DRAWING INDEX
CLX DRAWING INDEX, NARRATIVE AND FLOWCHART CLX.00 DRAWING INDEX CLX.01 DRAWING INDEX (CONTINUED) CLX.02 NARRATIVE 6 PAGE 1 OF 4 CLX.03 NARRATIVE 6 PAGE 2 OF 4 CLX.04 NARRATIVE 6 PAGE 3 OF 4 CLX.05 FLOWCHART 6 OVERVIEW OF OPD USE CLX.06 FLOWCHART 6 CEILING GRID CLX.07 FLOWCHART 6 COMPRESSION STRUT AND OBSTRUCTIONS CLX.08 FLOWCHART CONNECTIONS TO STRUCTURE CL0 GENERAL NOTES CL0.00 CL0.01 CL0.02 CL0.03 CL1 GENERAL NOTES GENERAL NOTES GENERAL NOTES GENERAL NOTES
REVISIONS
POWDER ACTUATED FASTENER VALUES / LT WT CONCRETE POWDER ACTUATED FASTENER DETAIL / LT WT CONCRETE POWDER ACTUATED FASTENER / STEEL EXPANSION/ ANCHOR CAPACITY EXPANSION ANCHOR INSTALLATION CRITERIA METAL STUD PROFILE
Agency Stamp: Code : 2010 CBC Section Title : . 2010 CBC Sheet Title : Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
CL2.1 ISOMETRIC DETAIL CL2.2 TYPICAL CEILING PLAN CL2.3 CORRIDOR CEILING PLAN CL2.4 CORRIDOR INTERSECTION SLIP JOINT CL2.5 TYPICAL CEILING SECTION CL2.6 CEILING PERIMETER CL2.7 CUBICLE CURTAIN/ I.V. TRACK CL2.8 LIGHT FIXTURE/ AIR TERMINAL SUPPORT DETAIL
t_
823 -2 01 2
CLX.00
DRAWING INDEX
8/22/2012 5:07:01 PM
DRAWING INDEX
CL3 COMPRESSION STRUT DETAILS CL3.1 CL3.2 CL3.3 CL3.4 CL4 CHANNEL TYPE COMPRESSION STRUT TUBE TYPE COMPRESSION STRUT CHANNEL TYPE COMPRESSION STRUT OFFSET WITH KICKER TUBE TYPE COMPRESSION STRUT OFFSET WITH KICKER HANGER AND SPLAY WIRE CONNECTION DETAILS TYPICAL WIRE TURNS CONNECTION MATRIX CONNECTION CONCRETE FILED METAL DECK CONNECTION METAL DECK AND NON6 STRUCTURAL FILL ASSEMBLY CONNECTION CONCRETE SLAB, BEAM, OR JOIST CONNECTION STRUCTURAL STEEL CONNECTION SAWN TIMBER CONNECTION CONNECTION TO METAL STUD WALL FRAMING CONNECTION CONNECTION TO METAL STUD WALL FRAMING CONNECTION CONNECTION TO METAL STUD WALL FRAMING
REVISIONS
CL4.1 CL4.2 CL4.3 CL4.4 CL4.5 CL4.6 CL4.7 CL4.8 CL4.9 CL4.10 CL5 CL5.1 CL5.2 CL5.3 CL5.4 CL5.5 CL5.6 CL5.7
CONNECTION MATRIX CONNECTION CONCRETE FILLED METAL DECK CONNECTION METAL DECK AND NON6 STRUCTURAL ASSEMBLY CONNECTION CONCRETE SLAB, BEAM, OR JOIST CONNECTION STRUCTURAL STEEL CONNECTION SAWN TIMBER WITH GYPSUM BOARD CONNECTION SAWN TIMBER WITHOUT GYPSUM BOARD
CL6 SPECIAL DETAILS CL6.1 CL6.2 CL6.3 CL6.4 CL6.5 CL6.6 CL6.7
Agency Stamp: Code : 2010 CBC Section Title : . Sheet Title : Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
OBSTRUCTION: COUNTER SLOPING WIRES AND TRAPEZE CONDITION OBSTRUCTION: BRIDGE AT LARGE OFFSET CONDITION OBSTRUCTION: COUNTER SLOPING COMPRESSION STRUTS OBSTRUCTION: PERIMETER CONDITION OBSTRUCTION: RECESSED LIGHT AT PERIMETER OBSTRUCTION: STUD BRACE TO OVERHEAD OBSTRUCTION: STUD BRACE TO WALL
t_
823 -2 01 2
CLX.01
NARRATIVE 2010 California Building Code (2010 CBC) Standard Ceiling Details document contains OSHPD Pre6Approved Details (OPD), which may be incorporated into construction documents. These details have been reviewed for compliance with the 2010 CBC and, when used as shown, without modifications, are deemed to comply with code. They are intended to cover common conditions that occur on many projects. It is anticipated that use of these details will facilitate the design, review, and construction process. The Narrative and supporting Flowchart, which follows the Narrative, are provided to assist in selecting applicable details from the OPD for incorporation into the construction documents. It is to be used only as a guide and does not provide complete step6by6 step instructions for use of the OPD. Narrative comment numbers correspond to the numbered items on the Flowchart. The following steps apply to use of OPD: 1. Define Project Parameters A. Short Period Spectral Response Acceleration (Sds) for project site. i. The (Sds) identified for use with the OPD shall not be lower than the Sds documented in the project General Notes and/or Specifications.
i. The Registered Design Professional (RDP) in responsible charge shall identify the floor and/or roof framing materials which apply to the use of the OPD under consideration (e.g. wood, concrete, metal deck). C. Project specific geometry and other conditions.
i. The RDP in responsible charge shall identify the geometry which applies to the use of the OPD under consideratio (e.g. floor6to6floor height, wall thickness). ii. The RDP in responsible charge shall identify other unique conditions which apply to the use of the OPD under consideration (e.g. mechanical duct conflicts and other obstructions). 2. Verify Applicability of OPD Refer to PIN 51.
Agency Stamp: Code : Section Title : DRAWING INDEX, . NARRATIVE AND FLOWCHART Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
NARRATIVE
8/22/2012 5:07:02 PM
B. The details must be directly applicable to the project conditions. For example, OPD for attachment of a ceiling below a steel deck with concrete fill are not applicable to wood frame construction.
ra f
A. The RDP in responsible charge shall verify the applicability of the OPD for their specific project conditions. For example, when designing a fire6rated corridor, use of ceiling details OPD are acceptable provided the OPD are compatible with the construction requirements for the fire rated assembly.
t_
OPD allow design professionals to incorporate pre6approved details into their construction documents. Projects that utilize OPD shall satisfy the following conditions.
823 -2 01 2
B. Type of construction.
CLX.02
A. Substitutions of items shown in the OPD are not permitted, unless specifically allowed by the OPD. For example, a power6actuated fastener (PAF) may not be substituted in a connection detail that specifies an expansion anchor, unless the OPD specifically permits it. Use of post6installed anchors from different manufacturers is permitted, provided the substituted anchors meet the installation criteria and Allowable Strengths as specified in the OPD. B. Changes to the OPD to accommodate project conditions are not permitted. In such cases, project specific details are required. 3. 1. Select Appropriate Details from OPD Review OPD General Notes before the start of OPD selection process. A. The GENERAL NOTES section of the OPD document provides detailed specification of the materials and the workmanship associated with the details. The Design Professional of Record (DPOR) shall confirm the applicability of the OPD details and the specifications noted in this section. (CL0.00, CL0.01, CL0.02, CL0.03, CL0.04). Refer to CL2.1 to confirm general configuration requirements. B. Typical geometric conditions shall be verified from CL2.2. Refer to Section 10 of the GENERAL NOTES for system component requirements. C. Ceiling boundary condition shall be provided in conformance with the requirements detailed on CL2.5 and CL2.6. Refer to Section 11 of the GENERAL NOTES for system installation requirements. D. Detailing requirements needed to comply with the requirements for both slip and fixed conditions in corridor ceilings are shown on CL2.3, CL2.4, and CL2.5. Refer to Section 12 of the GENERAL NOTES. E. CL2.7 and CL2.8 show the necessary detailing requirements for the support of Curtain Tracks, Air Terminals, and Light Fixtures suspended directly from the ceiling system. Refer to Section 15 of the GENERAL NOTES. F. Hanger and Splay Wire specifications are shown in Section 9 of the GENERAL NOTES. CL4.1 graphically illustrates the requirements of the specifications at the terminal ends of the wire. G. Compression Strut requirements are detailed in Section 3. Channel and Electrical Metallic Tubing (EMT) are the two types of Compression Struts that are included within the scope of this OPD. Refer to Section 13 of the GENERAL NOTES for system installation requirements. 1. Channel Type Compression Strut details are shown on CL3.1. The offset condition is shown on CL3.3. 2. Electrical Metallic Tubing (EMT) Compression Strut details are shown on CL3.2. The offset condition is shown on CL3.4. H. Requirements for detailing at obstructions between the ceiling and the support structure are illustrated in Section 6. Different obstruction types require special detailing of Hanger Wires, Splay Wires, and Compression Struts. Refer tO Section 14 of the GENERAL NOTES for system installation requirements.
Agency Stamp: Code : Section Title : DRAWING INDEX, . NARRATIVE AND FLOWCHART Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
NARRATIVE
8/22/2012 5:07:02 PM
ra f
t_
823 -2 01 2
CLX.03
1. Requirements for detailing at obstructions at Hanger and Spay Wires are shown on CL6.1. CL6.2, CL6.4, CL6.6, CL6.7. 2. Requirements for detailing at obstructions at Compression Struts are shown on CL6.2. CL6.3, CL6.5. I. Connection detail requirements for the connection of Hanger and Splay Wire to support structure are illustrated in Section 4. Detail requirements for attachment to various structural materials and systems are included within this Section of the OPD. Refer to Section 14 of the GENERAL NOTES for system installation requirements. Refer to Section 1 of the OPD document (SUSPENDED CEILING FRAMING COMPONENTS) for fastener design capacities and component properties. J. Connection detail requirements for the connection of Compression Strut to support structure are illustrated in Section 5. Detail requirements for attachment to various structural materials and systems are included within this Section of the OPD. Refer to Section 14 of the GENERAL NOTES for system installation requirements. Refer to Section 1 of the OPD document (SUSPENDED CEILING FRAMING COMPONENTS) for fastener design capacities and component properties.
4. 5.
Implementation and Use of OPD During Plan Review Refer to PIN 51. Implementation and Use of OPD During Construction Process Refer to PIN 51.
A.During construction, OPD are treated as any other detail in the approved documents.
B.Pre6approved details submitted after the construction documents have been approved and a building permit has been issued shall be used and/or processed in accordance with Code Application Notice 26107.4 Amended Construction Documents. Pre6approved details may be applied as alternates to the approved details shown on the permitted construction documents only on a one for one basis and with written consent of the registered design professional and the registered design professional in responsible charge and in concurrence with OSHPD field staff. Pre6approved details will not be subject to additional plan review provided they are incorporated without any modification. Pre6approved details are subject to field confirmation during which the applicability of pre6approved details for specific project conditions shall be evaluated. C. Changing the scope of a project (adding additional ceilings, for example) does constitute a material alteration to the project, even if OPD can be used for all conditions. In such a case, an Amended Construction Document must be submitted to OSHPD field staff for review.
Agency Stamp: Code : Section Title : DRAWING INDEX, . NARRATIVE AND FLOWCHART Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
NARRATIVE
8/22/2012 5:07:02 PM
ra f
t_
823 -2 01 2
CLX.04
Agency Stamp: Code : Section Title : DRAWING INDEX, . NARRATIVE AND FLOWCHART Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
FLOWCHART
8/22/2012 5:07:02 PM
ra f
t_
823 -2 01 2
CLX.05
Agency Stamp: Code : Section Title : DRAWING INDEX, . NARRATIVE AND FLOWCHART Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
FLOWCHART
8/22/2012 5:07:03 PM
ra f
t_
823 -2 01 2
CLX.06
Agency Stamp: Code : Section Title : DRAWING INDEX, . NARRATIVE AND FLOWCHART Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
FLOWCHART
8/22/2012 5:07:03 PM
ra f
t_
823 -2 01 2
CLX.07
Agency Stamp: Code : Section Title : DRAWING INDEX, . NARRATIVE AND FLOWCHART Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
FLOWCHART
8/22/2012 5:07:03 PM
ra f
t_
823 -2 01 2
CLX.08
1. CONSTRUCTION, WORKMANSHIP AND MATERIAL SHALL CONFORM TO THE 2010 CALIFORNIA BUILDING CODE, TITLE 24, PART 2 (CODE), WITH OSHPD AMENDMENTS, ASCE 7605. 2. THE CONTRACTOR SHALL NOTIFY OSHPD AND THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHERE A CONFLICT OR DISCREPANCY OCCURS BETWEEN THE CONSTRUCTION DRAWINGS AND ANY OTHER PORTION OF THE CONTRACT DOCUMENTS, FIELD CONDITIONS, OR WHERE ANY CONDITIONS ARISE NOT COVERED BY THESE DOCUMENTS WHEREIN WORK WILL NOT COMPLY WITH CODE REQUIREMENTS. 3. THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO CONSTRUCT THE HOSPITAL BUILDING IN ACCORDANCE WITH THE CALIFORNIA BUILDING STANDARD CODE, TITLE 24, CALIFORNIA CODE OF REGULATIONS. SHOULD ANY CONDITION DEVELOP NOT COVERED BY THE APPROVED PLANS AND SPECIFICATIONS WHEREIN THE WORK WILL NOT COMPLY WITH TITLE 24, CALIFORNIA CODE OF REGULATIONS, A CHANGE ORDER DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO AND APPROVED BY OSHPD BEFORE PROCEEDING WITH THE WORK. 4. GALVANIZED METAL STUDS, TRACK AND SHEET STEEL SHALL CONFORM TO ASTM A653 MATERIAL (OR OTHER EQUIVALENT ASTM LISTED MATERIALS INTHE 2001 EDITION OF THE AISI6NAS, SECTION A2.1) WITH A MINIMUM YIELD STRENGTH OF 33 KSI FOR 18 GAGE AND LIGHTER, AND MINIMUM YIELD STRENGTH OF 50 KSI FOR 16 GAGE AND HEAVIER. 5. METAL STUDS AND TRACKS SHALL BE OF SIZE, THICKNESS AND SECTION PROPERTIES SHOWN ON TABLES I61 AND I62 OF THE 2008 EDITION OF THE AISI MANUAL, COLD6FORMED STEEL DESIGN. THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL BE RESPONSIBLE FOR OBTAINING OSHPD APPROVAL FOR ANY SUBSTITUTIONS. 6. THESE DOCUMENTS REFER TO FASTENER TYPE AND SIZE BUT DO NOT SPECIFY OR ENDORSE A SPECIFIC MANUFACTURER,THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL SELECT A MANUFACTURER AND FASTENERS THAT MATCH OR EXCEED THE CAPACITIES/ DESIGN VALUES LISTED HEREIN. THE FOLLOWING REQUIREMENTS SHALL ALSO BE MET: a. SCREW FASTENER SHALL SATISFY AC1186 ACCEPTANCE CRITERIA FOR SELF DRILLING SCREW FASTENERS. PENETRATION OF SCREWS THROUGH JOINED MATERIAL SHALL NOT BE LESS THAN 3 EXPOSED THREADS. LISTING OF CURRENT ICC6ES EVALUATION REPORTS ( OR REPORTS FROM OTHER OSHPD6APPROVED TESTING AGENCIES) SHALL BE REQUIRED FOR FASTENERS USED. SAID REPORTS SHALL BE FIELD REVIEWED BY THE INSPECTOR OF RECORD (IOR) AND OSHPD FIELD STAFF TO VERIFY CONFORMANCE WITH THE ABOVE6NOTED ACCEPTANCE CRITERIA, PRIOR TO INSTALLATION OF FASTENERS. b. WELDING SHALL BE IN ACCORDANCE WITH AWS D1.3 USING E60XX SERIES ELECTRODES. ALL FIELD WELDING SHALL HAVE SPECIAL INSPECTION IN ACCORDANCE WITH CBC 1704A.3.1. c. POST6 INSTALLED ANCHORS SHALL HAVE SPECIAL INSPECTION IN ACCORDANCE WITH CBC 1916A.8, AND CAN 261916A.8. FOR QUALIFICATION, DESIGN AND USE OF POST6 INSTALLED ANCHORS IN CONCRETE SEE CBC 1912A.1 AND CAN 261912A.1. LISTING OF CURRENT ICC6ES EVALUATION REPORTS (OR REPORTS FROM OTHER OSHPD6APPROVED TESTING AGENCIES) SHALL BE REQUIRED FOR FASTENER USED. SAID REPORTS SHALL BE FIELD6 REVIEWED BY THE INSPECTOR OF RECORD (IOR) AND OSHPD FIELD STAFF TO VERIFY CONFORMANCE WITH THE ABOVE6 NOTED ACCEPTANCE CRITERIA, PRIOR TO INSTALLATION OF FASTENERS.
Agency Stamp: Code : Section Title : Sheet Title : 2010 CBC GENERAL NOTES
ra f
Issue Date : XX/XX/XX Revision : Date :
t_
823 -2 01 2
OPD No:
GENERAL NOTES
8/22/2012 5:06:50 PM
CL0.00
d. POWER6 ACTUATED FASTENER SHALL SATISFY THE CURRENT AC706 ACCEPTANCE CRITERIA FOR FASTENER DRIVEN INTO CONCRETE, STEEL AND MASONRY ELEMENTS. LISTING OF CURRENT ICC6ES EVALUATION REPORTS ( OR REPORTS FROM OTHER OSHPD6APPROVED TESTING AGENCIES) SHALL BE REQUIRED FOR FASTENERS USED. SAID REPORTS SHALL BE FIELD6REVIEWED BY THE INSPECTOR OF RECORD (IOR) AND OSHPD FIELD STAFF TO VERIFY CONFORMANCE WITH THE ABOVE6NOTED ACCEPTANCE CRITERIA, PRIOR TO INSTALLATION OF FASTENERS. 7. DESIGN CRITERIA a. BUILDING CODE: 2010 CALIFORNIA STATE BUILDING CODE (CBC), ASCE 7605, 2001 AISI/ NORTH AMERICAN SPECIFICATION (NASPEC) FOR COLD6FORMED MEMBERS, AISI 2007, ASTM E580, ASTM C 635, ASTM C 636. THE REQUIREMENTS IN THIS OPD APPLY TO CEILING SYSTEMS WHOSE TOTAL WEIGHT, INCLUDING CEILING MOUNTED AIR TERMINALS, SERVICES AND LIGHT FIXTURES, DOES NOT EXCEED FOUR (4) psf. HEAVY SYSTEMS, AND THOSE SUPPORTING LATERAL LOADS FROM PARTITIONS, WILL REQUIRE SPECIAL DESIGN DETAILS. b. FASTENER CAPACITIES TABLES WERE DEVELOPED BASED ON ICC REPORTS BY SEVERAL MANUFACTURERS. c. THE DESIGN ASSUMES THAT BUILDING ELEMENTS AND SUPPORTS, TO WHICH THE COMPONENTS ADDRESSED IN THIS DOCUMENT ARE ANCHORED, HAVE SUFFICIENT CAPACITY TO CARRY THE LOADS IMPOSED BY THE COMPONENTS IN COMBINATION WITH ALL OTHER LOADS. EVALUATION OF THE CAPACITY OF THESE SUPPORTING BUILDING ELEMENTS IS BEYOND THE SCOPE OF THE DESIGN. 8. THE DESIGN PROFESSIONAL OF RECORD SHALL VERIFY UNDERWRITER LABORATORY RATING FOR ALL CEILING ASSEMBLIES.
a. ULTIMATE STRESS FOR #10 AND #12 WIRE, OF 60,000 PSI SHALL BE USED.
b. DESIGN STRESS SHALL BE AND THE ULTIMATE STRESS DIVIDED BY 2.5 (24,000 PSI) FOR #10 AND #12 WIRE c. #10 WIRE (0.135" DIAMETER) SHALL HAVE AN ALLOWANCE LOAD OF 343 LBS.
d. #12 WIRE (0.106" DIAMETER) SHALL HAVE AN ALLOWANCE LOAD OF 209 LBS.
e. 4 TWISTS WITHIN 3" MAY BE USED TO DEVELOP THE MAXIMUM ALLOWABLE LOAD.
f. 3 TWISTS WITHIN 3" MAY BE USED TO DEVELOP THE MAXIMUM 50% OF ALLOWABLE LOAD.
Agency Stamp: Code : Section Title : Sheet Title : 2010 CBC GENERAL NOTES Issue Date : XX/XX/XX Revision : Date :
OPD No:
GENERAL NOTES
8/22/2012 5:06:50 PM
c. MAIN RUNNERS, CROSS RUNNERS, SPLICES, EXPANSION DEVICES, INTERSECTION CONNECTORS SHALL BE DESIGNED TO CARRY A MEAN ULTIMATE TEST LOAD OF NOT LESS THAN 180 lbs. IN COMPRESSION & TENSION.
ra f
.
b. SUSPENSION WIRES SHALL BE #12 GAGE (0.106" DIAMETER), SOFT ANNEALED, AND GALVANIZED STEEL WIRES WITH CLASS 1 COATING. THEY MAYBE USED FOR UP TO AND INCLUDING 4'60"x 4'60" GRID SPACING ALONG AND ATTACHED TO MAIN RUNNERS. SPLICES ARE NOT PERMITTED IN ANY HANGER WIRE.
t_
10. SUSPENSION SYSTEM COMPONENTS a. THE CEILING GRID SYSTEM MUST BE RATED HEAVY DUTY AS DEFINED BY ASTM C635.
823 -2 01 2
9. "CEILING WIRE" SHALL CONFORM WITH GALVANIZED SOFT ANNEALED MILD STEEL WIRE AS DEFINED IN ASTM A641 (CLASS 1 COATING):
CL0.01
11. SUSPENSION SYSTEM INSTALLATION: a. PROVIDE #12 GAGE HANGER WIRES AT THE ENDS OF ALL MAIN AND CROSS RUNNERS WITHIN EIGHT (8 INCHES OF THE SUPPORT OR WITHIN ONE6FOURTH (1/4) OF THE LENGTH OF THE END TEE, WHICHEVER IS LEAST, FOR THE PERIMETER OF THE CEILING AREA. PERIMETER WIRES ARE NOT REQUIRED WHEN THE LENGTH OF THE END TEE IS EIGHT (8) INCHES OR LESS. b. CEILING GRID MEMBERS SHALL BE ATTACHED TO TWO (2) ADJACENT WALLS. c. CEILING GRID MEMBERS SHALL BE AT LEAST 3/4" INCH CLEAR OF OTHER WALLS. IF WALLS RUN DIAGONALLY TO CEILING GRID SYSTEM RUNNERS, ONE END OF MAIN AND CROSS RUNNERS SHOULD BE FREE, AND A MINIMUM OF 3/4 INCH CLEAR OF WALL. d. THE WIDTH OF THE PERIMETER SUPPORTING CLOSURE ANGLE SHALL BE NOT LESS THAN 2 INCHES. e. AT THE PERIMETER OF THE CEILING AREA WHERE MAIN OR CROSS RUNNERS ARE NOT CONNECTED TO THE ADJACENT WALL, PROVIDE INTERCONNECTION BETWEEN THE RUNNERS AT THE FREE END TO PREVENT LATERAL SPREADING. A METAL STRUT OR A #16 GAGE WIRE WITH A POSITIVE MECHANICAL CONNECTION TO THE RUNNER MAY BE USED. WHERE THE PERPENDICULAR DISTANCE FROM THE WALL TO THE FIRST PARALLEL RUNNER IS 8 INCHES OR LESS, THIS INTERLOCK IS NOT REQUIRED. 12. EXPANSION JOINTS, SEISMIC SEPARATIONS, AND PENETRATIONS: a. EXPANSION JOINTS SHALL BE PROVIDED IN THE CEILING AT INTERSECTIONS OF CORRIDORS AND AT JUNCTIONS OF CORRIDORS WITH LOBBIES OR OTHER SIMILAR AREAS. b. FOR CEILING AREAS EXCEEDING 2500 SQUARE FEET, A SEISMIC SEPARATION JOINT SHALL BE PROVIDED TO DIVIDE THE CEILING INTO AREAS NOT EXCEEDING 2500 SQ. FT. c. PENETRATIONS THROUGH THE CEILING FOR SPRINKLER HEADS AND OTHER SIMILAR DEVICES THAT ARE NOT INTEGRALLY TIED TO THE CEILING SYSTEM IN THE LATERAL DIRECTION SHALL HAVE A TWO (2) INCH OVERSIZED RING, SLEEVE OR ADAPTER THROUGH THE CEILING TILE TO ALLOW FREE MOVEMENT OF ONE (1) INCH IN ALL HORIZONTAL DIRECTIONS. A FLEXIBLE SPRINKLER HOSE FITTING THAT CAN ACCOMMODATE 1 INCH OF CEILING MOVEMENT SHALL BE PERMITTED TO BE USED IN LIEU OF THE OVERSIZED RING, SLEEVE OR ADAPTER. 13. LATERAL FORCE BRACING:
LATERAL FORCE BRACING IS REQUIRED PER THIS SECTION FOR ALL CEILING AREAS. EXCEPTION: LATERAL FORCE BRACING MAY BE OMITTED FOR SUSPENDED ACOUSTICAL CEILING SYSTEMS WITH A CEILING AREA OF 144 SQ. FT. OR LESS, AND FIRE RATED SUSPENDED ACOUSTICAL CEILING SYSTEMS WITH A CEILING AREA OF 144 SQ. FT. OR LESS, WHEN PERIMETER SUPPORT IN ACCORDANCE WITH ASTM E580 ARE PROVIDED AND PERIMETER WALLS ARE DESIGNED TO CARRY THE CEILING LATERAL FORCES. a. PROVIDE LATERAL6FORCE BRACING ASSEMBLIES CONSISTING OF A COMPRESSION STRUT AND FOUR (4) #12 GAGE SPLAYED BRACING WIRES ORIENTED 90 DEGREES FROM EACH OTHER. b. LATERAL6FORCE BRACING ASSEMBLIES SHALL BE SPACED AT A MAXIMUM OF 12 FEET BY 12 FEET ON CENTER WITH THE FIRST ASSEMBLY WITHIN 6 FEET SPACING FROM EACH WALL AND AT THE EDGES OF ANY CHANGE IN ELEVATION OF THE CEILING. THE LAST ASSEMBLY MUST BE WITHIN MAXIMUM DISTANCE FROM EACH WALL. c. THE SLOPE OF BRACING WIRES MAY BE FROM 0 TO 45 DEGREES BUT MAY NOT EXCEED 45 DEGREES FROM THE PLANE OF THE CEILING AND WIRES SHALL BE TAUT. d. COMPRESSION STRUTS SHALL BE ADEQUATE TO RESIST THE VERTICAL COMPONENT INDUCED BY THE BRACING WIRES, AND SHALL NOT BE MORE THAN 1(HORIZONTAL) IN 6 (VERTICAL) OUT OF PLUMB.
Agency Stamp: Code : Section Title : Sheet Title : 2010 CBC GENERAL NOTES
ra f
t_
823 -2 01 2
OPD No:
GENERAL NOTES
8/22/2012 5:06:50 PM
CL0.02
14. ATTACHMENT OF HANGER AND BRACING WIRES: a. FASTEN #12 HANGER WIRES WITH NOT LESS THAN THREE (3) TIGHT TURN IN 3 INCHES. HANGERWIRE LOOPS SHALL BE TIGHTLY WRAPPED AND SHARPLY BENT TO PREVENT ANY VERTICAL MOVEMENT OR ROTATION OF THE MEMBER WITHIN THE LOOPS. b. FASTEN #12 BRACING WIRES WITH THREE (3) TIGHT TURNS. MAKE ALL TIGHT TURNS WITHIN A DISTANCE OF 3" INCHES. c. HANGER OR BRACING WIRE ANCHORED TO THE STRUCTURE SHOULD BE INSTALLED IN SUCH A MANNER THAT THE DIRECTION OF THE ANCHOR ALIGNS AS CLOSELY AS POSSIBLE WITH THE DIRECTION OF THE WIRE. d. SEPARATE ALL CEILING HANGER AND BRACING WIRES AT LEAST SIX (6) INCHES FROM ALL UNBRACED DUCTS, PIPES CONDUITS, ETC. e. HANGER WIRES SHALL NOT BE ATTACHED TO OR BEND AROUND INTERFERING MATERIAL OR EQUIPMENT. PROVIDE TRAPEZE OR OTHER SUPPLEMETARY SUPPORT MEMBERS AT OBSTRUCTIONS TO TYPICAL HANGER SPACING. PROVIDE ADDITIONAL HANGERS, STRUTS OR BRACES AS REQUIRED AT ALL CEILING BREAKS, SOFFITS, OR DISCONTINUOUS AREAS. f. HANGER WIRES THAT ARE MORE THAN 1 (HORIZONTAL) IN 6 (VERTICAL)OUT OF PLUMB SHALL HAVE COUNTER SLOPING WIRES. PERIMETER HANGER WIRES AT RUNNERS THAT ARE POSITIVELY ATTACHED TO THE PERIMETER CLOSURE ANGLE, COUNTER6SLOPING IS OPTIONAL. g. WHEN DRILLED6IN CONCRETE ANCHORS OR SHOT6IN ANCHORS ARE USED IN REIFORCED CONCRETE FOR HANGER WIRES 1 OUT OF 10 WIRE/ ANCHOR ASSEMBLIES MUST BE FIELD TESTED FOR 200 lbs. IN TENSION. WHEN DRILLED6IN CONCRETE ANCHORS ARE USED FOR BRACING WIRES, 1 OUT OF 2 WIRE/ ANCHOR ASSEMBLIES MUST BE FIELD TESTED FOR 440 lbs. IN TENSION IN THE DIRECTION OF THE WIRE. SHOT6IN ANCHORS IN CONCRETE ARE NOT PERMITTED FOR BRACING WIRES.
Agency Stamp: Code : Section Title : Sheet Title : 2010 CBC GENERAL NOTES
ra f
a. CEILING PANELS SHALL NOT SUPPORT ANY LIGHT FIXTURES, AIR TERMINALS OR DEVICES. b. ATTACH ALL LIGHT FIXTURES, CEILING MOUNTED AIR TERMINALS AND ALL OTHER DEVICES TO THE CEILING GRID RUNNERS TO RESIST A HORIZONTAL FORCE EQUAL TO THE WEIGHT OF THE FIXTURE. SCREWS OR APPROVED FASTENERS ARE REQUIRED. MINIMUM OF TWO ATTACHNMENTS ARE REQUIRED AT EACH LIGHT FIXTURE. c. RECESSED OR DROP6IN LIGHT FIXTURE, GRILLES, MECHANICAL TERMINALS, AND FLEXIBLE SPRINKLER HOSE FITTINGS OR OTHER SERVICES BE SUPPORTED DIRECTLY ON RUNNERS CLASSIFIED AS ASTM HEAVY DUTY, BUT THEY MUST ALSO HAVE A MINIMUM OF TWO (2) #12 GAGE SLACK SAFETY WIRES ATTACHED TO THE FIXTURE AT DIAGONAL CORNERS AND ANCHORED TO THE STRUCTURE ABOVE. d. ALL FLUSH OR RECESSED LIGHT FIXTURES, MECHANICAL TERMINALS, AND FLEXIBLE SPRINKLER HOSE FITTINGS OR OTHER SERVICES WEIGHING 56 lbs. OR MORE MUST BE INDEPENDENTLY SUPPORTED BY NOT LESS THAN FOUR (4) TAUT #12 GAGE WIRES ATTACHED TO THE HOUSING AND TO THE STRUCTURE ABOVE. THE FOUR (4) TAUT #12 GAGE WIRES, INCLUDING THEIR ATTACHMENT TO THE STRUCTURE ABOVE, MUST BE CAPABLE OF SUPPORTING FOUR (4) TIMES THE WEIGHT OF THE UNIT. e. ALL 4 ft.x 4 ft. LIGHT FIXTURES MUST HAVE SLACK SAFETY WIRES AT EACH CORNER. f. SURFACE6MOUNTED FIXTURES SHALL BE ATTACHED TO THE MAIN RUNNER WITH AT LEAST TWO POSITIVE CLAMPING DEVICES MADE OF MATERIAL WITH A MINIMUM #14 GAGE. ROTATIONAL SPRING CATCHES DO NOT COMPLY. A #12 GAGE SUSPENSION WIRE SHALL BE ATTACHED TO EACH CLAMPING DEVICE TO THE STRUCTURE ABOVE. PROVIDE ADDITIONAL SUPPORTS WHEN LIGHT FIXTURES ARE 8 ft. OR LONGER. MAXIMUM SPACING BETWEEN SUPPORTS SHALL NOT EXCEED 8 FEET.
t_
823 -2 01 2
OPD No:
GENERAL NOTES
8/22/2012 5:06:50 PM
CL0.03
g. SUPPORT PENDANT6MOUNTED LIGHT FIXTURES DIRECTLY FROM THE STRUCTURE ABOVE WITH THE HANGER WIRES OR CABLES PASSING THROUGH EACH PENDANT HANGER AND CAPABLE OF SUPPORTING TWO (2) TIMES THE WEIGHT OF THE FIXTURE. A BRACING ASSEMBLY (EITHER SPLAY WIRES ATTACHED TO THE PENDANT HOUSING OR THE PENDANT HOUSING ATTACHED TO THE CEILING GRID MEMBERS) IS REQUIRED IF THE PENDANT HANGER PENETRATES THE FEILD OF THE CEILING TILE. SPECIAL DETAILS ARE REQUIRED TO ATTACH THE PENDANT HANGER TO THE BRACING ASSEMBLY TO TRANSMIT HORIZONTAL FORCE. IF THE PENDANT MOUNTED LIGHT FIXTURE IS DIRECTLY ATTACHED TO THE CEILING GRID MEMBER, THEN THE BRACING ASSEMBLY IS NOT REQUIRED ABOVE THE CEILING. 16. ADDITIONAL REQUIREMENTS: a. FIRE RATED CEILINGS: PROVIDE A DETAIL AND DESIGN NUMBER FOR RATED CEILING ASSEMBLIES FROM AN AUTHORIZED TESTING AGENCY. THE COMPONENTS AND INSTALLATION DETAILS MUST CONFORM IN EVERY RESPECT WITH THE LISTED DETAIL AND NUMBER. DETAILS SHALL CLEARLY DEPICTS ALL COMPONENTS, INCLUDING INSULATION MATERIALS, FRAMING AND ATTACHMENT OF THE DESIGN SO THAT THE ASSEMBLY CAN BE CONSTRUCTED AND INSPECTED ACCORDINGLY. POP RIVETS, SCREWS, OR OTHER ATTACHMENTS ARE NOT ACCEPTABLE UNLESS SPECIFICALLY DETAILED ON THE DRAWINGS AND APPROVED BY U.L. b. METAL AND OTHER PANELS: METAL PANELS AND PANELS WEIGHING MORE THAN 1/2 psf, OTHER THAN MINERAL FIBER ACOUSTICAL TILE, ARE TO BE POSITIVELY ATTACHED TO THE CEILING SUSPENSION RUNNERS. c. ESSENTIAL SERVICES BUILDINGS: EXIT WAYS SHALL BE INSTALLED IN ACCORDANCE WITH SECTION 13.5.6.2.2(1) OF ASCE 7605 AS AMENDED BY 2010 CBC SECTION 1615A.1.16. SPLICES OR INTERSECTION OF SUCH RUNNERS SHALL BE ATTACHED WITH THROUGH CONNECTORS SUCH AS POP RIVETS, SCREWSS, PINS, PLATES WITH END TABS OR OTHER APPROVED CONNECTORS.
Agency Stamp: Code : Section Title : Sheet Title : 2010 CBC GENERAL NOTES
ra f
Issue Date : XX/XX/XX Revision : Date :
t_
823 -2 01 2
OPD No:
GENERAL NOTES
8/22/2012 5:06:50 PM
CL0.04
POWER ACTUATED FASTENER ALLOWABLE DESIGN VALUES (SERVICE LEVEL) . 1. POWER ACTUATED FASTENER DESIGN VALUES FOR SHEAR AND TENSION ARE GENERATED USING ICC REPORT FOR TWO PRODUCTS. S1 6 HILTI LOW6VELOCITY POWER6DRIVEN FASTENER6FASTENER X6U (ICC62269) W/ SHANK DIAMETER 0.157 6 ITW RAMSET POWER6DRIVEN FASTENERS6 PART NO. 1500 (ICC ESR6 1799) WITH SHANK DIAMETER 0.145 2. DESIGN VALUES LISTED BELOW ARE 75% OF THE LESSER VALUE BETWEEN THE TWO REPORTED IN ICC.M
TABLE 1 POWER ACTUATED FASTENER INSTALLED INTO SAND6LIGHTWEIGHT CONCRETE THROUGH METAL DECK f'c=3000 psi NOMINAL SHANK DIAMETER (in.) 0.138 0.145 MIN. EMBED (in.) 7/8" 1 1/8" 6 1 1/8" 7/8" 0.157 1 1/8" MIN. SPACING (in.) 4 4 6 4 4 4 MIN. EDGE DISTANCE (in.) 3.2 3.2 6 3.2 3.2 3.2 TENSION (lbs.) 75 75 6 75 6 SHEAR* (lbs.) 100 100 6 100 100 6
Agency Stamp: Code : Section Title : Sheet Title : 2010 CBC SUSPENDED CEILING FRAMING COMPONENTS
ra f
* POWER ACTUATED FASTENER SHEAR CAPACITY IS LIMITED TO 90 LBS WHERE PERMANENT GRAVITY TENSION LOADS ARE PRESENT (OSHPD CAN 261912A.1) ** VALUES ARE FOR SINGLE FASTENER, WHICH MEET REQUIREMENTS PER NOTES BELOW
t_
823 -2 01 2
100
OPD No:
CL1.1
NOTE: 1. MINIMUM CONCRETE STRENGTH fc= 2000 psi UNLESS OTHERWISE NOTED. 2. FASTENERS INSTALL THROUGH LOW FLUTES OF THE METAL DECK PER SKETCH BELOW. 3. MINIMUM EDGE DISTANCE OF 161/8" FROM THE EDGE OF METAL DECK WEB AND 4" FROM THE EDGE OF THE DECK. 4. STEEL DECK TO BE A MINIMUM OF 20 GA. 5. CONCRETE FILL DEPTH ABOVE THE TOP OF METAL DECK MUST BE A MINIMUM OF 361/4" @ LIGHT WEIGHT. COMPOSITE METAL DECK. 6. POWER ACTUATED FASTENERS SHALL NOT BE USED TO RESIST SEISMIC TENSILE FORCES. THEY ARE PERMITTED FOR ATTACHMENT OF VERTICAL SUSPENSION WIRES THAT ARE NOT PART OF THE SEISMIC BRACING. 7. POWER ACTUATED FASTENERS SHALL NOT BE USED IN PRE6STRESSED CONCRETE UNLESS NON6DESTRUCTIVE TESTING METHODS ARE USED TO LOCATE STRAND AND REINFORCE PRIOR TO THE PDF INSTALLATION. 8. PAF INSTALLATION SHALL NOT NICK OR DAMAGE EXISTING CONCRETE REINFORCE. 9. PAF SHALL BE INSTALLED PER CURRENT ICC6ES EVALUATION REPORTS OR REPORT FROM OTHER OSHPD. APPROVED TESTING AGENCY AND PER CAN 261916A.8. 10. TESTING OF PAF'S SHALL BE PER CBC SECTION 1916A.8 AND CAN 261916A.8. MINIMUM CONCRETE SUBSTRAIGHT THICKNESS IS THREE TIMES THE PAF'S PENETRATION INTO THE CONCRETE SUBSTRAIGHT. STEEL DECK CONCRETE STRENGTH SEE TABLE 1, 2, & 3 IN DETAIL CL1.2A
t_
823 -2 01 2
1 1/8" 4 1/2" 7 1/2" FASTENER
N.T.S.
6 1/4"
3"
3 1/4"
4 7/16"
Agency Stamp: Code : Section Title : Sheet Title : 2010 CBC SUSPENDED CEILING FRAMING COMPONENTS
ra f
OPD No:
CL1.2
POWER ACTUATED FASTENER ALLOWABLE DESIGN VALUES (SERVICE LEVEL INSTALLED IN STEEL) . 1. POWER ACTUATED FASTENER DESIGN VALUES FOR SHEAR AND TENSION ARE GENERATED USING ICC REPORT FOR THREE PRODUCTS. 6 HILTI LOW6VELOCITY POWER6DRIVEN FASTENER6 FASTENER X6U (ICC62269) W/ SHANK DIAMETER 0.157 6 ITW RAMSET POWER6DRIVEN FASTENERS6 PART NO. 1500K AND 1600K (ICC ESR6 1799) WITH SHANK DIAMETER 0.145 6 SIMPSON POWER6DRIVEN FASTENERS6 FASTENER PDPT (ICCESR62138) WITH SHANK DIAMETER 0.145 2. DESIGN VALUES LISTED BELOW ARE 75% OF THE LESSER VALUE AMONG THE THREE REPORTED IN ICC.
3/16 TENSION(lbs)
823 -2 01 2
1/4 3/8 SHEAR(lbs) TENSION(lbs) 494 510 SHEAR(lbs) 540 255
NOTE:
1. MINIMUM SPACING BETWEEN PINS =161/2" O.C. 2. MINIMUM EDGE DISTANCE = 1/2"
Agency Stamp: Code : Section Title : Sheet Title : 2010 CBC SUSPENDED CEILING FRAMING COMPONENTS
ra f
t_
Issue Date : XX/XX/XX Revision : Date :
OPD No:
POWER ACTUATED FASTENER (PAF)6 CAPACITIES (INSTALLED IN STEEL) & INSTALLATION CRITERIA
8/22/2012 5:06:51 PM
CL1.3
EXPANSION ANCHOR DESIGN VALUES NOTE: 1. DESIGN VALUES/ ASD VALUE TABLE 1 EXPANSION ANCHORS INSTALLED INTO THE UNDERSIDE OF STRUCTURAL SAND6LIGHTWEIGHT CONCRETE (f'c MIN= 3000 PSI) OVER METAL DECK ANCHOR DIA. (in) 3/8 1/2 1/2 5/8 5/8 EMBED (in.) 2 2 3 1/4 3 1/8 4 SHEAR (lb.) 708 998 1082 1523 2008 TENSION (lb.) (WITH INSPECTION) 532 532 954 728 1691
EMBED (in.) 2 2
TABLE 3 EXPANSION ANCHORS INSTALLED IN NORMAL WEIGHT CRACKED CONCRETE (f'c MIN= 3000 PSI) ANCHOR DIA. (in) 3/8 1/2 1/2 5/8 5/8 EMBED (in.) 2 2 SHEAR (lb.) 749 TENSION (lb.) (WITH INSPECTION) 827 875 1790 1710 2476
t_
ra f
* VALUES ARE FOR SINGLE ANCHORS, WHICH COMPLY WITH MIN. REQUIREMENTS PER NOTES ON CL1.3B
823 -2 01 2
SHEAR (lb.) 566 566 525 525 2129 2129 3509 3509 3 1/4 3 1/8 4
TABLE 2 EXPANSION ANCHORS INSTALLED INTO THE UNDERSIDE OF STRUCTURAL SAND6LIGHTWEIGHT CONCRETE (f'c MIN= 3000 PSI) OVER METAL DECK TENSION (lb.) (WITH INSPECTION)
OPD No:
CL1.4a
TABLE 4 NOMINAL ANCHOR DIAMETER (in.) 3/8" DIA. EFFECTIVE MIN. EMBEDMENT (in.) MIN. MEMBER THICKNESS NWC SLAB OR BEAM ONLY (in.) MINIMUM ANCHOR SPACING (3 x EMBED) (in.) MINIMUM EDGE DISTANCE (in.) 2 4 6 3/4 4 3/8 2 4 6 3/4 6 1/2" DIA. 3 1/2 6 9 3/4 7 1/2 3 1/8 5 9 3/8 6 1/2 5/8" DIA. 4 6 12 8 3/4
1.2
1" MIN.
Agency Stamp: Code : Section Title : Sheet Title : 2010 CBC SUSPENDED CEILING FRAMING COMPONENTS
1. MINIMUM CONCRETE STRENGTH fc= 3000 psi. 2. EXPANSION ANCHORS INSTALLED THROUGH UPPER OR LOWER FLUTES OF METAL DECK SHALL MEET REQUIREMENTS OF SKETCH ABOVE. 3. STEEL DECK TO BE MINIMUM 20 GA. W6DECK. 4. CONCRETE FILL DEPTH ABOVE THE TOP OF METAL DECK MUST BE A MINIMUM OF 361/4". 5. EXPANSION ANCHOR SHALL NOT BE USED IN PRE6STRESSED CONCRETE UNLESS NON6DESTRUCTIVE TESTING METHODS ARE USED TO LOCATE STRAND & REINFORCED PRIOR TO ANCHOR INSTALLATION. 6. EXPANSION ANCHOR INSTALLATION SHALL NOT NICK OR DAMAGE EXISTING REINFORCE. 7. EXPANSION ANCHOR SHALL BE INSTALLED PER CURRENT ICC6ES EVALUATION REPORT FROM OTHER OSHPD APPROVED TESTING AGENCY AND PER CAN 261912A.1. 8. TESTING OF EXPANSION ANCHORS SHALL BE PER CBC SECTION 1916A.8 AND PER CAN 261916A.8. 9. EXPANSION ANCHORS SHALL BE INSTALLED TO COMPLY WITH THE MIN. SLAB THICKNESS REQUIREMENTS ESTABLISHED BY THE MANUFACTURER'S TECHNICAL GUIDE FOR THE SPECIFIED ANCHOR, PROVIDED SUFFICIENT TEST DATA IS PROVIDED TO SUPPORT SAID INSTALLATION. IF SUFFICIENT TEST DATA IS NOT PROVIDED THAN DESIGN VALUES LISTED IN TABLE ABOVE ARE NOT VALID REQUIRING DESIGN VALUES TO BE DESIGNED BY SEOR AND REVIEWED BY OSHPD.
ra f
t_
823 -2 01 2
UPPER FLUTE (VALLEY) 4 1/2" MIN. 12" TYP.
OPD No:
CL1.4b
163/8" OR 165/8" 163/8" OR 1 5/8" 163/8" OR 165/8" . 3/8" MIN. 3 3/4" . MIN. 3/8" 4" . 3/8" MIN. 6"
STRUCTURAL TRACK ('T'6SECTIONS) 6 DEEP LEG TRACK (WHERE OCCURS AS NOTED IN DETAILS)
*
18 27 33 43 54 68 97
118
NOTE:
Agency Stamp: Code : Section Title : SUSPENDED CEILING FRAMING COMPONENTS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
1. SEE WALL STUD FRAMING SECTIONS FOR THICKNESS OF STUDS & TRACKS. 2. Fy = 50KSI FOR 54 MIL (16GA) & THICKER SECTIONS, AND Fy = 33KSI FOR SECTIONS UP TO & INCLUDING 43 MI (18GA). 3. SIZE AND THICKNESS ARE CONSIDERED MINIMUMS. 4. STRUCTURAL STUDS MAY BE PUNCHED UNLESS NOTED OTHERWISE. STRUCTURAL TRACK SHALL BE UNPUNCHED UNLESS NOTED OTHERWISE.
ra f
t_
823 -2 01 2
25 22 20 18 16 14 12 10
CL1.5
12 GA. VERT. HANGER WIRE @ 4'60" O.C. EA. WAY WITH MINIMUM SEE CL4.1
12 GA. SPLAYED BRACE WIRES IN FOUR DIRECTIONS 90 APART @ 12'60" x 12'60" O.C. EA. WAY. SEE CL4.1
RIGID VERT. COMPRESSION STRUT, SEE DET. CL2.21 COMPRESSION STRUT SHALL NOT REPLACE HANGR WIRES 45 OR CL2.22
CL2.3
NOTES:
Agency Stamp: Code : Section Title : SUSPENDED ACOUSTICAL CEILING DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ISOMETRIC DETAIL
8/22/2012 5:06:53 PM
ra f
t_
823 -2 01 2
CL2.1
12'60" MAX.
CL2.7
FIXED JOINT
CL2.7 12'60" MAX. 144SF CROSS RUNNERS TYP. MAIN RUNNERS BRACING WIRE LOCATION6TYP.
CL2.7
EXPANSION JOINT
NOTE:
Agency Stamp: Code : Section Title : SUSPENDED ACOUSTICAL CEILING DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
BRACING WIRES AND COMP. STRUT SHALL OCCUR AT EVERY 144 SQ. FT. MAX. IN ROOMS OVER 144 SQ. FT.
t_
823 -2 01 2
CL2.7 7/8 x 2" x 16GA CONT. ANGLE @ PERIMETER.
CL2.2
EXPANSION JOINT
FIXED JOINT
FIXED JOINT
CL2.5
823 -2 01 2
O.H. CL2.6 CL2.6 EXPANSION JOINT
EXPANSION JOINT
FIXED JOINT
Agency Stamp: Code : Section Title : SUSPENDED ACOUSTICAL CEILING DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
CL2.3
4'60" OR LESS
8" MAX.
8" MAX.
823 -2 01 2
POP RIVET CONT. RUNNERS (SPLICE ALL JOINTS)
POP RIVET
Agency Stamp: Code : Section Title : SUSPENDED ACOUSTICAL CEILING DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
RUNNER SPLICE
SLIP JOINT
CL2.4
8" MAX. TYP. HANGER WIRE @ 4'60" O.C. W/ (1) PAIR OF BRACING WIRES PARALLEL TO WALL @ 12'60" O.C. & 4'60" MAX. FROM EACH END
3/4"CLR.
FIXED JOINT
RUNNER SPLICE
Agency Stamp: Code : Section Title : SUSPENDED ACOUSTICAL CEILING DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
823 -2 01 2
POP RIVET TYP. WALL ANGLE
CL2.1
EXPANSION JOINT
CL2.5
3/4" CLR.
ACOUSTIC PANEL
ALTERNATE STRUT SPACER LOCATION W/O NAIL CONT. SLOTTED ANGLE STRUT SPACER W/ HORIZ. 6d RINGSHANK NAIL (SEE NOTE 2 BELOW) (OMIT STRUT WHERE RUNNER IS WITHIN 12" OF WALL)
FIXED JOINT
1.
PROVIDE #12 GAGE HANGER WIRES AT THE ENDS OF ALL MAIN AND CROSS RUNNERS WITHIN EIGHT (8) INCHES OF THE SUPPORT OR WITHIN ONE6FOURTH (1/4) OF THE LENGTH OF THE END TEE, WHICHEVER IS LEAST, FOR THE PERIMETER OF THE CEILING AREA. PERIMETER WIRES ARE NOT REQUIRED WHEN THE LENGTH OF THE END TEE IS EIGHT (8) INCHES OR LESS.
2. NAILS AT ENDS OF HORIZONTAL STRUTS ARE TO BE PLACED WITH NAIL HEAD TOWARD CENTER LINE OF SPAN OF STRUT.
ra f
t_
3. SPACER MAY ALSO BE CHANNELS WITH "DIAMOND POINTS" OF SPRING STEEL WHICH SNAP TIGHT TO PREVENT MOVEMENT OF STRUT.
823 -2 01 2
RUNNER
EXPANSION JOINT
Agency Stamp: Code : Section Title : SUSPENDED ACOUSTICAL CEILING DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
CEILING PERIMETER
8/22/2012 5:06:54 PM
CL2.6
LOCATE HANGER WIRE AT EACH TRACK CONNECTIONS SPLICE @ CROSS RUNNERS T6BAR ACOUSTICAL CEILING PANEL
Agency Stamp: Code : Section Title : SUSPENDED ACOUSTICAL CEILING DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
823 -2 01 2
24" MAX. CUBICLE CURTAIN OR I.V. TRACK
26#8 S.M.S. @ 48" O.C. AND 12" MAX. FROM EACH END OF TRACK ATTACHED TO CEILING GRID MEMBERS ONLY.
CL2.7
NOTES:
1. ATTACH ALL LIGHT FIXTURES TO THE CEILING GRID RUNNERS TO RESIST A HORIZONTAL FORCE EQUAL TO THE WEIGHT OF THE FIXTURES. 2. SUPPORT SURFACE MOUNTED LIGHT FIXTURES BY AT LEAST TWO POSITIVE DEVICES WHICH SURROUND THE CEILING RUNNER AND WHICH ARE EACH SUPPORTED FROM THE STRUCTRE ABOVE BY A 12 GA. WIRE SPRING CLIPS OR CLAMPS THAT CONNECT ONLY TO THE RUNNER ARE NOT ACCEPTABLE. 3. SUPPORT PENDANT MOUNTED LIGHT FIXTURES DIRECTLY FROM THE STRUCTURE ABOVE WITH HANGERS WIRES OR CABLES CAPABLE OF SUPPORTING 2 TIMES THE WEIGHT OF THE FIXTURE.
ra f
Agency Stamp: Code : Section Title : SUSPENDED ACOUSTICAL CEILING DETAILS . Sheet Title : 2010 CBC
t_
HEAVY DUTY SYSTEM
823 -2 01 2
12GA WIRE HANGERS HEAVY DUTY SYSTEM: PLACE ON DIAGONAL CORNERS (2) EXCEPT 4'x 4' FIXTURES SHALL HAVE HANGERS AT EACH CORNER (4). DEVICES THAT WEIGHT LESS THAN 56 LBS REQUIRE A MINIMUM OF 2 SLACK WIRES LOCATED AT DIAGONAL CORNERS.
OPD No:
CL2.8
STRUCTURE
823 -2 01 2
6" MAX. 2" MAX.
0 TO 45 MAX.
ra f
t_
Agency Stamp: Code : Section Title : COMPRESSION STRUT DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
CL3.1
CL5.1
HANGER WIRE WITHIN
823 -2 01 2
6"MAX. SPLAY WIRES SEE
CL4.1
12"MAX.
6"MIN. OVERALL
TIGHT TO RUNNER
FLATTEN END
2"MAX.
ra f
t_
(1) 3/8"DIA. MACHINE BOLT SLOT END
OPTION 1
OPTION 3
OPTION 2
DOUBLE NUTS
Agency Stamp: Code : Section Title : COMPRESSION STRUT DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
CL3.2
1/2" DIA. WEDGE ANCHOR W/ 3 1/4" EMBED 2" X 2" X 1/4" THK X 4" LONG ANGLE CHANNEL PER SCHEDULE L (2) 1/4" DIA. MACHINE BOLT OR (3)6#10 S.M.S. @ EACH END OF KICKER < 6'60" < 8'60"
CONCRETE STRUCTURE
823 -2 01 2
CHANNEL KICKER TO MATCH VERT. 6" MAX. 2" MAX. 1 2'60" MAX.
CL4.1
t_
ra f
Agency Stamp: Code : Section Title : COMPRESSION STRUT DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
SUSPENDED ACOUSTICAL CEILING6 CHANNEL TYPE COMPRESSION STRUT OFFSET WITH KICKER
8/22/2012 5:06:55 PM
CL3.3
1/2" DIA. WEDGE ANCHOR W/ 3 1/4" EMBED 2" X 2" X 1/4" THK X 4" LONG ANGLE.
#14 S.M.S.
823 -2 01 2
SPLAY WIRES SEE 6 MIN. OVERALL
HANGER WIRE
CL4.1
SLOT END
ra f
(1) 3/8" DIA. MACHINE BOLT (TYP. @ TOP AND BOTTOM) LOWER SECTION ONE SIZE LARGER THAN MAIN SECTION
t_
1'60" MAX.
Agency Stamp: Code : Section Title : COMPRESSION STRUT DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
CL3.4
CL4.2
3" MAX. 3 TURNS TYPICAL @ EACH END
HANGER WIRE
Agency Stamp: Code : Section Title : HANGER & SPLAY . WIRE CONNECTION DETAILS Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
SPLAY WIRE
823 -2 01 2
CL4.2
0 TO 45.0 MAX. 3"
.
CL4.1
APPLICABLE DETAIL
CL4.3 CL4.4 CL4.5 CL4.6 CL4.7 CL4.8
Agency Stamp: Code : Section Title : HANGER & SPLAY . WIRE CONNECTION DETAILS Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
823 -2 01 2
CL4.2
C L
1" MIN.
1" MIN.
STEEL DECK
CL4.1
3/8" MAX.
MIN. 3 TIGHT
MIN. 5/8" DRILL6IN EXPANSION ANCHOR W/ 4" MIN. EMBED. (REF. ICC6ES AC193 REPORT NO.)
t_
ra f
SPLAY WIRE
Agency Stamp: Code : Section Title : HANGER & SPLAY . WIRE CONNECTION DETAILS Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
823 -2 01 2
HANGER
OPTION 2
OPTION 1
OPTION 2
OPTION 3
CL4.3
1" MIN. 161/2" TO 2" 2" WIDEx 16GA STRAP #10 S.M.S. (4 PER CHANNEL) L 161/2"x 161/2"x 16ga OR 162T125616 #10 S.M.S. EACH SIDE
CL4.1 OPTION 2
OPTION
HANGER
METAL DECK (20 GA MIN.) W/ NON6STRUCTURAL FILL ASSEMBLY
66 #10 S.M.S. @ 2" O.C. 6" WIDE x 4" LONG x 12GA STRAP
823 -2 01 2
STRUC'L CONC. FILL POWDER6ACTUATED CEILING WIRE ASSEMBLY (REF. ICC6ES AC70 REPORT NO.) STRUCTURAL CONCRETE MIN. # 12 GA. ASTM A641 CLASS 1 WIRE
STEEL DECK
Agency Stamp: Code : Section Title : HANGER & SPLAY . WIRE CONNECTION DETAILS Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
SPLAY WIRE
CL4.4
5/8" DIA. WEDGE ANCHOR W/ 4" EMBED. LIGHTWEIGHT OR NORMAL WEIGHT CONCRETE SLAB. DO NOT CONNECT SPLAY WIRE TO JOIST OR BEAM.
CL4.1
1/2" (MAX) STEEL ANGLE 2" WIDE x 3" LONG x 1/4" THK.
OPTION 1
OPTION 2
SPLAY WIRE
261/4" MIN. EDGE DISTANCE FACE OF BEAM OR JOIST WHERE OCCUR 3/8" DIA. SLEEVE ANCHOR OR 3/8" DIA. WEDGE ANCHOR
CL4.1
OPTION 1
823 -2 01 2
LIGHTWEIGHT OR NORMAL WEIGHT CONC. SLAB, BEAM OR JOIST SOFFIT (MIN. 461/2" WIDE) 3/8" MAX.
OPTION 2
t_
HANGER
APPROVAL OF THE ENGINEER OF RECORD IS REQUIRED PRIOR TO INSTALLATION OF ANCHORAGE INTO PRESTRESSED CONCRETE.
ra f
NOTE:
OPTION 3
Agency Stamp: Code : Section Title : HANGER & SPLAY . WIRE CONNECTION DETAILS Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
HANGER & SPLAY WIRE CONNECTION TYPE 36 CONCRETE SLAB, BEAM, JOIST
8/22/2012 5:06:56 PM
CL4.5
FIRE PROOFING
CL1.3
STRUCTURAL STEEL 3/8" MAX.
TEST EACH WIRE & CLIP ASSEMBLY FOR 200# TENSION LOAD.
3/8" MAX.
3/16" MIN. TEST EACH WIRE AND CLIP ASSEMBLY FOR 440# TENSION LOAD IN THE DIRECTION OF THE WIRE.
t_
ra f
Agency Stamp: Code : Section Title : HANGER & SPLAY . WIRE CONNECTION DETAILS Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
823 -2 01 2
HANGER
1/4" MAX. 3" WIDE x 2"LONG x 12GA CLIP
FIRE PROOFING
STRUCTURAL STEEL
SPLAY WIRE
CL4.6
161/4" MIN.
1/4" DIA. CLOSED EYE SCREW 4" X 4" BLOCKING FASTEN TO JOIST USING 1 1/2" X 2 1/2" X 18 GA. FRAMING ANGLE W/ 868d X 1 1/2" NAILS EACH SIDE AND EACH END.
HANGER
1/2" DIA. EYE SCREW W/ 3" MIN. PENETRATION AT ANGLE OF WIRE. GYP. BOARD WHERE OCCURS
Agency Stamp: Code : Section Title : HANGER & SPLAY . WIRE CONNECTION DETAILS Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
SPLAY WIRE
t_
823 -2 01 2
0645 MAX.
CL4.7
METAL STUD (20 ga. MIN.) 1 LAYER OF GYP. BD. 26#10 S.M.S. @ 1" O.C. 1/2" 13 GA.x 2" WIDE CLIP ANGLE BACK TO BACK 161/2" X 3" X 14 GA ANGLE (LLV) SPAN 4 WALL STUDS MIN. FASTEN ANGLE TO WALL STUDS USING 2"X #10 X 16 1/4" SMS PER ANGLE AT EACH STUD.
SPLAY WIRE
0 TO 45 MAX.
Agency Stamp: Code : Section Title : HANGER & SPLAY . WIRE CONNECTION DETAILS Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
823 -2 01 2
1 6
HANGER
CL4.8
Agency Stamp: Code : Section Title : HANGER & SPLAY . WIRE CONNECTION DETAILS Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
NOTE: THIS IS APPLIED FOR PERIMETER WIRE ATTACHEMENT OR WHERE OBSTRUCTION PREVENTS ATTACHMENT TO STRUCTURE ABOVE.
t_
823 -2 01 2
B. "THRU GYP"
CL4.9
16 GA. BACKING STUD. SPAN 3 WALL STUDS MINIMUM. FASTEN BACKING TO WALL STUDS USING 2X #10X161/4" SMS AT EACH STUD. 12 GA.X 1" WIDE SIESMIC BRACKET. FASTEN TO BACKING STUD USING #10 X 161/4" SHEET METAL SCREW.
Agency Stamp: Code : Section Title : HANGER & SPLAY . WIRE CONNECTION DETAILS Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
823 -2 01 2
12 GA. PERIMETER WIRE WITH 3 TIGHT TURNS IN 3" BOTH ENDS OF WIRE TYPICAL.
CL4.10
APPLICABLE DETAIL
CL5.2 CL5.3 CL5.4 CL5.5 CL5.6 CL5.7
Agency Stamp: Code : Section Title : COMPRESSION STRUT CONNECTION DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
823 -2 01 2
CL5.1
1" MIN. #10 S.M.S. 2" 4 1/2" MIN. 5/16" DIM. SLEEVE ANCHOR @ CENTER OF FLUTE FLATTEN END PLACE TIGHT TO CLIP OR STRUCTURE CUT FLANGES AND BEND 161/2"x 161/2"x 13 ga x 0'62" SLOT END OF TUBE WIRE WITHIN CLIP PER
CL4.3
OPTION 1
OPTION 2
CHANNEL STRUT
1" MIN.
5/16" DIA. SLEEVE ANCHOR @ CENTER OF FLUTE PLACE TIGHT TO CLIP OR STRUCTURE
ra f D
Agency Stamp: Code : Section Title : 2010 CBC
t_
OPTION 3
823 -2 01 2
TUBE STRUT
L 161/2 x 161/2 x 13 ga.x 0'62" #10 S.M.S.x 2" LONG SLOT END OF TUBE
TUBE STRUT
OPD No:
CL5.2
CHANNEL STRUT
Agency Stamp: Code : Section Title : COMPRESSION STRUT CONNECTION DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
823 -2 01 2
260.145 DIM. SHOT6PINS CUT FLANGES AND BEND
CL5.3
1" MIN. #10 S.M.S. 2" 5/16" DIM. SLEEVE ANCHOR FLATTEN END PLACE TIGHT TO CLIP OR STRUCTURE CUT FLANGES AND BEND 161/2"x 161/2"x 13 ga x 0'62" SLOT END OF TUBE WIRE WITHIN CLIP PER
CL4.5
OPTION 1
OPTION 2
CHANNEL STRUT
ra f D
Agency Stamp: Code : Section Title : 2010 CBC
t_
OPTION 3
823 -2 01 2
TUBE STRUT
L 161/2 x 161/2 x 13 ga.x 0'62" #10 S.M.S.x 2" LONG SLOT END OF TUBE
TUBE STRUT
OPD No:
CL5.4
CHANNEL STRUT
FIRE PROOFING
OPTION 1
823 -2 01 2
260.145" DIA. SHOT PINS 161/2"x 161/2"x 13 ga x 3" ANGLE SLOT END OF TUBE
FIRE PROOFING
ra f
t_
WIRE WITHIN
Agency Stamp: Code : Section Title : COMPRESSION STRUT CONNECTION DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
OPTION 2
OPTION 3
CL5.5
C L STRUT
1 1/4" MIN.
1 1/4" MIN.
GYP. BOARD
2x4 STRUT 1/4" DIA. LAG SCREW CONNECT USING OTHER DETAIL ON THIS SHEET
OPTION
1 1/4"
823 -2 01 2
1/4" DIA. LAG SCREW 1 1/4" #10 S.M.S. PLACE TIGHT TO CLIP OR STRUCTURE
CHANNEL STRUT
1 1/4" 161/2" X 161/2" 13 GA. BEARING PLATE (MIN.) 1/4" DIA. CLOSED EYE SCREW WIRE WITHIN
OPTIONAL ORIENTATION SLOT END PLACE TIGHT TO CLIP OR STRUCTURE #10 S.M.S.
ra f
t_
OPTION
OPTION
OPTION
D
Agency Stamp: Code : Section Title : 2010 CBC
TUBE STRUT
OPD No:
CL5.6
1 1/4" #8 1/4" DIA. LAG SCREWS 1 1/2" MIN. FASTEN COMPRESSION STRUT TO 2x4 IN LIEU OF RAFTER/ JOIST
C L COMPRESSION STRUT
161/4" 2"MIN.
2"
1/4"DIA. LAG SCREW IN CENTER OF JOIST, TYP. CUT FLANGES AND BEND
OPTION 1
OPTION 2
CHANNEL STRUT
161/4"
823 -2 01 2
1/4" DIA. LAG SCREW 161/4" #10 S.M.S. PLACE TIGHT TO STRUCTURE
161/4"
ra f
t_
#10 S.M.S.
161/2" X 161/2" 13 GA. BEARING PLATE (MIN.) 1/4"DIA. CLOSED EYE SCREW WIRE WITHIN
OPTION
OPTION
OPTION
TUBE STRUT
Agency Stamp: Code : Section Title : COMPRESSION STRUT CONNECTION DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
CL5.7
CL4.1
12 GA WIRE WITH MIN. OF 3 TIGHT TURNS TOP & BOTTOM LOCATE CHANNEL AS REQUIRED TO MAINTAIN HANGER SPACING CHANNEL PER
CL6.2
4'60'
4'60"
TRAPEZE SUPPORT
823 -2 01 2
NOTE:
6 MAX. SLOPE 1 FROM VERT.
CL4.1
ra f
t_
4'60' 4'60' 4'60"
SINGLE HANGER WIRES OK UP TO 1/6 OUT OF PLUMB. COUNTER SLOPING WIRES REQUIRED WHEN GREATER THAN 1/6 OUT OF PLUMB.
Agency Stamp: Code : Section Title : SPECIAL DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
CL6.1
SEPARATE CONN. TO STRUCTURE BY AT LEAST 4 INCHES. DOUBLE HANGER WIRES MAX. 8'60" OR LONGER SPANS 1/6 OUT PLUMB. CONNECT TO STRUCTURE PER #10 S.M.S TOP & BOTT. TO PREVENT HGR. FROM SLIPPING OFF.
CL4.1
16 GA TRACK BRIDGE BETWEEN ADJACENT STUDS (3 STUDS MIN.) (4) # 10 S.M.S.TYP. 26#10 S.M.S. EACH STUD
OBSTRUCTIONS
823 -2 01 2
PROVIDE COMPRESSION STRUT WHERE OCCURS ACOUSTICAL OR GYPSUM BOARD CEILING AS OCCURS 12'60" MAX.
PROVIDE COMPR. STRUT & SPLAY WIRE WHERE CLG. STRUT OCCURS
t_
SPAN
4 FT. 6 FT. 8 FT. 10 FT. 12 FT.
SECTION
261/2" x 165/8" x 16GA. STUD DBL. 261/2" x 163/8" x 16GA. STUD DBL. 261/2" x 165/8" x 16GA. STUD DBL. 361/2" x 165/8" x 16GA. STUD DBL. 4" x 165/8" x 16GA. STUD
DBL. SECTION
Agency Stamp: Code : Section Title : SPECIAL DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
CL6.2
NORTH
EAST
09 22 20 MAIN RUNNER
Agency Stamp: Code : Section Title : SPECIAL DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
ra f
t_
823 -2 01 2
SOUTH
ATTACH TO STRUCTURE. SEE COMPRESSION STRUT CONNECTION FOR MORE DETAIL. WEST
OPPOSING COMPRESSION POSTS MAX LENGTH 20'. BOTH POSTS TO BE SAME ANGLE; MAX ANGLE FROM HORIZONTAL OF 70, MIN ANGLE FROM HORIZONTAL OF 30. SEE COMPRESSION STRUT CONNECTION FOR MORE DETAIL. HANGER WIRE AT EACH COMPRESSION POST 3 TIGHT TURNS.
(2) 12 GA BRACE WIRES ORTHOGONAL TO OPPOSING POSTS ATTACHED TO STRUCTURE. SEE HANGER & SPLAY WIRE CONNECTION TO STRUCTURE FOR MORE DETAIL. 45 MAX, TYP 09 22 20 (2) #8 SCREWS
2" M AX (T YP .)
NOTE: ONE WIRE PER 46WAY INTERSECTION MAY BE FIXED TO STUD EDGE 2" MAX ABOVE MAIN RUNNER (AT OBSTRUCTION)
CL6.3
16 GA.WALL BACKING
FRAMING GYP. BD. (3) #10 SCREW TO FRAMING, TOP & BOTTOM
10 GA. LLH 5"x6"x0'66" LONG 4" MIN. AT LOCATIONS W/O WALL BACKING IN6WALL, INSTALL 6" X 16 GA. TRACK OUTSIDE OF GYP. BD, FASTEN TO WALL STUD USING (3) #10 S.M.S. AT EACH STUD. MEP OBSTRUCTION
Agency Stamp: Code : Section Title : SPECIAL DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
OBSTRUCTION6PERIMETER CONDITION
8/22/2012 5:07:00 PM
ra f
t_
823 -2 01 2
CL6.4
20 GA ANGLE SCREWED TO (2) STUDS,WITH (2) #10 SMS TO EACH STUD ANGLE 1.5" x 1.5" x 20 GA WITH (2) #8 SMS EACH END LIGHT FIXTURE SUPPORT BRACKET STRONGBACK 250S162643, SPAN TO ADJ VERT L OR COMP POST EA SIDE, 4'60" MAX EACH DIRECTION .
45 MAX.
t_ ra f
DO NOT ATTACH CLG TO LIGHT FIXTURE Agency Stamp: Code : Section Title : SPECIAL DETAILS . Sheet Title : 2010 CBC 45 MAX.
823 -2 01 2
CROSS JOIST .
OPD No:
CL6.5
1/2" MAX.
(2) 1/4"620 MACHINE BOLTS KICKER BRACE PER SCHEDULE NOTE: KICKER IS AN ALTERNATE TO SPLAY WIRES. THIS METHOD MAY BE USED IN LIEU OF OPPOSING WIRES. COMPRESSION POST COMPRESSION POST 2 1/2" X 16 GA. STUD 1/2" MAX.
KICKER
823 -2 01 2
0 TO 45 MAX.
OBSTRUCTION
ra f
FRONT VIEW
t_
ATTACH KICKER TO MAIN MAIN RUNNER RUNNER WITH (2)1/4620 MACHINE BOLTS
SIDE VIEW
D
Agency Stamp: Code : Section Title : SPECIAL DETAILS . Sheet Title : 2010 CBC
T BAR CEILING 6 WIRE OBSTRUCTION DETAIL STUD BRACE, LESS SPLAY WIRES, TO DECK.
OPD No:
CL6.6
KICKER BRACE PER SCHEDULE BACK TO BACK 161/2" X 3" X 14 GA ANGLE (LLV) SPAN 4 WALL STUDS MIN. FASTEN ANGLE TO WALL STUDS USING 2"X #10 X 16 1/4" SMS PER ANGLE AT EACH STUD.
823 -2 01 2
0 TO 45 MAX. MAINRUNNER SIDE VIEW
OBSTRUCTION
NOTE: KICKER IS AN ALTERNATE TO SPALY WIRES. THIS METHOD MAY BE USED IN LIEU OF OPPOSING WIRES.
KICKER SCHEDULE SPAN < < < 4'60" 8'60" 14'60" MATERIAL 20 GA 20 GA 16 GA
SSMA
Agency Stamp: Code : Section Title : SPECIAL DETAILS . Sheet Title : 2010 CBC Issue Date : XX/XX/XX Revision : Date :
OPD No:
T BAR CEILING 6 WIRE OBSTRUCTION DETAIL STUD BRACE, LESS SPLAY WIRES, TO WALL.