BORNEO SAMUDERA SDN.BHD. Co.No.T334926-U


(Wholly owned by Sawit Kinabalu Sdn.Bhd) Co.No.403109 W
Serudung Palm Oil Mill

Issue date :
Report date :

MILL DAILY REPORT (Production)


ITEMS

TODAY

MTD

Budget/KPI

Var

FFB Received (mt)


KPSB
UKE

202.80
64.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
266.81
772.45
1,039.26
0.00

TOTAL FFB - BSSB


TOTAL FFB - PG

TOTAL FFB (mt)


FFB Diversion (mt)

4,714.31
2,057.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,772.02
15,451.49
22,223.51
0.00

4,686.00
1,840.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,526.00
8,368.00
14,894.00

28.31
217.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
246.02
7083.49
7329.51

% Var

MM Comments :
1. FFB Received
0.60 0.00
11.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00 2. FFB Processed
0.00 Mill stop at 5.20 pm no water supply to
0.00 mill due to electrical cable to Pump
3.77 house snapped and 7'' water piping to
84.65 mill leaked by estate contractor during
49.21 the maintenance road works.

FFB Process
B/F FFB Balance (mt)

FFB Process (mt)


C/F FFB Balance (mt)
Ave. Wt. FFB / Cages
Ave. Wt. FFB / Cycle

1101.45
446.20
1694.51
0.00
22.31

8/3/2013 4:42
29 Sep

3. CPO Production & Quality


0.00
20598.01

14,894.00

5704.01

0.00
21.66

2.50
22.50

(2.50)
(0.84)

4,397.72
99.6000 4,418.6060
22.32
21.45
5.33
4.57
2.48
2.51
0.179
0.177
0.040
0.041
236.98
3,996.32

3,336.09
22.40
5.00
2.31
0.200
0.050
3,336.09

1082.52
(0.95)
(0.43)
0.20
(0.023)
(0.009)
660.23

670.23
4.50
4.50
5.00
7.00
6.00
50.00
670.23

179.51
(0.37)
(0.35)
(4.04)
(0.51)
(0.80)
(11.93)
98.99

38.30
(100.00)
(3.74)

CPO Production & Quality


B/F CPO Stock (mt)
CPO Produced (mt)

OER (%)
FFA (%) as 29/9/12
DOBI as 29/9/12
VM (%) as 28/9/12

Dirt (%) as 28/9/12


CPO Despatched (mt)

32.45 4. PK Production & Quality


(4.23) 0.00
(8.64)
8.55
(11.487)
(17.738)
19.79

PK Production & Quality


B/F PK Stock (mt)
PK Produced (mt)

KER (%)
Est. KER (%)
FFA (%) as 28/9/12
VM (%) as 28/9/12
Dirt (%) as 29/9/12
OC (%) as 28/9/12
PK Despatched (mt)

Stock & Quality


CPO
C/F Stock (mt)
Stock Write off (mt)
FFA (%) as 29/9/12

271.68
26.1220
5.85
6.04
1.06
6.16
5.80
37.07
0.00

849.7440
4.13
4.15
0.96
6.49
5.20
38.07
769.22

ST No.1

ST No.2

2088.449
0.000
4.620

2171.893
0.000
4.760

ST No.3

0.000
0.000
0.000

ST No.4

0.000
0.000
0.000

5. Stock & Quality


26.78 0.00
(8.33)
(7.68)
(80.88)
(7.26)
(13.42)
(23.87)
14.77
ST No.5

0.000
0.000
0.000

Total/Ave.

4,260.34
0.000
4.691

Prepared by :-

DOBI as 29/9/12
VM (%) as 28/9/12
Dirt (%) as 28/9/12

PK
C/F Stock (mt)
Stock Write off (mt)
FFA (%) as 28/9/12
VM (%) as 28/9/12
Dirt (%) as 29/9/12
C.C.:

2.480
0.175
0.042

2.460
0.173
0.042

0.000
0.000
0.000

0.000
0.000
0.000

Bunker No.1 Bunker No.2 Bunker No.3 Bunker No.4

0.000
0.000
0.000
Others

32.09

265.71

0.00

0.00

0.00

1.00
6.75
5.50

1.06
6.13
5.80

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

(1) General Manager (Processing & Engineering)


(3) VM (P&E), ROT, BSSB

2.470
0.174
0.042

ME/AE/EA
Approved by :-

Total/Ave.

297.80
0.00
1.05
6.20
5.77

(2) General Manager (Region)


(4) Marketing & Trading Manager

MM/ME/AE

8/3/2013 4:42
2012

omments :

m no water supply to
rical cable to Pump
d 7'' water piping to
ate contractor during
oad works.
& Quality

& Quality

Prepared by :-

ME/AE/EA
Approved by :-

MM/ME/AE

Enter Report Date :

29

Sep

2012

BORNEO SAMUDERA SDN.BHD.

Co.No.T334926-U

(Wholly owned by Sawit Kinabalu Sdn.Bhd) Co.No.403109 W

Serudung Palm Oil Mill


(1) MILL DAILY REPORT (Milling & Extraction Efficiency)
ITEMS

28/09/12

29/09/12

MTD

Milling Efficiency
Milling Rate (mt/hr)
Press T/put (mt/hr)
Process Labour Hrs
Effective Process Hrs
Breakdown Hrs
Maintenance Hrs
Idling Hrs (Total)
Turbine, Ave. KW
Turbine, % to process
GenSet, Total Lts Diesel
GenSet, Total Rhrs
GenSet, KwH/lts diesel
GenSet, lts diesel / hr
Boiler - Water, m
Total Water, m
Total Rhr - Decanter
Total Rhr - S/Separator
Oil Purifier - Total Hrs
Oil Purifier - Oil/hr
EFB Evacuation, mt
EFB Evacuation, %

Gas Engine, Total KwH


Gas Engine, Total Rhrs
Rainfall (max), mm

34.06
11.35
23.08
22.08
0.00
1.92
-1.00
686.67
1.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
0.00
0.00
0.00
113.59
65.67%

42.82
14.71
21.42
10.42
0.00
12.58
-1.00
698.86
0.65
10692.00
15.55
0.31
687.59
0.00
0.00
8.42
0.00
0.00
0.00
134.72
131.27%

38.20
11.28
619.36
539.28
12.13
57.12
12.94
729.19
0.95
17267.00
149.74
1.40
115.31
0.00
0.00
540.26
0.00
0.00
0.00
3485.57
73.57%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
231.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

Stripping Efficiency
USB, %
PSB, %
Stripping Efficiency, %

ITEMS

27/09/12

28/09/12

Oil
PK

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

Oil Losses to sample (%)


EFB
Fibre
Nut
Cake
SBGP

0.00
0.00
0.00
0.00
0.00

Oil Losses to FFB (%)


EFB
Fibre
Nut
Cake
SBGP
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

Kernel Losses to sample (%)


Fiber
Dry Shell
Wet Shell

0.00
0.00
0.00

Kernel Losses to FFB (%)


Fiber

0.00

0.00

0.00

Dry Shell
Wet Shell
TOTAL

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

Effluent Treatment

29/09/12

Inffluent-process hrs, m
Inffluent - TOTAL, m
Effluent - TOTAL, m

(2) MILL DAILY REPORT (Mill Breakdown)

TODAY

MTD

Extraction Efficiency (%)

Others
Shred. EFB Despatch, mt

8/3/2013 4:42
29
Sep
2012

Issue date :
Report date :

Breakdown (Shutdown)
Mech.
Elect.
Ops.

MTD

Breakdown (Shutdown)
Mech.
Elect.
Ops.

MTD
0
0
0

0
0
0

0.00

TOTAL

0.00

0.00

TOTAL

Breakdown (Slowdown)
Mech.
Elect.
Ops.
0.00

TOTAL
Comments :

0.00

0.00

0.00

0.00

0.00

Breakdown (Slowdown)
Mech.
Elect.
Ops.
TOTAL

0.00

0.00

0.00

Prepared by :-

AE / EA
c.c. : (1) GMPE, HO, BSSB, KK

Checked by :-

ME / AE
(3) VM (PE), ROT, BSSB

Approved by :-

MM/ME/AE

Das könnte Ihnen auch gefallen