Sie sind auf Seite 1von 22

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS

(CL10) ITEM Soil investigation The contractor shall implemented of exploratory drilling and mechanical test in all types of soil with on site testing and the issuance of the final report which contain the test results and recommendations of the foundation work. 01 Research and treatment for cavities Implementation through a perforating exploratory(cavity probing) In all types of rock to determined the horizontal and vertical elongation of cavities, the contractor will be responsible for treatment all cavities By injection and treatment for all cavities and voids of rock with all necessary work accordance with the technical specifications and instructions of the Supervising engineer EXTERNAL WORKS The bidder is advised to visit the site before quoting the rates in order to get himself familiarized with the present site conditions SITE GRADING Bulk excavate over site on unclassified ground including all hard and rock layers to reduced levels generally in cutting profiles the work shall include clear away to approved disposals. All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation SITE PREPARATION AND GRADING 02 Excavation oversite on unclassified ground including all hard and rock layers (if any) to reduced levels generally in cutting profiles and forming depressions, falls and the like and clear away to approved disposal tip. Fill oversite with approved imported fill material according to site soil report recommendation including compaction in making up levels to required formations, embankments, contouring and the like as per drawings and spec. To Collection Note Note DESCRIPTION QTY UNIT RATE AMOUNT SR

M3

Note

1760

M3

03

7800

M3

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

1 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION PAVING AND SURFACING 01 Supply and install precast concrete shotblasted pavers with photocatalytic titamium dioxide coating (beige color) size 400x400x60mm thk. including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier on compacted subgrade as per detail no. A1 on drawing CL10-XL301 Supply and install precast concrete shotblasted pavers with photocatalytic titamium dioxide coating (brown and light beige color) size 400x400x40mm thk. with precast concrete band (light grey color) size 200x200x40mm including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier, compacted subgrade as per detail no. B12 on drawing CL10-XL301 Supply and install precast concrete shotblasted pavers with photocatolytic titamium dioxide coating ( light beige color) size 400x400x40mm thk. with precast concrete band (light grey color) size 200x200x40mm including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier, compacted subgrade as per detail no. B3 on drawing CL10-XL301 Supply and install cast in place concrete with brick band 60mm thick including A193WWF mesh reinforcement, setting mortar bed for brick, moisture barrier, compacted subgrade as per detail no. D5 on drawing CL10-XL301 QTY UNIT RATE AMOUNT SR

250

M2

02

665

M2

03

1120

M2

04

200

M2

05

Supply and install rubber pavement 50mm thick with various colors, including adhesive mixture, cast in place concrete base with A193 W.W.F. reinforcement mesh , moisture barrier on compacted subgrade as per detail no. E6 on drawing CL10-XL-301 Supply and install polished granite pavers light beige color size 400x400x30mm including 20mm thick setting mortar bed, 100mm thick cast in place concrete base with A193WWF reinforcement mesh moisture barrier on compacted subgrad as per detail no. C11 on drawing CL10-XL301

54

M2

06

95

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

2 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION PAVING AND SURFACING 01 Supply and install polished granite paving (brown color) size 400x400x30mm with granite band (light beige color) size 400x400x30mm including 20mm thick setting mortar bed, cast in place concrete base with A193WWF reinforcement mesh, moisture barrier, on compacted subgrade as per detail no. F4 on drawing CL10-XL-301 Supply and install polished granite paving (brown and light beige color) size 400x400x30mm with granite band (grey color) size 200x200x30 mm, including 20mm thick setting mortar bed, cast in place concrete base with A193WWF reinforcement mesh, moisture barrier, on compacted subgrade as per detail no. F7 on drawing CL10-XL-301 Supply and install polished granite paving light beige color size 400x400x30mm with polished granite edge paving brown color size 400x400x30mm thick including 20mm thick setting mortar bed, 100mm thick cast in place concrete base with A193WWF reinforcement mesh, moisture barrier on compacted subgrade as per detail no. F8 on drawing CL10-XL-301 Supply and install polished granite paving light brown and light beige colors size 400x400x30mm with granite band grey color size 200x200x30mm including 20mm thick setting mortar bed, 100mm thick cast in place concrete base with A193WWF reinforcement mesh, moisture barrier on compacted subgrade as per detail no. F9 on drawing CL10-XL-301 Supply and install polished granite paving beige color size 400x400x30mm with granite band grey color size 600x600x30mm including 20mm thick setting mortar bed, 100mm thick cast in place concrete base with A193WWF reinforcement mesh, moisture barrier on compacted subgrade as per detail no. F10 on drawing CL10-XL-301 Supply and install asphalt paving including 80mm bituminous wearing course, bituminous prime coat, granular base course, on compacted subgrade as per detail no. G on drawing CL10-XL-301 QTY UNIT RATE AMOUNT SR

718

M2

02

715

M2

03

685

M2

04

745

M2

05

470

M2

06

1955

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

3 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM CURBS AND EDGING 01 Supply and install Precast concrete curb, size 300X500X150 mm with exposed aggregate finish including bedding, haunching, cast in place concrete base and concrete grout behind curb, 20mm thick cement mortar setting bed, on compacted subgrade, as per detail no.1 on drawing CL10-XL302 Supply and install Precast concrete mowing edge, size 200X100X65 mm including concrete base, 20mm thick cement mortar setting bed, cast in place concrete base on compacted subgrade, as per detail no. 2 on drawing CL10-XL302 SUNDRIES Precast concrete wheel stopper including dowels, grouting and accessories for complete installation as per detail no. 9 on drawing CL10-XL302 and specification 03 Precast concrete wheel stopper including fixings Wooden Seating 04 Supply and install wooden seating comprising 50x75 mm interior wood rails, steel sheets, steel straps, including concrete footings, earthworks, insulation, finishing, fixing, and all required to complete the work as per detail no.4 on drawing CL10- XL302 WOODEN BENCH 05 Supply and install concrete raised planter with wooden bench, 50x75 mm interior wooden rails,comprising concrete walls, reinforced concrete slab with A 193 W.W.F reinforcement mesh smooth finished, (Softscape and planting soil mix are measured elsewhere), drainage layer, filter membrane, water proofing membrane, protection board, sealant and all required to complete and finish the work as per detail no.6 on drawing CL010- XL302 to suit required locations as shown on drawing CL10- XL101 DESCRIPTION QTY UNIT RATE AMOUNT SR

905

02

40

16

No.

No.

16

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

4 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM SUNDRIES Raised Planter Supply and install concrete raised planter with granite cladding, including soil mix, drainage layer, filter , membrane, sealant and all required to compleet and finish the work as per detail no. 5 on drawing CL10-Xl302 01 Raised planter, overall area 190 m2 on plan to suit required locations as shown on drawing CL10- XL101 Tent Structure 02 Supply and install tent staructure comprising columns, tent fabric, foundation, earthwork, and all required to compleet and fix the work as per manufacturer's recommendations and subject to engineer's approoval to cover an area of 60 m2 as per detail no. 7 on drawing XL-302 Contractor shall submitt shop drawings for approval before supply Earth Mount 03 Supply and formation of 6500-1500 mm height earth mount including compacted sub base layer, 100 mmm thick layer of sand and gravel mix, and all required to complete and finish te work as shown on drawing CL10- XL101 and as per detail no. 11 on drawing CL10- Xl302 Softscape and planting soil mix are measured lsewhere DESCRIPTION QTY UNIT RATE AMOUNT SR

Item

No.

Item Note

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

5 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM SUNDRIES WATER FEATURES Water fountain comprising reinforced concrete wall and base, ceramic tiles finish, cement mortar setting bed, 30 mm thick coping, water proofing & mositure barrier, subgrade compaction, fountain kit, supply and drainage pipework, fountain pump, electrical power and lighting, installation, ventilation and exhaust system and all associated works including builder's work and service installation as per deatil no.3 on drawing CL10- XL302 01 Water fountain, overall area 46 m2 area on plan, shape as shown on drawing CL10-XL101. Water fountain, overall area 38 m2 area on plan, shape as shown on drawing CL10-XL101. Water fountain, overall area 100 m2 area on plan, shape as shown on drawing CL10-XL101. DESCRIPTION QTY UNIT RATE AMOUNT SR

1 1

Item Item

02

03

Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

6 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM SUNDRIES Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL10-XL602 and as per specifications 01 02 03 Ref. type 1 (DIRECTIONAL SIGN) Ref. type 2 (COMMERCIAL CENTER ) Ref. type 3 (ADVERTISING PANEL) Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL10-XC-05 and as per specifications 04 05 06 07 08 Ref. type I1 (PARKING) Ref. type I2 (ENTRY ) Ref. type R2-1 (GIVE WAY ) Ref. type R5-1 ( ENTRY PROHIBTED ) Ref. type W11-1 ( PEDESTRAIN CROSSING ) Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL10-XC-04 and as per specifications 09 10 11 12 13 14 White stop line Pedestrain crossing White edge line Through traffic arrow Lane marking Speed control hump including cut & removal of existing wearing (0.05m) course & add a new course, tack coat and 0.10m of bituminous wearing course, ref. 10 detail G DESCRIPTION QTY UNIT RATE AMOUNT SR

2 2 6

No. No. No.

1 2 1 2 2

No. No. No. No. No.

7 13 860 18 205 7

M M M M M M

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

7 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM LANDSCAPING Trees/palms including pit excavation, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer all as details and planting schedule as per detail P1, on drawing CL10-XL-401 01 P/Wf Trees/palms including pit excavation, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer all as details and planting schedule as per detail P2 on drawing CL10-XL-401 02 03 04 05 T/Af T/Bv T/Fm T/Po Shrubs and ground cover including planting, site excavation as required, soil planting mix, mulching, filter membrane and drainage layer all as per details and planting schedule as per detail P3, on drawing CL10-XL-401 06 07 08 09 S/Iha S/Io S/Ob S/Pav DESCRIPTION QTY UNIT RATE AMOUNT SR

12

No.

14 9 7 2

No. No. No. No.

56 13 34 26

No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

8 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM LANDSCAPING Shrubs and ground cover including planting, site excavation as required, soil planting mix, mulching, filter membrane and drainage layer all as per details and planting schedule as per detail P3, on drawing CL10-XL-401 01 02 03 G/Ggp G/Cm ( O ) G/Cm (W) Lawn planting, including soil planting mix, filter membrane and drainage layer all as per details and planting schedule as per detail P4, on drawing CL10-XL-401 04 L/Cd DESCRIPTION QTY UNIT RATE AMOUNT SR

1088 747 1469

No. No. No.

1497

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

9 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 14 - CONVEYING SYSTEMS PIPE WORK Supply and installation of Automated waste collection system piping. Item shall include the earth works, insulation, ,concentric reducer, puddle flanges ,inspection covers and all required materials and equipments to complete the transport pipe line from DV rooms , outdoor load stations and full vacuum load stations to waste plant. 01 508mm under/above ground transport pipe RC MANHOLE Supply and install cast insitu or precast reinforced concrete manhole ,the item shall include excavation, backfill insulation ,inspection cover and all required to complete the work. 02 RC manhole to suit required location in sitesas shown on drawings STM - ITCCP2 - TD 001 to 016 75 M QTY UNIT RATE AMOUNT SR

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

10 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATION WASTE AND DRAINAGE INSTALLATION Supply, install and testing pipework, UPVC schedule 40, the work shall include but not limited to fittings, supports, cast iron pipes on roof for vent with caps, installation, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 03 04 05 50 mm dia. 75 mm dia. 100 mm dia. 150 mm dia. 200 mm dia. Accesssories 06 07 08 09 10 Ground cleanout 50 mm dia, ref. GCO Ground cleanout 100 mm dia, ref. GCO Ground cleanout 150 mm dia, ref. GCO Ground cleanout 200 mm dia, ref. GCO Grease interceptor Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 11 12 Inspection chamber, ref. (IC&STIC) 600x600mm Slow down chamber, ref. (IC&STIC) 600x600mm 11 2 No No 1 10 1 1 1 No No No No No 30 29 115 290 42 M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

11 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 15 - MECHANICAL MANHOLE AND COVERS Supply , install, testing and commissioning precast concrete sewer manholes with standard traffic (heavy duty) type cast iron manhole covers and frames, access ladders, concrete channel at manhole bed, foundation bed, drop pipe to manhole where required, all associated earthworks, damp proofing, and all materals, equipments required to complete and finish. the work according to specifications section 02605, 02730, drawings and code of practices 01 Sewer manhole, ref. (SMH) POTABLE WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for potable water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 02 03 04 05 06 07 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia. 75 mm dia. 100 mm dia. NOT POTABLE WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for not-potable water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 08 09 10 40 mm dia. 50 mm dia. 63 mm dia. 58 84 2 M M M 90 25 20 88 2 90 M M M M M M 5 No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

12 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 15 - MECHANICAL Accessories 01 02 03 04 Water meter assembly 100 mm dia., ref. WMA Gate valve, 40 mm dia., ref. GV Gate valve, 100 mm dia., ref. GV Back flow preventer assembly, 100mm dia., ref. BFPA Drainage installation to the external drainage network Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover, UPVC pipework schedule 40 to nearest main sewer manhole and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 05 Slow down chamber 1 No 1 1 1 1 No No No No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

13 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 15 - MECHANICAL IRRIGATION WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for Irrigataion water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 03 04 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia. Accessories 05 Supply and installation irrigation controller as detailed on drwings and as per specifications Supply and installation bubbler for shrubs, ground cover and succulents Supply and installation bubbler for trees and palm tree Supply and installation spray lawn sprinkler Gate valve W/valve box 32 mm dia., Gate valve W/valve box 40 mm dia., Gate valve W/valve box 50 mm dia., 1 No. 80 87 195 220 M M M M QTY UNIT RATE AMOUNT SR

06

569

No.

07 08 09 10 11

188 46 2 1 5

No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

14 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 15 - MECHANICAL IRRIGATION WATER INSTALLATION Supply and installation remote control valve assembly including piping complete with valve box, Y-strainer, accessories and all associated works as detail on drawing and as per specifications section 02810 01 02 03 04 Ref. RCV 25mm dia. Ref. RCV 32mm dia. Ref. RCV 40mm dia. Ref. RCV 50mm dia. DIESEL FUEL STORAGE TANK INSTALLATION Allow for underground fiberglass diesel fuel storage tank with required capacity including concrete anti-flotation pad, heavy duty traffic type manhole ring and cover, pipework, valves duplex diesel fuel transfer pumps, steel ladder, pea gravel bed, earthworks, fixings and accessories all as detailed on drawings 05 Proprietary tank units 1 Item 1 2 6 6 No. No. No. No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

15 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MEDIUM VOLTAGE CABLES Supply , install and test medium voltage Cables XLPE/STA/PVC 15KVcopper Between RMU unit and transformers as required to suit the following extensions as shown on drawings and drawings and as described in specifications drawings and by making arrangiement with supervising engineer to achieve the work to the best possible specifications 01 Medium voltage cable comprising 3 core 70 mm CU / XLPE /STA/ PVC, cables route from RMU up to transformers supply and install Electrical concrete ATTIC including trenching and backfilling for duct banks, conduits for M.V cables in duct banks, tapes, all as required to suit locations as shown on drawings XE-201and as per specifications section 16180 and by making arrangement with supervising engineer to achieve the work to the best possible specifications 02 Electrical concrete ATTIC MAIN AND SUB-MAIN POWER supply and install reinforced concrete Man / Holes connected via duct banks, complete with man / hand hole bolted type metal cover, drain pipe outlet, including trenching and backfilling for duct banks, conduits for M.V cables in duct banks, tapes, all as required to suit locations as shown on drawings drawings E201--E220and as all accessories and coordination & integration with other systems shall be conducted during work execution as per technical specificationssection 16180 and by making arrangement with supervising engineer to achieve the work to the best possible specifications Site work 03 Power Hand Holes (900900900) Ref. HH including UPVC conduit 10 M QTY UNIT RATE AMOUNT SR

32

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

16 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER CABLES FOR PUMP ROOMS supply , install, testing and commissioning multicore copper cable ( XLPE/PVC -1000/600V) in direct buiried including junction boxes, connection for feeders and various power loads as shown on drawings E-701 and as per specification section 16126 and by making arrangement with supervising engineer to achieve the work to the best possible specifications 01 (4 C-16 mm ) + 16 mm G /direct buiried QTY UNIT RATE AMOUNT SR

340

PANEL BOARDS FOR PUMP ROOMS Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers and , other functional units and all associated works as required and shown on drawings E 701, XE-201 and coordination & integration with other systems shall be conducted during work execution as per technical specificationssection 16442,16410,16415 and by making arrangement with supervising engineer to achieve the work to the best possible specifications 02 03 04 Ref. Ref. Ref. EPP (IP54) PP1(IP 54) PP2(IP 54)

1 1 1

No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

17 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approvement ) comprising cables, conduits, fittings, connections, from the outlets to Panelboards feeder associated works as required to suit the locations shown on drawings XE-201and Coordination with other disciplines shall be conducted during work execution as per technical specifications, section 16050and by making arrangiement with supervising engineer to achieve the work to the best possible specifications 01 02 Junction box , Floor mounted Disconnect switch,non fused and with pilot light16A, 1P, 230V ,weatherproof for waste collection Disconnect switch,non fused and with pilot light 20A, 1P, 230V ,weatherproof for feul pumsp PUMP ROOMS 04 Disconnect switch,non fused and with pilot light 20A, 3P, 400V ,weatherproof for fountain pump(FP3)& potable water pump Disconnect switch,non fused and with pilot light 20A, 1P, 230V ,weatherproof for submersible pump fountain pump(FP2)&(SP2) Disconnect switch, non fused, 400A, 3P, 400V ,weatherproof for fire jocky pumps Duplex socket outlet, 13A, 230V, grounding type, weatherproof Single pole one-way ,one gang switch (13A), weatherproof QTY UNIT RATE AMOUNT SR

10 2

No. No.

03

No.

No.

05

5 1 3 1

No. No. No No.

06

07 08

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

18 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply, install , testing and commissioning of lighting fixture outlets and including conduits, wires and all boxes belong to Lighting Panelboards and associated works as required to suit the locations shown on drawings XE-201 .Coordination with other disciplines shall be conducted during work execution as per technical specifications, section 16050 and by making arrangiement with supervising engineer to achieve the work to the best possible specifications PUMP ROOMS 01 Lighting fixer outlet LIGHTING INSTALLATION Supply ,install, testing and commissioning of lighting fixture (furnishe with lamp and electronic blast, accessories and internal wires) mounting accessories.(according to the engineer approval ) associated works as required to suit the locations shown on drawings XE-201 ,GE-E01,GE-E01 and Coordination with other disciplines shall be conducted during work execution as per technical specifications, section 16500 and by making arrangiement with supervising engineer to achieve the work to the best possible specifications PUMP ROOMS 02 03 Type F1 Type F1E QTY UNIT RATE AMOUNT SR

No.

4 4

No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

19 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL GROUNDING SYSTEM FOR PUMP ROOMS Supply, installation , test and commissioning of a grounding system comprising bare copper conductor to bond the building's distribution boards and HVACand plumping equipments to the main ear thing grid of the building. Including necessary earthwork, buried galvanized steel foundations strips surrounding the building phosphor bronze test joints & triangular counter poise and all associated works to suit grounding resistivity required as shown on drawings XE201 and as described in specifications16452,16453 by making arrangiement with supervising engineer to achieve the work to the best possible specifications 01 Complete building grounding system network to suit ground resistivity as shown on drawings and specification QTY UNIT RATE AMOUNT SR

Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

20 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL TELECOMMUNICATION SYSTEM Supply, installation, testing and commissioning of telecommunication system commporising of telecommunication outlets including cable / wires and conduits as shown on drawings E- 501-and as described in specification section 16715,16720 and by making arrangiement with supervising engineer to achieve the work to the best possible specifications To suit system network equipped with: 01 Wall mounted telecommunication outlet 1 port (1data ) , ref. (T0) weatherproof FIRE ALARM SYSTEM FOR PUMP ROOMS Supply, installation, testing and commissioning of Optical smoke detectors including associated cable wires and conduiting, interfacing as shown on drawings XE201and as described in specifications 16721 and by making arrangiement with supervising engineer to achieve the work to the best possible specifications To suit system network equipped with: 02 Optical smoke detector Ceiling mounted 3 No. 11 No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

21 / 22 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL10) ITEM Collection Sheet - 1 Sheet - 2 Sheet - 3 Sheet - 4 Sheet - 5 Sheet - 6 Sheet - 7 Sheet - 8 Sheet - 9 Sheet - 10 Sheet - 11 Sheet - 12 Sheet - 13 Sheet - 14 Sheet - 15 Sheet - 16 Sheet - 17 Sheet - 18 Sheet - 19 Sheet - 20 Sheet - 21 DESCRIPTION QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

22 / 22 REVISED PAGE

Date: MAY 2012

Das könnte Ihnen auch gefallen