Sl No 1

Description Sewerage Works TOTAL

No of items 35 35

No of A4 printed pages (Landscape) 4 4

Amount Qouted

Remarks

In Words Ngultrum

Page 1 of 5

Bill of Quantities (Sewer Works)


ROYAL AUDIT AUTHORITY TRAINING CENTRE, TSIRANG Royal Audit Authority Name of work:RAA Training Centre
Sl No BSR Ref Description of item Quantity Unit Rate (Nu.) Amount (Nu.)

SUB TITLE : SEWER WORKS FOR MAIN BUILDING


INSPECTION CHAMBER 1.0 1.1 1.2 1.3

Construction of standard inspection chamber as per dawings and specifications including excavation, fixing of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level. N/A Depth not exceeding 0.6m ("S" type chamber) Depth 0.61m to 0.90m ("M" type chamber) Depth 0.91m to 1.50m ("L" type chamber)
PIPE LAYING:

5.00 2.00 5.00

each each each

2.0

PO0052

Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling & thrust block) -160mm Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary rock with or without blasting-Pipes, cables etc. dia.> 300mm

142.50

3.0

EW0156

142.50

SUB TITLE: GENERAL HOSTELS (2 Nos.) & SELF CATERING HOSTELS(2 Nos.)
INSPECTION CHAMBER:

Construction of standard inspection chamber as per dawings and specifications including excavation, fixing
4.0

of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level.
4.1 4.2 4.3

N/A

Depth not exceeding 0.6m ("S" type chamber) Depth 0.61m to 0.90m ("M" type chamber) Depth 0.91m to 1.50m ("L" type chamber)
PIPE LAYING:

13.00 8.00 6.00

each each each

5.0

PO0052

Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling & thrust block) -160mm

381.61

Page 2 of 5

Sl No
6.0

BSR Ref EW0156

Description of item Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary rock with or without blasting-Pipes, cables etc. dia.> 300mm

Quantity 381.61

Unit m

Rate (Nu.)

Amount (Nu.)

SUB TITLE: EXECUTIVE HOSTELS (3 Nos.)


INSPECTION CHAMBER:

Construction of standard inspection chamber as per dawings and specifications including excavation, fixing
7.0

N/A
7.1 7.2

of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level. Depth not exceeding 0.6m ("S" type chamber) Depth 0.91m to 1.50m ("L" type chamber) Providing & fixing 110mm dia P.V.C soil waste and vent pipes, single or double socketed, including pipe clip complete (excluding the cost of PVC fittings) Providing & fixing P.V.C pipe connector - 110mm dia

3.00 4.00

each each

8.0

PO0372

12.00

9.0

PO0380

2.00

each

10.0

PO0387

Providing & fixing P.V.C pipe Coupler - 110mm dia

2.00

each

11.0

PO0407

Providing & fixing P.V.C plain bend - 110mm dia

2.00

each

12.0

PO0417

Providing & fixing P.V.C door bend - 110mm dia

3.00

each

13.0

PO0437

Providing & fixing P.V.C Single Tee Plain - 110mm dia

2.00

each

14.0

PO0447

Providing & fixing P.V.C Single Tee with door - 110mm dia

2.00

each

15.0

PO0477

Providing & fixing P.V.C Single Y, plain - 110mm dia

3.00

each

16.0

PO0487 PO0547 PO0555

Providing & fixing P.V.C Single Y, with door - 110mm dia Providing & fixing P.V.C Terminal guard - 110mm dia Providing & fixing P.V.C P- Trap, without air vent (Big) - 110mm dia

3.00 3.00 6.00

each each each

17.0 18.0

Page 3 of 5

Sl No

BSR Ref
PIPE LAYING:

Description of item

Quantity

Unit

Rate (Nu.)

Amount (Nu.)

19.0

PO0052

Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling & thrust block) -160mm Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary rock with or without blasting-Pipes, cables etc. dia.> 300mm

153.10

20.0

EW0156

153.10

SUB TITLE: GYMNASIUM (1 Nos.)


INSPECTION CHAMBER:

Construction of standard inspection chamber as per dawings and specifications including excavation, fixing
21.0

N/A
21.1 21.2

of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level. Depth not exceeding 0.6m ("S" type chamber) Depth 0.91m to 1.50m ("L" type chamber)
PIPE LAYING:

2.00 1.00

each each

22.0

PO0052

Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling & thrust block) -160mm Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary rock with or without blasting-Pipes, cables etc. dia.> 300mm

44.52

23.0

EW0156

44.52

SUB TITLE: GENERATOR ROOM (1 Nos.)


INSPECTION CHAMBER:

Construction of standard inspection chamber as per dawings and specifications including excavation, fixing
24.0

N/A

of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level. Depth not exceeding 0.6m ("S" type chamber)
PIPE LAYING:

1.00

each

25.0

PO0052

Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling & thrust block) -160mm

5.00

Page 4 of 5

Sl No
26.0

BSR Ref EW0156

Description of item Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary rock with or without blasting-Pipes, cables etc. dia.> 300mm

Quantity 5.00

Unit m

Rate (Nu.)

Amount (Nu.)

SUB TITLE: CARE TAKER'S ROOM (1 Nos.)


INSPECTION CHAMBER:

Construction of standard inspection chamber as per dawings and specifications including excavation, fixing
27.0

N/A

of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level. Depth not exceeding 0.6m ("S" type chamber)
PIPE LAYING:

1.00

each

28.0

PO0052

Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling & thrust block) -160mm Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary rock with or without blasting-Pipes, cables etc. dia.> 300mm Total for Sewer Works (Nu.)

10.00

29.0

EW0156

10.00

In Words: