PTN 910 COMMISSION GUIDE

PTN 910 COMMISSION GUIDE

CONFIDENTIAL COPYRIGHT (2012)

Page 1 of 13

PTN 910 COMMISSION GUIDE

Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For assistance, please contact our local office or company headquarters.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base Bantian, Longgang Shenzhen 518129 Peoples Republic of China Website: Email: http://www.huawei.com support@huawei.com

Copyright Huawei Technologies Co., Ltd. 2012. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the propert ies of their respective holders.

Notice Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute the warranty of any kind, express or implied.

CONFIDENTIAL COPYRIGHT (2012)

Page 2 of 13

PTN and BITS Commissioning Guide

1
For PTN910:

PTN 910 status check

After powering up the PTN equipment, wait 3-5 minutes for the PTN to start up completely. Then the engineer should check the status of PTN indicators.

There are 9 indicators on the PTN CXPH board. The correct indicators status should be as shown below:

PTN and BITS Commissioning Guide

GE optical interface check

By default, the GE optical interfaces are enabled after the PTN is powered up. The UGL engineer needs to check the output power of the GE optical interfaces (OUT1 and OUT2). The GE optical interface is 1000BASE4

PTN and BITS Commissioning Guide

LX(10Km). Its mean launched optical power should be from -11 to -3 dBm. The figures below shows the GE output interfaces to be tested.

CXPH unit for PTN910

PTN and BITS Commissioning Guide

Configure the PTN 910 Parameters

The NE IP and GE interface IP should be configured to enable the remote communication and control of the PTN. UGL engineer should be responsible for the IP address configuration.

Step 1: Configure the IP address on the PC


The UGL engineer should first configure the laptop IP address to be 129.9.0.1 (IP mask 255.255.0.0)

Then the Ethernet interface of the laptop should be connect to the ETH/OAM interface of the PTN with cable.

Step 2: Check the U2000 LCT server status


Launch the U2000LCT System Monitor shortcut icon to start System Monitor Client

In the Login dialog box, set the username and the password.

PTN and BITS Commissioning Guide

Check whether the U2000 LCT processes can be normally started. The processes whose startup mode is manual must be started manually. If all the processes can be normally started, the server runs normally

Step 3: Launch the U2000 LCT client


Open the U2000 LCT Client shortcut icon

PTN and BITS Commissioning Guide

Enter the username and the password, to open the U2000LCT.

PTN and BITS Commissioning Guide

Step 4: Find the PTN910 in the U2000 LCT

Click the Auto-Discovery icon on the bottom-right of the window

Select the row which has the 129.9.255.255 as the IP Address in the pop-out window and click next

PTN and BITS Commissioning Guide

The system will find out the directly connected PTN-910. Select the entry and click Create. Enter the username as root and password as password to integrate the PTN into the U2000.

If the operation succussed, a new entry will be created under NE information List as below.

Note: For most of time, if an action has been executed successfully, the following window will be pop-out to indicate the operation is succussed, click close to continue.

10

PTN and BITS Commissioning Guide

11

PTN and BITS Commissioning Guide

Step 4: Upload the PTN-910 configuration

Right-click the new-created 910 entry and click configuration; In the new window, select the Upload radio button and click Next to upload the configuration.

In the new pop-out window, click OK to continue.

The system will finish the uploading process after the progress reach 100%

12

PTN and BITS Commissioning Guide

13