Active Certifications
7/31/2013 1:39 PM
Year
Client
Contractor
Field Reviewer
Structure Type
Location (Rd/km)
Outstanding Issues
Date Certified
KT JV
in construction
Page 1 of 5
U:\DWB_Engineering_Files (Root Drive):\Certifications Inspections.xls
7/31/2013 1:39 PM
Completed (Y/N)
Page 2 of 5
U:\DWB_Engineering_Files (Root Drive):\Certifications Inspections.xls
Completed Certifications
Client Dunkley Dunkley Dunkley Dunkley Dunkley Dunkley BCTS-FSJ BCTS-VA Canfor Carrier Carrier Carrier Carrier Tolko Quesnel Tolko Quesnel West Fraser West Fraser West Fraser BC Hydro BC Hydro Formula Carrier Carrier Carrier WF Quesnel Leoka BCTS-MK BCTS-MK BCTS-MK Carrier BCTS-FSJ Carrier Carrier Carrier Carrier BCTS-SN BCTS-SN BCTS-SN BCTS-SN BCTS-SN BCTS-SN BCTS-SN Canfor Contractor Formula Formula Formula Formula Formula Formula and Ruskin New Land Formula Blackwater Blackwater Blackwater Blackwater Field Reviewer Structure Type Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge Arch Pipe Bridge Bridge Bridge Bridge Culvert Culvert Bridge Bridge Bridge Round CSP Round CSP Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge Location (Rd/km)
7/31/2013 1:39 PM Outstanding Issues Date Certified 26-Feb-08 26-Feb-08 26-Feb-08 26-Feb-08 26-Feb-08 26-Feb-08 26-Feb-08 1-Feb-08 10-Jan-08 26-Feb-08 26-Feb-08 26-Feb-08 26-Feb-08 12-Mar-08 12-Mar-08 1-Mar-08 1-Mar-08 1-Mar-08 15-Apr-08 15-Apr-08 28-Apr-08 3-Jun-08 Completed (Y/N) Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Carmen Carmen Carmen Joe Joe Ray/Robert White Ray Ray June 16/08 Troy Troy Troy Troy Joe \ Ray Emily
Blackwater Bridge
Canyon Tree Farms Frost Lake Logging Whiteriver Contracting Frost Lake Logging Whiteriver Contracting Whiteriver Contracting Whiteriver Contracting
Hominka 1382.0 Km Hominka 1382.3 Km Hominka 1381.0 Km Hominka 1380.8 Km Hominka 1380.0 Km Hominka River Trembluer (D51) Long Lake Salmon FSR km 20 Holmes 47 Km Holmes 47.6 Km Holmes CP580 Holmes 51.2 Km Ramsey Creek 6200 Rd Ramsey Creek 6200 Rd Willow FSR Km 35 Willow FSR Km 36 Willow FSR Km 37 Blackwater - Giesbrecht Blackwater - Giesbrecht Coyote Creek CP914 CP 701 SU-B Quesnel Mackenzie Mackenzie Mackenzie Mackenzie Holmes 42 Km Km 138 Teardrop/Carrier Castle Holmes Blue Tommy upper/lower Bridge Km 3+200 Loe Keve FSR Bridge Km 14 Rainbow FSR Min-Span Culvert Km 3+900 McLeod-Tsilcoh FSR Bridge TSL A82350 STA PO+448 Bridge Km 5+800 McLeod-Tsilcoh FSR Bridge TSL A82350 STA PO+861 Bridge TSL A82350 STA P1-026 Bridge Km 5+800 Red 2000 Rd Page 3 of 5
5-Mar-08 5-Mar-08 27-Feb-08 27-Feb-08 27-Feb-08 24-Dec-07 24-Dec-07 1-May-08 3-Jun-08 20-Jun-08 20-Jun-08 1-Jul-08
CP813 CP813
Completed Completed
Site 1 & 2 inspection Site 1 & 2 inspection 100 bridges Gillis FSR(6 sites) Rainbow (11 Sites) Natim Arm (2 sites) Natim (1 site) Cap needs fixing before certification can be completed
12-Nov-08 11/25/2008 11/25/2008 11/25/2008 26-Oct-08 29-Jul-08 14-Jan-09 26-Oct-08 12-Sep-08 12-Sep-08 27-Oct-08 4-Dec-08 17-Nov-08 4-Dec-08 17-Nov-08 4-Dec-08 4-Dec-08 9/4/2008
7/31/2013 1:39 PM
Client Cheslatta Forest Products Brinkman BCTS-SN BCTS-SN Frost Lake Logging
Location (Rd/km)
Marilla FSR 01/06/2007 Terrace Area 15/05/2008 Km 3+200 Leo Keve FSR October 2008 Km 14 Rainbow FSR 14/10/2008 Km 3+900 McLeod-Tsilcoh FSR 02/10/2008
Outstanding Issues Issues with debris under bridge. Client cleaned up.
Completed (Y/N) Y