SECTION 02730 SEWERAGE SYSTEM 00000000PART 1 - GENERAL 1.1 SECTION INCLUDES A. B.

Sewerage system outside buildings and up to interface points as shown on Drawings. Sewerage system shall include the following: 1. 2. 3. 4. 1.2 Pipes and pipe fittings. Sewer manholes. Lift Station as well as the related components including pumps and controllers. Miscellaneous materials related to the sewerage system.

REFERENCES A. SASO Saudi Arabian Standards Organization SASO 412 SASO 413 SASO 827 SASO 1014 Method of Testing for Cast Iron Manhole Covers Cast Iron Manhole Covers. Cast iron sanitary pipes and fittings for waste water and ventilation. Socket and spigot ductile cast iron pipes for pressure pipelines Ductile iron pressure pipelines Flanges. Ductile iron pipes, fittings and accessories for pressure pipelines Test methods. Ductile iron pipes, fittings and accessories for pressure pipelines General requirements Ductile iron fittings and accessories for pressure pipelines.

SASO 1015 SASO 1019

SASO 1020

SASO 1021 B.

ASTM - American Society for Testing and Materials: ASTM A 193/A Alloy-Steel and stainless Steel Bolting Materials for HighTemperature Service

ITCC in Riyadh Residential Complex J10-13300

02730-1

Sewerage System

ASTM A 194/A ASTM A 377 ASTM C 301 ASTM C 425 ASTM C 700 ASTM C 478M C.

Carbon and Alloy-Steel Nuts for Bolts for Highpressure and High- Temperature Service Ductile Iron Pressure Pipe Test Methods for Vitrified Clay Pipes Specification for Compression Joints for Vitrified Clay Pipe and Fitting Vitrified Clay Pipes Extra Strength Precast Concrete Sewer Manholes

ANSI - American National Standard Institute ANSI B16.5 Flanged Fittings Steel Pipe Flanges and

D.

ASME - American Society of Mechanical Engineers: ASME A40.8 National Plumbing Code.

1.3.

SUBMITTALS A. Product and Maintenance Data: Submit manufacturer's product and maintenance data for piping materials, precast elements lift station and fiberglass manholes as well as the related items. Coordination Drawings: Prepare and submit coordination drawings for sanitary sewerage piping including details for installation of manholes, lift station and other items related to the sewerage system.

B.

1.4.

WARRANTY A. Provide a written Guarantee covering the satisfactory operation of plumbing installations for a period of one year from the date of acceptance. During this period, repair providing new materials to replace defective work at no extra cost to the Owner.

1.5.

TRANSPORTATION, HANDLING AND STORAGE A. Conform to manufacturer's recommendations for the handling, transportation and storage of precast elements as well as nesting, denesting and stacking of pipes.

1.6.

QUALITY ASSURANCE A. Comply with the applicable requirements of the Uniform Plumbing Code (UPC), Basic National Plumbing Code, local utility authority requirements as well as the Codes and Standards referred to in this Section.

B.

Single Source Manufacturer: Provide pipes, fittings and piping specialties for a
02730-2 Sewerage System

ITCC in Riyadh Residential Complex J10-13300

particular installation from a single source to avoid incompatibility due to intermixing of products. C. Installer's Qualifications: Installer shall be subject to the Engineer's approval.

PART 2 - PRODUCTS 2.1. PIPES AND PIPE FITTINGS A. General: 1. 2. 3. 4. Materials used for pipes and pipe fittings shall conform to Standards referred to herein. Provide pipes and pipe fittings for a particular installation from a single source to avoid incompatibility due to inter-mixing of products. For Gravity Sewers Underground: Provide Vitrified Clay pipes, and pipe fittings as indicated on Drawings. For Force Mains: a. b. B. Inside Lift Station: Provide ductile iron pipes conforming to ASTM A 377. Outside Lift Station: Provide uPVC pipes and pipe fittings, Schedule 80 or Class V or as indicated on Drawings.

uPVC Pipes and Pipe Fittings: 1. Pipes: Unplasticized polyvinyl chloride (uPVC) plastic pipes conforming to ASTM D 3034 or ASTM D 1785, or SASO 14 and 15 standards, Schedule 80 or Class V. Pipe Fittings: Socket-type and bell and spigot type unplasticized polyvinyl chloride (uPVC) plastic fittings conforming to ASTM D 3034 or ASTM D 2466 or ASTM D 2467, or SASO standards, Schedule/Class to match that of pipe. Jointing System: a. b. Welded joints using solvent cement conforming to ASTM D 2564, for pipes less than 100 mm diameter. Gasketed joints using elastomeric seals conforming to ASTM F 477, for pipes of 100 mm and larger diameter.

2.

3.

C.

Vitrified Clay Pipes and Fittings: 1. Pipes: Vitrified clay pipe shall be manufactured from fire clay, shale, surface clay, or a combination of these materials conforming to ASTM C 700. Pipe shall be with manufacturer standard glazing from out side. Pipe Fittings: Bell and spigot type vitrified clay fittings conforming to ASTM C 700.
02730-3 Sewerage System

2.
ITCC in Riyadh Residential Complex J10-13300

3. D.

Jointing System: Gasketed joints using rubber ring sealing elements conforming to ASTM C 425.

Ductile Iron Pipe: 1. 2. 3. Pipe: Ductile iron pipe, conforming to the requirements of ASTM A 377. Pipe fittings: Ductile iron fittings conforming to the same requirements mentioned for the pipes. Jointing System: Flanged joints for standard fittings in accordance with the following: a. b. Flange and Gasket: Flat-faced flanges, rated class 150 in accordance with ANSI B16.5. Bolts, Nuts and Washers: 1). 2). 3). Bolts: Alloy stud bolts in conformance with ASTM A 193, Grade B7 Nuts: Semi-finished heavy pattern hex nuts conforming to ASTM A 194, Grade 2H. Washers: Conform to ASTM F 436.

2.2.

SEWER MANHOLES A. Shall be reinforced concrete, Class 30 complying with Division 3 - CONCRETE. 1. 2. 3. Exterior Surfaces: Exterior surfaces shall be coated at factory with a 100% solids coal-tar epoxy. Interior Surfaces: Lining complying with 07100 - WATERPROOFING. Manhole Cover and Frame: Conform to the requirements of SASO 412, SASO 413 and Section 05500 - METAL FABRICATIONS.

2.3.

LIFT STATION A. Underground lift station shall be constructed of reinforced concrete with waterproof lining on all inside areas and double layer full tanking on outside walls and foundation using waterproofing membrane complying with the requirements of Section 07100 - WATERPROOFING. Waterproofing on exterior walls shall be protected against soil with protection board. Reinforced concrete shall comply with the requirements of Division 3 - CONCRETE. Concrete shall be of minimum 30 MPa compressive strength at 28 days. Size of lift station shall be as shown on drawings. Lift station shall be provided with submersible sewage pumps with lifting chains, access cover and ladder rungs. Cover and Frame: Covers and frames shall be of gray cast iron casting, heavy duty, all complying with ASTM A48 or BS 497, Appendix A. Type and size shall be as shown on the drawings or selected by the Engineer. The words "SEWER" in Arabic and English shall be cast in covers. Covers and frames shall be coated with coal tar
02730-4 Sewerage System

B.

ITCC in Riyadh Residential Complex J10-13300

epoxy coating. 2.4. SUBMERSIBLE SEWAGE PUMPS A. General: Provide a for each lift station, factory-fabricated and tested automatic sewage pumping system consisting of submersible sewage pumps with flush valve, power and control panel as well as the required instrumentation to make system operational. Pumps shall be in accordance with the following requirements: 1. 2. Provide submersible centrifugal sewage pumps; type, capacity and number as indicated on Drawings. Construction: Cast iron body and parts conforming to BS 1452 grade 14 or equivalent standards, with aluminum lower bearing housing and stainless steel 316 shaft, studs, nuts, screws and washers. Parts shall be rubber Orings, graphite/carbide upper mechanical shaft seal, as well as a carbide/carbide lower mechanical shaft seal. Outer casing shall be primed with PVC epoxy and then painted with black chloric rubber paint. Cooling System: Built-in cooling system utilizing the pumped fluid to cool the pump motor. Junction Box: Fully sealed type, from the outside and from the motor, and shall be suitable for sewage service. Motor: Manufacturer's standard squirrel-cage type electric motor, designed for driving centrifugal pumps. Motor shall be TEFC type with Class F insulation with maximum operating temperature of not less than 55 degree C. Power rating for motor shall be as indicated on Drawings. Shaft and Shaft Seals: Stainless steel shaft with double shaft seals, operating independently in an oil bath. Impeller: Stainless steel 316, self-balancing, single vane type, clog free impeller.

B.

3. 4. 5.

6. 7. C.

0Pump Controls 1. Control Principle: As indicated on Drawings and in accordance with the following: a. b. c. Lead pump shall operate when the level of sewage reaches - PUMP No.1 ON - level. Lag pump shall operate when the level of sewage exceeds the capacity of the lead pump, and reaches - PUMP No.2 ON - level. Lead and lag pumps shall continue to operate. When the demand decreases, below - PUMP No.2 ON - level the lag pump shall stop. When the level reaches below - PUMP No.1 & 2 OFF - level, the lead pump shall stop. When level of sewage reach ALARM level, it shall initiate an alarm bell
02730-5 Sewerage System

d.
ITCC in Riyadh Residential Complex J10-13300

in the control panel. 2. Level Control System: Pump manufacturer's standard, bulb type level regulator, having a shock-proof mercury switch inside that operates when the regulator tilts and stops when the regulator straightens. Regulator shall have a polypropylene casing with cables running to the control panel sheathed with PVC compound. Start Method: Pumps shall be designed to start by reduced voltage type starter. Control panel: a. Construction: Enclosure shall be constructed of powder-enameled steel sheets, 2 mm for the door and 1.75 for the housing. Panel shall be suitable for outdoor installation in accordance with the requirements of IEC IP-55. Panel shall have an outer security door lockable with a separate key covering all control devices. Panel shall be supplied with the following controls for each pump: 1). 2). Stop/Start Push button: Non-illuminated type, NEMA type 4 or equivalent complete with legend plate. Selector Switch: 3-position selector with Hand-Off-Auto, nonilluminated with swing handle, NEMA type 4 or equivalent, complete with legend plate. Indicating Light: NEMA type 4 or equivalent, and in Red and Green colors. High water alarm indicators. Alarm bell and warning light located at the top of panel.

3. 4.

b.

3). 4). 5). 2.5.

LEVEL ALARM FOR LIFT STATIONS A. Mercury tilt float level switch shall be suitable for level control and alarm applications for lift stations. Float level switch shall be complete with oil-resistant cable of required length soldered to a stainless steel mercury capsule housed in a polypropylene shell. Contacts shall be SPST, Normally Open or Normal Closed. Power rating shall be as required. Float level switch shall be installed as per manufacturers written instructions.

2.6.

WASTE HOLDING TANK A. Underground waste holding tank shall be constructed of reinforced concrete with waterproof lining on all inside areas and double layer full tanking on outside walls and foundation using waterproofing membrane complying with the requirements of Section 07100 - WATERPROOFING. Waterproofing on exterior walls shall be protected against soil with protection board. Reinforced concrete shall comply with the requirements of Division 3 - CONCRETE. Concrete shall be of minimum 30 MPa compressive strength at 28 days. Size of tank shall be as shown on drawings. Tank shall be provided with access cover and ladder rungs.

ITCC in Riyadh Residential Complex J10-13300

02730-6

Sewerage System

B. Cover and Frame: Covers and frames shall be of gray cast iron casting, heavy duty, all complying with ASTM A48 or BS 497, Appendix A. Type and size shall be as shown on the drawings or selected by the Engineer. The words "SEWER" in Arabic and English shall be cast in covers. Covers and frames shall be coated with coal tar epoxy coating. 2.7. MISCELLANEOUS MATERIALS A. Marker Tape: Detectable polyethylene plastic tape with metallic core, color-coded, 150 mm wide, 100 microns thick, and labeled in Arabic and English alternately for the appropriate service. Anchor and Thrust Blocks: 1. Construction: Anchors and thrust blocks shall be of 20 MPa compressive strength conforming to Section 03300 - CAST-IN-PLACE CONCRETE, using Type 1 cement modified with silica fume. Location and Bearing Areas of Thrust Block: Conform to the International Association of Plumbing and Mechanical Officials (IAPMO) Standard IS-8-81 as required by the Uniform Plumbing Code, including tees, bends and valves unless otherwise indicated on Drawings. Trench Drain Grating: Medium duty cast iron with steel frame. Provide manufacturer's standard corrosion protection coating for grating.

B.

2.

3.

PART 3 - EXECUTION 3.1. GENERAL A. B. C. Products shall be installed in strict accordance with the manufacturer's instructions and recommendations. Excavation for Sewer Manholes: Conform to the requirements of Section 02200 EARTHWORK. Dewatering: Dewatering shall conform to the requirements of Section 02200 EARTHWORK.

3.2.

INSPECTION A. Inspect products for damage immediately before installation. Damaged products or products found to be not in accordance with the Specifications shall be rejected and removed from site and replaced with the appropriate products. Repairs shall not be undertaken without the Engineer review of the proposed action.

3.3.

RELATED WORKS A. B. Trenching and bedding for underground piping shall conform to Section 02225 TRENCHING AND BACKFILLING. Pipelines Crossings under Roads: Conform to the requirements of Section 02225 02730-7 Sewerage System

ITCC in Riyadh Residential Complex J10-13300

TRENCHING AND BACKFILLING C. 3.4. Dewatering: Dewatering, where required, shall conform to the requirements of Section 02200 - EARTHWORK.

PIPE INSTALLATION A. Install piping at low point of system, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install joints in accordance with manufacturer's written instructions and recommendations. Maintain swab or drag in line and pull past each joint as it is completed. Pipe Joints: 1. 2. C. D. E. F. Vitrified Clay Pipes: Install joints in accordance with ASTM C 425, ASTM C 700 and manufacturer's written instructions. Ductile Iron Pipes: Install flanged joints in accordance with manufacturer's written instructions.

B.

Plug open ends of pipe at the end of work in each area and at the end of each day. Provide the required connections with extreme care to prevent debris from entering sewer. Check the invert elevations to which connections are to be made. Record of grade letters, survey invert elevations and manhole stations as well as sewer locations shall be accurately maintained as construction proceeds. Outside lines shall be built to grades and elevations shown. Stakes, grade boards, cleats, nails, instruments, etc. shall be provided. Each pipeline shall be located and staked in its entire length.

3.5.

LIFT STATIONS A. B. C. D. E. Excavation for lift stations shall conform to the requirements of Section 02200 EARTHWORK as well as the recommendations of manufacturer of precast units. Dewatering: Dewatering, where required, shall conform to the requirements of Section 02200 - EARTHWORK. Pour concrete foundation in accordance with the requirements of Section 03300 CAST-IN-PLACE CONCRETE. Installation of Lift Stations: Install precast base units, risers and top in strict accordance with manufacturer's recommendations. Pumps: Examine area and conditions under which pumps are to be installed. Do not proceed with the work until unsatisfactory conditions have corrected in a manner acceptable to the Engineer. Installation shall be done in accordance with applicable standards as well as the manufacturer's written instructions. Wiring: Cables and wiring for power and control shall be in accordance with Section 16050 - BASIC ELECTRICAL MATERIALS AND METHODS.

F.

ITCC in Riyadh Residential Complex J10-13300

02730-8

Sewerage System

G. 3.6.

Install frames and covers leveled with the finished grade level of the surrounding.

SYSTEM TESTING A. Testing of Gravity Sewers: Testing shall be carried out from manhole to manhole. Branch sewers less than 10 m long connected to main sewer between manholes shall be tested separately. Pipes and joints shall be watertight. Testing of Sewer Piping: 1. Pipelines shall be tested hydraulically in sections during the course of construction. Testing shall be applied to prove the structural soundness of the various units in the line, including pipes, valves and various units in the line, including pipes, valves and anchorages, and to prove water-tightness of the line. Tests shall be applied to sections of pipeline not exceeding 1000 m in length, or such lesser length may be required, and pipe joints shall be left uncovered. Provide pumps, jacks, gauges, struts and apparatus necessary for carrying out the tests. Provide certificates for all gauges issued for testing. Before testing, anchoring of bends shall be complete and branch outlets taking end thrust shall be properly stayed. Test pressure shall be 30 kPa. When testing, the pipeline shall be charged with water and all air released. Care shall be taken during charging of mains to provide free outlets for air and to prevent water hammer. Pipeline shall then be kept under a nominal pressure for a period of 24 hours to allow for absorption. Thereafter, for a period of two hours the amount of water pumped during the period of test shall be measured and shall not exceed a rate of 0.1 liter per millimeter nominal diameter of the sewer per kilometer length of main per 30 kPa head for each 24 hours. If the amount of make-up water in the 2-hour test exceeds the specified quantity, the leaks shall be located and repaired and the test repeated. Test on each section shall be repeated until the specified degree of watertightness has been obtained. Any additional tests required by the Engineer shall be carried out by Contractor without any extra costs to Owner. In addition to the tests in separate sections, on completion, the main shall be tested in whole or in parts to the same pressure and by the same procedure as that outlined for individual sections. No erosion or silting shall be allowed to occur in water courses from the discharge of test water.

B.

2. 3. 4.

5.

6. 7.

8.

9. C.

Testing and commissioning of pump set motors and associated fittings shall be carried out by the manufacturer's or supplier's field commissioning and testing personnel.

3.7.

BACKFILL A. Trench backfilling shall conform to the requirements of Section 02225 02730-9 Sewerage System

ITCC in Riyadh Residential Complex J10-13300

TRENCHING AND BACKFILLING. B. Marker Tape: Install continuous, marker tape during backfilling of trench for underground services. Locate tape 300 mm below finished grade. END OF SECTION