Sie sind auf Seite 1von 8

STACKED RIG MAINTENANCE CHECKLIST

RIG NO.: AREA: DATE: NAME: POSITION: PAGES: KEY: ACTIONS TO BE TAKEN NOT APPLICABLE TO THIS RIG NO INSPECTION POSSIBLE INSPECTION MADE - NO ACTION NEEDED INSPECTIO N MADE - ACTION NEEDED, ACTION NOT TAKEN INSPECTION MADE - ACTION NEEDED, ACTION TAKEN __ O / X NO COMMENTS NECESSARY REPORT REASON IN COMMENTS SECTION NO COMMENTS NECESSARY REPORT ACTIONS AND MATERIALS NEEDED IN COMMENTS SECTION NO COMMENTS NECESSARY 1 OF 8

01 / 02 DRILL PIPE & COLLARS PRODUCT At two months intervals, visually inspect the drill pipe for deterioration of protective coating. Clean the corroded areas and spray with VCI-368 / 2M. Remove at random some protectors and check thread and pipe internally for any corrosion. Grease or spray if necessary with VCI-369T grease or VCI-368 spray / 1YR. 03 SUBS, STABILIZERS, PUP JOINTS, FISHING TOOLS PRODUCT At two months intervals, visually inspect the stabilizers, pup joints and fishing tools for deterioration of protective coating. Clean the corroded areas and spray with VCI-368 / 2M. Remove at random some protectors and check threads and stabilizers internally for any corrosion. Grease or spray if necessary with VCI-369T grease or VCI-368 spray / 1YR. 07 - RADIATORS PRODUCT At two months check for any corrosion. If needed clean and spray with VCI-368. At six months check the coolant for antifreeze. 08 - AUTO DRILLERS PRODUCT At two months intervals check that the unit is properly stored and wrapped At six months remove partly plastic and check condition. Properly re-wrap unit in VCI-126 plastic. 09 - DYNAMIC / HYDROMATIC BRAKES PRODUCT At two months intervals check that all openings are still closed. At six months intervals open inspection plugs and check for any corrosion. Spray with VCI-307 if necessary. % % % % %

F0677 (0)

STACKED RIG MAINTENANCE CHECKLIST


RIG NO.: AREA: DATE: NAME: POSITION: PAGES: 2 OF 8

10 - DRAWWORKS PRODUCT At two months rotate drawworks several revolutions. Check that tape, plastic and coverings are still installed. Replace if necessary. Check that all exposed parts are still coated with grease, etc. At six months open covers and inspect for corrosion. Add new inhibitors and or emitters as necessary. 11 DRIVES PRODUCT At two months check that all openings/couplings/etc. are still covered. At six months open drives and transmission covers and check for any corrosion. If found clean and spray with appropriate VCI369T / 6M product. Seal all covers after checking. 12 ENGINES PRODUCT At two months check that all openings are still closed and properly sealed. At six months open engine crankcase inspection cover check internally. If corroded clean and spray or grease with the appropriate VCI product / M529 / 6M. 13 CARRIERS PRODUCT At two months check that all protecting covers, plastic, etc. is still in place. At six months open some covers to verify the internal condition. If corrosion is present clean and apply appropriate VCI product. 15 AIR HOIST / WINCHES PRODUCT At six months open some inspection covers to ensure that there is no corrosion internally. 16 MUD PUMPS PRODUCT At two months intervals, rotate pump two revolutions. Re-coat extension rods. Check that tape, plastic and coverings are still installed. Replace if necessary. At six months intervals inspect pump internal and renew inhibitor as necessary. Open crosshead side-covers and apply a new coat of grease at the slides. Inspect pump external and paint unpainted surfaces. Check that the pistons/piston rods/intermediate rods/clamps are still properly protected. Simple visual check by looking through transparent plastic wrap is usually sufficient. Repackage or re-wrap as conditions warrant / 369T / 6M. 17 CENTRIFUGAL PUMPS PRODUCT At two months intervals, rotate pump two revolutions. Check that tape, plastic and coverings are still installed. Replace if necessary. At six months intervals inspect pump internal and renew inhibitor as necessary. 18 ELECTRICAL SYSTEMS PRODUCT At two months check that all coverings are still in place and all opening properly covered. At six months, open at random a panel and check for any moisture and/or rusted spots. Clean and spray with appropriate VCI product if necessary. % % % % % % % %

F0677 (0)

STACKED RIG MAINTENANCE CHECKLIST


RIG NO.: AREA: DATE: NAME: POSITION: PAGES: 3 OF 8

20 MULTI-PEN RECORDERS PRODUCT At two months check for proper storage of equipment. Check for any rusted spots. Clean and spray with appropriate VCI product. 21 ELECTRICAL MOTORS > 100 HP PRODUCT At two months check that all openings are still properly closed. Check that the strip heaters are still activated if applicable. At six months open motor and junction box and check for any moisture, corrosion, etc. Clean and spray with appropriate VCI product / VCI248 IF NEEDED / 6M. Renew VCI-101 Foam emitters if needed. 22 AC GENERATORS PRODUCT Replace if needed. Rotate units by hand 1-1/4 revolution if possible. At six months open motor and junction box and check for any moisture, corrosion, etc. Clean and spray with appropriate VCI product if necessary / VCI248 IF NEEDED / 6M. Renew Foam emitters if needed. 23 AIR COMPRESSORS PRODUCT At two months check that all openings are properly closed and sealed. Rotate each compressor by hand. At six months check compressor internal, if possible, for any corrosion or moisture. Ensure that all openings are properly closed. 24 ROTARY TABLES PRODUCT At two months check that all openings are still properly protected. Rotate unit by hand. At six months open transmission and check for any moisture. 25 CROWNS PRODUCT At two months check that the crown block is well preserved and no corrosion is present. Clean and paint corrosion. Rotate sheaves. Yearly grease the bearings with VCI-369 grease while rotating the sheaves. 26 TRAVELING BLOCK PRODUCT At two months check that the traveling block is well preserved and no corrosion present. Clean and paint corrosion if applicable. Rotate sheaves. At six months grease the bearings with VCI-369T grease while rotating the sheaves. 27 HOOKS PRODUCT At two months check that the hook is properly preserved. Clean and coat any rusted spots. At six months grease the bearings with VCI-369T grease while rotating the sheaves. 28 SWIVELS PRODUCT At two months check that the swivel is still properly preserved. Clean and coat any rusted spot. At six months check for water in the oil by slowly opening the drain plug. % % % % % % % % %

F0677 (0)

STACKED RIG MAINTENANCE CHECKLIST


RIG NO.: AREA: DATE: NAME: POSITION: PAGES: 4 OF 8

29 KELLY PRODUCT At two months check that the kelly cocks are properly preserved. Clean and coat rusted spots. At six months check kelly and kelly pin and box for any rusted spots. Clean and coat where necessary. 31 KELLY BUSHING PRODUCT At two months check that the unit is properly preserved. At six months check unit for any rusted spots. Clean and coat where necessary. 32 ELEVATORS PRODUCT At two months check that the elevators are properly preserved. Clean and coat any rusted spots. 33 ELEVATORS LINKS PRODUCT At two months check that the links are properly preserved. Clean and coat any rusted spots. 34 ROTARY TONGS PRODUCT At two months check that the tongs are still properly preserved. Clean and coat any rusted spots. 35 BLOW OUT PREVENTERS PRODUCT At two months check that all equipment is properly preserved. All covers still in place etc. At six months open cover on top of BOPs and check for any water, corrosion. Clean and protect with appropriate VCI product. 37 BOP SPOOLS, RISERS & CROSSOVERS PRODUCT At two months check that all spools, etc. are still properly preserved. Check for any corrosion and clean/coat if necessary. 38 MUD CONDITIONING EQUIPMENT PRODUCT At two months check that all equipment is properly preserved and all openings covered. At six months open some covers to inspect internally. If corroded clean and coat with appropriate VCI product. 39 SHALE SHAKERS PRODUCT At two months check that the units are still properly preserved. Clean and coat with VCI grease corroded spots. % % % % % % % % %

F0677 (0)

STACKED RIG MAINTENANCE CHECKLIST


RIG NO.: AREA: DATE: NAME: POSITION: PAGES: 5 OF 8

40 WIRELINE UNITS PRODUCT At two months check that the unit is still properly preserved. At six months remove plastic and check wire line for any corrosion. If necessary clean and coat with appropriate VCI product. Reinstall plastic wrap. 41 TANKS PRODUCT At two months check all tanks for corrosion. Clean and coat rusted spots appropriate VCI product. 42 WATER TANKS PRODUCT At two months check all tanks for corrosion. Clean and coat rusted spots with appropriate VCI product. 43 FUEL TANKS PRODUCT At two months check that the tanks are properly sealed. 46 CAMPS AND HOUSES PRODUCT At two months check that all still properly sealed. At six months check SCR house and cabinets. Replace VCI Foam emitter when necessary. Seal all openings. 47 SLIPS PRODUCT At two months check that the slips are properly preserved. Clean and coat any rusted spots. 48 SPINNING WRENCHES / POWER TONGS PRODUCT Clean and coat any corrosion. 49 MAST / DERRICK PRODUCT At two months check that all of this equipment is properly preserved. Clean and coat or paint rusted spots 51 - SUBSTRUCTURES PRODUCT At two months check that all of this equipment is properly preserved. Clean and coat or paint rusted spots. 53 CASING TOOLS & ELEVATORS PRODUCT At two months check that the casing tools are properly preserved. Clean and coat/grease all rusted spots with appropriate VCI product. % % % % % % % % % %

F0677 (0)

STACKED RIG MAINTENANCE CHECKLIST


RIG NO.: AREA: DATE: NAME: POSITION: PAGES: 6 OF 8

54 BOP ACCUMULATOR UNITS & CONTROLS PRODUCT At two months check that all equipment is properly preserved. Clean, paint or grease all rusted spots. At six months open fluid reservoir and check for any signs of corrosion. 55 TOP DRIVES PRODUCT At two months check that the unit is properly preserved. Rotate the motor and gear train to distribute lubricant over the top of the bearings. Megger the drilling motor armature and field (static voltage of 1,000 VAC and 2 Mohm minimum). Keep a record of the readings, as a drop between readings indicates an increase in moisture in the windings created by not adequate storage protection. If megger readings drop, bake the motor as soon as possible to restore proper resistance and avoid further damage. At six months grease bearings with VCI-369T grease. Replace VCI Foam emitter in drilling motor if necessary. 56 COMMUNICATIONS SYSTEMS PRODUCT At two months check that all communication equipment is properly preserved and stored. 57 BOILERS PRODUCT At two months check that all covers are still in place and properly sealed. 61 - FORKLIFTS PRODUCT At two months check that all covers are still tight and in place. At six months check cabs for corrosion. If corroded clean and spray or grease with the appropriate VCI product. 63 - CATWALK PRODUCT At two months check for any corrosion. Clean and paint or spray with appropriate VCI product. 64 OPERATIONAL SUPPORT EQUIPMENT (PIPE RACKS, STORAGE BINS) PRODUCT At two months check that all equipment is properly preserved. Clean and spray corroded areas with appropriate VCI product. 66 CHOKE MANIFOLD PRODUCT At two months check the manifold for any leaks. Ensure that all openings are closed. % % % % % %

F0677 (0)

STACKED RIG MAINTENANCE CHECKLIST


RIG NO.: AREA: DATE: NAME: POSITION: PAGES: 7 OF 8

67 HIGH PRESSURE SYSTEM PRODUC T At two months check that hoses and lines are still properly protected and grease where necessary still in place. 68 DRILLING LINE SPOOLER PRODUC T At two months check that the drill line is properly covered. At six months check that the drill line is free from any corrosion. 70 ANNUNCIATOR SYSTEMS PRODUC T At two months check that all equipment is properly preserved. At six months open one of the panel and check internally. Replace VCI Foam emitter if necessary. 71 DRY BULK STORAGE & SURGE TANKS PRODUC T At two months check that all openings are still properly sealed. Check that hydraulic load cell and gauge are properly preserved. At six months open at random one tank and check internally for any corrosion. 72 HAND TOOLS PRODUC T At two months check for any corrosion. If corroded clean and coat with the appropriate VCI product. 73 RIG TOOLS PRODUC T At two months check for any corrosion. If corroded and coat with the appropriate VCI product. 74 SAFETY EQUIPMENT PRODUC T two months check that all equipment is properly stored. 75 AUTOMATED PIPE HANDLING SYSTEMS PRODUC T At two months check that all tape is still in place and all exposed parts are still coated. If corroded clean and coat with appropriate VCI product. At six months intervals drain water from hydraulic reservoir. 76 HIGH PRESSURE CHOKE CONTROLS PRODUC T At two months check that plastic wrap and tarpaulin is still installed. At six months open remove plastic wrap and check for any corrosion. If corroded clean and spray with the appropriate VCI product. % % % % % % % % %

F0677 (0)

STACKED RIG MAINTENANCE CHECKLIST


RIG NO.: AREA: DATE: NAME: POSITION: PAGES: 8 OF 8

77 WATER TREATMENT SYSTEMS PRODUC T At two months check that all equipment is properly preserved. Clean and coat rusted spots with appropriate VCI product. At six months open sewage tank and check for any corrosion. If found clean and spray VCI-307 product. Ensure that the tank is properly sealed. 85 HYDRAULIC POWER UNITS At two months check that the unit is properly preserved. Clean and coat rusted spots with appropriate VCI product At six months open hydraulic tank and check for any corrosion. Add appropriate VCI product if necessary 86 CEMENTING UNITS PRODUC T At two months check that all equipment is properly preserved. Clean and coat corroded spots with appropriate VCI product At six months open inspection covers on pump gear and engine to verify the internal condition. Add appropriate VCI product if necessary 87 LIQUID ADDITIVE SYSTEMS PRODUC T At two months check that all tanks are properly preserved. Clean and coat with appropriate VCI product the corroded spots 91 LIGHT VEHICLES PRODUC T At two months check that all openings are still closed and properly sealed At six months open at random and check internally. If corroded clean and spray or grease with the appropriate VCI product 92 / 93 HEAVY TRANSPORT / TRANSPORT TRAILERS PRODUC T At two months check that all openings are still closed and properly sealed At six months open at random and check internally. If corroded clean and spray or grease with the appropriate VCI product 94 CONSTRUCTION EQUIPMENT PRODUC T At two months check that all openings are still closed and properly sealed At six months open at random and check internally. If corroded clean and spray or grease with the appropriate VCI product 95 SHIPPING CONTAINERS PRODUC T At two months check that the containers are properly stored and still locked Check for any damage % % % % % % %

F0677 (0)