Areas of use
The mobile scaffold AluKlik135 double width XXL corresponds to scaffold groupaccording to HD 1004: 1992. The maximum total load of the working-platform is 228 kg. This must not be exceeded even if the load is distributed over several platforms. Possible areas of use for the mobile scaffold AluKlik135 double width XXL are e.g. plastering and stucco works, painting works, renovation and maintenance works etc. If material is stored on the platform surface a passage of 0, 2 m has to be left open. A mobile working platform is not intended for use as a staircase-tower to reach other constructions. It is not intended to be lifted or to be attached to other devices. Mounting of bridges between the mobile scaffold and buildings is not allowed.
Parts must not be assembled or dismantled by force (e.g. by strokes with a hammer). The maximum platform height is 11, 5 m indoors and 7, 6 m outdoors. With all assembly variations it is not allowed to increase the height of the platform area by the means of ladders, boxes or other devices. Platform areas above 2 m platform height must be with a threepiece guard rail consisting of two horizontal braces and toe board. The toe board can be dispensedwith at intermediate platforms which are only used for ascending the scaffold. The fitting of the guard rail has to be carried out according to the instructions for erection and use. Before use the scaffold has to be checked for complete and correct assembly including the security device against unintentional unhinging of parts. Check if the mobile working platform has been erected in due order according to the instructions regarding the regular model (correct and complete assembly) and if it is standing in an upright position. Divergence from the perpendicular may only be 1 % maximum; this has to be checked by means of a spirit-level and if necessary has to be corrected. Brakes on castors have to be in locked position. Influences of possible changes in the exterior conditions have to be taken into account. Installation and use of lifting devices on the scaffold is not allowed. Climbing up and down the scaffold may only be done from the scaffold interior. The trapdoors of platforms are only to be opened for passage and otherwise have to remain closed. It is forbidden to jump on platforms. When the scaffold is used outdoors or in open buildings it has to be moved in a wind-protected area or be secured against
the scaffold for stabilising purposes. wind velocity 6 is exceeded there is a noticeable resistance while walking.) Do not use the scaffold during a thunderstorm. To ensure a secure stand of the scaffold please pay attention to the points fitting of stabilisers. Starting from AluKlik135-800 four stabilisers have to be fitted for each scaffold. You should note that horizontal loads may arise through use, e.g. by working on adjoining constructions, which may capsize the scaffold. Note: At corridor buildings and at building corners
capsizing by other means when wind velocity is above 6 (Beaufort scale), with squally wind or when work is left off. (If additional wind-loads may arise through tunnelling effects. The working platform must not be used for work on parts that are under electricity or for work on running machines. When working outdoors the folding scaffold AluKlik135 has to be dismantled or additionally secured against capsizing or rolling away if work is interrupted for some time, at closing time or if wind velocity above 12 m/s (wind force 6 on the Beaufort scale) is to be expected.
AluKlik 135-300
Platform height up to 1 m Working height up to 3 m
Components
Amount 1 1 1 Designation foldable base unit 135 platform 1, 9 m trapdoor platform 1, 9 m Art.-No. K00-FE-1613-R15 H00-BE-1900-0-0 H00-DB-1900-0-0
AluKlik 135-400
Platform height 1, 8 m Working height 3, 8 m
Components
Amount 1 1 1 2 2 2 Designation foldable base unit 135 platform 1, 9 m trapdoor platform 1, 9 m railing frame 135 diagonal brace horizontal brace 1, 9 m Art.-No. K00-FE-1613-R15 H00-BE-1900-0-0 H00-DB-1900-0-0 K00-GR-1013-2-0 H00-DI-1900-0-0 H00-HO-1900-0-0
AluKlik 135-600 S
Platform height 3, 8 m Working height 5, 8 m
Components
Amount 1 2 1 1 1 2 1 2 4 see below 2 4 2 Designation foldable base unit 135 vertical frames 135 2, 0 m platform 1, 9 m trapdoor platform 1, 9 m toeboard set railing frame 135 double railing horizontal brace 1, 9 m diagonal brace ballast wall support stabilisers 2, 2 m wall anchorage set Art.-No. K00-FE-1613-R15 K00-VR-0013-7-0 H00-BE-1900-0-0 H00-DB-1900-0-0 L00-BB-1913-0-0 K00-GR-1013-2-0 K00-DG-1900-0-0 H00-HO-1900-0-0 H00-DI-1900-3-0 K00-BL-0000-0-S K00-WA-1000-0-0 K00-DA-2200-0-0 K00-WS-0900-0-0
Accessory
8. Ballast regulations
Indoors three ballast weights of 10 kg on each frame tube and additionally one ballast weight one two frame tubes diagonally apart = a total of 140 kg. If the scaffold is erected outdoors four ballast weights of 10 kg on each frame tube and additionally one ballast weight on two frame tubes diagonally apart = a total of 180 kg. In wall position no ballast is needed if two pieces of wall anchorage are used. Alternatively, if four stabilisers are used no ballast is needed for all assembly possibilities mid and wall position, indoors and outdoors. Dismantling is carried out in reverse order.
AluKlik 135-600
Platform height Working height 3, 8 m 5, 8 m
Components
Amount 1 2 1 2 1 2 2 4 2 Designation foldable base unit 135 vertical frames 135 2, 0 m platform 1, 9 m trapdoor platform 1, 9 m toeboard set railing frame 135 double railing horizontal brace 1, 9 m diagonal brace Art.-No. K00-FE-1613-R15 K00-VR-0013-7-0 H00-BE-1900-0-0 H00-DB-1900-0-0 L00-BB-1913-0-0 K00-GR-1013-2-0 K00-DG-1900-0-0 H00-HO-1900-0-0 H00-DI-1900-3-0
Accessory
see below 2 4 2 ballast wall support stabilisers 2, 2 m wall anchorage set K00-BL-0000-0-S K00-WA-1000-0-0 K00-DA-2200-0-0 K00-WS-0900-0-0
3. Put on trapdoor platform Hang the trapdoor platform on the top rungs of the foldable base unit. Secure the platforms through the lever on the bottom side of the platform. 4. Attach vertical frames Insert the vertical frames with the connectors facing down into the openings of the tubes of the foldable base unit and secure them with the security clips. 5. Attach side protection Climb up the scaffold from the inside through the opening of the trapdoor platform. Attach on the inner side two horizontal braces on the second and fourth rungs of the vertical frames. Attach a double railing from the inside out to the frame tubes of the vertical frames in such a way that the upper beam of the double railing is located above the fourth rung. This double railing must not be replaced with horizontal braces as it serves stabilising purposes for the scaffold tower! 6. Put on platform and trapdoor platform Hang the platform and trapdoor platform on the top rungs of the vertical frames. Secure the platforms through the lever on the bottom side of the platform.
Climb up the scaffold from the inside through the opening of the trapdoor platform. On each front insert a railing frame with the plug-in connectors facing down and secure these with the security clips in the frame tubes. On one side attach a double railing from the inside out into the frame tubes of the railing frame. Alternatively you can also use two horizontal braces. On the other side attach two horizontal braces from the inside out into the frame tubes. 8. Attach toeboards Unfold the toeboard set. The aluminium clips are centred between the claws of the platform. 9. Ballast regulations Indoors three ballast weights of 10 kg on each frame tube and additionally one ballast weight one two frame tubes diagonally apart = a total of 140 kg. If the scaffold is erected outdoors four ballast weights of 10 kg on each frame tube and additionally one ballast weight on two frame tubes diagonally apart = a total of 180 kg. In wall position no ballast is needed if two pieces of wall anchorage are used. Alternatively, if four stabilisers are used no ballast is needed for all assembly possibilities mid and wall position, indoors and outdoors. Dismantling is carried out in reverse order.
Ballastposiotion
AluKlik 135-800
Platform height Working height 5, 7 m 7, 7 m
Components
Amount 1 4 1 2 1 2 2 6 5 4 Designation Art.-No. foldable base unit 135 K00-FE-1613-R15 vertical frames 135 2, 0 m K00-VR-0013-7-0 platform 1, 9 m H00-BE-1900-0-0 trapdoor platform 1, 9 m H00-DB-1900-0-0 toeboard set L00-BB-1913-0-0 railing frame 135 K00-GR-1013-2-0 double railing K00-DG-1900-0-0 horizontal brace 1, 9 m H00-HO-1900-0-0 diagonal brace H00-DI-1900-3-0 stabilisers 2, 2 m K00-DA-2200-0-0
6. Attach side protection and diagonal braces Climb up the scaffold from the inside through the opening of the trapdoor platform. Attach on the inner side two horizontal braces on the second and fourth rungs of the vertical frames. Attach a double railing from the inside out to the frame tubes of the vertical
frames in such a way that the upper beam of the double railing is located above the fourth rung. This double railing must not be replaced with horizontal braces as it serves stabilising purposes for the scaffold tower! Opposite the double railing attach a diagonal brace to the vertical frames in such a way that the lower claw is positioned above the second lowest rung. 7. Attach next vertical frame Proceed as described under no. 4. 8. Attach diagonal and horizontal braces Attach a horizontal brace on both sides above the second lowest rungs to the frame tubes of the vertical frame. Attach two intersecting diagonal braces for stabilising purposes to the vertical frames in such a way that the lower claws are mounted to the second lowest rungs of the frames. 9. Put on platform and trapdoor platform Hang the platform and trapdoor platform on the top rungs of the vertical frames. Secure the platforms through the lever on the bottom side of the platform. 10. Attach the all-round railing Climb up the scaffold from the inside through the opening of the trapdoor platform. On each front insert a railing frame with the plug - in connectors facing down and secure these with the security clips in the frame tubes. On one side attach a double railing from the inside out into the frame tubes of the railing frame. Alternatively you can also use two horizontal braces. On the other side attach two horizontal braces from the inside out into the frame tubes. 11. Attach toeboards Unfold the toeboard set. The aluminium clips are centred between the claws of the platform. 12. Ballast regulations Indoors in mid position no ballast is needed. If the scaffold is erected outdoors one ballast weight of 10 kg on each stabiliser = a total of 40 kg is necessary. Indoors and outdoors in wall position no ballast is needed if two pieces of wall support (accessory article no. K00 - WA - 1000 - 0 - 0) are used. In wall position no ballast is needed if two pieces of wall anchorage are used. Dismantling is carried out in reverse order.
M id le p o s i tio n B a l la s t
B a lla s t p o st it io n
AluKlik 135-960 S
Platform height Working height 7, 6 m 9, 6 m
Components Amount Designation Art.-No. 1 foldable base unit 135 K00-FE-1613-R15 6 vertical frames 135 2, 0 m K00-VR-0013-7-0 1 platform 1, 9 m H00-BE-1900-0-0 2 trapdoor platform 1, 9 m H00-DB-1900-0-0 1 toeboard set L00-BB-1913-0-0 2 railing frame 135 K00-GR-1013-2-0 2 double railing K00-DG-1900-0-0 6 horizontal brace 1, 9 m H00-HO-1900-0-0 7 diagonal brace H00-DI-1900-3-0 4 stabilisers 2, 2 m K00-DA-2200-0-0 Accessory see below ballast 2 wall support 2 wall anchorage set
connectors facing down into the openings of the tubes of the frames below and secure them with the security clips. 8. Attach side protection and diagonal brace Attach on the inner side two horizontal braces on the second and fourth rungs of the vertical frames. Attach a double railing from the inside out to the frame tubes of the vertical frames in such a way that the upper beam of the double railing is located above the fourth rung. This double railing must not be replaced with horizontal braces as it serves stabilising purposes for the scaffold tower! Opposite the double railing attach a diagonal brace to the vertical frames in such a way that the lower claw is positioned above the second lowest rung. 9. Attach next vertical frames Proceed as described under no. 7. 10. Attach diagonal and horizontal braces Attach a horizontal brace on both sides above the second lowest rungs to the frame tubes of the vertical frame. Attach two intersecting diagonal braces for stabilising purposes to the vertical frames in such a way that the lower claws are mounted to the second lowest rungs of the frames. 11. Put on platform and trapdoor platform Hang the platform and trapdoor platform on the top rungs of the vertical frames. Secure the platforms through the lever on the bottom side of the platform. 12. Attach the all-round railing Climb up the scaffold from the inside through the opening of the trapdoor platform. On each front insert a railing frame with the plug- In connectors facing down and secure these with the security clips in the frame tubes. On one side attach a double railing from the inside out into the frame tubes of the railing frame. Alternatively you can also use two horizontal braces. On the other side attach two horizontal braces from the inside out into the frame tubes.
M id le p o s itio n o f b a lla s t
B a ll a s tp o s itio n
13. Attach toeboards Unfold the toeboard set. The aluminium clips are centred the claws of the platform.
W allposttion B allast
between
B allastpostion
14. Ballast regulations AluKlik 135-960 S demands ballast for all assembly possibilities mid and wall position, indoors and outdoors as follows: In mid position: Indoors no ballast is needed. Outdoors four ballast weights of 10 kg on each stabiliser, a total of 160 kg. In wall position together with two pieces of wall support (accessory article no. K00-WA-1000-0-0): Indoors no ballast is needed. Outdoors three ballast weights of 10 kg on each frame tube near the wall, a total of 60 kg. In wall position no ballast is needed if two pieces of wall anchorage are used. Dismantling is carried out in reverse order.
AluKlik 135-960 V
Platform height Working height 7, 6 m 9, 6 m
Components
Amount 1 6 1 4 1 2 4 8 5 4 Accessory see below 2 2 Designation Art.-No. foldable base unit 135 K00-FE-1613-R15 vertical frames 135 2, 0 m K00-VR-0013-7-0 platform 1, 9 m H00-BE-1900-0-0 trapdoor platform 1, 9 m H00-DB-1900-0-0 toeboard set L00-BB-1913-0-0 railing frame 135 K00-GR-1013-2-0 double railing K00-DG-1900-0-0 horizontal brace 1, 9 m H00-HO-1900-0-0 diagonal brace H00-DI-1900-3-0 stabilisers 2, 2 m K00-DA-2200-0-0
7. Put on second trapdoor platform Hang the trapdoor platform on the top rungs of the vertical frames. Secure the platforms through the lever on the bottom side of the platform. 8. Attach next vertical frames Climb up the scaffold from the inside through the opening of the trapdoor platform. Insert the vertical frames with the connectors facing down into the openings of the tubes of the frames below and secure them with the security clips. 9. Attach side protection and diagonal brace Proceed as described under no. 6. 10. Put on third trapdoor platform Proceed as described under no. 7. 11. Attach next vertical frames Proceed as described under no. 8. 12. Attach side protection and diagonal brace Proceed as described under no. 6. 13. Put on platform and trapdoor platform Hang the platform and trapdoor platform on the top rungs of the vertical frames. Secure the platforms through the lever on the bottom side of the platform. 14. Attach the all-round railing Climb up the scaffold from the inside through the opening of the trapdoor platform. On each front insert a railing frame with the plugin connectors facing down and secure these with the security clips in the frame tubes. On one side attach a double railing from the inside out into the frame tubes of the railing frame. Alternatively you can also use two horizontal braces. On the other side attach two horizontal braces from the inside out into the frame tubes. 15. Attach toeboards Unfold the toeboard set. The aluminium clips are centred between the claws of the platform. 16. Ballast regulations AluKlik 135-960 V demands ballast for all assembly possibilities mid and wall position, indoors and outdoors as follows: In mid position: Indoors no ballast is needed. Outdoors four ballast weights of 10 kg on each stabiliser, a total of 160 kg. In wall position: together with two pieces of wall support ( accessory article no. K00-WA-1000-0-0): Indoors no ballast is needed. Outdoors three ballast weights of 10 kg on each frame tube near the wall, a total of 60 kg. In wall position no ballast is needed if two pieces of wall anchorage are used. Dismantling is carried out in reverse order.
M id le p o s itio n o f b a lla s t
B a ll a s tp o s itio n
W allposttion B allast
B allastpostion
AluKlik 135-1200
Platform height Working height 9, 6 m 11, 6 m
Components
Amount 1 8 1 3 1 2 3 8 8 4 Designation Art.-No. foldable base unit 135 K00-FE-1613-R15 vertical frames 135 2, 0 m K00-VR-0013-7-0 platform 1, 9 m H00-BE-1900-0-0 trapdoor platform 1, 9 m H00-DB-1900-0-0 toeboard set L00-BB-1913-0-0 railing frame 135 K00-GR-1013-2-0 double railing K00-DG-1900-0-0 horizontal brace 1, 9 m H00-HO-1900-0-0 diagonal brace H00-DI-1900-3-0 stabilisers 2, 6 m K00-DA-2600-0-0
Accessory
see below 2 2 ballast wall support wall anchorage set K00-BL-0000-0-S K00-WA-1000-0-0 K00-WS-0900-0-0
6. Put on trapdoor platform Hang the trapdoor platform on the top rungs of the vertical frames. Secure the platforms through the lever on the bottom side of the platform. 7. Attach next vertical frames Climb up the scaffold from the inside through the opening of the trapdoor platform. Insert the vertical frames with the connectors facing down into the openings of the tubes of the frames below and secure them with the security clips. 8. Attach side protection and diagonal brace Attach on the inner side two horizontal braces on the second and fourth rungs of the vertical frames. Attach a double railing from the inside out to the frame tubes of the vertical frames in such a way that the upper beam of the double railing is located above the fourth rung. This double railing must not be replaced with horizontal braces as it serves stabilising purposes for the scaffold tower! Opposite the double railing attach a diagonal brace to the vertical frames in such a way that the lower claw is positioned above the second lowest rung. 9. Attach next vertical frames Proceed as described under no. 7. 10. Attach diagonal and horizontal braces Attach a horizontal brace on both sides above the second lowest rungs to the frame tubes of the vertical frame. Attach two intersecting diagonal braces for stabilising purposes to the vertical frames in such a way that the lower claws are mounted to the second lowest rungs of the frames. 11. Put on second platform Proceed as described under no. 6. 12. Attach next vertical frames Proceed as described under no. 7. 13. Attach side protection and diagonal brace Proceed as described under no. 8. 14. Put on platform and trapdoor platform Hang the platform and trapdoor platform on the top rungs of the vertical frames. Secure the platforms through the lever on the bottom side of the platform. 15. Attach the all-round railing Climb up the scaffold from the inside through the opening of the trapdoor platform. On each front insert a railing frame with the plug-in connectors facing down and secure these with the security clips in the frame tubes. On one side attach a double railing from the inside out into the frame tubes of the railing frame. Alternatively you can also use two horizontal braces. On the other side attach two horizontal braces from the inside out into the frame tubes. 16. Attach toeboards Unfold the toeboard set. The aluminium clips are centred between the claws of the platform.
17. Ballast regulations If regular assembly is followed (using stabilisers 2, 6 m) no ballast is needed in mid position and in wall position if two pieces of wall support ( accessory article no. K00-WA-1000-0-0) are used. Alternatively, if the scaffold is erected with stabilisers 2,2 m no ballast is needed in mid position and in wall position if two pieces of wall support ( accessory article no. K00-WA-1000-0-0) are used.In wall position no ballast is needed if two pieces of wall anchorage are used. Dismantling is carried out in reverse order. Please note that the erection of mobile scaffolds with a working height exceeding 10 m is only allowed indoors according to DIN 4422!
AluKlik 135-1400
Platform height Working height 11, 5 m 13, 5 m
Components
Amount 1 10 1 3 1 2 3 10 10 4 Designation Art.-No. foldable base unit 135 K00-FE-1613-R15 vertical frames 135 2, 0 m K00-VR-0013-7-0 platform 1, 9 m H00-BE-1900-0-0 trapdoor platform 1, 9 m H00-DB-1900-0-0 toeboard set L00-BB-1913-0-0 railing frame 135 K00-GR-1013-2-0 double railing K00-DG-1900-0-0 horizontal brace 1, 9 m H00-HO-1900-0-0 diagonal brace H00-DI-1900-3-0 stabilisers 2, 6 m K00-DA-2600-0-0
7. Attach next vertical frames Climb up the scaffold from the inside through the opening of the trapdoor platform. Insert the vertical frames with the connectors facing down into the openings of the tubes of the frames below and secure them with the security clips. 8. Attach side protection and diagonal brace Attach on the inner side two horizontal braces on the second and fourth rungs of the vertical frames. Attach a double railing from the inside out to the frame tubes of the vertical frames in such a way that the upper beam of the double railing is located above the fourth rung. This double railing must not be replaced with horizontal braces as it serves stabilising purposes for the scaffold tower! Opposite the double railing attach a diagonal brace to the vertical frames in such a way that the lower claw is positioned above the second lowest rung. 9. Attach next vertical frames Proceed as described under no. 7. 10. Attach diagonal and horizontal braces Attach a horizontal brace on both sides above the second lowest rungs to the frame tubes of the vertical frame. Attach two intersecting diagonal braces for stabilising purposes to the vertical frames in such a way that the lower claws are mounted to the second lowest rungs of the frames. 11. Put on second platform Proceed as described under no. 6. 12. Attach next vertical frames Proceed as described under no. 7. 13. Attach side protection and diagonal brace Proceed as described under no. 8. 14. Attach next vertical frames Proceed as described under no. 7. 15. Attach diagonal and horizontal braces Proceed as described under no. 10. 16. Put on platform and trapdoor platform Hang the platform and trapdoor platform on the top rungs of the vertical frames. Secure the platforms through the lever on the bottom side of the platform. 17. Attach the all-round railing Climb up the scaffold from the inside through the opening of the trapdoor platform. On each front insert a railing frame with the plug-in connectors facing down and secure these with the security clips in the frame tubes. On one side attach a double railing from the inside out into the frame tubes of the railing frame. Alternatively you can also use two horizontal braces. On the other side attach two horizontal braces from the inside out into the frame tubes. 18. Attach toeboards Unfold the toeboard set. The aluminium clips are centred between the claws of the platform.
19. Ballast regulations If regular assembly is followed (using stabilisers 2, 6 m) no ballast is needed in mid position and in wall position if two pieces of wall support ( accessory article no. K00-WA-1000-0-0) are used. Alternatively, if the scaffold is erected with stabilisers 2, 2 m: In mid position on two stabilisers diagonally apart one ballast weight of 10 kg each = a total of 20 kg. In wall position no ballast is needed if two pieces of wall support ( accessory article no. K00-WA-1000-0-0 ) are used. In wall position no ballast is needed if two pieces of wall anchorage are used. Dismantling is carried out in reverse order. Please note that the erection of mobile scaffolds with a working height exceeding 10 m is only allowed indoors according to DIN 4422!
Attach ballast
When the scaffold is erected in mid position fasten the ballast weights to the upper sloping tube of the stabilisers by way of the affixed coupler as near the root point as possible. Each piece of ballast has a weight of 10 kg. Consult the ballast regulations of the particular scaffold type for the necessary amount of ballast weights. The ballast weights are available as accessory (article no. K00-BL-0000-0-S). If the scaffold is erected in wall position attach the ballast weights to the vertical frame tubes of the foldable base unit that are near the wall. Only solid ballast weights may be used and no fluid or granular ballast. Note: There is the risk of accidents if ballast regulations are not minded!
attachement situation
Adjustable legs
If adjustable legs are used attach a further horizontal brace from the inside out to the frame tubes above the second lowest rung on the open side of the foldable base unit.
Locking of castors
open locked
4 3
1,35
1,8 / 1,9
K00-FE-1613-R15
39,4
1,35
2,0
K00-VR-0013-7-0
12,4
1,35
1,07
K00-GR-1013-2-0
3,8
0,6
0,09
0,2
Ballast 10 kg
K00-BL-0000-0-S
10,8
0,5 0,2
K00-ET-SPIN0500 L00-ET-ROL200-N
2,2 3,7
0,9
Wall anchorage set (wall anchor, normal coupler, wall screw, dowel)
K00-WS-0900-0-0
3,3
Foldable base unit 135 Vertical frame 135/2,0 m Platform 1,9 m Trapdoor platform 1,9 m Toeboard set Railing frame 1,35 Double railing Horizontal brace 1,9 m Diagonal brace Stabiliser 2,2 m Stabiliser 2,6 m
1 -
1 -
1 2
1 2
1 4
1 6
1 6
1 8
1 10
1 1
1 1
1 1
1 2
1 2
1 2
1 4
1 3
1 3
2 2 2 -
1 2 1 2 4 -
1 2 2 4 2 -
1 2 2 6 5 4 -
1 2 2 6 7 4 -
1 2 4 8 5 4 -
1 2 3 8 8 4
1 2 3 10 10 4
Model
Accessory
position 0 0 18
AluKlik 135-300 AluKlik 135-400 AluKlik 135-600S AluKlik 135-600 AluKlik 135-600S AluKlik 135-600 AluKlik 135-800
up to 3 3,8 5,8
ballast weight 10kg ballast weight 10kg without stabiliser ballast weight
0 0 14
0 0 14
5,8
7,7
9,6
16
11,6
not allowed
not allowed
AluKlik 135-1200
11,6
not allowed
not allowed
AluKlik 135-1400
13,5
not allowed
not allowed
AluKlik 135-1400
13,5
not allowed
not allowed