.00 0.00 0.00 1.04
Shah Technical Consultants Page 27 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR TOP SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )
MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
3 5 4.27 0.00 0.00 0.00 0.00 0.83
6 -4.27 0.00 0.00 0.00 0.00 -0.83
4 5 0.74 2.57 0.00 0.00 0.00 -2.59
6 -0.74 -1.80 0.00 0.00 0.00 4.69
5 5 0.21 -0.35 0.00 0.00 0.00 -3.50
6 -0.21 0.35 0.00 0.00 0.00 3.19
6 5 0.44 1.54 0.00 0.00 0.00 -1.55
6 -0.44 -1.10 0.00 0.00 0.00 2.82
7 5 0.12 -0.22 0.00 0.00 0.00 -2.17
6 -0.12 0.22 0.00 0.00 0.00 1.97
21 5 4.92 4.69 0.00 0.00 0.00 -5.60
6 -4.92 -2.86 0.00 0.00 0.00 9.10
22 5 4.40 1.78 0.00 0.00 0.00 -6.51
6 -4.40 -0.71 0.00 0.00 0.00 7.60
31 5 4.63 3.66 0.00 0.00 0.00 -4.56
6 -4.63 -2.16 0.00 0.00 0.00 7.23
32 5 4.31 1.90 0.00 0.00 0.00 -5.19
6 -4.31 -0.84 0.00 0.00 0.00 6.38
35 5 4.19 2.12 0.00 0.00 0.00 -3.02
6 -4.19 -1.06 0.00 0.00 0.00 4.41

6 1 6 -0.23 0.84 0.00 0.00 0.00 -4.20
7 0.23 0.00 0.00 0.00 0.00 4.57
2 6 0.15 0.22 0.00 0.00 0.00 -1.04
7 -0.15 0.00 0.00 0.00 0.00 1.13
3 6 4.27 0.00 0.00 0.00 0.00 0.83
7 -4.27 0.00 0.00 0.00 0.00 -0.83
4 6 0.74 1.80 0.00 0.00 0.00 -4.69
7 -0.74 0.04 0.00 0.00 0.00 5.46
5 6 0.21 -0.35 0.00 0.00 0.00 -3.19
7 -0.21 0.35 0.00 0.00 0.00 2.89
6 6 0.44 1.10 0.00 0.00 0.00 -2.82
7 -0.44 0.03 0.00 0.00 0.00 3.29
7 6 0.12 -0.22 0.00 0.00 0.00 -1.97
7 -0.12 0.22 0.00 0.00 0.00 1.78
21 6 4.92 2.86 0.00 0.00 0.00 -9.10
7 -4.92 0.04 0.00 0.00 0.00 10.34
Shah Technical Consultants Page 28 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR TOP SLA

MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
22 6 4.40 0.71 0.00 0.00 0.00 -7.60
7 -4.40 0.35 0.00 0.00 0.00 7.76
31 6 4.63 2.16 0.00 0.00 0.00 -7.23
7 -4.63 0.03 0.00 0.00 0.00 8.17
32 6 4.31 0.84 0.00 0.00 0.00 -6.38
7 -4.31 0.22 0.00 0.00 0.00 6.65
35 6 4.19 1.06 0.00 0.00 0.00 -4.41
7 -4.19 0.00 0.00 0.00 0.00 4.87

7 1 7 -0.23 0.00 0.00 0.00 0.00 -4.57
8 0.23 0.84 0.00 0.00 0.00 4.20
2 7 0.15 0.00 0.00 0.00 0.00 -1.13
8 -0.15 0.22 0.00 0.00 0.00 1.04
3 7 4.27 0.00 0.00 0.00 0.00 0.83
8 -4.27 0.00 0.00 0.00 0.00 -0.83
4 7 0.74 -0.04 0.00 0.00 0.00 -5.46
8 -0.74 1.89 0.00 0.00 0.00 4.62
5 7 0.21 -0.35 0.00 0.00 0.00 -2.89
8 -0.21 0.35 0.00 0.00 0.00 2.59
6 7 0.44 -0.03 0.00 0.00 0.00 -3.29
8 -0.44 1.15 0.00 0.00 0.00 2.78
7 7 0.12 -0.22 0.00 0.00 0.00 -1.78
8 -0.12 0.22 0.00 0.00 0.00 1.59
21 7 4.92 -0.04 0.00 0.00 0.00 -10.34
8 -4.92 2.95 0.00 0.00 0.00 9.03
22 7 4.40 -0.35 0.00 0.00 0.00 -7.76
8 -4.40 1.41 0.00 0.00 0.00 7.00
31 7 4.63 -0.03 0.00 0.00 0.00 -8.17
8 -4.63 2.22 0.00 0.00 0.00 7.18
32 7 4.31 -0.22 0.00 0.00 0.00 -6.65
8 -4.31 1.28 0.00 0.00 0.00 5.99
35 7 4.19 0.00 0.00 0.00 0.00 -4.87
8 -4.19 1.06 0.00 0.00 0.00 4.41

8 1 8 -0.23 -0.84 0.00 0.00 0.00 -4.20
9 0.23 1.68 0.00 0.00 0.00 3.10
Shah Technical Consultants Page 29 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR TOP SLA

MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
2 8 0.15 -0.22 0.00 0.00 0.00 -1.04
9 -0.15 0.44 0.00 0.00 0.00 0.75
3 8 4.27 0.00 0.00 0.00 0.00 0.83
9 -4.27 0.00 0.00 0.00 0.00 -0.83
4 8 0.74 -1.89 0.00 0.00 0.00 -4.62
9 -0.74 2.66 0.00 0.00 0.00 2.43
5 8 0.21 -0.35 0.00 0.00 0.00 -2.59
9 -0.21 1.39 0.00 0.00 0.00 1.88
6 8 0.44 -1.15 0.00 0.00 0.00 -2.78
9 -0.44 1.59 0.00 0.00 0.00 1.46
7 8 0.12 -0.22 0.00 0.00 0.00 -1.59
9 -0.12 0.86 0.00 0.00 0.00 1.16
21 8 4.92 -2.95 0.00 0.00 0.00 -9.03
9 -4.92 4.78 0.00 0.00 0.00 5.45
22 8 4.40 -1.41 0.00 0.00 0.00 -7.00
9 -4.40 3.51 0.00 0.00 0.00 4.90
31 8 4.63 -2.22 0.00 0.00 0.00 -7.18
9 -4.63 3.72 0.00 0.00 0.00 4.47
32 8 4.31 -1.28 0.00 0.00 0.00 -5.99
9 -4.31 2.98 0.00 0.00 0.00 4.17
35 8 4.19 -1.06 0.00 0.00 0.00 -4.41
9 -4.19 2.12 0.00 0.00 0.00 3.02

9 1 9 -0.23 -1.68 0.00 0.00 0.00 -3.10
10 0.23 2.52 0.00 0.00 0.00 1.26
2 9 0.15 -0.44 0.00 0.00 0.00 -0.75
10 -0.15 0.66 0.00 0.00 0.00 0.26
3 9 4.27 0.00 0.00 0.00 0.00 0.83
10 -4.27 0.00 0.00 0.00 0.00 -0.83
4 9 0.74 -2.66 0.00 0.00 0.00 -2.43
10 -0.74 2.66 0.00 0.00 0.00 0.11
5 9 0.21 -1.39 0.00 0.00 0.00 -1.88
10 -0.21 2.02 0.00 0.00 0.00 0.26
6 9 0.44 -1.59 0.00 0.00 0.00 -1.46
10 -0.44 1.59 0.00 0.00 0.00 0.06
7 9 0.12 -0.86 0.00 0.00 0.00 -1.16
10 -0.12 1.24 0.00 0.00 0.00 0.16
Shah Technical Consultants Page 30 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR TOP SLA

MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
21 9 4.92 -4.78 0.00 0.00 0.00 -5.45
10 -4.92 5.84 0.00 0.00 0.00 0.80
22 9 4.40 -3.51 0.00 0.00 0.00 -4.90
10 -4.40 5.20 0.00 0.00 0.00 0.96
31 9 4.63 -3.72 0.00 0.00 0.00 -4.47
10 -4.63 4.78 0.00 0.00 0.00 0.76
32 9 4.31 -2.98 0.00 0.00 0.00 -4.17
10 -4.31 4.42 0.00 0.00 0.00 0.85
35 9 4.19 -2.12 0.00 0.00 0.00 -3.02
10 -4.19 3.18 0.00 0.00 0.00 0.69

10 1 10 -0.23 -2.52 0.00 0.00 0.00 -1.26
11 0.23 3.36 0.00 0.00 0.00 -1.31
2 10 0.15 -0.66 0.00 0.00 0.00 -0.26
11 -0.15 0.89 0.00 0.00 0.00 -0.42
3 10 4.27 0.00 0.00 0.00 0.00 0.83
11 -4.27 0.00 0.00 0.00 0.00 -0.83
4 10 0.74 -2.66 0.00 0.00 0.00 -0.11
11 -0.74 2.66 0.00 0.00 0.00 -2.22
5 10 0.21 -2.02 0.00 0.00 0.00 -0.26
11 -0.21 2.02 0.00 0.00 0.00 -1.50
6 10 0.44 -1.59 0.00 0.00 0.00 -0.06
11 -0.44 1.59 0.00 0.00 0.00 -1.33
7 10 0.12 -1.24 0.00 0.00 0.00 -0.16
11 -0.12 1.24 0.00 0.00 0.00 -0.93
21 10 4.92 -5.84 0.00 0.00 0.00 -0.80
11 -4.92 6.90 0.00 0.00 0.00 -4.78
22 10 4.40 -5.20 0.00 0.00 0.00 -0.96
11 -4.40 6.27 0.00 0.00 0.00 -4.06
31 10 4.63 -4.78 0.00 0.00 0.00 -0.76
11 -4.63 5.84 0.00 0.00 0.00 -3.89
32 10 4.31 -4.42 0.00 0.00 0.00 -0.85
11 -4.31 5.48 0.00 0.00 0.00 -3.48
35 10 4.19 -3.18 0.00 0.00 0.00 -0.69
11 -4.19 4.25 0.00 0.00 0.00 -2.56

Shah Technical Consultants Page 31 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR TOP SLA

MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
11 1 11 -0.23 -3.36 0.00 0.00 0.00 1.31
12 0.23 3.84 0.00 0.00 0.00 -3.11
2 11 0.15 -0.89 0.00 0.00 0.00 0.42
12 -0.15 1.01 0.00 0.00 0.00 -0.89
3 11 4.27 0.00 0.00 0.00 0.00 0.83
12 -4.27 0.00 0.00 0.00 0.00 -0.83
4 11 0.74 -2.66 0.00 0.00 0.00 2.22
12 -0.74 2.66 0.00 0.00 0.00 -3.55
5 11 0.21 -2.02 0.00 0.00 0.00 1.50
12 -0.21 2.02 0.00 0.00 0.00 -2.51
6 11 0.44 -1.59 0.00 0.00 0.00 1.33
12 -0.44 1.59 0.00 0.00 0.00 -2.13
7 11 0.12 -1.24 0.00 0.00 0.00 0.93
12 -0.12 1.24 0.00 0.00 0.00 -1.54
21 11 4.92 -6.90 0.00 0.00 0.00 4.78
12 -4.92 7.51 0.00 0.00 0.00 -8.38
22 11 4.40 -6.27 0.00 0.00 0.00 4.06
12 -4.40 6.87 0.00 0.00 0.00 -7.34
31 11 4.63 -5.84 0.00 0.00 0.00 3.89
12 -4.63 6.45 0.00 0.00 0.00 -6.96
32 11 4.31 -5.48 0.00 0.00 0.00 3.48
12 -4.31 6.09 0.00 0.00 0.00 -6.38
35 11 4.19 -4.25 0.00 0.00 0.00 2.56
12 -4.19 4.85 0.00 0.00 0.00 -4.83

12 1 12 -0.23 -3.84 0.00 0.00 0.00 3.11
13 0.23 4.03 0.00 0.00 0.00 -3.90
2 12 0.15 -1.01 0.00 0.00 0.00 0.89
13 -0.15 1.06 0.00 0.00 0.00 -1.10
3 12 4.27 0.00 0.00 0.00 0.00 0.83
13 -4.27 0.00 0.00 0.00 0.00 -0.83
4 12 0.74 -2.66 0.00 0.00 0.00 3.55
13 -0.74 2.66 0.00 0.00 0.00 -4.08
5 12 0.21 -2.02 0.00 0.00 0.00 2.51
13 -0.21 2.02 0.00 0.00 0.00 -2.92
6 12 0.44 -1.59 0.00 0.00 0.00 2.13
13 -0.44 1.59 0.00 0.00 0.00 -2.45
Shah Technical Consultants Page 32 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR TOP SLA

MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
7 12 0.12 -1.24 0.00 0.00 0.00 1.54
13 -0.12 1.24 0.00 0.00 0.00 -1.79
21 12 4.92 -7.51 0.00 0.00 0.00 8.38
13 -4.92 7.75 0.00 0.00 0.00 -9.91
22 12 4.40 -6.87 0.00 0.00 0.00 7.34
13 -4.40 7.11 0.00 0.00 0.00 -8.74
31 12 4.63 -6.45 0.00 0.00 0.00 6.96
13 -4.63 6.69 0.00 0.00 0.00 -8.27
32 12 4.31 -6.09 0.00 0.00 0.00 6.38
13 -4.31 6.33 0.00 0.00 0.00 -7.62
35 12 4.19 -4.85 0.00 0.00 0.00 4.83
13 -4.19 5.09 0.00 0.00 0.00 -5.83

ANALYSIS RESULTS : MEMER FORCES FOR OTTOM SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z

29 1 29 0.00 -6.93 0.00 0.00 0.00 -4.70
30 0.00 7.14 0.00 0.00 0.00 3.29
2 29 0.00 -1.00 0.00 0.00 0.00 -0.58
30 0.00 1.00 0.00 0.00 0.00 0.38
3 29 0.00 -0.05 0.00 0.00 0.00 -1.78
30 0.00 0.05 0.00 0.00 0.00 1.77
4 29 0.00 -3.59 0.00 0.00 0.00 -1.73
30 0.00 3.59 0.00 0.00 0.00 1.02
5 29 0.00 -7.44 0.00 0.00 0.00 -3.76
30 0.00 7.44 0.00 0.00 0.00 2.27
6 29 0.00 -2.16 0.00 0.00 0.00 -1.04
30 0.00 2.16 0.00 0.00 0.00 0.61
7 29 0.00 -4.68 0.00 0.00 0.00 -2.36
30 0.00 4.68 0.00 0.00 0.00 1.43
21 29 0.00 -11.58 0.00 0.00 0.00 -8.80
30 0.00 11.79 0.00 0.00 0.00 6.46
22 29 0.00 -15.42 0.00 0.00 0.00 -10.82
30 0.00 15.63 0.00 0.00 0.00 7.71
Shah Technical Consultants Page 33 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR OTTOM SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
31 29 0.00 -10.14 0.00 0.00 0.00 -8.10
30 0.00 10.36 0.00 0.00 0.00 6.05
32 29 0.00 -12.66 0.00 0.00 0.00 -9.42
30 0.00 12.88 0.00 0.00 0.00 6.87
35 29 0.00 -7.98 0.00 0.00 0.00 -7.06
30 0.00 8.20 0.00 0.00 0.00 5.44

30 1 30 0.00 -5.50 0.00 0.00 0.00 -3.29
31 0.00 6.04 0.00 0.00 0.00 0.41
2 30 0.00 -0.82 0.00 0.00 0.00 -0.38
31 0.00 0.82 0.00 0.00 0.00 -0.03
3 30 0.00 -0.20 0.00 0.00 0.00 -1.77
31 0.00 0.20 0.00 0.00 0.00 1.67
4 30 0.00 -2.86 0.00 0.00 0.00 -1.02
31 0.00 2.86 0.00 0.00 0.00 -0.41
5 30 0.00 -5.86 0.00 0.00 0.00 -2.27
31 0.00 5.86 0.00 0.00 0.00 -0.66
6 30 0.00 -1.72 0.00 0.00 0.00 -0.61
31 0.00 1.72 0.00 0.00 0.00 -0.25
7 30 0.00 -3.69 0.00 0.00 0.00 -1.43
31 0.00 3.69 0.00 0.00 0.00 -0.42
21 30 0.00 -9.38 0.00 0.00 0.00 -6.46
31 0.00 9.92 0.00 0.00 0.00 1.63
22 30 0.00 -12.39 0.00 0.00 0.00 -7.71
31 0.00 12.93 0.00 0.00 0.00 1.38
31 30 0.00 -8.24 0.00 0.00 0.00 -6.05
31 0.00 8.78 0.00 0.00 0.00 1.80
32 30 0.00 -10.21 0.00 0.00 0.00 -6.87
31 0.00 10.75 0.00 0.00 0.00 1.63
35 30 0.00 -6.52 0.00 0.00 0.00 -5.44
31 0.00 7.06 0.00 0.00 0.00 2.05

31 1 31 0.00 -3.21 0.00 0.00 0.00 -0.41
32 0.00 4.16 0.00 0.00 0.00 -2.82
2 31 0.00 -0.51 0.00 0.00 0.00 0.03
32 0.00 0.51 0.00 0.00 0.00 -0.47
3 31 0.00 -0.38 0.00 0.00 0.00 -1.67
32 0.00 0.38 0.00 0.00 0.00 1.34
4 31 0.00 -1.67 0.00 0.00 0.00 0.41
32 0.00 1.67 0.00 0.00 0.00 -1.88
5 31 0.00 -3.29 0.00 0.00 0.00 0.66
32 0.00 3.29 0.00 0.00 0.00 -3.54
Shah Technical Consultants Page 34 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR OTTOM SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
6 31 0.00 -1.01 0.00 0.00 0.00 0.25
32 0.00 1.01 0.00 0.00 0.00 -1.13
7 31 0.00 -2.07 0.00 0.00 0.00 0.42
32 0.00 2.07 0.00 0.00 0.00 -2.23
21 31 0.00 -5.77 0.00 0.00 0.00 -1.63
32 0.00 6.71 0.00 0.00 0.00 -3.83
22 31 0.00 -7.39 0.00 0.00 0.00 -1.38
32 0.00 8.33 0.00 0.00 0.00 -5.49
31 31 0.00 -5.10 0.00 0.00 0.00 -1.80
32 0.00 6.05 0.00 0.00 0.00 -3.08
32 31 0.00 -6.17 0.00 0.00 0.00 -1.63
32 0.00 7.11 0.00 0.00 0.00 -4.18
35 31 0.00 -4.09 0.00 0.00 0.00 -2.05
32 0.00 5.04 0.00 0.00 0.00 -1.95

32 1 32 0.00 -1.43 0.00 0.00 0.00 2.82
33 0.00 2.37 0.00 0.00 0.00 -4.48
2 32 0.00 -0.25 0.00 0.00 0.00 0.47
33 0.00 0.25 0.00 0.00 0.00 -0.69
3 32 0.00 -0.39 0.00 0.00 0.00 -1.34
33 0.00 0.39 0.00 0.00 0.00 1.00
4 32 0.00 -0.70 0.00 0.00 0.00 1.88
33 0.00 0.70 0.00 0.00 0.00 -2.49
5 32 0.00 -1.11 0.00 0.00 0.00 3.54
33 0.00 1.11 0.00 0.00 0.00 -4.52
6 32 0.00 -0.42 0.00 0.00 0.00 1.13
33 0.00 0.42 0.00 0.00 0.00 -1.50
7 32 0.00 -0.70 0.00 0.00 0.00 2.23
33 0.00 0.70 0.00 0.00 0.00 -2.84
21 32 0.00 -2.76 0.00 0.00 0.00 3.83
33 0.00 3.71 0.00 0.00 0.00 -6.66
22 32 0.00 -3.18 0.00 0.00 0.00 5.49
33 0.00 4.13 0.00 0.00 0.00 -8.69
31 32 0.00 -2.48 0.00 0.00 0.00 3.08
33 0.00 3.43 0.00 0.00 0.00 -5.67
32 32 0.00 -2.76 0.00 0.00 0.00 4.18
33 0.00 3.71 0.00 0.00 0.00 -7.01
35 32 0.00 -2.07 0.00 0.00 0.00 1.95
33 0.00 3.01 0.00 0.00 0.00 -4.17

33 1 33 0.00 -0.36 0.00 0.00 0.00 4.48
34 0.00 1.30 0.00 0.00 0.00 -5.20
Shah Technical Consultants Page 35 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR OTTOM SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
2 33 0.00 -0.10 0.00 0.00 0.00 0.69
34 0.00 0.10 0.00 0.00 0.00 -0.78
3 33 0.00 -0.28 0.00 0.00 0.00 -1.00
34 0.00 0.28 0.00 0.00 0.00 0.75
4 33 0.00 -0.14 0.00 0.00 0.00 2.49
34 0.00 0.14 0.00 0.00 0.00 -2.61
5 33 0.00 0.17 0.00 0.00 0.00 4.52
34 0.00 -0.17 0.00 0.00 0.00 -4.37
6 33 0.00 -0.09 0.00 0.00 0.00 1.50
34 0.00 0.09 0.00 0.00 0.00 -1.57
7 33 0.00 0.11 0.00 0.00 0.00 2.84
34 0.00 -0.11 0.00 0.00 0.00 -2.74
21 33 0.00 -0.88 0.00 0.00 0.00 6.66
34 0.00 1.83 0.00 0.00 0.00 -7.85
22 33 0.00 -0.57 0.00 0.00 0.00 8.69
34 0.00 1.52 0.00 0.00 0.00 -9.60
31 33 0.00 -0.83 0.00 0.00 0.00 5.67
34 0.00 1.77 0.00 0.00 0.00 -6.80
32 33 0.00 -0.63 0.00 0.00 0.00 7.01
34 0.00 1.57 0.00 0.00 0.00 -7.97
35 33 0.00 -0.74 0.00 0.00 0.00 4.17
34 0.00 1.68 0.00 0.00 0.00 -5.23

34 1 34 0.00 0.25 0.00 0.00 0.00 5.20
35 0.00 0.70 0.00 0.00 0.00 -5.40
2 34 0.00 -0.03 0.00 0.00 0.00 0.78
35 0.00 0.03 0.00 0.00 0.00 -0.80
3 34 0.00 -0.10 0.00 0.00 0.00 -0.75
35 0.00 0.10 0.00 0.00 0.00 0.67
4 34 0.00 0.13 0.00 0.00 0.00 2.61
35 0.00 -0.13 0.00 0.00 0.00 -2.50
5 34 0.00 0.82 0.00 0.00 0.00 4.37
35 0.00 -0.82 0.00 0.00 0.00 -3.65
6 34 0.00 0.08 0.00 0.00 0.00 1.57
35 0.00 -0.08 0.00 0.00 0.00 -1.50
7 34 0.00 0.52 0.00 0.00 0.00 2.74
35 0.00 -0.52 0.00 0.00 0.00 -2.29
21 34 0.00 0.25 0.00 0.00 0.00 7.85
35 0.00 0.70 0.00 0.00 0.00 -8.04
22 34 0.00 0.94 0.00 0.00 0.00 9.60
35 0.00 0.00 0.00 0.00 0.00 -9.19
Shah Technical Consultants Page 36 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR OTTOM SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
31 34 0.00 0.20 0.00 0.00 0.00 6.80
35 0.00 0.75 0.00 0.00 0.00 -7.04
32 34 0.00 0.64 0.00 0.00 0.00 7.97
35 0.00 0.30 0.00 0.00 0.00 -7.82
35 34 0.00 0.12 0.00 0.00 0.00 5.23
35 0.00 0.82 0.00 0.00 0.00 -5.54

35 1 35 0.00 0.70 0.00 0.00 0.00 5.40
36 0.00 0.25 0.00 0.00 0.00 -5.20
2 35 0.00 0.03 0.00 0.00 0.00 0.80
36 0.00 -0.03 0.00 0.00 0.00 -0.78
3 35 0.00 0.10 0.00 0.00 0.00 -0.67
36 0.00 -0.10 0.00 0.00 0.00 0.75
4 35 0.00 0.27 0.00 0.00 0.00 2.50
36 0.00 -0.27 0.00 0.00 0.00 -2.27
5 35 0.00 1.10 0.00 0.00 0.00 3.65
36 0.00 -1.10 0.00 0.00 0.00 -2.70
6 35 0.00 0.16 0.00 0.00 0.00 1.50
36 0.00 -0.16 0.00 0.00 0.00 -1.36
7 35 0.00 0.70 0.00 0.00 0.00 2.29
36 0.00 -0.70 0.00 0.00 0.00 -1.68
21 35 0.00 1.09 0.00 0.00 0.00 8.04
36 0.00 -0.15 0.00 0.00 0.00 -7.50
22 35 0.00 1.92 0.00 0.00 0.00 9.19
36 0.00 -0.97 0.00 0.00 0.00 -7.93
31 35 0.00 0.99 0.00 0.00 0.00 7.04
36 0.00 -0.04 0.00 0.00 0.00 -6.59
32 35 0.00 1.52 0.00 0.00 0.00 7.82
36 0.00 -0.57 0.00 0.00 0.00 -6.91
35 35 0.00 0.82 0.00 0.00 0.00 5.54
36 0.00 0.12 0.00 0.00 0.00 -5.23

36 1 36 0.00 1.30 0.00 0.00 0.00 5.20
37 0.00 -0.36 0.00 0.00 0.00 -4.48
2 36 0.00 0.10 0.00 0.00 0.00 0.78
37 0.00 -0.10 0.00 0.00 0.00 -0.69
3 36 0.00 0.28 0.00 0.00 0.00 -0.75
37 0.00 -0.28 0.00 0.00 0.00 1.00
4 36 0.00 0.43 0.00 0.00 0.00 2.27
37 0.00 -0.43 0.00 0.00 0.00 -1.89
5 36 0.00 1.21 0.00 0.00 0.00 2.70
37 0.00 -1.21 0.00 0.00 0.00 -1.63
Shah Technical Consultants Page 37 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR OTTOM SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
6 36 0.00 0.26 0.00 0.00 0.00 1.36
37 0.00 -0.26 0.00 0.00 0.00 -1.13
7 36 0.00 0.77 0.00 0.00 0.00 1.68
37 0.00 -0.77 0.00 0.00 0.00 -1.01
21 36 0.00 2.12 0.00 0.00 0.00 7.50
37 0.00 -1.17 0.00 0.00 0.00 -6.06
22 36 0.00 2.90 0.00 0.00 0.00 7.93
37 0.00 -1.95 0.00 0.00 0.00 -5.81
31 36 0.00 1.95 0.00 0.00 0.00 6.59
37 0.00 -1.00 0.00 0.00 0.00 -5.30
32 36 0.00 2.45 0.00 0.00 0.00 6.91
37 0.00 -1.51 0.00 0.00 0.00 -5.18
35 36 0.00 1.68 0.00 0.00 0.00 5.23
37 0.00 -0.74 0.00 0.00 0.00 -4.17

37 1 37 0.00 2.37 0.00 0.00 0.00 4.48
38 0.00 -1.43 0.00 0.00 0.00 -2.82
2 37 0.00 0.25 0.00 0.00 0.00 0.69
38 0.00 -0.25 0.00 0.00 0.00 -0.47
3 37 0.00 0.39 0.00 0.00 0.00 -1.00
38 0.00 -0.39 0.00 0.00 0.00 1.34
4 37 0.00 0.76 0.00 0.00 0.00 1.89
38 0.00 -0.76 0.00 0.00 0.00 -1.23
5 37 0.00 1.33 0.00 0.00 0.00 1.63
38 0.00 -1.33 0.00 0.00 0.00 -0.47
6 37 0.00 0.45 0.00 0.00 0.00 1.13
38 0.00 -0.45 0.00 0.00 0.00 -0.74
7 37 0.00 0.84 0.00 0.00 0.00 1.01
38 0.00 -0.84 0.00 0.00 0.00 -0.28
21 37 0.00 3.77 0.00 0.00 0.00 6.06
38 0.00 -2.82 0.00 0.00 0.00 -3.18
22 37 0.00 4.34 0.00 0.00 0.00 5.81
38 0.00 -3.40 0.00 0.00 0.00 -2.42
31 37 0.00 3.47 0.00 0.00 0.00 5.30
38 0.00 -2.52 0.00 0.00 0.00 -2.69
32 37 0.00 3.85 0.00 0.00 0.00 5.18
38 0.00 -2.90 0.00 0.00 0.00 -2.22
35 37 0.00 3.01 0.00 0.00 0.00 4.17
38 0.00 -2.07 0.00 0.00 0.00 -1.95

Shah Technical Consultants Page 38 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR OTTOM SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
38 1 38 0.00 4.16 0.00 0.00 0.00 2.82
39 0.00 -3.21 0.00 0.00 0.00 0.41
2 38 0.00 0.51 0.00 0.00 0.00 0.47
39 0.00 -0.51 0.00 0.00 0.00 -0.03
3 38 0.00 0.38 0.00 0.00 0.00 -1.34
39 0.00 -0.38 0.00 0.00 0.00 1.67
4 38 0.00 1.34 0.00 0.00 0.00 1.23
39 0.00 -1.34 0.00 0.00 0.00 -0.05
5 38 0.00 1.55 0.00 0.00 0.00 0.47
39 0.00 -1.55 0.00 0.00 0.00 0.88
6 38 0.00 0.81 0.00 0.00 0.00 0.74
39 0.00 -0.81 0.00 0.00 0.00 -0.03
7 38 0.00 0.96 0.00 0.00 0.00 0.28
39 0.00 -0.96 0.00 0.00 0.00 0.57
21 38 0.00 6.38 0.00 0.00 0.00 3.18
39 0.00 -5.44 0.00 0.00 0.00 1.99
22 38 0.00 6.59 0.00 0.00 0.00 2.42
39 0.00 -5.64 0.00 0.00 0.00 2.93
31 38 0.00 5.85 0.00 0.00 0.00 2.69
39 0.00 -4.90 0.00 0.00 0.00 2.02
32 38 0.00 6.00 0.00 0.00 0.00 2.22
39 0.00 -5.06 0.00 0.00 0.00 2.61
35 38 0.00 5.04 0.00 0.00 0.00 1.95
39 0.00 -4.09 0.00 0.00 0.00 2.05

39 1 39 0.00 6.04 0.00 0.00 0.00 -0.41
40 0.00 -5.50 0.00 0.00 0.00 3.29
2 39 0.00 0.82 0.00 0.00 0.00 0.03
40 0.00 -0.82 0.00 0.00 0.00 0.38
3 39 0.00 0.20 0.00 0.00 0.00 -1.67
40 0.00 -0.20 0.00 0.00 0.00 1.77
4 39 0.00 2.07 0.00 0.00 0.00 0.05
40 0.00 -2.07 0.00 0.00 0.00 0.98
5 39 0.00 1.82 0.00 0.00 0.00 -0.88
40 0.00 -1.82 0.00 0.00 0.00 1.79
6 39 0.00 1.24 0.00 0.00 0.00 0.03
40 0.00 -1.24 0.00 0.00 0.00 0.59
7 39 0.00 1.12 0.00 0.00 0.00 -0.57
40 0.00 -1.12 0.00 0.00 0.00 1.13
21 39 0.00 9.13 0.00 0.00 0.00 -1.99
40 0.00 -8.59 0.00 0.00 0.00 6.43
Shah Technical Consultants Page 39 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR OTTOM SLA
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
22 39 0.00 8.88 0.00 0.00 0.00 -2.93
40 0.00 -8.34 0.00 0.00 0.00 7.23
31 39 0.00 8.30 0.00 0.00 0.00 -2.02
40 0.00 -7.76 0.00 0.00 0.00 6.03
32 39 0.00 8.18 0.00 0.00 0.00 -2.61
40 0.00 -7.64 0.00 0.00 0.00 6.57
35 39 0.00 7.06 0.00 0.00 0.00 -2.05
40 0.00 -6.52 0.00 0.00 0.00 5.44

40 1 40 0.00 7.14 0.00 0.00 0.00 -3.29
41 0.00 -6.93 0.00 0.00 0.00 4.70
2 40 0.00 1.00 0.00 0.00 0.00 -0.38
41 0.00 -1.00 0.00 0.00 0.00 0.58
3 40 0.00 0.05 0.00 0.00 0.00 -1.77
41 0.00 -0.05 0.00 0.00 0.00 1.78
4 40 0.00 2.52 0.00 0.00 0.00 -0.98
41 0.00 -2.52 0.00 0.00 0.00 1.49
5 40 0.00 1.97 0.00 0.00 0.00 -1.79
41 0.00 -1.97 0.00 0.00 0.00 2.19
6 40 0.00 1.51 0.00 0.00 0.00 -0.59
41 0.00 -1.51 0.00 0.00 0.00 0.89
7 40 0.00 1.21 0.00 0.00 0.00 -1.13
41 0.00 -1.21 0.00 0.00 0.00 1.37
21 40 0.00 10.72 0.00 0.00 0.00 -6.43
41 0.00 -10.50 0.00 0.00 0.00 8.55
22 40 0.00 10.17 0.00 0.00 0.00 -7.23
41 0.00 -9.96 0.00 0.00 0.00 9.25
31 40 0.00 9.71 0.00 0.00 0.00 -6.03
41 0.00 -9.49 0.00 0.00 0.00 7.95
32 40 0.00 9.41 0.00 0.00 0.00 -6.57
41 0.00 -9.19 0.00 0.00 0.00 8.43
35 40 0.00 8.20 0.00 0.00 0.00 -5.44
41 0.00 -7.98 0.00 0.00 0.00 7.06



Shah Technical Consultants Page 40 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )

ANALYSIS RESULTS : MEMER FORCES FOR WALL
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z

13 1 1 4.03 0.23 0.00 0.00 0.00 -3.90
14 -4.22 -0.23 0.00 0.00 0.00 3.94
2 1 1.06 -0.15 0.00 0.00 0.00 -1.10
14 -1.06 0.15 0.00 0.00 0.00 1.07
3 1 0.00 -4.27 0.00 0.00 0.00 -0.83
14 0.00 3.97 0.00 0.00 0.00 0.00
4 1 3.82 -0.74 0.00 0.00 0.00 -4.33
14 -3.82 0.74 0.00 0.00 0.00 4.18
5 1 7.91 -0.21 0.00 0.00 0.00 -4.49
14 -7.91 0.21 0.00 0.00 0.00 4.45
6 1 2.30 -0.44 0.00 0.00 0.00 -2.60
14 -2.30 0.44 0.00 0.00 0.00 2.51
7 1 4.98 -0.12 0.00 0.00 0.00 -2.79
14 -4.98 0.12 0.00 0.00 0.00 2.76
21 1 8.91 -4.92 0.00 0.00 0.00 -10.15
14 -9.10 4.62 0.00 0.00 0.00 9.20
22 1 13.01 -4.40 0.00 0.00 0.00 -10.31
14 -13.20 4.10 0.00 0.00 0.00 9.46
31 1 7.39 -4.63 0.00 0.00 0.00 -8.42
14 -7.58 4.33 0.00 0.00 0.00 7.53
32 1 10.08 -4.31 0.00 0.00 0.00 -8.61
14 -10.27 4.01 0.00 0.00 0.00 7.78
35 1 5.09 -4.19 0.00 0.00 0.00 -5.83
14 -5.29 3.89 0.00 0.00 0.00 5.02

14 1 14 4.22 0.23 0.00 0.00 0.00 -3.94
15 -4.82 -0.23 0.00 0.00 0.00 4.09
2 14 1.06 -0.15 0.00 0.00 0.00 -1.07
15 -1.06 0.15 0.00 0.00 0.00 0.98
3 14 0.00 -3.97 0.00 0.00 0.00 0.00
15 0.00 2.78 0.00 0.00 0.00 -2.11
4 14 3.82 -0.74 0.00 0.00 0.00 -4.18
15 -3.82 0.74 0.00 0.00 0.00 3.72
5 14 7.91 -0.21 0.00 0.00 0.00 -4.45
15 -7.91 0.21 0.00 0.00 0.00 4.32
6 14 2.30 -0.44 0.00 0.00 0.00 -2.51
15 -2.30 0.44 0.00 0.00 0.00 2.24
7 14 4.98 -0.12 0.00 0.00 0.00 -2.76
15 -4.98 0.12 0.00 0.00 0.00 2.69
21 14 9.10 -4.62 0.00 0.00 0.00 -9.20
15 -9.70 3.44 0.00 0.00 0.00 6.68
Shah Technical Consultants Page 41 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR WALL
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
22 14 13.20 -4.10 0.00 0.00 0.00 -9.46
15 -13.79 2.91 0.00 0.00 0.00 7.27
31 14 7.58 -4.33 0.00 0.00 0.00 -7.53
15 -8.18 3.15 0.00 0.00 0.00 5.19
32 14 10.27 -4.01 0.00 0.00 0.00 -7.78
15 -10.86 2.82 0.00 0.00 0.00 5.64
35 14 5.29 -3.89 0.00 0.00 0.00 -5.02
15 -5.88 2.70 0.00 0.00 0.00 2.95

15 1 15 4.82 0.23 0.00 0.00 0.00 -4.09
16 -5.41 -0.23 0.00 0.00 0.00 4.23
2 15 1.06 -0.15 0.00 0.00 0.00 -0.98
16 -1.06 0.15 0.00 0.00 0.00 0.89
3 15 0.00 -2.78 0.00 0.00 0.00 2.11
16 0.00 1.22 0.00 0.00 0.00 -3.37
4 15 3.82 -0.74 0.00 0.00 0.00 -3.72
16 -3.82 0.74 0.00 0.00 0.00 3.27
5 15 7.91 -0.21 0.00 0.00 0.00 -4.32
16 -7.91 0.21 0.00 0.00 0.00 4.19
6 15 2.30 -0.44 0.00 0.00 0.00 -2.24
16 -2.30 0.44 0.00 0.00 0.00 1.96
7 15 4.98 -0.12 0.00 0.00 0.00 -2.69
16 -4.98 0.12 0.00 0.00 0.00 2.61
21 15 9.70 -3.44 0.00 0.00 0.00 -6.68
16 -10.29 1.87 0.00 0.00 0.00 5.01
22 15 13.79 -2.91 0.00 0.00 0.00 -7.27
16 -14.39 1.34 0.00 0.00 0.00 5.93
31 15 8.18 -3.15 0.00 0.00 0.00 -5.19
16 -8.77 1.58 0.00 0.00 0.00 3.71
32 15 10.86 -2.82 0.00 0.00 0.00 -5.64
16 -11.46 1.26 0.00 0.00 0.00 4.36
35 15 5.88 -2.70 0.00 0.00 0.00 -2.95
16 -6.48 1.14 0.00 0.00 0.00 1.74

16 1 16 5.41 0.23 0.00 0.00 0.00 -4.23
17 -6.01 -0.23 0.00 0.00 0.00 4.37
2 16 1.06 -0.15 0.00 0.00 0.00 -0.89
17 -1.06 0.15 0.00 0.00 0.00 0.80
3 16 0.00 -1.22 0.00 0.00 0.00 3.37
17 0.00 -0.74 0.00 0.00 0.00 -3.54
4 16 3.82 -0.74 0.00 0.00 0.00 -3.27
17 -3.82 0.74 0.00 0.00 0.00 2.81
Shah Technical Consultants Page 42 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR WALL
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
5 16 7.91 -0.21 0.00 0.00 0.00 -4.19
17 -7.91 0.21 0.00 0.00 0.00 4.06
6 16 2.30 -0.44 0.00 0.00 0.00 -1.96
17 -2.30 0.44 0.00 0.00 0.00 1.69
7 16 4.98 -0.12 0.00 0.00 0.00 -2.61
17 -4.98 0.12 0.00 0.00 0.00 2.54
21 16 10.29 -1.87 0.00 0.00 0.00 -5.01
17 -10.89 -0.08 0.00 0.00 0.00 4.44
22 16 14.39 -1.34 0.00 0.00 0.00 -5.93
17 -14.99 -0.61 0.00 0.00 0.00 5.69
31 16 8.77 -1.58 0.00 0.00 0.00 -3.71
17 -9.37 -0.38 0.00 0.00 0.00 3.31
32 16 11.46 -1.26 0.00 0.00 0.00 -4.36
17 -12.05 -0.70 0.00 0.00 0.00 4.17
35 16 6.48 -1.14 0.00 0.00 0.00 -1.74
17 -7.07 -0.82 0.00 0.00 0.00 1.63

17 1 17 6.01 0.23 0.00 0.00 0.00 -4.37
18 -6.60 -0.23 0.00 0.00 0.00 4.51
2 17 1.06 -0.15 0.00 0.00 0.00 -0.80
18 -1.06 0.15 0.00 0.00 0.00 0.70
3 17 0.00 0.74 0.00 0.00 0.00 3.54
18 0.00 -3.07 0.00 0.00 0.00 -2.38
4 17 3.82 -0.74 0.00 0.00 0.00 -2.81
18 -3.82 0.74 0.00 0.00 0.00 2.36
5 17 7.91 -0.21 0.00 0.00 0.00 -4.06
18 -7.91 0.21 0.00 0.00 0.00 3.93
6 17 2.30 -0.44 0.00 0.00 0.00 -1.69
18 -2.30 0.44 0.00 0.00 0.00 1.42
7 17 4.98 -0.12 0.00 0.00 0.00 -2.54
18 -4.98 0.12 0.00 0.00 0.00 2.47
21 17 10.89 0.08 0.00 0.00 0.00 -4.44
18 -11.48 -2.42 0.00 0.00 0.00 5.19
22 17 14.99 0.61 0.00 0.00 0.00 -5.69
18 -15.58 -2.95 0.00 0.00 0.00 6.77
31 17 9.37 0.38 0.00 0.00 0.00 -3.31
18 -9.96 -2.71 0.00 0.00 0.00 4.25
32 17 12.05 0.70 0.00 0.00 0.00 -4.17
18 -12.65 -3.03 0.00 0.00 0.00 5.30
35 17 7.07 0.82 0.00 0.00 0.00 -1.63
18 -7.67 -3.16 0.00 0.00 0.00 2.84

Shah Technical Consultants Page 43 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR WALL
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
18 1 18 6.60 0.23 0.00 0.00 0.00 -4.51
19 -7.20 -0.23 0.00 0.00 0.00 4.65
2 18 1.06 -0.15 0.00 0.00 0.00 -0.70
19 -1.06 0.15 0.00 0.00 0.00 0.61
3 18 0.00 3.07 0.00 0.00 0.00 2.38
19 0.00 -5.80 0.00 0.00 0.00 0.36
4 18 3.82 -0.74 0.00 0.00 0.00 -2.36
19 -3.82 0.74 0.00 0.00 0.00 1.90
5 18 7.91 -0.21 0.00 0.00 0.00 -3.93
19 -7.91 0.21 0.00 0.00 0.00 3.80
6 18 2.30 -0.44 0.00 0.00 0.00 -1.42
19 -2.30 0.44 0.00 0.00 0.00 1.14
7 18 4.98 -0.12 0.00 0.00 0.00 -2.47
19 -4.98 0.12 0.00 0.00 0.00 2.39
21 18 11.48 2.42 0.00 0.00 0.00 -5.19
19 -12.08 -5.14 0.00 0.00 0.00 7.52
22 18 15.58 2.95 0.00 0.00 0.00 -6.77
19 -16.18 -5.67 0.00 0.00 0.00 9.42
31 18 9.96 2.71 0.00 0.00 0.00 -4.25
19 -10.56 -5.44 0.00 0.00 0.00 6.76
32 18 12.65 3.03 0.00 0.00 0.00 -5.30
19 -13.24 -5.76 0.00 0.00 0.00 8.01
35 18 7.67 3.16 0.00 0.00 0.00 -2.84
19 -8.26 -5.88 0.00 0.00 0.00 5.62

21 1 21 4.22 -0.23 0.00 0.00 0.00 3.94
22 -4.82 0.23 0.00 0.00 0.00 -4.09
2 21 1.06 0.15 0.00 0.00 0.00 1.07
22 -1.06 -0.15 0.00 0.00 0.00 -0.98
3 21 0.00 3.97 0.00 0.00 0.00 0.00
22 0.00 -2.78 0.00 0.00 0.00 2.11
4 21 2.66 0.74 0.00 0.00 0.00 3.93
22 -2.66 -0.74 0.00 0.00 0.00 -3.48
5 21 2.02 0.21 0.00 0.00 0.00 2.88
22 -2.02 -0.21 0.00 0.00 0.00 -2.75
6 21 1.59 0.44 0.00 0.00 0.00 2.36
22 -1.59 -0.44 0.00 0.00 0.00 -2.09
7 21 1.24 0.12 0.00 0.00 0.00 1.77
22 -1.24 -0.12 0.00 0.00 0.00 -1.69
21 21 7.95 4.62 0.00 0.00 0.00 8.95
22 -8.54 -3.44 0.00 0.00 0.00 -6.43
Shah Technical Consultants Page 44 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR WALL
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
22 21 7.31 4.10 0.00 0.00 0.00 7.89
22 -7.90 -2.91 0.00 0.00 0.00 -5.70
31 21 6.88 4.33 0.00 0.00 0.00 7.38
22 -7.48 -3.15 0.00 0.00 0.00 -5.04
32 21 6.52 4.01 0.00 0.00 0.00 6.79
22 -7.12 -2.82 0.00 0.00 0.00 -4.65
35 21 5.29 3.89 0.00 0.00 0.00 5.02
22 -5.88 -2.70 0.00 0.00 0.00 -2.95

22 1 22 4.82 -0.23 0.00 0.00 0.00 4.09
23 -5.41 0.23 0.00 0.00 0.00 -4.23
2 22 1.06 0.15 0.00 0.00 0.00 0.98
23 -1.06 -0.15 0.00 0.00 0.00 -0.89
3 22 0.00 2.78 0.00 0.00 0.00 -2.11
23 0.00 -1.22 0.00 0.00 0.00 3.37
4 22 2.66 0.74 0.00 0.00 0.00 3.48
23 -2.66 -0.74 0.00 0.00 0.00 -3.02
5 22 2.02 0.21 0.00 0.00 0.00 2.75
23 -2.02 -0.21 0.00 0.00 0.00 -2.62
6 22 1.59 0.44 0.00 0.00 0.00 2.09
23 -1.59 -0.44 0.00 0.00 0.00 -1.81
7 22 1.24 0.12 0.00 0.00 0.00 1.69
23 -1.24 -0.12 0.00 0.00 0.00 -1.62
21 22 8.54 3.44 0.00 0.00 0.00 6.43
23 -9.14 -1.87 0.00 0.00 0.00 -4.77
22 22 7.90 2.91 0.00 0.00 0.00 5.70
23 -8.50 -1.34 0.00 0.00 0.00 -4.36
31 22 7.48 3.15 0.00 0.00 0.00 5.04
23 -8.07 -1.58 0.00 0.00 0.00 -3.56
32 22 7.12 2.82 0.00 0.00 0.00 4.65
23 -7.71 -1.26 0.00 0.00 0.00 -3.36
35 22 5.88 2.70 0.00 0.00 0.00 2.95
23 -6.48 -1.14 0.00 0.00 0.00 -1.74

23 1 23 5.41 -0.23 0.00 0.00 0.00 4.23
24 -6.01 0.23 0.00 0.00 0.00 -4.37
2 23 1.06 0.15 0.00 0.00 0.00 0.89
24 -1.06 -0.15 0.00 0.00 0.00 -0.80
3 23 0.00 1.22 0.00 0.00 0.00 -3.37
24 0.00 0.74 0.00 0.00 0.00 3.54
4 23 2.66 0.74 0.00 0.00 0.00 3.02
24 -2.66 -0.74 0.00 0.00 0.00 -2.57
Shah Technical Consultants Page 45 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR WALL
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
5 23 2.02 0.21 0.00 0.00 0.00 2.62
24 -2.02 -0.21 0.00 0.00 0.00 -2.49
6 23 1.59 0.44 0.00 0.00 0.00 1.81
24 -1.59 -0.44 0.00 0.00 0.00 -1.54
7 23 1.24 0.12 0.00 0.00 0.00 1.62
24 -1.24 -0.12 0.00 0.00 0.00 -1.54
21 23 9.14 1.87 0.00 0.00 0.00 4.77
24 -9.73 0.08 0.00 0.00 0.00 -4.19
22 23 8.50 1.34 0.00 0.00 0.00 4.36
24 -9.09 0.61 0.00 0.00 0.00 -4.12
31 23 8.07 1.58 0.00 0.00 0.00 3.56
24 -8.67 0.38 0.00 0.00 0.00 -3.17
32 23 7.71 1.26 0.00 0.00 0.00 3.36
24 -8.31 0.70 0.00 0.00 0.00 -3.17
35 23 6.48 1.14 0.00 0.00 0.00 1.74
24 -7.07 0.82 0.00 0.00 0.00 -1.63

24 1 24 6.01 -0.23 0.00 0.00 0.00 4.37
25 -6.60 0.23 0.00 0.00 0.00 -4.51
2 24 1.06 0.15 0.00 0.00 0.00 0.80
25 -1.06 -0.15 0.00 0.00 0.00 -0.70
3 24 0.00 -0.74 0.00 0.00 0.00 -3.54
25 0.00 3.07 0.00 0.00 0.00 2.38
4 24 2.66 0.74 0.00 0.00 0.00 2.57
25 -2.66 -0.74 0.00 0.00 0.00 -2.11
5 24 2.02 0.21 0.00 0.00 0.00 2.49
25 -2.02 -0.21 0.00 0.00 0.00 -2.36
6 24 1.59 0.44 0.00 0.00 0.00 1.54
25 -1.59 -0.44 0.00 0.00 0.00 -1.27
7 24 1.24 0.12 0.00 0.00 0.00 1.54
25 -1.24 -0.12 0.00 0.00 0.00 -1.47
21 24 9.73 -0.08 0.00 0.00 0.00 4.19
25 -10.33 2.42 0.00 0.00 0.00 -4.95
22 24 9.09 -0.61 0.00 0.00 0.00 4.12
25 -9.69 2.95 0.00 0.00 0.00 -5.20
31 24 8.67 -0.38 0.00 0.00 0.00 3.17
25 -9.26 2.71 0.00 0.00 0.00 -4.10
32 24 8.31 -0.70 0.00 0.00 0.00 3.17
25 -8.90 3.03 0.00 0.00 0.00 -4.31
35 24 7.07 -0.82 0.00 0.00 0.00 1.63
25 -7.67 3.16 0.00 0.00 0.00 -2.84

Shah Technical Consultants Page 46 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR WALL
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
25 1 25 6.60 -0.23 0.00 0.00 0.00 4.51
26 -7.20 0.23 0.00 0.00 0.00 -4.65
2 25 1.06 0.15 0.00 0.00 0.00 0.70
26 -1.06 -0.15 0.00 0.00 0.00 -0.61
3 25 0.00 -3.07 0.00 0.00 0.00 -2.38
26 0.00 5.80 0.00 0.00 0.00 -0.36
4 25 2.66 0.74 0.00 0.00 0.00 2.11
26 -2.66 -0.74 0.00 0.00 0.00 -1.65
5 25 2.02 0.21 0.00 0.00 0.00 2.36
26 -2.02 -0.21 0.00 0.00 0.00 -2.23
6 25 1.59 0.44 0.00 0.00 0.00 1.27
26 -1.59 -0.44 0.00 0.00 0.00 -0.99
7 25 1.24 0.12 0.00 0.00 0.00 1.47
26 -1.24 -0.12 0.00 0.00 0.00 -1.39
21 25 10.33 -2.42 0.00 0.00 0.00 4.95
26 -10.92 5.14 0.00 0.00 0.00 -7.27
22 25 9.69 -2.95 0.00 0.00 0.00 5.20
26 -10.28 5.67 0.00 0.00 0.00 -7.85
31 25 9.26 -2.71 0.00 0.00 0.00 4.10
26 -9.86 5.44 0.00 0.00 0.00 -6.61
32 25 8.90 -3.03 0.00 0.00 0.00 4.31
26 -9.50 5.76 0.00 0.00 0.00 -7.01
35 25 7.67 -3.16 0.00 0.00 0.00 2.84
26 -8.26 5.88 0.00 0.00 0.00 -5.62

42 1 13 4.03 -0.23 0.00 0.00 0.00 3.90
21 -4.22 0.23 0.00 0.00 0.00 -3.94
2 13 1.06 0.15 0.00 0.00 0.00 1.10
21 -1.06 -0.15 0.00 0.00 0.00 -1.07
3 13 0.00 4.27 0.00 0.00 0.00 0.83
21 0.00 -3.97 0.00 0.00 0.00 0.00
4 13 2.66 0.74 0.00 0.00 0.00 4.08
21 -2.66 -0.74 0.00 0.00 0.00 -3.93
5 13 2.02 0.21 0.00 0.00 0.00 2.92
21 -2.02 -0.21 0.00 0.00 0.00 -2.88
6 13 1.59 0.44 0.00 0.00 0.00 2.45
21 -1.59 -0.44 0.00 0.00 0.00 -2.36
7 13 1.24 0.12 0.00 0.00 0.00 1.79
21 -1.24 -0.12 0.00 0.00 0.00 -1.77
21 13 7.75 4.92 0.00 0.00 0.00 9.91
21 -7.95 -4.62 0.00 0.00 0.00 -8.95
22 13 7.11 4.40 0.00 0.00 0.00 8.74
21 -7.31 -4.10 0.00 0.00 0.00 -7.89
Shah Technical Consultants Page 47 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR WALL
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
31 13 6.69 4.63 0.00 0.00 0.00 8.27
21 -6.88 -4.33 0.00 0.00 0.00 -7.38
32 13 6.33 4.31 0.00 0.00 0.00 7.62
21 -6.52 -4.01 0.00 0.00 0.00 -6.79
35 13 5.09 4.19 0.00 0.00 0.00 5.83
21 -5.29 -3.89 0.00 0.00 0.00 -5.02

43 1 19 7.20 0.23 0.00 0.00 0.00 -4.65
29 -7.42 -0.23 0.00 0.00 0.00 4.70
2 19 1.06 -0.15 0.00 0.00 0.00 -0.61
29 -1.06 0.15 0.00 0.00 0.00 0.58
3 19 0.00 5.80 0.00 0.00 0.00 -0.36
29 0.00 -6.88 0.00 0.00 0.00 1.78
4 19 3.82 -0.74 0.00 0.00 0.00 -1.90
29 -3.82 0.74 0.00 0.00 0.00 1.73
5 19 7.91 -0.21 0.00 0.00 0.00 -3.80
29 -7.91 0.21 0.00 0.00 0.00 3.76
6 19 2.30 -0.44 0.00 0.00 0.00 -1.14
29 -2.30 0.44 0.00 0.00 0.00 1.04
7 19 4.98 -0.12 0.00 0.00 0.00 -2.39
29 -4.98 0.12 0.00 0.00 0.00 2.36
21 19 12.08 5.14 0.00 0.00 0.00 -7.52
29 -12.30 -6.22 0.00 0.00 0.00 8.80
22 19 16.18 5.67 0.00 0.00 0.00 -9.42
29 -16.39 -6.75 0.00 0.00 0.00 10.82
31 19 10.56 5.44 0.00 0.00 0.00 -6.76
29 -10.77 -6.52 0.00 0.00 0.00 8.10
32 19 13.24 5.76 0.00 0.00 0.00 -8.01
29 -13.46 -6.84 0.00 0.00 0.00 9.42
35 19 8.26 5.88 0.00 0.00 0.00 -5.62
29 -8.48 -6.96 0.00 0.00 0.00 7.06

44 1 26 7.20 -0.23 0.00 0.00 0.00 4.65
41 -7.42 0.23 0.00 0.00 0.00 -4.70
2 26 1.06 0.15 0.00 0.00 0.00 0.61
41 -1.06 -0.15 0.00 0.00 0.00 -0.58
3 26 0.00 -5.80 0.00 0.00 0.00 0.36
41 0.00 6.88 0.00 0.00 0.00 -1.78
4 26 2.66 0.74 0.00 0.00 0.00 1.65
41 -2.66 -0.74 0.00 0.00 0.00 -1.49
5 26 2.02 0.21 0.00 0.00 0.00 2.23
41 -2.02 -0.21 0.00 0.00 0.00 -2.19
Shah Technical Consultants Page 48 of 49
Guwahati ADB- Dibrugarh drainage project Design of BOX Drain ( 8m x 3.10m )
ANALYSIS RESULTS : MEMER FORCES FOR WALL
MEMBER END FORCES STRUCTURE TYPE = SPACE
-----------------
ALL UNITS ARE -- MTON METE (LOCAL )

MEMBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION MOM-Y MOM-Z
6 26 1.59 0.44 0.00 0.00 0.00 0.99
41 -1.59 -0.44 0.00 0.00 0.00 -0.89
7 26 1.24 0.12 0.00 0.00 0.00 1.39
41 -1.24 -0.12 0.00 0.00 0.00 -1.37
21 26 10.92 -5.14 0.00 0.00 0.00 7.27
41 -11.14 6.22 0.00 0.00 0.00 -8.55
22 26 10.28 -5.67 0.00 0.00 0.00 7.85
41 -10.50 6.75 0.00 0.00 0.00 -9.25
31 26 9.86 -5.44 0.00 0.00 0.00 6.61
41 -10.07 6.52 0.00 0.00 0.00 -7.95
32 26 9.50 -5.76 0.00 0.00 0.00 7.01
41 -9.72 6.84 0.00 0.00 0.00 -8.43
35 26 8.26 -5.88 0.00 0.00 0.00 5.62
41 -8.48 6.96 0.00 0.00 0.00 -7.06

Shah Technical Consultants Page 49 of 49