DWB Forestry Services Ltd.

Active Certifications

7/31/2013 1:39 PM

Year

Coordinating Registered Professional

Client

Contractor

Field Reviewer

Structure Type

Location (Rd/km)

Proposed Certification Date

Outstanding Issues

Date Certified

2009 2009 2009 2009 EAC 2010 EAC

Carrier Spectra Energy Formula

KT JV

Temp Bridge 18m bridge

CP 451 crossing km 22 Lower Burnt Road

6-Dec-09 Jan 15 2010

in construction

Page 1 of 5
U:\DWB_Engineering_Files (Root Drive):\Certifications Inspections.xls

DWB Forestry Services Ltd.


Active Certifications

7/31/2013 1:39 PM

Completed (Y/N)

Page 2 of 5
U:\DWB_Engineering_Files (Root Drive):\Certifications Inspections.xls

DWB Forestry Services Ltd.


Year 2005 2005 2005 2005 2005 2005 2007 2007 2007 2007 2007 2007 2007 2008 2008 2008 2008 2008 2007 2007 2008 2008 2008 2008 2008 2008 2008 2008 2008 2007 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 Coordinating Registered Professional Ray Ray Ray Ray Ray Ray Ray Ray Emily Ray Ray Ray Ray Ray Ray Ray Ray Ray Emily Emily Ray Ray Ray Ray Ray Troy Troy Troy Troy Ray Ray Emily Ray

Completed Certifications
Client Dunkley Dunkley Dunkley Dunkley Dunkley Dunkley BCTS-FSJ BCTS-VA Canfor Carrier Carrier Carrier Carrier Tolko Quesnel Tolko Quesnel West Fraser West Fraser West Fraser BC Hydro BC Hydro Formula Carrier Carrier Carrier WF Quesnel Leoka BCTS-MK BCTS-MK BCTS-MK Carrier BCTS-FSJ Carrier Carrier Carrier Carrier BCTS-SN BCTS-SN BCTS-SN BCTS-SN BCTS-SN BCTS-SN BCTS-SN Canfor Contractor Formula Formula Formula Formula Formula Formula and Ruskin New Land Formula Blackwater Blackwater Blackwater Blackwater Field Reviewer Structure Type Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge Arch Pipe Bridge Bridge Bridge Bridge Culvert Culvert Bridge Bridge Bridge Round CSP Round CSP Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge Location (Rd/km)

Proposed Certification Date

7/31/2013 1:39 PM Outstanding Issues Date Certified 26-Feb-08 26-Feb-08 26-Feb-08 26-Feb-08 26-Feb-08 26-Feb-08 26-Feb-08 1-Feb-08 10-Jan-08 26-Feb-08 26-Feb-08 26-Feb-08 26-Feb-08 12-Mar-08 12-Mar-08 1-Mar-08 1-Mar-08 1-Mar-08 15-Apr-08 15-Apr-08 28-Apr-08 3-Jun-08 Completed (Y/N) Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

Karl \ Joe \ James Mason Bauman Joe, Nick

Formula Formula Formula Formula Formula Formula Blackwater

Carmen Carmen Carmen Joe Joe Ray/Robert White Ray Ray June 16/08 Troy Troy Troy Troy Joe \ Ray Emily

Bridge Inspec. Leoka

Blackwater Bridge

Emily Emily Emily Emily Emily Emily Emily Emily/Ray

Canyon Tree Farms Frost Lake Logging Whiteriver Contracting Frost Lake Logging Whiteriver Contracting Whiteriver Contracting Whiteriver Contracting

Joe Joe James

Hominka 1382.0 Km Hominka 1382.3 Km Hominka 1381.0 Km Hominka 1380.8 Km Hominka 1380.0 Km Hominka River Trembluer (D51) Long Lake Salmon FSR km 20 Holmes 47 Km Holmes 47.6 Km Holmes CP580 Holmes 51.2 Km Ramsey Creek 6200 Rd Ramsey Creek 6200 Rd Willow FSR Km 35 Willow FSR Km 36 Willow FSR Km 37 Blackwater - Giesbrecht Blackwater - Giesbrecht Coyote Creek CP914 CP 701 SU-B Quesnel Mackenzie Mackenzie Mackenzie Mackenzie Holmes 42 Km Km 138 Teardrop/Carrier Castle Holmes Blue Tommy upper/lower Bridge Km 3+200 Loe Keve FSR Bridge Km 14 Rainbow FSR Min-Span Culvert Km 3+900 McLeod-Tsilcoh FSR Bridge TSL A82350 STA PO+448 Bridge Km 5+800 McLeod-Tsilcoh FSR Bridge TSL A82350 STA PO+861 Bridge TSL A82350 STA P1-026 Bridge Km 5+800 Red 2000 Rd Page 3 of 5

15-Feb-08 1-Jan-08 18-Dec-07

Final inspection by Emily and Brian - Completed

5-Mar-08 5-Mar-08 27-Feb-08 27-Feb-08 27-Feb-08 24-Dec-07 24-Dec-07 1-May-08 3-Jun-08 20-Jun-08 20-Jun-08 1-Jul-08

CP813 CP813

Completed Completed

Site 1 & 2 inspection Site 1 & 2 inspection 100 bridges Gillis FSR(6 sites) Rainbow (11 Sites) Natim Arm (2 sites) Natim (1 site) Cap needs fixing before certification can be completed

Tommy Creek Km1.9 D46 D3 D4

12-Nov-08 11/25/2008 11/25/2008 11/25/2008 26-Oct-08 29-Jul-08 14-Jan-09 26-Oct-08 12-Sep-08 12-Sep-08 27-Oct-08 4-Dec-08 17-Nov-08 4-Dec-08 17-Nov-08 4-Dec-08 4-Dec-08 9/4/2008

U:\DWB_Engineering_Files (Root Drive):\Certification Inspections.xls

DWB Forestry Services Ltd.


Inspections
Coordinating Registered Professional Ray Getzlaf Ray Getzlaf Joe Vanderzwan Joe Vanderzwan James Patterson Proposed Inspection Completion Date Report to Client, Report Filed Internally (Y/N) Y

7/31/2013 1:39 PM

Year 2007 2008 2008 2008 2008

Client Cheslatta Forest Products Brinkman BCTS-SN BCTS-SN Frost Lake Logging

Structure Type 9m Bridge 22 Bridges 18.288m Bridge Bridge Mini-span culvert

Location (Rd/km)

Marilla FSR 01/06/2007 Terrace Area 15/05/2008 Km 3+200 Leo Keve FSR October 2008 Km 14 Rainbow FSR 14/10/2008 Km 3+900 McLeod-Tsilcoh FSR 02/10/2008

Outstanding Issues Issues with debris under bridge. Client cleaned up.

Date Certified November 15, 2007

Completed (Y/N) Y

Page 4 of 5
U:\DWB_Engineering_Files (Root Drive):\Certification Inspections.xls

DWB Forestry Services Ltd.


Inspections

7/31/2013 1:39 PM

Page 5 of 5
U:\DWB_Engineering_Files (Root Drive):\Certification Inspections.xls

Das könnte Ihnen auch gefallen