VMV S891 K1

Installation & Maintenance Information IF 1646


SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE INSTALLATION
I. Installing Lens Without Removing Cover* 1. 2. Disconnect power supply. Remove lens retaining clips from the LED sub-assembly. 6. Remove gasket from clear lens.

7.

Install gasket onto diffused lens.

3.

Insert flat head screwdriver between gasket and lens, being careful not to damage gasket.

8.

Push lens/gasket assembly into fixture with textured surface toward the outside.

4.

Break seal between gasket and housing. This can be difficult depending on the amount of time the fixture was in service.

9.

Reinstall lens retaining clips; torque to 20 2 (2.4 0.2 N-m) in.-lbs.

5.

Pull out lens with gasket.

*Damage to lens gasket may occur during removal.

IF 1646 09/12

Copyright 2012, Cooper Industries, Inc.

Page 1

10. Reconnect the power supply. 11. Attach the fixture to the mounting module per instructions on IF 1594 (see below for reference): a. Hang LED luminaire on the cover module hinge hook. See Figure 2a (IF 1594). b. Connect supply wires to luminaire wire leads (or terminal blocks) per the attached wiring diagrams using methods that comply with all applicable codes. See Figure 2b (IF 1594). Tighten all electrical connections. c. Close driver housing onto cover module, making sure that all wires are safely inside driver housing. Tighten captive closing screw to 30 in.-lbs. (3.4 N-m). Ensure two (2) bosses on driver housing are in contact with cover module. WARNING To avoid electric shock: Be certain electrical power is OFF before and during installation and maintenance. Luminaire must be supplied by a wiring system with an equipment grounding conductor. To avoid burning hands: Make sure globe or refractor and lamp are cool when performing maintenance.

5._______ Verify all electrical connections are tightened.

6._______ Verify all wires are safely and neatly inside driver housing and not on top of wire terminal. Close driver housing onto cover module.

7._______ Verify captive closing screw is tightened to 30 in.-lbs. (3.4 N-m) and two (2) bosses on driver housing are in contact with cover module.

INSTALLATION CHECKLIST
1._______ Verify sufficient HTL lubricant is on conduit plugs (recommend approximately 1/8 bead around the first thread of plug) and that all unused conduit entries on the cover module are closed with lubricated plugs.

2._______ Verify conduit plugs are installed to at least five (5) full threads into the cover module conduit entries.

3._______ Verify installed conduit plugs are torqued to 42-52 ft.-lbs. for 3/4 plugs and 58-68 ft.-lbs. for 1 plug.

4._______ Verify supply wires are connected to luminaire wire leads (or terminal block) per wiring diagrams.

All statements, technical information and recommendations contained herein are based on information and tests we believe to be reliable.The accuracy or completeness thereof are not guaranteed. In accordance with Crouse-Hinds "Terms and Conditions of Sale," and since conditions of use are outside our control, the purchaser should determine the suitability of the product for his intended use and assumes all risk and liability whatsoever in connection therewith.

Cooper Industries Inc. Crouse-Hinds Division PO Box 4999, Syracuse, New York 13221 U.S.A. Copyright 2012, Cooper Industries, Inc.

IF 1646 Revision 2 Revised 09/12 Supercedes 06/12