Sie sind auf Seite 1von 2

Nassib

EDUCATION

Moussa
nassibmoussa@hotmail.com

+9613436403 July 2008

Bachelor of Science in Mechanical Engineering

University of Balamand (Koura, Lebanon) Important University projects: a) Impact solution: Table that can withstand a falling roof (analytical and numerical). b) Extended surfaces: solved analytically and numerically (MATLAB). c) Supercharger root: manufacturing and stress analysis. d) Polishing wheel: manufacturing, stress analysis and cost estimation. Drafting software: AutoCAD, SOLIDWORK, MATLAB, MILLCAM (For CNC machine). Management software: Primavera Contracts Manager, Primavera project manager, Microsoft Office & MS project.

Experience: certificate of safety training by (AFPA France)


Plant

manager in Sabil mineral water

July 2012 March 2013

responsible for all machines maintenance, labor duties, and all productions wares. Preparatory course for ISO 9001.
Site

project manager for the main water line in BHANNES-NABAA EL ASAL (SECTION 2 OUADI EL JAMAJEM) Mar 2012- Jun 2012
Responsible for the installation of the main water line passing through (kfardebian-bqaatuta-baskinta) with all its related valve (including gate valve ,anti shock valve ,air release valve etc..) responsible for the fabrication of all concrete chambers for all valves based on the structural design preparing and delivering for the pressure test to the consultant (including steel and ductile iron pipes) responsible for the asphalt surfacing of the road covering our work based on the specification book

Saudi OGER Limited (www.saudioger.com) Mechanical Engineer

Sep 2009- Mar 2012

Issuing the ERP (Equipment Requisition Package) of all piping and valves systems in the project. following and checking all mechanical installation on site including HVAC-Fire FightingPlumbing-water supply etc based on shop drawings and design drawings and follow up the progress with all mechanical subcontractors Checking the pump and pipe sizing calculations. Checking the design drawing for pipe sizing and resize pipes based on the international standards and project specifications. Checking all pipes installation including steel and cast iron pipes for internal and external building works Solve all mechanical NCRs and close them with the consultant. Coordinating all MEP trades and solving major crossing especially in technical rooms and levels. Attending progress, coordination and NCRs meetings with the project management

Site Engineer at King Abdullah Financial District project

Sodamco Sodap Liban Plant ( www.sodamco.com ) Manufacturing Manager


responsible for the mechanical team responsible for all materials productions

Feb 2009-Aug 2009

Skills: Languages: Arabic, French, English,

Capability in analyzing market trends and changes in consumer behavior through conducting quantitative and qualitative market research Proven record of building volume,
businesses. market share and profit on established and new

Das könnte Ihnen auch gefallen