Activity ID

Activity Name

Comment

OD

EPC4 Hides Gas Conditioning


C
Plant and Wellpads
MILESTONES
Common / Interface
Interfac Milestones
Logistical Routes
EPC4-CM06

Komo Airfield available for heavy haul delivery

Previous Forecast 1.FEB.13, Rev. 1 Forecast 15.MAR.13

40 - HIDES GAS C
CONDITIONING PLANT (HGCP)
CONSTRUCTION and
a
COMMISSIONING
40 - CONSTRUCTION
CONSTRUCT
COMMISSIONING FUEL GAS SUPPLY
Piping
Aboveground Piping
Pip
Carbon Steel Piping
P
MEG Incinerator
Incinerat
Subrack
COMGAS0880 Install Main Piperack 2" Temp Fuel Gas MEG Incinerator CS Piping
GTG
Subrack
COMGAS0870 Install Main Piperack 3" Temp Fuel Gas GTG CS Piping
Interconnecti
Interconnecting
COMGAS0905 Install 2" Temp PSV/BDV GTG Vent Line CS Piping (Sys 966-02)

New Entry 6 Week Lookahead

000 COMMON
Perimeter CCTV
000C0251061
000C0251101

*Pull U/G Site Wide LV Perimeter CCTV Cabling


Install Conduit Below Ground

Pending Mat'l ("white" conduit) delivery

Perimeter Lighting
000C0251086
Pull U/G Site Wide LV Perimeter Lighting Cabling

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

647

273

11-May-12 A

23-Nov-13

140

73

500

15-Mar-13

15-Mar-13

-40

-24

15-Mar-13

15-Mar-13

-40

-24

15-Mar-13

15-Mar-13

-40

-24

15-Mar-13*

-40

-24

647

273

11-May-12 A

23-Nov-13

140

73

500

647

273

11-May-12 A

23-Nov-13

140

73

500

647

273

11-May-12 A

23-Nov-13

140

73

500

14

14

02-Mar-13

17-Mar-13

-1

255

14
14
14
8
8
8

14
14
14
8
8
8

02-Mar-13
02-Mar-13
02-Mar-13
07-Mar-13
07-Mar-13
07-Mar-13

17-Mar-13
17-Mar-13
17-Mar-13
15-Mar-13
15-Mar-13
15-Mar-13

5
5
5
2
2
2

5
5
5
2
2
2

-1
-1
-1
1
1
1

255
255
255
234
234
234

14
10
10

14
10
10

02-Mar-13
02-Mar-13
02-Mar-13

17-Mar-13
13-Mar-13
13-Mar-13

5
5
5

5
5
5

-8
-8
-8

255
255
255

4
4

4
4

13-Mar-13
13-Mar-13

17-Mar-13
17-Mar-13

5
5

5
5

-8
-8

255
255

167

134

14-Dec-12 A

27-Jun-13

157

82
60

82
60

28-Feb-13
28-Feb-13

27-May-13
03-May-13

0
0

8
0

-40
-57

187
159

72

72

11-Mar-13

27-May-13

-40

187

105
63

79
39

14-Dec-12 A
14-Dec-12 A

29-Apr-13
16-Mar-13

0
0

0
0

-15
-15

212
157

000C0251081

Foundations for Site Wide Perimeter Lighting Columns

Foundation installation in progress

78

45

31-Dec-12 A

23-Mar-13

-15

212

000C0251041

Installation Site Wide Perimeter Lighting

Installation progressing

78

60

08-Jan-13 A

08-Apr-13

-16

212

000C0251096

Terminate Site Wide LV Perimeter Lighting Cabling

Pending Mat'l (JB's) delivery

78

79

10-Jan-13 A

29-Apr-13

-15

212

147
147

134
134

21-Jan-13 A
21-Jan-13 A

27-Jun-13
27-Jun-13

0
0

0
0

0
0

157
157

488

244

11-May-12 A

24-Oct-13

-30

508

Backfill to 600 MM done, Backfill Final Grade progressing

220
220
220
221

43
43
43
43

11-May-12 A
11-May-12 A
11-May-12 A
11-May-12 A

21-Mar-13
21-Mar-13
21-Mar-13
21-Mar-13

0
0
0
0

-1
-1
-1
-1

-1
-1
-1
-1

94
94
94
95

Progressing: Genarator, Diesel Fire Water Shelter

409
23
23
23

244
52
52
52

26-Jun-12 A
10-Sep-12 A
10-Sep-12 A
10-Sep-12 A

24-Oct-13
31-Mar-13
31-Mar-13
31-Mar-13

0
0
0
0

0
0
0
0

-30
-93
-93
-93

246
160
160
160

10
10
2

19-Nov-12 A
19-Nov-12 A
19-Nov-12 A

14-Feb-13
14-Feb-13
05-Feb-13

0
0
0

20
20
-1

-48
-48
-40

114
114
95

Perimeter Earthing
000C0251091
Installation of Perimeter Earthing

600 UTILITIES
Civil and Earthworks
Earthwo
Excavation & Backfill
Bac
Backfilling Area 600 Final Level
600C0235011
Backfill - Area 600 *[Pull U/G Cable, Paving, Misc Supports, HDPE UG Piping, MH&CB, Foundation]
Concrete
Equipment & Structural
Stru
Foundations
Equipment/Stru
Equipment/Structural
Foundations less than 4m3
600C0311100
Foundation for Misc Pipe Support in Area 600 *[Misc. Pipe Supports on Paving]
Concrete for Below
Belo Grade Structures
Duct Banks
600C0342012
Install Instrument Duct Banks #1, 2, 2A
600C0342026
Utility Concrete
Area Paving
600C0313027
600C0352011

DB# 2A Oustanding

70
70
31

Install Instrument Duct Banks 1A

10

10

04-Feb-13

14-Feb-13

20

20

Slab for Nitrogen Package

Foundation/Plinths on paving slab

202
202
18

210
210
18

02-Jan-13 A
02-Jan-13 A
25-Feb-13

17-Sep-13
17-Sep-13
15-Mar-13

0
0
0

0
0
0

-1
-1
25

280
280
453

Area Paving, Install kerbs around Equipment - Area 600 *[Misc. Supports, Grouting, Paving, Foundation,
Backfill]

Progressing: South Gen. Package C, Firewater Pump Shelter. Outsanding: Air Compressor Shelter, Diesel
Bowser, Essential Generator

186

210

02-Jan-13 A

17-Sep-13

-1

160

Outstanding LER, Genarators Structures, Platforms, Shelter

409
140
141

244
143
143

26-Jun-12 A
26-Jun-12 A
26-Jun-12 A

24-Oct-13
08-Jul-13
08-Jul-13

0
0
0

0
0
0

-30
-10
-10

209
200
200

DONE: Diesel Transfer A&B Pump, Utility Water Pump A&B, Diesel Offloading Pump,

120
120

120
120

11-Jan-13 A
11-Jan-13 A

24-Oct-13
24-Oct-13

0
0

0
0

-30
-30

209
209

29
18
18
6

16-Jan-13 A
11-Feb-13
11-Feb-13
11-Feb-13

06-Mar-13
02-Mar-13
02-Mar-13
17-Feb-13

0
-7
-7
-7

26
14
14
-7

58
8
8
-19

284
288
288
188

Grouting
Grouting - Non Shrink
600C0373011
Grouting Non-Shrink [LoE]
Grouting - Epoxy
Epox
600C0372011
Grouting Epoxy *[ Mechanical Equipments & Skid A600]

95

Foundation done, Received material and Shakeout

62
18
18
6

600C0531017

Erection of Shelter for 40-VPAU91120 : Diesel Fuel Browser

Foundation done, Received material and Shakeout

18-Feb-13

23-Feb-13

-60

188

600C0531027

Erection of Shelter for 40-VABM97711 : Demineralized Water Treatment Package

Foundation done, Received material and Shakeout

24-Feb-13

02-Mar-13

14

14

288

62
24

29
15

16-Jan-13 A
26-Jan-13 A

06-Mar-13
19-Feb-13

0
2

26
1

58
71

227
105

Structural
Major Structures
Major Structures
600C0531022
Erection of Shelter for 40-VABM97710 : Potable Water Treatment Package

Miscellaneous Steel
Ste & Platforms
LER's [Local Eequipment
Ee
Room] A600

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 1 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

600C0541096

*Installation of Stool and Cable Tray support for 40-LER71220

Started installation of Stools

26-Jan-13 A

06-Feb-13

-7

600C0541024

Preassembly & Partial Erection of Platform for 40-LER81121/40-LER81122

Started preassembly

04-Feb-13

08-Feb-13

81

107

600C0541026

Preassembly & Partial Erection of Platform for 40-LER81120

Started preassembly

28-Jan-13 A

11-Feb-13

13

64

105

600C0541098

*Installation of Stool and Cable Tray support for 40-LER81121/40-LER81122

Started installation of Stools

09-Feb-13

12-Feb-13

-4

-4

600C0541097

*Installation of Stool and Cable Tray support for 40-LER81120

Started installation of Stools

11-Feb-13

14-Feb-13

-1

-1

600C0541030

Preassembly & Partial Erection of Platform for 40-LER81123

Platform for 40-LER 81123 air compressor VFD switch room, ETA ??

11-Feb-13

16-Feb-13

-14

105

600C0541081

Installation of Stool and Cable Tray support for 40-LER81123

Stools & cable tray supports for 40-LER81123 air compressor VFD switch room ETA ??

16-Feb-13

19-Feb-13

-1

-1

-14

105

Start install tread and gratings

55
3

29
3

16-Jan-13 A
01-Feb-13 A

06-Mar-13
06-Feb-13

0
5

15
2

43
-7

216
174

Miscellaneous S
Steel
600C0541071
Erection of Platform #1 & #2 near 40-ABJ41201

109

109
107

600C0541017

Erection of Platform for 40-MAD91111 : Loading Diesel Filter Transfer Coalescer

Progressing

01-Feb-13 A

13-Feb-13

41

164

600C0541018

Erection of Platform for 40-MAD91112/13 : Diesel Filter Transfer Coalescer

Progressing

01-Feb-13 A

13-Feb-13

38

35

63

236

600C0541019

Erection of Misc. Platform and & Pipe Support Structure for Diesel Storage

ETA ??

13-Feb-13

22-Feb-13

-15

-15

-25

164

600C0541066

Installation of Miscellaneous Electrical Supports to attach to Subrack 6A,6B,6C,6D,6E

Received material and Shakeout

19

19

04-Feb-13

23-Feb-13

-7

-7

-49

155

600C0541046

Erection of Miscellaneous Platform near Subrack 6A

Platform to be pre-assembly up-to 90% prior to Erection

24-Feb-13

26-Feb-13

-7

-7

-59

155

600C0541086

Erection of Miscellaneous Pipesupport at Area 600

Progressing

27

16-Jan-13 A

04-Mar-13

160

600C0541091

Erection of Mics. Pipe Support near Main GEN 40-VTPGT83310/20/30

Foundation done, Awaiting Materials, ETA ??

20

20

13-Feb-13

06-Mar-13

-15

-15

-23

164

Crossover Platform for Diesel Storage Tank Bundwall, ETA ??

11
11

11
11

22-Feb-13
22-Feb-13

06-Mar-13
06-Mar-13

26
26

26
26

55
55

228
228

26
26
26
8

30-Jan-13 A
04-Feb-13
04-Feb-13
04-Feb-13

02-Mar-13
02-Mar-13
02-Mar-13
12-Feb-13

-2
-7
-7
-7

10
0
0
-7

38
11
11
-27

231
231
231
248

Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
600C0542013
Misc. Steels (gratings etc.) for Misc. Platform and & Pipe Support Structure for Diesel Storage Tank

Onsite

33
26
26
8

600C1131003

Installation of [40-PPW97721] Potable Water Pump A

Onsite

25-Feb-13

02-Mar-13

231

600C1131004

Installation of [40-PPW97722] Potable Water Pump B

Onsite

25-Feb-13

02-Mar-13

11

231

7
7
3

30-Jan-13 A
30-Jan-13 A
30-Jan-13 A

11-Feb-13
11-Feb-13
06-Feb-13

16
16
24

28
28
20

57
57
41

164
164
164

Mechanical
Rotating Equipments
Equipme
Pumps
600C1131010
Installation of [40-PJK41101] Firewater Jockey Pump

Processing Units
Filtration Systems
Syste
600C1153022
Installation of [40-MAJ91112] Diesel Transfer Filter Pre-filter

Progressing

22
22
3

600C1153023

Installation of [40-MAJ91113] Diesel Transfer Filter Pre-filter

Progressing

30-Jan-13 A

06-Feb-13

30

25

51

164

600C1153021

Installation of [40-MAJ91111] Loading Diesel Filter Pre-filter

Progressing

30-Jan-13 A

06-Feb-13

36

31

61

164

600C1153011

Installation of [40-MAD91111] Loading Diesel Filter Coalescer

Progressing

30-Jan-13 A

11-Feb-13

33

28

54

164

600C1153012

Installation of [40-MAD91112] Diesel Transfer Filter Coalescer

Progressing

30-Jan-13 A

11-Feb-13

16

11

34

164

600C1153013

Installation of [40-MAD91113] Diesel Transfer Filter Coalescer

Progressing

30-Jan-13 A

11-Feb-13

27

22

44

164

*Paint Tank prior to Hydrotest

15
15
15
15

15
15
15
15

18-Feb-13
18-Feb-13
18-Feb-13
18-Feb-13

05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13

0
0
0
0

0
0
0
0

-22
-22
-22
-22

231
231
231
231

3 spool install, 5 awaiting from Sino-Thai

227
227
6
6

70
70
45
45

20-Sep-12 A
20-Sep-12 A
15-Oct-12 A
15-Oct-12 A

19-Apr-13
19-Apr-13
23-Mar-13
23-Mar-13

0
0
0
0

7
7
-46
-46

0
0
-98
-98

228
228
166
166

Site Erected Tanks


Ground Storage Tanks
T
Firewater Storage
Stora Tank [30m dia. x 10.98m H]
600C1321011
Firewater Storage Tank [40-ABJ41203] Hydrotest, Draining, Cleaning
Piping
Aboveground Piping
Pip
Sub Rack 6A Upper
U
Bench
600C1521880
Install Subrack 6A8 Upper Bench Utility Air Distribution CS Piping [SYS 955-04]
Sub Rack 6B
600C1521910

Install Subrack 6B 2 1/2" to 12" IA Disribution SS Piping [SYS 955-02]

Awaiting 6 spool to arrive at site, on sea base on shipment 17~19

6
6

6
6

05-Mar-13
05-Mar-13

11-Mar-13
11-Mar-13

-2
-2

-2
-2

-66
-66

190
190

Sub Rack 6C
600C1521765

Install Subrack 6C 2 1/2" & Above Instrument Air Distribution SS Piping [SYS 955-02]

Awaiting for 5 spool from Sino-Thai

5
5

5
5

05-Mar-13
05-Mar-13

09-Mar-13
09-Mar-13

-34
-34

-34
-34

-86
-86

190
190

Sub Rack 6D
600C1522045

Install Subrack 6D Potable Water SS Piping Interconnecting to CCC [SYS 977-01]

All spool available on site base on shipment 1~15, On progress

61
26

45
19

22-Nov-12 A
07-Jan-13 A

23-Mar-13
23-Feb-13

0
0

-33
-7

-102
-76

153
178

Install Subrack 6D 2 1/2" to 12" IA Disribution SS Piping to [SYS 955-02]

2 spool install, 8 awaiting from Sino-Thai

45

22-Nov-12 A

23-Mar-13

-46

-102

153

50
50
50
25

04-Jan-13 A
04-Jan-13 A
04-Jan-13 A
04-Jan-13 A

29-Mar-13
29-Mar-13
29-Mar-13
02-Mar-13

0
0
0
0

7
7
7
-7

1
1
1
-13

173
173
173
158

600C1521685

10 spool available on site base on shipment 1~15, 3 spool on shipment 17~19 is on the sea, on progress

24
24
24
2

600C1521340 Install Interconnecting 2 1/2" to 12" HP FG to GTG A CS Piping [SYS 966-02]

All spool available on site base on shipment 1~15

02-Mar-13

04-Mar-13

-7

-7

-13

158

600C1521600 Install 2" & Under Open Drain CS Piping @ Fuel Gas Skid A [SYS 612-04]

All spool available on site base on shipment 1~15

05-Mar-13

05-Mar-13

-7

-7

-13

158

600C1521130 Install Interconnecting 2" & Under Instrument Air SS Piping @ Generator Package A [SYS 833-03]

3 spool available on site base on shipment 1~15, 6 awaiting from Sino-Thai

06-Mar-13

06-Mar-13

-7

-7

-13

158

600C1521745 Install Interconnecting Hp Flare Header Piping SS to Fuel Gas Skid Gen A [SYS 612-02]

All spool available on site base on shipment 1~15

06-Mar-13

06-Mar-13

-7

-7

-13

168

600C1521325 Install Interconnecting 2" & Under GTG A Closed Drain CS Piping [SYS 612-04]

All spool available on site base on shipment 1~15

06-Mar-13

07-Mar-13

-15

-15

-23

176

600C1521235 Install Interconnecting 2 1/2" to 12" Fuel Gas SS Piping @ Fuel Gas Skid A [SYS 833-03]

All spool available on site base on shipment 1~15

07-Mar-13

07-Mar-13

-7

-7

-13

158

600C1522085 Install Interconnecting Fuel Diesel CS Piping to Generator A Liquid Fuel Skid [SYS 911-01]

11 spool available on site base on shipment 1~15, awaiting 6 spool from ST

07-Mar-13

09-Mar-13

-15

-15

-23

189

600C1521660 Install Interconnecting 2" & Under Turbine Wash Water Generator A SS Piping [SYS 979-01]

All spool available on site base on shipment 1~15

09-Mar-13

12-Mar-13

-15

-15

-23

189

600C1521140 Install Interconnecting 2 1/2" to 12" GTG A Fuel Gas Skid SS Piping [SYS 833-03]

17 spool available on site base on shipment 1~15, 2 spool on shipment 17~19, 1 spool awaiting from
Sino-Thai, on progress

50

04-Jan-13 A

29-Mar-13

68

18

33

04-Jan-13 A

10-Mar-13

175

Gas Turbine Generator


Ge
Gas Turbine G
Generator A
Interconnecting
Interconnecti
600C1521665 Install Interconnecting 2" & Under IA Distribution Generator A SS Piping [SYS 955-02]

Gas Turbine G
Generator B

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 2 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

All spool available on site base on shipment 1~15

18
2

33
2

04-Jan-13 A
21-Feb-13

10-Mar-13
23-Feb-13

0
0

0
0

0
0

175
175

600C1521565 Install Interconnecting 2" & Under Turbine Wash Water Generator B SS Piping [SYS 979-01]

All spool available on site base on shipment 1~15

23-Feb-13

25-Feb-13

175

600C1522060 Install Interconnecting 2" & Under Instrument Air SS Piping @ Generator Package B [SYS 833-04]

3 spool available on site base on shipment 1~15, 6 awating from Sino-Thai

26-Feb-13

26-Feb-13

175

600C1521170 Install Interconnecting 2 1/2" to 12" GTG B Fuel Gas Skid SS Piping [SYS 833-04]

14 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 17~19, 4 awating from
Sino-Thai

27-Feb-13

04-Mar-13

175

600C1521240 Install Interconnecting 2 1/2" to 12" Fuel Gas SS Piping @ Fuel Gas Skid B [SYS 833-04]

All spool available on site base on shipment 1~15

04-Mar-13

05-Mar-13

175

600C1521635 Install Interconnecting 2" & Under IA Distribution Generator B SS Piping [SYS 955-02]

10 spool available on site base on shipment Shipment 1~15, 3 awaiting from Sino-Thai, on progress

29

04-Jan-13 A

06-Mar-13

-7

-13

175

600C1521225 Install Open Drain CS Piping @ Generator Package B [SYS 833-04]

All spool available on site base on shipment 1~15

05-Mar-13

08-Mar-13

175

600C1521160 Install 2" & Under Vent SS Piping @ Generator Package B [SYS 833-04]

All spool available on site base on shipment 1~15

08-Mar-13

10-Mar-13

175

40
40
1

04-Jan-13 A
04-Jan-13 A
06-Mar-13

18-Mar-13
18-Mar-13
07-Mar-13

0
0
-9

-7
-7
-9

-13
-13
-8

183
183
167

Interconnecti
Interconnecting
600C1521345 Install Interconnecting 2 1/2" to 12" HP FG to GTG B CS Piping [SYS 966-02]

All spool available on site base on shipment 1~15

8
8
1

600C1521335 Install Interconnecting 2" & Under GTG C Closed Drain CS Piping [SYS 612-04]

All spool available on site base on shipment 1~15

07-Mar-13

08-Mar-13

-9

-9

-8

174

600C1522130 Install 2" & Under Open Drain CS Piping @ Fuel Gas Skid C [SYS 612-04]

All spool available on site base on shipment 1~15

08-Mar-13

09-Mar-13

-9

-9

-8

174

600C1521460 Install Interconnecting 2" & Under Turbine Wash Water Generator C SS Piping [SYS 979-01]

All spool available on site base on shipment 1~15

09-Mar-13

12-Mar-13

-9

-9

-8

189

600C1521385 Install Interconnecting 2" & Under IA Distribution Generator C SS Piping [SYS 955-02]

9 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19

40

04-Jan-13 A

18-Mar-13

-7

-13

152

60
51
51
1

70
64
64
61

04-Jan-13 A
04-Jan-13 A
04-Jan-13 A
04-Jan-13 A

19-Apr-13
13-Apr-13
13-Apr-13
10-Apr-13

0
0
0
0

7
7
7
7

0
0
0
0

178
158
158
158

All spool available on site base on shipment 1~15, awaiting platform to be install

64

05-Jan-13 A

13-Apr-13

158

All spool available on site base on shipment 1~15, awaiting platform to be install

1
1
1

70
70
70

05-Jan-13 A
05-Jan-13 A
05-Jan-13 A

19-Apr-13
19-Apr-13
19-Apr-13

0
0
0

7
7
7

0
0
0

178
178
178

All spool available on site base on shipment 1~15, awaiting platform to be install

2
2
2

69
69
69

04-Jan-13 A
04-Jan-13 A
04-Jan-13 A

18-Apr-13
18-Apr-13
18-Apr-13

0
0
0

7
7
7

0
0
0

152
152
152

45
45
1

20-Sep-12 A
20-Sep-12 A
17-Oct-12 A

23-Mar-13
23-Mar-13
04-Feb-13

0
0
0

14
13
-2

-15
-15
-57

215
178
213

Gas Turbine G
Generator C
Interconnecting
Interconnecti
600C1522035 Install Interconnecting Hp Flare Header Piping SS to Fuel Gas Skid Gen C [SYS 612-02]

Essential Generator
Gene
Essential Generator
Gene
A
Interconnecting
Interconnecti
600C1521490 Install 2" & Under Vent SS Piping @ Diesel Day Tank Diesel Essential Generator Package A [SYS 833-01] All spool available on site base on shipment 1~15, awaiting platform to be install
600C1521495 Install Interconnecting 2 1/2" to 12" Diesel Essential Generator Package A SS Piping [SYS 833-01]
Essential Generator
Gene
B
Interconnecting
Interconnecti
600C1521355 Install Interconnecting 2" & Under Diesel Essential Generator Package B CS Piping [SYS 833-02]
Demineralized Water
W
Treatment Package
Interconnecting
600C1522120 Install Interconnecting 2" & Under Turbine Wash Water SS Piping to DW Treatment Pkg. [SYS 979-01]

All spool available on site base on shipment 1~15, On progress

199
199
9

600C1521515

Install Fire Water Storage and Pumps SS Piping on FW Tanks [412-01]

All spool available on site base on shipment 1~15, On progress

15-Oct-12 A

04-Feb-13

-2

-55

198

600C1521300

Install Interconnecting 2" & Under Fire Water Storage and Pumps SS Piping to Fire Water Pumps [412-01]

All spool available on site base on shipment 1~15

20

30-Jan-13 A

25-Feb-13

61

38

203

600C1521115

Install Interconnecting 2 1/2" to 12" Fire Water Storage and Pumps CS Piping on Fire Water Pumps [412...

16 spool available on site base on shipment 1~15, 3 spool awaiting from Sino-Thai, On progress

45

04-Jan-13 A

23-Mar-13

-45

-82

168

600C1521410

Install Interconnecting 2" & Under Utility Water Dist. Hdr. to FW Pumps and Tanks SS Piping [SYS 978-01] 4 spool available on site base on shipment 1~15, 8 spool awaiting from Sino-Thai, On progress

45

20-Sep-12 A

23-Mar-13

-46

-96

169

600C1521305

Install Interconnecting 2 1/2" & Above Fire Water Storage and Pumps SS Piping to Fire Water Pumps
[412-01]

19 spool available on site base on shipment 1~15, 8 spool in on sea base on shipment 17~19, 21 spool
awaiting from Sino-Thai

54

45

29-Jan-13 A

23-Mar-13

12

-26

178

600C1521210

Install Interconnecting Fire Water Storage and Pumps SS Piping from FW Pump to FW Tanks [412-01]

10 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai, On progress

10

45

03-Jan-13 A

23-Mar-13

-9

-15

178

1
1

1
1

25-Feb-13
25-Feb-13

26-Feb-13
26-Feb-13

38
38

38
38

0
0

239
239

All spool available on site base on shipment 1~15

54
54
2

68
68
65

04-Jan-13 A
04-Jan-13 A
05-Jan-13 A

17-Apr-13
17-Apr-13
14-Apr-13

0
0
0

7
7
7

0
0
0

155
155
156

Fire Water Storage


Stor
& Pumps
Interconnecting
600C1521275 Install Interconnecting 2 1/2" & Above Utility Water Dist. Hdr. to FW Pumps and Tanks SS Piping [SYS 9...

Tie-Ins
600C1521430

Tie-In 2" & Under Fire Water Storage and Pumps SS Piping to Fire Water Pumps [412-01]

Air Compression
Compressio Dryer & Receiver
Interconnecting
600C1521295 Install Interconnecting 2 1/2" to 12" SS Piping from IA Compressor & Dryer Package to IA Receiver [SYS
955-01]
600C1521520

Install Intercon 2 1/2" to 12" Air Compression Drying and Receiving SS Piping @ IA Receiver Drum [SYS
955-01]

5 spool available on site base on shipment 1~15, 11 spool awaiting from Sino-Thai

67

05-Jan-13 A

16-Apr-13

156

600C1521285

Install 2 1/2" to 12" Air Compression Drying and Receiving CS Piping to Instrument Air Receiver Drum
[SYS 955-01]

All spool available on site base on shipment 1~15

68

04-Jan-13 A

17-Apr-13

153

187
187
2

53
53
1

22-Oct-12 A
22-Oct-12 A
12-Nov-12 A

01-Apr-13
01-Apr-13
04-Feb-13

0
0
0

7
7
-2

0
0
-58

170
170
213

Potable Water S
Storage & Pumps
Interconnecting
600C1522015 Install Interconnecting 2" & Under Utility Water to Potable Water Pump SS Piping [SYS 978-01]

All spool available on site base on shipment 1~15, On progress

600C1521775

Install 2 1/2" to 12" Potable Water Drain CS Piping to Potable Water Tank [SYS 977-01]

All spool available on site base on shipment 1~15

04-Feb-13

04-Feb-13

-7

-7

-59

222

600C1521315

Install Interconnecting 2 1/2" & Above Potable Water SS Piping to PW Tank, Pumps & Treatment Package
[SYS 977-01]

33 spool available on site base on shipment 1~15, 8 spool is on sea base on shipment 17~19, On progress

15

30

14-Nov-12 A

07-Mar-13

-31

-74

193

600C1521310

Install Interconnecting 2" & Under Potable Water SS Piping to Potable Water Tank, Pumps & Treatment
Package [SYS 977-01]

28 spool available on site base on shipment 1~15, 2 spool awaiting from Sino-Thai, On progress

45

22-Oct-12 A

23-Mar-13

-46

-101

178

600C1522040

Install Interconnecting Potable Water SS Piping to Demineralized Water Treatment Package [SYS 977-01]

All spool available on site base on shipment 1~15, On progress

53

04-Jan-13 A

01-Apr-13

167

All spool available on site base on shipment 1~15, On progress

187
187
7

59
59
1

17-Oct-12 A
17-Oct-12 A
22-Oct-12 A

08-Apr-13
08-Apr-13
04-Feb-13

0
0
0

7
7
-2

5
0
-56

239
164
164

All spool available on site base on shipment 1~15, On progress

21-Nov-12 A

04-Feb-13

-2

-59

222

Diesel Storage & Transfer


Interconnecting
600C1522065 Install Interconnecting 2 1/2" & Above Diesel Transfer Pumps CS Piping on Diesel Transfer Pumps [SYS
911-01]
600C1521535

Install Intercon 2" & Under Diesel Storage and Transfer CS Piping @ OD Lines in Diesel Handling Area
[SYS 911-01]

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 3 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

600C1522075

Install Interconnecting 2" & Under IA Distribution SS Piping to Diesel Fuel Browser Pkg. [SYS 955-02]

6 spool available on site base on shipment 1~15, 4 spool is on sea base on shipment 17~19, On progress

30

13-Nov-12 A

07-Mar-13

-31

-86

168

600C1521850

Install Interconnecting 2 1/2" to 12" Diesel Storage and Transfer CS Piping to Deisel Tank [SYS 911-01]

21 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai, On progress

14

45

17-Oct-12 A

23-Mar-13

-46

-90

168

600C1521615

Install Interconnecting 2" & Under Diesel Transfer Pumps CS Piping on Diesel Tank [SYS 911-01]

6 spool available on site base on shipment 1~15, 9 spool awaiting from Sino-Thai, On progress

49

14-Jan-13 A

28-Mar-13

174

600C1522105

Install Open Drain CS Piping @ Diesel Transfer Coalescer, Filter Coalescer, Pump & Tank [SYS 911-01]

50 spool available on site base on shipment 1~15, 20 spool awaiting from Sino-Thai, On progress

49

28-Nov-12 A

28-Mar-13

174

600C1521270

Install Fuel Diesel CS Piping @ Diesel Transfer Coalescer to Diesel Storage Tank [SYS 911-01]

All spool available on site base on shipment 1~15, On progress

51

26-Nov-12 A

30-Mar-13

164

600C1521400

Install Fuel Diesel CS Piping @ Loading Filter Coalescer to Diesel Storage Tank [SYS 911-01]

19 spool available on site base on shipment 1~15, 5 spool awaiting from Sino-Thai, On progress

51

27-Nov-12 A

30-Mar-13

164

600C1521255

Install Interconnecting 2" & Under CS Piping on Diesel Browser and Offloading Pump [SYS 911-01]

11 spool available on site base on shipment 1~15, 2 spool awaiting from Sino-Thai, On progress

52

04-Jan-13 A

31-Mar-13

168

600C1521580

Install Interconnecting Fuel Deisel Suction CS Piping from Deisel Tank to Deisel Pump [SYS 911-01]

9 spool available on site base on shipment 1~15, 3 spool awaiting from Sino-Thai, On progress

55

05-Jan-13 A

03-Apr-13

168

600C1521405

Install Interconnecting Fuel Deisel Discharge CS Piping from Deisel Pump to Coalescer [SYS 911-01]

All spool available on site base on shipment 1~15, On progress

59

05-Jan-13 A

08-Apr-13

164

New Entry 6 Week Lookahead

1
1

1
1

06-Feb-13
06-Feb-13

07-Feb-13
07-Feb-13

31
31

31
31

61
61

294
294

45
45
1

22-Oct-12 A
22-Oct-12 A
26-Nov-12 A

23-Mar-13
23-Mar-13
04-Feb-13

0
0
0

-11
-11
-2

-65
-65
-58

178
178
198

Tie-Ins
600C1522200

Tie-In 2 1/2" & Above Diesel Transfer Pumps CS Piping on Diesel Transfer Pumps [SYS 911-01]

All spool available on site base on shipment 1~15, On progress

132
132
2

600C1521790

Install Interconnecting 2" & Under Utility Air Distribution on FW Tank CS Piping [SYS 955-04]

All spool available on site base on shipment 1~15

25

25

04-Feb-13

02-Mar-13

-7

-7

-83

198

600C1522025

Install Intercon 2" & Under Utility Air Distribution CS Piping to Utility Station @ Diesel Offloading Pumps
[SYS 955-04]

New Entry 6 Week Lookahead

12-Mar-13

12-Mar-13

-55

188

600C1521680

Install Interconnecting 2" & Under Utility Water to Generator A SS Piping [SYS 978-01]

2 spool available on site base on shipment 1~15, 6 spool awaiting from Sino-Thai, On progress

45

22-Oct-12 A

23-Mar-13

-46

-97

169

Install U/G Area 600 > CCB LP Fuel Gas Distibution CS Piping [SYS 966-03]

All spool available on site base on shipment 1~15, On progress

41
17

18
17

04-Jan-13 A
23-Jan-13 A

22-Feb-13
21-Feb-13

0
0

41
-7

1
-10

205
206

600C1521370

Install HDPE Area 600 > Ind Park Potable Water Supply Pipework [SYS 977-01]

On progress

18

04-Jan-13 A

22-Feb-13

24

-40

205

600C1521375

Install HDPE Area 600 >CCB Potable Water Supply Pipework [SYS 977-01]

On progress

14

18

04-Jan-13 A

22-Feb-13

41

205

4 spool available on site base on shipment 1~15, 12 spool awaiting from Sino-Thai

14
14
3

45
45
3

04-Jan-13 A
04-Jan-13 A
04-Feb-13

23-Mar-13
23-Mar-13
06-Feb-13

0
0
-7

-38
-38
-7

-44
-44
-59

111
111
152

38 spool available on site base on shipment 1~15, 10 spool awaiting from Sino-Thai, On progress

45

04-Jan-13 A

23-Mar-13

-38

-44

111

New Entry 6 Week Lookahead

33
33
1
1

33
33
1
1

04-Feb-13
04-Feb-13
11-Mar-13
11-Mar-13

11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13

0
0
0
0

0
0
0
0

-1
-1
-42
-42

122
122
122
122

32
32

32
32

04-Feb-13
04-Feb-13

10-Mar-13
10-Mar-13

0
0

0
0

1
1

122
122

Pending Mat'l (Cad Weld) Delivery, C-Crimps in lieu of Cad Welds

271
271
271
66

80
80
80
14

14-Jun-12 A
14-Jun-12 A
14-Jun-12 A
14-Jun-12 A

30-Apr-13
30-Apr-13
30-Apr-13
18-Feb-13

0
0
0
0

3
3
3
0

37
-20
-20
-17

672
262
262
165

Awaiting Materials, Will be installed on trays in A600 Subrack 6D/E/C/B/Raceways

63

80

28-Jan-13 A

30-Apr-13

26

-20

262

46
46
4

20-Jan-13 A
20-Jan-13 A
20-Jan-13 A

25-Mar-13
25-Mar-13
07-Feb-13

0
0
0

-1
-1
-1

-1
-1
-17

101
101
101

Utility Station
Interconnecting
600C1521670 Install Interconnecting 2" & Under Utility Air Distribution Generator A CS Piping [SYS 955-04]

CCC Area
600C1521590

Underground Piping
Pipi
U/G Steel Pipework
Pipew
[CS-SS]
600C1521630
Install Fire Water Galv. Piping to Fire Monitor System [Sys 412-03]
600C1521280

Install Vent CS Piping @ Manhole Around Area 600 [SYS 998-02]

Testing/Cleaning
Pressure Test
Above Ground
600C1633065 Pressure Test Firewater Monitors & Deluge Area 600 Pipework [Sys 412-03]
Under Ground
600C1521480

U/G HDPE Area 600 Open Drain Piping Hydrotest [Sys 998-02]

Electrical
Underground Electrical
Elec
Grounding
600C1611010
Grounding UG [4575m]
600C1611020

Grounding AG

Aboveground Electrical
Ele
Cable Trays
600C1621040
Install Cable Trays Subrack 6D

Started Electrical Tray, Awaiting Tray supports + Bends + Hold down clamps, QA Issues

42
42
10

600C1621030

Install Cable Trays Subrack 6C

Started Electrical Tray, Awaiting Tray supports + Bends + Hold down clamps, QA Issues

10

21-Jan-13 A

08-Feb-13

-1

-4

102

600C1621020

Install Cable Trays Subrack 6B

Started Electrical Tray, Awaiting Tray supports + Bends + Hold down clamps, QA Issues

22-Jan-13 A

12-Feb-13

-1

102

600C1621010

Install Cable Trays Subrack 6A

Started Electrical Tray, Awaiting Tray supports + Bends + Hold down clamps, QA Issues

10

15

25-Jan-13 A

19-Feb-13

102

600C1621050

Install Cable Trays Subrack 6E

Started Electrical Tray, Awaiting Tray supports + Bends + Hold down clamps, QA Issues

12

12

08-Feb-13

20-Feb-13

-1

-1

-25

101

600C1621060

Install Cable Raceways Area 600

30

30

21-Feb-13

25-Mar-13

-1

-1

-1

101

50
50
50
8

24-Jan-13 A
04-Feb-13
04-Feb-13
04-Feb-13

29-Mar-13
29-Mar-13
29-Mar-13
12-Feb-13

0
6
6
6

30
6
6
6

67
-21
-21
-30

702
702
702
261

Wire & Cable


Power Wire & C
Cable - Underground
LV Distribution
600C1631395 Pull U/G LV LER81120 Main Switchroom Cabling to Gen Equip Rm LER81122

After the Installation of Cable Trays under LER81120/21/22

50
50
50
8

600C1631265

Pull U/G LV Potable Water Distribution Cabling

After Installation of Cable Trays Subrack 6B

15

15

13-Feb-13

28-Feb-13

-30

204

600C1631480

Pull U/G LV LER81121 Utilities Switchroom Cabling to Gen Equip Rm LER81122

After the Installation of Cable Trays under LER81120/21/22

16

16

12-Feb-13

01-Mar-13

-30

261

600C1631485

Pull U/G LV LER81120 Main Switchroom Cabling to Utilities Switchroom LER81121

After the Installation of Cable Trays under LER81120/21/22

01-Mar-13

03-Mar-13

-30

261

600C1631630

Pull U/G LV Switchroom [81121] Cabling to Telecoms LER Feeder 1&2

LER FRAME WORK

14

14

16-Feb-13

03-Mar-13

15

15

-12

711

600C1631260

Pull U/G LV Utility Water Distribution Cabling

02-Mar-13

05-Mar-13

-84

254

600C1631610

Pull U/G LV LER81121 Utilities Switchroom Cabling to LER71220

04-Mar-13

06-Mar-13

-30

261

600C1631635

Pull U/G LV Switchroom [81121] Cabling to Utilities Area Welding Sockets

04-Mar-13

06-Mar-13

15

15

-12

711

600C1631255

Pull U/G LV Diesel Storage & Transfer Pumps Cabling

Traywork Req'd

01-Mar-13

07-Mar-13

-30

204

600C1631245

Pull U/G LV Firewater Storage & Pumps Cabling

Traywork Req'd

07-Mar-13

10-Mar-13

-30

204

600C1631275

Pull U/G LV Air Compression, Drying & Receiver Cabling

Traywork Req'd

07-Mar-13

15-Mar-13

-27

204

600C1631645

Pull U/G LV Switchroom [81121] Cabling to Area 41 Swichboard [SWG-82202]

12

12

07-Mar-13

19-Mar-13

15

15

-12

711

600C1631375

Pull U/G LV ICSS/CER/CCC/CCC Sewer Sump Pump Cabling

24

24

04-Mar-13

29-Mar-13

-27

261

42

42

24-Jan-13 A

20-Mar-13

19

75

241

Traywork Req'd

Traywork Req'd

Instrument and Control Wire & Cable - Underground

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 4 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

HV/LV Switchrooms
Switchr
> LER71220 Marshalling Cabinet
600C1632820 Pull U/G Instr LV Switchroom Cabling to Marshalling Cabinet - LER71220

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

4
3

4
3

24-Feb-13
24-Feb-13

28-Feb-13
27-Feb-13

19
19

19
19

-28
-34

114
95
95

600C1631960

Pull U/G Instr & Control HV Switchroom Cabling to Marshalling Cabinet - LER71220

24-Feb-13

27-Feb-13

19

19

-27

600C1631965

Pull U/G Instr Gen Eqpt Room Cabling to Marshalling Cabinet - LER71220

24-Feb-13

28-Feb-13

19

19

-31

20
20

27-Feb-13
27-Feb-13

20-Mar-13
20-Mar-13

19
19

19
19

1
1

114
95

95

ICSS/CER > LER71220/LER81122


LE
600C1631935 Pull U/G Instr ICSS/CER Cabling to Marshalling Cabinets - LER71220

Traywork Req'd

20
20

Field JB > LER71220


LER
Marshalling Cabinet
600C1632545 Pull U/G Instr & Control Instr & Control Generator Package A Cabling

Progressing

36
26

34
6

24-Jan-13 A
24-Jan-13 A

12-Mar-13
09-Feb-13

0
0

19
-1

83
69

249
247

600C1632550

Pull U/G Instr & Control Instr & Control Generator Package B Cabling

Progressing

26

24-Jan-13 A

10-Feb-13

90

255

600C1632555

Pull U/G Instr & Control Instr & Control Generator Package C Cabling

Progressing

26

24-Jan-13 A

11-Feb-13

110

257

600C1632535

Pull U/G Instr & Control Potable Water & Demineralized Package Cabling Area 600

Traywork Req'd

24-Feb-13

01-Mar-13

19

19

-25

117

600C1632955

Pull U/G Instr & Control Fire Detection Zone 11 Cabling

Traywork Req'd

01-Mar-13

05-Mar-13

19

19

-25

117

600C1632560

Pull U/G Instr & Control Inst Air Compression, Drying & Reciever Cabling

Traywork Req'd

06-Mar-13

08-Mar-13

19

19

15

209

600C1631940

Pull U/G Instr & Control Diesel Storage & Transfer Cabling

Traywork Req'd

09-Mar-13

12-Mar-13

19

19

15

249

14
14
11

14
14
11

05-Mar-13
05-Mar-13
05-Mar-13

19-Mar-13
19-Mar-13
16-Mar-13

39
39
39

39
39
39

-23
-23
-23

281
281
281

Fibre Optic - Underground


Un
Utilities LV Switch/Equip
Sw
Rm LER81121/22 > Gen & Diesel LER71220
600C1632040 Pull U/G Fibre Optic Cabling fr Generator CR - LER81122 to LER71220
600C1632035

Pull U/G Fibre Optic Cabling fr LV MCC - LER81121 to LER71220

16-Mar-13

19-Mar-13

39

39

-23

281

24
24
3

21-Feb-13
21-Feb-13
21-Feb-13

18-Mar-13
18-Mar-13
23-Feb-13

-1
-1
-1

19
19
-1

59
59
-8

230
230
215

Traywork Req'd, Awaiting Mat'l (Ladder Bends)

24
24
3

600C1631795

Pull A/G Instr & Control Firewater Distribution Cabling Area 600 Cabling

Traywork Req'd, Awaiting Mat'l (Ladder Bends)

24-Feb-13

27-Feb-13

-1

-1

-8

215

600C1631805

Pull A/G Instr & Control Firewater Storage & Pumps Cabling

Traywork Req'd, Awaiting Mat'l (Ladder Bends)

27-Feb-13

02-Mar-13

-1

-1

-8

215

600C1632695

Pull A/G Instr & Control Potable Water Distribution Cabling Area 600

Need Mat'l (Ladder Bends)

01-Mar-13

04-Mar-13

19

19

-25

243

600C1632080

Pull A/G Instr & Control FGS Fire Detection Zone 11 Cabling

06-Mar-13

08-Mar-13

19

19

-25

117

600C1632145

Pull A/G Instr & Control Firewater Monitors & Deluge Area 600 Cabling

09-Mar-13

12-Mar-13

19

19

-25

117

600C1632010

Pull A/G Instr & Control Inst Air Compression, Drying & Reciever Cabling

09-Mar-13

12-Mar-13

19

19

15

209

600C1631900

Pull A/G Instr & Control Instr & Control Generator Package A Cabling

12-Mar-13

15-Mar-13

19

19

41

219

600C1631905

Pull A/G Instr & Control Instr & Control Generator Package B Cabling

15-Mar-13

18-Mar-13

19

19

59

225

34
34
34
7

22-Jan-13 A
22-Jan-13 A
22-Jan-13 A
25-Jan-13 A

11-Mar-13
11-Mar-13
11-Mar-13
11-Feb-13

0
0
0
0

-1
-1
-1
-7

-32
-32
-32
-6

223
223
223
223

Instrument and Control Wire & Cable - Aboveground


Field Instr > Field
Fi
JB / Control Panel
600C1631775 Pull A/G Instr & Control Diesel Storage & Transfer Cabling

Started inside sand blasting & paint prepartion

46
46
46
7

600C0925030

Painting for [40-ABJ41203] Firewater Storage Tank

Equipment & Materials on site ETA 18.JAN, Forecast Finish 17.FEB [Hydrotest prior to Painting]

33

13

22-Jan-13 A

17-Feb-13

-22

223

600C0925020

Painting for [40-ABJ97720] Potable Water Tank

Equipment & Materials on site ETA 18.JAN, Forecast Finish 11.MAR

20

34

29-Jan-13 A

11-Mar-13

19

-1

-71

223

Change Location

35
14
14
14

24
14
14
14

22-Jan-13 A
14-Feb-13
14-Feb-13
14-Feb-13

28-Feb-13
28-Feb-13
28-Feb-13
28-Feb-13

0
0
0
0

0
0
0
0

-4
-46
-46
-46

143
143
143
143

35
35
35
15

20
20
20
1

22-Jan-13 A
22-Jan-13 A
22-Jan-13 A
22-Jan-13 A

24-Feb-13
24-Feb-13
24-Feb-13
04-Feb-13

0
0
0
0

0
0
0
-2

1
1
1
-1

27
27
27
27

Painting
Final/Touch Up Paint
P
Tanks/Vessels
600C0925010
Painting for [40-ABJ91110] Diesel Storage Tank

CCC - Central Control


Co
Centre
Concrete
Structural Foundations
Foun
940C0313015
Foundation for CCC HVAC Chiller Compound slab - Strip Footing & Slab
Architectural
Pre-Engineered Metal Buildings
Exterior Cladding
Cladd
940C0411012 Installation of CCC Roof Claddings [1000m2]
940C0411013

Installation of CCC Exterior Wall Claddings [500m2]

20

20

23-Jan-13 A

24-Feb-13

27

385

114

24-Aug-12 A

06-Jun-13

62

314

Backfill prior to Blinding, Clash with CB

92
10
10
10

36
8
8
8

24-Aug-12 A
19-Nov-12 A
19-Nov-12 A
19-Nov-12 A

13-Mar-13
11-Feb-13
11-Feb-13
11-Feb-13

0
0
0
0

0
0
0
0

-27
-49
-49
-49

392
416
416
416

Outstanding: Platforms, Crossover, Loop #4

92
92
93

36
36
36

24-Aug-12 A
24-Aug-12 A
24-Aug-12 A

13-Mar-13
13-Mar-13
13-Mar-13

0
0
0

0
0
0

-27
-27
-27

392
392
392

38
38
31
27

18-Jan-13 A
18-Jan-13 A
08-Feb-13
08-Feb-13

15-Mar-13
15-Mar-13
13-Mar-13
09-Mar-13

0
0
0
0

0
0
0
0

-29
-29
-27
-23

390
390
392
259

500 MAIN PIPERACK


PIPERA
Concrete
Equipment & Structural
Stru
Foundations
Equipment/Stru
Equipment/Structural
Foundations less than 4m3
500C0311056
Foundations on Loop #4
Grouting
Grout - Non Shrink
Shr
500C0373011
Grouting Non-Shrink [LoE]

Material Receive & Shakeout

36
36
31
27

500C0541016

Install Cable Tray Support

Awaiting materials, Check Material ETA ??

18

18

19-Feb-13

09-Mar-13

-25

259

500C0541034

Erection of Main Pipe Rack Loop Support #4

Awaiting foundation, Material Onsite

09-Mar-13

13-Mar-13

-73

392

Erection / installation started

27
27

38
38

18-Jan-13 A
18-Jan-13 A

15-Mar-13
15-Mar-13

0
0

0
0

-55
-55

253
253

385
385

114
114

08-Oct-12 A
08-Oct-12 A

06-Jun-13
06-Jun-13

0
0

62
62

0
0

236
236

Structural Steel
Miscellaneous Steel
Ste & Platforms
Miscellaneous S
Steel
500C0541014
Erection of Crossover Platform of Main Piperack 3

Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
500C0542011
Misc. Steels (gratings etc.) for Crossover Platforms
Piping
Aboveground Piping
Pip

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 5 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

Carbon Steel Piping


P
A/G 2" and Under,
Un
CS Piping
Piperack
500C1522755 Install 2" & Under Main Piperack Nitrogen Distribution CS Piping [Sys 961-01]

OD

All spool available on site base on shipment 1~15, On progress

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

231
185
185
34

114
45
45
20

08-Oct-12 A
19-Oct-12 A
19-Oct-12 A
22-Oct-12 A

06-Jun-13
23-Mar-13
23-Mar-13
25-Feb-13

0
0
0
0

62
-12
-12
1

0
-58
-58
-53

161
199
199
137
136

500C1522685 Install 2" & Under Main Piperack Pipeline Compressor Train no. 1 CS Piping [Sys 651-01]

All spool available on site base on shipment 1~15, Some line belong to A-102, awaiting to the platform to be
installed

30

31-Dec-12 A

07-Mar-13

-36

-81

500C1522810 Install 2" & Under Main Piperack Closed Drain Header CS Piping [Sys 612-04]

33 spool available on site base on shipment 1~15, 3 spool is on country base on shipment 16, On progress

47

45

14-Nov-12 A

23-Mar-13

-12

-58

59

500C1522815 Install 2" & Under Main Piperack LEAN MEG Storage and Distribution CS Piping [Sys 661-05]

55 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai, 28 spool on hold for
welding due to awaiting approval of welding procedure

34

45

19-Oct-12 A

23-Mar-13

-25

-84

110

500C1522820 Install 2" & Under Main Piperack DPCU LEAN MEG Storage and Distribution CS Piping [Sys 661-06]

7 spool available on site base on shipment 1~15, 4 spool is on sea base on shipment 17~19, 8 spool awaiting
from ST, On progress

45

26-Nov-12 A

23-Mar-13

-51

-98

199

500C1522710 Install 2" & Under Main Piperack Expansion Tank, Circulation Pump and Trim Cooler CS Piping [Sys 941... 5 spool available on site base on shipment 1~15, 27 spool awaiting from Sino-Thai, On progress

13

45

19-Nov-12 A

23-Mar-13

-26

-91

59

45
45
8

08-Oct-12 A
08-Oct-12 A
08-Oct-12 A

23-Mar-13
23-Mar-13
12-Feb-13

0
0
0

-4
-4
1

-57
-57
-61

176
176
45

All spool available on site base on shipment 1~15, On progress

175
175
6

500C1522765 Install CS Piping for MEG Recovery Hot Oil Circulation CS Piping [Sys 941-04]

3 spool available on site base on shipment 1~15, 25 spool awaiting from Sino-Thai, On progress

28

45

17-Nov-12 A

23-Mar-13

-31

-77

140

500C1522550 Install 2 1/2" & 12" Main Piperack LP Flare Header CS Piping [Sys 612-03]

41 spool available on site base on shipment 1~15, 22 spool awaiting from Sino-Thai, On progress

31

45

16-Oct-12 A

23-Mar-13

-4

-77

45

500C1522770 Install 2 1/2" & 12" Main Piperack HP Fuel Gas Distribution CS Piping [Sys 966-02]

22 spool available on site base on shipment 1~15, 11 spool awaiting from Sino-Thai, On progress

34

45

17-Oct-12 A

23-Mar-13

-4

-76

85

500C1522775 Install 2 1/2" & 12" Main Piperack LP Fuel Gas Distribution CS Piping [Sys 966-03]

33 spool available on site base on shipment 1~15, 8 spool awaiting from Sino-Thai, On progress

40

45

15-Nov-12 A

23-Mar-13

-4

-65

85

500C1522715 Install 2 1/2" & 12" Main Piperack Waste Heat Recovery CS Piping [Sys 941-02]

5 spool available on site base on shipment 1~15, 7 awaiting from Sino-Thai, On progress

11

45

21-Nov-12 A

23-Mar-13

-37

-93

45

500C1522735 Install 2 1/2" & 12" Main Piperack Hot Oil Supply and Return Headers CS Piping [Sys 941-03]

54 spool available on site base on shipment 1~15, 9 spool is on sea base on shipment 17~20, 4 spool
awaiting from Sino-Thai, On progress

62

45

16-Nov-12 A

23-Mar-13

-4

-65

45

500C1522690 Install 2 1/2" & 12" Main Piperack Fuel Gas Conditioning CS Piping [Sys 966-01]

4 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 20, 2 spool awaiting
from Sino-Thai

45

21-Jan-13 A

23-Mar-13

-45

-57

77

500C1522665 Install 2 1/2" & 12" Main Piperack DPCU Train no. 1 CS Piping [Sys 663-01]

2 spool available on site base on shipment 1~15, 14 spool awaiting from Sino-Thai, On progress

21

45

03-Dec-12 A

23-Mar-13

-4

-79

176

114
114
3

23-Nov-12 A
23-Nov-12 A
04-Mar-13

06-Jun-13
06-Jun-13
07-Mar-13

0
0
-21

62
62
-21

0
0
-78

161
161
137

A/G 2 1/2" to 12",


1
CS Piping
Piperack
500C1522675 Install 2 1/2" & 12" Main Piperack Condensate Pump and Metering CS Piping [Sys 626-07]

All spool is on shipment 20

217
217
3

500C1522720 Install 14" & Above Main Piperack Waste Heat Recovery CS Piping [Sys 941-02]

10 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 20, On progress

28

30

17-Dec-12 A

07-Mar-13

12

-62

161

500C1522730 Install 14" & Above Main Piperack Hot Oil Supply and Return Headers CS Piping [Sys 941-03]

8 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 20, On progress

27

30

23-Nov-12 A

07-Mar-13

12

-63

164

500C1522680 Install 14" & Above Main Piperack Gas Metering CS Piping [Sys 651-04]

5 spool available on site base on shipment 1~15, 4 spool awaiting from ST, On progress

20

114

28-Jan-13 A

06-Jun-13

162

62

161

113
45
45
1

08-Oct-12 A
15-Oct-12 A
15-Oct-12 A
29-Dec-12 A

05-Jun-13
23-Mar-13
23-Mar-13
04-Feb-13

0
0
0
0

-1
-4
-4
-7

1
-56
-56
-52

237
305
305
288
349

A/G 14" and Above,


A
CS Piping
Piperack
500C1522740 Install 14" & Above Main Piperack Expansion Tank, Circulation Pump and Trim Cooler CS Piping [Sys 9...

All spool available on site base on shipment 1~15, On progress

385
263
263
1

500C1522785 Install 2" & Under Main Piperack Turbine Wash Water - Area 200 SS Piping [Sys 979-02]

All spool available on site base on shipment 1~15, On progress

13-Nov-12 A

04-Feb-13

-7

-51

500C1522575 Install 2" & Under Main Piperack Liquid Inlet Separator no. 1 SS Piping [Sys 623-05]

All spool available on site base on shipment 1~16, On progress

15-Oct-12 A

04-Feb-13

-7

-58

45

500C1522615 Install 2" & Under Main Piperack Stabilization Feed Surge Drum SS Piping [Sys 626-01]

All spool available on site base on shipment 1~15

04-Feb-13

04-Feb-13

-7

-7

-55

127

500C1522580 Install 2" & Under Main Piperack Primary Separation System Slug Catcher SS Piping [Sys 623-02]

All spool available on site base on shipment 1~15, On progress

11

12-Nov-12 A

04-Feb-13

-5

-49

294

500C1522805 Install 2" & Under Main Piperack Closed Drain Header SS Piping [Sys 612-04]

25 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, On progress

15

23-Oct-12 A

19-Feb-13

-21

-66

161

24-Feb-13

25-Feb-13

-73

206

49

45

22-Oct-12 A

23-Mar-13

-4

-56

136

70
70
1

16-Oct-12 A
16-Oct-12 A
21-Nov-12 A

19-Apr-13
19-Apr-13
04-Feb-13

0
0
0

1
1
-7

1
1
-59

220
220
289

Stainless Steel Piping


A/G 2" and Under,
Un
SS Piping
Piperack
500C1522525 Install 2" & Under Main Piperack HP Flare Header SS Piping [Sys 612-02]

500C1522585 Install 2" & Under Main Piperack Liquid Inlet Separator no. 1 Liquid Separator Header SS Piping [Sys 62...
500C1522790 Install Main Piperack Potable Water Distribution Header SS Piping [Sys 977-02]

92 spool available on site base on shipment 1~15, 15 spool is on country base on shipment 16, 4 spool is on
sea base on shipment 17~19, 6 awaiting from Sino-Thai, On progress

All spool available on site base on shipment 1~15, On progress

316
316
8

500C1522660 Install 2 1/2" & 12" Main Piperack DPCU Train no. 1 SS Piping [Sys 663-01]

All spool available on site base on shipment 1~15, On progress

15

16

20-Nov-12 A

20-Feb-13

-70

160

500C1522590 Install 2 1/2" & 12" Main Piperack Liquid Inlet Separator no. 1 SS Piping [Sys 623-05]

All spool available on site base on shipment 1~15, On progress

19

16-Oct-12 A

23-Feb-13

-73

45

500C1522800 Install 2 1/2" & 12" Main Piperack Closed Drain Header SS Piping [Sys 612-04]

All spool available on site base on shipment 1~15, On progress

51

37

19-Oct-12 A

15-Mar-13

-59

500C1522535 Install 2 1/2" & 12" Main Piperack HP Flare Header SS Piping [Sys 612-02]

All spool available on site base on shipment 1~15, On progress

70

07-Jan-13 A

19-Apr-13

219

313
313
177

113
113
73

08-Oct-12 A
08-Oct-12 A
08-Oct-12 A

05-Jun-13
05-Jun-13
23-Apr-13

0
0
0

-1
-1
1

1
1
1

56
56
45

134

113

08-Jan-13 A

05-Jun-13

-1

56

45
45
45
45

47
47
47
47

31-Jan-13 A
31-Jan-13 A
31-Jan-13 A
31-Jan-13 A

25-Mar-13
25-Mar-13
25-Mar-13
25-Mar-13

6
6
6
6

1
1
1
1

0
0
0
0

249
249
249
249

442

167

02-Jul-12 A

01-Aug-13

102

34

606

269
269

107
107

17-Sep-12 A
17-Sep-12 A

29-May-13
29-May-13

0
0

0
0

0
0

221
221

A/G 2 1/2" to 12",


1
SS Piping
Piperack
500C1522845 Install 2 1/2" & 12" Main Piperack DPCU Liquid Separator SS Piping [Sys 663-04]

A/G 14" and Above,


A
SS Piping
Piperack
500C1522565 Install 14" & Above Main Piperack Gas Inlet Separator no. 1 SS Piping [Sys 623-03]
500C1522530 Install 14" & Above Main Piperack HP Flare Header SS Piping [Sys 612-02]
Electrical
Aboveground Electrical
Ele
Cable Trays
500C1621010
Install Cable Trays Main Piperack (1)

35 spool available on site base on shipment 1~16, 2 spool is on sea base on shipment 17~19, 12 spool is on
shipment 20, 23 spool awaiting from ST, On progress
50 spool available on site base on shipment 1~16, 5 spool is on sea base on shipment 17~19, 2 spool is on
shipment 20, On progress

Started, Pending Mat'l Delivery, QA Issues

200 GAS PROCESSING


PROCE
& COMPRESSION
Civil & Earthworks
Excavation & Backfill
Bac

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 6 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

59

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

Backfilling Area 200


200C0235011
Backfill to -0.6m - Area 200
200C0235012

Backfill to Final Grade - Area 200

Concrete
Equipment & Structural
Stru
Foundations
Equipment/Stru
Equipment/Structural
Foundations less than 4m3
200C0311047
Foundations for 40-XF82330/31 Transformers (LER)

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

269
125

107
10

17-Sep-12 A
17-Sep-12 A

29-May-13
13-Feb-13

0
0

0
0

0
-1

221
73

Progressing arround complete foundation and sub-rack

40

107

22-Dec-12 A

29-May-13

221

Blinded, After installation of Transformer wall, backfilling

333
131
24
6

151
60
24
6

02-Jul-12 A
29-Aug-12 A
16-Feb-13
16-Feb-13

15-Jul-13
08-Apr-13
13-Mar-13
22-Feb-13

0
0
-1
-1

0
-16
0
-1

50
10
34
-22

156
220
236
253

Progressing

200C0311077

Foundation for Misc. Vent pipe supports at area 200

New 6 Weeks Lookahead Entry, Verify Rebar ETA ??

01-Mar-13

07-Mar-13

34

234

200C0311042

Foundations for Gas Odorization Package [40-VPBE67910]

New 6 Weeks Lookahead Entry, Verify Rebar ETA ??

10

10

25-Feb-13

07-Mar-13

37

126

200C0311072

Foundation for Misc Cable Tray supports near Area 200 LER

New 6 Weeks Lookahead Entry, Verify Rebar ETA ??

07-Mar-13

13-Mar-13

34

234

Blinded, base rebars progressing

29
14

27
12

26-Jan-13 A
26-Jan-13 A

04-Mar-13
15-Feb-13

6
6

0
0

-33
-22

253
238

Equipment/Structural Foundations 4~23m3


Equipment/Stru
200C0312036
Foundations for 40-XF82330/31 Transformers Retaining Wall (LER)
200C0312041

Foundations for Stairway #1from Pipieline Comp > LER Area **

After Complete of Electrical Culvert & LER, Verify Rebar ETA ??

01-Mar-13

04-Mar-13

-33

253

200C0312046

Foundations for Stairway #2from Pipieline Comp > LER Area **

After Complete of Electrical Culvert & LER, Verify Rebar ETA ??

01-Mar-13

04-Mar-13

-33

253

Base done, Plinths progressing

65
22

60
4

29-Aug-12 A
25-Oct-12 A

08-Apr-13
07-Feb-13

0
0

-16
0

-90
-43

220
121

Equipment/Structural Foundations over 23m3


Equipment/Stru
200C0313044
Foundations for 40-LER71230 : LER for Compression Area-Equipment Room
200C0313028

Foundations for 40-LER65130 : LER for Compressor #3 LV Switchroom

Forms & rebars progressing

26

25-Oct-12 A

07-Feb-13

-42

217

200C0313038

Foundations for 40-VCBA62640 : Stabilizer Overhead Compressor #1 Package

Base foundation rebars on progress, Setting of template for concrete, Awaiting up-dated Drawings

40

29-Aug-12 A

07-Feb-13

-7

-35

223

200C0313040

Foundations for 40-VCBA62650 : Stabilizer Overhead Compressor #2 Package

Base foundation rebars on progress, Setting of template for concrete, Awaiting up-dated Drawings

40

03-Oct-12 A

07-Feb-13

-35

238

200C0313016

Foundations for 40-MBF65121/22 : Pipeline Compressor #2 Inlet & Interstage Scrubber

Rebars and Forms done, Awaiting anchor bolts, Forecast ETA 31.MAR

29

60

01-Dec-12 A

08-Apr-13

-16

-90

34

200C0313026

Foundations for 40-MBF65131/32 : Pipeline Compressor #3 Inlet & Interstage Scrubber

Rebars and Forms done, Awaiting anchor bolts, Forecast ETA 31.MAR

29

60

22-Nov-12 A

08-Apr-13

-16

-90

220

Blinded, base rebars progressing

30
30
14

24
24
12

26-Jan-13 A
26-Jan-13 A
27-Jan-13 A

28-Feb-13
28-Feb-13
16-Feb-13

0
0
5

0
0
-1

19
19
-8

227
227
238

Base rebars done, Wall rebars & forms progressing

30

24

26-Jan-13 A

28-Feb-13

19

40

On progress, Completion in line to DO U/G piping

13
13
13

18
18
18

02-Jul-12 A
02-Jul-12 A
02-Jul-12 A

22-Feb-13
22-Feb-13
22-Feb-13

0
0
0

0
0
0

-52
-52
-52

289
289
289

Concrete for Below


Belo Grade Structures
Duct Banks
200C0342026
Install Electrical Duct Bank DB21 [South Side Lower A200]

15
15
15

15
15
15

01-Mar-13
01-Mar-13
01-Mar-13

16-Mar-13
16-Mar-13
16-Mar-13

0
0
0

0
0
0

19
19
19

67
67
67

Utility Concrete
Area Paving
200C0352012

Gas Inlet Separator #1 (done), #2/3 rebars and forms ongoing

163
163
163

151
151
151

24-Jan-13 A
24-Jan-13 A
24-Jan-13 A

15-Jul-13
15-Jul-13
15-Jul-13

0
0
0

0
0
0

0
0
0

119
119
119

Progressing for Subracks

186
186
187

137
137
137

22-Nov-12 A
22-Nov-12 A
22-Nov-12 A

30-Jun-13
30-Jun-13
30-Jun-13

0
0
0

0
0
0

64
64
64

42
42
42

New 6 Weel Lookahead Entry

32
32
32

32
32
32

25-Feb-13
25-Feb-13
25-Feb-13

30-Mar-13
30-Mar-13
30-Mar-13

73
73
73

73
73
73

109
109
109

265
265
265

220
31
31
15

167
19
19
15

14-Jan-13 A
18-Jan-13 A
18-Jan-13 A
04-Feb-13

01-Aug-13
23-Feb-13
23-Feb-13
19-Feb-13

0
0
0
1

0
0
0
-1

-1
-11
-11
-7

606
165
165
169

Progressing

31

19

18-Jan-13 A

23-Feb-13

-19

34

Progressing

40
40
30
30

25
25
17
17

14-Jan-13 A
14-Jan-13 A
14-Jan-13 A
14-Jan-13 A

01-Mar-13
01-Mar-13
21-Feb-13
21-Feb-13

0
0
0
0

0
0
0
0

-30
-30
-34
-34

42
42
27
27

Erection progressing

30
30

25
25

29-Jan-13 A
29-Jan-13 A

01-Mar-13
01-Mar-13

0
0

0
0

-30
-30

42
42

To be pre-assemble up-to 90%, Prior to erection

207
42
4

167
42
4

18-Jan-13 A
04-Feb-13
04-Feb-13

01-Aug-13
20-Mar-13
07-Feb-13

0
-3
-3

0
0
-3

-1
-8
-9

606
370
102

After Electrical Culvert Wall, Verfiy Material ETA

01-Mar-13

05-Mar-13

-7

40

07-Mar-13

11-Mar-13

225

Elevated Structures
Structur
Walls
200C0323016
Install Walls for 40-XF82330/31 Transformers Retaining Wall (LER)
200C0323026

Install Walls for Electrical Culvert Walls [Compressor NO. 3] * NEW *

Pre-Cast Concrete
Concret Structures
Catch Basins, Manholes
M
& Valve Box
200C0331011
Install Catch Basins, Manholes & Valve box- Area 200 (CB=25;MH=11;VB=1)

Area Paving, Install kerbs around Equipment - Area 200 *[Misc. Supports, Grouting, Paving, Foundation,
Backfill]

Grouting
Grouting - Non Shrink
200C0373011
Grouting Non-Shrink [LoE]
Architectural
Exterior Cladding
200C0531257

Cladding of Steel Shelter 40-VCBA65110 Pipeline Compressor #1 Package

Structural
Pipe Rack Steel
Pipe Rack Steel
200C0521023
Erection Additional Subrack West of Pipeline Compressor #3
200C0521012

Erection of Subrack 2E & Stair Tower 1B

Major Structures
Major Structures
Compressor #2
200C0531019 Erection of Subrack 2H, Stair Tower 2B
Compressor #3
200C0531018 Erection of Subrack 2J, Stair Tower 2C
Misc. Steel & Platforms
Plat
Miscellaneous S
Steel
200C0541046
Erection of Miscellaneous Pipe Support near Subrack 2E
200C0541036

Erection of Cable Tray Steel Supports & Ladder *Culverts 1-2-3

200C0541040

Install Instrument Tray Supports Attached To Platform 40-MBD62301/02/03 Gas Inlet Separator

200C0541030

Erection of Stairway # 1 & # 2 From Pipeline Compressor Area To LER Area

LER's [Local Equipment


Eq
Room] Area 200
200C0541015
Preassembly & Partial Erection of Platform for 40-LER81131

12-Mar-13

20-Mar-13

-40

370

PLATFORM FOR LER AT AREA 200 #1/2/3/4/5 (received 100 %) #6 (received 90%)

40
4

40
4

04-Feb-13
04-Feb-13

18-Mar-13
07-Feb-13

-7
-7

18
-2

26
-4

733
196

200C0541014

Preassembly & Partial Erection of Platform for 40-LER71230

PLATFORM FOR LER AT AREA 200 #1/2/3/4/5 (received 100 %) #6 (received 90%)

08-Feb-13

12-Feb-13

12

58

213

200C0541016

Preassembly & Partial Erection of Platform for 40-LER65110

PLATFORM FOR LER AT AREA 200 #1/2/3/4/5 (received 100 %) #6 (received 90%)

08-Feb-13

12-Feb-13

-2

31

196

200C0541012

Preassembly & Partial Erection of Platform for 40-LER65120

PLATFORM FOR LER AT AREA 200 #1/2/3/4/5 (received 100 %) #6 (received 90%)

12-Feb-13

16-Feb-13

32

37

36

196

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 7 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

41

46

45

213

200C0541013

Preassembly & Partial Erection of Platform for 40-LER65130

PLATFORM FOR LER AT AREA 200 #1/2/3/4/5 (received 100 %) #6 (received 90%)

12-Feb-13

16-Feb-13

200C0541060

*Installation of Stool and Cable Tray support for 40-LER81131

Stool & Cable Tray Support fo 40-LER71230/65110/65130/8113, ETA ??

15-Mar-13

18-Mar-13

213

200C0541061

*Installation of Stool and Cable Tray support for 40-LER65110

Stool & Cable Tray Support fo 40-LER71230/65110/65130/8113, ETA ??

15-Mar-13

18-Mar-13

213

200C0541019

*Installation of Stool and Cable Tray support for 40-LER71230

Stool & Cable Tray Support fo 40-LER71230/65110/65130/8113, ETA ??

15-Mar-13

18-Mar-13

213

200C0541017

*Installation of Stool and Cable Tray support for 40-LER65120

Stool & Cable Tray Support fo 40-LER71230/65110/65130/8113, ETA ??

15-Mar-13

18-Mar-13

733

200C0541018

*Installation of Stool and Cable Tray support for 40-LER65130

Stool & Cable Tray Support fo 40-LER71230/65110/65130/8113, ETA ??

15-Mar-13

18-Mar-13

206
30

167
30

18-Jan-13 A
18-Jan-13 A

01-Aug-13
07-Mar-13

0
0

0
1

-1
-1

Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
200C0542017
Misc. Steels (gratings etc.) for Maintenance Platforms
200C0542012

Misc. Steels (gratings etc.) for Subrack 2G, 2H, 2J & Stair Towers

Progressing
Progressing

733
249
386

13

167

18-Jan-13 A

01-Aug-13

-1

42

293
293
48
32
16

164
97
48
32
16

04-Dec-12 A
03-Jan-13 A
04-Feb-13
04-Feb-13
04-Feb-13

29-Jul-13
18-May-13
27-Mar-13
10-Mar-13
21-Feb-13

0
0
-7
-7
-7

105
60
-7
-7
-7

9
0

609
167
12
12
12

Preassembly/Installation Pipeline Compressor #1Afterstage Cooler Supporting Structure

16

16

21-Feb-13

10-Mar-13

-7

-7

12

Compressor #2
# Interstage/After Stage Cooler
200C1122036 Preassembly/Installation Pipeline Compressor #2 Interstage Cooler Supporting Structure

New 6 Week Lookahead Entry

16
16

16
16

11-Mar-13
11-Mar-13

27-Mar-13
27-Mar-13

-7
-7

-7
-7

12
12

Progressing

293
144
5
5

97
53
53
53

03-Jan-13 A
05-Jan-13 A
05-Jan-13 A
05-Jan-13 A

18-May-13
01-Apr-13
01-Apr-13
01-Apr-13

0
0
0
0

60
104
0
0

0
-1
-1
-1

167
173
40
40

5
5

4
4

28-Jan-13 A
28-Jan-13 A

07-Feb-13
07-Feb-13

158
158

153
153

11
11

222
222

53
53
7

78
78
3

03-Jan-13 A
03-Jan-13 A
04-Jan-13 A

28-Apr-13
28-Apr-13
06-Feb-13

0
0
0

0
0
-7

0
0
-13

162
162
91

Mechanical
Heat Exchangers
Air Cooled
Compressor #1
# Interstage/After Stage Cooler
200C1122026 Preassembly/Installation Pipeline Compressor #1 Interstage Cooler Supporting Structure
200C1122031

Waste Heat Recovery


Rec
Unit
WHRU 1
Structural Steel
Ste
200C0531342 Preassembly/Erection of WHRU Walkways, Handrails & Ladders : Compressor #1
Ducting
200C0531357 Preassembly of Second Stack Duct, Walkway Cover & Insulated Hat: Compressor #1
WHRU 2
Structural Steel
Ste
200C0531112 *Preassembly of WHRU Structure Lvl 13.8mtrs : Compressor #2

Progressing

200C0531117 Preassembly of WHRU Structure Lvl 19mtrs : Compressor #2

Progressing

03-Jan-13 A

07-Feb-13

-7

91

200C0531142 Erection of WHRU Structure Lvl 13.8mtrs : Compressor #2

Preassembly

15

15

07-Feb-13

22-Feb-13

-7

-7

16

207

200C0531147 Erection of WHRU Structure Lvl 19mtrs : Compressor #2

New 6 Week Lookahead Entry

15

15

23-Feb-13

11-Mar-13

-7

-7

16

207

200C0531507 Preassembly/Erection of WHRU Walkways, Handrails & Ladders : Compressor #2

Progressing

78

09-Jan-13 A

28-Apr-13

91

WHRU 3
Structural Steel
Ste
200C0531182 *Preassembly of WHRU Structure Lvl 13.8mtrs : Compressor #3

Progressing

276
276
7

97
97
10

04-Jan-13 A
04-Jan-13 A
04-Jan-13 A

18-May-13
18-May-13
13-Feb-13

0
0
0

0
0
0

0
0
-1

167
167
167

200C0531187 Preassembly of WHRU Structure Lvl 19mtrs : Compressor #3

Progressing

17

04-Jan-13 A

21-Feb-13

-1

167

200C0531212 Erection of WHRU Structure Lvl 13.8mtrs : Compressor #3

Progressing

15

25

25-Jan-13 A

01-Mar-13

19

29

200

200C0531222 Erection of WHRU Structure Lvl 19mtrs : Compressor #3

Progressing

15

40

29-Jan-13 A

18-Mar-13

30

-1

28

200

200C0531692 Preassembly/Erection of WHRU Walkways, Handrails & Ladders : Compressor #3

Progressing

97

07-Jan-13 A

18-May-13

167

164
164
159
159
3

04-Dec-12 A
04-Dec-12 A
04-Dec-12 A
04-Dec-12 A
24-Jan-13 A

29-Jul-13
29-Jul-13
24-Jul-13
24-Jul-13
06-Feb-13

0
0
0
0
0

105
105
0
0
-1

9
9
0
0
-30

609
609
250
38
110
170

Rotating Equipment
Equipme
Compressors & Drivers
Compressor #1
Structural Steel
Ste
200C0531067 Preassembly of GT & CC Skid Maintenance Platforms : Compressor #1

Progressing

280
280
164
161
10

200C0531042 Preassembly of Filter House Supporting Structure Incl Handrails & Grating : Compressor #1

Progressing

13

22-Jan-13 A

07-Feb-13

-7

-16

200C0531237 *Erection of Steel Shelter 40-VCBA65110 Pipeline Compressor #1 Package

Progressing

32

10-Jan-13 A

11-Feb-13

-27

38

200C0531382 Erection of Inlet Duct Structure : Compressor #1

Progressing

13

12

04-Dec-12 A

15-Feb-13

-1

110

200C0531417 Installation of Rundown Tank : Compressor #1

New 6 Week Lookahead Entry

20-Feb-13

21-Feb-13

-18

-18

170

200C0531402 Erection of Walkways & Ladders around Inlet Duct @ 8.6mtrs : Compressor #1

Progressing

159

10-Jan-13 A

24-Jul-13

18
3

10-Jan-13 A
10-Jan-13 A

22-Feb-13
06-Feb-13

0
0

6
-5

134

Progressing

50
10

391
172

Ducting
200C0531912 Preassembly of Inlet Ventilation Duct : Compressor #1

38

200C0531397 Position Outlet Ventilation Duct : Compressor #1

Progressing

18-Jan-13 A

07-Feb-13

-8

148

405

200C0531387 Position Inlet Ventilation Duct : Compressor #1

Progressing

10

26-Jan-13 A

11-Feb-13

12

-44

178

200C0531252 Preassembly of Filter Housing : Compressor #1

Progressing

30

18

28-Jan-13 A

22-Feb-13

172

Preassembly

52
52
13

46
46
4

06-Dec-12 A
06-Dec-12 A
22-Jan-13 A

24-Mar-13
24-Mar-13
07-Feb-13

0
0
0

15
0
-7

117
6
18

727
727
241

10

10

28-Jan-13 A

14-Feb-13

11

-3

179

32

32

04-Feb-13

09-Mar-13

-7

-7

-17

741

11-Mar-13

13-Mar-13

-7

-7

16

256

Progressing

13

46

06-Dec-12 A

24-Mar-13

210

Progressing

30
5

25
5

28-Jan-13 A
04-Feb-13

02-Mar-13
08-Feb-13

0
51

36
51

138
158

374
210

Progressing

10

10

04-Feb-13

14-Feb-13

51

51

-7

210

Compressor #2
Structural Steel
Ste
200C0531052 Preassembly of Filter House Supporting Structure Incl Handrails & Grating : Compressor #2
200C0531122 Preassembly of GT & CC Skid Maintenance Platforms : Compressor #2
200C0531422 *Erection of Steel Shelter 40-VCBA65110 Pipeline Compressor #2 Package

Preassembly

200C0531622 Installation of Rundown Tank : Compressor #2


200C0531582 Erection of Inlet Duct Structure : Compressor #2
Ducting
200C0531597 Position Outlet Ventilation Duct : Compressor #2
200C0531587 Position of Inlet Ventilation Duct : Compressor #2

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 8 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

200C0531557 Preassembly of Filter Housing : Compressor #2


Compressor #3
Structural Steel
Ste
200C0531167 Preassembly of Filter House Supporting Structure Incl Handrails & Grating : Compressor #3

Preassembly

200C0531197 Preassembly of GT & CC Skid Maintenance Platforms : Compressor #3

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

30

25

28-Jan-13 A

02-Mar-13

-2

27

374

267
265
13

164
164
4

05-Dec-12 A
05-Dec-12 A
22-Jan-13 A

29-Jul-13
29-Jul-13
07-Feb-13

0
0
0

105
95
-7

9
0
37

609
609
241

10

28-Jan-13 A

12-Feb-13

24

19

18

370

200C0531642 *Erection of Steel Shelter 40-VCBA65110 Pipeline Compressor #3Package

Preassembly

32

32

02-Mar-13

05-Apr-13

-23

716

200C0531767 Erection of Inlet Duct Structure : Compressor #3

Progressing

13

65

05-Dec-12 A

13-Apr-13

-1

217

10

164

29-Jan-13 A

29-Jul-13

254

95

241

93
3

20-Jan-13 A
20-Jan-13 A

14-May-13
06-Feb-13

0
0

175
-7

80
170

677
316

200C0531757 Erection of Filter House Supporting Structure Incl Handrails & Grating : Compressor #3
Ducting
200C0531782 Position Outlet Ventilation Duct : Compressor #3

Progressing

267
5

200C0531772 Position Inlet Ventilation Duct : Compressor #3

Progressing

10

20-Jan-13 A

12-Feb-13

-7

73

217

30

25

28-Jan-13 A

02-Mar-13

-2

46

740

93

29-Jan-13 A

14-May-13

267

175

316

157
145
115
115
3

144
144
85
85
4

12-Nov-12 A
12-Nov-12 A
04-Jan-13 A
08-Jan-13 A
31-Jan-13 A

08-Jul-13
08-Jul-13
06-May-13
06-May-13
07-Feb-13

0
0
0
0
60

1
1
1
1
56

0
0
0
0
0

166
133
180
180
45

200C0531742 Preassembly of Filter Housing : Compressor #3


200C0531777 Final Fixing of Inlet/Outlet Ventilation Ducts : Compressor #3
Piping
Aboveground Piping
Pip
Compressor 1
Subrack
200C1523175 Install Subrack 2" & Under Pipeline Comp. Train no. 1 CS Piping frm Package Interface to Inlet Scrubber
[Sys 651-01]

Progressing

All spool available on site base on shipment 1~15

200C1523320

Install Subrack 2" & Under Utility Air Distribution CS Piping @ Compressor # 1 [Sys 955-04]

18

16-Jan-13 A

22-Feb-13

247

200C1522625

Install Subrack 14" & Above Pipeline Comp. Train no. 1 CS Piping frm Inlet Scubber to Stage # 1 [Sys 65... 5 spool available on site base on shipment Shipment 1~15, 5 spool awaiting from Sino-Thai, On progress

12

12

11-Feb-13

23-Feb-13

42

200C1521990

Install Subrack 2" & Under Nitrogen Distribution CS Piping @ Compressor # 1 [Sys 961-01]

23

15-Jan-13 A

28-Feb-13

75

200C1522580

Install Subrack 2" & Under Pipeline Comp. Train no. 1 CS Piping frm Inlet Scrubber to HP Flare [Sys 651... All spool available on site base on shipment Shipment 1~15

28-Feb-13

01-Mar-13

12

12

96

200C1522125

Install Subrack 2" & Under Potable Water Distribution SS Piping @ Compressor # 1 [Sys 977-02]

All spool available on site base on shipment 1~15, On progress

27

08-Jan-13 A

04-Mar-13

65

200C1521580

Install Subrack 2" & Under Close Drain Header SS Piping @ Comp. # 1 Sub-Header [Sys 612-04]

New Entry 6 Week Lookahead, All spool available on site base on shipment Shipment 1~15

31

28-Jan-13 A

08-Mar-13

41

65

200C1521925

Install Subrack 2" & Under Pipeline Comp. Train no. 1 CS Piping frm Intrstg Scrbr to Stab. Fd Srg Drm [Sys All spool available on site base on shipment 1~15, On progress
651-01]

34

10-Jan-13 A

12-Mar-13

82

200C1522630

Install Subrack 14" & Above Pipeline Comp. Train no. 1 CS Piping frm Stage # 1 to Interstage Cooler [Sys
651-01]

4 spool available on site base on shipment Shipment 1~15, 5 spool awaiting from ST

16

16

24-Feb-13

13-Mar-13

42

200C1521935

Install Subrack 2" & Under Pipeline Comp. Train no. 1 CS Piping frm Inlet Scrubber to Stab. Fd Srg Drm
[Sys 651-01]

New Entry 6 Week Lookahead

12-Mar-13

15-Mar-13

82

200C1521930

Install Subrack 2" & Under Pipeline Comp. Train no. 1 CS Piping frm Intrstg Scrbr to HP Flare [Sys 651-01] New Entry 6 Week Lookahead

15-Mar-13

16-Mar-13

82

200C1522095

Install Subrack 2" & Under Utility Water Distribution SS Piping @ Compressor # 1 to Utility Station [Sys 9... All spool available on site base on shipment 1~15

43

30-Jan-13 A

21-Mar-13

43

65

200C1523070

Install Subrack 14" & Above Pipeline Comp. Train no. 1 CS Piping frm Interstage Cooler to Scrubber [Sys
651-01]

New Entry 6 Week Lookahead

13-Mar-13

22-Mar-13

42

200C1521690

Install Subrack 14" & Above High Pressure Flare Line SS Piping @ Comp. # 1 Sub-Header [Sys 612-02]

6 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai

30

45

21-Jan-13 A

23-Mar-13

-38

-38

19

200C1523200

Install Subrack 2" & Under Pipeline Comp. Train no. 1 SS Piping Instrument Air [Sys 651-01]

3 spool available on site base on shipment 1~15, 11 spool awaiting from Sino-Thai, On progress

45

16-Jan-13 A

23-Mar-13

-36

-36

75

200C1523230

Install Subrack 2" & Under Expansion Tank, Circulation Pump and Trim Cooler CS Piping @ Compr # 1
[Sys 941-01]

6 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai, On progress

45

11-Jan-13 A

23-Mar-13

-32

-32

164

200C1522015

Install Subrack 2 1/2" & 12" Waste Heat Recovery CS Piping @ Compressor # 1 from HO Circulation [Sys
941-02]

All spool available on site base on shipment 1~15, On progress

13

52

09-Jan-13 A

31-Mar-13

45

200C1522635

Install Subrack 2 1/2" & 12" HP Fuel Gas Distribution CS Piping @ Compressor # 1 [Sys 966-02]

8 spool available on site base on shipment 1~15, 2 spool awaiting from Sino-Thai, On progress

61

08-Jan-13 A

10-Apr-13

45

200C1521750

Install Subrack 14" & Above DPCU Train no. 1 CS Piping @ Compressor # 1 from FG Feed Header [Sys
663-01]

All spool available on site base on shipment 1~15, On progress

85

14-Jan-13 A

06-May-13

17

All spool available on site base on shipment 1~15

79
2

85
2

04-Jan-13 A
04-Feb-13

06-May-13
05-Feb-13

0
-7

1
-7

0
-13

168
247

All spool available on site base on shipment 1~15

04-Feb-13

09-Feb-13

-7

-7

-13

247

Interconnecting
200C1522365 Install Interconnecting 2" & Under Close Drain Header SS Piping @ Comp. # 1 from FG Scrubber Skid
[Sys 612-04]

All spool available on site base on shipment 1~15, On progress


All spool available on site base on shipment 1~15, On progress

200C1522805

Install Interconnecting 2" & Under Utility Air Distribution CS Piping @ Compressor # 1 to Utility Station
[Sys 955-04]

200C1522545

Install Intercon 14" & Above Pipeline Comp. Train no. 1 CS Piping frm Inlet Scubber to Stage # 1 [Sys 65... All spool awating from ST

24-Feb-13

27-Feb-13

88

200C1522355

Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping @ Comp. # 1 frm FG Scrber Skid
[Sys 612-02]

4 spool available on site base on shipment Shipment 1~15, 2 spool awaiting from ST

27-Feb-13

01-Mar-13

225

200C1522935

Install Interconnecting 2" & Under Safety Shower / Eye Wash SS Piping @ Compr # 1 to SS/EW Station
[Sys 977-05]

All spool available on site base on shipment 1~15

05-Mar-13

05-Mar-13

173

200C1522865

Install Interconnecting 2 1/2" & 12" Open Drain Header Area 200 CS Piping @ Compressor # 1 [Sys 998...

16 spool available on site base on shipment 1~15, 7 spool awaiting from Sino-Thai, On progress

45

04-Jan-13 A

23-Mar-13

-17

-17

200C1522920

Install Interconnecting 2" & Under LP Fuel Gas Distribution CS Piping @ Compressor # 1 [Sys 966-03]

All spool available on site base on shipment 1~15, On progress

48

11-Jan-13 A

27-Mar-13

195

200C1522655

Install Interconnecting 2" & Under Turbine Wash Water - Area 200 SS Piping @ Compressor # 1 [Sys 97...

15 spool available on site base on shipment 1~15, 5 spool is on shipment 20

53

30-Jan-13 A

01-Apr-13

53

45

200C1522670

Install Interconnecting 2 1/2" to 12" Low Pressure Flare Header CS Piping @ Comp. 1 from Package
Interface [Sys 612-03]

6 spool available on site base on shipment 1~15, 17 spool awaiting from ST

13

63

31-Jan-13 A

12-Apr-13

54

45

200C1523205

Install Intercon 2" & Under Pipeline Comp. Train no. 1 SS Piping Instrument Air [Sys 651-01]

49 spool available on site base on shipment 1~15, 28 spool awaiting from ST

11

63

01-Feb-13 A

12-Apr-13

55

45

200C1522795

Install Interconnecting 2 1/2" & 12" Waste Heat Recovery CS Piping @ Compressor # 1 to HO Supply
Header [Sys 941-02]

14 spool available on site base on shipment 1~15, 6 spool awaiting from Sino-Thai, On progress

12

64

07-Jan-13 A

13-Apr-13

182

200C1522685

Install Interconnecting 2" & Under Gas Metering SS Piping @ Compressor # 1 from Gas Metering Header
[Sys 651-04]

All spool available on site base on shipment 1~15, On progress

85

10-Jan-13 A

06-May-13

101

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 9 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

40

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Compressor 2
Subrack
200C1521695

Comment

Install Subrack 14" & Above High Pressure Flare Line SS Piping @ Comp. # 2 Sub-Header [Sys 612-02]

Interconnecting
200C1522960 Install Interconnecting 14" & Above High Pressure Flare Line SS Piping @ Comp. # 2 from After Cooler
[Sys 612-02]

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

6 spool available on site base on shipment 1~15, 4 spool awaiting from Sino-Thai

50
19
19

50
19
19

04-Feb-13
04-Feb-13
04-Feb-13

29-Mar-13
23-Feb-13
23-Feb-13

29
29
29

29
29
29

0
0
0

220
48
48

All spool available on site base on shipment 1~15

31
4

31
4

24-Feb-13
24-Feb-13

29-Mar-13
28-Feb-13

29
29

29
29

0
0

220
163

200C1522465

Install Interconnecting 14" & Above High Pressure Flare Line SS Piping @ Comp. # 2 from Stage # 2 [Sys
612-02]

6 spool available on site base on shipment 1~15, 2 spool awaiting from ST

10

10

24-Feb-13

06-Mar-13

29

29

236

200c1521760

Install Interconnecting 14" & Above High Pressure Flare Line SS Piping @ Comp. # 2 from Stage # 1 [Sys
612-02]

7 spool available on site base on shipment 1~15, 2 spool awaiting from ST

10

10

28-Feb-13

11-Mar-13

29

29

163

200C1521765

Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping @ Comp. # 2 frm Intrstge Scrber
[Sys 612-02]

New Entry 6 Week Lookahead

11-Mar-13

13-Mar-13

29

29

163

200C1522965

Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping @ Comp. # 2 from Pckg Intrface
[Sys 612-02]

New Entry 6 Week Lookahead

13-Mar-13

15-Mar-13

29

29

163

200C1522950

Install Interconnecting 2" & Under Safety Shower / Eye Wash SS Piping @ Compr # 2 to SS/EW Station
[Sys 977-05]

New Entry 6 Week Lookahead

15-Mar-13

16-Mar-13

29

29

163

200C1522525

Install Interconnecting 14" & Above High Pressure Flare Line SS Piping @ Comp. # 2 frm Intrstge Cooler
[Sys 612-02]

New Entry 6 Week Lookahead

11-Mar-13

17-Mar-13

29

29

229

200C1522945

Install Interconnecting 2" & Under Utility Water Distribution SS Piping @ Compressor # 2 to Utility Station
[Sys 978-02]

New Entry 6 Week Lookahead

16-Mar-13

21-Mar-13

29

29

169

200C1522675

Install Interconnecting 2 1/2" to 12" Low Pressure Flare Header CS Piping @ Comp. 2 from Package
Interface [Sys 612-03]

New Entry 6 Week Lookahead

13

13

15-Mar-13

29-Mar-13

29

29

220

7 spool available on site base on shipment 1~15, 4 spool awaiting from ST

89
19
19

107
19
19

03-Jan-13 A
08-Mar-13
08-Mar-13

29-May-13
28-Mar-13
28-Mar-13

0
29
29

1
29
29

0
0
0

40
48
48

20 spool available on site base on shipment 1~15, 3 spool awaiting from Sino-Thai, On progress

8
4

107
103

03-Jan-13 A
03-Jan-13 A

29-May-13
25-May-13

0
0

1
1

0
0

40
40

14 spool available on site base on shipment 1~15, 9 spool awaiting from Sino-Thai, On progress

107

03-Jan-13 A

29-May-13

40

All spool available on site base on shipment 1~15, On progress

33
33
1

46
46
40

04-Jan-13 A
04-Jan-13 A
04-Jan-13 A

25-Mar-13
25-Mar-13
18-Mar-13

0
0
0

1
1
1

0
0
0

222
222
157

13 spool available on site base on shipment 1~15, 2 spool awaiting from ST, On progress

46

29-Jan-13 A

25-Mar-13

46

222

All spool available on site base on shipment 1~15, On progress

39
39
1

144
144
120

04-Jan-13 A
04-Jan-13 A
04-Jan-13 A

08-Jul-13
08-Jul-13
12-Jun-13

0
0
0

1
1
1

0
0
0

133
133
157

13 spool available on site base on shipment 1~15, 4 spool awaiting from ST

144

30-Jan-13 A

08-Jul-13

143

45

41
34
4

04-Feb-13
04-Feb-13
04-Feb-13

19-Mar-13
12-Mar-13
07-Feb-13

-7
-7
-7

29
29
-7

0
0
-13

190
181
211

Compressor 3
Subrack
200C1521700

Install Subrack 14" & Above High Pressure Flare Line SS Piping @ Comp. # 3 Sub-Header [Sys 612-02]

Interconnecting
200C1522860 Install Interconnecting 2 1/2" & 12" Open Drain Header Area 200 CS Piping @ Compressor # 3 [Sys 998...
200C1522855

Install Interconnecting 2 1/2" & 12" Open Drain Header Area 200 CS Piping @ Compressor # 2 [Sys 998...

Inlet Gas Separator


Separ
1
Interconnecting
200C1523355 Install Interconnecting 2 1/2" & 12" Open Drain Header Area 200 CS Piping @ Gas Inlet Separator # 1
[Sys 998-04]
200C1522290

Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping @ Gas Inlet Separator # 1 [Sys
612-02]

Inlet Gas Separator


Separ
2
Interconnecting
200C1523350 Install Interconnecting 2 1/2" & 12" Open Drain Header Area 200 CS Piping @ Gas Inlet Separator # 2
[Sys 998-04]
200C1522375

Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping @ Gas Inlet Separator # 2 [Sys
612-02]

Fire Systems
Subrack
200C1522040

Install Subrack 2 1/2" & 12" Fire Water Distribution SS Piping @ Compressor # 1 [Sys 412-07]

All spool available on site base on shipment 1~15

41
34
4

200C1523215

Install Subrack 2 1/2" & 12" Fire Water Distribution SS Piping @ Compressor # 2 [Sys 412-07]

All spool available on site base on shipment 1~15

04-Feb-13

07-Feb-13

29

29

211

200C1523220

Install Subrack 2 1/2" & 12" Fire Water Distribution SS Piping @ Compressor # 3 [Sys 412-07]

All spool available on site base on shipment 1~15

08-Mar-13

12-Mar-13

29

29

181

41
3

41
3

04-Feb-13
04-Feb-13

19-Mar-13
06-Feb-13

-7
-5

29
-5

0
-5

190
219

Interconnecting
200C1522840 Install Interconnecting 2 1/2" & 12" Fire Water Monitor & Deluge SS Piping @ 40-VCBA65110 [Sys 412-05] 2 spool available on site base on shipment 1~15, 10 spool is on shipment 20, 4 spool awaiting from ST
200C1522035

Install Interconnecting 2 1/2" & 12" Fire Water Monitor & Deluge SS Piping @ 40-VCLO65114 [Sys 412-05] 4 spool available on site base on shipment 1~15, 11 spool awaiting from Sino-Thai

04-Feb-13

07-Feb-13

-7

-7

-9

211

200C1522845

Install Interconnecting 2 1/2" & 12" F O A M CS Piping Area 200 [Sys 412-06]

08-Feb-13

14-Feb-13

-6

-6

-6

221

200C1522030

Install Interconnecting 2 1/2" & 12" Fire Water Monitor & Deluge SS Piping @ 40-VCLO65134 [Sys 412-05] New Entry 6 Week Lookahead

12-Mar-13

16-Mar-13

29

29

181

200C1522755

Install Interconnecting 2 1/2" & 12" Fire Water Monitor & Deluge SS Piping @ 40-VCBA65130 [Sys 412-05] New Entry 6 Week Lookahead

16-Mar-13

19-Mar-13

29

29

181

8
8
8

46
46
46

12-Nov-12 A
12-Nov-12 A
12-Nov-12 A

25-Mar-13
25-Mar-13
25-Mar-13

0
0
0

1
1
1

-97
-97
-97

45
45
45

57 spool available on site base on shipment 1~15, 3 spool awaiting from Sino-Thai, On progress

4
4
4

4
4
4

02-Jan-13 A
02-Jan-13 A
02-Jan-13 A

07-Feb-13
07-Feb-13
07-Feb-13

0
0
0

-7
-7
-7

-13
-13
-13

40
40
40

New Entry 6 Week Lookahead

64
64
4
4

52
52
4
4

07-Jan-13 A
07-Jan-13 A
12-Mar-13
12-Mar-13

31-Mar-13
31-Mar-13
16-Mar-13
16-Mar-13

0
0
29
29

15
15
29
29

0
0
0
0

258
258
272
272

On progress

64
20

52
15

07-Jan-13 A
07-Jan-13 A

31-Mar-13
19-Feb-13

0
0

-8
1

0
1

255
231

46

46

10-Feb-13

31-Mar-13

-8

-8

255

Services
Interconnecting
200C1523225 Install Interconnecting 2 1/2" to 12" Low Pressure Flare Header CS Piping from Gas Odorization Package
[Sys 612-03]
Open Drain
Interconnecting
200C1522850 Install 2" & Under Open Drain Header Area 200 CS Piping Vent Line [Sys 998-04]
Testing/Cleaning
Pressure Test
Above Ground
200C1522240 Pressure Test Area 200 Fire Water Distribution Pipework [Sys 412-07]
Under Ground
200C1581010
200C1581015

U/G HDPE Area 400 Firewater Piping Hydrotest [SYS 412-07]

4 spool available on site base on shipment 1~15, 32 spool awaiting from ST

7 spool available on site base on shipment 1~15, 2 spool is on shipment 20, 2 spool awaiting from Sino-Thai,
On progress

U/G HDPE Area 400 Open Drain Piping Hydrotest [SYS 998-03]

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 10 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

Electrical
Underground Electrical
Elec
Grounding
200C1611010
Grounding UG [5540]
200C1611020
Conduit
200C1613010

Grounding AG
Install Conduit Below Ground

Aboveground Electrical
Ele
Cable Trays
200C1621010
Install Cable Trays Subrack 2D

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

Pending Material (Cad Weld) Delivery, C-Crimps in lieu of Cad Welds

165
165
165
87

76
76
76
11

09-Jul-12 A
09-Jul-12 A
09-Jul-12 A
09-Jul-12 A

26-Apr-13
26-Apr-13
26-Apr-13
14-Feb-13

0
0
0
0

12
0
0
0

-10
-36
-36
-36

266
266
266
253

Pending Material (Tray) Delivery

65

65

15-Feb-13

26-Apr-13

-36

266

Pending Material (Cad Weld) Delivery, C-Crimps in lieu of Cad Welds

58
58

11
11

19-Nov-12 A
19-Nov-12 A

14-Feb-13
14-Feb-13

0
0

0
0

-18
-18

277
277

58
58
14

04-Feb-13
04-Feb-13
04-Feb-13

06-Apr-13
06-Apr-13
18-Feb-13

36
36
36

22
22
36

-25
-25
0

47
47
46

Verfity Material

58
58
14

200C1621040

Install Cable Trays Subrack 2G (2)

Verfity Material

32

32

12-Feb-13

18-Mar-13

29

29

-7

65

200C1621020

Install Cable Trays Subrack 2E

Verfity Material

14

14

04-Mar-13

18-Mar-13

24

24

-12

34

200C1621065

Install Cable Trays on Culvert 1-2-3

Verfity Material

30

30

05-Mar-13

06-Apr-13

22

22

33
33
33
33

33
33
33
33

11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13

15-Apr-13
15-Apr-13
15-Apr-13
15-Apr-13

22
22
22
22

22
22
22
22

0
0
0
0

40
40
40
40

98
98
98

98
98
98

12-Mar-13
12-Mar-13
12-Mar-13

25-Jun-13
25-Jun-13
25-Jun-13

29
29
29

29
29
29

0
0
0

85
85
85

326

212

06-Aug-12 A

20-Sep-13

-15

540

189
189
189
37

24
24
24
12

09-Aug-12 A
09-Aug-12 A
09-Aug-12 A
09-Aug-12 A

28-Feb-13
28-Feb-13
28-Feb-13
15-Feb-13

0
0
0
0

0
0
0
0

-23
-23
-23
-40

226
226
226
214

Progressing around completed Foundation, UG Piping,

18

24

29-Sep-12 A

28-Feb-13

-23

226

88
38
0

19-Oct-12 A
19-Oct-12 A

Progressing

202
152
0

09-May-13
15-Mar-13
15-Mar-13

0
0
4

0
4
4

-1
-13
-38

664
212
212

Blinded, Base foundation done, Plints progressing

106
35

5
4

21-Oct-12 A
21-Oct-12 A

08-Feb-13
07-Feb-13

0
0

0
0

-13
-44

136
82

Blinded, Base foundation done, Plints progressing

38

05-Dec-12 A

08-Feb-13

-13

136

Base rebars & forms progressing

38
12

36
3

19-Oct-12 A
19-Oct-12 A

14-Mar-13
06-Feb-13

0
0

5
0

-12
-42

206
147

Wire & Cable


Power Wire & C
Cable - Underground
LV Distribution
200C1631410 Pull U/G LV Compressor No1 Switchroom [65110] Field Cabling to Compressor No.1
Instrumentation
Bench Calibration
200C1781010
Instrument Calibration [LoE]

400 MEG REGENERATION


REGEN
Civil & Earthworks
Excavation & Backfill
Bac
Backfilling Area 400
400C0235011
Backfill to -0.6m - Area 400
400C0235012

Backfill to Final Grade - Area 400

Concrete
Equipment & Structural
Stru
Foundations
400C03100FM
Finish Foundations Area 400
Equipment/Structural Foundations over 23m3
Equipment/Stru
400C0313013
Foundation for 40-VEAL66710 : MEG Vent Gas Incinerator Package
400C0313033

Foundation for 40-MBA94140 : Hot Oil Expansion Vessel

Equipment/Structural Foundations 4~23m3


Equipment/Stru
400C0312017
Foundation for 40-PBE94171/72 : Hot Oil MEG Circuit Circulation Pump A&B

Progressing

40

400C0312036

Foundation for 40-PBE94141/42 : Hot Oil Circulation Pump A&B

Blinded, Rebars to start this week

26

25

25-Jan-13 A

01-Mar-13

14

136

400C0312038

Foundation for 40-MAJ94150 : Hot Oil Filter * [Plinths on Paving]

Foundation on Paving. Forecast 6WKS

36

36

28-Jan-13 A

14-Mar-13

12

-40

206

Blinded, Base rebars progressing, Ready for Concrete

36
4

13
3

18-Jan-13 A
18-Jan-13 A

16-Feb-13
06-Feb-13

0
0

0
0

11
-40

165
113

Equipment/Structural Foundations less than 4m3


Equipment/Stru
400C0311044
Foundation for MSP around VEAL667710 Incinerator MEG Package
400C0311039

Foundation for Misc Pipe Support South of Subrack 4A**

Backfilled blinding concrete to follow

04-Feb-13

07-Feb-13

-41

161

400C0313034

Foundation for Platform for 40-MBA94140 : Hot Oil Expansion Vessel

Plints rebars progressing, Awaiting Anchor Bolts ETA ??

31

13

19-Jan-13 A

16-Feb-13

11

165

After backfilling of LER and Transformer Wall foundation

32
7

19
7

17-Jan-13 A
16-Feb-13

23-Feb-13
23-Feb-13

0
0

0
0

-9
-14

99
99

Base poured, Wall ready to pour

31
12

12
6

17-Jan-13 A
17-Jan-13 A

15-Feb-13
09-Feb-13

0
0

0
-7

-2

Install Wall for 40-XF82360/61 LER Retaining Wall

82
82

Install Wall for 40-XF82360/61 Transformers Retaining Wall *[LER]

Wall rebars / forms progressing

12

12

26-Jan-13 A

15-Feb-13

-2

82

On progress, Completion in line to DO U/G Piping

59
59
60

38
38
38

01-Dec-12 A
01-Dec-12 A
01-Dec-12 A

15-Mar-13
15-Mar-13
15-Mar-13

0
0
0

-38
-38
-38

-38
-38
-38

188
188
188

21
21
13

05-Jan-13 A
05-Jan-13 A
05-Jan-13 A

25-Feb-13
25-Feb-13
17-Feb-13

0
0
0

0
0
-13

-43
-43
-44

731
731
178

Elevated Structures
Structur
400C0311026
Foundation for 40-XF82360/61 Transformers *[LER]
Walls
400C0323020
400C0323010

Pre-Cast Concrete
Concret Structures
Catch Basins,Manholes
Basins,M
& Valve Box
400C0331011
Install Catch Basins, Manholes & Valve box- Area 400 (CB=10; MH=3; VB=4)
Concrete for Below
Belo Grade Structures
Duct Banks
400C0342016
Install Electrical Duct Bank (DB#10, DB#5,DB#3)

Remaining DB#10, LER Road Crossing to Subrack 5A, Start excavation, (Road Close)

21
21
8

400C0342012

Install Instrument Duct Bank DB#7

LER Road Crossing to Subrack 4A / Incenarator Package Area, (Road Close)

13

13

29-Jan-13 A

17-Feb-13

-1

-14

-51

739

400C0342021

Install Electrical Duct Bank DB#25

Adjacent of HOEV, After completion of HOT OIL EXPANSION VESSEL foundation

17-Feb-13

25-Feb-13

-43

165

To start MEG Regeneration Package area

78
78
78

78
78
78

14-Feb-13
14-Feb-13
14-Feb-13

09-May-13
09-May-13
09-May-13

0
0
0

0
0
0

-1
-1
-1

161
161
161

Material Received and Shake-out

28
20
20
20

28
20
20
20

24-Feb-13
24-Feb-13
24-Feb-13
24-Feb-13

26-Mar-13
17-Mar-13
17-Mar-13
17-Mar-13

0
0
0
0

0
0
0
0

0
0
0
0

194
49
49
49

Material Received and Shake-out

23
23
23

23
23
23

01-Mar-13
01-Mar-13
01-Mar-13

26-Mar-13
26-Mar-13
26-Mar-13

0
0
0

0
0
0

0
0
0

194
194
194

Utility Concrete
Area Paving
400C0352011

Area Paving, Install kerbs around Equipment - Area 400

Structural
Pipe Rack Steel
Pipe Rack Steel
400C0521011
Erection of Subrack 4A, 4B, 4C, 4D
Major Structures
Major Structures
400C0531012
Erection of Platform for 40-MBA94140 : Hot Oil Expansion Vessel

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 11 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Mechanical
Tanks/Vessels
Vessel
400C1111010

Comment

Installation of [40-MAM66710] MEG Vent Gas Knock Out Drum

Rotating Equipment
Equipme
Pumps
400C1131011
Installation of [40-PBE94171] Hot Oil MEG Circuit Circulation Pump A

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

KO Drum Installed

38
26
26
26

102
102
102
102

23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A

23-May-13
23-May-13
23-May-13
23-May-13

0
0
0
0

0
0
0
0

75
0
0
0

158
116
116
116

38
38
23

23-Feb-13
23-Feb-13
23-Feb-13

04-Apr-13
04-Apr-13
20-Mar-13

20
20
25

14
14
25

121
121
124

136
136
147

Onsite

38
38
23

400C1131012

Installation of [40-PBE94172] Hot Oil MEG Circuit Circulation Pump B

Onsite

23

23

27-Feb-13

24-Mar-13

25

25

124

147

400C1131001

Installation of [40-PBE94141] Hot Oil Circulation Pump A

Onsite

17

17

17-Mar-13

04-Apr-13

-1

-1

48

136

400C1131002

Installation of [40-PBE94142] Hot Oil Circulation Pump B

Onsite

17

17

17-Mar-13

04-Apr-13

121

136

Onsite

17
17
17

17
17
17

14-Mar-13
14-Mar-13
14-Mar-13

02-Apr-13
02-Apr-13
02-Apr-13

35
35
35

35
35
35

-40
-40
-40

206
206
206

212
188
0

07-Jan-13 A
07-Jan-13 A
17-Mar-13

20-Sep-13
24-Aug-13

New Entry 6 Week Lookahead

206
143
0

0
0
3

0
-1
3

-15
0
0

115
70
49

New Entry 6 Week Lookahead

6
6
6
6

6
6
6
6

17-Mar-13
17-Mar-13
17-Mar-13
17-Mar-13

23-Mar-13
23-Mar-13
23-Mar-13
23-Mar-13

58
58
58
58

58
58
58
58

20
20
20
20

95
95
95
95

113
113
113
113
1

188
188
188
188
40

07-Jan-13 A
07-Jan-13 A
07-Jan-13 A
07-Jan-13 A
07-Jan-13 A

24-Aug-13
24-Aug-13
24-Aug-13
24-Aug-13
18-Mar-13

0
0
0
0
0

-1
-1
-1
-1
-1

0
0
0
0
0

70
70
70
70
70

Processing Units
Filter Vessel
400C1153010

Installation of [40-MAJ94150] Hot Oil Filter

Piping
Aboveground Piping
Pip
400C1521010
Start A/G Piping Area 400
Subrack
Carbon Steel P
Piping
A/G 14" and A
Above, CS Piping
400C1521140 Install Subrack 18" & Under Supply and Return Headers CS Piping to HO Supply Hdr. [Sys 941-03]
Utility Services
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
400C152113 Install Interconnecting 2" & Under Area 400 Open Drain CS Piping [Sys 998-03]
400C152233 Install 2" & Under Area 400 Vent CS Piping frm Catch Basin [Sys 998-03]

All spool available on site base on shipment 1~15, On progress

188

08-Jan-13 A

24-Aug-13

-1

Special Labor Items


Item
Stress Relieving
400C1572010
Stress Relieving [LoE]

173
173
173

173
173
173

17-Mar-13
17-Mar-13
17-Mar-13

20-Sep-13
20-Sep-13
20-Sep-13

3
3
3

0
0
0

-15
-15
-15

115
115
115

Testing/Cleaning
Pressure Test
Under Ground
400C1581010

26
26
26
12

30
30
30
12

09-Jan-13 A
09-Jan-13 A
09-Jan-13 A
10-Feb-13

07-Mar-13
07-Mar-13
07-Mar-13
22-Feb-13

0
0
0
25

13
13
13
25

-18
-18
-18
-6

289
289
289
301

1 TP remaining

12

30

09-Jan-13 A

07-Mar-13

-52

231

Pending Material (Cad Weld) Delivery, Need Backfill Around CB's

124
86
86
87

41
41
41
41

06-Aug-12 A
06-Aug-12 A
06-Aug-12 A
06-Aug-12 A

19-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13

0
0
0
0

0
0
0
0

-8
-73
-73
-73

253
253
253
253

9
9
6
3

9
9
6
3

09-Mar-13
09-Mar-13
09-Mar-13
09-Mar-13

19-Mar-13
19-Mar-13
15-Mar-13
12-Mar-13

-1
-1
-1
-1

-1
-1
-1
-1

-7
-7
-7
-7

154
154
154
154

13-Mar-13

15-Mar-13

-1

-1

-7

154

3
3

3
3

16-Mar-13
16-Mar-13

19-Mar-13
19-Mar-13

-1
-1

-1
-1

-7
-7

154
154

258

223

02-Jul-12 A

01-Oct-13

457

Progressing

140
140
140
30

223
223
223
114

01-Nov-12 A
01-Nov-12 A
01-Nov-12 A
01-Nov-12 A

01-Oct-13
01-Oct-13
01-Oct-13
05-Jun-13

0
0
0
0

0
0
0
0

0
0
0
-1

457
457
457
265

Initial backfill on progress around completed foundations

110

223

27-Nov-12 A

01-Oct-13

457

99
63
0

60
24
0

24-Oct-12 A
29-Nov-12 A

08-Apr-13
28-Feb-13
28-Feb-13

0
0
17

0
17
17

24
60
60

621
657
657

400C1581015

U/G HDPE Area 400 Open Drain Piping Hydrotest [SYS 998-03]
U/G HDPE Area 400 Firewater Piping Hydrotest [SYS 412-07]

Electrical
Underground Electrical
Elec
Grounding
400C1611010
Grounding UG [2,789]
Wire & Cable
Power Wire & C
Cable - Underground
HV Distribution
Distributio - Area 103 HV Switchroom LER81153
400C2631395 Pull U/G HV Switchroom [LER81153] Cabling to Hot Oil Circ Pump A/B Motor [94141]
400C2631480

All spool available on site base on shipment 1~15, On progress

PATH: Hot Oil Circ Pump, DB25, DB5, DB4, & LER81153

Pull U/G HV Switchroom [LER81153] Cabling to Hot Oil Circ Pump B Motor [94141]

LV Distribution
400C1631630 Pull U/G LV Hot Oil Circulation Pump A Cabling

101 RECEIVING
Civil & Earthworks
Excavation & Backfill
Bac
Backfill Area 101
101C0235011
Backfill to -0.6m - Area 101
101C0235012

Backfill to Final Grade - Area 101

Concrete
Equipment & Structural
Stru
Foundations
101C03100FM
Finish Foundations Area 101

70

Equipment/Structural Foundations 4~23m3


Equipment/Stru
101C0311073
Foundation for Pig Reciever [40-KGR60901] ORG EPC5a Scope

*Pile Head Foundations Complete and Ready for Concrete

19
20

12
12

29-Nov-12 A
29-Nov-12 A

15-Feb-13
15-Feb-13

0
0

0
0

-51
-51

195
195

Equipment/Structural Foundations less than 4m3


Equipment/Stru
101C0311058
Foundation for Misc Pipe supports around 40-VAFFF41310

*Commenced

10
10

13
13

25-Jan-13 A
25-Jan-13 A

17-Feb-13
17-Feb-13

0
0

-7
-7

-43
-43

454
454

*1& 2 Installed, Completion in line to U/G DO Piping

30
30
30

24
24
24

24-Oct-12 A
24-Oct-12 A
24-Oct-12 A

28-Feb-13
28-Feb-13
28-Feb-13

0
0
0

0
0
0

-61
-61
-61

142
142
142

Partially Complete

99
99
100

60
60
60

06-Dec-12 A
06-Dec-12 A
06-Dec-12 A

08-Apr-13
08-Apr-13
08-Apr-13

0
0
0

0
0
0

-1
-1
-1

41
41
41

Pre-Cast Concrete
Concret Structures
Catch Basins & Manholes
101C0331011
Install Catch Basins & Manholes - Area 101 (CB=2;MH=2)
Grouting
Grouting - Non Shrink
101C0373011
Grouting Non-Shrink [LoE]

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 12 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Structural
Pipe Rack Steel
Pie Rack Steel
101C0521011

Comment

Erection of Subrack 1A&1B

Major Structures
Major Structures
101C0541011
Erection of Platform East of 40-KGR60901 - Pig Receiver

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

*Will be Completed Once the First Gas Outlet Manifold of Slug Catcher is Installed

120
25
25
25

29
13
13
13

28-Oct-12 A
28-Oct-12 A
28-Oct-12 A
28-Oct-12 A

06-Mar-13
17-Feb-13
17-Feb-13
17-Feb-13

0
0
0
0

24
30
30
30

63
-69
-69
-69

442
87
87
87

24
24
3

18-Jan-13 A
18-Jan-13 A
18-Jan-13 A

01-Mar-13
01-Mar-13
06-Feb-13

0
0
0

25
25
-7

68
68
-9

447
447
187

*Erection has Commenced and is 75% Complete - One Beam is Missing and Being Located

32
32
7

101C0541012

Erection of Platform A for 40-KAQ62101 - Slug Catcher

Started Erection

14

14

28-Jan-13 A

18-Feb-13

16

10

-13

104

101C0541013

Erection of Platform for 40-KGR60901 - Pig Receiver

Material Received and Shakeout

12

12

07-Feb-13

20-Feb-13

-6

-6

-28

187

101C0541014

Erection of Miscellaneous Platform around 40-KAQ62101 - Slug Catcher

*Will Commence Once Slug Catcher Sludge Manifolds are Installed

20-Feb-13

01-Mar-13

25

25

68

447

29
29
4

28-Jan-13 A
28-Jan-13 A
28-Jan-13 A

06-Mar-13
06-Mar-13
07-Feb-13

30
30
30

24
24
24

60
60
1

442
442
194

Miscellaneous Steel
Ste & Platforms
Miscellanous Steel
S
101C0531020
Install Pipe Support South of 40-KAQ62101 - Slug Catcher

Material Received and Shakeout

29
29
4

101C0531015

Install Miscellaneous Pipe Support near 40-KGR60901 - Pig Receiver

Material Received and Shakeout

08-Feb-13

12-Feb-13

24

24

194

101C0531050

Install Misc. Pipe Support South of 40-VAFFF41310

Material Received and Shakeout

19-Feb-13

22-Feb-13

10

10

-27

453

101C0531025

Install Pipe Support of 40-KAQ62101 (Middle Part)- Slug Catcher

Material Received and Shakeout

12

12

12-Feb-13

25-Feb-13

24

24

60

442

101C0531040

Install Pipe Support North of 40-KAQ62101 - Slug Catcher

02-Mar-13

06-Mar-13

24

24

60

442

6
6

6
6

20-Feb-13
20-Feb-13

27-Feb-13
27-Feb-13

17
17

17
17

-28
-28

187
187

28
18
18
18
10

26-Jan-13 A
26-Jan-13 A
26-Jan-13 A
26-Jan-13 A
26-Jan-13 A

05-Mar-13
22-Feb-13
22-Feb-13
22-Feb-13
14-Feb-13

19
19
19
19
19

30
38
38
38
16

56
65
65
65
43

275
285
285
285
285

Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
101C0542013
Misc. Steels (gratings etc.) for Platform for 40-KGR60901 - Pig Receiver

*Separation Tubes Cut From Storage Tubes, 2 of 8 Install

20
20
20
20
15

101C1158040

Pre-Assemble/Install Wet Gas Inlet Piping [Slug Catcher] 40-KAQ62101

*Pre-Assembly Complete

15

14

29-Jan-13 A

18-Feb-13

31

27

54

285

101C1158045

Pre-Assemble/Install Dry Gas Outlet Piping [Slug Catcher] 40-KAQ62101

*Started Pre-assembly

15

18

01-Feb-13 A

22-Feb-13

43

38

65

285

15
15
15

15
15
15

18-Feb-13
18-Feb-13
18-Feb-13

05-Mar-13
05-Mar-13
05-Mar-13

30
30
30

30
30
30

-53
-53
-53

193
193
193

165
165
165
63
63
4

49
49
45
19
19
5

02-Jul-12 A
26-Nov-12 A
31-Dec-12 A
31-Dec-12 A
31-Dec-12 A
31-Dec-12 A

28-Mar-13
28-Mar-13
23-Mar-13
23-Feb-13
23-Feb-13
08-Feb-13

0
0
0
0
0
0

10
10
10
-1
-1
-1

35
35
-24
0
0
0

261
261
188
178
178
146

Mechanical
Package Unit
Misc. Mechanical
Mechanic Equipment
Slug Catcher P
Pre-Assembly and Installation
101C1158035 Pre-Assemble/Install Dry Gas Manifolds & Separation Tubes [Slug Catcher] 40-KAQ62101

Specialty Equipment
Equipm
Pig Receiver
101C1168010
Installation of [40-KGR60901] Pig Receiver [BY OTHERS]
Piping
Aboveground Piping
Pip
Subrack
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
101C1521771 Install Subrack 2" & Under Nitrogen Distribution CS Piping [Sys 961-01]

5 spool available on site base on shipment 1~15, 5 spool is on sea base on shipment 17~19, On progress

101C1521756 Install Subrack 2" & Under Utility Air Distribution CS Piping [Sys 955-04]

8 spool available on site base on shipment 1~15, 2 spool awaiting from Sino-Thai, On progress

02-Jan-13 A

13-Feb-13

-1

182

101C1521806 Install Subrack 2" & Under LEAN MEG Storage and Distribution CS Piping [Sys 661-05]

All spool available on site base on shipment 1~15, On progress

19

04-Jan-13 A

23-Feb-13

-1

178

All spool available on site base on shipment 1~15, On progress

9
9

1
1

25-Jan-13 A
25-Jan-13 A

04-Feb-13
04-Feb-13

0
0

2
2

-2
-2

103
103

All spool available on site base on shipment 1~15, On progress

137
114
4

45
20
5

01-Jan-13 A
01-Jan-13 A
01-Jan-13 A

23-Mar-13
25-Feb-13
08-Feb-13

0
0
0

10
-1
-1

-24
0
0

188
213
180

12

17

02-Jan-13 A

21-Feb-13

-1

216

A/G 2 1/2" to 12", CS Piping


101C1521776 Install Subrack 2 1/2" to 12" Close Drain Header CS Piping [Sys 612-04]
Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
101C1521746 Install Subrack 2" & Under Utility Water Distribution SS Piping [Sys 978-02]
101C1521811 Install Subrack 2" & Under Instrument Air Slug Catcher SS Piping [Sys 623-02]

38 spool available on site base on shipment 1~15, 8 spool is on country base on shipment 16, 8 spool
awaiting from Sino-Thai, On progress

101C1521736 Install Subrack 2" & Under Slug Catcher SS Piping to Fuel Gas PreHeater [Sys 623-02]

3 spool available on site base on shipment 1~15, 2 spool awaiting from ST

24-Feb-13

25-Feb-13

-1

-1

183

61
61

45
45

25-Jan-13 A
25-Jan-13 A

23-Mar-13
23-Mar-13

0
0

10
10

-24
-24

147
147

69
14
14
13
7

49
14
14
13
7

25-Jan-13 A
01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13

28-Mar-13
16-Mar-13
16-Mar-13
15-Mar-13
08-Mar-13

0
10
10
10
10

10
19
19
10
10

35
46
46
-11
-13

261
272
272
168
168

101C152178 Install Interconnecting 2 1/2" to 12" Slug Catcher CS Pipe fr Slug Catcher to Liq Inlet Separator [Sys 623...

09-Mar-13

15-Mar-13

10

10

-13

168

101C1524745 Install Intercon 2 1/2" to 12" Cond. Pump & Mtrng CS Ppng frm Pmps to Cond. Mtrng to Rcy Slug Catcher
[Sys 626-07]

15-Mar-13

15-Mar-13

10

10

-11

168

7
1

7
1

09-Mar-13
09-Mar-13

16-Mar-13
09-Mar-13

25
25

19
25

46
52

272
278

15-Mar-13

16-Mar-13

19

19

46

266

69
64
64
8

49
31
30
19

25-Jan-13 A
25-Jan-13 A
25-Jan-13 A
25-Jan-13 A

28-Mar-13
08-Mar-13
07-Mar-13
23-Feb-13

0
0
0
0

10
26
0
-1

35
54
1
0

260
278
198
175

A/G 14" and A


Above, SS Piping
101C1521791 Install Subrack 14" & Above High Pressure Flare Line SS Piping [Sys 612-02]

25 spool available on site base on shipment 1~15, 5 spool is on sea base on shipment 17~19, 6 spool
awaiting from ST, On progress

Slug Catcher
Carbon Steel P
Piping
A/G 2 1/2" to 12", CS Piping
Interconnecting
Interconnect
101C152164 Install Interconnecting 2 1/2" to 12" Closed Drain Header CS Piping to Slug Catcher [Sys 612-04]

Tie-Ins
101C152167 Tie-In 2 1/2" to 12" Closed Drain Header CS Piping to Slug Catcher [Sys 612-04]
101C152191 Tie-In 2 1/2" to 12" Slug Catcher CS Pipe fr Slug Catcher to Liq Inlet Separator [Sys 623-02]
Stainless Steel
Stee Piping
A/G 2 1/2" to 12", SS Piping
Interconnecting
Interconnect
101C1521661 Install Intercon 2 1/2" to 12" Liquid Inlet Separator #1 SS Piping fr Slug Catcher to Lqd Inlt Sprtor [Sys
623-05]

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 13 of 26

14 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 17~19, 2 spool
awaiting from ST, On progress

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

101C1521656 Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping to Slug Catcher [Sys 612-02]

OD

16 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, 6 spool
awaiting from ST

Tie-Ins
101C152197 Tie-In 2 1/2" to 12" Liquid Inlet Separator #1 SS Piping fr Slug Catcher to Lqd Inlt Sprtor [Sys 623-05]
101C152198 Tie-In 2 1/2" to 12" High Pressure Flare Line SS Piping to Slug Catcher [Sys 612-02]
A/G 14" and A
Above, SS Piping
Interconnecting
Interconnect
101C152168 Install Interconnecting 14" & Above Slug Catcher SS Piping from Slug Catcher to Flare Line [Sys 623-02]
101C1521666 Install Interconnecting 14" & Above Slug Catcher SS Piping from Slug Catcher to Inlet Gas Separator [Sys
623-02]

101C252125 Install Interconnecting 2 1/2" to 12" Area 101 Fire Water Monitor & Deluge CS Piping [Sys 412-05]
Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
Interconnecting
Interconnect
101C1521741 Install Interconnecting 2" & Under Safety Shower / Eye Wash SS Piping to Safety Shower/Eye Wash [Sys
977-03]
101C1521751 Install Interconnecting 2" & Under Utility Water Distribution SS Piping to Utility Station [Sys 978-02]
A/G 2 1/2" to 12", SS Piping
Interconnecting
Interconnect
101C252274 Install Interconnecting 2 1/2" to 12" Area 101 FOAM Pipework [Sys 412-06]
Underground Piping
Pipi
Plastic Pipe Installation
Ins
101C2522580
Install HDPE Area 101 Firewater Distribution Pipework [Sys 412-07]

101C1581010

101C1611020

Aboveground Electrical
Ele
Cable Trays
101C1621020
Install Cable Trays Subrack 1B
101C1621010

Install Cable Trays Subrack 1A

102C0235012

Backfill to Final Grade - Area 102

Variance - BL
Project Finish
Date

Total
Float

11

11

23-Feb-13

07-Mar-13

198

12
1

12
1

24-Feb-13
24-Feb-13

08-Mar-13
25-Feb-13

37
37

26
37

54
64

278
289

07-Mar-13

08-Mar-13

26

26

54

276

9 spool available on site base on shipment 1~16, 4 spool is on shipment 17~19, 2 spool awaiting from ST

19-Feb-13
19-Feb-13
19-Feb-13

28-Mar-13
28-Mar-13
01-Mar-13

10
10
10

10
10
10

35
-13
-13

255
243
168

1 spool available on site base on shipment 1~15, 7 spool is on shipment 17~19, 6 spool awaiting from ST

30

30

19-Feb-13

22-Mar-13

10

10

-13

172

25

25

01-Mar-13

28-Mar-13

10

10

-13

243

1
1

1
1

01-Mar-13
01-Mar-13

02-Mar-13
02-Mar-13

32
32

32
32

59
59

279
279

New Entry 6 Week Lookahead

106
80
6
6
6

48
41
6
6
6

26-Nov-12 A
08-Jan-13 A
13-Mar-13
13-Mar-13
13-Mar-13

27-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13

0
0
-1
-1
-1

-1
-1
-1
-1
-1

0
-8
-30
-30
-30

241
185
146
146
146

All spool available on site base on shipment 1~15, On progress

80
80
1

33
33
32

08-Jan-13 A
08-Jan-13 A
08-Jan-13 A

11-Mar-13
11-Mar-13
09-Mar-13

0
0
0

-1
-1
-1

0
0
0

193
193
187

All spool available on site base on shipment 1~15

10-Mar-13

11-Mar-13

-1

-1

193

106
106
106
2

48
26
26
2

26-Nov-12 A
04-Jan-13 A
04-Jan-13 A
24-Feb-13

27-Mar-13
03-Mar-13
03-Mar-13
26-Feb-13

0
0
0
-1

-1
-1
-1
-1

0
0
0
0

241
180
180
183

26

04-Jan-13 A

03-Mar-13

-1

180

4 spool available on site base on shipment 1~15, 9 spool awaiting from Sino-Thai, On progress

9
9
9

48
48
48

26-Nov-12 A
26-Nov-12 A
26-Nov-12 A

27-Mar-13
27-Mar-13
27-Mar-13

0
0
0

-1
-1
-1

0
0
0

241
241
241

Progressing

20
20
20

16
16
16

02-Jul-12 A
02-Jul-12 A
02-Jul-12 A

20-Feb-13
20-Feb-13
20-Feb-13

0
0
0

1
1
1

-62
-62
-62

86
86
86
11

12
12
12
4

24-Jan-13 A
24-Jan-13 A
24-Jan-13 A
24-Jan-13 A

16-Feb-13
16-Feb-13
16-Feb-13
07-Feb-13

0
0
0
0

1
1
1
1

1
1
1
1

174
174
174
174

4 spool available on site base on shipment 1~15, 6 spool awaiting from ST


5 spool available on site base on shipment 1~15, 6 spool is on sea base on shipment 17~19, 14 spool
awaiting from Sino-Thai, On progress

34
34
34

08-Feb-13

16-Feb-13

174

Pending Material (Cad Weld) Delivery, C-Crimps in lieu of Cad Welds

142
142
142
45

59
59
59
11

21-Jul-12 A
21-Jul-12 A
21-Jul-12 A
21-Jul-12 A

07-Apr-13
07-Apr-13
07-Apr-13
14-Feb-13

0
0
0
0

38
0
0
0

-16
-36
-36
-43

283
283
283
165

Pending Material (Tray) Delivery

40

40

23-Feb-13

07-Apr-13

-36

283

Verify Materials

30
30
30

30
30
30

18-Feb-13
18-Feb-13
18-Feb-13

21-Mar-13
21-Mar-13
21-Mar-13

53
53
53

53
53
53

-1
-1
-1

162
162
162

Verify Materials

30

30

18-Feb-13

21-Mar-13

53

53

-1

162

504

273

27-Jul-12 A

23-Nov-13

140

73

164

Progressing

255
255
255
91

130
130
130
13

04-Oct-12 A
04-Oct-12 A
04-Oct-12 A
04-Oct-12 A

22-Jun-13
22-Jun-13
22-Jun-13
16-Feb-13

0
0
0
0

0
0
0
0

52
52
52
1

307
307
307
307

Initial backfill on progress around completed foundations & subracks

168

130

14-Dec-12 A

22-Jun-13

52

307

211
33
33
16

03-Oct-12 A
03-Oct-12 A
26-Dec-12 A
26-Dec-12 A

18-Sep-13
11-Mar-13
11-Mar-13
20-Feb-13

0
0
0
0

202
0
0
0

135
-11
-22
-5

86
198
111
111

102 LIQUIDS
Civil & Earthworks
Excavation & Backfill
Bac
Backfilling Area 102
102C0235011
Backfill to -0.6m - Area 102

6Wk
Finish
Variance

U/G HDPE Area 101 Open Drain Piping Hydrotest [SYS 998-04]

Grounding AG

6Wk
Start
Vari...

35
35
10

Testing and Cleaning


Clean
Pressure Test
Under Ground
101C1581015 U/G HDPE Area 101 Firewater Piping Hydrotest [SYS 412-07]
Electrical
Underground Electrical
Elec
Grounding
101C1611010
Grounding UG [2,718]

Finish

101C152164 Install Interconnecting 14" & Above High Pressure Flare Line SS Piping to Slug Catcher [Sys 612-02]

A/G 2 1/2" to 12", CS Piping


Interconnecting
Interconnect
101C152173 Install Interconnecting 2 1/2" to 12" Open Drain Header CS Piping [Sys 998-04]

Start

35
35
10

Tie-Ins
101C152200 Tie-In 14" & Above Slug Catcher SS Piping from Slug Catcher to Flare Line [Sys 623-02]
Utility Services
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
101C152176 Install Interconnecting 2" & Under Nitrogen Distribution CS Piping to Utility Station [Sys 961-01]

RD

Base Foundation to Complete

504
125
61
24

102C0313015

Foundations for 40-LER81151 - LER Condensate Stab LV Switchroom

Base Foundation to Commence Following Pour of LER71250

30

29

26-Dec-12 A

06-Mar-13

-41

111

102C0313037

Foundations for 40-XF82350/51 : Transformer Retaining Wall (LER)

Awaiting backfill of LER wall

17

17

21-Feb-13

11-Mar-13

-58

111

*Ready for Blinding Reinforcement Has Been Fabricated

20
20

17
17

25-Jan-13 A
25-Jan-13 A

21-Feb-13
21-Feb-13

0
0

-6
-6

-6
-6

188
188

103

12

03-Oct-12 A

15-Feb-13

17

10

219

Concrete
Equipment & Structural
Stru
Foundations
Equipment/Stru
Equipment/Structural
Foundations over 23 m3
102C0313014
Foundations for 40-LER71250 - LER Condensate Stabilization Area

Equipment/Structural Foundations 4~23 m3


Equipment/Stru
102C0311085
Foundations for 40-KGL64401 - Condensate Pipeline Pig Launcher - ORG EPC5a Scope
Equipment/Stru
Equipment/Structural
Foundations less than 4 m3

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 14 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

118

102C0312027

Foundations for 40-VPAX64300 Condensate Pump Seal System**

Backfill Required

04-Feb-13

07-Feb-13

12

12

-53

102C0312017

Foundations for Miscellaneous Pipe Support around 40-HBG66341 DPCU Heater

Backfill Required

11

11

04-Feb-13

15-Feb-13

-6

-6

-12

73

102C0311060

Foundation for Misc Platform 40-MBD62601 Platform # 1

To start this week

11

11

04-Feb-13

15-Feb-13

-1

219

102C0311065

Foundation for Misc Pipe supports near 40-HFF62615/625

219

102C0311028

Foundations for 40-PBA62621/22 - Stabilizer 2 - Reflux Pump A&B

Elevated Structures
Structur
Wall
102C0323010
Install Walls for 40-XF82350/51 Transformer Retaining Wall *[LER]
Pre-Cast Concrete
Concret Structures
Catch Basins & Manholes
102C0331011
Install Catch Basins & Manholes - Area 102 (CB=15; MH=6)

11

11

04-Feb-13

15-Feb-13

17

17

10

Backfill Required

10

12

03-Oct-12 A

15-Feb-13

-62

73

After LER Wall completed

25
25
25

25
25
25

11-Mar-13
11-Mar-13
11-Mar-13

06-Apr-13
06-Apr-13
06-Apr-13

0
0
0

0
0
0

-58
-58
-58

111
111
111

On Progress, Completion in line to U/G DO Piping

59
59
60

22
22
22

19-Nov-12 A
19-Nov-12 A
19-Nov-12 A

26-Feb-13
26-Feb-13
26-Feb-13

0
0
0

0
0
0

-30
-30
-30

142
142
142

211
211
211

211
211
211

07-Jan-13 A
07-Jan-13 A
07-Jan-13 A

18-Sep-13
18-Sep-13
18-Sep-13

228
228
228

202
202
202

135
135
135

86
86
86

73
11
11
11

73
11
11
11

13-Feb-13
04-Mar-13
04-Mar-13
04-Mar-13

02-May-13
15-Mar-13
15-Mar-13
15-Mar-13

18
0
0
0

17
0
0
0

-3
2
2
2

209
253
253
253

73
73
11

73
73
11

13-Feb-13
13-Feb-13
13-Feb-13

02-May-13
02-May-13
24-Feb-13

23
23
45

17
17
45

-3
-3
23

114
114
104

Grouting
Grout - Non Shrink
Shr
102C0373011
Grouting Non-Shrink [LoE]
Structural
Miscellaneous Steel
Ste & Platforms
Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
102C0542012
Misc. Steels (gratings etc.) for Subrack 1C

Material Received and Shakeout

Major Structures
Major Structures
102C0531011
Erection of Platform for 40-MBD62311/12 - Liquid Inlet Separators 1&2
102C0531013

Erection of Platform A for 40-MBD62601 - Stabilizer Feed Surge Drum

102C0531012

Erection of Platform for 40-MBD62630 & 40-HBG62630 - Stabilizer Overhead Knockout Vessel

102C0531019

Erection of Steel Shelter & Pump Valve Platform - PAX64301/302/303 - Condensate Pipeline Pump A,B&C

102C0531016

Erection of Structure No. 1 for 40-MBD62610/40-HBC62610/40-HFF62610

Mechanical
Rotating Equipments
Equipme
Pumps & Drivers
Drive
102C1131003
Installation of [40-PBA62611] Stabilizer #1 Reflux Pump A
102C1131004

Installation of [40-PBA62612] Stabilizer #1 Reflux Pump B

24-Feb-13

06-Mar-13

34

34

31

104

11

11

06-Mar-13

18-Mar-13

103

50

50

24-Feb-13

18-Apr-13

30

30

-25

127

Material ETA ??

50

50

09-Mar-13

02-May-13

-3

54

Onsite

35
13
13
9

35
13
13
9

22-Feb-13
09-Mar-13
09-Mar-13
09-Mar-13

31-Mar-13
23-Mar-13
23-Mar-13
19-Mar-13

-13
75
75
75

68
75
75
75

65
73
73
73

210
217
217
217

Material Received and Shakeout

Onsite

14-Mar-13

23-Mar-13

75

75

73

217

Verify rebar ETA ??

35
35
35

35
35
35

22-Feb-13
22-Feb-13
22-Feb-13

31-Mar-13
31-Mar-13
31-Mar-13

-13
-13
-13

-13
-13
-13

-13
-13
-13

188
188
188

All spool available on site base on shipment 1~15, On progress

356
219
219
219
114
3

273
194
194
194
128
32

02-Aug-12 A
09-Jan-13 A
14-Jan-13 A
14-Jan-13 A
14-Jan-13 A
14-Jan-13 A

23-Nov-13
31-Aug-13
31-Aug-13
31-Aug-13
21-Jun-13
09-Mar-13

0
0
0
0
0
0

0
14
10
10
-1
-1

0
0
0
0
0
0

68
140
61
61
41
59

102C1524060 Install Subrack 2" & Under LP Fuel Gas Distribution CS Piping [Sys 966-03]

6 spool available on site base on shipment 1~15, 13 spool is on shipment 17~19, 6 spool awaiting from ST

10

10

06-Mar-13

16-Mar-13

91

102C1524055 Install Subrack 2" & Under Utility Air Distribution CS Piping from Header [Sys 955-04]

6 spool available on site base on shipment 1~15, 5 spool awaiting from ST, On progress

101

23-Jan-13 A

23-May-13

-1

41

102C1523985 Install Subrack 2" & Under Nitrogen Distribution CS Piping from Header [Sys 961-01]

6 spool available on site base on shipment 1~15, 4 spool awaiting from ST, On progress

128

22-Jan-13 A

21-Jun-13

-1

41

185
2

194
2

16-Jan-13 A
26-Feb-13

31-Aug-13
28-Feb-13

0
181

10
181

0
114

61
203

Specialty Equipment
Equipm
Pig Launcher
102C1168010
Installation of [40-KGL64401] Condensate Pipeline Pig Launcher
Piping
Aboveground Piping
Pip
Subrack
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
102C1524355 Install Subrack 2" & Under Exp. Tank, Circ. Pmp & Trm Clr CS Ppng frm Stab. Clmn # 1 Rboiler to Ho Drn
Hdr [Sys 941-01]

A/G 2 1/2" to 12", CS Piping


102C1523450 Install Subrack 2 1/2" to 12" Fire Water Monitor & Deluge CS Piping to Stab. Feed Surge Drum [Sys 412-...
102C1523955 Install Subrack 2 1/2" to 12" Cond. Pump and Metering CS Piping from Cond. Metering Pig Launcher [Sys
626-07]

All spool available on site base on shipment 1~16

06-Mar-13

08-Mar-13

169

102C1523430 Install Subrack 2 1/2" to 12" Condensate Pump and Metering CS Piping from Pumps to Cond. Metering
[Sys 626-07]

All spool is on shipment 17~19

08-Mar-13

10-Mar-13

222

102C1523440 Install Subrack 2 1/2" to 12" Fire Water Monitor & Deluge CS Piping to Liquid Inlet Separator [Sys 412-05]

11 spool available on site base on shipment 1~15, 15 spool awaiting from ST

10

10

06-Mar-13

16-Mar-13

155

102C1523850 Install Subrack 2 1/2" to 12" Stabilizer Train no. 1 CS Piping frm Feed Surge Drum to Feed Exchanger [Sys New Entry 6 Week Lookahead
626-02]

17-Mar-13

23-Mar-13

91

102C1524505 Install Subrack 2 1/2" to 12" Stabilizer Train no. 1 CS Ppng frm Rndwn Cler to Slop/Condensate Tank [Sys
626-02]

8 spool available on site base on shipment 1~15, 3 spool is on country base on shipment 16, 6 spool is on
sea base on shipment 17~19, On progress

12

151

16-Jan-13 A

16-Jul-13

59

102C1524620 Install Subrack 2 1/2" to 12" Stabilizer Train no. 2 CS Ppng frm Rndown Cooler to Slop/Condansate Tank
[Sys 626-03]

12 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, On progress

13

194

24-Jan-13 A

31-Aug-13

-1

41

8 spool available on site base on shipment 1~15, 6 spool awaiting from ST

105
105
5

133
133
34

28-Jan-13 A
28-Jan-13 A
28-Jan-13 A

26-Jun-13
26-Jun-13
12-Mar-13

35
35
35

-1
-1
-1

0
0
0

81
81
176

133

29-Jan-13 A

26-Jun-13

133

-1

81

1
1
1
1

1
1
1
1

12-Mar-13
12-Mar-13
12-Mar-13
12-Mar-13

13-Mar-13
13-Mar-13
13-Mar-13
13-Mar-13

-1
-1
-1
-1

-1
-1
-1
-1

0
0
0
0

297
297
297
297

Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
102C1524040 Install Subrack 2" & Under Instrument Air Distribution SS Piping from Header [Sys 955-03]
102C1524005 Install Subrack 2" & Under Utility Water Distribution SS Piping [Sys 978-02]

All spool available on site base on shipment 1~15

Condensate Pig Launcher


Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
Interconnecting
Interconnect

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 15 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

102C1524015 Install Intercon 2" & Under Instrument Air Distribution SS Piping to HGCP Cond. Pipeline Pig Launcher
[Sys 955-03]
Condensate Pumps
Pu
Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
Interconnecting
Interconnect
102C152345 Install Interconnecting 2" & Under High Pressure Flare Line SS Piping from Condensate Metering [Sys 6...
Stabiliser no. 1 Rundown Cooler
Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
Interconnecting
Interconnect
102C1523340 Install Interconnecting 2" & Under High Pressure Flare Line SS Piping from Stabiliser Rundown Coolers
[Sys 612-02]
Stabiliser no. 1
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
102C152366 Install Interconnecting 2" & Under Close Drain Header CS Piping from Stabiliser Column # 1 [Sys 612-04]
102C1523670 Install Interconnecting 2" & Under LP Fuel Gas Distribution CS Piping to Stabiliser Column # 1 Reboiler
[Sys 966-03]

OD

Stabiliser no. 2
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
102C1523720 Install Interconnecting 2" & Under LP Fuel Gas Distribution CS Piping to Stabiliser Column # 2 Reboiler
[Sys 966-03]
Liquid Inlet Separator
Sep
no. 1
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
102C152352 Install Interconnecting 2" & Under Close Drain Header CS Piping from Liquid Inlet Separator [Sys 612-04]
102C152344 Install Intercon 2" & Under Fire Water Monitor & Deluge CS Piping to Liquid Inlet Separator [Sys 412-05]

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

New Entry 6 Week Lookahead

12-Mar-13

13-Mar-13

-1

-1

297

New Entry 6 Week Lookahead

2
2
2
2
2

2
2
2
2
2

17-Mar-13
17-Mar-13
17-Mar-13
17-Mar-13
17-Mar-13

19-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13
19-Mar-13

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

163
163
163
163
163

2 spool available on site base on shipment 1~15, 3 spool is on shipment 17~19

1
1
1
1
1

1
1
1
1
1

06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13

07-Mar-13
07-Mar-13
07-Mar-13
07-Mar-13
07-Mar-13

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

163
163
163
163
163

149
149
50
50
3

138
138
44
44
3

15-Jan-13 A
15-Jan-13 A
30-Jan-13 A
30-Jan-13 A
06-Mar-13

02-Jul-13
02-Jul-13
22-Mar-13
22-Mar-13
09-Mar-13

0
0
33
33
0

1
1
-1
-1
0

0
0
0
0
0

166
166
260
260
164

44

30-Jan-13 A

22-Mar-13

47

-1

260

10
10
10

138
138
138

15-Jan-13 A
15-Jan-13 A
15-Jan-13 A

02-Jul-13
02-Jul-13
02-Jul-13

0
0
0

1
1
1

0
0
0

104
104
104

All spool available on site base on shipment 1~15

2
2
2
2

2
2
2
2

06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13

08-Mar-13
08-Mar-13
08-Mar-13
08-Mar-13

0
0
0
0

0
0
0
0

0
0
0
0

185
185
185
185

All spool available on site base on shipment 1~15, On progress

1
1
1
1
1

125
125
125
125
125

23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A

18-Jun-13
18-Jun-13
18-Jun-13
18-Jun-13
18-Jun-13

0
0
0
0
0

-1
-1
-1
-1
-1

0
0
0
0
0

179
179
179
179
179

3 spool available on site base on shipment 1~15, 3 spool awaiting from ST

15
15
15
15
1

15
15
15
15
1

06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13

22-Mar-13
22-Mar-13
22-Mar-13
22-Mar-13
07-Mar-13

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

176
176
176
176
190

9 spool is on shipment 17~19, 6 spool awaiting from ST


All spool available on site base on shipment 1~15

A/G 2 1/2" to 12", CS Piping


Interconnecting
Interconnect
102C1523820 Install Intercon 2 1/2" to 12" Stabilizer Train no. 1 CS Piping frm Feed Surge Drum to Feed Exchanger [Sys 14 spool available on site base on shipment 1~15, 7 spool awaiting from Sino-Thai, On progress
626-02]
Stainless Steel
Stee Piping
A/G 2 1/2" to 12", SS Piping
Interconnecting
Interconnect
102C1523770 Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping from Stabiliser Column # 1 [Sys
612-02]

RD

17-Mar-13

22-Mar-13

155

Stabiliser Feed Surge Drum


Carbon Steel P
Piping
A/G 2 1/2" to 12", CS Piping
Interconnecting
Interconnect
102C152415 Install Intercon 2 1/2" to 12" Fire Water Monitor & Deluge CS Piping to Stab. Feed Surge Drum [Sys 412-...

93
4
4
4
4

100
4
4
4
4

24-Jan-13 A
28-Feb-13
28-Feb-13
28-Feb-13
28-Feb-13

22-May-13
04-Mar-13
04-Mar-13
04-Mar-13
04-Mar-13

0
181
181
181
181

108
181
181
181
181

41
114
114
114
114

130
203
203
203
203

Stainless Steel
Stee Piping
A/G 2 1/2" to 12", SS Piping
Interconnecting
Interconnect
102C1523610 Install Intercon 2 1/2" to 12" Stab. Fd Srg Drm SS Piping from Stab. Reflux Accum. to Comp. Inlt Scrbber
[Sys 626-01]

All spool available on site base on shipment 1~15, On progress

37
37
37
11

100
100
100
91

24-Jan-13 A
24-Jan-13 A
24-Jan-13 A
24-Jan-13 A

22-May-13
22-May-13
22-May-13
12-May-13

0
0
0
0

16
16
16
-1

16
16
16
0

125
125
125
134

17 spool available on site base on shipment 1~15, 2 spool awaiting from ST

11

100

28-Jan-13 A

22-May-13

111

16

16

81

2 spool available on site base on shipment 1~15, 9 spool awaiting from ST

82
2
2
2
2

111
2
2
2
2

16-Jan-13 A
06-Mar-13
06-Mar-13
06-Mar-13
06-Mar-13

03-Jun-13
08-Mar-13
08-Mar-13
08-Mar-13
08-Mar-13

0
0
0
0
0

-1
0
0
0
0

0
0
0
0
0

223
148
148
148
148

New Entry 6 Week Lookahead

81
76
76
2

111
111
111
2

16-Jan-13 A
16-Jan-13 A
16-Jan-13 A
13-Mar-13

03-Jun-13
03-Jun-13
03-Jun-13
15-Mar-13

0
0
0
-1

-1
-1
-1
-1

0
0
0
0

223
223
223
297

111

16-Jan-13 A

03-Jun-13

-1

109

9
9

9
9

07-Mar-13
07-Mar-13

16-Mar-13
16-Mar-13

0
0

0
0

0
0

163
163

102C1523800 Install Intercon 2 1/2" to 12" Stab. Fd Srg Drm SS Ppng frm Cond Mtrng Disch Man. to Lqd Stab. Fd Hdr
[Sys 626-01]
DPCU Heater & Liquid Separator
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
102C152368 Install Interconnecting 2" & Under High Pressure Flare Line CS Piping from DPCU Heater [Sys 612-02]
Stainless Steel
Stee Piping
A/G 2" and Under,
Un
SS Piping
Interconnecting
Interconnect
102C152431 Install Interconnecting 2" & Under Instrument Air Distribution SS Piping to DPCU Heater [Sys 955-03]

New Entry 6 Week Lookahead

102C152427 Install Interconnecting 2" & Under Close Drain Header SS Piping from DPCU Liquid Separator [Sys 612-... All spool available on site base on shipment 1~15, On progress
A/G 2 1/2" to 12", SS Piping
Interconnecting
Interconnect

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 16 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

102C1523345 Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping from DPCU Liquid Separator [Sys
612-02]

10 spool available on site base on shipment 1~15, 2 spool awaiting from ST

102C152341 Install Interconnecting 2 1/2" to 12" High Pressure Flare Line SS Piping from DPCU Heater [Sys 612-02]

New Entry 6 Week Lookahead

Utility Services
Carbon Steel P
Piping
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
102C1524280 Install Interconnecting 2" & Under Open Drain - Area 102 CS Piping [Sys 998-04]
102C152356 Install Interconnecting 2" & Under Open Drain - Area 102 CS Piping Vent Line [Sys 998-04]
Underground Piping
Pipi
Plastic Pipe Installation
Ins
102C2522585
Install HDPE Area 102 Firewater Distribution Pipework [Sys 412-07]

71 spool available on site base on shipment 1~15, 4 spool is on sea base on shipment 17~19, 72 spool
awaiting from Sino-Thai, On progress
All spool available on site base on shipment 1~15, On progress

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

07-Mar-13

10-Mar-13

163

11-Mar-13

16-Mar-13

163

60
60
60
60
30

140
140
140
140
136

09-Jan-13 A
09-Jan-13 A
09-Jan-13 A
09-Jan-13 A
09-Jan-13 A

04-Jul-13
04-Jul-13
04-Jul-13
04-Jul-13
29-Jun-13

0
0
0
0
0

-1
-1
-1
-1
-1

0
0
0
0
0

81
81
81
81
34

140

09-Jan-13 A

04-Jul-13

-1

21
21
21

02-Aug-12 A
02-Aug-12 A
02-Aug-12 A

26-Feb-13
26-Feb-13
26-Feb-13

0
0
0

1
1
1

-29
-29
-51

81

On progress

113
113
26

102C2522740

Install HDPE Area 102 Open Drain Pipework [Sys 998-04]

On Progress, Completion in line to Catch Basin

67

21

13-Aug-12 A

26-Feb-13

-29

34

102C2522745

Install HDPE Area 102 Liquids Deluge System #2 & #3 Pipework [Sys 412-05]

Progressing

31

21

05-Nov-12 A

26-Feb-13

-50

229

244
244
244

244
244
244

06-Mar-13
06-Mar-13
06-Mar-13

23-Nov-13
23-Nov-13
23-Nov-13

0
0
0

0
0
0

0
0
0

56
56
56

7
7
7
7

7
7
7
7

15-Mar-13
15-Mar-13
15-Mar-13
15-Mar-13

22-Mar-13
22-Mar-13
22-Mar-13
22-Mar-13

-1
-1
-1
-1

-1
-1
-1
-1

0
0
0
0

297
297
297
297

79
79
29
29

36
36
12
12

27-Jul-12 A
27-Jul-12 A
04-Jan-13 A
04-Jan-13 A

14-Mar-13
14-Mar-13
15-Feb-13
15-Feb-13

0
0
0
0

0
0
0
0

-2
-2
-2
-2

306
306
230
230

79
68

36
11

27-Jul-12 A
27-Jul-12 A

14-Mar-13
14-Feb-13

0
0

0
0

-2
-43

306
230

Special Labor Items


Item
Stress Relieving
102C1572010
Stress Relieving [LoE]
Testing/Cleaning
Pressure Test
Above Ground
102C1524305 Pressure Test Area 102 Instrument Air Distribution Pipework [Sys 955-03]

New Entry 6 Week Lookahead

Electrical
Underground Electrical
Elec
Conduit
102C1613010
Install Conduit Below Ground
Grounding
102C1611010
102C1611020

Grounding UG [2,718]

Pending Material (Cad Weld) Delivery

Grounding AG

After cable trays install

24

24

16-Feb-13

14-Mar-13

-2

306

374

186

09-Jul-12 A

22-Aug-13

209

Initial backfill on comple foundation, In line with completion of foundations in A103

40
40
40
40

49
49
49
49

22-Dec-12 A
22-Dec-12 A
22-Dec-12 A
22-Dec-12 A

27-Mar-13
27-Mar-13
27-Mar-13
27-Mar-13

0
0
0
0

0
0
0
0

7
7
7
7

346
346
346
346

86
37
0

27-Dec-12 A
03-Jan-13 A

Construction progressing

100
53
0

07-May-13
15-Mar-13
15-Mar-13

0
0
-4

5
-4
-4

-4
-14
-22

309
358
358

Reinforcing Steel Installation Ongoing

45
12

31
6

03-Jan-13 A
23-Jan-13 A

09-Mar-13
09-Feb-13

0
0

-1
-1

-45
-20

254
276

103 DRYERS
Civil & Earthworks
Excavation & Backfill
Bac
Backfilling Area 103
103C0235011
Backfill to -0.6m - Area 103
Concrete
Equipment & Structural
Stru
Foundations
103C03100FM
Finish Foundations Area 103
Equipment/Structural Foundations less than 4m3
Equipment/Stru
103C0311038
Foundation for Misc Pipe supports near 40-HBG66312

229
229
34

103C0311043

Foundation for Misc Pipe supports near 40-HBG66322

Reinforcing Steel Installation Ongoing

12

23-Jan-13 A

09-Feb-13

-1

-34

276

103C0311048

Foundation for Misc Pipe supports near 40-HBG66332

Reinforcing Steel Installation Ongoing

12

23-Jan-13 A

09-Feb-13

-1

-20

276

103C0311033

Foundations for Miscellaneous Platform & Pipe Support around 40-KGL65201

Excavation and Road Diversion Required

12

12

03-Jan-13 A

15-Feb-13

-7

-29

274

103C0311085

Foundation for Misc. Supports at area 103

Confirm Rebar Material Status ETA ??

13

13

04-Feb-13

17-Feb-13

-1

-1

-44

238

103C0311023

Foundations for Platform for 40-KGL65201 - Gas Pipe Pig Launcher

Excavation and Road Diversion Required

25

25

04-Feb-13

01-Mar-13

-7

-7

-44

113

103C0311053

Foundation for Misc. Vent pipe supports at area 103

Confirm Material Status

19

19

17-Feb-13

09-Mar-13

-1

-1

-69

238

Equipment/Structural Foundations 4~23m3


Equipment/Stru
103C0311058
Foundations for 40-KGL65201 - Gas Pipe Pig Launcher - ORG EPC5a Scope

Forms, rebars, embeds progressing

15
15

15
15

31-Jan-13 A
31-Jan-13 A

19-Feb-13
19-Feb-13

22
22

18
18

0
0

380
380

Equipment/Structural Foundations over 23m3


Equipment/Stru
103C0313016
Foundation for 40-LER81152 - Condensate Stabilization HV VFD Switchroom

Base Foundation Poured Plinth Installation Ongoing

25
21

24
24

15-Jan-13 A
15-Jan-13 A

28-Feb-13
28-Feb-13

0
0

0
0

-1
-22

162
142

Base Foundation Poured Plinth Installation Ongoing

21

24

18-Jan-13 A

28-Feb-13

-1

162

DB#6 Done, DB#26 Remaining

35
35
30

24
24
24

27-Dec-12 A
27-Dec-12 A
27-Dec-12 A

28-Feb-13
28-Feb-13
28-Feb-13

0
0
0

0
0
-25

29
29
29

258
258
142

Onhold clash with Sewer Line

30

24

18-Jan-13 A

28-Feb-13

29

258

Completion in line to U/G Open Drain Piping

17
17
17

17
17
17

25-Feb-13
25-Feb-13
25-Feb-13

15-Mar-13
15-Mar-13
15-Mar-13

1
1
1

1
1
1

-51
-51
-51

264
264
264

66
66
66

66
66
66

25-Feb-13
25-Feb-13
25-Feb-13

07-May-13
07-May-13
07-May-13

5
5
5

5
5
5

-4
-4
-4

298
298
298

32
29
29

32
29
29

13-Feb-13
13-Feb-13
13-Feb-13

20-Mar-13
16-Mar-13
16-Mar-13

5
5
5

5
5
5

0
0
0

217
220
220

103C0313017

Foundation for 40-LER81153 - Condensate Stabilization HV Switchroom

Concrete for Below


Belo Grade Structures
Duct Banks
103C0342011
Install Electrical Duct Banks DB#6, DB#26
103C0342012

Install Instrument Duct Banks DB#5B

Pre-Cast Concrete
Concret Structures
Catch Basins & Manholes
103C0331011
Install Catch Basins & Manholes - Area 103 (CB=7; MH=3)
Grouting
Grout - Non Shrink
Shr
103C0373011
Grouting Non-Shrink
Structural
Pipe Rack Steel
Pipe Rack Steel

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 17 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

103C0521011

Erection of Subrack 1D

Material received & Shakeout, Backfill required

13-Feb-13

21-Feb-13

169

103C0521013

Erection of Subrack 1E

Material received & Shakeout, Backfill required

25-Feb-13

04-Mar-13

231

103C0521012

Erection of Subrack 1F

Material received & Shakeout, Backfill required

08-Mar-13

16-Mar-13

147

32
32
11

13-Feb-13
13-Feb-13
13-Feb-13

20-Mar-13
20-Mar-13
25-Feb-13

5
5
5

5
5
5

0
0
0

144
144
144

Major Structures
Major Structures
103C0531011
Erection of Platform for 40-MBD66310 - Low Temperature Separator 1

Material received & Shakeout

32
32
11

103C0531013

Erection of Platform for 40-MBD66320 - Low Temperature Separator 2

Material received & Shakeout

11

11

25-Feb-13

08-Mar-13

144

103C0531012

Erection of Platform for 40-MBD66330 - Low Temperature Separator 3

Material received & Shakeout

11

11

08-Mar-13

20-Mar-13

144

All spool available on site base on shipment 1~15, On progress

336
2
2
2
2
2
2

186
186
186
186
186
186
186

09-Jul-12 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A

22-Aug-13
22-Aug-13
22-Aug-13
22-Aug-13
22-Aug-13
22-Aug-13
22-Aug-13

0
0
0
0
0
0
0

2
2
2
2
2
2
2

0
0
0
0
0
0
0

114
114
114
114
114
114
114

Progressing

185
185
58

37
37
27

09-Jul-12 A
09-Jul-12 A
09-Jul-12 A

15-Mar-13
15-Mar-13
04-Mar-13

0
0
0

1
1
-6

-51
-51
-41

114
114
114

On progress, Completion in line to Catch Basin

40

37

15-Aug-12 A

15-Mar-13

-51

114

Pending Material (Cad Weld) Delivery, C-Crimps in lieu of Cad Welds

47
47
47
47

11
11
11
11

22-Aug-12 A
22-Aug-12 A
22-Aug-12 A
22-Aug-12 A

14-Feb-13
14-Feb-13
14-Feb-13
14-Feb-13

0
0
0
0

0
0
0
0

-43
-43
-43
-43

247
247
247
247

223

134

14-Aug-12 A

27-Jun-13

81

639

154
154
154
43

108
108
108
43

29-Sep-12 A
29-Sep-12 A
29-Sep-12 A
29-Sep-12 A

30-May-13
30-May-13
30-May-13
21-Mar-13

0
0
0
0

0
0
0
0

107
107
107
0

327
327
327
196

Piping
Aboveground Piping
Pip
Utility Services
Carbon Steel
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnect
103C152158 Install 2" & Under Vent CS Piping [Sys 998-04]
Underground Piping
Pipi
Plastic Pipe Installation
Ins
103C2522575
Install HDPE Area 103 Firewater Distribution Pipework [Sys 412-07]
103C2522730

Install HDPE Area 103 Open Drain Pipework [Sys 998-04]

Electrical
Underground Electrical
Elec
Grounding
103C1611010
Grounding UG [1,359]

300 GAS METERING


METER
& MEG STORAGE
Civil & Earthworks
Excavation & Backfill
Bac
Backfilling Area 300
300C0235011
Backfill to -0.6m - Area 300
300C0235012

Backfill to Final Grade - Area 300

Initial backfill on progress around completed foundations


Progressing

Concrete
Equipment & Structural
Stru
Foundations
300C03100FM
Finish Foundations Area 300

20

108

17-Jan-13 A

30-May-13

107

327

126
70
0

52
29
0

20-Nov-12 A
20-Nov-12 A

30-Mar-13
06-Mar-13
28-Feb-13

0
0
20

0
14
20

-9
14
-42

721
744
750

Equipment/Structural Foundations over 23m3


Equipment/Stru
300C0313035
Foundation for 40-VHFG96610/20 : Fuel Gas Metering Skid A,B

Skid A done, Skid B progressing

26
27

8
8

20-Nov-12 A
20-Nov-12 A

11-Feb-13
11-Feb-13

0
0

-7
-7

-27
-27

104
104

Equipment/Structural Foundations less than 4m3


Equipment/Stru
300C0311036
Foundation for Platform for 40-VHFG96610/20 : Fuel Gas Skid A&B

Blinded, Rebars / Forms progressing for Plinths

66
12

29
4

21-Nov-12 A
23-Nov-12 A

06-Mar-13
07-Feb-13

0
0

14
-7

14
-9

246
104

300C0311046

Foundation for PSV Platform near Analyzer Shelter

Awaiting access, Backfilling

10

11

27-Dec-12 A

14-Feb-13

-7

20

252

300C0311014

Foundation for Shelter for 40-VPBE67410/310 : Reverse Demulsifier/Scale Inhibitor Injection Package

Blinded, Rebar received, Base forms & rebars progressing

16

12

21-Nov-12 A

15-Feb-13

-7

-36

94

300C0311013

Foundation for 40-VPBE67410/310 : Reverse Demulsifier/Scale Inhibitor Injection Package

Blinded, Rebar received, Base forms & rebars progressing

10

12

21-Nov-12 A

15-Feb-13

-7

-36

94

300C0311043

Foundation for Misc. Supports south of 40-VHFG96610/20 Fuel Gas Skid A&B

Blinded, Rebars received

12

12

08-Feb-13

21-Feb-13

-7

-7

-2

104

300C0311053

Foundation for Misc Pipe Supports at Area 300 * [On Paving]

12

12

15-Feb-13

28-Feb-13

20

20

20

252

300C0311058

Foundation for Misc. Vent pipe supports at area 300

12

12

15-Feb-13

28-Feb-13

20

20

20

252

300C0311033

Foundation for Structure/Shelter for 40-VKAU65210 : Gas Metering

Blinded, Foundation/Plinths/Shelter on Paving, Rebar ETA 31.JAN

19

24

24-Nov-12 A

28-Feb-13

-29

151

300C0311048

Foundation for Misc Pipe supports West of 40-VPBE68110 PWT Skid

Blinded, Rebars received

17

17

16-Feb-13

06-Mar-13

-7

-7

-44

246

On progress, Completion in line to DO U/G Piping, 8 Nos. Outstanding

48
48
48

52
52
52

03-Jan-13 A
03-Jan-13 A
03-Jan-13 A

30-Mar-13
30-Mar-13
30-Mar-13

0
0
0

0
0
0

-51
-51
-51

144
144
144

17
17
17

17
17
17

11-Feb-13
11-Feb-13
11-Feb-13

28-Feb-13
28-Feb-13
28-Feb-13

0
0
0

0
0
0

-22
-22
-22

226
226
226

Steel material received and Shakeout, Backfill required

64
17
17
14

64
17
17
14

04-Feb-13
04-Feb-13
04-Feb-13
04-Feb-13

12-Apr-13
22-Feb-13
22-Feb-13
19-Feb-13

-5
-5
-5
-5

0
-5
-5
-5

-8
-6
-6
-6

227
103
103
74

Steel material received and Shakeout, Backfill required

12

12

09-Feb-13

22-Feb-13

-5

-5

-6

103

49
49
7

19-Feb-13
19-Feb-13
19-Feb-13

12-Apr-13
12-Apr-13
26-Feb-13

-5
-5
-5

0
0
-5

-8
-8
-6

151
151
74
103

Pre-Cast Concrete
Concret Structures
Catch Basins & Manholes
300C0331011
Install Catch Basins & Manholes - Area 300 (CB=3; MH=6)
Utility Concrete
Area Paving
300C0311032

Slab For Analyzer Shelter * South of GAS Metering

Structural
Pipe Rack Steel
Pipe Rack Steel
300C0521011
Erection of Subrack 3C
300C0521012

Erection of Subrack 3A

Major Structures
Major Structures
300C0531022
Erection of Platform near 40-MBM68110 & 40-VPBE68110

Steel material received and Shakeout

49
49
7

300C0531014

Erection of Platform near 40-VHFG96610/20 : Fuel Gas Skid A,B

Steel material received and Shakeout

11

11

22-Feb-13

06-Mar-13

-5

-5

-6

300C0531015

Erection of Platform for 40-MBM68110 : Produced Water Skimmer/Degasser

Steel material received and Shakeout

11

11

26-Feb-13

09-Mar-13

-5

-5

-6

74

300C0531037

Erection of Subrack 3A PSV Platform

Steel material received and Shakeout

06-Mar-13

13-Mar-13

-5

-5

-6

105

300C0531042

Erection of Shelter for 40-VPBE67410/310 : Reverse Demulsifier/Scale Inhibitor Injection Package

Verify Steel Status, ETA ??

09-Mar-13

17-Mar-13

-5

-5

-6

74

300C0531016

Erection of Platform for 40-MBA67101 : MEG Flash Drum

Steel material received and Shakeout

11

11

17-Mar-13

29-Mar-13

-5

-5

-6

74

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 18 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

300C0531012

Comment

Erection of Structure/Shelter for 40-VKAU65210 Gas Metering

Misc. Steel & Platforms


Plat
Miscellaneous S
Steel
300C0541046
Install Miscellaneous Pipe Support on 40-VHFG96610/620 Fuel Gas Skid A/B

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

Steel material received and Shakeout

40

40

01-Mar-13

12-Apr-13

-8

151

14
14
5

06-Mar-13
06-Mar-13
06-Mar-13

21-Mar-13
21-Mar-13
11-Mar-13

-5
-5
-5

-5
-5
-5

7
7
16

249
103
112

Steel material received and Shakeout

14
14
5

300C0541041

Install Misc Platforms Around Fuel Gas Skids A/B

Steel material received and Shakeout

06-Mar-13

13-Mar-13

-5

-5

103

300C0541036

Install Miscellaneous Pipe Support Near Fuel Gas Skids A/B * [On Paving]

Verify Steel Status, ETA ??

13-Mar-13

19-Mar-13

-5

-5

-6

105

300C0541026

Install IBC Stand At Reverse Delmulsifier Injection Shelter

Steel material received and Shakeout

13-Mar-13

21-Mar-13

-5

-5

103

Verify Steel Status, ETA ??

5
5

5
5

13-Mar-13
13-Mar-13

19-Mar-13
19-Mar-13

-5
-5

-5
-5

2
2

250
250

206
54
54
54
54
1

134
134
134
134
134
82

14-Aug-12 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A

27-Jun-13
27-Jun-13
27-Jun-13
27-Jun-13
27-Jun-13
02-May-13

0
0
0
0
0
0

1
1
1
1
1
2

0
0
0
0
0
0

152
152
152
152
152
188

All spool available on site base on shipment 1~15, On progress

134

10-Jan-13 A

27-Jun-13

152

On progress, Completion in line to Catch Basin

22
22
22

50
50
50

14-Aug-12 A
14-Aug-12 A
14-Aug-12 A

29-Mar-13
29-Mar-13
29-Mar-13

0
0
0

1
1
1

-49
-49
-49

144
144
144

2 TP Remaining

10
10
10
10

48
48
48
48

10-Jan-13 A
10-Jan-13 A
10-Jan-13 A
10-Jan-13 A

27-Mar-13
27-Mar-13
27-Mar-13
27-Mar-13

0
0
0
0

1
1
1
1

-75
-75
-75
-75

231
231
231
231

Progressing

130
130
58
58

43
43
14
14

13-Sep-12 A
13-Sep-12 A
11-Jan-13 A
11-Jan-13 A

22-Mar-13
22-Mar-13
18-Feb-13
18-Feb-13

0
0
0
0

55
55
55
55

159
159
22
22

297
297
297
297

Pending Material (Cad Weld) Delivery, C-Crimps in lieu of Cad Welds

130
40

43
11

13-Sep-12 A
13-Sep-12 A

22-Mar-13
14-Feb-13

0
0

55
0

159
-41

297
292

Grating/Floor P
Plate/ Ladders/Cages/ Handrails & Stair Treads
300C0542013
Misc. Steels (gratings etc.) for 40-VHFG96610/20 : Fuel Gas Skid A&B Platform
Piping
Aboveground Piping
Pip
Carbon Steel Piping
P
A/G 2 1/2" to 12",
1
CS Piping
Interconnecting
Interconnecti
300C2522720 Install Interconnecting 2 1/2" to 12" Open Drain - Area 300 [Sys 998-03]
300C1522595 Install Interconnecting 2 1/2" to 12" Vent Open Drain - Area 300 [Sys 998-03]
Underground Piping
Pipi
Plastic Pipe Installation
Ins
300C2522715
Install HDPE Area 300 Open Drain Pipework [Sys 998-03]
Testing/Cleaning
Pressure Test
Under Ground
300C1581010

U/G HDPE Area 300 Fire Water Distribution Piping Hydrotest [SYS 412-07]

Electrical
Underground Electrical
Elec
Conduit
300C1613010
Install Conduit Below Ground
Grounding
300C1611010
300C1611020

Grounding UG [2,350]

All spool available on site base on shipment 1~15, On progress

Grounding AG

24

24

24-Feb-13

22-Mar-13

55

55

159

297

411

212

30-Jun-12 A

19-Sep-13

545

Progressing

411
202
202
116

212
212
212
26

30-Jun-12 A
30-Sep-12 A
30-Sep-12 A
30-Sep-12 A

19-Sep-13
19-Sep-13
19-Sep-13
02-Mar-13

0
0
0
0

0
0
0
0

0
0
0
-1

120
120
120
120

Progressing portion of Subrack 7C

64

212

10-Jan-13 A

19-Sep-13

120

45
45
45

30
30
30

30-Jun-12 A
30-Jun-12 A
30-Jun-12 A

07-Mar-13
07-Mar-13
07-Mar-13

0
0
0

-1
-1
-1

-68
-68
-68

94
94
94

98
95
95
9

01-Sep-12 A
01-Sep-12 A
01-Sep-12 A
06-Nov-12 A

19-May-13
16-May-13
16-May-13
12-Feb-13

0
0
0
0

0
-21
-43
-85

11
-21
-53
-85

659
191
191
206

700 FLARE
Civil and Earthworks
Earthwo
Excavation & Backfill
Bac
Backfilling Area 700
700C0235011
Backfill to -0.6m - Area 700
700C0235012

Backfill to Final Grade - Area 700

Piling - 289
Pile Cover Plates
Plate & Hooks
700C0251001
Install Pile Cover Plates & Hooks

ON HOLD Subrack 7C - Drive Way (Access road) From 400 to Flare will complete upon installation of Flare
Stack, 15 Piles outstanding

Progressing

285
242
242
15

700C0311023

Foundation for 40-NBA99110 : Closed Drain / LP Flare Drum****

Forecast Fin. 28 FEB

12

24

04-Dec-12 A

28-Feb-13

-70

76

700C0311024

Foundation for 40-NBA61201/02 : HP Flare K/O Drum 1&2****

K.O. Drum #2 done, #1 Base rebars / forms progressing

23

24

23-Oct-12 A

28-Feb-13

-69

76

700C0311021

Foundation for Subrack 7A

Lower Section done, 4 location outsatnding, Forecast Fin. 28 FEB

25

24

01-Sep-12 A

28-Feb-13

-69

48

700C0311026

Foundation for Miscellaneous Pipe Support for Flarelines

Forecast Fin. 28 FEB

15

24

05-Dec-12 A

28-Feb-13

-30

156

700C0311047

Foundation for Miscellaneous Platform & Pipe Support near 40-NBA61202 HP Flare KO Drum

Forecast Fin. 28 FEB

12

24

23-Oct-12 A

28-Feb-13

-65

152

700C0311072

Foundation for Area 700 > 300 Stairway**

Access required for Excavator, Rebars Pre-fabricate

10

10

23-Feb-13

05-Mar-13

-1

-1

-11

179

700C0311016

Foundation for Miscellaneous Pipe Supports near Subrack 7C

Rebars Pre-fabricated, Ready for blinding

13

13

23-Feb-13

08-Mar-13

-38

134

700C0311027

Foundation for Subrack 7C

Onhold, Completion cannot finish until Flare Stack done, Remaining foundation along the construction access
road, Access road Detour required.

21

17

06-Nov-12 A

13-Mar-13

-18

-55

76

700C0311032

Foundations for Piperack Crossover Area 700

ETA ??

12

12

09-Mar-13

21-Mar-13

-38

233

700C0311051

Foundation for crossover & access platform at Tank farm area

Rebar ETA ??

25

25

06-Mar-13

01-Apr-13

-1

-1

-11

179

700C0311056

Foundation for Misc. Vent pipe supports at area 700

Rebar ETA ??

25

25

06-Mar-13

01-Apr-13

-1

-1

-11

233

700C0311057

Concrete Sleeper Foundations at Tank Farm Area

Rebars/Forms pre-assembly done for Pre-cast to install after Bundwall install

14

15-Jan-13 A

02-May-13

-74

-75

174

700C0311062

Foundation for Monorail Support along Tankfarm*** [8 Nos.]

Plinths forms & rebars progressing, Ready for concrete

14

21

21-Jan-13 A

16-May-13

-74

-74

191

Equipment/Structural Foundations 4~23m3


Equipment/Stru
700C0312046
Foundation for 40-XAW61801 HP/LP Flare Stack Davit Winch**

Rebars done, Limited work area, Awaiting Erection of Flare Stack

10
10

30
30

05-Jan-13 A
05-Jan-13 A

07-Mar-13
07-Mar-13

0
0

0
0

-25
-25

76
76

Equipment/Structural Foundations over 23m3


Equipment/Stru
700C0313017
Foundation for Bundwall for Storage Tanks

After Hydrotesting of Tanks

37
37

37
37

15-Mar-13
15-Mar-13

24-Apr-13
24-Apr-13

0
0

0
0

0
0

75
75

16

18-Jan-13 A

09-Feb-13

266

Concrete
Equipment & Structural
Stru
Foundations
Equipment/Stru
Equipment/Structural
Foundations less than 4m3
700C0311043
Foundation for Shelter for 40-VPBE67510/50 : Oxygen Scavenging and Biocide Injection Package

Elevated Structures
Structur

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 19 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Walls
300C0323011

Comment

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

09-Feb-13
09-Feb-13

0
0

0
0

0
0

266
266

On Progress, Completion in line to U/G DO Piping, Excavated all CB's

60
60
60

52
52
52

23-Oct-12 A
23-Oct-12 A
23-Oct-12 A

31-Mar-13
31-Mar-13
31-Mar-13

0
0
0

0
0
0

-70
-70
-70

193
193
193

On the ROAD, Forecast Fin. 15.FEB

12
12
12

12
12
12

04-Feb-13
04-Feb-13
04-Feb-13

15-Feb-13
15-Feb-13
15-Feb-13

-6
-6
-6

0
0
0

1
1
1

745
745
320

On the ROAD, Forecast Fin. 15.FEB

12

12

04-Feb-13

15-Feb-13

-6

-25

745

Subrack 7B done, 7A partial

145
145
145

98
98
98

27-Dec-12 A
27-Dec-12 A
27-Dec-12 A

19-May-13
19-May-13
19-May-13

0
0
0

0
0
0

11
11
11

48
48
48

78
5
5
5

40
5
5
5

17-Dec-12 A
06-Mar-13
06-Mar-13
06-Mar-13

18-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13

0
-1
-1
-1

-8
-1
-1
-1

-18
-11
-11
-11

241
248
248
248

78
78
43

40
40
30

17-Dec-12 A
17-Dec-12 A
17-Dec-12 A

18-Mar-13
18-Mar-13
07-Mar-13

0
0
0

-10
-10
-32

-18
-18
-8

76
76
48

Major Steel materials in LAE

31

31

13-Feb-13

18-Mar-13

-10

-10

-60

76

Onsite

177
35
35
35

71
35
35
35

15-Nov-12 A
15-Mar-13
15-Mar-13
15-Mar-13

21-Apr-13
21-Apr-13
21-Apr-13
21-Apr-13

0
67
67
67

67
67
67
67

33
33
33
33

135
129
129
129

In Port Moresby

21
21
11

21
21
11

15-Feb-13
15-Feb-13
15-Feb-13

09-Mar-13
09-Mar-13
26-Feb-13

-16
-16
-16

-16
-16
-16

-26
-26
-26

160
160
157

In Port Moresby

11

11

26-Feb-13

09-Mar-13

-16

-16

-26

160

Section A&B welded, Awaiting 9% of Materials, ETA 28.FEB

77
77
77

30
30
30

15-Nov-12 A
15-Nov-12 A
15-Nov-12 A

07-Mar-13
07-Mar-13
07-Mar-13

0
0
0

0
0
0

-25
-25
-25

76
76
76

Installation of [40-MAJ68401] Water Injection Coarse Filter #1

Onsite

9
9
9

9
9
9

10-Mar-13
10-Mar-13
10-Mar-13

19-Mar-13
19-Mar-13
19-Mar-13

54
54
54

62
62
54

9
9
0

166
166
166

Installation of [40-MAJ68402] Water Injection Coarse Filter #2

Onsite

10-Mar-13

19-Mar-13

62

62

166

28
28
28
19

13-Nov-12 A
13-Nov-12 A
13-Nov-12 A
08-Dec-12 A

05-Mar-13
05-Mar-13
05-Mar-13
23-Feb-13

0
0
0
0

0
0
0
0

-21
-21
-21
-21

75
75
75
75
75

Install Instrument Duct Bank DB11, DB11A

Pipe Rack Steel


Pipe Rack Steel
700C0521011
Erection of Subrack 7A

Partial erection, Awaiting remaining foundation to complete 28.FEB

Erection of Subrack 7C

Mechanical
Shop Built Tanks/Vessels
Tanks/
Vessel
700C1111011
Installation of [40-NBA99110] Closed Drain/LP Flare Drum
Rotating Equipments
Equipme
Pumps
700C1131017
Installation of [40-PBE67211] Corrosion Inhibitor Injection Pump A
Installation of [40-PBE67212] Corrosion Inhibitor Injection Pump B

Heaters/Furnaces
Flare
700C1147002
Installation of [40-XAW61801] HP/LP Flare Stack

700C1153002

6Wk
Start
Vari...

18-Jan-13 A
18-Jan-13 A

Structural
Misc. Steel & Platforms
Plat
Miscellaneous S
Steel
700C0541023
Erection of Stairway From Area 300 to 700

Processing Units
Filter Vessel
700C1153001

Finish

6
6

Grouting
Grout - Non Shrink
Shr
700C0373011
Grouting Non Shrink

700C1131018

Start

16
16

Concrete for Below


Belo Grade Structures
Duct Banks
700C0342011
Install Electrical Duct Bank DB14, DB23

700C0521013

RD

Foundation done, Wall rebars & forms progressing

Install Pipe Culvert Walls

Pre-Cast Concrete
Concret Structures
Catch Basins, Manholes
M
& Valve Box
700C0331011
Install Catch Basins, Manholes & Valve box- Area 700 (CB=7; MH=3; VB=2)

700C0342016

OD

*To complete with Roofing

57
57
57
32

700C1321038

Erection of Roof Trusses & Plates Slop Condensate Storage Tank [40-ABJ96401]

*Awaiting replacement roof plate, ETA forecast 18.FEB from Thailand

11

19

13-Nov-12 A

23-Feb-13

-71

700C1321039

Hydrotest, Draining, Cleaning Slop Condensate Storage Tank [40-ABJ96401]

*Forecast Finish Early of March

24-Feb-13

05-Mar-13

-21

297
192
192
191
191
1

196
196
177
124
124
1

15-Oct-12 A
07-Jan-13 A
07-Jan-13 A
14-Jan-13 A
14-Jan-13 A
13-Feb-13

02-Sep-13
02-Sep-13
13-Aug-13
17-Jun-13
17-Jun-13
14-Feb-13

0
0
0
0
0
0

1
1
1
-1
-1
0

0
0
0
0
0
0

122
122
140
193
193
267

Site Erected Tanks


Ground Storage Tanks
T
[40-ABJ96401] Slop Condensate Storage Tank [18m dia. x 12.15m H]
700C1321035
Erection of Stairways, Nozzles and Uppertenances Slop Condensate Storage Tank [40-ABJ96401]

Piping
Aboveground Piping
Pip
Carbon Steel Piping
P
A/G 2" and Under,
Un
CS Piping
Interconnecting
Interconnecti
700C1523370 Install Intercon 2" and under LP Fuel Gas Distrib Header CS Piping from FG Header to Slop/Condensate
Pump [Sys 966-03]

All spool is on sea base on shipment 17~19

75

700C1523345 Install Intercon 2" and under LP Fuel Gas Distrib Header CS Ppng from FG Hdr to Wellpad MEG Injection
Pump [Sys 966-03]

New Entry 6 Week Lookahead

12-Mar-13

13-Mar-13

-26

167

700C1523705 Install Interconnecting 2" and under Nitrogen Distribution CS Piping Utility Station [Sys 961-01]

6 spool available on site base on shipment 1~15, 13 spool is on sea base on shipment 17~19, 12 spool
awaiting from Sino-Thai

08-Mar-13

14-Mar-13

-8

-8

-8

141

700C1523570 Install Intercon 2" and under Flare K.O. Drum & Stacks FG CS Ppng Spply frm Flare Ignation CP to Flr
Stck [Sys 612-01]

New Entry 6 Week Lookahead

47

47

13-Mar-13

02-May-13

-27

167

700C1523790 Install 2" and under Open Drain - Area 700 Vent CS Piping [Sys 998-03]

21 spool available on site base on shipment 1~15, 1 spool awaiting from Sino-Thai, On progress

A/G 2 1/2" to 12",


1
CS Piping
Subrack
700C1523695 Install Subrack 2 1/2" to 12" MEG Regen Pckg no. 1 CS Ppng frm Regen Pckg to DPCU LEAN MEG Strg
Tnk [Sys 661-02]

13 spool available on site base on shipment 1~15, 1 spool is on sea base on shipment 17~19, 10 spool
awaiting from ST

124

14-Jan-13 A

17-Jun-13

-1

193

183
120
25

177
177
33

07-Jan-13 A
17-Jan-13 A
25-Jan-13 A

13-Aug-13
13-Aug-13
11-Mar-13

0
0
0

1
1
-1

0
0
0

137
118
233

700C1523620 Install Subrack 2 1/2" to 12" Stabilizer Train no. 1 Rundown Cooler CS Piping to Slop/Condesate Tanks
[Sys 626-02]

10 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, On progress

11

116

17-Jan-13 A

08-Jun-13

-1

179

700C1523395 Install Subrack 2 1/2" to 12" PW Treatment SS Piping from PW Treatment Package to PW Buffer Tank
[Sys 681-01]

17 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, 20 spool
awaiting from Sino-Thai, On progress

27

177

17-Jan-13 A

13-Aug-13

48

183

121

07-Jan-13 A

13-Jun-13

-1

193

Interconnecting
Interconnecti

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 20 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

700C1523925 Install Intercon 2 1/2" to 12" DPCU LEAN MEG Strg and Dstrb CS Ppng frm Strge Tnk to HGCP MEG
Injctn Pmp [Sys 661-06]

3 spool available on site base on shipment 1~15, 18 spool is on sea base on shipment 17~19

700C1523785 Install 2 1/2" to 12" Open Drain - Area 700 Open Drain CS Piping [Sys 998-03]

16 spool available on site base on shipment 1~15, 1 spool awaiting from SIno-Thai, On progress

Stainless Steel Piping


A/G 2" and Under,
Un
SS Piping
Subrack
700C1523765 Install Subrack 2" and under Potable Water Distribution SS Piping [Sys 977-02]
Interconnecti
Interconnecting
700C1523770 Install Intercon 2" and under Safety Shower / Eye Wash Area 700 SS Piping to Safety Shower / Eye Wash
[Sys 977-04]

12 spool available on site base on shipment 1~15, 4 spool is on sea base on shipment 17~19, 8 spool
awaiting from Sino-Thai, On progress
17 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, 14 spool
awaiting from ST, On progress

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

10

10

12-Feb-13

22-Feb-13

112

121

07-Jan-13 A

13-Jun-13

-1

193

187
83
10
10

196
133
114
114

14-Jan-13 A
14-Jan-13 A
14-Jan-13 A
14-Jan-13 A

02-Sep-13
26-Jun-13
06-Jun-13
06-Jun-13

0
0
0
0

1
1
1
1

0
0
0
0

122
164
106
106

83
12

133
20

14-Jan-13 A
22-Jan-13 A

26-Jun-13
25-Feb-13

0
0

1
-1

0
0

164
277

700C1523365 Install Intercon 2" & Under PW Treatment SS Piping frm Water Injec Booster Pmp to Recycle Floatation
Cell [Sys 681-01]

16 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 17~19, 2 spool is on
shipment 20, 4 spool awaiting from Sino-Thai, On progress

20

14-Jan-13 A

25-Feb-13

-1

87

700C1523435 Install Intercon 2" & Under PW Treatment SS Piping from MEG Regen Package to Recycle Floatation Cell
[Sys 681-01]

All spool available on site base on shipment 1~15, On progress

13

133

15-Jan-13 A

26-Jun-13

87

187
174
21

196
196
38

15-Jan-13 A
15-Jan-13 A
29-Jan-13 A

02-Sep-13
02-Sep-13
17-Apr-13

0
0
28

1
1
-25

0
0
-25

122
122
201

18

196

15-Jan-13 A

02-Sep-13

122

9 spool available on site base on shipment 1~15, 7 spool awaiting from ST

117
8

149
8

16-Jan-13 A
13-Feb-13

13-Jul-13
21-Feb-13

0
21

1
21

0
-1

76
81

700C1523550 Install Interconnecting 2 1/2" to 12" Flare Knock Out Drum and Stacks Open Drain SS Piping [Sys 612-01]

3 spool available on site base on shipment 1~15, 2 spool awaiting from ST

21-Feb-13

23-Feb-13

21

21

-1

81

700C1523755 Install Intercon 2 1/2" to 12" Flare K.O. Drum and Stacks SS Piping Supply from DC/LP Flare Drum to
Pump [Sys 612-01]

8 spool available on site base on shipment 1~15, 3 spool is on sea base on shipment 17~19, 6 spool awaiting
from ST

23-Feb-13

03-Mar-13

21

21

-1

81

700C1523400 Install Intercon 2 1/2" to 12" PW Treatment SS Ppng frm PW Injec Bster Pumps to Water Injec Coarse
Filter [Sys 681-01]

9 spool available on site base on shipment 1~15, 21 spool awaiting from Sino-Thai, on progress

10

96

17-Jan-13 A

17-May-13

-1

78

700C1523405 Install Intercon 2 1/2" to 12" PW Treatment SS Piping from Water Injection Fine Filter to DO Oil Sump [Sys
681-01]

8 spool available on site base on shipment 1~15, 4 spool is on sea base on shipment 17~19, 4 spool awaiting
from Sino-Thai, On progress

10

106

17-Jan-13 A

28-May-13

-1

78

700C1523390 Install Intercon 2 1/2" to 12" PW Treatment SS Piping frm Water Injection Fne Fltr to Water Injection
Pumps [Sys 681-01]

7 spool available on site base on shipment 1~15, 1 spool is on sea base on shipment 17~19, 8 spool awaiting
from Sino-Thai, On progress

10

149

16-Jan-13 A

13-Jul-13

76

166
166
166

166
166
166

13-Feb-13
13-Feb-13
13-Feb-13

10-Aug-13
10-Aug-13
10-Aug-13

21
21
21

21
21
21

-1
-1
-1

76
76
76

64
64
39

50
50
50

15-Oct-12 A
15-Oct-12 A
17-Oct-12 A

29-Mar-13
29-Mar-13
29-Mar-13

0
0
0

1
1
1

-68
-68
-68

229
229
229

On Progress, Completion in line to Catch Basin

43

50

15-Oct-12 A

29-Mar-13

-68

193

Pending Material (Cad Weld) Delivery, C-Crimps in lieu of Cad Welds, Access required

125
125
125
60

77
77
77
37

12-Dec-12 A
12-Dec-12 A
12-Dec-12 A
12-Dec-12 A

26-Apr-13
26-Apr-13
26-Apr-13
14-Mar-13

0
0
0
0

4
-26
-26
-26

-14
-26
-26
-26

264
264
264
247

Pending Material (Tray) Delivery

40

40

15-Mar-13

26-Apr-13

-26

-26

-26

264

Materials Onsite

48
48
24

48
48
24

10-Feb-13
10-Feb-13
10-Feb-13

03-Apr-13
03-Apr-13
07-Mar-13

26
26
26

26
26
26

8
8
17

98
98
98

Materials Onsite

24

24

08-Mar-13

03-Apr-13

26

26

47
47
47
11

04-Feb-13
04-Feb-13
04-Feb-13
04-Feb-13

25-Mar-13
25-Mar-13
25-Mar-13
15-Feb-13

-7
-7
-7
-7

-7
-7
-7
-7

-68
-68
-68
-32

182
182
182
182

A/G 2 1/2" to 12",


1
SS Piping
Subrack
700C1523745 Install Subrack 2 1/2" to 12" Instrument Air Distribution SS Piping [Sys 955-03]
700C1523775 Install Subrack 2 1/2" to 12" Utility Water Distribution Header SS Piping [Sys 978-02]
Interconnecti
Interconnecting
700C1523545 Install Intercon 2 1/2" to 12" Flare K.O. Drum and Stacks SS Piping Supply from HP Flare K.O. Drums to
Pump [Sys 612-01]

A/G 14" and Above,


A
SS Piping
Subrack
700C1523555 Install Subrack 14" and above Flare Knock Out Drum and Stacks HP Flare SS Piping [Sys 612-01]
Underground Piping
Pipi
Plastic Pipe Installation
Ins
700C2522575
Install HDPE Area 700 Firewater Distribution Pipework [Sys 412-07]
700C2522730

Install HDPE Area 700 Open Drain Header #4 Pipework [Sys 998-03]

Electrical
Underground Electrical
Elec
Grounding
700C1611010
Grounding UG
700C1611015

Grounding AG

Aboveground Electrical
Ele
Cable Trays
700C1621010
Install Cable Trays Subrack 7A
700C1621030

Install Cable Trays Subrack 7C

9 spool available on site base on shipment 1~15, 27 spool is on sea base on shipment 17~19, 12 spool
awaiting from ST
13 spool available on site base on shipment 1~15, 2 spool is on sea base on shipment 17~19, 7 spool
awaiting from Sino-Thai, On progress

5 spool available on site base on shipment 1~15, 28 spool is on sea base on shipment 17~19, 15 spool is on
shipment 20, 2 spool awaiting from ST

On progress

98

*Equipments & Materials onsite ETA 18.JAN, Forecast Finish 31.JAN

47
47
47
11

700C0926035

Painting [40-ABJ96140] Lean MEG Storage Tank **

*Equipments & Materials onsite ETA 18.JAN, Forecast Finish 19.FEB

18

18

15-Feb-13

06-Mar-13

-7

-7

-50

182

700C0926015

Painting [40-ABJ68110] Produced Water Buffer Tank #1**

*Equipments & Materials onsite ETA 18.JAN, Forecast Finish 10.MAR

18

18

07-Mar-13

25-Mar-13

-7

-7

-82

182

126

94

05-Nov-12 A

15-May-13

-1

206

44
44
44
45

80
80
80
80

26-Nov-12 A
26-Nov-12 A
26-Nov-12 A
26-Nov-12 A

30-Apr-13
30-Apr-13
30-Apr-13
30-Apr-13

0
0
0
0

0
0
0
0

-95
-95
-95
-95

219
219
219
219

49
12
12
12

16
12
12
12

26-Dec-12 A
08-Feb-13
08-Feb-13
08-Feb-13

20-Feb-13
20-Feb-13
20-Feb-13
20-Feb-13

0
0
0
0

0
0
0
0

38
-19
-19
-19

261
261
261
261

Painting
Final/Touch Up Paint
P
Tanks & Vessel
700C0926030
Painting [40-ABJ67110] DPCU Lean MEG Storage Tank **

700 OPEN DRAIN TREATMENT/RETENTION POND


Civil & Earthworks
Ponds / Containment
Containm
Retention Ponds
700C0262010
Earthworks for 40-ABH99801: Retention Pond

Const. Schedule to be discuss with Site Engineer incharge

Concrete
Equipment & Structural
Stru
Foundations
Equipment/Stru
Equipment/Structural
Foundations less than 4m3
700C2312020
Foundation for Misc. steel at CPI Pad area

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 21 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

Concrete for Below


Belo Grade Structures
Basins, Sumps and Pits
700C0343010
Install [40-ABH99910] Open Drain First Flush Sump

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

30
30
30

4
4
4

26-Dec-12 A
26-Dec-12 A
26-Dec-12 A

07-Feb-13
07-Feb-13
07-Feb-13

0
0
0

0
0
0

50
50
50

219
219
219

Structural
Miscellaneous Steel
Ste & Platforms
Miscellaneous S
Steel
700C0541010
Install Steel Cover of 40-ABH99910: Open Drain Oil Sump

3
3
3
3

3
3
3
3

12-Mar-13
12-Mar-13
12-Mar-13
12-Mar-13

15-Mar-13
15-Mar-13
15-Mar-13
15-Mar-13

0
0
0
0

0
0
0
0

20
20
20
20

225
225
225
225

Mechanical
Shop Built Tanks/Vessels
Tanks/
Purchased Tanks
Tan
700C1113010
Installation of [40-VBM99910] CPI Tank A

6
6
6
6

6
6
6
6

12-Mar-13
12-Mar-13
12-Mar-13
12-Mar-13

18-Mar-13
18-Mar-13
18-Mar-13
18-Mar-13

0
0
0
0

0
0
0
0

-22
-22
-22
-22

219
219
219
219

7 spool available on site base on shipment 1~15, 5 spool is on sea base on shipment 17~19, On progress

126
2
2
2
2
2

94
94
94
94
94
94

05-Nov-12 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A

15-May-13
15-May-13
15-May-13
15-May-13
15-May-13
15-May-13

0
0
0
0
0
0

-1
-1
-1
-1
-1
-1

0
0
0
0
0
0

199
199
199
199
199
199

On progress

10
10
10

39
39
39

05-Nov-12 A
05-Nov-12 A
05-Nov-12 A

17-Mar-13
17-Mar-13
17-Mar-13

0
0
0

1
1
1

-88
-88
-88

194
194
194

Started, No access in some areas due to tank and piping work. Cadwelding

5
5
5
5

30
30
30
30

11-Jan-13 A
11-Jan-13 A
11-Jan-13 A
11-Jan-13 A

07-Mar-13
07-Mar-13
07-Mar-13
07-Mar-13

0
0
0
0

0
0
0
0

-30
-30
-30
-30

270
270
270
270

10

10

01-Mar-13

11-Mar-13

-1

97

310

10
0
0
0

01-Mar-13
11-Mar-13
11-Mar-13

Fire Water Distribution Area 600

10
0
0
0

11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13

-1
0
0
0

0
0
0
0

97
97
97
97

310
305
305
305

0
0
0

06-Mar-13
06-Mar-13

Diesel Storage Tank Bund, Awaiting Crossover Platform ETA ??

0
0
0

06-Mar-13
06-Mar-13
06-Mar-13

-6
-6
-6

-6
-6
-6

-16
-16
-16

269
269
269

0
0
0

0
0
0

01-Mar-13
01-Mar-13

01-Mar-13
01-Mar-13
01-Mar-13

0
0
0

0
0
0

-25
-25
-25

320
320
320

10

10

01-Mar-13

12-Mar-13

-1

97

310

10

10

01-Mar-13

12-Mar-13

-1

97

310

40-412 Fire Water


40-412-02 Fire Water
W
Distribution Area 600
40S41202100
40-412-02 - MC Fire Water Distribution Area 600

0
0
0

0
0
0

12-Mar-13
12-Mar-13
12-Mar-13

12-Mar-13
12-Mar-13

0
0
0

0
0
0

97
97
97

305
305
305

40-274 Structural
40-274-01 Piperacks
Pipera
Area 600
40S27401100
40-274-01 - MC Piperacks Area 600

0
0
0

0
0
0

01-Mar-13
01-Mar-13
01-Mar-13

01-Mar-13
01-Mar-13

0
0
0

0
0
0

-25
-25
-25

320
320
320

01-Mar-13

-25

320

0
0
0

0
0
0

06-Mar-13
06-Mar-13
06-Mar-13

-6
-6
-6

-6
-6
-6

-16
-16
-16

315
315
269

Piping
Aboveground Piping
Pip
Interconnecting Pipework
Carbon Steel P
Piping
A/G 2 1/2" to 12", CS Piping
700C1523230 Install 2 1/2" to 12" Open Drain Sump and Retention Pond Vent CS Piping [Sys 998-01]
Underground Piping
Pipi
Plastic Pipe Installation
Ins
700C2522580
Install HDPE Area 104 Open Drain to Collection Header Pipework [Sys 998-03]
Electrical
Underground Electrical
Elec
Grounding
700C1611020
Grounding UG

Bars done, Forms progressing > To pour concrete this Week

Onsite

MC COMPLETION
COMPLETIO MILESTONES
MAIN UTILITIES S
SYSTEMS - AREA 600
40-412 Fire Water
40-412-02 Fire Water
W
Distribution Area 600
4041202S010
MC & Handover of System.# 40-412-02
40-081 Civil & Earthworks
Ea
40-081-01 Diesel
Diese Storage Tank Bund
4008101S010
MC & Handover of System.# 40-081-01
40-274 Structural
40-274-01 Piperacks
Piper
Area 600
4027401S010
MC & Handover of System.# 40-274-01

40 - COMMISSIONING
COMMISSION
KEY UTILITIES

40S27401400

40-274-01 - TO Piperacks Area 600

40-081 Civils & Earthworks


Ea
40-081-01 Diesel Storage Tank Bund
40S08101100
40-081-01 - MC Diesel Storage Tank Bund
40S08101400

40-081-01 - TO Diesel Storage Tank Bund

Diesel Storage Tank Bund, Awaiting Crossover Platform ETA ??


Diesel Storage Tank Bund, Awaiting Crossover Platform ETA ??

06-Mar-13

-6

-6

-16

315

147

90

02-Jan-13 A

11-May-13

204

235

340

147

90

02-Jan-13 A

11-May-13

204

235

340

147

90

02-Jan-13 A

11-May-13

204

235

340

147

90

02-Jan-13 A

11-May-13

204

235

340

47
47
35
15

47
47
35
15

26-Feb-13
26-Feb-13
26-Feb-13
26-Feb-13

17-Apr-13
17-Apr-13
04-Apr-13
13-Mar-13

0
0
0
60

126
28
40
60

215
12
25
45

192
45
3
3

Sewer 1 - 150mm dia. - MR09 to MH12 [172m]

20

20

14-Mar-13

04-Apr-13

-15

-15

-31

Installation of Manholes [20Nos.] -Cast in Place

47
27

47
27

26-Feb-13
26-Feb-13

17-Apr-13
17-Apr-13

0
0

0
0

-14
-9

45
26

27
27
15

27
27
15

27-Feb-13
27-Feb-13
27-Feb-13

27-Mar-13
27-Mar-13
14-Mar-13

10
10
10

145
145
10

235
235
247

212
212
212

12

12

15-Mar-13

27-Mar-13

145

145

142

212

41 - INDUSTRIAL PARK
CONSTRUCTION and
a
COMMISSIONING
41 - CONSTRUCTION
CONSTRUCT
910 Industrial Park
Pa
Utilities
Sewer
UG Sewer Piping
Pipin
C91UTI160
Sewer 4 - 150mm dia. - MH05 to MH12 + MR07 to MR08 [93m]
C91UTI140
Manholes
C91UTI290

Electrical & Instrumentation


Instru
Cabling
Electrical & Instrument
Ins
Ducts
C91UTI305
Electrical Ductbank 11
C91UTI245

06-Mar-13
06-Mar-13

New Entry 6 Week Lookahead

Electrical Ductbank 2

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 22 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

Buildings
L1 & XF1- Industrial
Industr Park Switchroom & Industrial Transformer Compound [41-LER81110 & 41-ELW506311]
Architectural
Prefabricated Buildings [L1]
L1-C0431020 Assemble/Install Modular Units -- L1 [41-LER81110]
Pre-Engineered Metal Buildings [XF1]
Pre-Engineere
L1-C0411075 Installation of Steel Columns & Beams -- L1

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

147
101
85
53
53

90
90
85
53
53

02-Jan-13 A
02-Jan-13 A
09-Feb-13
16-Mar-13
16-Mar-13

11-May-13
11-May-13
11-May-13
11-May-13
11-May-13

0
0
0
3
3

204
3
3
3
3

235
4
4
4
4

340
340
340
340
340

40
6

40
6

09-Feb-13
09-Feb-13

24-Mar-13
15-Feb-13

0
0

-1
0

-16

204
204

L1-C0411070

Installation of Steel Columns & Beams -- XF1

20-Feb-13

26-Feb-13

-1

-1

-16

204

L1-C0411071

Installation of Steel Purlins, Framing, Bracing -- L1

24

24

27-Feb-13

24-Mar-13

-1

-1

-16

204

L1-C0411076

Installation of Steel Purlins, Framing, Bracing -- XF1

24

24

27-Feb-13

24-Mar-13

-1

-1

Concrete
Pre-cast Concrete
Conc
Structures
L1-C0331073 Installation of Precast Concrete Wall Panels --XF1

6
6
6

6
6
6

07-Mar-13
07-Mar-13
07-Mar-13

13-Mar-13
13-Mar-13
13-Mar-13

0
0
0

0
0
0

6
6
6

392
392
392

Structural Steel
Miscellaneous Steel for L1
L1-C0541010 Steel Platforms for [41-LER81110] -- L1

12
12
12

12
12
12

03-Mar-13
03-Mar-13
03-Mar-13

15-Mar-13
15-Mar-13
15-Mar-13

3
3
3

3
3
3

4
4
4

340
340
340

Electrical
Underground E
Electrical Groundings, Conduits
L1-C1611017 Grounding -- XF1/L1

Laying of grounding cable done

3
3
3

12
12
12

02-Jan-13 A
02-Jan-13 A
02-Jan-13 A

15-Feb-13
15-Feb-13
15-Feb-13

0
0
0

0
0
0

-19
-19
-19

404
404
404

L2 done, XF3 On progress

67
8
8
8

48
3
3
3

08-Jan-13 A
08-Jan-13 A
08-Jan-13 A
08-Jan-13 A

26-Mar-13
06-Feb-13
06-Feb-13
06-Feb-13

0
0
0
0

0
-7
-7
-7

122
-6
-6
-6

360
219
219
219

Rebars assembly done, form works on progress, awaiting remaining 10% rebar material

10
10
10

48
48
48

23-Jan-13 A
23-Jan-13 A
23-Jan-13 A

26-Mar-13
26-Mar-13
26-Mar-13

0
0
0

0
0
0

122
122
122

219
219
219

13
13
3

13
13
3

28-Feb-13
28-Feb-13
28-Feb-13

14-Mar-13
14-Mar-13
03-Mar-13

-24
-24
-24

-24
-24
-24

-23
-23
-23

372
372
372

10

10

04-Mar-13

14-Mar-13

-24

-24

-23

372

77
77
77
77

71
71
71
67

15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A

20-Apr-13
20-Apr-13
20-Apr-13
16-Apr-13

0
0
0
0

-4
-4
-4
0

-4
-4
-4
0

278
149
149
149

71

71

04-Feb-13

20-Apr-13

-5

-5

-4

149

24
16
16

28
18
18

15-Jan-13 A
15-Jan-13 A
15-Jan-13 A

05-Mar-13
22-Feb-13
22-Feb-13

0
0
0

0
0
0

-1
1
1

322
257
257

8
8

8
8

25-Feb-13
25-Feb-13

05-Mar-13
05-Mar-13

0
0

0
0

-1
-1

322
322

87
14
14
14

88
22
22
22

23-Jan-13 A
23-Jan-13 A
23-Jan-13 A
23-Jan-13 A

08-May-13
26-Feb-13
26-Feb-13
26-Feb-13

0
0
0
0

0
0
0
0

243
309
309
309

Architectural
Structural Steel
W2-C0411020 Installation of Steel Columns & Beams [60Tons]

87
87
87

88
88
88

24-Jan-13 A
24-Jan-13 A
24-Jan-13 A

08-May-13
08-May-13
08-May-13

0
0
0

0
0
0

1
1
1

96
96
96

Electrical
Underground E
Electrical Groundings, Conduits
W2-C1611011 Grounding

Earthworks on going

8
8
8

8
8
8

23-Feb-13
23-Feb-13
23-Feb-13

03-Mar-13
03-Mar-13
03-Mar-13

-25
-25
-25

-25
-25
-25

1
1
1

257
257
257

New Entry 6 Week Lookahead

20
20
20
20

20
20
20
20

12-Mar-13
12-Mar-13
12-Mar-13
12-Mar-13

02-Apr-13
02-Apr-13
02-Apr-13
02-Apr-13

7
7
7
7

7
7
7
7

-27
-27
-27
-27

69
69
69
69

128
7
7
7

46
14
14
14

22-Jan-13 A
22-Jan-13 A
22-Jan-13 A
22-Jan-13 A

25-Mar-13
18-Feb-13
18-Feb-13
18-Feb-13

0
0
0
0

50
-1
-1
-1

70
59
59
59

290
193
193
193

18
18
18

16
16
16

01-Feb-13 A
01-Feb-13 A
01-Feb-13 A

20-Feb-13
20-Feb-13
20-Feb-13

1
1
1

0
0
0

75
75
75

193
193
193

25
25
25

25
25
25

26-Feb-13
26-Feb-13
26-Feb-13

25-Mar-13
25-Mar-13
25-Mar-13

-5
-5
-5

-5
-5
-5

70
70
70

193
193
193

L2 & XF3 - Communication


Comm
Switchroom & Transformer Compound [41-LER81130 & XF3]
Civil and Earthworks
Earthw
Site Preparation
Preparatio
L2-C0221085 Earthworks-Select Fill -- XF3/L2
Concrete
Structural Foundations
Fou
L2-C0313085 Foundation Strip Footing & Slab -- XF3/L2
Electrical
Underground E
Electrical Groundings, Conduits
L2-C1611027 Grounding -- L2/XF3
L2-C1613065

Install Conduit Below Ground

W1- Warehouse [41-WHSE06401]


[
[1st Gas]
Architectural
Exterior Cladding
Cladd
W1-C0411013 Installation of Exterior Wall Claddings [1800m2]

On progress

W1-C0411012 Installation of Roof Claddings & Vents [4300m2]


Electrical
Underground E
Electrical Groundings, Conduits
W1-C1611010 Grounding

Laying of grounding cable done, Pending Mat'l (Cadwelds) delivery, C-Crimps in lieu of Cad Welds

Aboveground Electrical Cable Trays, Conduit & Systems


W1-C1625010 Install Lightning Protection [Earth Electrode]
W2 & W2H - Maintenance
Main
& Vehicle Workshop [41-MAWS06201] [1st Gas]
Concrete
Structural Foundations
Fou
W2-C0313033 Strip Footing & Slab for Concrete Exterior Slab [92m3]

C9 - HVAC Building
Build
[41-MAWS06201-01]
Concrete
Structural Foundations
Fou
C9-C0313090 Strip Footing & Slab [Pile Foundation]
W3 - Laboratory [41-LAB06601]
[
[1st Gas]
Civil and Earthworks
Earthw
Site Preparation
Preparatio
W3-C0221040 Earthworks-Select Fill
Concrete
Structural Foundations
Fou
W3-C0313040 Strip Footing & Slab [36m3]

Excavation ongoing

Architectural
Pre-Engineere Metal Buildings
Pre-Engineered
Structural Steel
Ste

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 23 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

204

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

W3-C0431010 Installation of Steel Columns, Rafters & Horizontal Braces

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

25

25

26-Feb-13

25-Mar-13

-5

-5

70

193

On progress

6
6
6

30
30
30

01-Feb-13 A
01-Feb-13 A
01-Feb-13 A

07-Mar-13
07-Mar-13
07-Mar-13

92
92
92

66
66
66

67
67
67

306
306
306

Backfill Material issues on compaction

38
4
4
4

44
17
17
17

21-Jan-13 A
21-Jan-13 A
21-Jan-13 A
21-Jan-13 A

22-Mar-13
21-Feb-13
21-Feb-13
21-Feb-13

0
0
0
0

10
-7
-7
-7

120
115
115
115

242
64
64
64

Concrete
Structural Foundations
Fou
W4-C0313050 Strip Footing & Slab [53m3]

27
27
27

27
27
27

22-Feb-13
22-Feb-13
22-Feb-13

22-Mar-13
22-Mar-13
22-Mar-13

10
10
10

10
10
10

115
115
115

212
212
212

Electrical
Underground E
Electrical Groundings, Conduits
W4-C1611014 Grounding

5
5
5

5
5
5

22-Feb-13
22-Feb-13
22-Feb-13

27-Feb-13
27-Feb-13
27-Feb-13

10
10
10

10
10
10

142
142
142

264
264
264

13
3
3
3

30
17
17
17

24-Jan-13 A
24-Jan-13 A
24-Jan-13 A
24-Jan-13 A

07-Mar-13
21-Feb-13
21-Feb-13
21-Feb-13

0
0
0
0

10
-21
-21
-21

171
179
179
179

387
119
119
119

Concrete
Structural Foundations
Fou
W12C0313055 Strip Footing & Slab [5m3]

5
5
5

5
5
5

22-Feb-13
22-Feb-13
22-Feb-13

27-Feb-13
27-Feb-13
27-Feb-13

10
10
10

10
10
10

179
179
179

256
256
256

Electrical
Underground E
Electrical Groundings, Conduits
W12C1611029 Grounding

2
2
2

2
2
2

06-Mar-13
06-Mar-13
06-Mar-13

07-Mar-13
07-Mar-13
07-Mar-13

10
10
10

10
10
10

168
168
168

387
387
387

New Entry 6 Week Lookahead

29
29
29
6

29
29
29
6

11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13

10-Apr-13
10-Apr-13
10-Apr-13
16-Mar-13

6
233
233
233

233
233
233
233

264
264
264
264

361
294
294
294

New Entry 6 Week Lookahead

23

23

17-Mar-13

10-Apr-13

233

233

264

294

New Entry 6 Week Lookahead

4
4
4

4
4
4

16-Mar-13
16-Mar-13
16-Mar-13

20-Mar-13
20-Mar-13
20-Mar-13

0
0
0

0
0
0

247
247
247

380
380
380

30

30

01-Mar-13

02-Apr-13

-55

269

30

30

01-Mar-13

02-Apr-13

-55

269

30

30

01-Mar-13

02-Apr-13

-55

269

01-Mar-13*

-55

196

30

30

01-Mar-13

02-Apr-13

-55

269

30
30

30
30

01-Mar-13
01-Mar-13*

02-Apr-13
02-Apr-13

0
0

0
0

-55
-55

269
269

206

147

26-Nov-12 A

11-Jul-13

-108

594

206

147

26-Nov-12 A

11-Jul-13

-108

594

206

147

26-Nov-12 A

11-Jul-13

-108

594

83

24

26-Nov-12 A

01-Mar-13

698

83
51

24
14

26-Nov-12 A
26-Nov-12 A

01-Mar-13
18-Feb-13

0
0

0
0

698
698

10

10

19-Feb-13

01-Mar-13

698

16

16

01-Mar-13

18-Mar-13

701

9
9
9
9

9
9
9
9

01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13

11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13

0
0
0
0

0
0
0
0

698
698
698
698

12
12
12
12
8

12
12
12
12
8

01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13
01-Mar-13

14-Mar-13
14-Mar-13
14-Mar-13
14-Mar-13
09-Mar-13

0
0
0
0
0

0
0
0
0
0

698
698
698
698
698

New 6 Week Lookahead Entry

10-Mar-13

14-Mar-13

698

New 6 Week Lookahead Entry

3
3
3
3

3
3
3
3

11-Mar-13
11-Mar-13
11-Mar-13
11-Mar-13

14-Mar-13
14-Mar-13
14-Mar-13
14-Mar-13

0
0
0
0

0
0
0
0

705
705
705
705

7
3

7
3

11-Mar-13
11-Mar-13

18-Mar-13
14-Mar-13

0
0

0
0

701
698

Electrical
Underground E
Electrical Groundings, Conduits
W3-C1611013 Grounding
W4 - Chemical & Hazardous Materials & Shelter [41-HMS0641] [1st Gas]
Civil and Earthworks
Earthw
Site Preparation
Preparatio
W4-C0221050 Earthworks-Select Fill

W12 - Acetylene Store [41-HMS06402]


Civil and Earthworks
Earthw
Site Preparation
Preparatio
W12C0221055 Earthworks-Select Fill

Backfill Material issues on compaction

W10 - Pesticide Mixing


M
& Loading Bay [41-OSLD06601]
Architectural
Structural Steel
W10C0411090 Installation of Steel Columns & Beams [3Tons]
W10C0411091 Installation of Steel Girts, Steel Purlins, Framing, Bracing [1Ton]
Electrical
Underground E
Electrical Groundings, Conduits
W10C1611019 Grounding

42 - 10 YEAR CAMP
CAM
42 - Construction
42 - HGCP Construction
Constr
Camp
0001000870

10 YEAR CAMP - Commence Work

PHASE 2
NEW WASTE WATER
WA
TREATMENT PLANT
PH200940
Install Concrete Foundations for WWTP

45 - HIDES WELLPADS
WELLP
AND ASSOCIATED FLOWLINES
CONSTRUCTION and
a
COMMISSIONING
45 - CONSTRUCTION
CONSTRUCT
PWD Support Works
Wo
- Drilling Rig
Common / Temp Works
PWDC0000T25
Erect Anti Climb Fence
PWDC0000T55

On progress

Install piping between PWD and temporary water pad

PWD Temporary Filtration System


Mechanical
Processing Units
Filter Vessel
PWD1153006

Installation of Temp PWD Filters #1 #2

Piping
Aboveground Piping
Pip
Carbon Steel Piping
P
Interconnecting
PWD1000955 Install 3" Temp PWD Filter Inlet/Oulet CS Piping
PWD1000965

Tie-in 3" Temp PWD Inlet/Outlet Lines to 3" Perm Water Inj Pumps SS Piping

Wire and Cable


Instrument and Control
C
Wire & Cable - Aboveground
Field Instr > Field
Fie JB / Control Panel
PWD1633715
Pull A/G Instr & Control Temp PWD Filter PDIT Field Cabling
Instrumentation
Bench Calibration

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 24 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

PWD1632700

Comment

Instrument Calibration of Temp PWD Filter Instruments

Instruments
Instrument Valves/Regulators
Valv
Instrument Valves/Regulators
Va
PWD1000985 Install Temp PWD Filter Control Valve Relief Valve YV (1)
Process Instruments
Instrum
Field Instruments
Instrume
PWD1000995 Install Temp PWD Filter Inlet Pressure Gauges PG (2)
PWD1000990

Install Temp PWD Filter Pressure Transmitters PDIT (2)

OD

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

New 6 Week Lookahead Entry

11-Mar-13

14-Mar-13

698

New 6 Week Lookahead Entry

4
4
4
4

4
4
4
4

14-Mar-13
14-Mar-13
14-Mar-13
14-Mar-13

18-Mar-13
18-Mar-13
18-Mar-13
18-Mar-13

0
0
0
0

0
0
0
0

701
701
701
701

New 6 Week Lookahead Entry

4
4
4

4
4
4

14-Mar-13
14-Mar-13
14-Mar-13

18-Mar-13
18-Mar-13
18-Mar-13

0
0
0

0
0
0

698
698
698

New 6 Week Lookahead Entry

14-Mar-13

18-Mar-13

56

55

22-Jan-13 A

03-Apr-13

-16

412

Pre-cast Footing - PAU Fdn Type F4B (2 ea)

47
10

47
4

22-Jan-13 A
22-Jan-13 A

25-Mar-13
07-Feb-13

0
0

0
-7

-8
35

151
164

80BC0331080

Pre-cast Footing - [45-MBA61520] Vent KO Pot Fdn

10

10

21-Feb-13

04-Mar-13

151

80BC0331015

Pre-cast Instrument Tubing Tray Supports

20

20

04-Mar-13

25-Mar-13

151

WELLPADS C
80CC0331265

Pre-cast Footing - [45-MBA61520] Vent KO Pot Fdn

10
10

10
10

04-Mar-13
04-Mar-13

14-Mar-13
14-Mar-13

0
0

0
0

285
285

WELLPADS D
80DC0331035

Pre-cast Flowine Pipe Supports Fdn (39no)

29
20

39
20

24-Jan-13 A
24-Jan-13 A

17-Mar-13
25-Feb-13

0
0

0
-7

405
405

80DC0331105

Pre-cast Instrument Tubing Tray Supports

20

20

19-Feb-13

12-Mar-13

405

80DC0331115

Pre-cast Protection Barriers

10

10

02-Mar-13

13-Mar-13

405

80DC0331095

Pre-cast Free Standing Field Instrument Supports

15

15

01-Mar-13

17-Mar-13

405

PWD
PWDC0331020

Install Pipe Sleepers/Stanchion Support Concrete (x2sets)

New 6 Week Lookahead Entry

20
20

20
20

13-Mar-13
13-Mar-13

03-Apr-13
03-Apr-13

0
0

0
0

412
412

WELLPADS E
80EC0331050

Install Pipe Sleepers/Stanchion Support Concrete (x2sets)

New 6 Week Lookahead Entry

20
20

20
20

13-Mar-13
13-Mar-13

03-Apr-13
03-Apr-13

0
0

0
0

412
412

WELLPADS G
80GC0331100

Pre-cast Footing - [45-MBA61570] Vent KO Drum Fdn

10
10

10
10

11-Feb-13
11-Feb-13

21-Feb-13
21-Feb-13

0
0

0
0

151
151

41

41

25-Feb-13

09-Apr-13

388

41
8
0

41
8
0

25-Feb-13
25-Feb-13
25-Feb-13

09-Apr-13
05-Mar-13

0
0
0

0
0
0

388
279
279

COMMON - Pre-Cast
Pre-C
Works
WELLPADS B
80BC0331090

WELLPAD C (C1,C2)-1
(C1
Pre-Drilling Works
Common / Temp Works
80BC00MS020 Wellpad C Pre Drilling Acess
80BC00MC025

Set-up Temporary Office and Other Facilities

Concrete
Equipment & Structural
St
Foundations
Equipment/Str
Equipment/Structural
Foundations over 23m3
80BC0313035 Foundation for [45-LER71230] LER
Equipment/Structural Foundations less than 4m3
Equipment/Str
80BC0311015 Install Pre-cast Ftg & Cast Plinth In-situ - C1 PAU Fdns
80BC0312015 Install Pre-cast Ftg & Cast Plinth In-situ for [45-MBA61530] Vent KO Pot

New 6 Week Lookahead Entry

Electrical
Underground E
Electrical
Grounding
80BC1611015 Install of Earthing Network
Conduit
80BC1613015 Install Conduit to UG Cables & Earthing Network

WELLPAD D (D1,D2)
(D1

698

26-Feb-13

05-Mar-13

279

33
33
33
33

33
33
33
33

05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13

09-Apr-13
09-Apr-13
09-Apr-13
09-Apr-13

0
0
0
0

0
0
0
0

306
306
306
306

19
15

19
15

05-Mar-13
05-Mar-13

25-Mar-13
21-Mar-13

0
0

0
0

298
279

10

10

15-Mar-13

25-Mar-13

298

30
30
30
30

30
30
30
30

05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13

06-Apr-13
06-Apr-13
06-Apr-13
06-Apr-13

0
0
0
0

0
0
0
0

391
391
391
391

30
30

30
30

05-Mar-13
05-Mar-13

06-Apr-13
06-Apr-13

0
0

0
0

391
391

64

57

25-Jan-13 A

05-Apr-13

-1

423

57
47
47
47
15

25-Jan-13 A
25-Jan-13 A
25-Jan-13 A
31-Jan-13 A
31-Jan-13 A

05-Apr-13
26-Mar-13
26-Mar-13
26-Mar-13
19-Feb-13

0
0
0
1
1

-1
-1
-1
-1
-3

423
393
392
392
358

Pre-Drilling Works
Concrete
Equipment & Structural
St
Foundations
Equipment/Str
Equipment/Structural
Foundations less than 4m3
80DC0311015 Install Pre-cast Ftg & Cast Plinth In-situ - D1 PAU Fdns

Excavation Start

64
54
54
47
15

80DC0311025 Install Pre-cast Ftg & Cast Plinth In-situ - D2 PAU Fdns

Excavation Start

15

15

01-Feb-13 A

07-Mar-13

15

-3

358

10

10

08-Mar-13

18-Mar-13

-3

-3

358

New 6 Week Lookahead Entry

10

10

15-Mar-13

26-Mar-13

-1

-1

392

Blinded

44
33

37
27

25-Jan-13 A
25-Jan-13 A

15-Mar-13
04-Mar-13

0
0

-1
-1

392
392

10

10

05-Mar-13

15-Mar-13

-1

-1

392

5
5
5

5
5
5

05-Mar-13
05-Mar-13
05-Mar-13

09-Mar-13
09-Mar-13
09-Mar-13

-1
-1
-1

-1
-1
-1

408
408
408

14
14
14

14
14
14

05-Mar-13
05-Mar-13
05-Mar-13

19-Mar-13
19-Mar-13
19-Mar-13

-1
-1
-1

-1
-1
-1

401
401
401

80DC0311045 Install Pre-cast HPU Shelter Footings and Cast Plinths In-situ
80DC0312015 Install Pre-cast Ftg & Cast Plinth In-situ for [45-MBA61520] Vent KO Pot
Equipment/Structural Foundations over 23m3
Equipment/Str
80DC0313035 Foundation for [45-LER71240] LER
80DC1311025 Foundation for [45-XF82340] Transfromer, use 2.5m3
Concrete for Below
Be
Grade Structures
Sumps and Pits
80DC0343025 Install In-situ Fiber Optic Cable Pit
Structural
Miscellaneous S
Steel & Platforms
Miscellaneous Steel

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 25 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

2013
February
28 04 11 18

March
25 04 11 18 25

Activity ID

Activity Name

Comment

OD

80DC0541080 Install Wellpad D [45-LER71240] LER Platform


Electrical
Underground E
Electrical
Grounding
80DC1611015 Install of Earthing Network
Conduit
80DC1613015 Install Conduit to UG Cables & Earthing Network
Aboveground E
Electrical
Lightning Protection
Prot
80DC1625015 Install Lightning Protection

PRODUCED WATER
WAT
DISPOSAL WELLPAD
Pre-Drilling Works
Piping
Underground P
Pipe Installation
Underground P
Plastic Pipe Installation (HDPE)
PWDC1522215 Install U/G PWD & Injection HDPE Piping from Water Injection Filter to Pumps [Sys 681-02]

Start Sorting Material and Delivered to work site

WELLPAD G (G1,G2)-1
(G1
Pre-Drilling Works
Common / Temp Works
80GC00MS070 Wellpad G Pre Drilling Acess
80GC00MC025

Set-up Temporary Office and Other Facilities

Actual Work

Data Date : 04-Feb-13

Remaining Work

Date : 05-Feb-13

Critical Remaining Work


Milestone
MIlestone
Project Baseline Bar

Layout Name : 6Wk lookahead for


internal review_3
Page 26 of 26

EPC4 Hides Gas Conditioning Plant and Wellpads


Project Execution Schedule Rev 2
---- 6 Week Lookahead ----

RD

Start

Finish

6Wk
Start
Vari...

6Wk
Finish
Variance

Variance - BL
Project Finish
Date

Total
Float

14

14

05-Mar-13

19-Mar-13

-1

-1

401

30
30
30
30

30
30
30
30

05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13

05-Apr-13
05-Apr-13
05-Apr-13
05-Apr-13

-1
-1
-1
-1

-1
-1
-1
-1

423
423
423
423

30
30

30
30

05-Mar-13
05-Mar-13

05-Apr-13
05-Apr-13

-1
-1

-1
-1

423
423

30
30
30

30
30
30

05-Mar-13
05-Mar-13
05-Mar-13

05-Apr-13
05-Apr-13
05-Apr-13

-1
-1
-1

-1
-1
-1

423
423
423

120

120

05-Mar-13

11-Jul-13

435

120
120
120
120
120

120
120
120
120
120

05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13
05-Mar-13

11-Jul-13
11-Jul-13
11-Jul-13
11-Jul-13
11-Jul-13

0
0
0
0
0

0
0
0
0
0

435
435
435
435
435

04-Feb-13

12-Feb-13

-7

-7

345

8
8
0

8
8
0

04-Feb-13
04-Feb-13
04-Feb-13

12-Feb-13
12-Feb-13

-7
-7
-7

-7
-7
-7

345
345
345

05-Feb-13

12-Feb-13

-7

-7

345

2013