Beruflich Dokumente
Kultur Dokumente
i
l
t
e
r
s
romet urn i r ri l l e bel ow
romet urn i r ri l l e bel ow
i xed i r
hamber
romresh i r nt ake above
romresh i r nt ake above
o uppl y i r
uct
an hambe
r
egends
mbi ent i r
et urn i r
ol d i r
ampers
ot e:
hi s mode i s t he
same as t he mode
f or non- f i re
emergency
vent i l at i on mode
( ) , except f or f an
speed
( )
/ / age or por at i on / / age or por at i on
rom
uppl y
i r uct
ustomised nit nt ernal moke emoval ode i r
l ow i agram
i xed i r
hamber
et urn i r
et urn i r
o
i
l
s
&
i
l
t
e
r
s
romet urn i r ri l l e bel ow
romet urn i r ri l l e bel ow
( )
amper l osed
??
an hambe
r
moke
egends
( ) resh i r
amper l os
ed
( )
amper l osed ??
moke
out l et s
above ampers
( ) uppl y i r
ampers l osed
( ) xhaust i r
ampers pened
( )
i xed i r
hamber
i xed i r
hamber
/ / age or por at i on / / age or por at i on
o uppl y i r
uct
ustomised nit xt ernal i re / moke ode - i r
l ow i agram
i xed i r
hamber
et urn i r
et urn i r
o
i
l
s
&
i
l
t
e
r
s
romet urn i r ri l l e bel ow
romet urn i r ri l l e bel ow
egends
et urn i r
ol d i r
( ) resh i r
amper l os
ed
ampers
( )
i xed i r
hamber
i xed i r
hamber
an hambe
r
/ / age or por at i on / / age or por at i on
rot ot ype evel opment est s and
emonst rat i on
/ / age or por at i on / / age or por at i on
/ ni t rot ot ype evel opment
Appointed Sigma Coachair Group specialist manufacturer supplying
worldwide market
Several months of development work
Typically utilising tried and tested standard components
Demonstration of advanced prototype on 21 December 2010
/ / age or por at i on / / age or por at i on
moke emoval ut l et s nsert ed on op of
t he ni t
at er pr oof sl i di ng hat ch
t o be f i t t ed on t op of
r oof
xhaust openi ng cover wi t h l i near
act uat ors t o open and cl ose t he exhaust
pat h
/ / age or por at i on / / age or por at i on
ans and ampers onf i gured f or moke
emoval
he smoke r emoval ( exhaust ) damper
i n t he mi ddl e
he suppl y ai r dampers on t he l ef t and
ri ght
/ / age or por at i on / / age or por at i on
est s and eri f i cat i on
Test Set Objectives and Works Involved
(A) Standalone A/C Unit
Smoke Removal
Airflow Test
COMPLETED
to measure the extract airflow rates achieved under different
combinations of air paths for a standalone VAC unit; and
to identify the extent of VAC unit modification such that when
operated in smoke removal mode the extract airflow rate can be
maximized.
(B) 250
o
C Hot Air Chamber
Motor Test
COMPLETED
to conduct temperature stress test on fan motor assembly at 250
o
C
hot air chamber to validate its proper functioning duration.
(C) On Vehicle Smoke
Removal System Test
COMPLETED
by installing two VAC unit prototypes on an existing operating train
to verify the overall performance;
to measure the extract airflow rate achieved on-train; and
to conduct on-train smoke visualization tests (December 2010)
/ / age or por at i on / / age or por at i on
mproved moke emoval at e
per VAC Unit per Car 3-car Train Margin of
Safety
Smoke removal rate required
empirically*
1.33 cu.m/s 2.66 cu.m/s 7.98 cu.m/s 117%
Smoke removal rate achieved 2.89 cu.m/s
5.77 cu.m/s 17.31 cu.m/s
moke cl ear
hei ght at . m
eadr oom
~. m
baggage
f i r e
equi r ed smoke r emoval r at e cal cul at ed by empi r i cal smoke pl ume f or mul a:
cu. m/ s = . cu. m/ s* f or each of uni t s*
/ / age or por at i on / / age or por at i on
Video - Internal
/ / age or por at i on
i deo - nt ernal
/ / age or por at i on / / age or por at i on
Video - External
/ / age or por at i on
i deo - xt ernal
/ / age or por at i on / / age or por at i on
Conclusion
/ / age or por at i on
ummary
Consideration Side Detrainment End Detrainment End Detrainment
with SRS
Minimise Construction Risks
associated with tunnel size
Eliminate falling hazard from
elevated walkway
Visual impact of elevated structures
Infrastructure resources
Available walkway width
Evacuee self help
Walkway continuity
Clear headroom above walkway
Simplicity in operation
External train fire & capsule effect
Internal train fire drive-through Short Long Short Long Short Long
Internal train fire detrainment
/ / age or por at i on
oncl usi on
et r ai nment due t o t r ai n f i r e i s r ar e as dr i ve
t hr ough i s t he by f ar t he best opt i on
ot h end det r ai nment and si de det r ai nment ar e
accept abl e
nd et r ai nment wi t h can addr ess al l
scenar i os
can al so enhance dr i ve t hr ough f or r ai l way
wi t h l onger i nt er - st at i on di st ance
/ / age or por at i on
hank ou
ilfred eung
hief rchitect or por at i on
wi l f r edymt r . com. hk
eb