Activity Name
Comment
OD
40 - HIDES GAS C
CONDITIONING PLANT (HGCP)
CONSTRUCTION and
a
COMMISSIONING
40 - CONSTRUCTION
CONSTRUCT
COMMISSIONING FUEL GAS SUPPLY
Piping
Aboveground Piping
Pip
Carbon Steel Piping
P
MEG Incinerator
Incinerat
Subrack
COMGAS0880 Install Main Piperack 2" Temp Fuel Gas MEG Incinerator CS Piping
GTG
Subrack
COMGAS0870 Install Main Piperack 3" Temp Fuel Gas GTG CS Piping
Interconnecti
Interconnecting
COMGAS0905 Install 2" Temp PSV/BDV GTG Vent Line CS Piping (Sys 966-02)
000 COMMON
Perimeter CCTV
000C0251061
000C0251101
Perimeter Lighting
000C0251086
Pull U/G Site Wide LV Perimeter Lighting Cabling
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
647
273
11-May-12 A
23-Nov-13
140
73
500
15-Mar-13
15-Mar-13
-40
-24
15-Mar-13
15-Mar-13
-40
-24
15-Mar-13
15-Mar-13
-40
-24
15-Mar-13*
-40
-24
647
273
11-May-12 A
23-Nov-13
140
73
500
647
273
11-May-12 A
23-Nov-13
140
73
500
647
273
11-May-12 A
23-Nov-13
140
73
500
14
14
02-Mar-13
17-Mar-13
-1
255
14
14
14
8
8
8
14
14
14
8
8
8
02-Mar-13
02-Mar-13
02-Mar-13
07-Mar-13
07-Mar-13
07-Mar-13
17-Mar-13
17-Mar-13
17-Mar-13
15-Mar-13
15-Mar-13
15-Mar-13
5
5
5
2
2
2
5
5
5
2
2
2
-1
-1
-1
1
1
1
255
255
255
234
234
234
14
10
10
14
10
10
02-Mar-13
02-Mar-13
02-Mar-13
17-Mar-13
13-Mar-13
13-Mar-13
5
5
5
5
5
5
-8
-8
-8
255
255
255
4
4
4
4
13-Mar-13
13-Mar-13
17-Mar-13
17-Mar-13
5
5
5
5
-8
-8
255
255
167
134
14-Dec-12 A
27-Jun-13
157
82
60
82
60
28-Feb-13
28-Feb-13
27-May-13
03-May-13
0
0
8
0
-40
-57
187
159
72
72
11-Mar-13
27-May-13
-40
187
105
63
79
39
14-Dec-12 A
14-Dec-12 A
29-Apr-13
16-Mar-13
0
0
0
0
-15
-15
212
157
000C0251081
78
45
31-Dec-12 A
23-Mar-13
-15
212
000C0251041
Installation progressing
78
60
08-Jan-13 A
08-Apr-13
-16
212
000C0251096
78
79
10-Jan-13 A
29-Apr-13
-15
212
147
147
134
134
21-Jan-13 A
21-Jan-13 A
27-Jun-13
27-Jun-13
0
0
0
0
0
0
157
157
488
244
11-May-12 A
24-Oct-13
-30
508
220
220
220
221
43
43
43
43
11-May-12 A
11-May-12 A
11-May-12 A
11-May-12 A
21-Mar-13
21-Mar-13
21-Mar-13
21-Mar-13
0
0
0
0
-1
-1
-1
-1
-1
-1
-1
-1
94
94
94
95
409
23
23
23
244
52
52
52
26-Jun-12 A
10-Sep-12 A
10-Sep-12 A
10-Sep-12 A
24-Oct-13
31-Mar-13
31-Mar-13
31-Mar-13
0
0
0
0
0
0
0
0
-30
-93
-93
-93
246
160
160
160
10
10
2
19-Nov-12 A
19-Nov-12 A
19-Nov-12 A
14-Feb-13
14-Feb-13
05-Feb-13
0
0
0
20
20
-1
-48
-48
-40
114
114
95
Perimeter Earthing
000C0251091
Installation of Perimeter Earthing
600 UTILITIES
Civil and Earthworks
Earthwo
Excavation & Backfill
Bac
Backfilling Area 600 Final Level
600C0235011
Backfill - Area 600 *[Pull U/G Cable, Paving, Misc Supports, HDPE UG Piping, MH&CB, Foundation]
Concrete
Equipment & Structural
Stru
Foundations
Equipment/Stru
Equipment/Structural
Foundations less than 4m3
600C0311100
Foundation for Misc Pipe Support in Area 600 *[Misc. Pipe Supports on Paving]
Concrete for Below
Belo Grade Structures
Duct Banks
600C0342012
Install Instrument Duct Banks #1, 2, 2A
600C0342026
Utility Concrete
Area Paving
600C0313027
600C0352011
DB# 2A Oustanding
70
70
31
10
10
04-Feb-13
14-Feb-13
20
20
202
202
18
210
210
18
02-Jan-13 A
02-Jan-13 A
25-Feb-13
17-Sep-13
17-Sep-13
15-Mar-13
0
0
0
0
0
0
-1
-1
25
280
280
453
Area Paving, Install kerbs around Equipment - Area 600 *[Misc. Supports, Grouting, Paving, Foundation,
Backfill]
Progressing: South Gen. Package C, Firewater Pump Shelter. Outsanding: Air Compressor Shelter, Diesel
Bowser, Essential Generator
186
210
02-Jan-13 A
17-Sep-13
-1
160
409
140
141
244
143
143
26-Jun-12 A
26-Jun-12 A
26-Jun-12 A
24-Oct-13
08-Jul-13
08-Jul-13
0
0
0
0
0
0
-30
-10
-10
209
200
200
DONE: Diesel Transfer A&B Pump, Utility Water Pump A&B, Diesel Offloading Pump,
120
120
120
120
11-Jan-13 A
11-Jan-13 A
24-Oct-13
24-Oct-13
0
0
0
0
-30
-30
209
209
29
18
18
6
16-Jan-13 A
11-Feb-13
11-Feb-13
11-Feb-13
06-Mar-13
02-Mar-13
02-Mar-13
17-Feb-13
0
-7
-7
-7
26
14
14
-7
58
8
8
-19
284
288
288
188
Grouting
Grouting - Non Shrink
600C0373011
Grouting Non-Shrink [LoE]
Grouting - Epoxy
Epox
600C0372011
Grouting Epoxy *[ Mechanical Equipments & Skid A600]
95
62
18
18
6
600C0531017
18-Feb-13
23-Feb-13
-60
188
600C0531027
24-Feb-13
02-Mar-13
14
14
288
62
24
29
15
16-Jan-13 A
26-Jan-13 A
06-Mar-13
19-Feb-13
0
2
26
1
58
71
227
105
Structural
Major Structures
Major Structures
600C0531022
Erection of Shelter for 40-VABM97710 : Potable Water Treatment Package
Miscellaneous Steel
Ste & Platforms
LER's [Local Eequipment
Ee
Room] A600
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
600C0541096
26-Jan-13 A
06-Feb-13
-7
600C0541024
Started preassembly
04-Feb-13
08-Feb-13
81
107
600C0541026
Started preassembly
28-Jan-13 A
11-Feb-13
13
64
105
600C0541098
09-Feb-13
12-Feb-13
-4
-4
600C0541097
11-Feb-13
14-Feb-13
-1
-1
600C0541030
Platform for 40-LER 81123 air compressor VFD switch room, ETA ??
11-Feb-13
16-Feb-13
-14
105
600C0541081
Stools & cable tray supports for 40-LER81123 air compressor VFD switch room ETA ??
16-Feb-13
19-Feb-13
-1
-1
-14
105
55
3
29
3
16-Jan-13 A
01-Feb-13 A
06-Mar-13
06-Feb-13
0
5
15
2
43
-7
216
174
Miscellaneous S
Steel
600C0541071
Erection of Platform #1 & #2 near 40-ABJ41201
109
109
107
600C0541017
Progressing
01-Feb-13 A
13-Feb-13
41
164
600C0541018
Progressing
01-Feb-13 A
13-Feb-13
38
35
63
236
600C0541019
Erection of Misc. Platform and & Pipe Support Structure for Diesel Storage
ETA ??
13-Feb-13
22-Feb-13
-15
-15
-25
164
600C0541066
19
19
04-Feb-13
23-Feb-13
-7
-7
-49
155
600C0541046
24-Feb-13
26-Feb-13
-7
-7
-59
155
600C0541086
Progressing
27
16-Jan-13 A
04-Mar-13
160
600C0541091
20
20
13-Feb-13
06-Mar-13
-15
-15
-23
164
11
11
11
11
22-Feb-13
22-Feb-13
06-Mar-13
06-Mar-13
26
26
26
26
55
55
228
228
26
26
26
8
30-Jan-13 A
04-Feb-13
04-Feb-13
04-Feb-13
02-Mar-13
02-Mar-13
02-Mar-13
12-Feb-13
-2
-7
-7
-7
10
0
0
-7
38
11
11
-27
231
231
231
248
Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
600C0542013
Misc. Steels (gratings etc.) for Misc. Platform and & Pipe Support Structure for Diesel Storage Tank
Onsite
33
26
26
8
600C1131003
Onsite
25-Feb-13
02-Mar-13
231
600C1131004
Onsite
25-Feb-13
02-Mar-13
11
231
7
7
3
30-Jan-13 A
30-Jan-13 A
30-Jan-13 A
11-Feb-13
11-Feb-13
06-Feb-13
16
16
24
28
28
20
57
57
41
164
164
164
Mechanical
Rotating Equipments
Equipme
Pumps
600C1131010
Installation of [40-PJK41101] Firewater Jockey Pump
Processing Units
Filtration Systems
Syste
600C1153022
Installation of [40-MAJ91112] Diesel Transfer Filter Pre-filter
Progressing
22
22
3
600C1153023
Progressing
30-Jan-13 A
06-Feb-13
30
25
51
164
600C1153021
Progressing
30-Jan-13 A
06-Feb-13
36
31
61
164
600C1153011
Progressing
30-Jan-13 A
11-Feb-13
33
28
54
164
600C1153012
Progressing
30-Jan-13 A
11-Feb-13
16
11
34
164
600C1153013
Progressing
30-Jan-13 A
11-Feb-13
27
22
44
164
15
15
15
15
15
15
15
15
18-Feb-13
18-Feb-13
18-Feb-13
18-Feb-13
05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13
0
0
0
0
0
0
0
0
-22
-22
-22
-22
231
231
231
231
227
227
6
6
70
70
45
45
20-Sep-12 A
20-Sep-12 A
15-Oct-12 A
15-Oct-12 A
19-Apr-13
19-Apr-13
23-Mar-13
23-Mar-13
0
0
0
0
7
7
-46
-46
0
0
-98
-98
228
228
166
166
6
6
6
6
05-Mar-13
05-Mar-13
11-Mar-13
11-Mar-13
-2
-2
-2
-2
-66
-66
190
190
Sub Rack 6C
600C1521765
Install Subrack 6C 2 1/2" & Above Instrument Air Distribution SS Piping [SYS 955-02]
5
5
5
5
05-Mar-13
05-Mar-13
09-Mar-13
09-Mar-13
-34
-34
-34
-34
-86
-86
190
190
Sub Rack 6D
600C1522045
61
26
45
19
22-Nov-12 A
07-Jan-13 A
23-Mar-13
23-Feb-13
0
0
-33
-7
-102
-76
153
178
45
22-Nov-12 A
23-Mar-13
-46
-102
153
50
50
50
25
04-Jan-13 A
04-Jan-13 A
04-Jan-13 A
04-Jan-13 A
29-Mar-13
29-Mar-13
29-Mar-13
02-Mar-13
0
0
0
0
7
7
7
-7
1
1
1
-13
173
173
173
158
600C1521685
10 spool available on site base on shipment 1~15, 3 spool on shipment 17~19 is on the sea, on progress
24
24
24
2
02-Mar-13
04-Mar-13
-7
-7
-13
158
600C1521600 Install 2" & Under Open Drain CS Piping @ Fuel Gas Skid A [SYS 612-04]
05-Mar-13
05-Mar-13
-7
-7
-13
158
600C1521130 Install Interconnecting 2" & Under Instrument Air SS Piping @ Generator Package A [SYS 833-03]
06-Mar-13
06-Mar-13
-7
-7
-13
158
600C1521745 Install Interconnecting Hp Flare Header Piping SS to Fuel Gas Skid Gen A [SYS 612-02]
06-Mar-13
06-Mar-13
-7
-7
-13
168
600C1521325 Install Interconnecting 2" & Under GTG A Closed Drain CS Piping [SYS 612-04]
06-Mar-13
07-Mar-13
-15
-15
-23
176
600C1521235 Install Interconnecting 2 1/2" to 12" Fuel Gas SS Piping @ Fuel Gas Skid A [SYS 833-03]
07-Mar-13
07-Mar-13
-7
-7
-13
158
600C1522085 Install Interconnecting Fuel Diesel CS Piping to Generator A Liquid Fuel Skid [SYS 911-01]
07-Mar-13
09-Mar-13
-15
-15
-23
189
600C1521660 Install Interconnecting 2" & Under Turbine Wash Water Generator A SS Piping [SYS 979-01]
09-Mar-13
12-Mar-13
-15
-15
-23
189
600C1521140 Install Interconnecting 2 1/2" to 12" GTG A Fuel Gas Skid SS Piping [SYS 833-03]
17 spool available on site base on shipment 1~15, 2 spool on shipment 17~19, 1 spool awaiting from
Sino-Thai, on progress
50
04-Jan-13 A
29-Mar-13
68
18
33
04-Jan-13 A
10-Mar-13
175
Gas Turbine G
Generator B
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
18
2
33
2
04-Jan-13 A
21-Feb-13
10-Mar-13
23-Feb-13
0
0
0
0
0
0
175
175
600C1521565 Install Interconnecting 2" & Under Turbine Wash Water Generator B SS Piping [SYS 979-01]
23-Feb-13
25-Feb-13
175
600C1522060 Install Interconnecting 2" & Under Instrument Air SS Piping @ Generator Package B [SYS 833-04]
26-Feb-13
26-Feb-13
175
600C1521170 Install Interconnecting 2 1/2" to 12" GTG B Fuel Gas Skid SS Piping [SYS 833-04]
14 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 17~19, 4 awating from
Sino-Thai
27-Feb-13
04-Mar-13
175
600C1521240 Install Interconnecting 2 1/2" to 12" Fuel Gas SS Piping @ Fuel Gas Skid B [SYS 833-04]
04-Mar-13
05-Mar-13
175
600C1521635 Install Interconnecting 2" & Under IA Distribution Generator B SS Piping [SYS 955-02]
10 spool available on site base on shipment Shipment 1~15, 3 awaiting from Sino-Thai, on progress
29
04-Jan-13 A
06-Mar-13
-7
-13
175
05-Mar-13
08-Mar-13
175
600C1521160 Install 2" & Under Vent SS Piping @ Generator Package B [SYS 833-04]
08-Mar-13
10-Mar-13
175
40
40
1
04-Jan-13 A
04-Jan-13 A
06-Mar-13
18-Mar-13
18-Mar-13
07-Mar-13
0
0
-9
-7
-7
-9
-13
-13
-8
183
183
167
Interconnecti
Interconnecting
600C1521345 Install Interconnecting 2 1/2" to 12" HP FG to GTG B CS Piping [SYS 966-02]
8
8
1
600C1521335 Install Interconnecting 2" & Under GTG C Closed Drain CS Piping [SYS 612-04]
07-Mar-13
08-Mar-13
-9
-9
-8
174
600C1522130 Install 2" & Under Open Drain CS Piping @ Fuel Gas Skid C [SYS 612-04]
08-Mar-13
09-Mar-13
-9
-9
-8
174
600C1521460 Install Interconnecting 2" & Under Turbine Wash Water Generator C SS Piping [SYS 979-01]
09-Mar-13
12-Mar-13
-9
-9
-8
189
600C1521385 Install Interconnecting 2" & Under IA Distribution Generator C SS Piping [SYS 955-02]
9 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19
40
04-Jan-13 A
18-Mar-13
-7
-13
152
60
51
51
1
70
64
64
61
04-Jan-13 A
04-Jan-13 A
04-Jan-13 A
04-Jan-13 A
19-Apr-13
13-Apr-13
13-Apr-13
10-Apr-13
0
0
0
0
7
7
7
7
0
0
0
0
178
158
158
158
All spool available on site base on shipment 1~15, awaiting platform to be install
64
05-Jan-13 A
13-Apr-13
158
All spool available on site base on shipment 1~15, awaiting platform to be install
1
1
1
70
70
70
05-Jan-13 A
05-Jan-13 A
05-Jan-13 A
19-Apr-13
19-Apr-13
19-Apr-13
0
0
0
7
7
7
0
0
0
178
178
178
All spool available on site base on shipment 1~15, awaiting platform to be install
2
2
2
69
69
69
04-Jan-13 A
04-Jan-13 A
04-Jan-13 A
18-Apr-13
18-Apr-13
18-Apr-13
0
0
0
7
7
7
0
0
0
152
152
152
45
45
1
20-Sep-12 A
20-Sep-12 A
17-Oct-12 A
23-Mar-13
23-Mar-13
04-Feb-13
0
0
0
14
13
-2
-15
-15
-57
215
178
213
Gas Turbine G
Generator C
Interconnecting
Interconnecti
600C1522035 Install Interconnecting Hp Flare Header Piping SS to Fuel Gas Skid Gen C [SYS 612-02]
Essential Generator
Gene
Essential Generator
Gene
A
Interconnecting
Interconnecti
600C1521490 Install 2" & Under Vent SS Piping @ Diesel Day Tank Diesel Essential Generator Package A [SYS 833-01] All spool available on site base on shipment 1~15, awaiting platform to be install
600C1521495 Install Interconnecting 2 1/2" to 12" Diesel Essential Generator Package A SS Piping [SYS 833-01]
Essential Generator
Gene
B
Interconnecting
Interconnecti
600C1521355 Install Interconnecting 2" & Under Diesel Essential Generator Package B CS Piping [SYS 833-02]
Demineralized Water
W
Treatment Package
Interconnecting
600C1522120 Install Interconnecting 2" & Under Turbine Wash Water SS Piping to DW Treatment Pkg. [SYS 979-01]
199
199
9
600C1521515
15-Oct-12 A
04-Feb-13
-2
-55
198
600C1521300
Install Interconnecting 2" & Under Fire Water Storage and Pumps SS Piping to Fire Water Pumps [412-01]
20
30-Jan-13 A
25-Feb-13
61
38
203
600C1521115
Install Interconnecting 2 1/2" to 12" Fire Water Storage and Pumps CS Piping on Fire Water Pumps [412...
16 spool available on site base on shipment 1~15, 3 spool awaiting from Sino-Thai, On progress
45
04-Jan-13 A
23-Mar-13
-45
-82
168
600C1521410
Install Interconnecting 2" & Under Utility Water Dist. Hdr. to FW Pumps and Tanks SS Piping [SYS 978-01] 4 spool available on site base on shipment 1~15, 8 spool awaiting from Sino-Thai, On progress
45
20-Sep-12 A
23-Mar-13
-46
-96
169
600C1521305
Install Interconnecting 2 1/2" & Above Fire Water Storage and Pumps SS Piping to Fire Water Pumps
[412-01]
19 spool available on site base on shipment 1~15, 8 spool in on sea base on shipment 17~19, 21 spool
awaiting from Sino-Thai
54
45
29-Jan-13 A
23-Mar-13
12
-26
178
600C1521210
Install Interconnecting Fire Water Storage and Pumps SS Piping from FW Pump to FW Tanks [412-01]
10 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai, On progress
10
45
03-Jan-13 A
23-Mar-13
-9
-15
178
1
1
1
1
25-Feb-13
25-Feb-13
26-Feb-13
26-Feb-13
38
38
38
38
0
0
239
239
54
54
2
68
68
65
04-Jan-13 A
04-Jan-13 A
05-Jan-13 A
17-Apr-13
17-Apr-13
14-Apr-13
0
0
0
7
7
7
0
0
0
155
155
156
Tie-Ins
600C1521430
Tie-In 2" & Under Fire Water Storage and Pumps SS Piping to Fire Water Pumps [412-01]
Air Compression
Compressio Dryer & Receiver
Interconnecting
600C1521295 Install Interconnecting 2 1/2" to 12" SS Piping from IA Compressor & Dryer Package to IA Receiver [SYS
955-01]
600C1521520
Install Intercon 2 1/2" to 12" Air Compression Drying and Receiving SS Piping @ IA Receiver Drum [SYS
955-01]
5 spool available on site base on shipment 1~15, 11 spool awaiting from Sino-Thai
67
05-Jan-13 A
16-Apr-13
156
600C1521285
Install 2 1/2" to 12" Air Compression Drying and Receiving CS Piping to Instrument Air Receiver Drum
[SYS 955-01]
68
04-Jan-13 A
17-Apr-13
153
187
187
2
53
53
1
22-Oct-12 A
22-Oct-12 A
12-Nov-12 A
01-Apr-13
01-Apr-13
04-Feb-13
0
0
0
7
7
-2
0
0
-58
170
170
213
Potable Water S
Storage & Pumps
Interconnecting
600C1522015 Install Interconnecting 2" & Under Utility Water to Potable Water Pump SS Piping [SYS 978-01]
600C1521775
Install 2 1/2" to 12" Potable Water Drain CS Piping to Potable Water Tank [SYS 977-01]
04-Feb-13
04-Feb-13
-7
-7
-59
222
600C1521315
Install Interconnecting 2 1/2" & Above Potable Water SS Piping to PW Tank, Pumps & Treatment Package
[SYS 977-01]
33 spool available on site base on shipment 1~15, 8 spool is on sea base on shipment 17~19, On progress
15
30
14-Nov-12 A
07-Mar-13
-31
-74
193
600C1521310
Install Interconnecting 2" & Under Potable Water SS Piping to Potable Water Tank, Pumps & Treatment
Package [SYS 977-01]
28 spool available on site base on shipment 1~15, 2 spool awaiting from Sino-Thai, On progress
45
22-Oct-12 A
23-Mar-13
-46
-101
178
600C1522040
Install Interconnecting Potable Water SS Piping to Demineralized Water Treatment Package [SYS 977-01]
53
04-Jan-13 A
01-Apr-13
167
187
187
7
59
59
1
17-Oct-12 A
17-Oct-12 A
22-Oct-12 A
08-Apr-13
08-Apr-13
04-Feb-13
0
0
0
7
7
-2
5
0
-56
239
164
164
21-Nov-12 A
04-Feb-13
-2
-59
222
Install Intercon 2" & Under Diesel Storage and Transfer CS Piping @ OD Lines in Diesel Handling Area
[SYS 911-01]
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
600C1522075
Install Interconnecting 2" & Under IA Distribution SS Piping to Diesel Fuel Browser Pkg. [SYS 955-02]
6 spool available on site base on shipment 1~15, 4 spool is on sea base on shipment 17~19, On progress
30
13-Nov-12 A
07-Mar-13
-31
-86
168
600C1521850
Install Interconnecting 2 1/2" to 12" Diesel Storage and Transfer CS Piping to Deisel Tank [SYS 911-01]
21 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai, On progress
14
45
17-Oct-12 A
23-Mar-13
-46
-90
168
600C1521615
Install Interconnecting 2" & Under Diesel Transfer Pumps CS Piping on Diesel Tank [SYS 911-01]
6 spool available on site base on shipment 1~15, 9 spool awaiting from Sino-Thai, On progress
49
14-Jan-13 A
28-Mar-13
174
600C1522105
Install Open Drain CS Piping @ Diesel Transfer Coalescer, Filter Coalescer, Pump & Tank [SYS 911-01]
50 spool available on site base on shipment 1~15, 20 spool awaiting from Sino-Thai, On progress
49
28-Nov-12 A
28-Mar-13
174
600C1521270
Install Fuel Diesel CS Piping @ Diesel Transfer Coalescer to Diesel Storage Tank [SYS 911-01]
51
26-Nov-12 A
30-Mar-13
164
600C1521400
Install Fuel Diesel CS Piping @ Loading Filter Coalescer to Diesel Storage Tank [SYS 911-01]
19 spool available on site base on shipment 1~15, 5 spool awaiting from Sino-Thai, On progress
51
27-Nov-12 A
30-Mar-13
164
600C1521255
Install Interconnecting 2" & Under CS Piping on Diesel Browser and Offloading Pump [SYS 911-01]
11 spool available on site base on shipment 1~15, 2 spool awaiting from Sino-Thai, On progress
52
04-Jan-13 A
31-Mar-13
168
600C1521580
Install Interconnecting Fuel Deisel Suction CS Piping from Deisel Tank to Deisel Pump [SYS 911-01]
9 spool available on site base on shipment 1~15, 3 spool awaiting from Sino-Thai, On progress
55
05-Jan-13 A
03-Apr-13
168
600C1521405
Install Interconnecting Fuel Deisel Discharge CS Piping from Deisel Pump to Coalescer [SYS 911-01]
59
05-Jan-13 A
08-Apr-13
164
1
1
1
1
06-Feb-13
06-Feb-13
07-Feb-13
07-Feb-13
31
31
31
31
61
61
294
294
45
45
1
22-Oct-12 A
22-Oct-12 A
26-Nov-12 A
23-Mar-13
23-Mar-13
04-Feb-13
0
0
0
-11
-11
-2
-65
-65
-58
178
178
198
Tie-Ins
600C1522200
Tie-In 2 1/2" & Above Diesel Transfer Pumps CS Piping on Diesel Transfer Pumps [SYS 911-01]
132
132
2
600C1521790
Install Interconnecting 2" & Under Utility Air Distribution on FW Tank CS Piping [SYS 955-04]
25
25
04-Feb-13
02-Mar-13
-7
-7
-83
198
600C1522025
Install Intercon 2" & Under Utility Air Distribution CS Piping to Utility Station @ Diesel Offloading Pumps
[SYS 955-04]
12-Mar-13
12-Mar-13
-55
188
600C1521680
Install Interconnecting 2" & Under Utility Water to Generator A SS Piping [SYS 978-01]
2 spool available on site base on shipment 1~15, 6 spool awaiting from Sino-Thai, On progress
45
22-Oct-12 A
23-Mar-13
-46
-97
169
Install U/G Area 600 > CCB LP Fuel Gas Distibution CS Piping [SYS 966-03]
41
17
18
17
04-Jan-13 A
23-Jan-13 A
22-Feb-13
21-Feb-13
0
0
41
-7
1
-10
205
206
600C1521370
Install HDPE Area 600 > Ind Park Potable Water Supply Pipework [SYS 977-01]
On progress
18
04-Jan-13 A
22-Feb-13
24
-40
205
600C1521375
Install HDPE Area 600 >CCB Potable Water Supply Pipework [SYS 977-01]
On progress
14
18
04-Jan-13 A
22-Feb-13
41
205
4 spool available on site base on shipment 1~15, 12 spool awaiting from Sino-Thai
14
14
3
45
45
3
04-Jan-13 A
04-Jan-13 A
04-Feb-13
23-Mar-13
23-Mar-13
06-Feb-13
0
0
-7
-38
-38
-7
-44
-44
-59
111
111
152
38 spool available on site base on shipment 1~15, 10 spool awaiting from Sino-Thai, On progress
45
04-Jan-13 A
23-Mar-13
-38
-44
111
33
33
1
1
33
33
1
1
04-Feb-13
04-Feb-13
11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13
0
0
0
0
0
0
0
0
-1
-1
-42
-42
122
122
122
122
32
32
32
32
04-Feb-13
04-Feb-13
10-Mar-13
10-Mar-13
0
0
0
0
1
1
122
122
271
271
271
66
80
80
80
14
14-Jun-12 A
14-Jun-12 A
14-Jun-12 A
14-Jun-12 A
30-Apr-13
30-Apr-13
30-Apr-13
18-Feb-13
0
0
0
0
3
3
3
0
37
-20
-20
-17
672
262
262
165
63
80
28-Jan-13 A
30-Apr-13
26
-20
262
46
46
4
20-Jan-13 A
20-Jan-13 A
20-Jan-13 A
25-Mar-13
25-Mar-13
07-Feb-13
0
0
0
-1
-1
-1
-1
-1
-17
101
101
101
Utility Station
Interconnecting
600C1521670 Install Interconnecting 2" & Under Utility Air Distribution Generator A CS Piping [SYS 955-04]
CCC Area
600C1521590
Underground Piping
Pipi
U/G Steel Pipework
Pipew
[CS-SS]
600C1521630
Install Fire Water Galv. Piping to Fire Monitor System [Sys 412-03]
600C1521280
Testing/Cleaning
Pressure Test
Above Ground
600C1633065 Pressure Test Firewater Monitors & Deluge Area 600 Pipework [Sys 412-03]
Under Ground
600C1521480
U/G HDPE Area 600 Open Drain Piping Hydrotest [Sys 998-02]
Electrical
Underground Electrical
Elec
Grounding
600C1611010
Grounding UG [4575m]
600C1611020
Grounding AG
Aboveground Electrical
Ele
Cable Trays
600C1621040
Install Cable Trays Subrack 6D
Started Electrical Tray, Awaiting Tray supports + Bends + Hold down clamps, QA Issues
42
42
10
600C1621030
Started Electrical Tray, Awaiting Tray supports + Bends + Hold down clamps, QA Issues
10
21-Jan-13 A
08-Feb-13
-1
-4
102
600C1621020
Started Electrical Tray, Awaiting Tray supports + Bends + Hold down clamps, QA Issues
22-Jan-13 A
12-Feb-13
-1
102
600C1621010
Started Electrical Tray, Awaiting Tray supports + Bends + Hold down clamps, QA Issues
10
15
25-Jan-13 A
19-Feb-13
102
600C1621050
Started Electrical Tray, Awaiting Tray supports + Bends + Hold down clamps, QA Issues
12
12
08-Feb-13
20-Feb-13
-1
-1
-25
101
600C1621060
30
30
21-Feb-13
25-Mar-13
-1
-1
-1
101
50
50
50
8
24-Jan-13 A
04-Feb-13
04-Feb-13
04-Feb-13
29-Mar-13
29-Mar-13
29-Mar-13
12-Feb-13
0
6
6
6
30
6
6
6
67
-21
-21
-30
702
702
702
261
50
50
50
8
600C1631265
15
15
13-Feb-13
28-Feb-13
-30
204
600C1631480
16
16
12-Feb-13
01-Mar-13
-30
261
600C1631485
01-Mar-13
03-Mar-13
-30
261
600C1631630
14
14
16-Feb-13
03-Mar-13
15
15
-12
711
600C1631260
02-Mar-13
05-Mar-13
-84
254
600C1631610
04-Mar-13
06-Mar-13
-30
261
600C1631635
04-Mar-13
06-Mar-13
15
15
-12
711
600C1631255
Traywork Req'd
01-Mar-13
07-Mar-13
-30
204
600C1631245
Traywork Req'd
07-Mar-13
10-Mar-13
-30
204
600C1631275
Traywork Req'd
07-Mar-13
15-Mar-13
-27
204
600C1631645
12
12
07-Mar-13
19-Mar-13
15
15
-12
711
600C1631375
24
24
04-Mar-13
29-Mar-13
-27
261
42
42
24-Jan-13 A
20-Mar-13
19
75
241
Traywork Req'd
Traywork Req'd
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
HV/LV Switchrooms
Switchr
> LER71220 Marshalling Cabinet
600C1632820 Pull U/G Instr LV Switchroom Cabling to Marshalling Cabinet - LER71220
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
4
3
4
3
24-Feb-13
24-Feb-13
28-Feb-13
27-Feb-13
19
19
19
19
-28
-34
114
95
95
600C1631960
Pull U/G Instr & Control HV Switchroom Cabling to Marshalling Cabinet - LER71220
24-Feb-13
27-Feb-13
19
19
-27
600C1631965
Pull U/G Instr Gen Eqpt Room Cabling to Marshalling Cabinet - LER71220
24-Feb-13
28-Feb-13
19
19
-31
20
20
27-Feb-13
27-Feb-13
20-Mar-13
20-Mar-13
19
19
19
19
1
1
114
95
95
Traywork Req'd
20
20
Progressing
36
26
34
6
24-Jan-13 A
24-Jan-13 A
12-Mar-13
09-Feb-13
0
0
19
-1
83
69
249
247
600C1632550
Pull U/G Instr & Control Instr & Control Generator Package B Cabling
Progressing
26
24-Jan-13 A
10-Feb-13
90
255
600C1632555
Pull U/G Instr & Control Instr & Control Generator Package C Cabling
Progressing
26
24-Jan-13 A
11-Feb-13
110
257
600C1632535
Pull U/G Instr & Control Potable Water & Demineralized Package Cabling Area 600
Traywork Req'd
24-Feb-13
01-Mar-13
19
19
-25
117
600C1632955
Traywork Req'd
01-Mar-13
05-Mar-13
19
19
-25
117
600C1632560
Pull U/G Instr & Control Inst Air Compression, Drying & Reciever Cabling
Traywork Req'd
06-Mar-13
08-Mar-13
19
19
15
209
600C1631940
Pull U/G Instr & Control Diesel Storage & Transfer Cabling
Traywork Req'd
09-Mar-13
12-Mar-13
19
19
15
249
14
14
11
14
14
11
05-Mar-13
05-Mar-13
05-Mar-13
19-Mar-13
19-Mar-13
16-Mar-13
39
39
39
39
39
39
-23
-23
-23
281
281
281
16-Mar-13
19-Mar-13
39
39
-23
281
24
24
3
21-Feb-13
21-Feb-13
21-Feb-13
18-Mar-13
18-Mar-13
23-Feb-13
-1
-1
-1
19
19
-1
59
59
-8
230
230
215
24
24
3
600C1631795
Pull A/G Instr & Control Firewater Distribution Cabling Area 600 Cabling
24-Feb-13
27-Feb-13
-1
-1
-8
215
600C1631805
Pull A/G Instr & Control Firewater Storage & Pumps Cabling
27-Feb-13
02-Mar-13
-1
-1
-8
215
600C1632695
Pull A/G Instr & Control Potable Water Distribution Cabling Area 600
01-Mar-13
04-Mar-13
19
19
-25
243
600C1632080
Pull A/G Instr & Control FGS Fire Detection Zone 11 Cabling
06-Mar-13
08-Mar-13
19
19
-25
117
600C1632145
Pull A/G Instr & Control Firewater Monitors & Deluge Area 600 Cabling
09-Mar-13
12-Mar-13
19
19
-25
117
600C1632010
Pull A/G Instr & Control Inst Air Compression, Drying & Reciever Cabling
09-Mar-13
12-Mar-13
19
19
15
209
600C1631900
Pull A/G Instr & Control Instr & Control Generator Package A Cabling
12-Mar-13
15-Mar-13
19
19
41
219
600C1631905
Pull A/G Instr & Control Instr & Control Generator Package B Cabling
15-Mar-13
18-Mar-13
19
19
59
225
34
34
34
7
22-Jan-13 A
22-Jan-13 A
22-Jan-13 A
25-Jan-13 A
11-Mar-13
11-Mar-13
11-Mar-13
11-Feb-13
0
0
0
0
-1
-1
-1
-7
-32
-32
-32
-6
223
223
223
223
46
46
46
7
600C0925030
Equipment & Materials on site ETA 18.JAN, Forecast Finish 17.FEB [Hydrotest prior to Painting]
33
13
22-Jan-13 A
17-Feb-13
-22
223
600C0925020
20
34
29-Jan-13 A
11-Mar-13
19
-1
-71
223
Change Location
35
14
14
14
24
14
14
14
22-Jan-13 A
14-Feb-13
14-Feb-13
14-Feb-13
28-Feb-13
28-Feb-13
28-Feb-13
28-Feb-13
0
0
0
0
0
0
0
0
-4
-46
-46
-46
143
143
143
143
35
35
35
15
20
20
20
1
22-Jan-13 A
22-Jan-13 A
22-Jan-13 A
22-Jan-13 A
24-Feb-13
24-Feb-13
24-Feb-13
04-Feb-13
0
0
0
0
0
0
0
-2
1
1
1
-1
27
27
27
27
Painting
Final/Touch Up Paint
P
Tanks/Vessels
600C0925010
Painting for [40-ABJ91110] Diesel Storage Tank
20
20
23-Jan-13 A
24-Feb-13
27
385
114
24-Aug-12 A
06-Jun-13
62
314
92
10
10
10
36
8
8
8
24-Aug-12 A
19-Nov-12 A
19-Nov-12 A
19-Nov-12 A
13-Mar-13
11-Feb-13
11-Feb-13
11-Feb-13
0
0
0
0
0
0
0
0
-27
-49
-49
-49
392
416
416
416
92
92
93
36
36
36
24-Aug-12 A
24-Aug-12 A
24-Aug-12 A
13-Mar-13
13-Mar-13
13-Mar-13
0
0
0
0
0
0
-27
-27
-27
392
392
392
38
38
31
27
18-Jan-13 A
18-Jan-13 A
08-Feb-13
08-Feb-13
15-Mar-13
15-Mar-13
13-Mar-13
09-Mar-13
0
0
0
0
0
0
0
0
-29
-29
-27
-23
390
390
392
259
36
36
31
27
500C0541016
18
18
19-Feb-13
09-Mar-13
-25
259
500C0541034
09-Mar-13
13-Mar-13
-73
392
27
27
38
38
18-Jan-13 A
18-Jan-13 A
15-Mar-13
15-Mar-13
0
0
0
0
-55
-55
253
253
385
385
114
114
08-Oct-12 A
08-Oct-12 A
06-Jun-13
06-Jun-13
0
0
62
62
0
0
236
236
Structural Steel
Miscellaneous Steel
Ste & Platforms
Miscellaneous S
Steel
500C0541014
Erection of Crossover Platform of Main Piperack 3
Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
500C0542011
Misc. Steels (gratings etc.) for Crossover Platforms
Piping
Aboveground Piping
Pip
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
231
185
185
34
114
45
45
20
08-Oct-12 A
19-Oct-12 A
19-Oct-12 A
22-Oct-12 A
06-Jun-13
23-Mar-13
23-Mar-13
25-Feb-13
0
0
0
0
62
-12
-12
1
0
-58
-58
-53
161
199
199
137
136
500C1522685 Install 2" & Under Main Piperack Pipeline Compressor Train no. 1 CS Piping [Sys 651-01]
All spool available on site base on shipment 1~15, Some line belong to A-102, awaiting to the platform to be
installed
30
31-Dec-12 A
07-Mar-13
-36
-81
500C1522810 Install 2" & Under Main Piperack Closed Drain Header CS Piping [Sys 612-04]
33 spool available on site base on shipment 1~15, 3 spool is on country base on shipment 16, On progress
47
45
14-Nov-12 A
23-Mar-13
-12
-58
59
500C1522815 Install 2" & Under Main Piperack LEAN MEG Storage and Distribution CS Piping [Sys 661-05]
55 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai, 28 spool on hold for
welding due to awaiting approval of welding procedure
34
45
19-Oct-12 A
23-Mar-13
-25
-84
110
500C1522820 Install 2" & Under Main Piperack DPCU LEAN MEG Storage and Distribution CS Piping [Sys 661-06]
7 spool available on site base on shipment 1~15, 4 spool is on sea base on shipment 17~19, 8 spool awaiting
from ST, On progress
45
26-Nov-12 A
23-Mar-13
-51
-98
199
500C1522710 Install 2" & Under Main Piperack Expansion Tank, Circulation Pump and Trim Cooler CS Piping [Sys 941... 5 spool available on site base on shipment 1~15, 27 spool awaiting from Sino-Thai, On progress
13
45
19-Nov-12 A
23-Mar-13
-26
-91
59
45
45
8
08-Oct-12 A
08-Oct-12 A
08-Oct-12 A
23-Mar-13
23-Mar-13
12-Feb-13
0
0
0
-4
-4
1
-57
-57
-61
176
176
45
175
175
6
500C1522765 Install CS Piping for MEG Recovery Hot Oil Circulation CS Piping [Sys 941-04]
3 spool available on site base on shipment 1~15, 25 spool awaiting from Sino-Thai, On progress
28
45
17-Nov-12 A
23-Mar-13
-31
-77
140
500C1522550 Install 2 1/2" & 12" Main Piperack LP Flare Header CS Piping [Sys 612-03]
41 spool available on site base on shipment 1~15, 22 spool awaiting from Sino-Thai, On progress
31
45
16-Oct-12 A
23-Mar-13
-4
-77
45
500C1522770 Install 2 1/2" & 12" Main Piperack HP Fuel Gas Distribution CS Piping [Sys 966-02]
22 spool available on site base on shipment 1~15, 11 spool awaiting from Sino-Thai, On progress
34
45
17-Oct-12 A
23-Mar-13
-4
-76
85
500C1522775 Install 2 1/2" & 12" Main Piperack LP Fuel Gas Distribution CS Piping [Sys 966-03]
33 spool available on site base on shipment 1~15, 8 spool awaiting from Sino-Thai, On progress
40
45
15-Nov-12 A
23-Mar-13
-4
-65
85
500C1522715 Install 2 1/2" & 12" Main Piperack Waste Heat Recovery CS Piping [Sys 941-02]
5 spool available on site base on shipment 1~15, 7 awaiting from Sino-Thai, On progress
11
45
21-Nov-12 A
23-Mar-13
-37
-93
45
500C1522735 Install 2 1/2" & 12" Main Piperack Hot Oil Supply and Return Headers CS Piping [Sys 941-03]
54 spool available on site base on shipment 1~15, 9 spool is on sea base on shipment 17~20, 4 spool
awaiting from Sino-Thai, On progress
62
45
16-Nov-12 A
23-Mar-13
-4
-65
45
500C1522690 Install 2 1/2" & 12" Main Piperack Fuel Gas Conditioning CS Piping [Sys 966-01]
4 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 20, 2 spool awaiting
from Sino-Thai
45
21-Jan-13 A
23-Mar-13
-45
-57
77
500C1522665 Install 2 1/2" & 12" Main Piperack DPCU Train no. 1 CS Piping [Sys 663-01]
2 spool available on site base on shipment 1~15, 14 spool awaiting from Sino-Thai, On progress
21
45
03-Dec-12 A
23-Mar-13
-4
-79
176
114
114
3
23-Nov-12 A
23-Nov-12 A
04-Mar-13
06-Jun-13
06-Jun-13
07-Mar-13
0
0
-21
62
62
-21
0
0
-78
161
161
137
217
217
3
500C1522720 Install 14" & Above Main Piperack Waste Heat Recovery CS Piping [Sys 941-02]
10 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 20, On progress
28
30
17-Dec-12 A
07-Mar-13
12
-62
161
500C1522730 Install 14" & Above Main Piperack Hot Oil Supply and Return Headers CS Piping [Sys 941-03]
8 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 20, On progress
27
30
23-Nov-12 A
07-Mar-13
12
-63
164
500C1522680 Install 14" & Above Main Piperack Gas Metering CS Piping [Sys 651-04]
5 spool available on site base on shipment 1~15, 4 spool awaiting from ST, On progress
20
114
28-Jan-13 A
06-Jun-13
162
62
161
113
45
45
1
08-Oct-12 A
15-Oct-12 A
15-Oct-12 A
29-Dec-12 A
05-Jun-13
23-Mar-13
23-Mar-13
04-Feb-13
0
0
0
0
-1
-4
-4
-7
1
-56
-56
-52
237
305
305
288
349
385
263
263
1
500C1522785 Install 2" & Under Main Piperack Turbine Wash Water - Area 200 SS Piping [Sys 979-02]
13-Nov-12 A
04-Feb-13
-7
-51
500C1522575 Install 2" & Under Main Piperack Liquid Inlet Separator no. 1 SS Piping [Sys 623-05]
15-Oct-12 A
04-Feb-13
-7
-58
45
500C1522615 Install 2" & Under Main Piperack Stabilization Feed Surge Drum SS Piping [Sys 626-01]
04-Feb-13
04-Feb-13
-7
-7
-55
127
500C1522580 Install 2" & Under Main Piperack Primary Separation System Slug Catcher SS Piping [Sys 623-02]
11
12-Nov-12 A
04-Feb-13
-5
-49
294
500C1522805 Install 2" & Under Main Piperack Closed Drain Header SS Piping [Sys 612-04]
25 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, On progress
15
23-Oct-12 A
19-Feb-13
-21
-66
161
24-Feb-13
25-Feb-13
-73
206
49
45
22-Oct-12 A
23-Mar-13
-4
-56
136
70
70
1
16-Oct-12 A
16-Oct-12 A
21-Nov-12 A
19-Apr-13
19-Apr-13
04-Feb-13
0
0
0
1
1
-7
1
1
-59
220
220
289
500C1522585 Install 2" & Under Main Piperack Liquid Inlet Separator no. 1 Liquid Separator Header SS Piping [Sys 62...
500C1522790 Install Main Piperack Potable Water Distribution Header SS Piping [Sys 977-02]
92 spool available on site base on shipment 1~15, 15 spool is on country base on shipment 16, 4 spool is on
sea base on shipment 17~19, 6 awaiting from Sino-Thai, On progress
316
316
8
500C1522660 Install 2 1/2" & 12" Main Piperack DPCU Train no. 1 SS Piping [Sys 663-01]
15
16
20-Nov-12 A
20-Feb-13
-70
160
500C1522590 Install 2 1/2" & 12" Main Piperack Liquid Inlet Separator no. 1 SS Piping [Sys 623-05]
19
16-Oct-12 A
23-Feb-13
-73
45
500C1522800 Install 2 1/2" & 12" Main Piperack Closed Drain Header SS Piping [Sys 612-04]
51
37
19-Oct-12 A
15-Mar-13
-59
500C1522535 Install 2 1/2" & 12" Main Piperack HP Flare Header SS Piping [Sys 612-02]
70
07-Jan-13 A
19-Apr-13
219
313
313
177
113
113
73
08-Oct-12 A
08-Oct-12 A
08-Oct-12 A
05-Jun-13
05-Jun-13
23-Apr-13
0
0
0
-1
-1
1
1
1
1
56
56
45
134
113
08-Jan-13 A
05-Jun-13
-1
56
45
45
45
45
47
47
47
47
31-Jan-13 A
31-Jan-13 A
31-Jan-13 A
31-Jan-13 A
25-Mar-13
25-Mar-13
25-Mar-13
25-Mar-13
6
6
6
6
1
1
1
1
0
0
0
0
249
249
249
249
442
167
02-Jul-12 A
01-Aug-13
102
34
606
269
269
107
107
17-Sep-12 A
17-Sep-12 A
29-May-13
29-May-13
0
0
0
0
0
0
221
221
35 spool available on site base on shipment 1~16, 2 spool is on sea base on shipment 17~19, 12 spool is on
shipment 20, 23 spool awaiting from ST, On progress
50 spool available on site base on shipment 1~16, 5 spool is on sea base on shipment 17~19, 2 spool is on
shipment 20, On progress
Actual Work
Remaining Work
Date : 05-Feb-13
59
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
Concrete
Equipment & Structural
Stru
Foundations
Equipment/Stru
Equipment/Structural
Foundations less than 4m3
200C0311047
Foundations for 40-XF82330/31 Transformers (LER)
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
269
125
107
10
17-Sep-12 A
17-Sep-12 A
29-May-13
13-Feb-13
0
0
0
0
0
-1
221
73
40
107
22-Dec-12 A
29-May-13
221
333
131
24
6
151
60
24
6
02-Jul-12 A
29-Aug-12 A
16-Feb-13
16-Feb-13
15-Jul-13
08-Apr-13
13-Mar-13
22-Feb-13
0
0
-1
-1
0
-16
0
-1
50
10
34
-22
156
220
236
253
Progressing
200C0311077
01-Mar-13
07-Mar-13
34
234
200C0311042
10
10
25-Feb-13
07-Mar-13
37
126
200C0311072
Foundation for Misc Cable Tray supports near Area 200 LER
07-Mar-13
13-Mar-13
34
234
29
14
27
12
26-Jan-13 A
26-Jan-13 A
04-Mar-13
15-Feb-13
6
6
0
0
-33
-22
253
238
01-Mar-13
04-Mar-13
-33
253
200C0312046
01-Mar-13
04-Mar-13
-33
253
65
22
60
4
29-Aug-12 A
25-Oct-12 A
08-Apr-13
07-Feb-13
0
0
-16
0
-90
-43
220
121
26
25-Oct-12 A
07-Feb-13
-42
217
200C0313038
Base foundation rebars on progress, Setting of template for concrete, Awaiting up-dated Drawings
40
29-Aug-12 A
07-Feb-13
-7
-35
223
200C0313040
Base foundation rebars on progress, Setting of template for concrete, Awaiting up-dated Drawings
40
03-Oct-12 A
07-Feb-13
-35
238
200C0313016
Rebars and Forms done, Awaiting anchor bolts, Forecast ETA 31.MAR
29
60
01-Dec-12 A
08-Apr-13
-16
-90
34
200C0313026
Rebars and Forms done, Awaiting anchor bolts, Forecast ETA 31.MAR
29
60
22-Nov-12 A
08-Apr-13
-16
-90
220
30
30
14
24
24
12
26-Jan-13 A
26-Jan-13 A
27-Jan-13 A
28-Feb-13
28-Feb-13
16-Feb-13
0
0
5
0
0
-1
19
19
-8
227
227
238
30
24
26-Jan-13 A
28-Feb-13
19
40
13
13
13
18
18
18
02-Jul-12 A
02-Jul-12 A
02-Jul-12 A
22-Feb-13
22-Feb-13
22-Feb-13
0
0
0
0
0
0
-52
-52
-52
289
289
289
15
15
15
15
15
15
01-Mar-13
01-Mar-13
01-Mar-13
16-Mar-13
16-Mar-13
16-Mar-13
0
0
0
0
0
0
19
19
19
67
67
67
Utility Concrete
Area Paving
200C0352012
163
163
163
151
151
151
24-Jan-13 A
24-Jan-13 A
24-Jan-13 A
15-Jul-13
15-Jul-13
15-Jul-13
0
0
0
0
0
0
0
0
0
119
119
119
186
186
187
137
137
137
22-Nov-12 A
22-Nov-12 A
22-Nov-12 A
30-Jun-13
30-Jun-13
30-Jun-13
0
0
0
0
0
0
64
64
64
42
42
42
32
32
32
32
32
32
25-Feb-13
25-Feb-13
25-Feb-13
30-Mar-13
30-Mar-13
30-Mar-13
73
73
73
73
73
73
109
109
109
265
265
265
220
31
31
15
167
19
19
15
14-Jan-13 A
18-Jan-13 A
18-Jan-13 A
04-Feb-13
01-Aug-13
23-Feb-13
23-Feb-13
19-Feb-13
0
0
0
1
0
0
0
-1
-1
-11
-11
-7
606
165
165
169
Progressing
31
19
18-Jan-13 A
23-Feb-13
-19
34
Progressing
40
40
30
30
25
25
17
17
14-Jan-13 A
14-Jan-13 A
14-Jan-13 A
14-Jan-13 A
01-Mar-13
01-Mar-13
21-Feb-13
21-Feb-13
0
0
0
0
0
0
0
0
-30
-30
-34
-34
42
42
27
27
Erection progressing
30
30
25
25
29-Jan-13 A
29-Jan-13 A
01-Mar-13
01-Mar-13
0
0
0
0
-30
-30
42
42
207
42
4
167
42
4
18-Jan-13 A
04-Feb-13
04-Feb-13
01-Aug-13
20-Mar-13
07-Feb-13
0
-3
-3
0
0
-3
-1
-8
-9
606
370
102
01-Mar-13
05-Mar-13
-7
40
07-Mar-13
11-Mar-13
225
Elevated Structures
Structur
Walls
200C0323016
Install Walls for 40-XF82330/31 Transformers Retaining Wall (LER)
200C0323026
Pre-Cast Concrete
Concret Structures
Catch Basins, Manholes
M
& Valve Box
200C0331011
Install Catch Basins, Manholes & Valve box- Area 200 (CB=25;MH=11;VB=1)
Area Paving, Install kerbs around Equipment - Area 200 *[Misc. Supports, Grouting, Paving, Foundation,
Backfill]
Grouting
Grouting - Non Shrink
200C0373011
Grouting Non-Shrink [LoE]
Architectural
Exterior Cladding
200C0531257
Structural
Pipe Rack Steel
Pipe Rack Steel
200C0521023
Erection Additional Subrack West of Pipeline Compressor #3
200C0521012
Major Structures
Major Structures
Compressor #2
200C0531019 Erection of Subrack 2H, Stair Tower 2B
Compressor #3
200C0531018 Erection of Subrack 2J, Stair Tower 2C
Misc. Steel & Platforms
Plat
Miscellaneous S
Steel
200C0541046
Erection of Miscellaneous Pipe Support near Subrack 2E
200C0541036
200C0541040
Install Instrument Tray Supports Attached To Platform 40-MBD62301/02/03 Gas Inlet Separator
200C0541030
12-Mar-13
20-Mar-13
-40
370
PLATFORM FOR LER AT AREA 200 #1/2/3/4/5 (received 100 %) #6 (received 90%)
40
4
40
4
04-Feb-13
04-Feb-13
18-Mar-13
07-Feb-13
-7
-7
18
-2
26
-4
733
196
200C0541014
PLATFORM FOR LER AT AREA 200 #1/2/3/4/5 (received 100 %) #6 (received 90%)
08-Feb-13
12-Feb-13
12
58
213
200C0541016
PLATFORM FOR LER AT AREA 200 #1/2/3/4/5 (received 100 %) #6 (received 90%)
08-Feb-13
12-Feb-13
-2
31
196
200C0541012
PLATFORM FOR LER AT AREA 200 #1/2/3/4/5 (received 100 %) #6 (received 90%)
12-Feb-13
16-Feb-13
32
37
36
196
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
41
46
45
213
200C0541013
PLATFORM FOR LER AT AREA 200 #1/2/3/4/5 (received 100 %) #6 (received 90%)
12-Feb-13
16-Feb-13
200C0541060
15-Mar-13
18-Mar-13
213
200C0541061
15-Mar-13
18-Mar-13
213
200C0541019
15-Mar-13
18-Mar-13
213
200C0541017
15-Mar-13
18-Mar-13
733
200C0541018
15-Mar-13
18-Mar-13
206
30
167
30
18-Jan-13 A
18-Jan-13 A
01-Aug-13
07-Mar-13
0
0
0
1
-1
-1
Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
200C0542017
Misc. Steels (gratings etc.) for Maintenance Platforms
200C0542012
Misc. Steels (gratings etc.) for Subrack 2G, 2H, 2J & Stair Towers
Progressing
Progressing
733
249
386
13
167
18-Jan-13 A
01-Aug-13
-1
42
293
293
48
32
16
164
97
48
32
16
04-Dec-12 A
03-Jan-13 A
04-Feb-13
04-Feb-13
04-Feb-13
29-Jul-13
18-May-13
27-Mar-13
10-Mar-13
21-Feb-13
0
0
-7
-7
-7
105
60
-7
-7
-7
9
0
609
167
12
12
12
16
16
21-Feb-13
10-Mar-13
-7
-7
12
Compressor #2
# Interstage/After Stage Cooler
200C1122036 Preassembly/Installation Pipeline Compressor #2 Interstage Cooler Supporting Structure
16
16
16
16
11-Mar-13
11-Mar-13
27-Mar-13
27-Mar-13
-7
-7
-7
-7
12
12
Progressing
293
144
5
5
97
53
53
53
03-Jan-13 A
05-Jan-13 A
05-Jan-13 A
05-Jan-13 A
18-May-13
01-Apr-13
01-Apr-13
01-Apr-13
0
0
0
0
60
104
0
0
0
-1
-1
-1
167
173
40
40
5
5
4
4
28-Jan-13 A
28-Jan-13 A
07-Feb-13
07-Feb-13
158
158
153
153
11
11
222
222
53
53
7
78
78
3
03-Jan-13 A
03-Jan-13 A
04-Jan-13 A
28-Apr-13
28-Apr-13
06-Feb-13
0
0
0
0
0
-7
0
0
-13
162
162
91
Mechanical
Heat Exchangers
Air Cooled
Compressor #1
# Interstage/After Stage Cooler
200C1122026 Preassembly/Installation Pipeline Compressor #1 Interstage Cooler Supporting Structure
200C1122031
Progressing
Progressing
03-Jan-13 A
07-Feb-13
-7
91
Preassembly
15
15
07-Feb-13
22-Feb-13
-7
-7
16
207
15
15
23-Feb-13
11-Mar-13
-7
-7
16
207
Progressing
78
09-Jan-13 A
28-Apr-13
91
WHRU 3
Structural Steel
Ste
200C0531182 *Preassembly of WHRU Structure Lvl 13.8mtrs : Compressor #3
Progressing
276
276
7
97
97
10
04-Jan-13 A
04-Jan-13 A
04-Jan-13 A
18-May-13
18-May-13
13-Feb-13
0
0
0
0
0
0
0
0
-1
167
167
167
Progressing
17
04-Jan-13 A
21-Feb-13
-1
167
Progressing
15
25
25-Jan-13 A
01-Mar-13
19
29
200
Progressing
15
40
29-Jan-13 A
18-Mar-13
30
-1
28
200
Progressing
97
07-Jan-13 A
18-May-13
167
164
164
159
159
3
04-Dec-12 A
04-Dec-12 A
04-Dec-12 A
04-Dec-12 A
24-Jan-13 A
29-Jul-13
29-Jul-13
24-Jul-13
24-Jul-13
06-Feb-13
0
0
0
0
0
105
105
0
0
-1
9
9
0
0
-30
609
609
250
38
110
170
Rotating Equipment
Equipme
Compressors & Drivers
Compressor #1
Structural Steel
Ste
200C0531067 Preassembly of GT & CC Skid Maintenance Platforms : Compressor #1
Progressing
280
280
164
161
10
200C0531042 Preassembly of Filter House Supporting Structure Incl Handrails & Grating : Compressor #1
Progressing
13
22-Jan-13 A
07-Feb-13
-7
-16
Progressing
32
10-Jan-13 A
11-Feb-13
-27
38
Progressing
13
12
04-Dec-12 A
15-Feb-13
-1
110
20-Feb-13
21-Feb-13
-18
-18
170
200C0531402 Erection of Walkways & Ladders around Inlet Duct @ 8.6mtrs : Compressor #1
Progressing
159
10-Jan-13 A
24-Jul-13
18
3
10-Jan-13 A
10-Jan-13 A
22-Feb-13
06-Feb-13
0
0
6
-5
134
Progressing
50
10
391
172
Ducting
200C0531912 Preassembly of Inlet Ventilation Duct : Compressor #1
38
Progressing
18-Jan-13 A
07-Feb-13
-8
148
405
Progressing
10
26-Jan-13 A
11-Feb-13
12
-44
178
Progressing
30
18
28-Jan-13 A
22-Feb-13
172
Preassembly
52
52
13
46
46
4
06-Dec-12 A
06-Dec-12 A
22-Jan-13 A
24-Mar-13
24-Mar-13
07-Feb-13
0
0
0
15
0
-7
117
6
18
727
727
241
10
10
28-Jan-13 A
14-Feb-13
11
-3
179
32
32
04-Feb-13
09-Mar-13
-7
-7
-17
741
11-Mar-13
13-Mar-13
-7
-7
16
256
Progressing
13
46
06-Dec-12 A
24-Mar-13
210
Progressing
30
5
25
5
28-Jan-13 A
04-Feb-13
02-Mar-13
08-Feb-13
0
51
36
51
138
158
374
210
Progressing
10
10
04-Feb-13
14-Feb-13
51
51
-7
210
Compressor #2
Structural Steel
Ste
200C0531052 Preassembly of Filter House Supporting Structure Incl Handrails & Grating : Compressor #2
200C0531122 Preassembly of GT & CC Skid Maintenance Platforms : Compressor #2
200C0531422 *Erection of Steel Shelter 40-VCBA65110 Pipeline Compressor #2 Package
Preassembly
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
Preassembly
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
30
25
28-Jan-13 A
02-Mar-13
-2
27
374
267
265
13
164
164
4
05-Dec-12 A
05-Dec-12 A
22-Jan-13 A
29-Jul-13
29-Jul-13
07-Feb-13
0
0
0
105
95
-7
9
0
37
609
609
241
10
28-Jan-13 A
12-Feb-13
24
19
18
370
Preassembly
32
32
02-Mar-13
05-Apr-13
-23
716
Progressing
13
65
05-Dec-12 A
13-Apr-13
-1
217
10
164
29-Jan-13 A
29-Jul-13
254
95
241
93
3
20-Jan-13 A
20-Jan-13 A
14-May-13
06-Feb-13
0
0
175
-7
80
170
677
316
200C0531757 Erection of Filter House Supporting Structure Incl Handrails & Grating : Compressor #3
Ducting
200C0531782 Position Outlet Ventilation Duct : Compressor #3
Progressing
267
5
Progressing
10
20-Jan-13 A
12-Feb-13
-7
73
217
30
25
28-Jan-13 A
02-Mar-13
-2
46
740
93
29-Jan-13 A
14-May-13
267
175
316
157
145
115
115
3
144
144
85
85
4
12-Nov-12 A
12-Nov-12 A
04-Jan-13 A
08-Jan-13 A
31-Jan-13 A
08-Jul-13
08-Jul-13
06-May-13
06-May-13
07-Feb-13
0
0
0
0
60
1
1
1
1
56
0
0
0
0
0
166
133
180
180
45
Progressing
200C1523320
Install Subrack 2" & Under Utility Air Distribution CS Piping @ Compressor # 1 [Sys 955-04]
18
16-Jan-13 A
22-Feb-13
247
200C1522625
Install Subrack 14" & Above Pipeline Comp. Train no. 1 CS Piping frm Inlet Scubber to Stage # 1 [Sys 65... 5 spool available on site base on shipment Shipment 1~15, 5 spool awaiting from Sino-Thai, On progress
12
12
11-Feb-13
23-Feb-13
42
200C1521990
Install Subrack 2" & Under Nitrogen Distribution CS Piping @ Compressor # 1 [Sys 961-01]
23
15-Jan-13 A
28-Feb-13
75
200C1522580
Install Subrack 2" & Under Pipeline Comp. Train no. 1 CS Piping frm Inlet Scrubber to HP Flare [Sys 651... All spool available on site base on shipment Shipment 1~15
28-Feb-13
01-Mar-13
12
12
96
200C1522125
Install Subrack 2" & Under Potable Water Distribution SS Piping @ Compressor # 1 [Sys 977-02]
27
08-Jan-13 A
04-Mar-13
65
200C1521580
Install Subrack 2" & Under Close Drain Header SS Piping @ Comp. # 1 Sub-Header [Sys 612-04]
New Entry 6 Week Lookahead, All spool available on site base on shipment Shipment 1~15
31
28-Jan-13 A
08-Mar-13
41
65
200C1521925
Install Subrack 2" & Under Pipeline Comp. Train no. 1 CS Piping frm Intrstg Scrbr to Stab. Fd Srg Drm [Sys All spool available on site base on shipment 1~15, On progress
651-01]
34
10-Jan-13 A
12-Mar-13
82
200C1522630
Install Subrack 14" & Above Pipeline Comp. Train no. 1 CS Piping frm Stage # 1 to Interstage Cooler [Sys
651-01]
4 spool available on site base on shipment Shipment 1~15, 5 spool awaiting from ST
16
16
24-Feb-13
13-Mar-13
42
200C1521935
Install Subrack 2" & Under Pipeline Comp. Train no. 1 CS Piping frm Inlet Scrubber to Stab. Fd Srg Drm
[Sys 651-01]
12-Mar-13
15-Mar-13
82
200C1521930
Install Subrack 2" & Under Pipeline Comp. Train no. 1 CS Piping frm Intrstg Scrbr to HP Flare [Sys 651-01] New Entry 6 Week Lookahead
15-Mar-13
16-Mar-13
82
200C1522095
Install Subrack 2" & Under Utility Water Distribution SS Piping @ Compressor # 1 to Utility Station [Sys 9... All spool available on site base on shipment 1~15
43
30-Jan-13 A
21-Mar-13
43
65
200C1523070
Install Subrack 14" & Above Pipeline Comp. Train no. 1 CS Piping frm Interstage Cooler to Scrubber [Sys
651-01]
13-Mar-13
22-Mar-13
42
200C1521690
Install Subrack 14" & Above High Pressure Flare Line SS Piping @ Comp. # 1 Sub-Header [Sys 612-02]
6 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai
30
45
21-Jan-13 A
23-Mar-13
-38
-38
19
200C1523200
Install Subrack 2" & Under Pipeline Comp. Train no. 1 SS Piping Instrument Air [Sys 651-01]
3 spool available on site base on shipment 1~15, 11 spool awaiting from Sino-Thai, On progress
45
16-Jan-13 A
23-Mar-13
-36
-36
75
200C1523230
Install Subrack 2" & Under Expansion Tank, Circulation Pump and Trim Cooler CS Piping @ Compr # 1
[Sys 941-01]
6 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai, On progress
45
11-Jan-13 A
23-Mar-13
-32
-32
164
200C1522015
Install Subrack 2 1/2" & 12" Waste Heat Recovery CS Piping @ Compressor # 1 from HO Circulation [Sys
941-02]
13
52
09-Jan-13 A
31-Mar-13
45
200C1522635
Install Subrack 2 1/2" & 12" HP Fuel Gas Distribution CS Piping @ Compressor # 1 [Sys 966-02]
8 spool available on site base on shipment 1~15, 2 spool awaiting from Sino-Thai, On progress
61
08-Jan-13 A
10-Apr-13
45
200C1521750
Install Subrack 14" & Above DPCU Train no. 1 CS Piping @ Compressor # 1 from FG Feed Header [Sys
663-01]
85
14-Jan-13 A
06-May-13
17
79
2
85
2
04-Jan-13 A
04-Feb-13
06-May-13
05-Feb-13
0
-7
1
-7
0
-13
168
247
04-Feb-13
09-Feb-13
-7
-7
-13
247
Interconnecting
200C1522365 Install Interconnecting 2" & Under Close Drain Header SS Piping @ Comp. # 1 from FG Scrubber Skid
[Sys 612-04]
200C1522805
Install Interconnecting 2" & Under Utility Air Distribution CS Piping @ Compressor # 1 to Utility Station
[Sys 955-04]
200C1522545
Install Intercon 14" & Above Pipeline Comp. Train no. 1 CS Piping frm Inlet Scubber to Stage # 1 [Sys 65... All spool awating from ST
24-Feb-13
27-Feb-13
88
200C1522355
Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping @ Comp. # 1 frm FG Scrber Skid
[Sys 612-02]
4 spool available on site base on shipment Shipment 1~15, 2 spool awaiting from ST
27-Feb-13
01-Mar-13
225
200C1522935
Install Interconnecting 2" & Under Safety Shower / Eye Wash SS Piping @ Compr # 1 to SS/EW Station
[Sys 977-05]
05-Mar-13
05-Mar-13
173
200C1522865
Install Interconnecting 2 1/2" & 12" Open Drain Header Area 200 CS Piping @ Compressor # 1 [Sys 998...
16 spool available on site base on shipment 1~15, 7 spool awaiting from Sino-Thai, On progress
45
04-Jan-13 A
23-Mar-13
-17
-17
200C1522920
Install Interconnecting 2" & Under LP Fuel Gas Distribution CS Piping @ Compressor # 1 [Sys 966-03]
48
11-Jan-13 A
27-Mar-13
195
200C1522655
Install Interconnecting 2" & Under Turbine Wash Water - Area 200 SS Piping @ Compressor # 1 [Sys 97...
53
30-Jan-13 A
01-Apr-13
53
45
200C1522670
Install Interconnecting 2 1/2" to 12" Low Pressure Flare Header CS Piping @ Comp. 1 from Package
Interface [Sys 612-03]
13
63
31-Jan-13 A
12-Apr-13
54
45
200C1523205
Install Intercon 2" & Under Pipeline Comp. Train no. 1 SS Piping Instrument Air [Sys 651-01]
11
63
01-Feb-13 A
12-Apr-13
55
45
200C1522795
Install Interconnecting 2 1/2" & 12" Waste Heat Recovery CS Piping @ Compressor # 1 to HO Supply
Header [Sys 941-02]
14 spool available on site base on shipment 1~15, 6 spool awaiting from Sino-Thai, On progress
12
64
07-Jan-13 A
13-Apr-13
182
200C1522685
Install Interconnecting 2" & Under Gas Metering SS Piping @ Compressor # 1 from Gas Metering Header
[Sys 651-04]
85
10-Jan-13 A
06-May-13
101
Actual Work
Remaining Work
Date : 05-Feb-13
40
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Compressor 2
Subrack
200C1521695
Comment
Install Subrack 14" & Above High Pressure Flare Line SS Piping @ Comp. # 2 Sub-Header [Sys 612-02]
Interconnecting
200C1522960 Install Interconnecting 14" & Above High Pressure Flare Line SS Piping @ Comp. # 2 from After Cooler
[Sys 612-02]
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
6 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai
50
19
19
50
19
19
04-Feb-13
04-Feb-13
04-Feb-13
29-Mar-13
23-Feb-13
23-Feb-13
29
29
29
29
29
29
0
0
0
220
48
48
31
4
31
4
24-Feb-13
24-Feb-13
29-Mar-13
28-Feb-13
29
29
29
29
0
0
220
163
200C1522465
Install Interconnecting 14" & Above High Pressure Flare Line SS Piping @ Comp. # 2 from Stage # 2 [Sys
612-02]
10
10
24-Feb-13
06-Mar-13
29
29
236
200c1521760
Install Interconnecting 14" & Above High Pressure Flare Line SS Piping @ Comp. # 2 from Stage # 1 [Sys
612-02]
10
10
28-Feb-13
11-Mar-13
29
29
163
200C1521765
Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping @ Comp. # 2 frm Intrstge Scrber
[Sys 612-02]
11-Mar-13
13-Mar-13
29
29
163
200C1522965
Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping @ Comp. # 2 from Pckg Intrface
[Sys 612-02]
13-Mar-13
15-Mar-13
29
29
163
200C1522950
Install Interconnecting 2" & Under Safety Shower / Eye Wash SS Piping @ Compr # 2 to SS/EW Station
[Sys 977-05]
15-Mar-13
16-Mar-13
29
29
163
200C1522525
Install Interconnecting 14" & Above High Pressure Flare Line SS Piping @ Comp. # 2 frm Intrstge Cooler
[Sys 612-02]
11-Mar-13
17-Mar-13
29
29
229
200C1522945
Install Interconnecting 2" & Under Utility Water Distribution SS Piping @ Compressor # 2 to Utility Station
[Sys 978-02]
16-Mar-13
21-Mar-13
29
29
169
200C1522675
Install Interconnecting 2 1/2" to 12" Low Pressure Flare Header CS Piping @ Comp. 2 from Package
Interface [Sys 612-03]
13
13
15-Mar-13
29-Mar-13
29
29
220
89
19
19
107
19
19
03-Jan-13 A
08-Mar-13
08-Mar-13
29-May-13
28-Mar-13
28-Mar-13
0
29
29
1
29
29
0
0
0
40
48
48
20 spool available on site base on shipment 1~15, 3 spool awaiting from Sino-Thai, On progress
8
4
107
103
03-Jan-13 A
03-Jan-13 A
29-May-13
25-May-13
0
0
1
1
0
0
40
40
14 spool available on site base on shipment 1~15, 9 spool awaiting from Sino-Thai, On progress
107
03-Jan-13 A
29-May-13
40
33
33
1
46
46
40
04-Jan-13 A
04-Jan-13 A
04-Jan-13 A
25-Mar-13
25-Mar-13
18-Mar-13
0
0
0
1
1
1
0
0
0
222
222
157
13 spool available on site base on shipment 1~15, 2 spool awaiting from ST, On progress
46
29-Jan-13 A
25-Mar-13
46
222
39
39
1
144
144
120
04-Jan-13 A
04-Jan-13 A
04-Jan-13 A
08-Jul-13
08-Jul-13
12-Jun-13
0
0
0
1
1
1
0
0
0
133
133
157
144
30-Jan-13 A
08-Jul-13
143
45
41
34
4
04-Feb-13
04-Feb-13
04-Feb-13
19-Mar-13
12-Mar-13
07-Feb-13
-7
-7
-7
29
29
-7
0
0
-13
190
181
211
Compressor 3
Subrack
200C1521700
Install Subrack 14" & Above High Pressure Flare Line SS Piping @ Comp. # 3 Sub-Header [Sys 612-02]
Interconnecting
200C1522860 Install Interconnecting 2 1/2" & 12" Open Drain Header Area 200 CS Piping @ Compressor # 3 [Sys 998...
200C1522855
Install Interconnecting 2 1/2" & 12" Open Drain Header Area 200 CS Piping @ Compressor # 2 [Sys 998...
Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping @ Gas Inlet Separator # 1 [Sys
612-02]
Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping @ Gas Inlet Separator # 2 [Sys
612-02]
Fire Systems
Subrack
200C1522040
Install Subrack 2 1/2" & 12" Fire Water Distribution SS Piping @ Compressor # 1 [Sys 412-07]
41
34
4
200C1523215
Install Subrack 2 1/2" & 12" Fire Water Distribution SS Piping @ Compressor # 2 [Sys 412-07]
04-Feb-13
07-Feb-13
29
29
211
200C1523220
Install Subrack 2 1/2" & 12" Fire Water Distribution SS Piping @ Compressor # 3 [Sys 412-07]
08-Mar-13
12-Mar-13
29
29
181
41
3
41
3
04-Feb-13
04-Feb-13
19-Mar-13
06-Feb-13
-7
-5
29
-5
0
-5
190
219
Interconnecting
200C1522840 Install Interconnecting 2 1/2" & 12" Fire Water Monitor & Deluge SS Piping @ 40-VCBA65110 [Sys 412-05] 2 spool available on site base on shipment 1~15, 10 spool is on shipment 20, 4 spool awaiting from ST
200C1522035
Install Interconnecting 2 1/2" & 12" Fire Water Monitor & Deluge SS Piping @ 40-VCLO65114 [Sys 412-05] 4 spool available on site base on shipment 1~15, 11 spool awaiting from Sino-Thai
04-Feb-13
07-Feb-13
-7
-7
-9
211
200C1522845
Install Interconnecting 2 1/2" & 12" F O A M CS Piping Area 200 [Sys 412-06]
08-Feb-13
14-Feb-13
-6
-6
-6
221
200C1522030
Install Interconnecting 2 1/2" & 12" Fire Water Monitor & Deluge SS Piping @ 40-VCLO65134 [Sys 412-05] New Entry 6 Week Lookahead
12-Mar-13
16-Mar-13
29
29
181
200C1522755
Install Interconnecting 2 1/2" & 12" Fire Water Monitor & Deluge SS Piping @ 40-VCBA65130 [Sys 412-05] New Entry 6 Week Lookahead
16-Mar-13
19-Mar-13
29
29
181
8
8
8
46
46
46
12-Nov-12 A
12-Nov-12 A
12-Nov-12 A
25-Mar-13
25-Mar-13
25-Mar-13
0
0
0
1
1
1
-97
-97
-97
45
45
45
57 spool available on site base on shipment 1~15, 3 spool awaiting from Sino-Thai, On progress
4
4
4
4
4
4
02-Jan-13 A
02-Jan-13 A
02-Jan-13 A
07-Feb-13
07-Feb-13
07-Feb-13
0
0
0
-7
-7
-7
-13
-13
-13
40
40
40
64
64
4
4
52
52
4
4
07-Jan-13 A
07-Jan-13 A
12-Mar-13
12-Mar-13
31-Mar-13
31-Mar-13
16-Mar-13
16-Mar-13
0
0
29
29
15
15
29
29
0
0
0
0
258
258
272
272
On progress
64
20
52
15
07-Jan-13 A
07-Jan-13 A
31-Mar-13
19-Feb-13
0
0
-8
1
0
1
255
231
46
46
10-Feb-13
31-Mar-13
-8
-8
255
Services
Interconnecting
200C1523225 Install Interconnecting 2 1/2" to 12" Low Pressure Flare Header CS Piping from Gas Odorization Package
[Sys 612-03]
Open Drain
Interconnecting
200C1522850 Install 2" & Under Open Drain Header Area 200 CS Piping Vent Line [Sys 998-04]
Testing/Cleaning
Pressure Test
Above Ground
200C1522240 Pressure Test Area 200 Fire Water Distribution Pipework [Sys 412-07]
Under Ground
200C1581010
200C1581015
7 spool available on site base on shipment 1~15, 2 spool is on shipment 20, 2 spool awaiting from Sino-Thai,
On progress
U/G HDPE Area 400 Open Drain Piping Hydrotest [SYS 998-03]
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
Electrical
Underground Electrical
Elec
Grounding
200C1611010
Grounding UG [5540]
200C1611020
Conduit
200C1613010
Grounding AG
Install Conduit Below Ground
Aboveground Electrical
Ele
Cable Trays
200C1621010
Install Cable Trays Subrack 2D
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
165
165
165
87
76
76
76
11
09-Jul-12 A
09-Jul-12 A
09-Jul-12 A
09-Jul-12 A
26-Apr-13
26-Apr-13
26-Apr-13
14-Feb-13
0
0
0
0
12
0
0
0
-10
-36
-36
-36
266
266
266
253
65
65
15-Feb-13
26-Apr-13
-36
266
58
58
11
11
19-Nov-12 A
19-Nov-12 A
14-Feb-13
14-Feb-13
0
0
0
0
-18
-18
277
277
58
58
14
04-Feb-13
04-Feb-13
04-Feb-13
06-Apr-13
06-Apr-13
18-Feb-13
36
36
36
22
22
36
-25
-25
0
47
47
46
Verfity Material
58
58
14
200C1621040
Verfity Material
32
32
12-Feb-13
18-Mar-13
29
29
-7
65
200C1621020
Verfity Material
14
14
04-Mar-13
18-Mar-13
24
24
-12
34
200C1621065
Verfity Material
30
30
05-Mar-13
06-Apr-13
22
22
33
33
33
33
33
33
33
33
11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13
15-Apr-13
15-Apr-13
15-Apr-13
15-Apr-13
22
22
22
22
22
22
22
22
0
0
0
0
40
40
40
40
98
98
98
98
98
98
12-Mar-13
12-Mar-13
12-Mar-13
25-Jun-13
25-Jun-13
25-Jun-13
29
29
29
29
29
29
0
0
0
85
85
85
326
212
06-Aug-12 A
20-Sep-13
-15
540
189
189
189
37
24
24
24
12
09-Aug-12 A
09-Aug-12 A
09-Aug-12 A
09-Aug-12 A
28-Feb-13
28-Feb-13
28-Feb-13
15-Feb-13
0
0
0
0
0
0
0
0
-23
-23
-23
-40
226
226
226
214
18
24
29-Sep-12 A
28-Feb-13
-23
226
88
38
0
19-Oct-12 A
19-Oct-12 A
Progressing
202
152
0
09-May-13
15-Mar-13
15-Mar-13
0
0
4
0
4
4
-1
-13
-38
664
212
212
106
35
5
4
21-Oct-12 A
21-Oct-12 A
08-Feb-13
07-Feb-13
0
0
0
0
-13
-44
136
82
38
05-Dec-12 A
08-Feb-13
-13
136
38
12
36
3
19-Oct-12 A
19-Oct-12 A
14-Mar-13
06-Feb-13
0
0
5
0
-12
-42
206
147
Concrete
Equipment & Structural
Stru
Foundations
400C03100FM
Finish Foundations Area 400
Equipment/Structural Foundations over 23m3
Equipment/Stru
400C0313013
Foundation for 40-VEAL66710 : MEG Vent Gas Incinerator Package
400C0313033
Progressing
40
400C0312036
26
25
25-Jan-13 A
01-Mar-13
14
136
400C0312038
36
36
28-Jan-13 A
14-Mar-13
12
-40
206
36
4
13
3
18-Jan-13 A
18-Jan-13 A
16-Feb-13
06-Feb-13
0
0
0
0
11
-40
165
113
04-Feb-13
07-Feb-13
-41
161
400C0313034
31
13
19-Jan-13 A
16-Feb-13
11
165
32
7
19
7
17-Jan-13 A
16-Feb-13
23-Feb-13
23-Feb-13
0
0
0
0
-9
-14
99
99
31
12
12
6
17-Jan-13 A
17-Jan-13 A
15-Feb-13
09-Feb-13
0
0
0
-7
-2
82
82
12
12
26-Jan-13 A
15-Feb-13
-2
82
59
59
60
38
38
38
01-Dec-12 A
01-Dec-12 A
01-Dec-12 A
15-Mar-13
15-Mar-13
15-Mar-13
0
0
0
-38
-38
-38
-38
-38
-38
188
188
188
21
21
13
05-Jan-13 A
05-Jan-13 A
05-Jan-13 A
25-Feb-13
25-Feb-13
17-Feb-13
0
0
0
0
0
-13
-43
-43
-44
731
731
178
Elevated Structures
Structur
400C0311026
Foundation for 40-XF82360/61 Transformers *[LER]
Walls
400C0323020
400C0323010
Pre-Cast Concrete
Concret Structures
Catch Basins,Manholes
Basins,M
& Valve Box
400C0331011
Install Catch Basins, Manholes & Valve box- Area 400 (CB=10; MH=3; VB=4)
Concrete for Below
Belo Grade Structures
Duct Banks
400C0342016
Install Electrical Duct Bank (DB#10, DB#5,DB#3)
Remaining DB#10, LER Road Crossing to Subrack 5A, Start excavation, (Road Close)
21
21
8
400C0342012
13
13
29-Jan-13 A
17-Feb-13
-1
-14
-51
739
400C0342021
17-Feb-13
25-Feb-13
-43
165
78
78
78
78
78
78
14-Feb-13
14-Feb-13
14-Feb-13
09-May-13
09-May-13
09-May-13
0
0
0
0
0
0
-1
-1
-1
161
161
161
28
20
20
20
28
20
20
20
24-Feb-13
24-Feb-13
24-Feb-13
24-Feb-13
26-Mar-13
17-Mar-13
17-Mar-13
17-Mar-13
0
0
0
0
0
0
0
0
0
0
0
0
194
49
49
49
23
23
23
23
23
23
01-Mar-13
01-Mar-13
01-Mar-13
26-Mar-13
26-Mar-13
26-Mar-13
0
0
0
0
0
0
0
0
0
194
194
194
Utility Concrete
Area Paving
400C0352011
Structural
Pipe Rack Steel
Pipe Rack Steel
400C0521011
Erection of Subrack 4A, 4B, 4C, 4D
Major Structures
Major Structures
400C0531012
Erection of Platform for 40-MBA94140 : Hot Oil Expansion Vessel
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Mechanical
Tanks/Vessels
Vessel
400C1111010
Comment
Rotating Equipment
Equipme
Pumps
400C1131011
Installation of [40-PBE94171] Hot Oil MEG Circuit Circulation Pump A
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
KO Drum Installed
38
26
26
26
102
102
102
102
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
23-May-13
23-May-13
23-May-13
23-May-13
0
0
0
0
0
0
0
0
75
0
0
0
158
116
116
116
38
38
23
23-Feb-13
23-Feb-13
23-Feb-13
04-Apr-13
04-Apr-13
20-Mar-13
20
20
25
14
14
25
121
121
124
136
136
147
Onsite
38
38
23
400C1131012
Onsite
23
23
27-Feb-13
24-Mar-13
25
25
124
147
400C1131001
Onsite
17
17
17-Mar-13
04-Apr-13
-1
-1
48
136
400C1131002
Onsite
17
17
17-Mar-13
04-Apr-13
121
136
Onsite
17
17
17
17
17
17
14-Mar-13
14-Mar-13
14-Mar-13
02-Apr-13
02-Apr-13
02-Apr-13
35
35
35
35
35
35
-40
-40
-40
206
206
206
212
188
0
07-Jan-13 A
07-Jan-13 A
17-Mar-13
20-Sep-13
24-Aug-13
206
143
0
0
0
3
0
-1
3
-15
0
0
115
70
49
6
6
6
6
6
6
6
6
17-Mar-13
17-Mar-13
17-Mar-13
17-Mar-13
23-Mar-13
23-Mar-13
23-Mar-13
23-Mar-13
58
58
58
58
58
58
58
58
20
20
20
20
95
95
95
95
113
113
113
113
1
188
188
188
188
40
07-Jan-13 A
07-Jan-13 A
07-Jan-13 A
07-Jan-13 A
07-Jan-13 A
24-Aug-13
24-Aug-13
24-Aug-13
24-Aug-13
18-Mar-13
0
0
0
0
0
-1
-1
-1
-1
-1
0
0
0
0
0
70
70
70
70
70
Processing Units
Filter Vessel
400C1153010
Piping
Aboveground Piping
Pip
400C1521010
Start A/G Piping Area 400
Subrack
Carbon Steel P
Piping
A/G 14" and A
Above, CS Piping
400C1521140 Install Subrack 18" & Under Supply and Return Headers CS Piping to HO Supply Hdr. [Sys 941-03]
Utility Services
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
400C152113 Install Interconnecting 2" & Under Area 400 Open Drain CS Piping [Sys 998-03]
400C152233 Install 2" & Under Area 400 Vent CS Piping frm Catch Basin [Sys 998-03]
188
08-Jan-13 A
24-Aug-13
-1
173
173
173
173
173
173
17-Mar-13
17-Mar-13
17-Mar-13
20-Sep-13
20-Sep-13
20-Sep-13
3
3
3
0
0
0
-15
-15
-15
115
115
115
Testing/Cleaning
Pressure Test
Under Ground
400C1581010
26
26
26
12
30
30
30
12
09-Jan-13 A
09-Jan-13 A
09-Jan-13 A
10-Feb-13
07-Mar-13
07-Mar-13
07-Mar-13
22-Feb-13
0
0
0
25
13
13
13
25
-18
-18
-18
-6
289
289
289
301
1 TP remaining
12
30
09-Jan-13 A
07-Mar-13
-52
231
124
86
86
87
41
41
41
41
06-Aug-12 A
06-Aug-12 A
06-Aug-12 A
06-Aug-12 A
19-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13
0
0
0
0
0
0
0
0
-8
-73
-73
-73
253
253
253
253
9
9
6
3
9
9
6
3
09-Mar-13
09-Mar-13
09-Mar-13
09-Mar-13
19-Mar-13
19-Mar-13
15-Mar-13
12-Mar-13
-1
-1
-1
-1
-1
-1
-1
-1
-7
-7
-7
-7
154
154
154
154
13-Mar-13
15-Mar-13
-1
-1
-7
154
3
3
3
3
16-Mar-13
16-Mar-13
19-Mar-13
19-Mar-13
-1
-1
-1
-1
-7
-7
154
154
258
223
02-Jul-12 A
01-Oct-13
457
Progressing
140
140
140
30
223
223
223
114
01-Nov-12 A
01-Nov-12 A
01-Nov-12 A
01-Nov-12 A
01-Oct-13
01-Oct-13
01-Oct-13
05-Jun-13
0
0
0
0
0
0
0
0
0
0
0
-1
457
457
457
265
110
223
27-Nov-12 A
01-Oct-13
457
99
63
0
60
24
0
24-Oct-12 A
29-Nov-12 A
08-Apr-13
28-Feb-13
28-Feb-13
0
0
17
0
17
17
24
60
60
621
657
657
400C1581015
U/G HDPE Area 400 Open Drain Piping Hydrotest [SYS 998-03]
U/G HDPE Area 400 Firewater Piping Hydrotest [SYS 412-07]
Electrical
Underground Electrical
Elec
Grounding
400C1611010
Grounding UG [2,789]
Wire & Cable
Power Wire & C
Cable - Underground
HV Distribution
Distributio - Area 103 HV Switchroom LER81153
400C2631395 Pull U/G HV Switchroom [LER81153] Cabling to Hot Oil Circ Pump A/B Motor [94141]
400C2631480
PATH: Hot Oil Circ Pump, DB25, DB5, DB4, & LER81153
Pull U/G HV Switchroom [LER81153] Cabling to Hot Oil Circ Pump B Motor [94141]
LV Distribution
400C1631630 Pull U/G LV Hot Oil Circulation Pump A Cabling
101 RECEIVING
Civil & Earthworks
Excavation & Backfill
Bac
Backfill Area 101
101C0235011
Backfill to -0.6m - Area 101
101C0235012
Concrete
Equipment & Structural
Stru
Foundations
101C03100FM
Finish Foundations Area 101
70
19
20
12
12
29-Nov-12 A
29-Nov-12 A
15-Feb-13
15-Feb-13
0
0
0
0
-51
-51
195
195
*Commenced
10
10
13
13
25-Jan-13 A
25-Jan-13 A
17-Feb-13
17-Feb-13
0
0
-7
-7
-43
-43
454
454
30
30
30
24
24
24
24-Oct-12 A
24-Oct-12 A
24-Oct-12 A
28-Feb-13
28-Feb-13
28-Feb-13
0
0
0
0
0
0
-61
-61
-61
142
142
142
Partially Complete
99
99
100
60
60
60
06-Dec-12 A
06-Dec-12 A
06-Dec-12 A
08-Apr-13
08-Apr-13
08-Apr-13
0
0
0
0
0
0
-1
-1
-1
41
41
41
Pre-Cast Concrete
Concret Structures
Catch Basins & Manholes
101C0331011
Install Catch Basins & Manholes - Area 101 (CB=2;MH=2)
Grouting
Grouting - Non Shrink
101C0373011
Grouting Non-Shrink [LoE]
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Structural
Pipe Rack Steel
Pie Rack Steel
101C0521011
Comment
Major Structures
Major Structures
101C0541011
Erection of Platform East of 40-KGR60901 - Pig Receiver
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
*Will be Completed Once the First Gas Outlet Manifold of Slug Catcher is Installed
120
25
25
25
29
13
13
13
28-Oct-12 A
28-Oct-12 A
28-Oct-12 A
28-Oct-12 A
06-Mar-13
17-Feb-13
17-Feb-13
17-Feb-13
0
0
0
0
24
30
30
30
63
-69
-69
-69
442
87
87
87
24
24
3
18-Jan-13 A
18-Jan-13 A
18-Jan-13 A
01-Mar-13
01-Mar-13
06-Feb-13
0
0
0
25
25
-7
68
68
-9
447
447
187
*Erection has Commenced and is 75% Complete - One Beam is Missing and Being Located
32
32
7
101C0541012
Started Erection
14
14
28-Jan-13 A
18-Feb-13
16
10
-13
104
101C0541013
12
12
07-Feb-13
20-Feb-13
-6
-6
-28
187
101C0541014
20-Feb-13
01-Mar-13
25
25
68
447
29
29
4
28-Jan-13 A
28-Jan-13 A
28-Jan-13 A
06-Mar-13
06-Mar-13
07-Feb-13
30
30
30
24
24
24
60
60
1
442
442
194
Miscellaneous Steel
Ste & Platforms
Miscellanous Steel
S
101C0531020
Install Pipe Support South of 40-KAQ62101 - Slug Catcher
29
29
4
101C0531015
08-Feb-13
12-Feb-13
24
24
194
101C0531050
19-Feb-13
22-Feb-13
10
10
-27
453
101C0531025
12
12
12-Feb-13
25-Feb-13
24
24
60
442
101C0531040
02-Mar-13
06-Mar-13
24
24
60
442
6
6
6
6
20-Feb-13
20-Feb-13
27-Feb-13
27-Feb-13
17
17
17
17
-28
-28
187
187
28
18
18
18
10
26-Jan-13 A
26-Jan-13 A
26-Jan-13 A
26-Jan-13 A
26-Jan-13 A
05-Mar-13
22-Feb-13
22-Feb-13
22-Feb-13
14-Feb-13
19
19
19
19
19
30
38
38
38
16
56
65
65
65
43
275
285
285
285
285
Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
101C0542013
Misc. Steels (gratings etc.) for Platform for 40-KGR60901 - Pig Receiver
20
20
20
20
15
101C1158040
*Pre-Assembly Complete
15
14
29-Jan-13 A
18-Feb-13
31
27
54
285
101C1158045
*Started Pre-assembly
15
18
01-Feb-13 A
22-Feb-13
43
38
65
285
15
15
15
15
15
15
18-Feb-13
18-Feb-13
18-Feb-13
05-Mar-13
05-Mar-13
05-Mar-13
30
30
30
30
30
30
-53
-53
-53
193
193
193
165
165
165
63
63
4
49
49
45
19
19
5
02-Jul-12 A
26-Nov-12 A
31-Dec-12 A
31-Dec-12 A
31-Dec-12 A
31-Dec-12 A
28-Mar-13
28-Mar-13
23-Mar-13
23-Feb-13
23-Feb-13
08-Feb-13
0
0
0
0
0
0
10
10
10
-1
-1
-1
35
35
-24
0
0
0
261
261
188
178
178
146
Mechanical
Package Unit
Misc. Mechanical
Mechanic Equipment
Slug Catcher P
Pre-Assembly and Installation
101C1158035 Pre-Assemble/Install Dry Gas Manifolds & Separation Tubes [Slug Catcher] 40-KAQ62101
Specialty Equipment
Equipm
Pig Receiver
101C1168010
Installation of [40-KGR60901] Pig Receiver [BY OTHERS]
Piping
Aboveground Piping
Pip
Subrack
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
101C1521771 Install Subrack 2" & Under Nitrogen Distribution CS Piping [Sys 961-01]
5 spool available on site base on shipment 1~15, 5 spool is on sea base on shipment 17~19, On progress
101C1521756 Install Subrack 2" & Under Utility Air Distribution CS Piping [Sys 955-04]
8 spool available on site base on shipment 1~15, 2 spool awaiting from Sino-Thai, On progress
02-Jan-13 A
13-Feb-13
-1
182
101C1521806 Install Subrack 2" & Under LEAN MEG Storage and Distribution CS Piping [Sys 661-05]
19
04-Jan-13 A
23-Feb-13
-1
178
9
9
1
1
25-Jan-13 A
25-Jan-13 A
04-Feb-13
04-Feb-13
0
0
2
2
-2
-2
103
103
137
114
4
45
20
5
01-Jan-13 A
01-Jan-13 A
01-Jan-13 A
23-Mar-13
25-Feb-13
08-Feb-13
0
0
0
10
-1
-1
-24
0
0
188
213
180
12
17
02-Jan-13 A
21-Feb-13
-1
216
38 spool available on site base on shipment 1~15, 8 spool is on country base on shipment 16, 8 spool
awaiting from Sino-Thai, On progress
101C1521736 Install Subrack 2" & Under Slug Catcher SS Piping to Fuel Gas PreHeater [Sys 623-02]
24-Feb-13
25-Feb-13
-1
-1
183
61
61
45
45
25-Jan-13 A
25-Jan-13 A
23-Mar-13
23-Mar-13
0
0
10
10
-24
-24
147
147
69
14
14
13
7
49
14
14
13
7
25-Jan-13 A
01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13
28-Mar-13
16-Mar-13
16-Mar-13
15-Mar-13
08-Mar-13
0
10
10
10
10
10
19
19
10
10
35
46
46
-11
-13
261
272
272
168
168
101C152178 Install Interconnecting 2 1/2" to 12" Slug Catcher CS Pipe fr Slug Catcher to Liq Inlet Separator [Sys 623...
09-Mar-13
15-Mar-13
10
10
-13
168
101C1524745 Install Intercon 2 1/2" to 12" Cond. Pump & Mtrng CS Ppng frm Pmps to Cond. Mtrng to Rcy Slug Catcher
[Sys 626-07]
15-Mar-13
15-Mar-13
10
10
-11
168
7
1
7
1
09-Mar-13
09-Mar-13
16-Mar-13
09-Mar-13
25
25
19
25
46
52
272
278
15-Mar-13
16-Mar-13
19
19
46
266
69
64
64
8
49
31
30
19
25-Jan-13 A
25-Jan-13 A
25-Jan-13 A
25-Jan-13 A
28-Mar-13
08-Mar-13
07-Mar-13
23-Feb-13
0
0
0
0
10
26
0
-1
35
54
1
0
260
278
198
175
25 spool available on site base on shipment 1~15, 5 spool is on sea base on shipment 17~19, 6 spool
awaiting from ST, On progress
Slug Catcher
Carbon Steel P
Piping
A/G 2 1/2" to 12", CS Piping
Interconnecting
Interconnect
101C152164 Install Interconnecting 2 1/2" to 12" Closed Drain Header CS Piping to Slug Catcher [Sys 612-04]
Tie-Ins
101C152167 Tie-In 2 1/2" to 12" Closed Drain Header CS Piping to Slug Catcher [Sys 612-04]
101C152191 Tie-In 2 1/2" to 12" Slug Catcher CS Pipe fr Slug Catcher to Liq Inlet Separator [Sys 623-02]
Stainless Steel
Stee Piping
A/G 2 1/2" to 12", SS Piping
Interconnecting
Interconnect
101C1521661 Install Intercon 2 1/2" to 12" Liquid Inlet Separator #1 SS Piping fr Slug Catcher to Lqd Inlt Sprtor [Sys
623-05]
Actual Work
Remaining Work
Date : 05-Feb-13
14 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 17~19, 2 spool
awaiting from ST, On progress
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
101C1521656 Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping to Slug Catcher [Sys 612-02]
OD
16 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, 6 spool
awaiting from ST
Tie-Ins
101C152197 Tie-In 2 1/2" to 12" Liquid Inlet Separator #1 SS Piping fr Slug Catcher to Lqd Inlt Sprtor [Sys 623-05]
101C152198 Tie-In 2 1/2" to 12" High Pressure Flare Line SS Piping to Slug Catcher [Sys 612-02]
A/G 14" and A
Above, SS Piping
Interconnecting
Interconnect
101C152168 Install Interconnecting 14" & Above Slug Catcher SS Piping from Slug Catcher to Flare Line [Sys 623-02]
101C1521666 Install Interconnecting 14" & Above Slug Catcher SS Piping from Slug Catcher to Inlet Gas Separator [Sys
623-02]
101C252125 Install Interconnecting 2 1/2" to 12" Area 101 Fire Water Monitor & Deluge CS Piping [Sys 412-05]
Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
Interconnecting
Interconnect
101C1521741 Install Interconnecting 2" & Under Safety Shower / Eye Wash SS Piping to Safety Shower/Eye Wash [Sys
977-03]
101C1521751 Install Interconnecting 2" & Under Utility Water Distribution SS Piping to Utility Station [Sys 978-02]
A/G 2 1/2" to 12", SS Piping
Interconnecting
Interconnect
101C252274 Install Interconnecting 2 1/2" to 12" Area 101 FOAM Pipework [Sys 412-06]
Underground Piping
Pipi
Plastic Pipe Installation
Ins
101C2522580
Install HDPE Area 101 Firewater Distribution Pipework [Sys 412-07]
101C1581010
101C1611020
Aboveground Electrical
Ele
Cable Trays
101C1621020
Install Cable Trays Subrack 1B
101C1621010
102C0235012
Variance - BL
Project Finish
Date
Total
Float
11
11
23-Feb-13
07-Mar-13
198
12
1
12
1
24-Feb-13
24-Feb-13
08-Mar-13
25-Feb-13
37
37
26
37
54
64
278
289
07-Mar-13
08-Mar-13
26
26
54
276
9 spool available on site base on shipment 1~16, 4 spool is on shipment 17~19, 2 spool awaiting from ST
19-Feb-13
19-Feb-13
19-Feb-13
28-Mar-13
28-Mar-13
01-Mar-13
10
10
10
10
10
10
35
-13
-13
255
243
168
1 spool available on site base on shipment 1~15, 7 spool is on shipment 17~19, 6 spool awaiting from ST
30
30
19-Feb-13
22-Mar-13
10
10
-13
172
25
25
01-Mar-13
28-Mar-13
10
10
-13
243
1
1
1
1
01-Mar-13
01-Mar-13
02-Mar-13
02-Mar-13
32
32
32
32
59
59
279
279
106
80
6
6
6
48
41
6
6
6
26-Nov-12 A
08-Jan-13 A
13-Mar-13
13-Mar-13
13-Mar-13
27-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13
0
0
-1
-1
-1
-1
-1
-1
-1
-1
0
-8
-30
-30
-30
241
185
146
146
146
80
80
1
33
33
32
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
11-Mar-13
11-Mar-13
09-Mar-13
0
0
0
-1
-1
-1
0
0
0
193
193
187
10-Mar-13
11-Mar-13
-1
-1
193
106
106
106
2
48
26
26
2
26-Nov-12 A
04-Jan-13 A
04-Jan-13 A
24-Feb-13
27-Mar-13
03-Mar-13
03-Mar-13
26-Feb-13
0
0
0
-1
-1
-1
-1
-1
0
0
0
0
241
180
180
183
26
04-Jan-13 A
03-Mar-13
-1
180
4 spool available on site base on shipment 1~15, 9 spool awaiting from Sino-Thai, On progress
9
9
9
48
48
48
26-Nov-12 A
26-Nov-12 A
26-Nov-12 A
27-Mar-13
27-Mar-13
27-Mar-13
0
0
0
-1
-1
-1
0
0
0
241
241
241
Progressing
20
20
20
16
16
16
02-Jul-12 A
02-Jul-12 A
02-Jul-12 A
20-Feb-13
20-Feb-13
20-Feb-13
0
0
0
1
1
1
-62
-62
-62
86
86
86
11
12
12
12
4
24-Jan-13 A
24-Jan-13 A
24-Jan-13 A
24-Jan-13 A
16-Feb-13
16-Feb-13
16-Feb-13
07-Feb-13
0
0
0
0
1
1
1
1
1
1
1
1
174
174
174
174
34
34
34
08-Feb-13
16-Feb-13
174
142
142
142
45
59
59
59
11
21-Jul-12 A
21-Jul-12 A
21-Jul-12 A
21-Jul-12 A
07-Apr-13
07-Apr-13
07-Apr-13
14-Feb-13
0
0
0
0
38
0
0
0
-16
-36
-36
-43
283
283
283
165
40
40
23-Feb-13
07-Apr-13
-36
283
Verify Materials
30
30
30
30
30
30
18-Feb-13
18-Feb-13
18-Feb-13
21-Mar-13
21-Mar-13
21-Mar-13
53
53
53
53
53
53
-1
-1
-1
162
162
162
Verify Materials
30
30
18-Feb-13
21-Mar-13
53
53
-1
162
504
273
27-Jul-12 A
23-Nov-13
140
73
164
Progressing
255
255
255
91
130
130
130
13
04-Oct-12 A
04-Oct-12 A
04-Oct-12 A
04-Oct-12 A
22-Jun-13
22-Jun-13
22-Jun-13
16-Feb-13
0
0
0
0
0
0
0
0
52
52
52
1
307
307
307
307
168
130
14-Dec-12 A
22-Jun-13
52
307
211
33
33
16
03-Oct-12 A
03-Oct-12 A
26-Dec-12 A
26-Dec-12 A
18-Sep-13
11-Mar-13
11-Mar-13
20-Feb-13
0
0
0
0
202
0
0
0
135
-11
-22
-5
86
198
111
111
102 LIQUIDS
Civil & Earthworks
Excavation & Backfill
Bac
Backfilling Area 102
102C0235011
Backfill to -0.6m - Area 102
6Wk
Finish
Variance
U/G HDPE Area 101 Open Drain Piping Hydrotest [SYS 998-04]
Grounding AG
6Wk
Start
Vari...
35
35
10
Finish
101C152164 Install Interconnecting 14" & Above High Pressure Flare Line SS Piping to Slug Catcher [Sys 612-02]
Start
35
35
10
Tie-Ins
101C152200 Tie-In 14" & Above Slug Catcher SS Piping from Slug Catcher to Flare Line [Sys 623-02]
Utility Services
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
101C152176 Install Interconnecting 2" & Under Nitrogen Distribution CS Piping to Utility Station [Sys 961-01]
RD
504
125
61
24
102C0313015
30
29
26-Dec-12 A
06-Mar-13
-41
111
102C0313037
17
17
21-Feb-13
11-Mar-13
-58
111
20
20
17
17
25-Jan-13 A
25-Jan-13 A
21-Feb-13
21-Feb-13
0
0
-6
-6
-6
-6
188
188
103
12
03-Oct-12 A
15-Feb-13
17
10
219
Concrete
Equipment & Structural
Stru
Foundations
Equipment/Stru
Equipment/Structural
Foundations over 23 m3
102C0313014
Foundations for 40-LER71250 - LER Condensate Stabilization Area
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
118
102C0312027
Backfill Required
04-Feb-13
07-Feb-13
12
12
-53
102C0312017
Backfill Required
11
11
04-Feb-13
15-Feb-13
-6
-6
-12
73
102C0311060
11
11
04-Feb-13
15-Feb-13
-1
219
102C0311065
219
102C0311028
Elevated Structures
Structur
Wall
102C0323010
Install Walls for 40-XF82350/51 Transformer Retaining Wall *[LER]
Pre-Cast Concrete
Concret Structures
Catch Basins & Manholes
102C0331011
Install Catch Basins & Manholes - Area 102 (CB=15; MH=6)
11
11
04-Feb-13
15-Feb-13
17
17
10
Backfill Required
10
12
03-Oct-12 A
15-Feb-13
-62
73
25
25
25
25
25
25
11-Mar-13
11-Mar-13
11-Mar-13
06-Apr-13
06-Apr-13
06-Apr-13
0
0
0
0
0
0
-58
-58
-58
111
111
111
59
59
60
22
22
22
19-Nov-12 A
19-Nov-12 A
19-Nov-12 A
26-Feb-13
26-Feb-13
26-Feb-13
0
0
0
0
0
0
-30
-30
-30
142
142
142
211
211
211
211
211
211
07-Jan-13 A
07-Jan-13 A
07-Jan-13 A
18-Sep-13
18-Sep-13
18-Sep-13
228
228
228
202
202
202
135
135
135
86
86
86
73
11
11
11
73
11
11
11
13-Feb-13
04-Mar-13
04-Mar-13
04-Mar-13
02-May-13
15-Mar-13
15-Mar-13
15-Mar-13
18
0
0
0
17
0
0
0
-3
2
2
2
209
253
253
253
73
73
11
73
73
11
13-Feb-13
13-Feb-13
13-Feb-13
02-May-13
02-May-13
24-Feb-13
23
23
45
17
17
45
-3
-3
23
114
114
104
Grouting
Grout - Non Shrink
Shr
102C0373011
Grouting Non-Shrink [LoE]
Structural
Miscellaneous Steel
Ste & Platforms
Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
102C0542012
Misc. Steels (gratings etc.) for Subrack 1C
Major Structures
Major Structures
102C0531011
Erection of Platform for 40-MBD62311/12 - Liquid Inlet Separators 1&2
102C0531013
102C0531012
Erection of Platform for 40-MBD62630 & 40-HBG62630 - Stabilizer Overhead Knockout Vessel
102C0531019
Erection of Steel Shelter & Pump Valve Platform - PAX64301/302/303 - Condensate Pipeline Pump A,B&C
102C0531016
Mechanical
Rotating Equipments
Equipme
Pumps & Drivers
Drive
102C1131003
Installation of [40-PBA62611] Stabilizer #1 Reflux Pump A
102C1131004
24-Feb-13
06-Mar-13
34
34
31
104
11
11
06-Mar-13
18-Mar-13
103
50
50
24-Feb-13
18-Apr-13
30
30
-25
127
Material ETA ??
50
50
09-Mar-13
02-May-13
-3
54
Onsite
35
13
13
9
35
13
13
9
22-Feb-13
09-Mar-13
09-Mar-13
09-Mar-13
31-Mar-13
23-Mar-13
23-Mar-13
19-Mar-13
-13
75
75
75
68
75
75
75
65
73
73
73
210
217
217
217
Onsite
14-Mar-13
23-Mar-13
75
75
73
217
35
35
35
35
35
35
22-Feb-13
22-Feb-13
22-Feb-13
31-Mar-13
31-Mar-13
31-Mar-13
-13
-13
-13
-13
-13
-13
-13
-13
-13
188
188
188
356
219
219
219
114
3
273
194
194
194
128
32
02-Aug-12 A
09-Jan-13 A
14-Jan-13 A
14-Jan-13 A
14-Jan-13 A
14-Jan-13 A
23-Nov-13
31-Aug-13
31-Aug-13
31-Aug-13
21-Jun-13
09-Mar-13
0
0
0
0
0
0
0
14
10
10
-1
-1
0
0
0
0
0
0
68
140
61
61
41
59
102C1524060 Install Subrack 2" & Under LP Fuel Gas Distribution CS Piping [Sys 966-03]
6 spool available on site base on shipment 1~15, 13 spool is on shipment 17~19, 6 spool awaiting from ST
10
10
06-Mar-13
16-Mar-13
91
102C1524055 Install Subrack 2" & Under Utility Air Distribution CS Piping from Header [Sys 955-04]
6 spool available on site base on shipment 1~15, 5 spool awaiting from ST, On progress
101
23-Jan-13 A
23-May-13
-1
41
102C1523985 Install Subrack 2" & Under Nitrogen Distribution CS Piping from Header [Sys 961-01]
6 spool available on site base on shipment 1~15, 4 spool awaiting from ST, On progress
128
22-Jan-13 A
21-Jun-13
-1
41
185
2
194
2
16-Jan-13 A
26-Feb-13
31-Aug-13
28-Feb-13
0
181
10
181
0
114
61
203
Specialty Equipment
Equipm
Pig Launcher
102C1168010
Installation of [40-KGL64401] Condensate Pipeline Pig Launcher
Piping
Aboveground Piping
Pip
Subrack
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
102C1524355 Install Subrack 2" & Under Exp. Tank, Circ. Pmp & Trm Clr CS Ppng frm Stab. Clmn # 1 Rboiler to Ho Drn
Hdr [Sys 941-01]
06-Mar-13
08-Mar-13
169
102C1523430 Install Subrack 2 1/2" to 12" Condensate Pump and Metering CS Piping from Pumps to Cond. Metering
[Sys 626-07]
08-Mar-13
10-Mar-13
222
102C1523440 Install Subrack 2 1/2" to 12" Fire Water Monitor & Deluge CS Piping to Liquid Inlet Separator [Sys 412-05]
10
10
06-Mar-13
16-Mar-13
155
102C1523850 Install Subrack 2 1/2" to 12" Stabilizer Train no. 1 CS Piping frm Feed Surge Drum to Feed Exchanger [Sys New Entry 6 Week Lookahead
626-02]
17-Mar-13
23-Mar-13
91
102C1524505 Install Subrack 2 1/2" to 12" Stabilizer Train no. 1 CS Ppng frm Rndwn Cler to Slop/Condensate Tank [Sys
626-02]
8 spool available on site base on shipment 1~15, 3 spool is on country base on shipment 16, 6 spool is on
sea base on shipment 17~19, On progress
12
151
16-Jan-13 A
16-Jul-13
59
102C1524620 Install Subrack 2 1/2" to 12" Stabilizer Train no. 2 CS Ppng frm Rndown Cooler to Slop/Condansate Tank
[Sys 626-03]
12 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, On progress
13
194
24-Jan-13 A
31-Aug-13
-1
41
105
105
5
133
133
34
28-Jan-13 A
28-Jan-13 A
28-Jan-13 A
26-Jun-13
26-Jun-13
12-Mar-13
35
35
35
-1
-1
-1
0
0
0
81
81
176
133
29-Jan-13 A
26-Jun-13
133
-1
81
1
1
1
1
1
1
1
1
12-Mar-13
12-Mar-13
12-Mar-13
12-Mar-13
13-Mar-13
13-Mar-13
13-Mar-13
13-Mar-13
-1
-1
-1
-1
-1
-1
-1
-1
0
0
0
0
297
297
297
297
Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
102C1524040 Install Subrack 2" & Under Instrument Air Distribution SS Piping from Header [Sys 955-03]
102C1524005 Install Subrack 2" & Under Utility Water Distribution SS Piping [Sys 978-02]
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
102C1524015 Install Intercon 2" & Under Instrument Air Distribution SS Piping to HGCP Cond. Pipeline Pig Launcher
[Sys 955-03]
Condensate Pumps
Pu
Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
Interconnecting
Interconnect
102C152345 Install Interconnecting 2" & Under High Pressure Flare Line SS Piping from Condensate Metering [Sys 6...
Stabiliser no. 1 Rundown Cooler
Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
Interconnecting
Interconnect
102C1523340 Install Interconnecting 2" & Under High Pressure Flare Line SS Piping from Stabiliser Rundown Coolers
[Sys 612-02]
Stabiliser no. 1
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
102C152366 Install Interconnecting 2" & Under Close Drain Header CS Piping from Stabiliser Column # 1 [Sys 612-04]
102C1523670 Install Interconnecting 2" & Under LP Fuel Gas Distribution CS Piping to Stabiliser Column # 1 Reboiler
[Sys 966-03]
OD
Stabiliser no. 2
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
102C1523720 Install Interconnecting 2" & Under LP Fuel Gas Distribution CS Piping to Stabiliser Column # 2 Reboiler
[Sys 966-03]
Liquid Inlet Separator
Sep
no. 1
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
102C152352 Install Interconnecting 2" & Under Close Drain Header CS Piping from Liquid Inlet Separator [Sys 612-04]
102C152344 Install Intercon 2" & Under Fire Water Monitor & Deluge CS Piping to Liquid Inlet Separator [Sys 412-05]
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
12-Mar-13
13-Mar-13
-1
-1
297
2
2
2
2
2
2
2
2
2
2
17-Mar-13
17-Mar-13
17-Mar-13
17-Mar-13
17-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
163
163
163
163
163
1
1
1
1
1
1
1
1
1
1
06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13
07-Mar-13
07-Mar-13
07-Mar-13
07-Mar-13
07-Mar-13
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
163
163
163
163
163
149
149
50
50
3
138
138
44
44
3
15-Jan-13 A
15-Jan-13 A
30-Jan-13 A
30-Jan-13 A
06-Mar-13
02-Jul-13
02-Jul-13
22-Mar-13
22-Mar-13
09-Mar-13
0
0
33
33
0
1
1
-1
-1
0
0
0
0
0
0
166
166
260
260
164
44
30-Jan-13 A
22-Mar-13
47
-1
260
10
10
10
138
138
138
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
02-Jul-13
02-Jul-13
02-Jul-13
0
0
0
1
1
1
0
0
0
104
104
104
2
2
2
2
2
2
2
2
06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13
08-Mar-13
08-Mar-13
08-Mar-13
08-Mar-13
0
0
0
0
0
0
0
0
0
0
0
0
185
185
185
185
1
1
1
1
1
125
125
125
125
125
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
18-Jun-13
18-Jun-13
18-Jun-13
18-Jun-13
18-Jun-13
0
0
0
0
0
-1
-1
-1
-1
-1
0
0
0
0
0
179
179
179
179
179
15
15
15
15
1
15
15
15
15
1
06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13
22-Mar-13
22-Mar-13
22-Mar-13
22-Mar-13
07-Mar-13
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
176
176
176
176
190
RD
17-Mar-13
22-Mar-13
155
93
4
4
4
4
100
4
4
4
4
24-Jan-13 A
28-Feb-13
28-Feb-13
28-Feb-13
28-Feb-13
22-May-13
04-Mar-13
04-Mar-13
04-Mar-13
04-Mar-13
0
181
181
181
181
108
181
181
181
181
41
114
114
114
114
130
203
203
203
203
Stainless Steel
Stee Piping
A/G 2 1/2" to 12", SS Piping
Interconnecting
Interconnect
102C1523610 Install Intercon 2 1/2" to 12" Stab. Fd Srg Drm SS Piping from Stab. Reflux Accum. to Comp. Inlt Scrbber
[Sys 626-01]
37
37
37
11
100
100
100
91
24-Jan-13 A
24-Jan-13 A
24-Jan-13 A
24-Jan-13 A
22-May-13
22-May-13
22-May-13
12-May-13
0
0
0
0
16
16
16
-1
16
16
16
0
125
125
125
134
11
100
28-Jan-13 A
22-May-13
111
16
16
81
82
2
2
2
2
111
2
2
2
2
16-Jan-13 A
06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13
03-Jun-13
08-Mar-13
08-Mar-13
08-Mar-13
08-Mar-13
0
0
0
0
0
-1
0
0
0
0
0
0
0
0
0
223
148
148
148
148
81
76
76
2
111
111
111
2
16-Jan-13 A
16-Jan-13 A
16-Jan-13 A
13-Mar-13
03-Jun-13
03-Jun-13
03-Jun-13
15-Mar-13
0
0
0
-1
-1
-1
-1
-1
0
0
0
0
223
223
223
297
111
16-Jan-13 A
03-Jun-13
-1
109
9
9
9
9
07-Mar-13
07-Mar-13
16-Mar-13
16-Mar-13
0
0
0
0
0
0
163
163
102C1523800 Install Intercon 2 1/2" to 12" Stab. Fd Srg Drm SS Ppng frm Cond Mtrng Disch Man. to Lqd Stab. Fd Hdr
[Sys 626-01]
DPCU Heater & Liquid Separator
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
102C152368 Install Interconnecting 2" & Under High Pressure Flare Line CS Piping from DPCU Heater [Sys 612-02]
Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
Interconnecting
Interconnect
102C152431 Install Interconnecting 2" & Under Instrument Air Distribution SS Piping to DPCU Heater [Sys 955-03]
102C152427 Install Interconnecting 2" & Under Close Drain Header SS Piping from DPCU Liquid Separator [Sys 612-... All spool available on site base on shipment 1~15, On progress
A/G 2 1/2" to 12", SS Piping
Interconnecting
Interconnect
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
102C1523345 Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping from DPCU Liquid Separator [Sys
612-02]
102C152341 Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping from DPCU Heater [Sys 612-02]
Utility Services
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
102C1524280 Install Interconnecting 2" & Under Open Drain - Area 102 CS Piping [Sys 998-04]
102C152356 Install Interconnecting 2" & Under Open Drain - Area 102 CS Piping Vent Line [Sys 998-04]
Underground Piping
Pipi
Plastic Pipe Installation
Ins
102C2522585
Install HDPE Area 102 Firewater Distribution Pipework [Sys 412-07]
71 spool available on site base on shipment 1~15, 4 spool is on sea base on shipment 17~19, 72 spool
awaiting from Sino-Thai, On progress
All spool available on site base on shipment 1~15, On progress
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
07-Mar-13
10-Mar-13
163
11-Mar-13
16-Mar-13
163
60
60
60
60
30
140
140
140
140
136
09-Jan-13 A
09-Jan-13 A
09-Jan-13 A
09-Jan-13 A
09-Jan-13 A
04-Jul-13
04-Jul-13
04-Jul-13
04-Jul-13
29-Jun-13
0
0
0
0
0
-1
-1
-1
-1
-1
0
0
0
0
0
81
81
81
81
34
140
09-Jan-13 A
04-Jul-13
-1
21
21
21
02-Aug-12 A
02-Aug-12 A
02-Aug-12 A
26-Feb-13
26-Feb-13
26-Feb-13
0
0
0
1
1
1
-29
-29
-51
81
On progress
113
113
26
102C2522740
67
21
13-Aug-12 A
26-Feb-13
-29
34
102C2522745
Install HDPE Area 102 Liquids Deluge System #2 & #3 Pipework [Sys 412-05]
Progressing
31
21
05-Nov-12 A
26-Feb-13
-50
229
244
244
244
244
244
244
06-Mar-13
06-Mar-13
06-Mar-13
23-Nov-13
23-Nov-13
23-Nov-13
0
0
0
0
0
0
0
0
0
56
56
56
7
7
7
7
7
7
7
7
15-Mar-13
15-Mar-13
15-Mar-13
15-Mar-13
22-Mar-13
22-Mar-13
22-Mar-13
22-Mar-13
-1
-1
-1
-1
-1
-1
-1
-1
0
0
0
0
297
297
297
297
79
79
29
29
36
36
12
12
27-Jul-12 A
27-Jul-12 A
04-Jan-13 A
04-Jan-13 A
14-Mar-13
14-Mar-13
15-Feb-13
15-Feb-13
0
0
0
0
0
0
0
0
-2
-2
-2
-2
306
306
230
230
79
68
36
11
27-Jul-12 A
27-Jul-12 A
14-Mar-13
14-Feb-13
0
0
0
0
-2
-43
306
230
Electrical
Underground Electrical
Elec
Conduit
102C1613010
Install Conduit Below Ground
Grounding
102C1611010
102C1611020
Grounding UG [2,718]
Grounding AG
24
24
16-Feb-13
14-Mar-13
-2
306
374
186
09-Jul-12 A
22-Aug-13
209
40
40
40
40
49
49
49
49
22-Dec-12 A
22-Dec-12 A
22-Dec-12 A
22-Dec-12 A
27-Mar-13
27-Mar-13
27-Mar-13
27-Mar-13
0
0
0
0
0
0
0
0
7
7
7
7
346
346
346
346
86
37
0
27-Dec-12 A
03-Jan-13 A
Construction progressing
100
53
0
07-May-13
15-Mar-13
15-Mar-13
0
0
-4
5
-4
-4
-4
-14
-22
309
358
358
45
12
31
6
03-Jan-13 A
23-Jan-13 A
09-Mar-13
09-Feb-13
0
0
-1
-1
-45
-20
254
276
103 DRYERS
Civil & Earthworks
Excavation & Backfill
Bac
Backfilling Area 103
103C0235011
Backfill to -0.6m - Area 103
Concrete
Equipment & Structural
Stru
Foundations
103C03100FM
Finish Foundations Area 103
Equipment/Structural Foundations less than 4m3
Equipment/Stru
103C0311038
Foundation for Misc Pipe supports near 40-HBG66312
229
229
34
103C0311043
12
23-Jan-13 A
09-Feb-13
-1
-34
276
103C0311048
12
23-Jan-13 A
09-Feb-13
-1
-20
276
103C0311033
12
12
03-Jan-13 A
15-Feb-13
-7
-29
274
103C0311085
13
13
04-Feb-13
17-Feb-13
-1
-1
-44
238
103C0311023
25
25
04-Feb-13
01-Mar-13
-7
-7
-44
113
103C0311053
19
19
17-Feb-13
09-Mar-13
-1
-1
-69
238
15
15
15
15
31-Jan-13 A
31-Jan-13 A
19-Feb-13
19-Feb-13
22
22
18
18
0
0
380
380
25
21
24
24
15-Jan-13 A
15-Jan-13 A
28-Feb-13
28-Feb-13
0
0
0
0
-1
-22
162
142
21
24
18-Jan-13 A
28-Feb-13
-1
162
35
35
30
24
24
24
27-Dec-12 A
27-Dec-12 A
27-Dec-12 A
28-Feb-13
28-Feb-13
28-Feb-13
0
0
0
0
0
-25
29
29
29
258
258
142
30
24
18-Jan-13 A
28-Feb-13
29
258
17
17
17
17
17
17
25-Feb-13
25-Feb-13
25-Feb-13
15-Mar-13
15-Mar-13
15-Mar-13
1
1
1
1
1
1
-51
-51
-51
264
264
264
66
66
66
66
66
66
25-Feb-13
25-Feb-13
25-Feb-13
07-May-13
07-May-13
07-May-13
5
5
5
5
5
5
-4
-4
-4
298
298
298
32
29
29
32
29
29
13-Feb-13
13-Feb-13
13-Feb-13
20-Mar-13
16-Mar-13
16-Mar-13
5
5
5
5
5
5
0
0
0
217
220
220
103C0313017
Pre-Cast Concrete
Concret Structures
Catch Basins & Manholes
103C0331011
Install Catch Basins & Manholes - Area 103 (CB=7; MH=3)
Grouting
Grout - Non Shrink
Shr
103C0373011
Grouting Non-Shrink
Structural
Pipe Rack Steel
Pipe Rack Steel
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
103C0521011
Erection of Subrack 1D
13-Feb-13
21-Feb-13
169
103C0521013
Erection of Subrack 1E
25-Feb-13
04-Mar-13
231
103C0521012
Erection of Subrack 1F
08-Mar-13
16-Mar-13
147
32
32
11
13-Feb-13
13-Feb-13
13-Feb-13
20-Mar-13
20-Mar-13
25-Feb-13
5
5
5
5
5
5
0
0
0
144
144
144
Major Structures
Major Structures
103C0531011
Erection of Platform for 40-MBD66310 - Low Temperature Separator 1
32
32
11
103C0531013
11
11
25-Feb-13
08-Mar-13
144
103C0531012
11
11
08-Mar-13
20-Mar-13
144
336
2
2
2
2
2
2
186
186
186
186
186
186
186
09-Jul-12 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
22-Aug-13
22-Aug-13
22-Aug-13
22-Aug-13
22-Aug-13
22-Aug-13
22-Aug-13
0
0
0
0
0
0
0
2
2
2
2
2
2
2
0
0
0
0
0
0
0
114
114
114
114
114
114
114
Progressing
185
185
58
37
37
27
09-Jul-12 A
09-Jul-12 A
09-Jul-12 A
15-Mar-13
15-Mar-13
04-Mar-13
0
0
0
1
1
-6
-51
-51
-41
114
114
114
40
37
15-Aug-12 A
15-Mar-13
-51
114
47
47
47
47
11
11
11
11
22-Aug-12 A
22-Aug-12 A
22-Aug-12 A
22-Aug-12 A
14-Feb-13
14-Feb-13
14-Feb-13
14-Feb-13
0
0
0
0
0
0
0
0
-43
-43
-43
-43
247
247
247
247
223
134
14-Aug-12 A
27-Jun-13
81
639
154
154
154
43
108
108
108
43
29-Sep-12 A
29-Sep-12 A
29-Sep-12 A
29-Sep-12 A
30-May-13
30-May-13
30-May-13
21-Mar-13
0
0
0
0
0
0
0
0
107
107
107
0
327
327
327
196
Piping
Aboveground Piping
Pip
Utility Services
Carbon Steel
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
103C152158 Install 2" & Under Vent CS Piping [Sys 998-04]
Underground Piping
Pipi
Plastic Pipe Installation
Ins
103C2522575
Install HDPE Area 103 Firewater Distribution Pipework [Sys 412-07]
103C2522730
Electrical
Underground Electrical
Elec
Grounding
103C1611010
Grounding UG [1,359]
Concrete
Equipment & Structural
Stru
Foundations
300C03100FM
Finish Foundations Area 300
20
108
17-Jan-13 A
30-May-13
107
327
126
70
0
52
29
0
20-Nov-12 A
20-Nov-12 A
30-Mar-13
06-Mar-13
28-Feb-13
0
0
20
0
14
20
-9
14
-42
721
744
750
26
27
8
8
20-Nov-12 A
20-Nov-12 A
11-Feb-13
11-Feb-13
0
0
-7
-7
-27
-27
104
104
66
12
29
4
21-Nov-12 A
23-Nov-12 A
06-Mar-13
07-Feb-13
0
0
14
-7
14
-9
246
104
300C0311046
10
11
27-Dec-12 A
14-Feb-13
-7
20
252
300C0311014
Foundation for Shelter for 40-VPBE67410/310 : Reverse Demulsifier/Scale Inhibitor Injection Package
16
12
21-Nov-12 A
15-Feb-13
-7
-36
94
300C0311013
10
12
21-Nov-12 A
15-Feb-13
-7
-36
94
300C0311043
Foundation for Misc. Supports south of 40-VHFG96610/20 Fuel Gas Skid A&B
12
12
08-Feb-13
21-Feb-13
-7
-7
-2
104
300C0311053
12
12
15-Feb-13
28-Feb-13
20
20
20
252
300C0311058
12
12
15-Feb-13
28-Feb-13
20
20
20
252
300C0311033
19
24
24-Nov-12 A
28-Feb-13
-29
151
300C0311048
17
17
16-Feb-13
06-Mar-13
-7
-7
-44
246
48
48
48
52
52
52
03-Jan-13 A
03-Jan-13 A
03-Jan-13 A
30-Mar-13
30-Mar-13
30-Mar-13
0
0
0
0
0
0
-51
-51
-51
144
144
144
17
17
17
17
17
17
11-Feb-13
11-Feb-13
11-Feb-13
28-Feb-13
28-Feb-13
28-Feb-13
0
0
0
0
0
0
-22
-22
-22
226
226
226
64
17
17
14
64
17
17
14
04-Feb-13
04-Feb-13
04-Feb-13
04-Feb-13
12-Apr-13
22-Feb-13
22-Feb-13
19-Feb-13
-5
-5
-5
-5
0
-5
-5
-5
-8
-6
-6
-6
227
103
103
74
12
12
09-Feb-13
22-Feb-13
-5
-5
-6
103
49
49
7
19-Feb-13
19-Feb-13
19-Feb-13
12-Apr-13
12-Apr-13
26-Feb-13
-5
-5
-5
0
0
-5
-8
-8
-6
151
151
74
103
Pre-Cast Concrete
Concret Structures
Catch Basins & Manholes
300C0331011
Install Catch Basins & Manholes - Area 300 (CB=3; MH=6)
Utility Concrete
Area Paving
300C0311032
Structural
Pipe Rack Steel
Pipe Rack Steel
300C0521011
Erection of Subrack 3C
300C0521012
Erection of Subrack 3A
Major Structures
Major Structures
300C0531022
Erection of Platform near 40-MBM68110 & 40-VPBE68110
49
49
7
300C0531014
11
11
22-Feb-13
06-Mar-13
-5
-5
-6
300C0531015
11
11
26-Feb-13
09-Mar-13
-5
-5
-6
74
300C0531037
06-Mar-13
13-Mar-13
-5
-5
-6
105
300C0531042
09-Mar-13
17-Mar-13
-5
-5
-6
74
300C0531016
11
11
17-Mar-13
29-Mar-13
-5
-5
-6
74
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
300C0531012
Comment
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
40
40
01-Mar-13
12-Apr-13
-8
151
14
14
5
06-Mar-13
06-Mar-13
06-Mar-13
21-Mar-13
21-Mar-13
11-Mar-13
-5
-5
-5
-5
-5
-5
7
7
16
249
103
112
14
14
5
300C0541041
06-Mar-13
13-Mar-13
-5
-5
103
300C0541036
Install Miscellaneous Pipe Support Near Fuel Gas Skids A/B * [On Paving]
13-Mar-13
19-Mar-13
-5
-5
-6
105
300C0541026
13-Mar-13
21-Mar-13
-5
-5
103
5
5
5
5
13-Mar-13
13-Mar-13
19-Mar-13
19-Mar-13
-5
-5
-5
-5
2
2
250
250
206
54
54
54
54
1
134
134
134
134
134
82
14-Aug-12 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
27-Jun-13
27-Jun-13
27-Jun-13
27-Jun-13
27-Jun-13
02-May-13
0
0
0
0
0
0
1
1
1
1
1
2
0
0
0
0
0
0
152
152
152
152
152
188
134
10-Jan-13 A
27-Jun-13
152
22
22
22
50
50
50
14-Aug-12 A
14-Aug-12 A
14-Aug-12 A
29-Mar-13
29-Mar-13
29-Mar-13
0
0
0
1
1
1
-49
-49
-49
144
144
144
2 TP Remaining
10
10
10
10
48
48
48
48
10-Jan-13 A
10-Jan-13 A
10-Jan-13 A
10-Jan-13 A
27-Mar-13
27-Mar-13
27-Mar-13
27-Mar-13
0
0
0
0
1
1
1
1
-75
-75
-75
-75
231
231
231
231
Progressing
130
130
58
58
43
43
14
14
13-Sep-12 A
13-Sep-12 A
11-Jan-13 A
11-Jan-13 A
22-Mar-13
22-Mar-13
18-Feb-13
18-Feb-13
0
0
0
0
55
55
55
55
159
159
22
22
297
297
297
297
130
40
43
11
13-Sep-12 A
13-Sep-12 A
22-Mar-13
14-Feb-13
0
0
55
0
159
-41
297
292
Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
300C0542013
Misc. Steels (gratings etc.) for 40-VHFG96610/20 : Fuel Gas Skid A&B Platform
Piping
Aboveground Piping
Pip
Carbon Steel Piping
P
A/G 2 1/2" to 12",
1
CS Piping
Interconnecting
Interconnecti
300C2522720 Install Interconnecting 2 1/2" to 12" Open Drain - Area 300 [Sys 998-03]
300C1522595 Install Interconnecting 2 1/2" to 12" Vent Open Drain - Area 300 [Sys 998-03]
Underground Piping
Pipi
Plastic Pipe Installation
Ins
300C2522715
Install HDPE Area 300 Open Drain Pipework [Sys 998-03]
Testing/Cleaning
Pressure Test
Under Ground
300C1581010
U/G HDPE Area 300 Fire Water Distribution Piping Hydrotest [SYS 412-07]
Electrical
Underground Electrical
Elec
Conduit
300C1613010
Install Conduit Below Ground
Grounding
300C1611010
300C1611020
Grounding UG [2,350]
Grounding AG
24
24
24-Feb-13
22-Mar-13
55
55
159
297
411
212
30-Jun-12 A
19-Sep-13
545
Progressing
411
202
202
116
212
212
212
26
30-Jun-12 A
30-Sep-12 A
30-Sep-12 A
30-Sep-12 A
19-Sep-13
19-Sep-13
19-Sep-13
02-Mar-13
0
0
0
0
0
0
0
0
0
0
0
-1
120
120
120
120
64
212
10-Jan-13 A
19-Sep-13
120
45
45
45
30
30
30
30-Jun-12 A
30-Jun-12 A
30-Jun-12 A
07-Mar-13
07-Mar-13
07-Mar-13
0
0
0
-1
-1
-1
-68
-68
-68
94
94
94
98
95
95
9
01-Sep-12 A
01-Sep-12 A
01-Sep-12 A
06-Nov-12 A
19-May-13
16-May-13
16-May-13
12-Feb-13
0
0
0
0
0
-21
-43
-85
11
-21
-53
-85
659
191
191
206
700 FLARE
Civil and Earthworks
Earthwo
Excavation & Backfill
Bac
Backfilling Area 700
700C0235011
Backfill to -0.6m - Area 700
700C0235012
Piling - 289
Pile Cover Plates
Plate & Hooks
700C0251001
Install Pile Cover Plates & Hooks
ON HOLD Subrack 7C - Drive Way (Access road) From 400 to Flare will complete upon installation of Flare
Stack, 15 Piles outstanding
Progressing
285
242
242
15
700C0311023
12
24
04-Dec-12 A
28-Feb-13
-70
76
700C0311024
23
24
23-Oct-12 A
28-Feb-13
-69
76
700C0311021
25
24
01-Sep-12 A
28-Feb-13
-69
48
700C0311026
15
24
05-Dec-12 A
28-Feb-13
-30
156
700C0311047
Foundation for Miscellaneous Platform & Pipe Support near 40-NBA61202 HP Flare KO Drum
12
24
23-Oct-12 A
28-Feb-13
-65
152
700C0311072
10
10
23-Feb-13
05-Mar-13
-1
-1
-11
179
700C0311016
13
13
23-Feb-13
08-Mar-13
-38
134
700C0311027
Onhold, Completion cannot finish until Flare Stack done, Remaining foundation along the construction access
road, Access road Detour required.
21
17
06-Nov-12 A
13-Mar-13
-18
-55
76
700C0311032
ETA ??
12
12
09-Mar-13
21-Mar-13
-38
233
700C0311051
Rebar ETA ??
25
25
06-Mar-13
01-Apr-13
-1
-1
-11
179
700C0311056
Rebar ETA ??
25
25
06-Mar-13
01-Apr-13
-1
-1
-11
233
700C0311057
14
15-Jan-13 A
02-May-13
-74
-75
174
700C0311062
14
21
21-Jan-13 A
16-May-13
-74
-74
191
10
10
30
30
05-Jan-13 A
05-Jan-13 A
07-Mar-13
07-Mar-13
0
0
0
0
-25
-25
76
76
37
37
37
37
15-Mar-13
15-Mar-13
24-Apr-13
24-Apr-13
0
0
0
0
0
0
75
75
16
18-Jan-13 A
09-Feb-13
266
Concrete
Equipment & Structural
Stru
Foundations
Equipment/Stru
Equipment/Structural
Foundations less than 4m3
700C0311043
Foundation for Shelter for 40-VPBE67510/50 : Oxygen Scavenging and Biocide Injection Package
Elevated Structures
Structur
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Walls
300C0323011
Comment
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
09-Feb-13
09-Feb-13
0
0
0
0
0
0
266
266
60
60
60
52
52
52
23-Oct-12 A
23-Oct-12 A
23-Oct-12 A
31-Mar-13
31-Mar-13
31-Mar-13
0
0
0
0
0
0
-70
-70
-70
193
193
193
12
12
12
12
12
12
04-Feb-13
04-Feb-13
04-Feb-13
15-Feb-13
15-Feb-13
15-Feb-13
-6
-6
-6
0
0
0
1
1
1
745
745
320
12
12
04-Feb-13
15-Feb-13
-6
-25
745
145
145
145
98
98
98
27-Dec-12 A
27-Dec-12 A
27-Dec-12 A
19-May-13
19-May-13
19-May-13
0
0
0
0
0
0
11
11
11
48
48
48
78
5
5
5
40
5
5
5
17-Dec-12 A
06-Mar-13
06-Mar-13
06-Mar-13
18-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13
0
-1
-1
-1
-8
-1
-1
-1
-18
-11
-11
-11
241
248
248
248
78
78
43
40
40
30
17-Dec-12 A
17-Dec-12 A
17-Dec-12 A
18-Mar-13
18-Mar-13
07-Mar-13
0
0
0
-10
-10
-32
-18
-18
-8
76
76
48
31
31
13-Feb-13
18-Mar-13
-10
-10
-60
76
Onsite
177
35
35
35
71
35
35
35
15-Nov-12 A
15-Mar-13
15-Mar-13
15-Mar-13
21-Apr-13
21-Apr-13
21-Apr-13
21-Apr-13
0
67
67
67
67
67
67
67
33
33
33
33
135
129
129
129
In Port Moresby
21
21
11
21
21
11
15-Feb-13
15-Feb-13
15-Feb-13
09-Mar-13
09-Mar-13
26-Feb-13
-16
-16
-16
-16
-16
-16
-26
-26
-26
160
160
157
In Port Moresby
11
11
26-Feb-13
09-Mar-13
-16
-16
-26
160
77
77
77
30
30
30
15-Nov-12 A
15-Nov-12 A
15-Nov-12 A
07-Mar-13
07-Mar-13
07-Mar-13
0
0
0
0
0
0
-25
-25
-25
76
76
76
Onsite
9
9
9
9
9
9
10-Mar-13
10-Mar-13
10-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13
54
54
54
62
62
54
9
9
0
166
166
166
Onsite
10-Mar-13
19-Mar-13
62
62
166
28
28
28
19
13-Nov-12 A
13-Nov-12 A
13-Nov-12 A
08-Dec-12 A
05-Mar-13
05-Mar-13
05-Mar-13
23-Feb-13
0
0
0
0
0
0
0
0
-21
-21
-21
-21
75
75
75
75
75
Erection of Subrack 7C
Mechanical
Shop Built Tanks/Vessels
Tanks/
Vessel
700C1111011
Installation of [40-NBA99110] Closed Drain/LP Flare Drum
Rotating Equipments
Equipme
Pumps
700C1131017
Installation of [40-PBE67211] Corrosion Inhibitor Injection Pump A
Installation of [40-PBE67212] Corrosion Inhibitor Injection Pump B
Heaters/Furnaces
Flare
700C1147002
Installation of [40-XAW61801] HP/LP Flare Stack
700C1153002
6Wk
Start
Vari...
18-Jan-13 A
18-Jan-13 A
Structural
Misc. Steel & Platforms
Plat
Miscellaneous S
Steel
700C0541023
Erection of Stairway From Area 300 to 700
Processing Units
Filter Vessel
700C1153001
Finish
6
6
Grouting
Grout - Non Shrink
Shr
700C0373011
Grouting Non Shrink
700C1131018
Start
16
16
700C0521013
RD
Pre-Cast Concrete
Concret Structures
Catch Basins, Manholes
M
& Valve Box
700C0331011
Install Catch Basins, Manholes & Valve box- Area 700 (CB=7; MH=3; VB=2)
700C0342016
OD
57
57
57
32
700C1321038
Erection of Roof Trusses & Plates Slop Condensate Storage Tank [40-ABJ96401]
11
19
13-Nov-12 A
23-Feb-13
-71
700C1321039
24-Feb-13
05-Mar-13
-21
297
192
192
191
191
1
196
196
177
124
124
1
15-Oct-12 A
07-Jan-13 A
07-Jan-13 A
14-Jan-13 A
14-Jan-13 A
13-Feb-13
02-Sep-13
02-Sep-13
13-Aug-13
17-Jun-13
17-Jun-13
14-Feb-13
0
0
0
0
0
0
1
1
1
-1
-1
0
0
0
0
0
0
0
122
122
140
193
193
267
Piping
Aboveground Piping
Pip
Carbon Steel Piping
P
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnecti
700C1523370 Install Intercon 2" and under LP Fuel Gas Distrib Header CS Piping from FG Header to Slop/Condensate
Pump [Sys 966-03]
75
700C1523345 Install Intercon 2" and under LP Fuel Gas Distrib Header CS Ppng from FG Hdr to Wellpad MEG Injection
Pump [Sys 966-03]
12-Mar-13
13-Mar-13
-26
167
700C1523705 Install Interconnecting 2" and under Nitrogen Distribution CS Piping Utility Station [Sys 961-01]
6 spool available on site base on shipment 1~15, 13 spool is on sea base on shipment 17~19, 12 spool
awaiting from Sino-Thai
08-Mar-13
14-Mar-13
-8
-8
-8
141
700C1523570 Install Intercon 2" and under Flare K.O. Drum & Stacks FG CS Ppng Spply frm Flare Ignation CP to Flr
Stck [Sys 612-01]
47
47
13-Mar-13
02-May-13
-27
167
700C1523790 Install 2" and under Open Drain - Area 700 Vent CS Piping [Sys 998-03]
21 spool available on site base on shipment 1~15, 1 spool awaiting from Sino-Thai, On progress
13 spool available on site base on shipment 1~15, 1 spool is on sea base on shipment 17~19, 10 spool
awaiting from ST
124
14-Jan-13 A
17-Jun-13
-1
193
183
120
25
177
177
33
07-Jan-13 A
17-Jan-13 A
25-Jan-13 A
13-Aug-13
13-Aug-13
11-Mar-13
0
0
0
1
1
-1
0
0
0
137
118
233
700C1523620 Install Subrack 2 1/2" to 12" Stabilizer Train no. 1 Rundown Cooler CS Piping to Slop/Condesate Tanks
[Sys 626-02]
10 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, On progress
11
116
17-Jan-13 A
08-Jun-13
-1
179
700C1523395 Install Subrack 2 1/2" to 12" PW Treatment SS Piping from PW Treatment Package to PW Buffer Tank
[Sys 681-01]
17 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, 20 spool
awaiting from Sino-Thai, On progress
27
177
17-Jan-13 A
13-Aug-13
48
183
121
07-Jan-13 A
13-Jun-13
-1
193
Interconnecting
Interconnecti
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
700C1523925 Install Intercon 2 1/2" to 12" DPCU LEAN MEG Strg and Dstrb CS Ppng frm Strge Tnk to HGCP MEG
Injctn Pmp [Sys 661-06]
3 spool available on site base on shipment 1~15, 18 spool is on sea base on shipment 17~19
700C1523785 Install 2 1/2" to 12" Open Drain - Area 700 Open Drain CS Piping [Sys 998-03]
16 spool available on site base on shipment 1~15, 1 spool awaiting from SIno-Thai, On progress
12 spool available on site base on shipment 1~15, 4 spool is on sea base on shipment 17~19, 8 spool
awaiting from Sino-Thai, On progress
17 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, 14 spool
awaiting from ST, On progress
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
10
10
12-Feb-13
22-Feb-13
112
121
07-Jan-13 A
13-Jun-13
-1
193
187
83
10
10
196
133
114
114
14-Jan-13 A
14-Jan-13 A
14-Jan-13 A
14-Jan-13 A
02-Sep-13
26-Jun-13
06-Jun-13
06-Jun-13
0
0
0
0
1
1
1
1
0
0
0
0
122
164
106
106
83
12
133
20
14-Jan-13 A
22-Jan-13 A
26-Jun-13
25-Feb-13
0
0
1
-1
0
0
164
277
700C1523365 Install Intercon 2" & Under PW Treatment SS Piping frm Water Injec Booster Pmp to Recycle Floatation
Cell [Sys 681-01]
16 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 17~19, 2 spool is on
shipment 20, 4 spool awaiting from Sino-Thai, On progress
20
14-Jan-13 A
25-Feb-13
-1
87
700C1523435 Install Intercon 2" & Under PW Treatment SS Piping from MEG Regen Package to Recycle Floatation Cell
[Sys 681-01]
13
133
15-Jan-13 A
26-Jun-13
87
187
174
21
196
196
38
15-Jan-13 A
15-Jan-13 A
29-Jan-13 A
02-Sep-13
02-Sep-13
17-Apr-13
0
0
28
1
1
-25
0
0
-25
122
122
201
18
196
15-Jan-13 A
02-Sep-13
122
117
8
149
8
16-Jan-13 A
13-Feb-13
13-Jul-13
21-Feb-13
0
21
1
21
0
-1
76
81
700C1523550 Install Interconnecting 2 1/2" to 12" Flare Knock Out Drum and Stacks Open Drain SS Piping [Sys 612-01]
21-Feb-13
23-Feb-13
21
21
-1
81
700C1523755 Install Intercon 2 1/2" to 12" Flare K.O. Drum and Stacks SS Piping Supply from DC/LP Flare Drum to
Pump [Sys 612-01]
8 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, 6 spool awaiting
from ST
23-Feb-13
03-Mar-13
21
21
-1
81
700C1523400 Install Intercon 2 1/2" to 12" PW Treatment SS Ppng frm PW Injec Bster Pumps to Water Injec Coarse
Filter [Sys 681-01]
9 spool available on site base on shipment 1~15, 21 spool awaiting from Sino-Thai, on progress
10
96
17-Jan-13 A
17-May-13
-1
78
700C1523405 Install Intercon 2 1/2" to 12" PW Treatment SS Piping from Water Injection Fine Filter to DO Oil Sump [Sys
681-01]
8 spool available on site base on shipment 1~15, 4 spool is on sea base on shipment 17~19, 4 spool awaiting
from Sino-Thai, On progress
10
106
17-Jan-13 A
28-May-13
-1
78
700C1523390 Install Intercon 2 1/2" to 12" PW Treatment SS Piping frm Water Injection Fne Fltr to Water Injection
Pumps [Sys 681-01]
7 spool available on site base on shipment 1~15, 1 spool is on sea base on shipment 17~19, 8 spool awaiting
from Sino-Thai, On progress
10
149
16-Jan-13 A
13-Jul-13
76
166
166
166
166
166
166
13-Feb-13
13-Feb-13
13-Feb-13
10-Aug-13
10-Aug-13
10-Aug-13
21
21
21
21
21
21
-1
-1
-1
76
76
76
64
64
39
50
50
50
15-Oct-12 A
15-Oct-12 A
17-Oct-12 A
29-Mar-13
29-Mar-13
29-Mar-13
0
0
0
1
1
1
-68
-68
-68
229
229
229
43
50
15-Oct-12 A
29-Mar-13
-68
193
Pending Material (Cad Weld) Delivery, C-Crimps in lieu of Cad Welds, Access required
125
125
125
60
77
77
77
37
12-Dec-12 A
12-Dec-12 A
12-Dec-12 A
12-Dec-12 A
26-Apr-13
26-Apr-13
26-Apr-13
14-Mar-13
0
0
0
0
4
-26
-26
-26
-14
-26
-26
-26
264
264
264
247
40
40
15-Mar-13
26-Apr-13
-26
-26
-26
264
Materials Onsite
48
48
24
48
48
24
10-Feb-13
10-Feb-13
10-Feb-13
03-Apr-13
03-Apr-13
07-Mar-13
26
26
26
26
26
26
8
8
17
98
98
98
Materials Onsite
24
24
08-Mar-13
03-Apr-13
26
26
47
47
47
11
04-Feb-13
04-Feb-13
04-Feb-13
04-Feb-13
25-Mar-13
25-Mar-13
25-Mar-13
15-Feb-13
-7
-7
-7
-7
-7
-7
-7
-7
-68
-68
-68
-32
182
182
182
182
Install HDPE Area 700 Open Drain Header #4 Pipework [Sys 998-03]
Electrical
Underground Electrical
Elec
Grounding
700C1611010
Grounding UG
700C1611015
Grounding AG
Aboveground Electrical
Ele
Cable Trays
700C1621010
Install Cable Trays Subrack 7A
700C1621030
9 spool available on site base on shipment 1~15, 27 spool is on sea base on shipment 17~19, 12 spool
awaiting from ST
13 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 17~19, 7 spool
awaiting from Sino-Thai, On progress
5 spool available on site base on shipment 1~15, 28 spool is on sea base on shipment 17~19, 15 spool is on
shipment 20, 2 spool awaiting from ST
On progress
98
47
47
47
11
700C0926035
18
18
15-Feb-13
06-Mar-13
-7
-7
-50
182
700C0926015
18
18
07-Mar-13
25-Mar-13
-7
-7
-82
182
126
94
05-Nov-12 A
15-May-13
-1
206
44
44
44
45
80
80
80
80
26-Nov-12 A
26-Nov-12 A
26-Nov-12 A
26-Nov-12 A
30-Apr-13
30-Apr-13
30-Apr-13
30-Apr-13
0
0
0
0
0
0
0
0
-95
-95
-95
-95
219
219
219
219
49
12
12
12
16
12
12
12
26-Dec-12 A
08-Feb-13
08-Feb-13
08-Feb-13
20-Feb-13
20-Feb-13
20-Feb-13
20-Feb-13
0
0
0
0
0
0
0
0
38
-19
-19
-19
261
261
261
261
Painting
Final/Touch Up Paint
P
Tanks & Vessel
700C0926030
Painting [40-ABJ67110] DPCU Lean MEG Storage Tank **
Concrete
Equipment & Structural
Stru
Foundations
Equipment/Stru
Equipment/Structural
Foundations less than 4m3
700C2312020
Foundation for Misc. steel at CPI Pad area
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
30
30
30
4
4
4
26-Dec-12 A
26-Dec-12 A
26-Dec-12 A
07-Feb-13
07-Feb-13
07-Feb-13
0
0
0
0
0
0
50
50
50
219
219
219
Structural
Miscellaneous Steel
Ste & Platforms
Miscellaneous S
Steel
700C0541010
Install Steel Cover of 40-ABH99910: Open Drain Oil Sump
3
3
3
3
3
3
3
3
12-Mar-13
12-Mar-13
12-Mar-13
12-Mar-13
15-Mar-13
15-Mar-13
15-Mar-13
15-Mar-13
0
0
0
0
0
0
0
0
20
20
20
20
225
225
225
225
Mechanical
Shop Built Tanks/Vessels
Tanks/
Purchased Tanks
Tan
700C1113010
Installation of [40-VBM99910] CPI Tank A
6
6
6
6
6
6
6
6
12-Mar-13
12-Mar-13
12-Mar-13
12-Mar-13
18-Mar-13
18-Mar-13
18-Mar-13
18-Mar-13
0
0
0
0
0
0
0
0
-22
-22
-22
-22
219
219
219
219
7 spool available on site base on shipment 1~15, 5 spool is on sea base on shipment 17~19, On progress
126
2
2
2
2
2
94
94
94
94
94
94
05-Nov-12 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
15-May-13
15-May-13
15-May-13
15-May-13
15-May-13
15-May-13
0
0
0
0
0
0
-1
-1
-1
-1
-1
-1
0
0
0
0
0
0
199
199
199
199
199
199
On progress
10
10
10
39
39
39
05-Nov-12 A
05-Nov-12 A
05-Nov-12 A
17-Mar-13
17-Mar-13
17-Mar-13
0
0
0
1
1
1
-88
-88
-88
194
194
194
Started, No access in some areas due to tank and piping work. Cadwelding
5
5
5
5
30
30
30
30
11-Jan-13 A
11-Jan-13 A
11-Jan-13 A
11-Jan-13 A
07-Mar-13
07-Mar-13
07-Mar-13
07-Mar-13
0
0
0
0
0
0
0
0
-30
-30
-30
-30
270
270
270
270
10
10
01-Mar-13
11-Mar-13
-1
97
310
10
0
0
0
01-Mar-13
11-Mar-13
11-Mar-13
10
0
0
0
11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13
-1
0
0
0
0
0
0
0
97
97
97
97
310
305
305
305
0
0
0
06-Mar-13
06-Mar-13
0
0
0
06-Mar-13
06-Mar-13
06-Mar-13
-6
-6
-6
-6
-6
-6
-16
-16
-16
269
269
269
0
0
0
0
0
0
01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13
0
0
0
0
0
0
-25
-25
-25
320
320
320
10
10
01-Mar-13
12-Mar-13
-1
97
310
10
10
01-Mar-13
12-Mar-13
-1
97
310
0
0
0
0
0
0
12-Mar-13
12-Mar-13
12-Mar-13
12-Mar-13
12-Mar-13
0
0
0
0
0
0
97
97
97
305
305
305
40-274 Structural
40-274-01 Piperacks
Pipera
Area 600
40S27401100
40-274-01 - MC Piperacks Area 600
0
0
0
0
0
0
01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13
0
0
0
0
0
0
-25
-25
-25
320
320
320
01-Mar-13
-25
320
0
0
0
0
0
0
06-Mar-13
06-Mar-13
06-Mar-13
-6
-6
-6
-6
-6
-6
-16
-16
-16
315
315
269
Piping
Aboveground Piping
Pip
Interconnecting Pipework
Carbon Steel P
Piping
A/G 2 1/2" to 12", CS Piping
700C1523230 Install 2 1/2" to 12" Open Drain Sump and Retention Pond Vent CS Piping [Sys 998-01]
Underground Piping
Pipi
Plastic Pipe Installation
Ins
700C2522580
Install HDPE Area 104 Open Drain to Collection Header Pipework [Sys 998-03]
Electrical
Underground Electrical
Elec
Grounding
700C1611020
Grounding UG
Onsite
MC COMPLETION
COMPLETIO MILESTONES
MAIN UTILITIES S
SYSTEMS - AREA 600
40-412 Fire Water
40-412-02 Fire Water
W
Distribution Area 600
4041202S010
MC & Handover of System.# 40-412-02
40-081 Civil & Earthworks
Ea
40-081-01 Diesel
Diese Storage Tank Bund
4008101S010
MC & Handover of System.# 40-081-01
40-274 Structural
40-274-01 Piperacks
Piper
Area 600
4027401S010
MC & Handover of System.# 40-274-01
40 - COMMISSIONING
COMMISSION
KEY UTILITIES
40S27401400
06-Mar-13
-6
-6
-16
315
147
90
02-Jan-13 A
11-May-13
204
235
340
147
90
02-Jan-13 A
11-May-13
204
235
340
147
90
02-Jan-13 A
11-May-13
204
235
340
147
90
02-Jan-13 A
11-May-13
204
235
340
47
47
35
15
47
47
35
15
26-Feb-13
26-Feb-13
26-Feb-13
26-Feb-13
17-Apr-13
17-Apr-13
04-Apr-13
13-Mar-13
0
0
0
60
126
28
40
60
215
12
25
45
192
45
3
3
20
20
14-Mar-13
04-Apr-13
-15
-15
-31
47
27
47
27
26-Feb-13
26-Feb-13
17-Apr-13
17-Apr-13
0
0
0
0
-14
-9
45
26
27
27
15
27
27
15
27-Feb-13
27-Feb-13
27-Feb-13
27-Mar-13
27-Mar-13
14-Mar-13
10
10
10
145
145
10
235
235
247
212
212
212
12
12
15-Mar-13
27-Mar-13
145
145
142
212
41 - INDUSTRIAL PARK
CONSTRUCTION and
a
COMMISSIONING
41 - CONSTRUCTION
CONSTRUCT
910 Industrial Park
Pa
Utilities
Sewer
UG Sewer Piping
Pipin
C91UTI160
Sewer 4 - 150mm dia. - MH05 to MH12 + MR07 to MR08 [93m]
C91UTI140
Manholes
C91UTI290
06-Mar-13
06-Mar-13
Electrical Ductbank 2
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
Buildings
L1 & XF1- Industrial
Industr Park Switchroom & Industrial Transformer Compound [41-LER81110 & 41-ELW506311]
Architectural
Prefabricated Buildings [L1]
L1-C0431020 Assemble/Install Modular Units -- L1 [41-LER81110]
Pre-Engineered Metal Buildings [XF1]
Pre-Engineere
L1-C0411075 Installation of Steel Columns & Beams -- L1
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
147
101
85
53
53
90
90
85
53
53
02-Jan-13 A
02-Jan-13 A
09-Feb-13
16-Mar-13
16-Mar-13
11-May-13
11-May-13
11-May-13
11-May-13
11-May-13
0
0
0
3
3
204
3
3
3
3
235
4
4
4
4
340
340
340
340
340
40
6
40
6
09-Feb-13
09-Feb-13
24-Mar-13
15-Feb-13
0
0
-1
0
-16
204
204
L1-C0411070
20-Feb-13
26-Feb-13
-1
-1
-16
204
L1-C0411071
24
24
27-Feb-13
24-Mar-13
-1
-1
-16
204
L1-C0411076
24
24
27-Feb-13
24-Mar-13
-1
-1
Concrete
Pre-cast Concrete
Conc
Structures
L1-C0331073 Installation of Precast Concrete Wall Panels --XF1
6
6
6
6
6
6
07-Mar-13
07-Mar-13
07-Mar-13
13-Mar-13
13-Mar-13
13-Mar-13
0
0
0
0
0
0
6
6
6
392
392
392
Structural Steel
Miscellaneous Steel for L1
L1-C0541010 Steel Platforms for [41-LER81110] -- L1
12
12
12
12
12
12
03-Mar-13
03-Mar-13
03-Mar-13
15-Mar-13
15-Mar-13
15-Mar-13
3
3
3
3
3
3
4
4
4
340
340
340
Electrical
Underground E
Electrical Groundings, Conduits
L1-C1611017 Grounding -- XF1/L1
3
3
3
12
12
12
02-Jan-13 A
02-Jan-13 A
02-Jan-13 A
15-Feb-13
15-Feb-13
15-Feb-13
0
0
0
0
0
0
-19
-19
-19
404
404
404
67
8
8
8
48
3
3
3
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
26-Mar-13
06-Feb-13
06-Feb-13
06-Feb-13
0
0
0
0
0
-7
-7
-7
122
-6
-6
-6
360
219
219
219
Rebars assembly done, form works on progress, awaiting remaining 10% rebar material
10
10
10
48
48
48
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
26-Mar-13
26-Mar-13
26-Mar-13
0
0
0
0
0
0
122
122
122
219
219
219
13
13
3
13
13
3
28-Feb-13
28-Feb-13
28-Feb-13
14-Mar-13
14-Mar-13
03-Mar-13
-24
-24
-24
-24
-24
-24
-23
-23
-23
372
372
372
10
10
04-Mar-13
14-Mar-13
-24
-24
-23
372
77
77
77
77
71
71
71
67
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
20-Apr-13
20-Apr-13
20-Apr-13
16-Apr-13
0
0
0
0
-4
-4
-4
0
-4
-4
-4
0
278
149
149
149
71
71
04-Feb-13
20-Apr-13
-5
-5
-4
149
24
16
16
28
18
18
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
05-Mar-13
22-Feb-13
22-Feb-13
0
0
0
0
0
0
-1
1
1
322
257
257
8
8
8
8
25-Feb-13
25-Feb-13
05-Mar-13
05-Mar-13
0
0
0
0
-1
-1
322
322
87
14
14
14
88
22
22
22
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
08-May-13
26-Feb-13
26-Feb-13
26-Feb-13
0
0
0
0
0
0
0
0
243
309
309
309
Architectural
Structural Steel
W2-C0411020 Installation of Steel Columns & Beams [60Tons]
87
87
87
88
88
88
24-Jan-13 A
24-Jan-13 A
24-Jan-13 A
08-May-13
08-May-13
08-May-13
0
0
0
0
0
0
1
1
1
96
96
96
Electrical
Underground E
Electrical Groundings, Conduits
W2-C1611011 Grounding
Earthworks on going
8
8
8
8
8
8
23-Feb-13
23-Feb-13
23-Feb-13
03-Mar-13
03-Mar-13
03-Mar-13
-25
-25
-25
-25
-25
-25
1
1
1
257
257
257
20
20
20
20
20
20
20
20
12-Mar-13
12-Mar-13
12-Mar-13
12-Mar-13
02-Apr-13
02-Apr-13
02-Apr-13
02-Apr-13
7
7
7
7
7
7
7
7
-27
-27
-27
-27
69
69
69
69
128
7
7
7
46
14
14
14
22-Jan-13 A
22-Jan-13 A
22-Jan-13 A
22-Jan-13 A
25-Mar-13
18-Feb-13
18-Feb-13
18-Feb-13
0
0
0
0
50
-1
-1
-1
70
59
59
59
290
193
193
193
18
18
18
16
16
16
01-Feb-13 A
01-Feb-13 A
01-Feb-13 A
20-Feb-13
20-Feb-13
20-Feb-13
1
1
1
0
0
0
75
75
75
193
193
193
25
25
25
25
25
25
26-Feb-13
26-Feb-13
26-Feb-13
25-Mar-13
25-Mar-13
25-Mar-13
-5
-5
-5
-5
-5
-5
70
70
70
193
193
193
On progress
Laying of grounding cable done, Pending Mat'l (Cadwelds) delivery, C-Crimps in lieu of Cad Welds
C9 - HVAC Building
Build
[41-MAWS06201-01]
Concrete
Structural Foundations
Fou
C9-C0313090 Strip Footing & Slab [Pile Foundation]
W3 - Laboratory [41-LAB06601]
[
[1st Gas]
Civil and Earthworks
Earthw
Site Preparation
Preparatio
W3-C0221040 Earthworks-Select Fill
Concrete
Structural Foundations
Fou
W3-C0313040 Strip Footing & Slab [36m3]
Excavation ongoing
Architectural
Pre-Engineere Metal Buildings
Pre-Engineered
Structural Steel
Ste
Actual Work
Remaining Work
Date : 05-Feb-13
204
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
25
25
26-Feb-13
25-Mar-13
-5
-5
70
193
On progress
6
6
6
30
30
30
01-Feb-13 A
01-Feb-13 A
01-Feb-13 A
07-Mar-13
07-Mar-13
07-Mar-13
92
92
92
66
66
66
67
67
67
306
306
306
38
4
4
4
44
17
17
17
21-Jan-13 A
21-Jan-13 A
21-Jan-13 A
21-Jan-13 A
22-Mar-13
21-Feb-13
21-Feb-13
21-Feb-13
0
0
0
0
10
-7
-7
-7
120
115
115
115
242
64
64
64
Concrete
Structural Foundations
Fou
W4-C0313050 Strip Footing & Slab [53m3]
27
27
27
27
27
27
22-Feb-13
22-Feb-13
22-Feb-13
22-Mar-13
22-Mar-13
22-Mar-13
10
10
10
10
10
10
115
115
115
212
212
212
Electrical
Underground E
Electrical Groundings, Conduits
W4-C1611014 Grounding
5
5
5
5
5
5
22-Feb-13
22-Feb-13
22-Feb-13
27-Feb-13
27-Feb-13
27-Feb-13
10
10
10
10
10
10
142
142
142
264
264
264
13
3
3
3
30
17
17
17
24-Jan-13 A
24-Jan-13 A
24-Jan-13 A
24-Jan-13 A
07-Mar-13
21-Feb-13
21-Feb-13
21-Feb-13
0
0
0
0
10
-21
-21
-21
171
179
179
179
387
119
119
119
Concrete
Structural Foundations
Fou
W12C0313055 Strip Footing & Slab [5m3]
5
5
5
5
5
5
22-Feb-13
22-Feb-13
22-Feb-13
27-Feb-13
27-Feb-13
27-Feb-13
10
10
10
10
10
10
179
179
179
256
256
256
Electrical
Underground E
Electrical Groundings, Conduits
W12C1611029 Grounding
2
2
2
2
2
2
06-Mar-13
06-Mar-13
06-Mar-13
07-Mar-13
07-Mar-13
07-Mar-13
10
10
10
10
10
10
168
168
168
387
387
387
29
29
29
6
29
29
29
6
11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13
10-Apr-13
10-Apr-13
10-Apr-13
16-Mar-13
6
233
233
233
233
233
233
233
264
264
264
264
361
294
294
294
23
23
17-Mar-13
10-Apr-13
233
233
264
294
4
4
4
4
4
4
16-Mar-13
16-Mar-13
16-Mar-13
20-Mar-13
20-Mar-13
20-Mar-13
0
0
0
0
0
0
247
247
247
380
380
380
30
30
01-Mar-13
02-Apr-13
-55
269
30
30
01-Mar-13
02-Apr-13
-55
269
30
30
01-Mar-13
02-Apr-13
-55
269
01-Mar-13*
-55
196
30
30
01-Mar-13
02-Apr-13
-55
269
30
30
30
30
01-Mar-13
01-Mar-13*
02-Apr-13
02-Apr-13
0
0
0
0
-55
-55
269
269
206
147
26-Nov-12 A
11-Jul-13
-108
594
206
147
26-Nov-12 A
11-Jul-13
-108
594
206
147
26-Nov-12 A
11-Jul-13
-108
594
83
24
26-Nov-12 A
01-Mar-13
698
83
51
24
14
26-Nov-12 A
26-Nov-12 A
01-Mar-13
18-Feb-13
0
0
0
0
698
698
10
10
19-Feb-13
01-Mar-13
698
16
16
01-Mar-13
18-Mar-13
701
9
9
9
9
9
9
9
9
01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13
0
0
0
0
0
0
0
0
698
698
698
698
12
12
12
12
8
12
12
12
12
8
01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13
14-Mar-13
14-Mar-13
14-Mar-13
14-Mar-13
09-Mar-13
0
0
0
0
0
0
0
0
0
0
698
698
698
698
698
10-Mar-13
14-Mar-13
698
3
3
3
3
3
3
3
3
11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13
14-Mar-13
14-Mar-13
14-Mar-13
14-Mar-13
0
0
0
0
0
0
0
0
705
705
705
705
7
3
7
3
11-Mar-13
11-Mar-13
18-Mar-13
14-Mar-13
0
0
0
0
701
698
Electrical
Underground E
Electrical Groundings, Conduits
W3-C1611013 Grounding
W4 - Chemical & Hazardous Materials & Shelter [41-HMS0641] [1st Gas]
Civil and Earthworks
Earthw
Site Preparation
Preparatio
W4-C0221050 Earthworks-Select Fill
42 - 10 YEAR CAMP
CAM
42 - Construction
42 - HGCP Construction
Constr
Camp
0001000870
PHASE 2
NEW WASTE WATER
WA
TREATMENT PLANT
PH200940
Install Concrete Foundations for WWTP
45 - HIDES WELLPADS
WELLP
AND ASSOCIATED FLOWLINES
CONSTRUCTION and
a
COMMISSIONING
45 - CONSTRUCTION
CONSTRUCT
PWD Support Works
Wo
- Drilling Rig
Common / Temp Works
PWDC0000T25
Erect Anti Climb Fence
PWDC0000T55
On progress
Piping
Aboveground Piping
Pip
Carbon Steel Piping
P
Interconnecting
PWD1000955 Install 3" Temp PWD Filter Inlet/Oulet CS Piping
PWD1000965
Tie-in 3" Temp PWD Inlet/Outlet Lines to 3" Perm Water Inj Pumps SS Piping
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
PWD1632700
Comment
Instruments
Instrument Valves/Regulators
Valv
Instrument Valves/Regulators
Va
PWD1000985 Install Temp PWD Filter Control Valve Relief Valve YV (1)
Process Instruments
Instrum
Field Instruments
Instrume
PWD1000995 Install Temp PWD Filter Inlet Pressure Gauges PG (2)
PWD1000990
OD
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
11-Mar-13
14-Mar-13
698
4
4
4
4
4
4
4
4
14-Mar-13
14-Mar-13
14-Mar-13
14-Mar-13
18-Mar-13
18-Mar-13
18-Mar-13
18-Mar-13
0
0
0
0
0
0
0
0
701
701
701
701
4
4
4
4
4
4
14-Mar-13
14-Mar-13
14-Mar-13
18-Mar-13
18-Mar-13
18-Mar-13
0
0
0
0
0
0
698
698
698
14-Mar-13
18-Mar-13
56
55
22-Jan-13 A
03-Apr-13
-16
412
47
10
47
4
22-Jan-13 A
22-Jan-13 A
25-Mar-13
07-Feb-13
0
0
0
-7
-8
35
151
164
80BC0331080
10
10
21-Feb-13
04-Mar-13
151
80BC0331015
20
20
04-Mar-13
25-Mar-13
151
WELLPADS C
80CC0331265
10
10
10
10
04-Mar-13
04-Mar-13
14-Mar-13
14-Mar-13
0
0
0
0
285
285
WELLPADS D
80DC0331035
29
20
39
20
24-Jan-13 A
24-Jan-13 A
17-Mar-13
25-Feb-13
0
0
0
-7
405
405
80DC0331105
20
20
19-Feb-13
12-Mar-13
405
80DC0331115
10
10
02-Mar-13
13-Mar-13
405
80DC0331095
15
15
01-Mar-13
17-Mar-13
405
PWD
PWDC0331020
20
20
20
20
13-Mar-13
13-Mar-13
03-Apr-13
03-Apr-13
0
0
0
0
412
412
WELLPADS E
80EC0331050
20
20
20
20
13-Mar-13
13-Mar-13
03-Apr-13
03-Apr-13
0
0
0
0
412
412
WELLPADS G
80GC0331100
10
10
10
10
11-Feb-13
11-Feb-13
21-Feb-13
21-Feb-13
0
0
0
0
151
151
41
41
25-Feb-13
09-Apr-13
388
41
8
0
41
8
0
25-Feb-13
25-Feb-13
25-Feb-13
09-Apr-13
05-Mar-13
0
0
0
0
0
0
388
279
279
COMMON - Pre-Cast
Pre-C
Works
WELLPADS B
80BC0331090
WELLPAD C (C1,C2)-1
(C1
Pre-Drilling Works
Common / Temp Works
80BC00MS020 Wellpad C Pre Drilling Acess
80BC00MC025
Concrete
Equipment & Structural
St
Foundations
Equipment/Str
Equipment/Structural
Foundations over 23m3
80BC0313035 Foundation for [45-LER71230] LER
Equipment/Structural Foundations less than 4m3
Equipment/Str
80BC0311015 Install Pre-cast Ftg & Cast Plinth In-situ - C1 PAU Fdns
80BC0312015 Install Pre-cast Ftg & Cast Plinth In-situ for [45-MBA61530] Vent KO Pot
Electrical
Underground E
Electrical
Grounding
80BC1611015 Install of Earthing Network
Conduit
80BC1613015 Install Conduit to UG Cables & Earthing Network
WELLPAD D (D1,D2)
(D1
698
26-Feb-13
05-Mar-13
279
33
33
33
33
33
33
33
33
05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13
09-Apr-13
09-Apr-13
09-Apr-13
09-Apr-13
0
0
0
0
0
0
0
0
306
306
306
306
19
15
19
15
05-Mar-13
05-Mar-13
25-Mar-13
21-Mar-13
0
0
0
0
298
279
10
10
15-Mar-13
25-Mar-13
298
30
30
30
30
30
30
30
30
05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13
06-Apr-13
06-Apr-13
06-Apr-13
06-Apr-13
0
0
0
0
0
0
0
0
391
391
391
391
30
30
30
30
05-Mar-13
05-Mar-13
06-Apr-13
06-Apr-13
0
0
0
0
391
391
64
57
25-Jan-13 A
05-Apr-13
-1
423
57
47
47
47
15
25-Jan-13 A
25-Jan-13 A
25-Jan-13 A
31-Jan-13 A
31-Jan-13 A
05-Apr-13
26-Mar-13
26-Mar-13
26-Mar-13
19-Feb-13
0
0
0
1
1
-1
-1
-1
-1
-3
423
393
392
392
358
Pre-Drilling Works
Concrete
Equipment & Structural
St
Foundations
Equipment/Str
Equipment/Structural
Foundations less than 4m3
80DC0311015 Install Pre-cast Ftg & Cast Plinth In-situ - D1 PAU Fdns
Excavation Start
64
54
54
47
15
80DC0311025 Install Pre-cast Ftg & Cast Plinth In-situ - D2 PAU Fdns
Excavation Start
15
15
01-Feb-13 A
07-Mar-13
15
-3
358
10
10
08-Mar-13
18-Mar-13
-3
-3
358
10
10
15-Mar-13
26-Mar-13
-1
-1
392
Blinded
44
33
37
27
25-Jan-13 A
25-Jan-13 A
15-Mar-13
04-Mar-13
0
0
-1
-1
392
392
10
10
05-Mar-13
15-Mar-13
-1
-1
392
5
5
5
5
5
5
05-Mar-13
05-Mar-13
05-Mar-13
09-Mar-13
09-Mar-13
09-Mar-13
-1
-1
-1
-1
-1
-1
408
408
408
14
14
14
14
14
14
05-Mar-13
05-Mar-13
05-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13
-1
-1
-1
-1
-1
-1
401
401
401
80DC0311045 Install Pre-cast HPU Shelter Footings and Cast Plinths In-situ
80DC0312015 Install Pre-cast Ftg & Cast Plinth In-situ for [45-MBA61520] Vent KO Pot
Equipment/Structural Foundations over 23m3
Equipment/Str
80DC0313035 Foundation for [45-LER71240] LER
80DC1311025 Foundation for [45-XF82340] Transfromer, use 2.5m3
Concrete for Below
Be
Grade Structures
Sumps and Pits
80DC0343025 Install In-situ Fiber Optic Cable Pit
Structural
Miscellaneous S
Steel & Platforms
Miscellaneous Steel
Actual Work
Remaining Work
Date : 05-Feb-13
2013
February
28 04 11 18
March
25 04 11 18 25
Activity ID
Activity Name
Comment
OD
PRODUCED WATER
WAT
DISPOSAL WELLPAD
Pre-Drilling Works
Piping
Underground P
Pipe Installation
Underground P
Plastic Pipe Installation (HDPE)
PWDC1522215 Install U/G PWD & Injection HDPE Piping from Water Injection Filter to Pumps [Sys 681-02]
WELLPAD G (G1,G2)-1
(G1
Pre-Drilling Works
Common / Temp Works
80GC00MS070 Wellpad G Pre Drilling Acess
80GC00MC025
Actual Work
Remaining Work
Date : 05-Feb-13
RD
Start
Finish
6Wk
Start
Vari...
6Wk
Finish
Variance
Variance - BL
Project Finish
Date
Total
Float
14
14
05-Mar-13
19-Mar-13
-1
-1
401
30
30
30
30
30
30
30
30
05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13
05-Apr-13
05-Apr-13
05-Apr-13
05-Apr-13
-1
-1
-1
-1
-1
-1
-1
-1
423
423
423
423
30
30
30
30
05-Mar-13
05-Mar-13
05-Apr-13
05-Apr-13
-1
-1
-1
-1
423
423
30
30
30
30
30
30
05-Mar-13
05-Mar-13
05-Mar-13
05-Apr-13
05-Apr-13
05-Apr-13
-1
-1
-1
-1
-1
-1
423
423
423
120
120
05-Mar-13
11-Jul-13
435
120
120
120
120
120
120
120
120
120
120
05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13
11-Jul-13
11-Jul-13
11-Jul-13
11-Jul-13
11-Jul-13
0
0
0
0
0
0
0
0
0
0
435
435
435
435
435
04-Feb-13
12-Feb-13
-7
-7
345
8
8
0
8
8
0
04-Feb-13
04-Feb-13
04-Feb-13
12-Feb-13
12-Feb-13
-7
-7
-7
-7
-7
-7
345
345
345
05-Feb-13
12-Feb-13
-7
-7
345
2013
February
28 04 11 18
March
25 04 11 18 25