Sie sind auf Seite 1von 2

9-Hole Dist Cat Sheet 5/3/02 3:23 PM Page 1

9-Hole Distribution Box


Tough Problem
Providing a simple, reliable, and
permanent means for dividing septic
tank effluent flow.

TUF-TITE Solution
A strong, stable, permanent,
non-corrosive Tuf-Tite Distribution
Box, with a Tuf-Tite Speed Leveler
in each outlet.

Tuf-Tite®
Distribution Box.
THE TOUGH ONE!
■ Injection molded HDPE
■ Non-corrosive
■ Simple to install
■ Easy to level
In a septic environment, no other
material can match High Density Snap-in pipe seals They’re permanent
Polyethylene in delivering a lifetime They’re patented. Simply insert your Unlike cement-based pipe grout,
of trouble-free service. Tuf-Tite PVC pipe and push it through the Tuf-Tite seals will not crack or corrode
Distribution Boxes are injection flexible, polyethylene Tuf-Tite seal. in septic conditions. They stay pliable
molded, using only premium HDPE Pipes fit watertight. Installation couldn’t and watertight permanently.
which contains no fillers or foam. be easier.
9-Hole Dist Cat Sheet 5/3/02 3:24 PM Page 2

9-Hole Distribution Box 9HD2


■ Injection molded. 15” 22”
Exceptionally
strong.

■ HDPE is non-
corrosive 22” 15”

in a septic 15”
environment.
Domed Lid. Heavy-duty HDPE Lid is ribbed
■ Patented and domed for exceptional strength. Slotted
snap-in sides interlock on the Distribution Box to
assure a tight fit.
pipe seals 2” Drop
simplify The 9HD2 Distribution Box comes complete
with a Domed Lid, 11 snap-in fittings of your
installation. choice, and a Plastic Handle should a
precast concrete lid be used.

INSTALLATION IS HOW TO SET SPEED LEVELERS


1. Insert a Speed Leveler into each
JUST THIS SIMPLE outlet pipe inside the Distributions
Box. Rotate each Leveler until the
1. Position the Distribution Box Flo-Hole is at the 12 o’clock position.
on level virgin soil. 2. Start filling the Distribution Box with
Do not place box on a water. Stop when the water level
touches the “Inner Guide Ring” of the
concrete slab. S-35 highest Speed Leveler.
2. Install the inlet pipe and S-40 3. Rotate all the Speed Levelers until
outlet pipes. Be sure the each of the Flo-Holes is aligned just
above the water level. Slowly add
bottoms of all pipes rest on more water to see if it enters all the
virgin soil. P-10
Flo-Holes simultaneously. Make fine-
3. Level the Distribution Box tune adjustments if necessary.
4. You can alternate fields, or rest failed
and all pipes as needed. lines anytime. Simply rotate the
4. Backfill the pipes to within Choice of Fittings Tuf-Tite Speed Levelers™ Leveler on the appropriate pipe until
two feet of the Distribution S-35 Pipe Seal, for: Control the flow of effluent from the Flo-Hole is at the 12 o’clock posi-
tion to stop the flow.
Box. Recheck the level of the ■ Sewer and Drain the Distribution Box. Simply
box, then backfill up to the ■ SDR 35 ■ ASTM 3034 insert a Speed Leveler into each
top lid ridge. ■ Thin Wall ■ 1500 Lb. Crush outlet pipe. Rotate each Speed
5. Install and adjust Tuf-Tite S-40 Pipe Seal, for: Leveler so the flow is distributed
Speed Levelers. ■ Schedule 40 as desired. Available for 3” or 4”
6. Place lid on the Distribution
■ 4” Corrugated PVC pipe.
Box and finish backfilling.
P-10 Plug, for unused holes

Water-tight
Lids and Risers
Drainage and Septic Products
by Tuf-Tite®

Tuf-Tite® Corporation
1200 Flex Court
Lake Zurich, Illinois 60047

©2002 Tuf-Tite® Corporation


Form 6HD2-3. Printed in USA

Das könnte Ihnen auch gefallen