0 STATION HIGHLIGHTS FOR THE MONTH OF


Contents:
1.0 STATION HIGHLIGHTS
1.1 RANKING OF STATIONS (PREVIOUS MONTH):
1.2 BEST ACHIEVED PARAMETERS
1.3 TRENDING OF BEST ACHIEVED PARAMETERS

1.0 STATION HIGHLIGHTS


ACHIEVEMENTS / HIGHLIGHTS DURING THE MONTH :

1. Planned Shut Down :


i) Unit-I was taken under planned shut down at 00:45 hrs. on 18/08/2009, for Boiler Licence
Renewal, unit synchronised at 15:38 hrs. on 21/08/2009 (Outage hrs.=86.88, 3.62 days).

2.
3.

4.

5.

ii) Unit-III was taken under planned shut down at 23:47 hrs. on 31/08/2009, for Capital
Overhauling (Outage hrs.=0.22).
Availability Factor :
Unit-V recorded 100% availability factor during the month.
Minimum Sp. Oil Consumption :
Unit-V recorded zero Sp. Oil Consumption during the month, surpassing previous minimum Sp. Oil
Consumption of 0.01 ml/kWh during May'09.
Maximum Continuous Running :
Unit-I recorded maximum continuous running for 237.35 days (5696.50 hrs.) from 23.12.2008 to
18/08/2009, surpassing previous continuous running for 232.65 days (5583.48 hrs.) from 28/11/2005
D.C. :

D.C. (Provisional) for Stage-I , Stage-II, Stage-III & Station (Comml.) were 97.98%, 99.81%,
103.81% & 99.87% respectively during the month.
6. Coal Receipt :
Total coal received during the month was 4,49,487.30 MT (122 Rakes).
1.1 RANKING OF STATION
Note: The latest ranking as per performance evaluation matrix to be provided.
APR

MAY

JUN

JUL

RANK
SCORE

1.2 BEST ACHIEVED PARAMETERS

Parameters

Unit

Best achieved
(Till Date)

Actual
(Current
Month)

Value

Month

Value

MU

815.4160

Dec.'07

778.9640

Plant Load Factor

104.40

Feb.'09

99.71

Availability Factor(on bar)

100.00

Feb.'08

95.87

Partial Loading Factor

-4.53

-4.01

Kcal/Kwh

2376.00

Dec.'07
Dec.'08 &
Feb.'09

Generation

Heat Rate

2387

AUG

SEP

OCT

NOV

DEC

Sp. Oil

ml/Kwh

0.02

Feb.'08

0.22

Sp. Coal

Kg/Kwh

0.61

Feb'09

0.644

% of MCR

0.47

Feb.'09

0.78

DM Makeup

1.3 TRENDING OF BEST ACHIEVED PARAMETERS (Update as and when the base value is improved)
Best achieved
(Base Value)
Parameters

Generation

Unit

Value

Month

MU

634.1910

Jan.'05

Best achieved(Next)

Value

Month

Best
achieved(Next)

Best
achieved(Next)

Value

Value

Month

Month

634.5440 Dec.'05 635.4480 Dec.'06 761.6880 Jan.'07

Plant Load Factor

101.97

Mar.'99

102.34 Feb.'06

102.76

Nov.07

104.38 Dec'07

Availability Factor(on bar)

100.00

Mar.'05

100.00 Feb.'06

100.00 Feb.'09

100.00 July'09

Partial Loading Factor

0.00

Feb.'05

-2.34 Feb.'06

-4.01

Aug'09

Kcal/Kwh

2440

Mar.'05

2433

2423

Nov'05

Sp. Oil

ml/Kwh

0.08

Feb.'04

0.04 Mar.'06

Sp. Coal

Kg/Kwh

Oct.'02

0.665 Mar.'06

Heat Rate

DM Makeup

% of MCR

0.673
0.55

Dec.'04

0.47

Oct'05

Feb'09

2413 Dec'05

0.02 Feb.'08
0.662

Jul-07

0.662 Feb-08

ence
).

mum Sp. Oil

.2008 to
28/11/2005

.81%,

JAN

FEB

MAR

Fin. Year

roved)
Best
achieved(Next)

Best
achieved(Next)

Best
achieved(Next)

Best
achieved(Next)

Value

Value

Value

Value

765.5510

Month

Month

Month

Best
Best
Best
Best
achieved(Next) achieved(Next) achieved(Next) achieved(Next)

Month Value Month Value Month Value Month Value

Mar-07 768.3930 Aug.'07 794.3600 Oct.'07 815.4160 Dec.'07

104.40

Feb'09

2407

Jan'06

0.645 Dec.'08

2405 Feb'06

0.613

Feb'09

2405

Jan'07

2402

Feb'07

2398 Mar'07

2394 Oct.'07

2392 Nov.07

2388

Best
achieved(Next)

Best
Best
achieved(Next) achieved(Next)

Best
achieved(Next)

Best
achieved(Next)

Month Value Month Value Month Value Month Value Month

DEC.'07

2385 JAN.'08

2383 FEB.'08

2376 DEC.'08

2376 Feb.'09

2.0 STATION PERFORMANCE W.R.T. MOU TARGET (YEAR):


Contents:
2.1 VARIATION IN MOU TARGET WITH ACTION PLAN:
2.2 DETAILS OF PARAMETERS

2.1 VARIATION IN MOU TARGET WITH ACTION PLAN :

PARAMETERS

MOU
TARGET (R0)
(FINANCIAL YEAR)

MOU
TARGET

MOU TARGET (Fin. Yr.)


R1

R2

R3

R4

Pro rata

(Revision)

ACTUAL
TILL
Aug-09

GENERATION-MU

8414

--

--

--

--

3586.6706

3818.1610

PLANNED OUTAGE-%

5.37

--

--

--

--

3.79

3.34

FORCED OUTAGE-%

1.50

--

--

--

--

1.53

1.17

PARTIAL LOADING (%)

0.50

--

--

--

--

0.51

0.01

HEAT RATE-KCAL/KWH

2392

--

--

--

--

2399

2391

SP. OIL-ML/KWH

0.25

--

--

--

--

0.28

0.16

AUX. POWER CONS.ml/kwh

8.34

--

--

--

--

8.39

8.05

INVENTORY-(Rs. Cr)

70.00

--

--

--

--

75.00

75.24

REASON FOR
VARIATION

VARIATION

2.2 DETAILS OF PARAMETERS WITH RETRIEVAL PROGRAM

Description
Gross Gen. (MU)

Planned outage(%)

Apr-09

May-09

Jun-09

Jul-09

Aug-09

Sep-09

Oct-09

Nov-09

Dec-09

Jan-10

Feb-10

Mar-10

Target

732.1104

721.2341

666.4392

756.2016

710.6854

586.0512

629.1079

660.7944

756.5141

756.0454

682.8797

756.0454

Actual

773.6130

756.4340

698.9800

810.1700

778.9640

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

Deviation (+/-)
Program for Balance
Period

41.5026

35.19992

32.5408

53.9684

68.27864

-586.0512

-629.10792

-660.7944

-756.51408

-756.04536

-682.87968

-756.04536

Target

0.00

4.52

8.67

0.00

5.81

20.00

16.13

9.33

0.00

0.00

0.00

0.00

Description

Forced Outage (%)

Partial loading (%)

Aux. power Con. (%)

Apr-09

May-09

Jun-09

Jul-09

Aug-09

Sep-09

Oct-09

Nov-09

Dec-09

Jan-10

Feb-10

Mar-10

Actual

0.00

4.51

9.96

0.00

2.34

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Deviation (+/-)
Program for Balance
Period

-3.465053763

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Target

1.52

1.52

1.54

1.54

1.54

1.20

1.54

1.52

1.52

1.52

1.52

1.52

Actual

1.86

1.33

0.88

0.00

1.79

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Deviation (+/-)
Program for Balance
Period

0.33888889

-0.185323

-0.662778

-1.54

0.249784946

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Target

0.50

0.50

0.50

0.52

0.54

0.40

0.52

0.50

0.50

0.50

0.50

0.50

Actual

0.00

0.00

0.00

0.02

0.04

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Deviation (+/-)
Program for Balance
Period

-0.5

-0.5

-0.5

-0.504293

-0.498230927

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Target

8.30

8.32

8.37

8.48

8.48

8.48

8.41

8.30

8.26

8.24

8.24

8.26

Actual

7.58

8.01

8.15

8.22

8.28

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

-0.203826707

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!
#REF!

Deviation (+/-)
Program for Balance
Period
Specific Oil Cons. (%)

Heat Rate(Kcal)

-0.72577556 -0.311262

-0.217218 -0.257798

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Target

0.17

0.17

0.44

0.22

0.41

0.24

0.43

0.44

0.16

0.12

0.12

0.12

Actual

0.13

0.06

0.39

0.03

0.22

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Deviation (+/-)
Program for Balance
Period

-0.0374635

-0.112523

-0.192843287

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Target

2388

2395

2396

2409

2406

2400

2402

2394

2383

2379

2379

2380

Actual

2387

2391

2396

2392

2387

-18.74675171

-2400.00645

-2401.5284

-2394.074441

-2382.948162

-2378.924365

-2378.924365

-2379.933871

Shortfall/
Excess
Program for Balance
Period
Inventory (Rs.Cr)

-0.004032 1.2894444

-0.042038 -0.184864

-0.92028088 -3.618105 0.0769871 -16.81364


#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Target

Actual

70

70

74

75

75

Deviation (+/-)
Program for Balance
Period

70

70

74.28

75.23

75.24

Note: The shortfall (-) & excess (+) in the above parameters should be highlighted in red & green colour respectively.

2.3 ACTUALISATION OF ROPR TARGETS :

PARAMETERS

ROPR
TARGET (R0)
(FIN. YEAR)

ROPR TARGET (Fin. Yr.)


R1

R2
R3
(Revision)

R4

ACTUALTILL
DATE

EXPEXTD FOR
BALANCE
PERIOD

EXPEXTD FY

Description

GENERATION-MU
FORCED OUTAGE-%
HEAT RATE-KCAL/KWH
SP. OIL-ML/KWH
AUX. POWER CONS.ml/kwh

Apr-09

May-09

Jun-09

Jul-09

Aug-09

Sep-09

Oct-09

Nov-09

Dec-09

Jan-10

Feb-10

Mar-10

CORRECTIVE ACTION

CUMM FY
8414.1086
3818.1610
-4595.94764

5.37

FY Target &
Expected

CUMM FY
3.34
-2.029067807
#REF!
1.50
1.17
-0.330884979

0.51
0.01
-0.496929944
#REF!
8.34
8.05
-0.294517904
#REF!
0.25
0.16
-0.086516145
#REF!
2392
2391
-1.696413121
#REF!
70
75
5.24
0

FY Target &
Expected

CUMM FY

FY Target &
Expected

3.0 PERFORMANCE TREND


Contents:
3.1

OVERVIEW OF STATION PERFORMANCE (TREND)

3.1 OVERVIEW OF STATION PERFORMANCE (TREND)

Unit

2001-02

2002-03

2003-04

2004-05

2005-06

2006-07

2007-08

2008-09

Current
Year(Cumul
ative)

MU

6560.9920

6148.8330

6450.9290

6781.0900

7041.2050

7467.2270

9010.0690

8620.9160

3818.1610

Plant Load Factor


Availability Factor on
bar

89.16

83.56

87.43

92.15

95.69

95.59

97.69

93.73

99.03

92.10

87.60

89.94

92.25

94.70

94.69

95.05

91.46

95.49

Machine A.V.F

92.10

87.60

89.94

92.25

94.70

94.69

95.16

91.46

95.49

Total Partial Loading


Equipment
Partial Loading

3.19

4.61

2.79

0.11

-1.05

-0.95

0.48

0.70

0.25

0.69

1.40

0.87

0.38

0.20

0.19

0.10

0.24

0.01

ml/kwh

0.60

0.64

0.50

0.43

0.36

0.27

0.24

0.27

0.16

Aux Poer Cons.

8.51

8.76

8.93

8.58

8.37

8.18

8.05

8.07

8.05

Sp. Coal cons.

kg/Kwh

0.68

0.68

0.69

0.68

0.67

0.67

0.66

0.64

0.617

% of MCR

1.23

1.06

0.99

0.88

1.00

1.03

0.87

0.77

0.61

Description
Gross Gen.

Sp. Oil Cons.

DM Make up Cons.

3.2

OVERVIEW OF STATION PERFORMANCE DATA (MONTH WISE / CUMULATIVE):


DATA AVAILABLE IN BI ANALYTICS IN ESS : COAL STATION PERFORMANCE

3.3

UNIT WISE PERFORMANCE DATA (MONTH WISE / CUMULATIVE):


DATA AVAILABLE IN BI ANALYTICS IN ESS : COAL STATION PERFORMANCE

Pre.Year
(Same
Period)
3456.5750
89.65
88.61
19.44
1.10
0.39
0.29
8.45
0.661
0.87

4.0 ABT ANALYSIS


Contents:
4.1 TRENDING OF DC GAP
4.2 ABT GAP ANALYSIS (FOR STATIONS UNDER ABT)
4.3 ACTION PLAN FOR ANY DEVIATION IN ABT GAP ANALYSIS:
4.4 DATA FOR TRENDING OF DC GAP

Trending of DC GAP

4.1 TRENDING OF DC GAP

[Difference of DC (Installed) - Planned & Forced Outage (Ex bus) and DC on bar (%)]

120
100
100
80
60
40
20
0
APRIL -4.162198212
MAY -3.822353736
JUNE -4.472992863
JULY -2.549716565
AUG
SEPT
-20 -5.348650948

100

100

100

100

OCT

NOV

DEC

JAN

Note: Data for this graph is obtained from the table given under section 4.4

4.2. ABT GAP ANALYSIS (FOR STATIONS UNDER ABT):

MONTH

DC installed
(A)

DC (bar)
%of A

SG %
of DC bar

AG %
of DC bar

DC (installed)-DC (bar) break up (%)

AG <101%

Fuel
Forced Equpt. quality

Planned

Fuel
supply

Others*

Grid

APRIL

688.65552

103.8021521

99.31997998

100.02411

1.546499

-5.34865 0.68002

MAY

711.610704

98.74746066

98.3757022

99.02376

4.088106016

1.326632

-4.1622

JUNE

688.65552

93.16326979

99.64371998

100.06963

10.62333313

0.035751

-3.82235 0.35628

JULY

711.610704

104.4729929

99.44649609

100.01367

-4.47299

AUG

711.610704

99.87430571

99.92425951

100.53122

2.346438847

0.328972

-2.54972 0.07574

3512.14

100.03

99.34

99.93

3.39

0.65

0.00

0.00

0.00

1.62305

0.5535

SEPT
OCT
NOV
DEC
JAN
FEB
MAR
CUM.

-4.06

0.89

Note: If ABT is followed stage wise ,please add additional formats/graphs

4.3 ACTION PLAN FOR ANY DEVIATION IN ABT GAP ANALYSIS:


Issues

Reasons

Action Plan

Responsibility

Reason for not achieving 80%


of installed DC

Reason for not achieving


100.5% * of DC (Declared)

NA

LOW SHEDULE&HIGH FREQUENCY

* Based on the instructions from SIIS from time to time

4.4 DATA FOR TRENDING OF DC GAP


DC
installed
(A)

Planned & Forced


Outage (Ex-bus)
%of A (B)

DC
Installed%-Planned
& Forced

DC (bar)
%of A
(D)

Differenc
e
(C)- (D)%

APRIL

688.65552

1.546498894

98.453501

103.8021521

-5.34865

MAY

711.610704

5.41473755

94.585262

98.74746066

-4.1622

JUNE

688.65552

10.65908395

89.340916

93.16326979

-3.82235

JULY

711.610704

100

104.4729929

-4.47299

AUG

711.610704

2.675410852

97.324589

99.87430571

-2.54972

SEPT

100

100

OCT

100

100

NOV

100

100

DEC

100

100

JAN

100

100

MONTH

FEB

100

100

MAR

100

100

CUM.

3512.14

100.03

-4.06

4.03

100

100

FEB

MAR

CUM.
-4.064459329

AG <101% DC break up (%)

Equivalen
t
Availabilit
y (%)

Freq>50
Hz or
BEF

Unit
Equpt Trip

Fuel
qualit Fuel
y
supply

Others*

0.229149

0.05

0.016746 103.8022

0.858124

0.0201

-0.52507 98.74746

0.262837

0.1819

0.12936

93.16327

0.218584

0.214243

104.473

0.008212

0.340282 99.87431

0.45

0.00

Target Date

0.0351 0.01

0.07

0.00

0.00

Present status

-0.34

100.03

MONTH

APRIL

Difference (C)- (D)-%

-5.34865

MAY

-4.1622

JUNE

-3.82235

JULY

-4.47299

AUG

-2.54972

SEPT

100

OCT

100

NOV

100

DEC

100

JAN

100

FEB

100

MAR
CUM.

100
-4.06446

4.0 ABT ANALYSIS


Contents:
4.5 SCATTER DIAGRAM (AG/DC PLOT AGAINST FREQUENCY)-MONTH WISE
4.6 OPPORTUNITY MATRIX (FOR STATIONS UNDER ABT):
4.5 SCATTER DIAGRAM (AG/DC PLOT AGAINST FREQUENCY)-MONTH WISE
Note: Attach Scatter diagram here month wise
Ideal AG/DC plot against Average Frequency:
(SG=90%DC)
110

AG/DC (%)

100
BEF, 50.3Hz

90

80

AG/DC(%)

AG/SG(%)
70

48

48.5

49

49.5

50

50.5

Av. Frequency (Hz)

51

Notes: AG should scatter close to the purple trace


SG is arbitrarily assumed to be 90% of DC for illustration purposes
Y-axis corresponds to AG/DC, to left of 50Hz axis
and to AG/SG to the right of 50Hz axis
Technical Minimum assumed to be 80% of DC

51.5

Scatter Diagram for the Month of April

Scatter Diagram

Scatter Diagram for the Month of Aug

Scatter Diagram for the Month of Sept

Scatter Diagram

Scatter Diagram for the Month of Jan

Scatter Diagram for the Month of Feb

Scatter Diagram

Note: If ABT is followed stage wise ,please add additional formats/graphs

4.6 OPPORTUNITY MATRIX (FOR STATIONS UNDER ABT):


1. Freq< 50 Hz

2. Freq.> 50 Hz & < BEF

3. Freq>BEF&<50.5 Hz

2.2.
3.1.
3.2.
Duration 2.3. Duration Duration
Duration
when
when
when
when AG>SG,
AG=SG, %
AG>SG, % AG<SG, %
%

4. Freq.>50.5 Hz

MONTH

1.1.
2.1.
Duration 1.2. Duration Duration
when
when
when
AG<SG, %
AG>SG, %
AG<SG, %

4.1.
Duration
when
AG<SG, %

4.2
Duration
when
AG>SG, %

APRIL

4.236111111

92.36111111

0.659722222

1.180555556

1.111111111

0.451388889

MAY

5.947580645

77.35215054

0.403225806

10.55107527

5.443548387

0.201612903

0.672043011

JUNE

6.25

86.70138889

2.361111111

1.805555556

2.256944444

0.625

JULY

8.366935484

81.75403226

3.293010753

3.494623656

2.688172043

0.403225806

AUG

7.930107527

88.64247312

0.201612903

0.672043011

1.512096774

1.041666667

SEPT
OCT
NOV
DEC
JAN
FEB
MAR
CUM.
Note:

4.236111111

92.36111111

0.659722222

Indicates good performance

1.180555556

1.111111111

0.451388889

ter Diagram for the Month of May

Freq. VS AG % of DC (Unchahar Stage-II+III) Apr-2k9

110.00

105.00
AG % of DC

AG % of DC (%)

100.00

95.00

90.00

85.00

80.00

75.00

70.00
48.50

48.75

49.00

49.25

49.50

49.75
Freq.(Hz)

Scatter Diagram for the Month of June

50.00
BEF
50.03

Scatter Diagram for the Month of July

50.25

50.50

50.75

51.00

ter Diagram for the Month of Oct

ter Diagram for the Month of March

Scatter Diagram for the Month of Nov

Scatter Diagram for the Month of Dec

% of DC (Unchahar Stage-II+III) Apr-2k9

AG % of DC

49.50

49.75
Freq.(Hz)

50.00
BEF
50.03

of July

50.25

50.50

50.75

51.00

of Dec

4.0 ABT ANALYSIS


Contents:
4.7 105% DC CAPABILITY
4.8 CONTRAINTS FOR ACHIEVING 105% DC
4.9 ABT COMPLIANCE (GENERAL):
4.10 No. of time blocks when the unit generated at 105% DC
No. of Time blocks unit operated at 105% DC

Nos(Blocks).

4.7 105% RATED CAPACITY


Unit-12

Unit-11

Unit-10

Unit-9

Unit-8

Unit-7

Unit-6

Unit-5

Unit-4

Unit-3

Unit-2

Unit-1

14000
12000
10000
8000
6000
4000
2000
0

April

May

June

July

Aug

Sept

Note: Data for this graph is to be filled in the table given under section 4.10

4.8 CONTRAINTS FOR ACHIEVING 105% RATED CAPACITY

Oct

Nov

Dec

Jan

Feb

Unit

Capability

Constraints
Boiler & Aux.

Nil

Action Plan

Responsibility

Mills
Nil

2
3
4
5
6
7
8
9
10
11
12
* Limited to 105% of the name plate rating of the unit.
(Continuation)
Unit

1
2

Capability

Constraints

Action Plan

Turbine & Aux.

Elec

Nil

Nil

Responsibility

3
4
5
6
7
8
9
10
11
12
* Limited to 105% of the name plate rating of the unit.
(Continuation)
Unit

1
2
3
4
5
6
7

Capability

Constraints
C&I

BoP

Nil

Nil

Action Plan
Others
Nil

8
9
10
11
12
* Limited to 105% of the name plate rating of the unit.
STATUS OF MATERIAL PROCUREMENT AS PER ACTION PLAN
Sr. No

Equipment/Component

Indent
No. &
Date

Estimated
Cost

Status of any
Enquiry /NIT Date Bid Received date Bid
CC/RHQ approval
Evalua
,if required
tion
Expected Actual Expected Actual

Nil

4.9 ABT COMPLIANCE (GENERAL):

Sl. No.

ABT behaviour
Average DC during peak
hours as a % of Average DC
during other hours in a day

April

99.70

May

100.26

June

July

99.58

Aug

100.026 100.49

Sept

Oct

Nov

Instances when during forced


outage the station could not
inform RLDC in the same time
block for revision of DC (no.)
Instances when the station
could not meet MVAR
requirement of RLDC (no.)
Instances when the station
could not demonstrate DC on
RLDC demand (no.)

4.10 No. of time blocks when the unit generated at 105% DC


NOTE: As per the schedule for each unit for establishing 105% DC capability.
UNIT

ABT behaviour

April

May

June

July

Aug

2680

1899

2484

2227

1788

2680

1899

2484

2227

1788

2421

1959

634

1081

1357

2421

1959

634

1081

1357

2421

1959

634

1081

1357

3
4
5
6
7
8
9
10
11
12
STATION

No. of time blocks when


the unit generated at 105%
DC

Sept

Oct

Nov

Unit-7
Unit-1

eb

DATA
TABLE

Mar

April

May June July

Aug

Sept

Oct

Nov

Dec

Jan

Unit-1
Unit-2
Unit-3
Unit-4
Unit-5
Unit-6
Unit-7
Unit-8
Unit-9
Unit-10
Unit-11

2680
2680
2421
2421
2421
0
0
0
0
0
0

1899
1899
1959
1959
1959
0
0
0
0
0
0

##
##
##
##
##
0
0
0
0
0
0

2227
2227
1081
1081
1081
0
0
0
0
0
0

1788
1788
1357
1357
1357
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

Unit-12

Target Date

esponsibility

Target Date

Present status

Present status

n Plan

Responsibility

Target Date

Present status

PO/Work Inspection Date


Order
Delivery Date
Date
Expected Actual Expected Actual

Dec

Jan

Feb

Mar

Fin-Year

100.01

Implementation/
Installation Date
Expected Actual

Dec

Jan

Feb

Mar Fin-Year
11078
11078
7452
7452
7452

Feb

Mar

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

5.0 AVAILABILITY LOSS ANALYSIS:


Contents:
5.1 TREND OF AVAILBILITY LOSS (STATION) FOR LAST 9 YEARS (%):
5.2 SUMMARY OF AVAILBILITY LOSS BREAK UP(STATION)-MONTH WISE:
5.3 EXCEPTIONS DURING THE MONTH AND ACTION PLAN

5.1 TREND OF AVAILBILITY LOSS (STATION) FOR LAST 9 YEARS (%):


2008-09
(Same
Period)

2001-02

2002-03

2003-04

2004-05

2005-06

2006-07

2007-08

2008-09

2009-10 Till
Date

PLANNED

6.40

7.25

6.07

6.21

4.02

0.00

3.17

5.84

3.34

9.82

GRID (Reserve)

0.12

3.57

0.00

0.07

0.00

0.00

0.00

0.00

0.00

0.00

GRID (Regulation)
TOTAL FORCED
OUTAGE
(WITHOUT COAL)
TOTAL FORCED
OUTAGE
(WITH COAL)

2.76

2.94

1.73

0.62

0.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.45

1.77

2.52

1.17

1.56

0.00

0.00

0.00

0.00

0.00

1.45

1.79

2.52

1.17

1.56

Description

5.2 SUMMARY OF AVAILBILITY LOSS BREAK UP(STATION)-MONTH WISE:


5.3 EXCEPTIONS FOR THE MONTH AND ACTION PLAN
Sl.No

Unit

Reason for major Av Loss

Corrective Action

Responsibility

Target
date

Nil

5.3 OVERVIEW OF FORCED OUTAGE-% -UNIT WISE-FIN. YEAR- CUMULATIVE


5.4 SUMMARY OF AVAILBILITY LOSS BREAK UP(STATION)-MONTH WISE:
5.5 UNIT WISE AVAILBILITY LOSS BREAK UP:
5.6 DETAILS OF AVAILBILITY LOSS BREAK UP DUE TO EQUIPMENT(UNIT WISE & MONTH WISE):

7.0 PARTIAL LOADING


Contents:
7.1 TREND OF PARTIAL LOADING (%) FOR THE LAST 9 FIN. YEARS (STATION)
7.2 OVERVIEW OF PARTIAL LOADING--CUMULATIVE-CURRENT FIN. YEAR (%)
7.3 ACTION PLAN FOR REDUCING PARTIAL LOADING

7.1 TREND OF PARTIAL LOADING (%) FOR LAST 9 FIN. YEARS (STATION)

DATA AVAILABLE IN ERP : ORT/ZOPNOUTREP

Present status

Total Partial Loading


ABT/Grid
Equipment
External
Others

2008-09
(Same
Period)

2001-02

2002-03

2003-04

2004-05

2005-06

2006-07

2007-08

2008-09

2009-10 Till
Date

3.45
2.76
0.69
0.00
0.00

4.33
2.94
1.40
0.00
0.00

2.60
1.73
0.87
0.00
0.00

1.00
0.62
0.38
0.00
0.00

0.55
0.39
0.16
0.00
0.00

0.31
0.27
0.20
0.00
0.36

0.65
0.20
0.11
0.02
0.32

0.69
0.33
0.24
0.02
0.11

0.25
0.15
0.01
0.00
0.05

1.10
0.59
0.39
0.00
0.00

Oct
%

Nov
%

Dec
%

Jan
%

7.2 OVERVIEW OF PARTIAL LOADING- MONTHWISE & CUMULATIVE (CURRENT FIN. YEAR (%))
Description
BOILER & AUX. TOTAL
TURBINE & AUX.
GEN, AUXLIARIES & ELECTRICAL SYSTEM
OFFSITE SYSTEM & AUXLIARIES
C& I SYSTEM
OPERATION INDUCED
TRANMISSION LINES / GRID DISTURBANCE
FUEL PRIMARY- COAL & GAS
NO DEMAND / REGULATION
PLANNED OUTAGE
OTHER
ENVIRONMENT
CW SHORTAGE
EXCESS GENERATION
TOTAL EQUIPMENT
TOTAL EXTERNAL
TOTAL ABT
OTHERS
Net Partial loss (a-b)

Apr
%

May
%

Jun
%

Jul
%

Aug
%

Sep
%

Feb
%

Mar
%

0.016

0.021

0.007

0.105

0.021

0.009

0.002

0.002

0.036

0.008

0.084

0.619

0.052

0.008

0.154

0.033

0.057

0.166

0.051

-4.305

-3.352

-3.512

-3.767

-3.979

-3.781

0.033

0.057

0.166

0.016

0.135

0.081

0.002

0.036

0.008

0.084

0.619

0.052

0.008

0.154

Cum
%

7.3 EXCEPTIONS FOR THE MONTH & ACTION PLAN FOR REDUCING PARTIAL LOADING

Sl.No

Unit

Reason for major Partial Loading

7.4 SUMMARY OF PARTIAL LOADING (STATION) MONTHWISE,%:


DATA AVAILABLE IN ERP : ORTZOPNLOSS
7.5 SUMMARY OF EQUIPMENT PARTIAL LOADING UNITWISE-MONTHWISE (%)DATA AVAILABLE IN ERP : ORTZOPNLOSS
7.6 SUMMARY OF EXTERNAL PARTIAL LOADING UNITWISE-MONTHWISE (%)-

Corrective Action

Responsibility

Target
date

Present status

DATA AVAILABLE IN ERP : ORTZOPNLOSS

Item Description
Installed Capacity
Generation
Total Loss
Total Outage Loss
Total Partial Loading
Loss
BREAK UP OF
PARTIAL LOADING
LOSS
BOILER &
AUXILARIES.
TURBINE &
AUXILARIES
GEN, AUXLIARIES &
ELECTRICAL
SYSTEM
OFFSITE SYSTEM &
AUXLIARIES
C& I SYSTEM
OPERATION
INDUCED
TRANMISSION
LINES / GRID
DISTURBANCE
FUEL PRIMARYCOAL & GAS
NO DEMAND /
REGULATION
PLANNED OUTAGE
GAS TURBINE &
AUXLIARIES
OTHER
ENVIRONMENT
CW SHORTAGE
EXCESS
GENERATION

Total M-MU
Total M-% Total Y-MU Total Y-%
781.200
0.000
3855.600
0.000
778.964
99.714
3818.157
99.029
2.236
0.286
37.443
0.971
32.274
4.131
173.901
4.510

STAGE3 M- STAGE3 M- STAGE3 Y- STAGE3 Y- UNIT05 M- UNIT05 M- UNIT05 Y- UNIT05 Y- STAGE2 M- STAGE2 MMU
%
MU
%
MU
%
MU
%
MU
%
156.240
0.000
771.120
0.000
156.240
0.000
771.120
0.000
312.480
0.000
163.044
104.355
798.998
103.615
163.044
104.355
798.998
103.615
309.860
99.162
-6.804
-4.355
-27.878
-3.615
-6.804
-4.355
-27.878
-3.615
2.620
0.838
0.000
0.000
0.924
0.120
0.000
0.000
0.924
0.120
13.325
4.264

-30.038
0.000

-3.845
0.000

-136.458
0.000

-3.539
0.000

-6.804
0.000

-4.355
0.000

-28.802
0.000

-3.735
0.000

-6.804
0.000

-4.355
0.000

-28.802
0.000

-3.735
0.000

-10.705
0.000

-3.426
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.162

0.021

0.285

0.007

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.061

0.019

0.819

0.105

0.819

0.021

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.257

0.082

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.067
0.000

0.009
0.000

0.067
0.000

0.002
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.297

0.008

0.000

0.000

0.033

0.004

0.000

0.000

0.033

0.004

0.000

0.000

0.000

0.000

5.923

0.154

0.000

0.000

1.548

0.201

0.000

0.000

1.548

0.201

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

0.000
1.949
0.000
0.000

0.000
0.051
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.130
0.000
0.000

0.000
0.017
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.130
0.000
0.000

0.000
0.017
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

-31.085

-3.979

-145.797

-3.781

-6.804

-4.355

-30.513

-3.957

-6.804

-4.355

-30.513

-3.957

-11.022

-3.527

t status

DATA TABLE

DATA TABLE

t status

STAGE2 Y- STAGE2 Y- UNIT04 M- UNIT04 M- UNIT04 Y- UNIT04 Y- UNIT03 M- UNIT03 M- UNIT03 Y- UNIT03 Y- STAGE1 M- STAGE1 M- STAGE1 Y- STAGE1 Y- UNIT02 M- UNIT02 M- UNIT02 YMU
%
MU
%
MU
%
MU
%
MU
%
MU
%
MU
%
MU
%
MU
1542.240
0.000
156.240
0.000
771.120
0.000
156.240
0.000
771.120
0.000
312.480
0.000
1542.240
0.000
156.240
0.000
771.120
1446.785
93.811
147.720
94.547
654.278
84.848
162.140
103.776
792.507
102.773
306.060
97.945
1572.374
101.954
162.505
104.010
790.678
95.455
6.189
8.520
5.453
116.842
15.152
-5.900
-3.776
-21.387
-2.773
6.420
2.055
-30.134
-1.954
-6.265
-4.010
-19.558
142.713
9.254
13.279
8.499
138.089
17.908
0.046
0.029
4.624
0.600
18.949
6.064
30.265
1.962
0.704
0.450
12.019
-47.258
0.000

-3.064
0.000

-4.759
0.000

-3.046
0.000

-21.247
0.000

-2.755
0.000

-5.946
0.000

-3.805
0.000

-26.011
0.000

-3.373
0.000

-12.529
0.000

-4.010
0.000

-60.399
0.000

-3.916
0.000

-6.969
0.000

-4.460
0.000

-31.577
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.168

0.011

0.061

0.039

0.167

0.022

0.000

0.000

0.001

0.000

0.101

0.032

0.117

0.008

0.002

0.001

0.002

0.257

0.017

0.138

0.088

0.138

0.018

0.119

0.076

0.119

0.015

0.563

0.180

0.563

0.036

0.141

0.090

0.141

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.067
0.000

0.021
0.000

0.067
0.000

0.004
0.000

0.027
0.000

0.017
0.000

0.027
0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.018

0.001

0.000

0.000

0.009

0.001

0.000

0.000

0.009

0.001

0.000

0.000

0.246

0.016

0.000

0.000

0.104

2.040

0.132

0.000

0.000

0.345

0.045

0.000

0.000

1.695

0.220

0.000

0.000

2.335

0.151

0.000

0.000

1.072

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000
1.327
0.000
0.000

0.000
0.086
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.826
0.000
0.000

0.000
0.107
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.501
0.000
0.000

0.000
0.065
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.492
0.000
0.000

0.000
0.032
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.492
0.000
0.000

-51.068

-3.311

-4.958

-3.173

-22.732

-2.948

-6.064

-3.881

-28.335

-3.675

-13.259

-4.243

-64.217

-4.164

-7.137

-4.568

-33.414

UNIT02 Y- UNIT01 M- UNIT01 M- UNIT01 Y- UNIT01 Y%


MU
%
MU
%
0.000
156.240
0.000
771.120
0.000
102.536
143.555
91.881
781.696
101.372
-2.536
12.685
8.119
-10.576
-1.372
1.559
18.246
11.678
18.246
2.366
-4.095
0.000

-5.561
0.000

-3.559
0.000

-28.822
0.000

-3.738
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000

0.100

0.064

0.115

0.015

0.018

0.422

0.270

0.422

0.055

0.000

0.000

0.000

0.000

0.000

0.003
0.000

0.040
0.000

0.026
0.000

0.040
0.000

0.005
0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.013

0.000

0.000

0.142

0.018

0.139

0.000

0.000

1.263

0.164

0.000

0.000

0.000

0.000

0.000

0.000
0.064
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000

-4.333

-6.122

-3.918

-30.803

-3.995

2001-02
PLANNED

2002-03

2003-04

2004-05

2009-10 Till Date

6.4001427

7.2482306

6.0715505

6.2095605

3.3407952

GRID (Reserve)
0.1203196

3.5681507

0.0694635

GRID (Regulation)
2.7594477

2.9365229

1.7282412

0.6236529

TOTAL FORCED OUTAGE(WITHOUT


0
0 COAL)

1.1695534

TOTAL FORCED OUTAGE(WITH


0
COAL)
0

1.1695534

6.0 OUTAGE ANALYSIS & RESTORATION


Click to go

Contents:
6.1 TREND OF NUMER OF OUTAGES (STATION) FOR LAST 5 YEARS (No.):
6.2 ACTION PLAN TO ACHIEVE 'ZERO FORCED OUTAGE".
6.3 STATUS OF MATERIAL PROCUREMENT AS PER ACTION PLAN
6.4 DETAILS OF UNIT OUTAGES
6.5 EXCEPTIONS OF THE ACTION PLAN OF LAST FINANCIAL YEAR:
6.6 RESTORATION OF UNITS *
6.7 START UP COMPLIANCE

TREND OF NUMBER OF OUTAGES FOR LAST 5 FIN.


YEAR

6.8 DETAILS OF MULTIPLE UNIT TRIPPING:

Total Forced
Outages

6.9 DETAILS OF MAJOR FAILURES:


6.10 FAILURE OF TRANSFORMERS:
30

25
6.1 TREND OF NUMBER OF OUTAGES (STATION) FOR LAST 5 YEARS
(No.):

Total Outages
Total Forced
Outages

15

23

20
15

No.

2009-10
Till Date

2008-09
(Same
Period)

System/Equipment
As per enclosed File

15

10
DATA
TABLE
5
0

12

19

6.2 ACTION PLAN TO ACHIEVE 'ZERO FORCED OUTAGE".


S.N

12

Present status

Note: List shall contain major action points for each section/ category

6.3 STATUS OF MATERIAL PROCUREMENT AS PER ACTION PLAN

2009-10 Till Date

Sr. No

Equipment/ Component

Indent No. & PO/Work


Date
Order
Date

Inspection Date

Expected

Actual

As per enclosed File

6.4 DETAILS OF UNIT OUTAGES


Note: The following tables will contain all outages during the financial year.

Unit

Outage
Date

4/23/2009

Unit Running
Normal

4/14/2009

Unit Running
Normal

4/28/2009

Unit Running
Normal

5/10/2009

5/25/2009

6/6/2009

6/19/2009

6/24/2009

6/26/2009

S.N

Respons
ibility

Target
Date

Present Status

Unit Running
Normal
Unit Running
Normal
Unit Running
Normal
Unit Running
Normal
Unit Running
Normal
Unit Running
Normal

Delivery Date
Expected
Actual

Implementation/
Installation Date
Expected

10

6/7/2009

11

8/21/2009

Unit Running
Normal
Unit Running
Normal

12

8/9/2009

Unit Running
Normal
Unit Under Planned
Shut Down

13

8/31/2009

14

8/1/2009

15

Unit Running
Normal
Unit Running
Normal

8/29/2009

6.5 EXCEPTIONS OF THE ACTION PLAN OF LAST FINANCIAL YEAR:

S.N

Outage
No./ Date

Unit

Target
Date

Present
Status

As per enclosed sheet (Trip committee Recommendations)

6.6 RESTORATION OF UNITS *

S.N

Outage
no./Date

Unit

#4

#3

Responsibility

Problems faced
during restoration

Corrective actions

1/14.04.2009

1.DR16 in operative
2.EF 1 atomising v/v LS not making
3.EF4 HONV LS not making

-atteded

2/23.04.2009

1.In ATRS mode, trip oil pressure coming down while


opening stop valves.
2. HPSV 2,IPSV 2 not opening from UCB.
3.MS 101,105 Jamming.

1.point no:1&2-TMD to attend in unit overhaul.


2.point 3 attended .

TMD

#4

3/28.04.2009

1.AB2/ 4 NOZZLE atomising problem-gun replaced


2.AB 1 scanner replced
3.AB 4 no sparking.
4.MFT CHANNEL 3 acting falsely 5.MS 106 passing

#2

4/10.05.2009

1.FG14,BA63 inoperative2.HPBypass spray valves passing


3.DW 269 in operative 3.dw 303,311,317,339,341 passing

#2

5/06.06.2009

1.BA 63 inoperative2.HP Bypass spray valve passing/dw


305,311,315 passing

To be attended

C&I/TMD

Point 1/2 Attended.Point 3 -next unit s/d

C&I/EMD

Point 1.BMD/C&I
Point 2/3--C&I/TMD

#5

6/07.06.2009

1.PA Fan Blade pitch stuckup at 51% 2.PA Fan B tripped


after starting3.E-o23 inoperative

#4

7/25.04.2009

1.SAD 7 inoperative 2.EHC Hunting 3.AS 02 passing

8
9
10

#3
#4
#4

8/19.06.2009
9/24.06.2009
10/26.06.2009

11
12
13

#4
#2
#1

11/01.08.2009
12/09.08.2009
13/18.08.2009

14

#4

14/29.08.2009

1.points 1,2,3,4 attended.


2.point 5 shutdown job.

TMD

point 2 /3 to be attended(TMD) Point 1-C&I

TMD /C&I

BMD/C&I/TMD

Attended on 19.06.2009,but again


failed.
CAD C1 both open/close indication coming
Attended
1.AB 3 gun flame not ok 2.AB 2 gun not
Point 1/2 attended by gun
catching flame 3.MS 04,05,06 inoperative
changing.Point 3 to be attended.Ponit 4
PA Fan A/B NTS
attended
Generator Field breaker not closing/HPH 6 tube
Attended
1.AB 2 Ignitor not sparking2..MS 04 inoperative
3.Mill C purge air damper not working
Point 1/3 attended
Exciter brg /exciter shaft vibration pickup feedback hunting

C&I
C&I
C&I
EMD/TMD
Point 2--C&I

*Note: ORT Cordinator to check the above aspects personally

6.7 START UP COMPLIANCE


Note: The list of parameters is indicative and additional parameters if required may be added.
Timing of Different actvities (Hr: Min)
Boiler
Light up

Boiler
Coal Firing

HP -LP
ByPass Charging

Soaking at
N1
speed

Soaking at
N2
speed

Unit
Synchronisatio
n

S.N

Unit

Outage No./
Date

#4

1/14.04.2009

4:02

6:10

6:00

6:42

7:04

7:18

#3

2/23.04.2009

18:48

19:07

18:50

20:19

20:26

20:59

#4

3/28.04.2009

19:45

23:16

21:30

22:58

23:09

23:36

#2

4/10.05.2009

11:46

14:55

13:45

15:46

15:55

16:10

5
6
7
8
9
10
11
12
13

#2
#5
#4
#3
#4
#4
#4
#2
#1

5/06.06.2009
6/07.06.2009
7/25.04.2009
8/19.06.2009
9/24.06.2009
10/26.06.2009
11/01.08.2009
12/09.08.2009
13/18.08.2009

19:33
4:40
21:37
18:03
23:37
12:13
20:45
14:17
4:50

20:00
5:44
2:50
19;42
00;07
12:50
23:10
15:15
8:00

19:34
4:41
23:55
19:00
23;38
12:14
21:50
14:18

21:04
7:56
15:17
20:25
0:54
13:12
23:30
15:42
8:36

21:07
8:00
16:38
20:38
00;54
13:13
23:33
15:49
8:51

21:20
8:10
22:25
21:16
1:03
13:28
23:59
16:07
15:38

14

#4

14/29.08.2009

1:09

2:23

2:00

3:27

3:32

4:10

6:59

BOILER : START UP PARAMETERS


1

unit 4

15.04.2009

S.N.

Parameter

Unit

1.
2

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

warm
Deg C

113.28

113.28

249

250

316

HFO Pr.

Ksc

10.5

10.5

10.5

10.5

10.5

4
5
6

HFO temp
Atm. Stm. Pressure
Total Air Flow

C
Ksc
TPH

110
11
307

110
11
307

110
11
399

110
11
485

110
11
610

Flue Gas

19

19

13

7.7

3.3

Drum Pr.

KSC

0.66

0.66

44.19

56

96

APH-A sec.air outlet temp

63.72

63.72

171

178

230

O2

10

APH-A gas inlet temp

74.22

74.22

198

190

298

11

APH-A gas outlet temp

36.38

36.38

70

75

113

12

APH-B sec.air outlet temp

65.43

65.43

168

175

240

13

APH-B gas inlet temp

72.02

72.02

194

198

295

14

APH-B gas outlet temp

36.87

36.87

67

72

95

15

APH-A pri.air outlet temp

58.5

58.5

129

146

235

16

APH-B pri.air outlet temp

55.5

55.5

154

160

236

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

450/450

465

515/515

434/434

472

514/515

<0.2

<0.2

<0.2

0.3

0.4

88

88

89

99

111

21

FW temp. at economizer
inlet
Feed water flow/MS flow

266/402

200/228

424/465

22

PA header pressure

600

700

760

23
24

Total coal flow


Max. SH / RH metal temp.

tph

121/73

121/73

17
461/452

55
434/464

112
514/515

18
19
20

ppm

BOILER : START UP PARAMETERS


2
S.N.

unit 3

23.04.2009

Parameter

Unit

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

1.
2

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

HOT
Deg C

330

330

318

330

330

HFO Pr.

Ksc

11.7

11.7

10.5

10.5

10.5

HFO temp

109

109

10.53

10.53

10.53

Atm. Stm. Pressure

Ksc

10.5

10.5

109

10.73

10.73

Total Air Flow

TPH

401

401

396

600

600

Flue Gas

10.44

10.44

10.4

Drum Pr.

KSC

98

98

109

115

115

APH-A sec.air outlet temp

229

229

227

267

267

10

APH-A gas inlet temp

249

249

251

305

305

11

APH-A gas outlet temp

105

105

103

129

129

12

APH-B sec.air outlet temp

226

226

225

301

301

13

APH-B gas inlet temp

249

249

250

308

308

14

APH-B gas outlet temp

97

97

95

129

129

15

APH-A pri.air outlet temp

238

238

233

310

310

16

APH-B pri.air outlet temp

240

240

233

308

308

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

508

508

512

525/528

525/528

488

488

489

530/530

530/530

ppm

<0.2

<0.2

<0.2

0.25

0.25

18
19

O2

119

119

125

220

220

21

FW temp. at economizer
inlet
Feed water flow/MS flow

175

175/388

247/578

434/440

434/440

22

PA header pressure

388

750

750

780

780

23

Total coal flow

tph

26

26

26

95

95

24

Max. SH / RH metal temp.

508/489

508/489

512/489

523/543

523/543

20

BOILER : START UP PARAMETERS


3

unit 4

29.04.2009

S.N.

Parameter

Unit

1.
2

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

warm
Deg C

107

107

286

312

312

HFO Pr.

Ksc

11

11

11

11

11

HFO temp

110

110

110

110

110

Atm. Stm. Pressure

Ksc

12

12

12

12

12

Total Air Flow

TPH

304

304

368

523

523

Flue Gas

19.6

19.6

17

Drum Pr.

KSC

0.9

0.9

55

116

116

APH-A sec.air outlet temp

65

65

166

229

229

10

APH-A gas inlet temp

74

74

186

263

263

O2

11

APH-A gas outlet temp

44

44

80

98

98

12

APH-B sec.air outlet temp

69

69

170

234

234

13

APH-B gas inlet temp

75

75

190

273

273

14

APH-B gas outlet temp

43

43

80

96

96

15

APH-A pri.air outlet temp

47

47

118

216

216

16

APH-B pri.air outlet temp

47

47

148

226

226

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

-/-

-/-

435/435

467/467

467/467

-/-

-/-

415/415

484/484

484/484

<0.2

<0.2

<0.2

0.3

0.3

87

87

90

220

220

21

FW temp. at economizer
inlet
Feed water flow/MS flow

-/-

-/-

213/211

507/512

507/512

22

PA header pressure

720

723

723

23

Total coal flow

tph

71

71

24

Max. SH / RH metal temp.

104/70

104/70

426/390

496/480

496/480

18
19
20

ppm

BOILER : START UP PARAMETERS


4

unit 2

S.N.

Parameter

1.

Initial Unit condition:Cold


/warm/ Hot

12.05.2009
Unit
warm

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

Drum Metal Temperature

Deg C

116

150

235

301

301

HFO Pr.

Ksc

12

11

11

11

11

HFO temp

98

97.4

97.4

97.4

97.4

Atm. Stm. Pressure

Ksc

13.5

12

12

12

12

Total Air Flow

TPH

300

350

400

573

573

Flue Gas

11.3

11.3

11

Drum Pr.

KSC

0.4

8.8

47

99.7

99.7

APH-A sec.air outlet temp

63

156

207

237

237

10

APH-A gas inlet temp

77

193

255

274

274

11

APH-A gas outlet temp

33

56

80

98

98

12

APH-B sec.air outlet temp

68

162

212

236

236

13

APH-B gas inlet temp

77

190

257

277

277

14

APH-B gas outlet temp

36

62

86

102

102

15

APH-A pri.air outlet temp

37

60

198

237

237

16

APH-B pri.air outlet temp

41

73

202

241

241

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

384/376

450/450

450/450

380/380

430/430

430/430

ppm

<0.2

<0.2

<0.2

0.45

0.45

FW temp. at economizer
inlet

76.1

100

105

138.7

138.7

18
19
20

O2

21

Feed water flow/MS flow

22

PA header pressure

23
24

50/58

100/100

521/472

521/472

mm of wc

780

805

805

Total coal flow

tph

17

85

85

Max. SH / RH metal temp.

94/85

240/111.5

390/400

459/436

459/436

BOILER : START UP PARAMETERS


5

unit 2

06.06.2009

S.N.

Parameter

Unit

1.

Hot

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

Deg C

305

305

298

318

318

HFO Pr.

Ksc

10

10

10

10

10

HFO temp

105

105

105

105

105

Atm. Stm. Pressure

Ksc

11

11

11

11

11

Total Air Flow

TPH

442

442

420

542

542

Flue Gas

11.5

11.5

11

8/6

8/6

Drum Pr.

KSC

28

28

80

100

100

APH-A sec.air outlet temp

210

210

250

280

280

10

APH-A gas inlet temp

260

260

288

320

320

11

APH-A gas outlet temp

80

80

102

105

105

O2

12

APH-B sec.air outlet temp

212

212

240

254

254

13

APH-B gas inlet temp

258

258

285

310

310

14

APH-B gas outlet temp

91

91

99

106

106

15

APH-A pri.air outlet temp

210

210

250

258

258

16

APH-B pri.air outlet temp

215

215

245

261

261

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

310/310

310/310

500/500

510/510

510/510

345/345

345/345

500/500

515/515

515/515

ppm

<0.2

<0.2

<0.2

0.25

0.25

148

148

136

238

238

21

FW temp. at economizer
inlet
Feed water flow/MS flow

97/0

97/0

186/189

392/380

392/380

22

PA header pressure

mm of wc

800

800

800

800

800

23

Total coal flow

tph

19

19

36

61

61

24

Max. SH / RH metal temp.

310/342

310/342

500/503

491/529

491/529

18
19
20

BOILER : START UP PARAMETERS


6

unit 5

07.06.2009

S.N.

Parameter

Unit

1.

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

Hot

Deg C

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

335

335

332

306

60% load

306

HFO Pr.

Ksc

11.5

11.5

11.5

11.5

11.5

HFO temp

105

105

105

105

105

Atm. Stm. Pressure

Ksc

12.2

12.2

12.2

12.2

12.2

Total Air Flow

TPH

319

319

350

530

530

Flue Gas

9.9

9.9

9.98

4.5

4.5

Drum Pr.

KSC

70

70

98

106

106

APH-A sec.air outlet temp

210

210

212

226

226

10

APH-A gas inlet temp

238

238

211

279

279

11

APH-A gas outlet temp

95

95

29

98

98

12

APH-B sec.air outlet temp

205

205

231

221

221

13

APH-B gas inlet temp

234

234

205

278

278

14

APH-B gas outlet temp

91

91

29

98

98

15

APH-A pri.air outlet temp

250

250

228

231

231

16

APH-B pri.air outlet temp

246

246

225

231

231

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

350/350

350/350

390/390

537/537

537/537

357/357

357/357

405/405

530/530

530/530

ppm

<0.2

<0.2

<0.2

0.25

0.25

FW temp. at economizer
inlet
Feed water flow/MS flow

154

154

136

223

223

140/69

462/439

462/439

18
19
20
21

O2

mm of wc

588

588

700

740

740

Total coal flow

tph

15

82

82

Max. SH / RH metal temp.

338/317

338/317

375/399

531/537

531/537

22

PA header pressure

23
24

BOILER : START UP PARAMETERS


7

unit 4

15.06.2009

S.N.

Parameter

Unit

1.

Cold

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

Deg C

92

92

244

292

292

HFO Pr.

Ksc

10

10

10

10

10

HFO temp

110

110

11

110

110

Atm. Stm. Pressure

Ksc

12

12

12

12

12

Total Air Flow

TPH

294

294

279

562

562

Flue Gas

17

17

17

6.58

6.58

Drum Pr.

KSC

2.49

2.49

32

96

96

APH-A sec.air outlet temp

73

73

159

245

245

10

APH-A gas inlet temp

86

86

177

274

274

11

APH-A gas outlet temp

54

54

80

109

109

12

APH-B sec.air outlet temp

73

73

159

243

243

O2

13

APH-B gas inlet temp

89

89

174

281

281

14

APH-B gas outlet temp

45

45

82

109

109

15

APH-A pri.air outlet temp

52

52

125

235

235

16

APH-B pri.air outlet temp

41

41

121

241

241

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

132/132

132/132

357/357

455/455

455/455

36/36

36/36

357/357

465/465

465/465

<0.2

<0.2

<0.2

0.3

0.3

74

74

81

215

215

21

FW temp. at economizer
inlet
Feed water flow/MS flow

-/-

-/-

85/280

457/463

457/463

22

PA header pressure

mm of wc

855

855

23

Total coal flow

tph

87

87

24

Max. SH / RH metal temp.

127/49

127/49

352/360

454/463

454/463

18
19
20

ppm

BOILER : START UP PARAMETERS


8

unit 3

19.06.2009

S.N.

Parameter

Unit

1.
2

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

HFO Pr.

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

Warm
Deg C

135

135

250

279

279

Ksc

11

11

11

11

11

HFO temp

112

112

110

110

110

Atm. Stm. Pressure

Ksc

13

13

13

13

13

Total Air Flow

TPH

372

372

370

623

623

Flue Gas

18.2

18.2

17

Drum Pr.

KSC

5.3

5.3

60

95

95

APH-A sec.air outlet temp

110

110

220

241

241

10

APH-A gas inlet temp

135

135

270

298

298

11

APH-A gas outlet temp

43

43

85

104

104

12

APH-B sec.air outlet temp

105

105

221

232

232

13

APH-B gas inlet temp

134

134

271

295

295

14

APH-B gas outlet temp

52

52

86

94

94

15

APH-A pri.air outlet temp

74

74

200

241

241

16

APH-B pri.air outlet temp

70

70

200

232

232

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

356/356

356/356

455/460

526/526

526/526

298/298

298/298

450/460

515/515

515/515

<0.2

<0.2

<0.2

0.25

0.25

78

78

100

213

213

21

FW temp. at economizer
inlet
Feed water flow/MS flow

0/0

0/0

200/250

356/430

356/430

22

PA header pressure

800

800

800

18
19
20

O2

ppm

mm of wc

23

Total coal flow

tph

24

Max. SH / RH metal temp.

17

132

132

151/110

151/110

445/450

512/513

512/513

BOILER : START UP PARAMETERS


9

unit 4

S.N.

Parameter

Unit

1.

Hot

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

DESIGN
VALUE

After Boiler After HP-LP


Before Turbine
After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

Deg C

338

338

319

319

319

HFO Pr.

Ksc

11

11

11

11

11

HFO temp

110

110

110

110

110

Atm. Stm. Pressure

Ksc

13

13

13

13

13

Total Air Flow

TPH

381

381

395

487

487

Flue Gas

12

12

11

Drum Pr.

KSC

103

103

90

100

100

APH-A sec.air outlet temp

223

223

206

244

244

10

APH-A gas inlet temp

255

255

227

290

290

11

APH-A gas outlet temp

93

93

95

98

98

12

APH-B sec.air outlet temp

230

230

210

244

244

13

APH-B gas inlet temp

254

254

229

286

286

O2

14

APH-B gas outlet temp

93

93

90

99

99

15

APH-A pri.air outlet temp

238

238

218

242

242

16

APH-B pri.air outlet temp

234

234

215

238

238

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

451/451/

451/451/

520/520

530/530

530/530

437/437

437/437

515/515

530/530

530/530

ppm

<0.2

<0.2

<0.2

0.25

0.25

137

137

114

212

212

21

FW temp. at economizer
inlet
Feed water flow/MS flow

323/385

323/385

190/256

376/427

376/427

22

PA header pressure

mm of wc

680

680

780

780

780

23
24

Total coal flow


Max. SH / RH metal temp.

tph

36
450/426

36
450/426

36
520/504

98
524/526

98
524/526

18
19
20

BOILER : START UP PARAMETERS


10

unit 4

26.06.2009

S.N.

Parameter

Unit

1.

Hot

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

HFO Pr.

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

Deg C

344

344

333

319

319

Ksc

11

11

11

11

11

HFO temp

110

110

110

110

110

Atm. Stm. Pressure

Ksc

13

13

13

13

13

Total Air Flow

TPH

344

344

346

500

500

Flue Gas

17

17

5.5

5.5

Drum Pr.

KSC

67

67

86

100

100

APH-A sec.air outlet temp

235

235

221

244

244

10

APH-A gas inlet temp

265

265

250

292

292

11

APH-A gas outlet temp

103

103

102

98

98

12

APH-B sec.air outlet temp

236

236

222

244

244

13

APH-B gas inlet temp

259

259

244

286

286

14

APH-B gas outlet temp

105

105

99

100

100

15

APH-A pri.air outlet temp

278

278

237

242

242

16

APH-B pri.air outlet temp

270

270

230

238

238

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

378/378

378/378

500/500

530/530

530/530

359/359

359/359

500/500

530/530

530/530

ppm

0.19

0.19

0.132

0.25

0.25

144

144

134

220

220

21

FW temp. at economizer
inlet
Feed water flow/MS flow

86/178

86/178

489/583

376/427

376/427

22

PA header pressure

605

605

667

780

780

18
19
20

O2

mm of wc

23

Total coal flow

tph

24

Max. SH / RH metal temp.

17

17

42

98

98

367/342

367/342

500/498

524/526

522/523

BOILER : START UP PARAMETERS


11

Unit 4

01.08.2009
Unit

DESIGN
VALUE

S.N.

Parameter

1.

Initial Unit condition:Cold


/warm/ Hot

Drum Metal Temperature

120

175

227

283

283

3
4

HFO Pr.
HFO temp

12
110

12
110

12
110

12
110

12
110

Atm. Stm. Pressure

12.5

12.5

12.5

12.5

12.5

Total Air Flow

300

300

423

637

637

Flue Gas

18

18

14.27

4.98

4.98

Drum Pr.

0.78

8.5

39.62

117.87

117.87

O2

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

warm

APH-A sec.air outlet temp

80

141

185

255

255

10

APH-A gas inlet temp

88

160

208

289

289

11

APH-A gas outlet temp

44.6

54

76

101

101

12

APH-B sec.air outlet temp

80

141

182

250

250

13

APH-B gas inlet temp

90.8

169

218

304

304

14

APH-B gas outlet temp

46.14

56

75

101

101

15

APH-A pri.air outlet temp

41

41

100

237

237

16

APH-B pri.air outlet temp

39

39

142

241

241

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

161/146

181/180

375/375

474/474

474/474

163/150

145/149

371/371

464/464

464/464

0.1

0.1

0.109

0.235

0.235

92

103

109

221.44

221.44

184/206

558/524

558/524

738

735

735

107/101

244/109

41.55
386/392

128
470/461

128
470/461

18
19
20
21

FW temp. at economizer
inlet
Feed water flow/MS flow

22

PA header pressure

23
24

Total coal flow


Max. SH / RH metal temp.

BOILER : START UP PARAMETERS


12

U#2

09.08.2009

S.N.

Parameter

Unit

1.

HOT

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

325

325

312.5

318.3

318.3

HFO Pr.

11

11

10.5

10.5

10.5

HFO temp

100

100

96

100

100

Atm. Stm. Pressure

12

12

12.1

12

12

Total Air Flow

320

320

392

517

517

Flue Gas

11.3

11.3

11.3

Drum Pr.

61

61

96

86

86

APH-A sec.air outlet temp

234

234

240

244

244

10

APH-A gas inlet temp

275

275

287

299

299

11

APH-A gas outlet temp

95

95

104

129

129

12

APH-B sec.air outlet temp

243

243

242

259

259

13

APH-B gas inlet temp

265

265

285

298

298

14

APH-B gas outlet temp

129

129

100

119

119

15

APH-A pri.air outlet temp

277

277

242

249

249

16

APH-B pri.air outlet temp

277

277

244

282

282

O2

17
18
19
20

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

21

FW temp. at economizer
inlet
Feed water flow/MS flow

22

PA header pressure

23
24

Total coal flow


Max. SH / RH metal temp.

378/377

378/377

514/502

529/516

529/516

420/420

420/420

487/478

510/522

510/522

0.1

0.1

0.15

0.25

0.25

108

108

133

139

139

185/190

441/409

441/409

80

770

770

NA/428

NA/428

32
NA/500

87
NA/548

87
NA/548

BOILER : START UP PARAMETERS


13

U#1

21.08.2009

S.N.

Parameter

Unit

1.
2

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

Warm
122

232

234

310

310

HFO Pr.

10

10

10

10

10

HFO temp

108

108

108

108

108

Atm. Stm. Pressure

13

13

13

13

13

Total Air Flow

318

395

342

690

690

Flue Gas

10.23

10.59

10.59

O2

Drum Pr.

4.5

30

30

107

107

APH-A sec.air outlet temp

135

193

192

288

288

10

APH-A gas inlet temp

145

226

219

319

319

11

APH-A gas outlet temp

50

92

90

122

122

12

APH-B sec.air outlet temp

140

176

175

275

275

13

APH-B gas inlet temp

145

225

215

318

318

14

APH-B gas outlet temp

52

79

85

127

127

15

APH-A pri.air outlet temp

140

148

320

320

16

APH-B pri.air outlet temp

159

159

287

287

17

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

153/154

335/342

335/336

540/535

540/535

69/68

329/330

335/336

501/525

501/525

0.18

0.186

0.186

0.18

0.18

78

80

80

151

151

-/'-

78/85

78/85

614/540

614/540

800

830

830

160/119

440/363

440/364

123
540/530

123
540/530

18
19
20
21

FW temp. at economizer
inlet
Feed water flow/MS flow

22

PA header pressure

23
24

Total coal flow


Max. SH / RH metal temp.

BOILER : START UP PARAMETERS


14

U#4

30.08.2009

S.N.

Parameter

Unit

1.

Hot

Initial Unit condition:Cold


/warm/ Hot
Drum Metal Temperature

DESIGN
VALUE

After Boiler Before HP-LP Before Turbine


After Unit
Light Up Bypass charging
Rolling
Synchronisation

60% load

226

226

317

317

317

HFO Pr.

10.75

10.75

10.4

10.3

10.3

HFO temp

104.7

104.7

107

108

108

Atm. Stm. Pressure

12.3

12.3

12.3

12.06

12.06

Total Air Flow

281

281

387

552

552

Flue Gas

19.3

19.3

10.6

2.92

2.92

Drum Pr.

85.8

102.6

102.6

APH-A sec.air outlet temp

128

128

199

238

238

10

APH-A gas inlet temp

144

144

227

267

267

11

APH-A gas outlet temp

56

56

86.9

101

101

12

APH-B sec.air outlet temp

132

132

195

235

235

13

APH-B gas inlet temp

28

28

230

284

284

14

APH-B gas outlet temp

68

68

70

95

95

15

APH-A pri.air outlet temp

112

112

132

221

221

16

APH-B pri.air outlet temp

108

108

191

232

232

O2

17
18
19
20

MS temp. at Blr O/L


LHS/RHS
HRH Temp. LHS/RHS (blr
side)
Silica (drum)

21

FW temp. at economizer
inlet
Feed water flow/MS flow

22

PA header pressure

23
24

Total coal flow


Max. SH / RH metal temp.

25/343

25/343

509/499

515/515

515/515

490/488

518/518

518/518

0.068

0.068

0.068

0.029

0.029

110

110

110

173

173

179/262

403/438

403/438

675

708

708

180/171

180/171

17
502/479

97
515/518

97
515/518

ementation/
llation Date
Actual

Target date

unit
overhaul.

Present
Status

Next unit
shutdown
unit
overhaul.
unit
overhaul.
Next unit
shutdown
Next
shutdown
Next s/d
Next
shutdown.
Next
shutdown.

Unit Full
Load
10:47
22:15

1:47
20:30

23:30
9:45
2:39
23:00
2:40
15:09
3:15
20:30
10:00
5:44

MAIN TURBINE: START UP PARAMETERS


Full Load

SL.

346.6

10.5

110
11
710

3
4
5

2.93

156

277

DESIGN
VALUE

Initial Unit
condition:Cold/warm /
Hot
Turbine Speed on
Barring Gear
Throttle
Steam(RPM)

DESIGN
VALUE

TURBINE
SPEED,
N1
N2
(RPM)
(RPM)

Full Load

600

3000

3000

44
5.5
6

45
12.4
6

145
139
33

Temperature -Deg C

362

416

524

CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C

258

305

331

393

432

531

Pressure 1st
(Kg/Cm2)
Turbine
Stage
Steam
Pressure
Hot
reheat
Steam
Pressure
(Kg/Cm2)
Main Steam

REMARKS

317

122

10

276

11

322

12

117

13

271

14

273

15

535/535

16

Condenser Vacuummmhg
SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

532/532

17

HP RELATIVE EXP.:

0.45

18

IP RELATIVE EXP.:

240

19

LP RELATIVE EXP.:

681/652

20

767

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

HP casing mid wall


temp. C
TSE Margin

361

359

466

44

52

108

0.056

0.056

0.075

9/11/24/2 98/30/35/
86/35/59/27/36
6/9
24/31
1/1/0/2/0/ 6/4/1/5/0 10/7/2/18/2/17/
0/0
/10/0.6
5/
48/46/60/ 59/57/77/
60/62/87/85
57/
77
51/53/50 69/71/50
-0.17

-0.24

-0.23

-0.4

-0.4

0.91

1.39

1.38

5.46

7.43

5.93

12.62

18

18.07

21.37

5.61

6.43

140
528/520

MAIN TURBINE: START UP PARAMETERS


2
Full Load

SL.

DESIGN
VALUE

UNIT 3
DESIGN
VALUE

74/74/52

TURBINE
SPEED,
RPM

SL.

DESIGN
VALUE

360

10.5

10.53

10.73

690

163

308

342

138

10

308

11

345

12

124

13

307

14

310

15

537/537

16

Condenser Vacuummmhg
SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

540/540

17

0.3

18

Initial Unit
condition:Cold/warm /
Turbine Speed on
Barring Gear (RPM)
Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C
CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C
HP casing mid wall
temp. C
TSE Margin

N1
(RPM)

N2
(RPM)

Full Load

600

3000

3000

88

85

150

12

15

147

12

12

36

510

508

540

322

335

339

503

502

537

499

501

519

45

52

22

0.1

0.1

0.11

16/17/27/1
9/7
1/0/1/0/0/0
/6
51/51/63/5
5
30/49/48

41//37/37 63/74/34/52/14
/23/46
2/3/4/2/3 5/2/11/8/2/7/11
/1/15
65/60/81/ 67/59/87/81
80/
73/74/65
/74/74/64

-0.22

-0.22

-0.2

HP RELATIVE EXP.:

-0.12

0.01

-0.76

IP RELATIVE EXP.:

2.5

2.97

5.6

REMARKS

243

19

LP RELATIVE EXP.:

12.9

13.28

13.5

670/680

20

22

22.66

23.1

780

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

7.98

8.15

147
538/546

MAIN TURBINE: START UP PARAMETERS


Full Load

SL.

353

11

110

12

752

2.86

163

277

313

DESIGN
VALUE

Initial Unit
condition:Cold/warm /
Turbine Speed on
Barring Gear (RPM)
Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C
CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C
HP casing mid wall
temp. C

DESIGN
VALUE

TURBINE
SPEED,
N1
N2
(RPM)
(RPM)

Full Load

600

3000

3000

55

54

148

11

9.5

144

11.5

34

395

413

532

280

334

334

415

404

532

310

311

423

REMARKS

121

10

TSE Margin

281

11

325

12

120

13

271

14

277

15

542/542

16

Condenser Vacuummmhg
SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

535/535

17

0.45

35

56

151

0.06

0.06

0.08

9/15/21/2
7/10
2/2/0.35/2
/0.05/0.63
50/47/61/
59
53/55/51

87/29/35/ 39/66/33/40
30/31
7/2/0.59/ 8/7/4/22/2.1/20.
9.6/1/12/
4/6.8
59/57/77/ 61/63/86/84
77
70/71/51
74/74/52

-0.15

-0.23

-0.2

HP RELATIVE EXP.:

-0.17

0.28

1.79

18

IP RELATIVE EXP.:

1.19

1.13

4.56

241

19

LP RELATIVE EXP.:

6.47

4.99

10.86

726/683

20

15.14

14.73

18.83

750

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

4.39

4.39

5.63

N1
(RPM)

N2
(RPM)

Full Load

160
540/546

MAIN TURBINE: START UP PARAMETERS


Full Load

SL.

DESIGN
VALUE

REMARKS

346

11

97.4

12

815

2.5/2.0

161.1

320

348

148

10

314

11

366

12

150

13

320

14

322

15

537/537

16

Condenser Vacuummmhg
SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

530/535

17

0.5
236

Initial Unit
warm
condition:Cold/warm /
Turbine Speed on
Barring Gear (RPM)
Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C
CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C
HP casing mid wall
temp. C
TSE Margin

600

3000

3000

51

51

149

6.9

8.9

138

10

10

35

380

390

535

262

265

340

390

395

535

284

288

509

50

70

30

0.075

0.075

0.09

54/12/16/ 39/26/7/6 24.8/37.5/9.6/72


19
2
.4
2/0.5/2/3/ 2/3/6/13/
8/18
22/40 4/1/6/12/14/35
44/46/58/ 55/65/78/
61/66/88/80
55
73
57/58
77/65
82/66
-0.16

-0.15

-0.34

HP RELATIVE EXP.:

-0.83

-0.63

0.46

18

IP RELATIVE EXP.:

0.23

0.39

4.59

19

LP RELATIVE EXP.:

3.01

1.91

11.87

717/696

20

850

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

24.1

24.1

23.6

5.6

5.4

9.8

N1
(RPM)

N2
(RPM)

Full Load

600

3000

3000

96

96

147

10.8

12

137

12

12

36

505

505

540/540

313

313

342

500

500

532/533

491

491

511

148
539/565

MAIN TURBINE: START UP PARAMETERS


Full Load

SL.

345

10

105

11

812

3.8/2.6

158

300

365

142

10

DESIGN
VALUE

Initial Unit
Hot
condition:Cold/warm /
Turbine Speed on
Barring Gear (RPM)
Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C
CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C
HP casing mid wall
temp. C
TSE Margin

REMARKS

292

11

337

12

137

13

301

14

301

15

529/535

16

Condenser Vacuummmhg
SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

528/539

17

<0.2

0.09
35/45/12/5
0
1.5/0.5/2.1/
5.3/12
48/49/58/5
6
55/58

0.09

0.08

35/48/12/
22/48/8/72
58
3/2/5/14/
26.4/24.5 3/3/8/10/18/35
51/47/73/
62/51/90/75/
65
73/63
81/65

-0.3

-0.36

-0.37

HP RELATIVE EXP.:

-0.47

-1.36

0.4

18

IP RELATIVE EXP.:

0.8

0.97

4.61

238

19

LP RELATIVE EXP.:

6.7

8.92

11.9

609/595

20

23

23.1

23.5

840

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

9.6

9.8

10

N1
(RPM)

N2
(RPM)

Full Load

142
540/547

MAIN TURBINE: START UP PARAMETERS


Full Load

SL.

325

DESIGN
VALUE

Initial Unit
Hot
condition:Cold/warm /

REMARKS

Turbine Speed on
Barring Gear (RPM)
Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C
CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C
HP casing mid wall
temp. C
TSE Margin

600

3000

3000

80

80

145

12

16.8

144

12

12

36

512

512

530

335

335

338

512

512

530

494

494

510

40

41

38

0.1

0.1

0.11

16

Condenser Vacuummmhg
SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

510/510

17

0.25

11.5

105

12.2

720

2.6

159

247

312

110

10

248

11

310

12

109

13

256

14

258

15

520/520

45/45/33/45/ 62/54/36/4 58/29/18/20/31/39/


25/35/58 4/25/45/60
75
4/5/6/10/9/5/ 17/13/12/1 15/8/10/15/18/30/
14
8/10/17/22 30
59/60/72/6
53/51/61/61
9
75/75/65/95/
62/55/53
79/71/62
52/47/44
-0.26

-0.28

-0.19

HP RELATIVE EXP.:

-0.56

-0.68

-0.6

18

IP RELATIVE EXP.:

2.08

1.69

5.06

241

19

LP RELATIVE EXP.:

11.28

9.61

11.9

680/694

20

OVERALL EXP: AT
HP FRONT

22.11

22.11

22.69

730

21

ABSOLUTE EXP: IP
FRONT

9.5

9.5

9.32

N1
(RPM)

N2
(RPM)

Full Load

600

3000

3000

33

35

148

8.59

8.69

146.5

9.55

35

318

337

537

176

267

343

347

358

537

152

193

518

60

59

40

0.06

0.06

0.11

134
495/514

MAIN TURBINE: START UP PARAMETERS


Full Load

SL.

357

10

110

12

710

3.4

162

300

338

118

10

300

11

DESIGN
VALUE

Initial Unit
Cold
condition:Cold/warm /
Turbine Speed on
Barring Gear (RPM)
Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C
CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C
HP casing mid wall
temp. C
TSE Margin
Condenser Vacuummmhg

REMARKS

340

12

125

13

301

14

304

15

537/537

16

SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

537/537

17

<0.2

7/12/18/2 87/32/36/
0/9
27/33
2.64/0.93/1/2/0. 7/3/3/10/1/10/
2/0.4/0.29
2

62/25653741

4/8/3/15/3/22/10

44/44/57/ 58/58/78/
61/64/88/81
52/
75/
51/51/46 67/69/49
74/73/82
-0.14

-0.16

-0.39

HP RELATIVE EXP.:

1.11

2.8

-0.65

18

IP RELATIVE EXP.:

2.33

2.6

8.44

243

19

LP RELATIVE EXP.:

7.62

7.76

13.63

675/680

20

4.65

6.33

25.14

800

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

0.31

0.35

8.67

N1
(RPM)

N2
(RPM)

Full Load

600

3000

3000

145
539/546

MAIN TURBINE: START UP PARAMETERS


Full Load

SL.

358

11

DESIGN
VALUE

Initial Unit
warm
condition:Cold/warm /
Turbine Speed on
Barring Gear (RPM)

REMARKS

110

13

710

3.2

161

290

330

120

10

292

11

335

12

115

13

290

14

290

15

535/532

16

Condenser Vacuummmhg
SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

528/535

17

0.4

Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C
CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C
HP casing mid wall
temp. C
TSE Margin

60

60

147

17

18

145

10.6

10

35.5

391

438

537

284

295

345

401

430

537

383

382

515

35

36

40

0.1

0.095

0.11

17/23/43/
19/20
1/2/5/3/3/
5/6
47/52/52/
50
47/48/46

31/39/46/ 51/78/32/60
24/26
2/1/4/1/5
7/16 6/2/10/6/2/7/nw
66/55/84/
66/62/86/80
83
73/74/65
74/73/64

-0.08

-0.12

-0.15

HP RELATIVE EXP.:

0.17

1.08

-0.53

18

IP RELATIVE EXP.:

1.45

1.89

5.72

245

19

LP RELATIVE EXP.:

6.9

6.45

13.28

630/645

20

14.2

14.2

21.88

825

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

5.52

5.11

7.55

148
532/531

MAIN TURBINE: START UP PARAMETERS


Full Load

SL.

341

11

110

13

711

153

284

322

117

10

285

11

330

12

DESIGN
VALUE

Initial Unit
Hot
condition:Cold/warm /
Turbine Speed on
Barring Gear (RPM)
Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C
CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C
HP casing mid wall
temp. C
TSE Margin
Condenser Vacuummmhg
SHAFT
VIBRATIONS:

N1
(RPM)

N2
(RPM)

Full Load

600

3000

3000

80

80

145

15

15

142

11

11

33.8

510

510

537

335

335

341

515

515

538

510

510

502

45

42

80

0.1

0.1

0.085

125/20/33/ 106/33/31 69/26/65/35/42


/43/24
20

REMARKS

121

13

281

14

285

15

541/541/

16

BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

534/534

17

0.4

BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4

6/3/2/10/2/ 7/3/1/11/1 5/3/2/22/2/25/


/11/1
9
8/1
47/47/62/5 58/60/83/ 60/65/87/81
7
81

55/55/58

76/74/52

72/72/52

-0.49

-0.45

-0.38

HP RELATIVE EXP.:

-1.08

-1.1

-0.44

18

IP RELATIVE EXP.:

2.83

2.69

5.01

239

19

LP RELATIVE EXP.:

11.14

11.03

13.34

629/647

20

25.14

25.1

25.14

696

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

8.67

8.69

8.57

N1
(RPM)

N2
(RPM)

Full Load

600

3000

3000

119
537/539

MAIN TURBINE: START UP PARAMETERS


Full Load

SL.

342

11

DESIGN
VALUE

Initial Unit
Hot
condition:Cold/warm /
Hot
Turbine Speed on
Barring Gear (RPM)

REMARKS

110

90

91

146

13

14

19

143

710

11

12

34

3.9

500

500

538

152

335

339

342

500

500

537

CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg
HP casing mid wallC

284

321

509

509

505

117

10

temp.
C
TSE Margin

44

49

77

285

11

0.1

0.1

0.09

231

12

Condenser Vacuummmhg
SHAFT

Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
(Kg/Cm2)
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C

VIBRATIONS:
BEARING
VIBRATIONS:

119

13

280

14

284

15

541/541/

16

BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

534/534

17

0.4

120/19/31/
21
5/2/2/9/2/9
/2

113/31/2
7/50/27
8/3/1/9/
1/11/2
48/48/63/5 53/55/7
7
0/65
54/55/57 64/64/49

70/25/64/34/42
5/3/2/21/2/24/
10
60/65/86/80
72/71/52

-0.48

-0.45

-0.37

HP RELATIVE EXP.:

-1.04

-0.65

-0.44

18

IP RELATIVE EXP.:

2.87

2.01

5.01

239

19

LP RELATIVE EXP.:

11.1

11.31

1.25

629/647

20

25.1

25.14

25.12

696

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

8.3

8.6

119
535/536

MAIN TURBINE: START UP PARAMETERS

Full Load

SL.

DESIGN
VALUE

343

Initial Unit
warm
condition:Cold/warm /
Hot

12
110

2
3

12.5

712

Turbine Speed
Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
Hot reheat Steam
Pressure (Kg/Cm2)

3.6

154

Main Steam
Temperature -Deg C
CRH Steam
Temperature-Deg C

N1
(RPM)

N2
(RPM)

Full Load

650

3000

40

3000
40

145.8

5.66

8.98

143

7.56

33.7

380

380

537

282

282

341

REMARKS

285

HRH Steam
Temperature-Deg C

370

370

537

322

HP casing mid wall


temp. C

244

248

508

116

10

TSE Margin

61.62

48.55

69

284

11

0.076

0.08

0.09

323

12
13

279

14
15

73/33/37/
28/30
5/6/3/13
/1/9/1
51/55/5
6/80
72/60/50/

5/3/2/21/2/24/
10
60/64/85/79

285

16/19/20/2
2/9
2/1/0/3/0/0
/0
44/456/48/
53
65/58/47

69/25/65/34/41

120

540/540

16

Condenser Vacuummmhg
SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

-0.24

-0.26

-0.37

534/534

17

HP RELATIVE EXP.:

-0.03

-0.09

-0.4

0.39

18

IP RELATIVE EXP.:

1.13

0.84

4.8

233

19

LP RELATIVE EXP.:

6.31

4.53

12

630/650

20

11.66

11.34

25

735

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

4.47

4.45

122
535/536

MAIN TURBINE: START UP PARAMETERS

72/71/53

Full Load

SL.

DESIGN
VALUE

N1
(RPM)

N2
(RPM)

Full Load

600

3000

94

98

145

NA

NA

NA

36

520

516

535

320

320

261

520

516

525

481

481

485

0.088

0.088

0.088

Hot
335

10.5

100

12

850

2.3

164

303

375

145

10

303

11

372

12

147

13

309

14

308

15

Initial Unit
condition:Cold/warm /
Hot
Turbine Speed on
Barring Gear (RPM)
Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
(Kg/Cm2)
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C
CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C
HP casing mid wall
temp. C
TSE Margin
Condenser Vacuummmhg
SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP

30/42/12/4
8
1.5/0.5/2/
5/10
48/50/59/5
6
55/57

26/43/8/6 28/34/10/68
0
3/2/5/14/
26/34.5 3/3/7/11/17/5
51/48/74/ 62/61/90/75/
65
72/63
81/80

REMARKS

536/538

16

AXIAL SHIFT:

-0.3

-0.34

-0.25

493/525

17

HP RELATIVE EXP.:

-1.2

-0.9

0.8

0.35

18

IP RELATIVE EXP.:

1.2

4.4

240

19

LP RELATIVE EXP.:

8.5

6.8

11.2

753/710

20

23.6

23.4

23.2

760

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

10.1

10.1

9.9

N1
(RPM)

N2
(RPM)

Full Load

600

3000

30

30

146

3.9

138.5

3.45

35

335

352

538

146
NA/545

MAIN TURBINE: START UP PARAMETERS


Full Load

SL.

DESIGN
VALUE
warm

352

10

108

13

740

35

Initial Unit
condition:Cold/warm /
Hot
Turbine Speed on
Barring Gear (RPM)
Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
(Kg/Cm2)
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C

REMARKS

161

CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C
HP casing mid wall
temp. C
TSE Margin

250

218

342

340

335

350

530

377

234

235

538

156

10

318

11

Condenser Vacuummmhg
SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:

0.13

0.1

0.07

366

12

157

13

330

14

330

15

538/540

16

BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP
AXIAL SHIFT:

515/538

17

0.18

2.7/25.4/20 83/23/76/ 105/25/70/33


.4
23
4/2.3/5/6/2 6/5/16/1
0/21/12/ 10/13/16/15/1
23/23
7/17
5/15
52/45/56/5 76/65/9 73/70/98/82
6
5/80
56/55
80/69
84/73
0.214

0.3

-0.13

HP RELATIVE EXP.:

-0.6

-0.154

-1.6

18

IP RELATIVE EXP.:

0.39

0.94

3.15

243

19

LP RELATIVE EXP.:

14.64

14.654

14.65

720/720

20

4.64

4.53

21.22

800

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

2.12

2.21

8.76

127
557/555

MAIN TURBINE: START UP PARAMETERS

Full Load

SL.

DESIGN
VALUE

N1
(RPM)

N2
(RPM)

Full Load

600

3000

86

74

144

10.55

13.4

144

9.72

10.7

34.5

422

454

535

284

282

338

456

467

542

420

419

472

53

41

112

0.128

0.128

0.095

18.75/41/2
9/28
2/3/4/5/0.2/
2.4/1.17
48/46/61/5
6
54/55/48

80/31/47/
38/34
7/2/2/6/
2/12/4
64/60/8
7/7
73/73/52

59/30/71/39/36

Hot
356

10.3

107

12

718

3.66

161.01

295

329

127

10

293

11

347

12

124

13

291

14

291

15

Initial Unit
condition:Cold/warm /
Hot
Turbine Speed on
Barring Gear (RPM)
Throttle Steam
Pressure (Kg/Cm2)
Turbine 1st Stage
Steam Pressure
(Kg/Cm2)
Hot reheat Steam
Pressure (Kg/Cm2)
Main Steam
Temperature -Deg C
CRH Steam
Temperature-Deg C
HRH Steam
Temperature-Deg C
HP casing mid wall
temp. C
TSE Margin
Condenser Vacuummmhg
SHAFT
VIBRATIONS:
BEARING
VIBRATIONS:
BEARING TEMP.
BEARING-1/2/3/4
BEARINGS 5/6/7
TEMP

4/5/2/21/2/22/
11
64/65/88/82
74/73/53

REMARKS

533/533

16

AXIAL SHIFT:

-0.31

-0.28

-0.22

540/540

17

HP RELATIVE EXP.:

-0.41

-0.41

0.89

0.415

18

IP RELATIVE EXP.:

0.95

1.11

5.25

242

19

LP RELATIVE EXP.:

9.36

9.24

13.3

694/676

20

21.64

21.21

22.05

834

21

OVERALL EXP: AT
HP FRONT
ABSOLUTE EXP: IP
FRONT

8.5

8.5

8.09

161
537/547

NTPC Limited
Unchahar, Raebareli
UNIT TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009 )

UNIT-I
SL. No.01
OUTAGE NO.
CODE NO.

:
:

1.DATE OF TRIPPING :
2.TIME OF TRIPPING :
3.Analysis (By site) :
4

a)
5

a)

RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :

Present status

RECOMMEND
ATIONS
(By
OS NR)

Present status

Action to be
taken by

NTPC Limited
Unchahar, Raebareli
UNIT TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009 )

UNIT-I
SL. No.01
OUTAGE NO.
CODE NO.

: I/08-09/02
: 0702

1.DATE OF TRIPPING 14/05/2008


2.TIME OF TRIPPING : 15:29 Hrs.

3.Analysis (By site) : Unit was running normal with mill A, B,C & D in service without oil support . At 15:29:13 Hrs. g
On analysis it was found that all feeders connected to 220 KV Main Bus II (GT I, ST-I and transmission lines Raebare
Heavy power swing in the system (because of storm) resulted in overvoltage of Raebareli III line (RBL-III), which coul
Sudden opening of generator breaker at full load resulted in tripping of turbine on electrical overspeed protection. Due to
4

a)

RECOMMEND Action taken / Present status


ATIONS (By
To be taken by
site) :
PSL
of PE ( Electrical) Letter given to
Numerical relay
AGM ( COS) by
should be part of
AGM (O&M)
approved relay
setting
and
should
be
factory
tested
during PDI.
RECOMMEND Action to be
Present status
ATIONS
(By
taken by
OS NR)

a)

PSL
of
numerical relay
should
be
configured
by
electrical
maintenance
group at site as
per
approved
protection
scheme
and
tested
by
simulation
before
putting
the
numerical
relay
in
operation

NTPC Limited
Unchahar, Raebareli
UNIT TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009 )

UNIT-I
SL. No.02
OUTAGE NO.
CODE NO.

: I/08-09/06
: 1108

1.DATE OF TRIPPING 06/09/2008


2.TIME OF TRIPPING : 13:21 Hrs.

3.Analysis (By site) : Unit was running at 200 MW with mill A,B,C,D in service without oil support.BFP A and B wer

On checking it
was found that
BFP-A tripped
on
Negative
Phase Sequence
due to reverse
connection
of
one CT of BFPA.

a)

RECOMMEND Action taken / Present status


ATIONS (By
To be taken by
site) :
BFP discharge DGM ( C& I) Implemented
Pressure
Very
low Protection
to be removed in
line with st-II &
st-III.
RECOMMEND Action to be
Present status
ATIONS
(By
taken by
OS NR)

NTPC Limited
Unchahar, Raebareli
UNIT TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009 )

UNIT-I
SL. No.03
OUTAGE NO.
CODE NO.

: I/08-09/07

1.DATE OF TRIPPING 11/10/2008


2.TIME OF TRIPPING : 17:13 Hrs

: 0509

3.Analysis (By site) : Unit was running at 218 MW with mill ABCD in service, without oil support. At 16:37 Hrs mill
At 16:53 Hrs. Mill- F and all oil guns were taken out. Load increased to 218 MW at 17:04Hrs but while load rais
Due to continuous high FW flow of around 800 T / Hr drum level started increasing and Turbine tripped on D
On analysis it was found that with the increase of firing, load increased to 218 MW from 150 MW. And for main
4

a)

a)

b)

RECOMMEND Action taken / Present status


ATIONS (By
To be taken by
site) :
Tuning of Drum
C&I
Implemented
level
control
loop to be done,
till such time
during
disturbance
drum
level
controller may
be
taken
in
manual.
RECOMMEND Action to be
Present status
ATIONS
(By
taken by
OS NR)
Legible SOE and
related
parameters color
trends needs to
be attached with
trip report for
better
trip
analysis.
Reason for millB tripping is not
established. All
the alarm points
for the mill
tripping needs to
be
properly
checked for all
the units of
unit#1

c)

As suggested by
GM ,the drum
level
control
should be taken
manual on such
type of situation
in future.

NTPC Limited
Unchahar, Raebareli
UNIT TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009 )

UNIT-I
SL. No.04
OUTAGE NO.
CODE NO.

: I/08-09/08
: 0110

1.DATE OF TRIPPING : 31/10/2008


2.TIME OF TRIPPING : 11:46 Hrs

3.Analysis (By site) : Unit was running at 140 MW with mill A, B & C in service with oil gun AB-3 in service. ID fan
4

a)

a)

RECOMMEND Action taken / Present status


ATIONS (By
To be taken by
site) :
A alarm is to be DGM (C&I) Implemented
provided on rate
of rise of bearing
temp. ( more
than 2 C per
minute)
RECOMMEND Action to be
Present status
ATIONS
(By
taken by
OS NR)
Greasing
interval of fan
bearing should
be bi-monthly

b)

Bearing capable
of high variable
dynamic
load
and
axial
displacement
suitable to fan
needs to be used

RECOMMEND
ATIONS
(By
OS CC)
Both ID fan A &
B bearings were
replaced during
the last OH.
Bearing damage
of both fans
within
two
months
of
completion
of
overhaul
indicates that the
quality of work
done on ID fans
during OH was
not OK.
As given in site
recommendation
(
Separately
annexed in trip
analysis report
,only
genuine
bearings
from
OEM are to be
procured.

a)

Action to be
taken by

Present status

b)

One Fan was


under shutdown
and other fan
was
running
with abnormal
condition.
In
such a situation,
the loading of
the fan should
have
been
regulated
keeping a close
watch on bearing
temp. Operating
staff have to be
instructed
accordingly

NTPC Limited
Unchahar, Raebareli
UNIT TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009 )

UNIT-I
SL. No.05
OUTAGE NO.
CODE NO.

: I/08-09/09
: 0502/0601

1.DATE OF TRIPPING : 02/11/2008


2.TIME OF TRIPPING : 13:18 Hrs.

3.Analysis (By site) : Unit was running at 210 MW with mills A, B, C & D in service without oil support. BFP-A and C
On checking it was found that BFP C Discharge pressure very low protection was earlier in bypass condition.
4

RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :

Present status

a)

a)

BPF
recirculation
valve should be
in
open
condition along
with discharge
valve in auto
standby mode as
provided in Unit
#2 logic
RECOMMEND
ATIONS
(By
NR OS)
Whenever
normalization of
protection
is
being carried out
by
C&I
maintenance
person
should
ensure whether
any
trip
condition persist
,or
not
.A
documented
procedure
should be made
available
for
working
of
critical
equipments.

b)

Site
recommendation
for review of
protection may
please be seen
by OS-CC and if
found in order
may please be
concurred by PECC

RECOMMEND
ATIONS
(By
OS CC)

DGM ( C& I)

Implemented

Action to be
taken by

Present status

Action to be
taken by

Present status

a)

b)

c)

d)

The bypassing
and
normalization of
protection shall
be done by C& I
only
after
ensuring that no
trip command is
present
.such
bypassing
or
normalising
should
be
recorded
in
register.
Tripping
analysis report
should contain
one trip code
only based on
root
cause
analysis. In this
case , human
error code is
applicable
. for
Any
proposal
modification of
protection
should be sent
separately to CCOS
after
approval
of
station head.
Bypassing
/
normalizing of
protection
should
be
defeated in OWS

NTPC Limited
Unchahar, Raebareli
UNIT TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009 )

UNIT-I
SL. No.06
OUTAGE NO.
CODE NO.

: I/08-09/10
: 1113

1.DATE OF TRIPPING : 02/11/2008


2.TIME OF TRIPPING : 16:44 Hrs

3.Analysis (By site) : Unit was running at 70 MW with mill B and C and three oil guns in service after synchronization a
On investigation it was found that in DDCMIS only breaker close status is used in logic and interlock. Service R

RECOMMEND Action taken / Present status


ATIONS (By
To be taken by
site) :
HT breaker On DGM ( C & I ) Implemented
status is to be
used in logic and
interlock after
ANDing with
service remote
status. Necessary
modification is
to be done in
DDCMIS.

a)

DGM ( EMD)
PE
(Elect / C & I)
RECOMMEND Action to be
ATIONS
(By
taken by
OS NR)
HT breaker ON
status is to be
used in logic and
interlock after
ANDing
with
service remote
status
in
DDCMIS.

a)

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( UP DATED ON :13/03/2009)

UNIT-III

Present status

SL.No. 01
OUTAGE NO.
CODE NO.

:
:
1 DATE OF TRIPPING :
2 TIME OF TRIPPING :
Analysis
(By
site)
:

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :

Present status

5 RECOMMEND

Present status

a)
ATIONS (By OSCC ) :

Action to be
taken by

a)
b)

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( UP DATED ON :13/03/2009)

UNIT-III
SL.No. 01
OUTAGE NO.
CODE NO.

: III/ 08- 09/04


: 0119
1 DATE OF TRIPPING : 06/09/2008
2 TIME OF TRIPPING :. 9:47 Hrs

3
Mechanical
maintenance
was
informed about the
leakage. In between
leakage had increased
.Due to this leakage
,water ingress took
place in the positioner
of FRS control valve
FW-1 and valve got
closed fully leading to
disruption feed water
to boiler and boiler
tripped on Drum Level
very Protection.

Analysis
site)

: Unit was
running at 197
MW with mill
AB,
EF
in
service without
oil support. FRS
control
valve
FW-01 was in
service .Gland
leakage
was
(By observed in this
valve.

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :

Present status

a)

Whenever any
leakage
is
developed
in
FRS
control
valve,
the
particular stream
is to be isolated
and & PTW to
be given to
concern
maintenance
deptt. to attend
on urgent basis.
5 RECOMMEND
ATIONS (By NRHQ ) :
All important
petitioners, JBs,
EP Converter,&
FB transmitters to
be wrapped with
polythene paper /
cloth.

a)

6 RECOMMEND
ATIONS (By OSCC ) :
Gland leakage in
FRS valves can
cause unit trip if
not attended in
time . During
every OH gland
replacement of
such critical
valves have to be
done to ensure that
such outages do
not take place.

a)

NTPC Limited

Being followed

Action to be
taken by

Present status

Action to be
taken by

Present status

Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( UP DATED ON :13/03/2009)

UNIT-III
SL.No. 02
OUTAGE NO.
CODE NO.

: III/ 08- 09/ 05


: 0113
1 DATE OF TRIPPING : 13/11/2008
2 TIME OF TRIPPING
: 19:05:18
: Unit
was

Analysis
site)

running normal
with mill -AB
and
CD
in
service. At 18:28
hrs feeder C
Discharge
plugged
and
No coal Flow
alarm appeared.
Mill CD to EF
change
over
started at 18:38
hrs. After taking
mill EF End-E
in service, millCD
End-C
shutdown
command was
given at 19:02
hrs. At 19:05:17
Mill AB and CD
Seal air to mill
DP low and
Transmitter
(By disturbed alarm
appeared in

On checking it was
found that all of
sudden Mill-CD End
D inlet pressure
increased to 1031
mmwc
from
495
mmwc
.Simultaneously EndD outlet pressure also
increased
to
412
mmwc
from
166
mmwc. Inlet and outlet
pressures of End C
also increased in the
similar way.
Hot
PA
header
pressure was also
suddenly increased to
987mmwc from 823
mmwc. In the next
moment
all
the
primary air pressures
which had increased,
were came down.
Sudden rise and fall of
the mill- CD primary
air pressures might be
due to spontaneous
burning
of
the
pulverized coal in the
milling system of CD.
This
disturbance
propagated to
the
Hot
PA
header
leading to actuation
of PA header pressure
Very Low protection
causing tripping of
unit on Loss of all
fuel.
4 RECOMMEND Action taken /
ATIONS (By
To be taken by
site) :

Present status

a)

b)

a)

b)

Screw conveyor DGM ( C & I)


vibration
monitoring is to
be done on trial
basis in one mill
to detect
breakage of
helix and tie rod.
Other
DGM (OPN)/
possibilities are
to be explored to
avoid such
conditions.( with
other stations
also)
DGM ( BMD )
RECOMMEND
5
Action to be
ATIONS (By OStaken by

Is being
implemented in
mill-3CD

Consulted with
other projects

Present status

CC ) :
Mill coal level
measurement
transmitter
impulse line auto
purging to be
ensured to avoid
false level sensing
resulting in lean
air mixture
leading to
explosion.

In case of no coal
flow ,PA flow
reduction
commensurate
to other end coal
flow as mill outlet
temp control to
be done to avoid
any
instantaneous
combustion
/Explosion

6 RECOMMEND
ATIONS (By OSCC ) :

Action to be
taken by

Present status

a)

The
recommendation
given by site done
not match with
analysis of
tripping. Site to
give their
recommendation
based on the trip
analysis

b)

Unit was not


stabilized
following feeder
C discharge
pluggedalarm.Oil
guns cut in to
stabiles the mill
were cut out
quickly

c)

Mill CD was run


for half an hour
with one side
feeder. Such
operation should
be minimized as
this increases the
risk of a mill Fire

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009)

UNIT-II
SL. No. 0
OUTAGE NO.
CODE NO.

2.
3

:
:

1 DATE OF TRIPPING :
TIME OF TRIPPING :
Analysis
(By
site)
:.

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :
RECOMMEND
ATIONS
(By
OS-NR ) :

Action to be
taken by

Present status

Present status

a)
b)
c)

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2007-2008)

( 13/09/2009)

UNIT-II
SL. No. 01
OUTAGE NO.
CODE NO.
2.

: II/08-09/01

: 0201
1 DATE OF TRIPPING : 25/05/2008
TIME OF TRIPPING : 13:53 Hrs

: Unit was
running at 205
MW with mill
A,B,C,D & E in
service, without
oil support. All
of sudden unit
load
became
zero and turbine
controller
changed to speed
from
load
controller.
At
13:53:28
Hrs.
generator,
turbine
and
boiler tripped on
Anti motoring
3.
Analysis (By Protection (Class
site)
A Protection).
On thorough analysis
it was found that all of
sudden all the 4
control
valves
of
turbine started closing.
To maintain the load
,EHC
demand
increased but control
valves got closed fully
and unit tripped on
Anti
motoring
Generator Protection.
4 RECOMMEND Action taken /
ATIONS (By
To be taken by
site) :
NIL
RECOMMEND
ATIONS
(By
OS-NR ) :

Action to be
taken by

Present status

Present status

There has been


at least six unit
trappings in the
station in the last
one
year
attributable
to
malfunctioning
of
turbine
governing
system. BHEL
should
be
involved
in
thorough
checking
/
servicing of the
system
(mechanical as
well
as
electronic part)
in the next unit
OH .details /
record of all
malfunctioning
related
to
governing
system to be
forwarded to

a)

TMD

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2007-2008)

( 13/09/2009)

UNIT-II
SL. No. 02
OUTAGE NO.
CODE NO.

: II/08-09/02
: 0114
1 DATE OF TRIPPING : 25.06.08

Problem was
attended. Now
m/c is running in
EHC mode.

2.

TIME OF TRIPPING : 09:46:40 hrs


:. Unit was
running at 208
MW will mill A,
C, D, E & F in
service
and
without
oil
support. Boiler
was in manual
mode. At 09:24
Hrs. Mill- B was
started
for
changeover.
After attaining
mill outlet temp,
feeder B was
started at 9:46
hrs, but unit
tripped
on
Analysis
(By Flame Failure
site)
Protection.

Before tripping coal


flow was maintaining
approx 165- 168 T /
Hr. R C feeder sample
analysis was report
was as follows: -------Ash-51 %
, VM12.9 %

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :

a)

NIL
RECOMMEND
ATIONS
(By
OS-NR ) :
Blending of the
coal must be
resorted,
to
overcome
the
problems created
by low VM coal.

Action to be
taken by

Present status

Present status

Being done

Oil
support
should be taken
during
mill
changeover
to
stablise
the
flame
during
poor coal quality
regimes
and
withdrawn
gradually after
ensuring flame
stability.

b)

Being followed

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009)

UNIT-II
SL. No. 03
OUTAGE NO.
CODE NO.

4.

: II/08-09/4
: 0509

1 DATE OF TRIPPING : 09/07/2008


TIME OF TRIPPING : 5:33 hrs

Analysis
3
site)
PA header pressure
controller was running
in auto mode. From
trend log it was found
that IGV of PA fans
started decreasing at
05:32:58
Hrs.
resulting in decrease
of PA header pressure
to very low limit. All
the running mills
tripped on PA header
pressure very low
protection and unit
tripped on loss of all
fuel at 05:33:10 hrs.

: Unit was
running normal
at 217 MW with
mill
A,B,C,D
and E in service
without
oil
support. All of
sudden all the
mills tripped on
PA
header
pressure
Very
Low Protection
and unit tripped
(By in Loss of All
Fuel.

Just after tripping it


was observed that at 200 mmwc furnace
draft IGV of ID fan-B
opened fully ,FRS
control valve became
full open,BFP scoops
decreased to 45 %
from 80 % ( approx)
and push buttons of
the desk became non
functional
momentarily. But on
checking
no
abnormality
was
observed
in
any
control
loop.
All
voltages were found
normal. Reason for
abnormality could not
be established. Earth
fault was suspected,
but not found in any
panel.
.

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :
Nil
RECOMMEND Action to be
ATIONS
(By
taken by
OS-NR ) :

Present status

Present status

The
control
supply extended
for
field
instrumentation
should
have
individual
isolation( fuse
provision
)so
that the earth
fault in the field
gets isolated on
its own and dose
not cause overall
disruption in the
supply bus.

a)

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009)

UNIT-II
SL. No. 0
OUTAGE NO.
CODE NO.

: II/08-09/5
: 0501

5.

1 DATE OF TRIPPING : 14.07.2008


TIME OF TRIPPING : 14:29:27 hrs.

3
On thorough checking
of system it was found
that cable of Mill-B
hot
air
damper
positioner which was
creating disturbance in
the control supply was
getting earthed due to
cut in cable.
.

Analysis
site)

: Unit was
running normal
at 213 MW with
coal
mill
A,B,C,D and E
in
service
without any oil
support. All of a
sudden both the
PA fans got
unloaded
.All
mills tripped on
PA
Header
Pressure
Very
Low protection
and unit tripped
on Loss of all
Fuel. Just after
unit tripping it
was
observed
that all the push
buttons of the
(By desk
became
inoperative.

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :
Nil
RECOMMEND Action to be
ATIONS
(By
taken by
OS-NR ) :

Present status

Present status

The
control
supply extended
for
field
instrumentation
should
have
individual
isolation( fuse
provision
)so
that the earth
fault in the field
gets isolated on
its own and dose
not cause overall
disruption in the
supply bus.

a)

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009)

UNIT-II
SL. No. 3
OUTAGE NO.
CODE NO.
6.

: II/08-09/06

: 0114
1 DATE OF TRIPPING : 28/07/2008
TIME OF TRIPPING : 01:12 hrs.

Analysis
3
site)
Due to disruption of
the coal to mill -A,
mill
outlet
temp
became High leading
to closing of hot air
gate and full opening
of cold air damper on
protection
.
This
created disturbance in
furnace
and
unit
tripped on flame
failure Protection.
Later on R C feeder
coal sample analysis
done, report was as
follows; --Ash

50.2
%
VM 12.8 %

: Unit was
running normal
at 215 MW with
mill A, B, C,D &
E in service
without
oil
support .At 1:10
hrs
heavy
hunting
was
observed in the
current of R C
feeder A and
mill
A
.
Immediately
Mill F was
taken in service.
But unit tripped
on
Flame
(By Failure
Protection.

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :

Present status

a)

b)

c)

Full opening of DGM ( C & I)


the cold air
damper in auto
on mill hot air
gate
closing
protection to be
modified.
5 RECOMMEND Action to be
ATIONS
(By
taken by
OS-NR ) :
To prevent entry
of big size coal
,stones, foreign
material etc, in
feeders
,preventive
checkes of the
coal
crusher
breakers plates
,case screens and
& bunker grill
should
be
ensured .
Blending of coal
must be resorted
, to over come
the
problems
created by the
the low VM coal
Mill changeover
procedure to be
reviewed
and
desk operator to
be
advised
accordingly.

Implemented

Present status

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009)

UNIT-II
SL. No. 4
OUTAGE NO.
CODE NO.
2.

: II/08-09/07

: 0112
1 DATE OF TRIPPING : 20/08/2008
TIME OF TRIPPING : 07:31:47 Hrs.

Analysis
site)

: Unit was
running at 217
MW load with
combustion
control
auto
mode with mill
A,B,D,E & F in
service. Due to
High outlet temp
hot air gate of
mill-E closed at
7:29 Hrs. At
7:31
Hrs.
scanners
flickering
started, oil gun
tried in elevation
AB but unit
tripped
on
(By flame
failure
protection.

From analysis it was


found that Air flow
Master and Fuel flow
Master
were
remaining in auto
mode till unit tripping.
When Hot air gate of
mill E closed, actual
coal flow to the boiler
reduced by 37 T/Hr
(approx) so unit load
started decreasing but
feedback of total coal
flow to Fuel flow
Master
did
not
changed
because
feeder -E was in
running condition. To
maintain the load fuel
master
demand
increased to 155 T/hr
from 146 T/Hr and
accordingly Air flow
also reached 883 T /hr
from
831
T/Hr.
Oxygen in flue gas
increased to 8.5 /6.9 %
4 RECOMMEND Action taken / Present status
ATIONS (By
To be taken by
site) :
During furnace DGM ( OPN) Being followed
disturbance total
air flow should
be
maintained
according
to
total fuel flow.
RECOMMEND Action to be
Present status
ATIONS
(By
taken by
OS-CC ) :

a)

The trend report


attached
suggested that
the rise in mill
outlet temp of
mill was gradual
.The
desk
operator
must
investigate the
abnormal rise in
mill outlet temp
and
initiate
corrective
actions . the
cause of rise in
temp
is
gradually
an
interruption in
coal flow which
will
be
associated with a
drop in load or
an interruption
in cold air flow
to mill.
RECOMMEND
ATIONS
(By
OS-CC ) :

Action to be
taken by

Present status

a)

Unit combustion
control systems
like air and fuel
flow were in
auto at the time
of tripping .
closure of hot air
gate has to be
delt
very
carefully in a
case
mills
remains
in
service
and
accumulates coal
bed from feeder
.The following
points need to be
taken care while
handling such an
emergency. :---

b)

Hot air gate


closes
in
a
running mill due
to coal flow
interruption or
improper
response/ Failure
of temp control
system.
Such
closing
will
initiate Mill
outlet Temp Hi
alarm
during
such conditions,
control loop like
fuel ,air shall be
taken out of
auto.

c)

Efforts should
be made to admit
cold air into mill
and reduce the
feeder
speed.
This step will
ensure
that
minimum load
reduction takes
place in the unit.

d)

Opening of hot
air gate after
normalizing mill
outlet temp has
to be done very
care fully .All
along mill fuel
air ratio should
be maintained.
If
there
is
difficulty
in
admitting cold
air damper into
mill,
feeder
should
be
stopped
temporarily and
unit load shall be
brought down.

e)

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( 13/03/2009)

UNIT-II
SL. No. 5
OUTAGE NO.
CODE NO.

: II/08-09/10
: 0112
1 DATE OF TRIPPING : 05/12/2008
2.
TIME OF TRIPPING : 16:34:50 hrs.

Analysis
3
site)
When mill-C tripped,
furnace got disturbed (
From -6 to -43
mmwc). Mill-A was
taken in service. Due
to passing of Hot air
damper of mill-A, a
sudden flow of air of
30 T/hr to furnace
from lowest elevation,
without oil support,
worsened the furnace
flame condition and
unit tripped on Flame
failure condition.

: Unit was
running at 219
MW with mill B,
C,D,E & F in
service . Mill A
was
being
normalized after
cancellation of
PTW by BMD.
At 16:33:48 Hrs
mill-C tripped
on
thermal
overload.
Immediately
Mill-A
was
started and oil
guns tried in AB
elevation
.But
guns did not
prove and Flame
Scanners started
flickering .Unit
tripped
on
(By Flame Failure
Protection.

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :

Present status

a)

b)

Passing of the DGM ( BMD )


Hot air dampers
of mills is to be
arrested.
Thermal
DGM ( EMD)
overload relay of
mill-2C is to be
checked.
RECOMMEND Action to be
ATIONS
(By
taken by
NR-OS ) :
when low VM
coal is being
fired ,tripping of
one mill will
result in major
disturbance in
the furnace. At
such a point ,it is
advisable to take
oil support and
stabiles
the
furnace
first
before taking the
other / same
mill in service.
As
per
observations
contained in the
trip report of the
shift
charge
engineer,
mill
C tripped on
thermal overload
while taking 35 37 Amp current
which is well
below the trip
value,
current
indication error
needs to be
looked
into
along
with
checking
of
overload relay.

Being followed

Checked ,found
O.K

Present status

a)

b)

RECOMMEND
ATIONS
(By
OS-CC ) :
During
such
cases of mill
tripping, oil gun
should be proven
first before try to
take another mill
in service. This
will improve the
flame condition
and stabilize the
furnace. Cutting
in of another
new mill will
induce
more
disturbance.( A
40
mm
disturbance
is
normal
and
should not cause
panic)

Action to be
taken by

As per the report


, a passing of 30
T /Hr observed
from mill-A hot
air damper .This
is very High
level of passing
and it should be
rectified at the
earliest.

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( UP DATED ON :13/03/2009)
UNIT-IV
SL.No. 0

Present status

OUTAGE NO.
CODE NO. :

3.
Analysis
site):

1 DATE OF TRIPPING :
2 TIME OF TRIPPING :
(By

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :

Present status

5 RECOMMEND
ATIONS (By
OS-NR) :

Present status

a)

Action to be
taken by

a)
b)
c)
d)

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2007-2008)

( UP DATED ON :02/08/2008)
UNIT-IV
SL.No. 01
OUTAGE NO. : IV/ 08-09/01
CODE NO.
: 0112
1 DATE OF TRIPPING : 24/05/2008
2 TIME OF TRIPPING : 00:27 Hrs

Analysis
(By
site) : Unit was

running at 175
MW with mill CD
& EF in service
,without
oil
support . Due to
low load schedule,
while reducing the
load ,furnace got
disturbed and unit
tripped on Flame
Failure
protection.

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :
a)

Present status

NIL

5 RECOMMEND
ATIONS (By
OS-NR) :

Action to be
taken by

Present status

a)

Load reduction
in the boiler
,particularly
during low VM
regimes has to
be
done
gradually ,taking
care of all the
parameters
affecting
the
combustion , so
that there is
minimum
disturbance to
the flame in the
furnace
.if
required , oil
support can be
taken to stabilize
the flame
6 RECOMMEND
ATIONS (By
CC-OS)

Being followed

Action to be
taken by

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( UP DATED ON :13/03/2009)
UNIT-IV
SL.No. 02

Present status

OUTAGE NO. IV/ 08-09/ 2


CODE NO. : 1203

1 DATE OF TRIPPING : 02/07/2008


2 TIME OF TRIPPING : 12:18 Hrs
3.
Analysis (By
site): Unit was running
at 218 MW with mill AB
and CD in service and
without oil support. All
of sudden unit tripped on
drum level very low
protection.

On checking at
local it was found
that heavy gland
leakage
had
developed
in
steam side manual
isolating valve of
drum
level
transmitter no. LT
674
D
.This
transmitter started
showing very high
value (False) ,FRS
control valve came
down and came to
manual mode due
to deviation of
transmitters. Due
to sudden and
large amount of
reduction of feed
water flow, unit
tripped on Drum
Level very Low
protection.

4 RECOMMEND
ATIONS (By
OS-NR) :

Action to be
taken by

Present status

a)

In case of auto
control failure,
the desk operator
has to take quick
action for
controlling the
drum level. To
deal with
indication
discrepancies,
Hydrastep is
generally more
dependable since
it gives direct
indication of
both LHS &
RHS.

b)

The reason for


failure of auto
control also
needs to be
investigated and
addressed. Auto
control should
not fail with the
failure of one
transmitter.

c)

Any leakage in
impulse line of
critical
instruments
should be
attended
immediately
after obtaining
permission from
operation by
means of
suitable safety
documents
(LWC/PTW).Ne
cessary
precautions has
to be taken ( like
suspending the
instrument
service) to
prevent unit
?equipment
tripping before
commencing of
repair job.

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2007-2008)

( UP DATED ON :19/12/2008)
UNIT-IV
SL.No. 03
OUTAGE NO. . IV/ 08-09/ 03
CODE NO. : 0505
1 DATE OF TRIPPING : 09/08/2008
2 TIME OF TRIPPING : 06:46:14 Hrs.

3.
Analysis (By
site): Unit was running
normal at 185 MW with
mill AB , EF in service.
Boiler master was in
manual mode and turbine
was in hydraulic control
mode. At 06:23:33 Hrs.
Mill AB Reducer Lub
oil temp Very High
alarm appeared in event
log and got reset itself .
Second reducer lub oil
pump was taken in
service immediately. In
local every thing was
found normal so second
pump was stopped. At
6:45:35 Hrs. again same
alarm appeared in event
log and mill AB tripped
at 6:45:45 Hrs. Furnace
got disturbed and Flame
scanner of EF and FF
elevations
started
flickering( from 6:46:08
Hrs.), immediately oil
gun was tried in EF
elevation but unit tripped
On checking it was
found that one out of two
temp switches of reducer
lub oil system was not
functioning properly.

M/C was in manual


mode but air flow master
was in auto. Demand of
the air flow master is
generated by Boiler
master and Total fuel
flow (Max of the two)
even when machine is in
manual mode. When mill
AB tripped all aux air
damper associated to millAB( AB,BC) closed. So
Wind Box pressure
increased to 131 mmwc ,
so to maintain the air
flow and windbox to
furnace DP ,aux air
dampers associated to
mill EF ( DE , EF ,FF)
opened. Total air flow
demand remained almost
unchanged because one
input of total air flow
was from Boiler master
which was in manual
mode . So with the
tripping of two lower
elevation at a time and
formation of lean

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :

Present status

a)

Mill
Reducer Temp
logic Implemented
Lubrication Not modified
from
OK temp logic to 1/2 to 2/3
be modified from
1/2 to 2/3 with
alarm.

b)

Desk engineer
Instruction to be Being followed
should control air given to operation
flow as per fuel
engineer
flow during
emergency to
avoid lean mixture

5 RECOMMEND
ATIONS (By
OS-NR) :

Action to be
taken by

Present status

a)

b)

c)

Whenever unit is
running on
partial load, it is
better to keep
the gap between
the running mills
at minimum
Any
malfunctioning
of trip devices
should be
immediately
investigated. In
this case , there
was any
opportunity to
check the
malfunctioning
temp switch
when the the
alarm appeared
the first time
Provision for
providing an
alarm with a
setting lower
than trip value
to be explored.

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( UP DATED ON :13/03/2009)
UNIT-IV
SL.No. 04
OUTAGE NO. IV/ 08-09/ 04
CODE NO. : 1103
1 DATE OF TRIPPING : 12/08/2008
2 TIME OF TRIPPING : 17:09 Hrs.

3.
Analysis (By
site): Unit was running
at 212 MW with mill CD
and EF in service
without oil support.
Source breaker of ID fan
A channel-I tripped on
earth
fault.
Simultaneously incomer
from UAT of 6.6 KV
Unit Bus -4A also
tripped with flag in lock
out relay (86) and earth
fault relay .Reserve
supply from Station Bus
SF-1 did not come in
service
leading
to
tripping of all running
auxiliaries of the Bus-A,
including mill EF. Mill CD also tripped on PA
Header Pressure Very
Low Protection and unit
tripped on Loss of All
fuel.

During investigation a
fault was found in the
6.6 KV cable from VFD 4A channel-I breaker to
VFD
transformer.
During
the
E/F
condition, starter element
for E/F relay in UAT I/C4A has also operated and
since the fault was in
outgoing
feeder
,it
received the reverse
blocking signal from
VFD-4A
ch-I
transformer feeder, but it
tripped in 254 msec time
without any flag in its
timer ( T1 & T2).On
further investigation it
was found that one
contact of E / F relay of
UAT I/C was going to
DDCMIS as Digital
Input ( DI) and it was
coming back as Digital
output(DO) after time
delay of 100 msec and
initiating the lockout
relay . Thus the time
Due to E/F in the UAT
I/C breaker, changeover
to reserve supply from
station bus SF-1 was
restricted. On tripping of
PA fan A, Mill-CD
tripped on PA header
Pressure
Very Low
Protection.

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :
a)

Tripping of UAT DGM ( EMD)


incomer Breaker
on
E/F
from
DDCMIS to be
removed

Present status

Implemented

b)

Dead bus
changeover, in
case of fast
changeover fails,
is to be provided
in stage-II .

DGM ( EMD)

DGM ( PE- Ele)

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2008-2009)

( UP DATED ON :13/03/2009)
UNIT-IV
SL.No. 05
OUTAGE NO. IV/ 08-09/06
CODE NO. : 1104
1 DATE OF TRIPPING : 03/11/2008
2 TIME OF TRIPPING : 20:42 Hrs.
3.
Analysis (By
site):
Unit
was
running at 217 MW
with CD, EF in service
without oil support.
All of sudden all the
auxiliaries from Unit
bus-A tripped and unit
tripped on Loss of all
Fuel.

On checking it was
found that Unit Bus
4 A was showing
Zero Volts though
bus
was
actuall
charged. On further
investigation it was
found that coil of
27N relay burnt,
resulting in blowing of
fuses in Y & B phase
of P.T. secondary. Due
to this the under
voltage relay sensed
the under voltage
and all motor feeders
tripped
on
under
voltage protection.

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :
a)

Under
voltage DGM ( EMD)
Tripping is to be
modified to block
tripping in case of
fuse failure in P.T.
secondary circuit

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2007-2008)

( UP DATED ON : 13/03/2009 )

UNIT-V
SL.No. 0
OUTAGE NO.
CODE NO.

:
:
1 DATE OF TRIPPING :
2 TIME OF TRIPPING :

Present status

3.
site) :

Analysis (By

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :

Present status

5 RECOMMEND
ATIONS (By
OS-NR) :

Present status

a)
Action to be
taken by

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2007-2008)

( UP DATED ON : 13/03/2009 )

UNIT-V
SL.No. 01
OUTAGE NO.
CODE NO.

: V/ 08-09/02
: 0114
1 DATE OF TRIPPING : 28/04/2008
2 TIME OF TRIPPING : 11:07 Hrs

3.Analysis (By site) :


Unit was running at 217
MW with mill B, C, D
and E in service without
oil support. Unit was in
CMC mode. At 11:07:37
Hrs. all of sudden
Elevation B voted No
Flame.
Subsequently
elevation C, D and E
also voted No Flame
and unit tripped on
Flame
Failure
Protection.

On thorough checking no
major deviation observed
in any parameters except
slight
hunting and
rising trend in furnace
pressure. Boiler was
running with high ash
content and low VM
coal. R C feeder sample
analysis was report was
as follows: -------VM 13 % , Ash 49
%

a)

a)

4 RECOMMEND Action taken / Present status


ATIONS (By
To be taken by
site) :
Nil
5 RECOMMEND Action to be
Present status
ATIONS (By
taken by
OS-NR) :
Mill fineness
BMD
Being followed
must be
maintained
within limits as
it exacerbebates
the already poor
flame caused by
low VM

Blending of the
coal must be
resorted to
overcome the
problems created
by low VM coal

b)

Being followed

NTPC Limited
Unchahar, Raebareli

T TRIPPING RECOMMENDATIONS SUMMERY(2007-2008)

( UP DATED ON : 13/03/2009 )

UNIT-V
SL.No. 02
OUTAGE NO.
CODE NO.

: V/ 08-09/ 03
: 0220
1 DATE OF TRIPPING: 03/05/2008
2 TIME OF TRIPPING: 18:20:00 Hrs.

3.
Analysis (By
site): Unit was running
at 218 MW with mill A,
B, C and D in service
and without oil support.
One of the dearator level
transmitter
started
showing erratic value.
During the flushing of
impulse line of this
transmitter by C& I
personnel, all running
BFP tripped on dearator
level
very
low
protection.
Dearator has two
standpipes
for
instrumentation.
Standpipe of left hand
side has two level
switches for dearator
level very low protection
of
BFP
and
one
transmitter for level
indication.
On checking it was
found that water sideisolating valve of the
standpipe was in choked
condition. Because of
non
availability
of
sufficient make up water,
level
in
standpipe
dropped
during
the
flushing of impulse line
and both the level
switches of the standpipe
acted,
resulting
in
tripping
of
running
BFPs.

a)

4 RECOMMEND Action taken /


ATIONS (By
To be taken by
site) :
Nil
5 RECOMMEND Action to be
ATIONS (By
taken by
OS-NR) :

Present status

Present status

a)

b)

with the present


arrangement of
instrumentation,
the checking /
purging
of
transmitter must
be done after
taking sufficient
precaution
to
avoid
unit
tripping.
Unit #5 OH has
not been done
since
commissioning (
short shutdown
was taken in
march 07 for PG
test ). In such
conditions,
opportunity
based purging of
all
water
connected
protection
devices , using
compressed air
should
be
arranged
to
ensure complete
cleanliness
of
pipes.

without oil support . At 15:29:13 Hrs. generator breaker tripped. Turbine control changed from load to speed controller. But turbine tripped
I, ST-I and transmission lines Raebareli-I & III, Fatehpur II) tripped due to operation of LBB Protection.
Raebareli III line (RBL-III), which could not be cleared by RBL-III breaker leading to operation of LBB protection.As per approved setting
n electrical overspeed protection. Due to LBB Protection, generator protection relay of class C (86 T) operated. Boiler tripped on Loss o

e without oil support.BFP A and B were in service and BFP C was in manual mode because its trial after attending mechanical seal leaka

without oil support. At 16:37 Hrs mill A got unloaded due to coal interruption and at 16:50Hrs mill-B also tripped. Immediately oil guns C
218 MW at 17:04Hrs but while load raising , FRS control valve got full open and FRS DP came down to 2.0 KG /Sc.
ed increasing and Turbine tripped on Drum level Very High Protection.
o 218 MW from 150 MW. And for maintaining drum level feed water flow increased to 800 T/hr by full opening of FRS control and raising

e with oil gun AB-3 in service. ID fan B was under PTW for Fan NDE side bearing Temp High problem. At 11:46 Hrs. all of sudden ID f

ervice without oil support. BFP-A and C were in service and BFP-B was in auto standby mode. At 13:14 hrs BFP- C tripped on discharge p
tection was earlier in bypass condition. It was normalized at 13:14 Hrs. As soon as the protection was normalized, BFP-C tripped on this p

il guns in service after synchronization at 15:55 hrs. At 16:35 Hrs Unit Bus A supply was change from reserve source to main source from
is used in logic and interlock. Service Remote status available in DDCMIS is used only in close permissive.So when UAT-B breaker was c

m load to speed controller. But turbine tripped on electrical overspeed protection and boiler tripped on loss of all fuel.

on of LBB protection.As per approved setting of RBL-III line ,overvoltage protection was enabled. As per PSL configuration in numerical r
C (86 T) operated. Boiler tripped on Loss of all Fuel.

its trial after attending mechanical seal leakage was pending. At 13:17 Hrs. BFP -1 A tripped without alarm. Immediately BFP C was star

rs mill-B also tripped. Immediately oil guns CD-1,2 & 4 was taken in service and Mill F was taken in service. In the mean time coal flow
ame down to 2.0 KG /Sc.

hr by full opening of FRS control and raising of BFP SCOOP of both the BFP to 95%. But when drum level started increasing, FRS contro

igh problem. At 11:46 Hrs. all of sudden ID fan A fan NDE bearing temp also increased and fan tripped on bearing temp very high protect

At 13:14 hrs BFP- C tripped on discharge pressure very low protection. Standby BFP B took auto start but tripped on Discharge / Suct
ion was normalized, BFP-C tripped on this protection though its discharge pressure was normal (167.2 Kg/Sc). From the trend it was observ

nge from reserve source to main source from UAT-A.UAT-B breaker was also tried but it did not close .So UAT B breaker was put in tes
se permissive.So when UAT-B breaker was closed in test mode, reserve supply breaker tripped assuming actual closing of UAT-B breaker.

ped on loss of all fuel.

led. As per PSL configuration in numerical relay,overvoltage protection stage-I was not configured to any output ( B.O.). Hence it did not t

without alarm. Immediately BFP C was started but it tripped on discharge pressure Very Low Protection. Mean while Mill B, D and E we

taken in service. In the mean time coal flow from Mill A resumed by hammering of feeder inlet chute and Mill-B was also taken in service

hen drum level started increasing, FRS control valve closing started but drum level could not be controlled due to sluggish operation of FRS

an tripped on bearing temp very high protection leading to tripping of unit on Both ID fans off Protection

ok auto start but tripped on Discharge / Suction temp difference High protection at 13:15:20 hrs. At 13:16 hrs Mill-D was taken out .Oil g
l (167.2 Kg/Sc). From the trend it was observed that unit load was maintained 210 MW during the emergency situation with only one BFP

not close .So UAT B breaker was put in test / switchgear mode and closed from local . As soon as this breaker was closed, reserve supply
d assuming actual closing of UAT-B breaker.

ured to any output ( B.O.). Hence it did not trip RBL III line. This caused initiation of LBB protection.

Protection. Mean while Mill B, D and E were taken out one by one and oil gun AB -1, 2, 3 were taken in service. Drum level started decre

et chute and Mill-B was also taken in service thereafter.

e controlled due to sluggish operation of FRS CV/SCOOP.

hrs. At 13:16 hrs Mill-D was taken out .Oil guns AB-1, 2, 3, 4 were taken in service. Mill C was also taken out at 13:17 hrs . Drum level s
the emergency situation with only one BFP in service. And FRS control valve was reduced with decreasing drum level when running BFP-

on as this breaker was closed, reserve supply breaker tripped and Unit bus B became dead . All the auxiliaries including Mill-B from Uni

ere taken in service. Drum level started decreasing. As boiler protection on drum level very low was not in service, boiler manually tripped

was also taken out at 13:17 hrs . Drum level started decreasing and FRS control valve got full open in auto. Drum level controller taken in m
th decreasing drum level when running BFP-A current was well within the limit( 312 Amp) .

All the auxiliaries including Mill-B from Unit Bus B tripped and unit tripped on Flame Failure Protection.

w was not in service, boiler manually tripped when level went out of hydrastep.

pen in auto. Drum level controller taken in manual mode and FRS control valve was decreased to 59.9 % from 100 % but at 13:18:14 Hrs u

to 59.9 % from 100 % but at 13:18:14 Hrs unit tripped on Drum Level Very Low Protection.

8.0 OIL & APC


Contents:

V2

8.4 MAJOR CONTRIBUTORS FOR AUX. POWER CONSUMPTION:

8.1 SPECIFIC OIL CONSUMPTION-UNIT-WISE-MONT

8.5 STEPS TAKEN FOR ENERGY CONSERVATION:


8.6 STATUS OF ENERGY AUDIT

8.2 MAJOR REASONS FOR OIL CONSUMPTION DUR

DATA

DATA

8.4 MAJOR CONTRIBUTORS FOR AUX. POWER CONSUMPTION:


Note: Details of equipments kept in service more than the envisaged design with reasons thereof to be filled in the folowing table.
Note:Major deviations to be brought out in ORT exception report.
Total Running Hours for the
Actual
month (hrs)
Design for
Running
Stage-I
Stage-II
Stage-III
S.N
Equipment Full Load (No.) (No./Ocassions))
Reason
MD BFP
(For 500 MW
2
2
0
0
0
sets)
1

4&2

5&2

1440

744

744

744

744

744

1488

1488

744

CEP
MILL

Instrument
Air
Compressor
Plant Air
Compressor
:1/2/3/4
Vacuum
Pump

7
Unchahar Specific
HFO
pressurising
Pump
8

Corrective
Action

Responsibility

DM make up pump

1488

1488

8.5 STEPS TAKEN FOR ENERGY CONSERVATION:


S.N

3
4

Activity

Steps Taken

Results

BFP 1C recirculation valve BFP


current
BFP 1C recirculation
passing arrested by replacing with reduced to 284
BFP 3B & 3C recirculation valve Energy
consumption in
BFP 3B & 3C recirculation passing was 23.02 and 14.0 MT /
BFP
will
be
hr respectively.
reduced.
LPH - 1 of Unit # 1 detail study
carried out before OH. Based on TTD improved
LPH - 1
from 3.2 to 8.3
study corrective maintenance
degree C
works carried out during OH.
Unit - 1 & 3 APH seal and air
APH and duct seal leakage ingress
through
duct
were
measured a
Unit # 3 bus 3A and 3B all HT
Unit # 3 HT power
drives
power
measurement
measurement
carried out.

6
7

8.6 STATUS OF ENERGY AUDIT

S.N

Area

A/C System
stage - II

Audit Date

Observation

August'09

All data collected as well as


measured between 10.08.09 to
14.08.09.
Report
preparation
pending with CEETEM.

Corrective
Action

Responsibility

EEMG

Target
Date

September'09

Present status

9.1 COAL RECEIPT / STOCK STATUS:


9.2 TREND OF GCV (KCAL/KG)
9.3 FUEL STOCK DETAILS

DATA AVAILABLE IN ERP - ZOPNORT1 (CHEMISTRY)

9.4 DM WATER CONSUMPTION, PRODUCTION AND STOCK


DM water
(MT)
April
May
June
July
Aug

Cyclic

Opening
Stock

Production

MT

4143
4731
3302
4281
4497

25081
24868
33108
27672
32347

13227
12709
15480
13573.3
19147

0.54
0.52
0.7
0.53
0.78

4497

143076

74136.3

0.61

Consumption
Non-Cyclic
MT

Total
%

MT

26969
13230
16205
13542.7
13233

1.10
0.54
0.73
0.53
0.54

24275
25939
31685
27116
32380

1.641025
1.061317
1.432784
1.058805
1.32

67258.7

0.55

141395

1.163411

Sept
Oct
Nov
Dec
Jan
Feb
March
Cumulative

Closing
Stock

4731
3302
4281
4497
4169
0
0
0
0
0
0
0
4169

-WISE-MONTH WISE (ml/Kwh):

MPTION DURING THE MONTH:

Target
Date

Present status

DATA AVAILABLE IN ERP - ZMM027V2

TRY)

GENERATION DATA :
Aug-09

REPORT UPTO THE MONTH :

Aug-08

Installed Capacity - Generation (MU's)

Month
1
######################
######################
######################
Jul-09
######################
######################
######################
######################
######################
######################
######################
######################
CURRENT MONTH :
CUMM FY
CUMM. LFY
CURRENT MONTHLFY :

Reference Period (Hrs.)

Gross Generation (MU's)

Unit Running Hrs.

Aux. Power Consp. (MU's)

Coal Consp. (MT's)

Oil Consp. (KLtrs.)

DM Make-up (MTs)

No. of Tube Leakage

Planned Outage (Hrs.)

Forced Outage (Hrs.) including Coal & Grid

Forced Outage due to Grid Reserve (Hrs.)

Running Hours since last overhaul (Hrs.)

Running Hours since inception (Hrs.)

Planned Outage (nos.)

Forced Outage (nos.)

Reserve Outage (nos.)

Forced Outage due to Tube Leakage (Hrs.)

Unit-1
2
151.2
156.24
151.2
156.24
156.24

Unit-2
3
151.2
156.24
151.2
156.24
156.24

Unit-3
4
151.2
156.24
151.2
156.24
156.24

Unit-4
5
151.2
156.24
151.2
156.24
156.24

Unit-5
6
151.2
156.24
151.2
156.24
156.24

Station
7
756
781.2
756
781.2
781.2

Unit-1
8
720
744
720
744
744

Unit-2
9
720
744
720
744
744

Unit-3
10
720
744
720
744
744

Unit-4
11
720
744
720
744
744

Unit-5
12
720
744
720
744
744

Station
13
3600
3720
3600
3720
3720

Unit-1
14
157.765
160.424
157.784
162.168
143.555

Unit-2
15
157.977
149.445
157.157
163.561
162.505

Unit-3
16
157.085
160.43
151.59
161.295
162.14

Unit-4
17
142.97
125.693
76.705
161.19
147.72

Unit-5
18
157.816
160.442
155.744
161.956
163.044

Station
19
773.613
756.434
698.98
810.17
778.964

Unit-1
20
720
744
720
744
657.12

Unit-2
21
720
694.35
715.77
744
740.65

Unit-3
22
717.43
744
700.77
744
743.78

Unit-4
23
655.65
576.15
357.86
744
680.77

Unit-5
24
720
744
715.6
744
744

Station
25
3533.08
3502.5
3210
3720
3566.32

Unit-1
26
11.544512
12.811349
12.564346
13.177212
12.039724

Unit-2
27
11.544512
12.148803
12.516206
13.177212
13.348548

Unit-3
28
12.634933
13.156623
12.720383
13.783074
13.55871

Unit-4
29
11.466172
10.328921
6.774445
13.783022
12.681496

Unit-5
30
11.411287
12.150816
12.383916
12.706856
12.843826

Station
31
58.601416
60.596512
56.959296
66.627376
64.472304

Unit-1
32
95958.98
94642.52
96386.78
101180
92107.61

Unit-2
33
95308.9
86929.97
95190.87
101387.3
104065.3

Unit-3
34
95122.68
98904.13
91795.92
102998.4
105490.2

Unit-4
35
85988.32
76891.9
46068.6
102446.8
95671.17

Unit-5
36
93145.28
98900.46
93657.6
102886.5
104559

Station
37
465524.2
456269
423099.8
510899
501893.2

Unit-1
38
2.801
10.283
4.802
20.877
59.514

Unit-2
39
4.634
23.818
12.937
2.134
34.58

Unit-3
40
22.368
0
41.725
2.335
1.868

Unit-4
41
72.419
7.939
176.193
1.868
74.253

Unit-5
42
0
1.86
39.224
0.934
0.467

Station
43
102.222
43.9
274.881
28.148
170.682

Unit-1
44
387
619
2127
1106
1855

Unit-2
45
2566
2880
3332
6711
7677

Unit-3
46
1791.5
1882
3161
1938.3
2604

Unit-4
47
5154
3719
3221
1030
4180

Unit-5
48
3328
3609
3639
2788
2831

Station
49
13226.5
12709
15480
13573.3
19147

Unit-1
50
0
0
0
0
0

Unit-2
51
0
1
0
0
0

Unit-3
52
0
0
0
0
0

Unit-4
53
2
0
0
0
0

Unit-5
54
0
0
0
0
0

Station
55
2
1
0
0
0

Unit-1
56
0
0
0
0
86.88

Unit-2
57
0
0
0
0
0

Unit-3
58
0
0
0
0
0.22

Unit-4
59
0
167.85
358.42
0
0

Unit-5
60
0
0
0
0
0

Station
61
0
167.85
358.42
0
87.1

Unit-1
62
0
0
0
0
0

Unit-2
63
0
49.65
4.23
0
3.35

Unit-3
64
2.57
0
19.23
0
0

Unit-4
65
64.35
0
3.72
0
63.23

Unit-5
66
0
0
4.4
0
0

Station
67
66.92
49.65
31.58
0
66.58

Unit-1
68
0
0
0
0
0

Unit-2
69
0
0
0
0
0

Unit-3
70
0
0
0
0
0

Unit-4
71
0
0
0
0
0

Unit-5
72
0
0
0
0
0

Station
73
0
0
0
0
0

Unit-1
74
5645.96
6389.96
7109.96
7853.96
8511.08

Unit-2
75
15191.01
15885.36
16601.13
17345.13
18085.78

Unit-3
76
8550.07
9294.07
9994.84
10738.84
11482.62

Unit-4
77
16620.11
17196.26
357.86
1101.86
1782.63

Unit-5
78
3633.04
4377.04
5092.64
5836.64
6580.64

Station
79
49640.19
53142.69
39156.43
42876.43
46442.75

Unit-1
80
133794.6
134538.6
135258.6
136002.6
136659.7

Unit-2
81
135117.5
135811.9
136527.6
137271.6
138012.3

Unit-3
82
68932.43
69676.43
70377.2
71121.2
71864.98

Unit-4
83
75778.86
76355.01
76712.87
77456.87
78137.64

Unit-5
84
19733.68
20477.68
21193.28
21937.28
22681.28

Station
85
433357.1
436859.6
440069.6
443789.6
447355.9

Unit-1
86
0
0
0
0
1

Unit-2
87
0
0
0
0
0

Unit-3
88
0
0
0
0
1

Unit-4
89
0
1
0
0
0

Unit-5
90
0
0
0
0
0

Station
91
0
1
0
0
2

Unit-1
92
0
0
0
0
0

Unit-2
93
0
1
1
0
1

Unit-3
94
1
0
1
0
0

Unit-4
95
2
0
2
0
2

Unit-5
96
0
0
1
0
0

Station
97
3
1
5
0
3

Unit-1
98
0
0
0
0
0

Unit-2
99
0
0
0
0
0

Unit-3
100
0
0
0
0
0

Unit-4
101
0
0
0
0
0

Unit-5
102
0
0
0
0
0

Station
103
0
0
0
0
0

Unit-1
104
0
0
0
0
0

Unit-2
105
0
49.65
0
0
0

Unit-3
106
0
0
0
0
0

156.24
771.12
771.12
156.24

156.24
771.12
771.12
156.24

156.24
771.12
771.12
156.24

156.24
771.12
771.12
156.24

156.24
771.12
771.12
156.24

781.2
3855.6
3855.6
781.2

744
3672
3672
744

744
3672
3672
744

744
3672
3672
744

744
3672
3672
744

744
3672
3672
744

3720
18360
18360
3720

143.555
781.696
503.273
0

162.505
790.645
774.916
159.05

162.14
792.54
631.723
157.995

147.72
654.278
785.971
156.74

163.044
799.002
760.692
156.764

778.964
3818.161
3456.575
630.549

657.12
3585.12
2449.2
0

740.65
3614.77
3599.56
742.12

743.78
3649.98
2988.62
744

680.77
3014.43
3663.12
738.97

744
3667.6
3568.84
744

3566.32
17531.9
16269.34
2969.09

12.039724
62.137143
41.463552
0.11661

13.348548
62.735281
62.659352
13.19651

13.55871
65.853723
56.41825
13.961341

12.681496
55.034056
70.160053
13.934271

12.843826
61.496701
61.398289
12.891308

64.472304
307.2569
292.0995
54.10004

92107.61
480275.8
342263
0

104065.3
482882.4
515965
105991

105490.2
494311.3
413027
103151

95671.17
407066.8
519402
103687

104559
493148.8
495657
102505

501893.2
2357685
2286314
415334

59.514
98.277
233.902
44.331

34.58
78.103
231.599
101.354

1.868
68.296
260.85
10.872

74.253
332.672
124.488
51.543

0.467
42.485
142.723
30.748

170.682
619.833
993.562
238.848

1855
6094
29801
0

7677
23166
19951
3251

2604
11376.8
17005
3301

4180
17304
15778.83
2919

2831
16195
14861
2757

19147
74135.8
97396.83
12228

0
0
1
0

0
1
0
0

0
0
2
0

0
2
0
0

0
0
2
0

0
3
5
0

86.88
86.88
1134.9
744

0
0
59.66
0

0.22
0.22
608.84
0

0
526.27
0
0

0
0
0
0

87.1
613.37
1803.4
744

0
0
87.9
0

3.35
57.23
12.78
1.88

0
21.8
74.54
0

63.23
131.3
8.88
5.03

0
4.4
103.16
0

66.58
214.73
287.26
6.91

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

8511.08
35510.92
59284.68
12526.68

18085.78
83108.41
42130.79
9862.28

11482.62
50060.44
19513.63
2843.74

1782.63
37058.72
47499.57
10972.54

6580.64
25520
66357.17
14739.66

46442.75
231258.5
234785.8
50944.9

136659.7
676254.2
637394.5
128148.7

138012.3
682740.9
641763.2
129788.8

71864.98
351972.2
308876.4
63226.1

78137.64
384441.3
343293.3
70131.29

22681.28
106023.2
66357.17
14739.66

447355.9
2201432
1997685
406034.5

1
1
2
0

0
0
1
0

1
1
1
0

0
1
0
0

0
0
0
0

2
3
4
0

0
0
3
0

1
3
6
1

0
2
2
0

2
6
4
2

0
1
4
0

3
12
19
3

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
31.25
0

0
49.65
0
0

0
0
74.54
0

Unit-5
108
0
0
0
0
0

Station
109
64.35
49.65
0
0
0

0
64.35
0
0

0
0
99.16
0

Tube Lekage (No.)


Tube Lekage (% )

PARTIAL LOADING (STATION) MU:


Total Partial Loading (MU's)

Month
1
######################
######################
######################
Jul-09
######################
######################
######################
######################
######################
######################
######################
######################
CURRENT MONTH :
CUMM FY
CUMM. LFY
CURRENT MONTHLFY :

Unit-1
2
0.088
1.156
0.019
0.1568
0.5624

0.5624
1.9822
14.222
0

Unit-2
3
0.118
1.3743
0.0717
0.0869
0.1687

Unit-3
4
0.32
1.315
0.6817
0.0403
0.1186

Unit-4
5
0.411
0.1885
0.5556
0.1306
0.228

0.228
1.5137
6.3532
2.0137

Equipment Partial Loading (MU's)


Unit-5
6
0.092
1.244
0.324
0.0508
0

0
1.7108
6.4713
1.55

Grid (MUs)

Boiler & Aux. (MUs)

Turbine & Aux. (MUs)

Unit-3
22
0
0
0
0
0

Unit-4
23
0
0
0
0.1064
0.0606

Unit-5
24
0
0
0
0
0

Station
25
0
0
0
0.1216
0.0622

Unit-1
26
0
0
0
0
0

Unit-2
27
0
0
0
0
0

Unit-3
28
0
0
0
0
0

Unit-4
29
0
0
0
0
0

Unit-5
30
0
0
0
0
0

Station
31
0
0
0
0
0

Unit-1
32
0
0
0
0
0

Unit-2
33
0
0
0
0
0

Unit-3
34
0
0
0
0
0

Unit-4
35
0
0
0
0
0

Unit-5
36
0
0
0
0
0

Station
37
0
0
0
0
0

Unit-1
38
0
0
0

Unit-2
39
0
0
0

Unit-3
40
0
0
0

Unit-4
41
0
0
0

Unit-5
42
0
0
0

Station
43
0
0
0

Unit-1
44
0
0
0
0
0

Unit-2
45
0
0
0
0
0

Unit-3
46
0
0
0
0
0

Unit-4
47
0
0
0
0
0

Unit-5
48
0
0
0
0
0

Station
49
0
0
0
0
0

Unit-1
50
0
0
0
0
0.1949

Unit-2
51
0
0
0
0
0

Unit-3
52
0
0
0
0.0011
0.0382

Unit-4
53
0
0
0
0
0

Unit-5
54
0
0
0
0
0

Station
55
0
0
0
0.0011
0.2331

Unit-1
56
0
0
0
0
0

Unit-2
57
0
0
0
0
0

Unit-3
58
0
0
0
0
0

Unit-4
59
0
0
0
0
0

Unit-5
60
0
0
0
0
0

Station
61
0
0
0
0
0

Unit-1
62
0
0
0
0.1416
0.04

Unit-2
63
0
0
0.017
0.0869
0.0265

Unit-3
64
0
0
0
0.0092
0

Unit-4
65
0
0
0
0.0092
0

Unit-5
66
0
0
0
0.0328
0

Station
67
0
0
0.017
0.2797
0.0665

Unit-1
68
0
0
0
0
0

Unit-2
69
0
0
0
0
0

Unit-3
70
0
0
0
0
0

Unit-4
71
0
0
0
0
0

Unit-5
72
0
0
0
0
0

Station
73
0
0
0
0
0

Unit-1
74
0
0
0
0
0

Unit-2
75
0
0
0
0
0

Unit-3
76
0
0
0
0
0

Unit-4
77
0
0
0
0
0

Unit-5
78
0
0
0
0
0

Station
79
0
0
0
0
0

Unit-1
80
0
0
0
0
0.2965

Unit-2
81
0
0.4203
0.0717
0
0.1406

Unit-3
82
0.15
0
0.5017
0
0.0804

Unit-4
83
0.246
0.1035
0.5556
0
0.1674

Unit-5
84
0
0
0.13
0
0

Station
85
0.396
0.5238
1.259
0
0.6849

Unit-1
86
6.653
5.34
6.603
6.035
5.995

Unit-2
87
6.895
5.0058
6.917
7.321
6.9685

Unit-3
88
6.5947
5.505
5.11
5.085
5.9462

Unit-4
89
5.6945
4.89
1.7912
4.965
4.8821

Unit-5
90
6.708
5.446
5.792
5.734
6.804

Station
91
32.5452
26.1868
26.2132
29.14
30.5958

Unit-1
92
3945
4073
3937
3853
3735

Unit-2
93
3947
4100
3941
3853
3723

Unit-3
94
3947
3891
3961
3753
3675

Unit-4
95
3956
3903
3983
3754
3675

Unit-5
96
4028
3857
3951
3753
3702

Station
97
3964
3963
3951
3793
3702

Unit-1
98
9990
9990
9990
9990
9990

Unit-2
99
9990
9990
9990
9990
9990

Unit-3
100
9990
9990
9990
9990
9990

Unit-4
101
9990
9990
9990
9990
9990

Unit-5
102
9990
9990
9990
9990
9990

Station
103
9990
9990
9990
9990
9990

Unit-1
104
2400
2404
2405
2405
2401

Unit-2
105
2382
2387
2388
2389
2386

Unit-3
106
2392
2399
2401
2397
2391

Unit-4
107
2384
2388
2415
2386
2385

Unit-5
108
2377
2378
2378
2384
2374

Station
109
2387
2391
2396
2392
2387

Unit-1
110
2400
2402
2402
2404
2403

Unit-2
111
2382
2384
2385
2386
2386

Unit-3
112
2392
2395
2397
2397
2396

Unit-4
113
2384
2386
2393
2390
2389

Unit-5
114
2377
2378
2377
2379
2379

Station
115
2387
2389
2391
2391
2391

1.0777
9.5019
42.3941
6.5039

0.2259
0.2411
8.2697
0

0.0016
0.0016
0.6352
0.322

0.0382
0.0393
2.8498
0.525

0.0606
0.167
1.355
0.49

0
0
1.8805
0.592

0.3263
0.449
14.9902
1.929

0
1.263
4.518
0
0.1677569

0
1.072
4.7592
0.944
0.14

0
1.695
4.9413
1.11
0.22

0
0.265
4.564
1.31
0.04

0
1.548
4.055
0.958
0.20

0
5.843
22.8375
4.322
0.16

0
0.0152
0.1
0

0.0016
0.0016
0
0

0
0
0.886
0.06

0.0606
0.167
0.015
0.015

0
0
0.096
0.096

0.0622
0.1838
1.097
0.171

0
0
0.773
0

0
0
0.143
0

0
0
0
0

0
0
0
0

0
0
0.081
0

0
0
0.997
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0.052
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0.052
0

0
0
0
0

0
0
0.322
0.322

0
0
1.625
0.465

0
0
0
0

0
0
0
0

0
0
1.947
0.787

0.1949
0.1949
6.3505
0

0
0
0
0

0.0382
0.0393
0
0

0
0
0
0

0
0
0.1395
0

0.2331
0.2342
6.49
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0.04
0.1816
0.113
0

0.0265
0.1304
0
0

0
0.0092
0.05
0

0
0.0092
0.035
0

0
0.0328
0
0

0.0665
0.3632
0.198
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0.2965
0.2965
1.3213
0

0.1406
0.6326
0.931
0.0392

0.0804
0.7321
1.1811
0

0.1674
1.0725
0.3992
0.2137

0
0.13
0.5358
0

0.6849
2.8637
4.3684
0.2529

5.995
30.626
3.1864
0

6.9685
33.1073
25.3338
4.51

5.9462
28.2409
13.1054
3.39

4.8821
22.2228
23.169
3.57

6.804
30.484
17.8069
2.074

30.5958
144.681
82.6015
13.544

3735
19543
14308
0

3723
19564
17915
3600

3675
19227
18076
3628

3675
19271
18124
3628

3702
19291
18214
3643

3702
19373
18058
3625

9990
49950
49950
9990

9990
49950
49950
9990

9990
49950
49950
9990

9990
49950
49950
9990

9990
49950
49950
9990

9990
49950
49950
9990

2400.588
12014.84
9748
0

2386.268
11931.78
11944
2405

2391.113
11979.82
11855
2369

2385.143
11958.17
11984
2403

2374.095
11891.34
11877
2384

2387.42
2387.42
11959
2392

2402.955
12010.87
12176
2438

2385.945
11922.81
11902
2389

2395.889
11977.15
11874
2371

2389.204
11942.45
11970
2397

2378.626
11890.03
11861
2376

2390.512
11948.87
2391
2391

GENERAT
ION

PLANNED
OUTAGE

FORCED
OUTAGE

PLANNED
OUTAGE

HEAT
RATE

SP. OIL

AUX.
POWER
CONS.

INVENTO
RY

KCAL /
KWH

ML/KWH

(Rs. Cr)

PRORATA TARGET

0.50
0.50
0.50
0.52
0.54
0.40
0.52
0.50
0.50
0.50
0.50
0.50

2388
2395
2396
2409
2406
2400
2402
2394
2383
2379
2379
2380

0.17
0.17
0.44
0.22
0.41
0.24
0.43
0.44
0.16
0.12
0.12
0.12

8.30
8.32
8.37
8.48
8.48
8.48
8.41
8.30
8.26
8.24
8.24
8.26

5.37

1.50

0.51

2392

0.25

8.34

(MU)

10
732.1104
1453.3445
2119.7837
2875.9853
3586.6706
4172.7218
4801.8298
5462.6242
6219.1382
6975.1836
7658.0633
8414.1086

70.00

8414

PRORATA TARGET (Revision-1)

PARTIAL
LOADING

HEAT
RATE

SP. OIL

AUX.
POWER
CONS.

INVENTO
RY

GENERA
TION

KCAL /
KWH

ML/KWH

(Rs. Cr)

(MU)

11

12

13

15

16

14

17

0.00
2.30
4.40
3.28
3.79
6.45
7.85
8.03
7.13
6.41
5.87
5.37

1.52
1.52
1.53
1.53
1.53
1.48
1.49
1.49
1.49
1.50
1.50
1.50

0.50
0.50
0.50
0.51
0.51
0.49
0.50
0.50
0.50
0.50
0.50
0.50

2388
2391
2393
2397
2399
2399
2399
2399
2397
2395
2393
2392

0.17
0.17
0.25
0.24
0.28
0.27
0.29
0.31
0.29
0.27
0.26
0.25

8.30
8.31
8.33
8.37
8.39
8.40
8.40
8.39
8.38
8.36
8.35
8.34

75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00

5.37

1.50

0.50

2392

0.25

8.34

75.00

18

FORCED
OUTAGE

PARTIAL
LOADIN
G

HEAT
RATE

SP. OIL

AUX.
POWER
CONS.

INVENT
ORY

KCAL /
KWH

ML/KWH

(Rs. Cr)

19

20

21

22

23

24

25

Current Fin. Year :

UNIT

Generation loss due to fuel (partial +


Generation loss due to grid (partial
Generation loss due to water (partial
No. of Outages
No. of Tube Lkg
DC
SG
AG

Kcal/Kwh
MU
MU

MOU

PRO-RATA

8366
90.95
91.45
7.40
1.00
-0.50
0.27
--8.35
2392

1513.066
98.43
99.00
0.00
1.00
-0.50
0.16
--8.32
2391
---------

No.
No.
%
%
%

FOR THE MONTH


CURREN
T YEAR
756.434
96.83
94.15
0.00
1.86
0.14
0.00
0.13
0.602
0.54
7.58
2387
0.00
0.63
0
3
2
103.8
103.09
100.02

PREV.
YEAR
621.133
82.16
79.71
18.84
1.45
0.14
0.00
0.18
0.663
0.68
8.31
2390
0.00
0.63
0
4
1
82.52
82.02
100.21

CUMULATIVE
CURREN
T
773.613
102.33
98.14
0.00
1.86
0.14
0.00
0.13
0.602
0.54
7.58
2387
0.00
0.63
0
3
2
103.8
103.09
100.02

PREV.
YEAR
621.133
82.16
79.71
18.84
1.45
0.14
0.00
0.18
0.663
0.68
8.31
2390
0.00
0.63
0
4
1
82.52
82.02
100.21

Business Plan Target Fin. Year : 2009-10


MONTHLY TARGET
MONTH

PRORATA TARGET

GENERA
TION

PLANNED
OUTAGE

FORCED
OUTAGE

PARTIAL
LOADING

HEAT
RATE

SP. OIL

AUX.
POWER
CONS.

INVENTO
RY

(MU)

KCAL /
KWH

ML/KWH

(Rs. Cr)

######################
######################
######################
Jul-09
######################
######################
######################
######################
######################
######################
######################
######################

744.1308
768.9352
744.1308
666.0259
635.0828
594.8208
639.5760
672.2100
768.9352
768.9352
694.5221
668.1352

CUMM FY
8365

Heat Rate - Fin. Year (Kcal/Kwh)

Unit-2
21
0
0
0
0
0.0016

1.52
1.52
1.54
1.54
1.54
1.20
1.54
1.52
1.52
1.52
1.52
1.52

MU
%
%
%
%
%
%
ml/kwh
kg/Kwh
% of MCR
%

Heat Rate - Monthly (Kcal/Kwh)

Unit-1
20
0
0
0
0.0152
0

PARTIAL
LOADING

Gross Gen.
Plant Load Factor
Availability Factor on bar
Planned Outage
Forced Outage
Total Partial Loading
Equipment
Sp. Oil Cons.
Sp. Coal cons.
DM Make up Cons.
APC
Station Heat Rate

0
0
0.00
0

Station
19
0.633
4.754
0.393
0.063
0

PARAMETER

0
0
0
0

Unit-5
18
0.092
1.244
0.194
0.018
0

18
13

GCV of Oil (Kcal/Ltr) Monthly

0
0
0
0

Unit-4
17
0.165
0.085
0
0.015
0

FORCED
OUTAGE

30
25

GCV of Coal (Kcal/kg) (Monthly)

0
0
0
0

Unit-3
16
0.17
1.315
0.18
0.03
0

0.00
4.52
8.67
0.00
5.81
20.00
16.13
9.33
0.00
0.00
0.00
0.00

01/Aug/2008
01/Apr/2008

Excess Generation (MUs)

0
0
0
0

5
1.12

Unit-2
15
0.118
0.954
0
0
0

01/Aug/2009
01/Apr/2009

Start up/ Stab./S/D (MUs)

0
0
0
0

3
0.62

Unit-1
14
0.088
1.156
0.019
0
0

Month of Report :
First Date of Fin Year :

Grid Disturbence (MUs)

0
114
204.95
0

Station
13
0
0
0
0.1227
0.3263

PLANNED
OUTAGE

Month of Report :
First Date of Fin Year :

Water Shortage (MUs)

Station
115
0
0
0
0
0

Unit-5
12
0
0
0
0
0

(MU)

CUMM FY
8414

Coal Quality (MUs)

Unit-5
114
0
0
0
0
0

Unit-4
11
0
0
0
0.1064
0.0606

GENERA
TION

Coal Shortage (MUs)

Unit-4
113
0
0
0
0
0

Unit-3
10
0
0
0
0.0011
0.0382

0.1186
2.4756
9.0222
1.635

732.1104
721.2341
666.4392
756.2016
710.6854
586.0512
629.1079
660.7944
756.5141
756.0454
682.8797
756.0454

Others (MUs)

Unit-3
112
0
0
0
0
0

Unit-2
9
0
0
0
0
0.0016

0.1687
1.8196
6.3254
1.3052

BOP (MUs)

Unit-2
111
0
0
0
0
0

Unit-1
8
0
0
0
0.0152
0.2259

MONTHLY TARGET
MONTH

C&I (MUs)

No. of Outages

Unit-1
110
0
0
0
0
0

Station
7
1.029
5.2778
1.652
0.4654
1.0777

MOU TARGETS :

######################
######################
######################
Jul-09
######################
######################
######################
######################
######################
######################
######################
######################

Electrical (MUs)

Forced Outage due to Coal (Hrs.)

Unit-4
107
64.35
0
0
0
0

0.00
0.00
0.00
12.90
16.77
20.00
16.13
9.33
0.00
0.00
0.00
12.90

1.00
1.00
1.00
1.04
1.06
0.80
1.10
1.00
1.00
1.00
1.00
1.00

0.50
0.50
0.50
0.52
0.52
0.40
0.56
0.50
0.50
0.50
0.50
0.50

2388
2393
2394
2408
2405
2401
2400
2395
2386
2383
2381
2377

0.15
0.17
0.17
0.45
0.46
0.21
0.43
0.41
0.15
0.15
0.15
0.42

8.32
8.32
8.36
8.46
8.48
8.48
8.40
8.32
8.28
8.26
8.26
8.30

7.40

1.00

0.50

2392

0.27

8.35

PLANNED
OUTAGE

FORCED
OUTAGE

PARTIAL
LOADING

HEAT
RATE

SP. OIL

AUX.
POWER
CONS.

INVENTO
RY

GENERA
TION

PLANNED
OUTAGE

FORCED
OUTAGE

PARTIAL
LOADIN
G

HEAT
RATE

SP. OIL

AUX.
POWER
CONS.

INVENT
ORY

(MU)

KCAL /
KWH

ML/KWH

(Rs. Cr)

(MU)

KCAL /
KWH

ML/KWH

(Rs. Cr)

11

12

13

15

16

19

20

21

10
744.1308
1513.0660
2257.1968
2923.2227
3558.3055
4153.1263
4792.7023
5464.9123
6233.8475
7002.7826
7697.3047
8365.4399

70.00

PRORATA TARGET (Revision-1)

GENERAT
ION

8365

14

0.00
0.00
0.00
3.28
6.01
8.31
9.44
9.43
8.36
7.52
6.89
7.40

1.00
1.00
1.00
1.01
1.02
0.98
1.00
1.00
1.00
1.00
1.00
1.00

0.50
0.50
0.50
0.51
0.51
0.49
0.50
0.50
0.50
0.50
0.50
0.50

2388
2391
2392
2396
2397
2398
2398
2398
2396
2395
2394
2392

0.15
0.16
0.17
0.23
0.27
0.26
0.29
0.30
0.28
0.27
0.26
0.27

8.32
8.32
8.33
8.36
8.38
8.40
8.40
8.39
8.37
8.36
8.35
8.35

7.40

1.00

0.50

2392

0.27

8.35

17

70.00

18

22

23

24

25

Unit-1
116

No. of Trips

Grid Regulation Outage (nos.)

0
0
0
0
1

Unit-2
117
0
1
0
0
0

Unit-3
118
0
0
1
0
1

Unit-4
119
2
1
0
0
1

Unit-5
120
0
0
0
0
0

Station
121
2
2
1
0
3

Unit-1
122
0
0
0
0
0

Unit-2
123
0
0
1
0
1

Unit-3
124
1
0
0
0
0

Unit-4
125
0
0
2
0
1

Unit-5
126
0
0
1
0
0

Station
127
1
0
4
0
2

Unit-1
128
0
0
0
0
0

Unit-2
129
0
0
0
0
0

Unit-3
130
0
0
0
0
0

Unit-4
131
0
0
0
0
0

Unit-5
132
0
0
0
0
0

1
1
4
0

0
1
1
0

1
2
3
0

1
4
0
0

0
0
2
0

3
8
10
0

0
0
1
0

1
2
6
1

0
1
0
0

1
3
4
2

0
1
2
0

2
7
13
3

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

Inventory (Rs. Crs.)


Station
116
70
70
74.28
75.23
75.24

75.24
75.24
290.21
69.1

Grid Regulation Outage (nos.)

Grid Regulation Outage (Hrs,)

Forced Outage Boiler & Aux. (nos.)

Forced Outage Boiler & Aux. (Hrs.)

Forced Outage Turbine & Aux. (nos.)

Forced Outage Turbine & Aux. (Hrs.)

Forced Outage Elect. (nos.)

Forced Outage Elect. (Hrs.)

Station
133
0
0
0
0
0

Unit-1
134
0
0
0
0
0

Unit-2
135
0
0
0
0
0

Unit-3
136
0
0
0
0
0

Unit-4
137
0
0
0
0
0

Unit-5
138
0
0
0
0
0

Station
139
0
0
0
0
0

Unit-1
140
0
0
0
0
0

Unit-2
141
0
0
0
0
0

Unit-3
142
0
0
0
0
0

Unit-4
143
0
0
0
0
1

Unit-5
144
0
0
0
0
0

Station
145
0
0
0
0
1

Unit-1
146
0
0
0
0
0

Unit-2
147
0
0
0
0
0

Unit-3
148
0
0
0
0
0

Unit-4
149
0
0
0
0
12.3

Unit-5
150
0
0
0
0
0

Station
151
0
0
0
0
12.3

Unit-1
152
0
0
0
0
0

Unit-2
153
0
0
0
0
0

Unit-3
154
0
0
1
0
0

Unit-4
155
0
0
0
0
1

Unit-5
156
0
0
0
0
0

Station
157
0
0
1
0
1

Unit-1
158
0
0
0
0
0

Unit-2
159
0
0
0
0
0

Unit-3
160
0
0
19.23
0
0

Unit-4
161
0
0
0
0
50.93

Unit-5
162
0
0
0
0
0

Station
163
0
0
19.23
0
50.93

Unit-1
164
0
0
0
0
0

Unit-2
165
0
0
0
0
0

Unit-3
166
0
0
0
0
0

Unit-4
167
0
0
0
0
0

Unit-5
168
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
3
1

0
0
0
0

1
1
1
0

0
0
1
0

1
1
5
1

0
0
0
0

0
0
5.85
1.88

0
0
0
0

12.3
12.3
1.4
0

0
0
1.97
0

12.3
12.3
9.22
1.88

0
0
1
0

0
0
1
0

0
1
0
0

1
1
0
0

0
0
1
0

1
2
3
0

0
0
53.33
0

0
0
2.68
0

0
19.23
0
0

50.93
50.93
0
0

0
0
2.03
0

50.93
70.16
58.04
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
1
1

0
0
0
0

Station
169
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
1

Forced Outage C&I (nos.)

Unit-1
170
0
0
0
0
0

Unit-2
171
0
0
0
0
0

Unit-3
172
0
0
0
0
0

Unit-4
173
0
0
0
0
0

Unit-5
174
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
1.9
1.9

0
0
0
0

Station
175
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.9
1.9

Forced Outage C&I (Hrs.)

Unit-1
176
0
0
0
0
0

Unit-2
177
0
0
0
0
0

Unit-3
178
0
0
0
0
0

Unit-4
179
0
0
1
0
0

Unit-5
180
0
0
1
0
0

0
0
0
0

0
0
2
0

0
0
0
0

0
1
1
1

0
1
0
0

Station
181
0
0
2
0
0
0
0
0
0
0
0
0
0
2
3
1

Forced Outage Human Error (Operation) (nos.)

Unit-1
182
0
0
0
0
0

Unit-2
183
0
0
0
0
0

Unit-3
184
0
0
0
0
0

Unit-4
185
0
0
1.57
0
0

Unit-5
186
0
0
4.4
0
0

0
0
0
0

0
0
4.25
0

0
0
0
0

0
1.57
3.13
3.13

0
4.4
0
0

Station
187
0
0
5.97
0
0
0
0
0
0
0
0
0
0
5.97
7.38
3.13

Unit-1
188
0
0
0
0
0

Unit-2
189
0
0
1
0
0

Unit-3
190
1
0
0
0
0

Unit-4
191
0
0
1
0
0

Unit-5
192
0
0
0
0
0

0
0
0
0

0
1
0
0

0
1
0
0

0
1
0
0

0
0
0
0

Forced Outage Human Error (Operation) (Hrs.)


Station
193
1
0
2
0
0
0
0
0
0
0
0
0
0
3
0
0

Unit-1
194
0
0
0
0
0

Unit-2
195
0
0
4.23
0
0

Unit-3
196
2.57
0
0
0
0

Unit-4
197
0
0
2.15
0
0

Unit-5
198
0
0
0
0
0

0
0
0
0

0
4.23
0
0

0
2.57
0
0

0
2.15
0
0

0
0
0
0

Forced Outage Grid Disturbance (nos.)


Station
199
2.57
0
6.38
0
0
0
0
0
0
0
0
0
0
8.95
0
0

Forced Outage Grid Disturbance (Hrs.)

Unit-1
200
0
0
0
0
0

Unit-2
201
0
0
0
0
1

Unit-3
202
0
0
0
0
0

Unit-4
203
0
0
0
0
0

Unit-5
204
0
0
0
0
0

0
0
1
0

1
1
0
0

0
0
0
0

0
0
0
0

0
0
0
0

Station
205
0
0
0
0
1
0
0
0
0
0
0
0
1
1
1
0

Forced Outage Balance Of Plant (nos.)

Unit-1
206
0
0
0
0
0

Unit-2
207
0
0
0
0
3.35

Unit-3
208
0
0
0
0
0

Unit-4
209
0
0
0
0
0

Unit-5
210
0
0
0
0
0

0
0
3.32
0

3.35
3.35
0
0

0
0
0
0

0
0
0
0

0
0
0
0

Station
211
0
0
0
0
3.35
0
0
0
0
0
0
0
3.35
3.35
3.32
0

Forced Outage Balance Of Plant (Hrs.)

Unit-1
212
0
0
0
0
0

Unit-2
213
0
0
0
0
0

Unit-3
214
0
0
0
0
0

Unit-4
215
0
0
0
0
0

Unit-5
216
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

Station
217
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Forced Outage Coal (nos.)

Unit-1
218
0
0
0
0
0

Unit-2
219
0
0
0
0
0

Unit-3
220
0
0
0
0
0

Unit-4
221
0
0
0
0
0

Unit-5
222
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

Station
223
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Forced Outage Coal (Hrs.)

Unit-1
224
0
0
0
0
0

Unit-2
225
0
0
0
0
0

Unit-3
226
0
0
0
0
0

Unit-4
227
0
0
0
0
0

Unit-5
228
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

Station
229
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Forced Outage Others (nos.)

Unit-1
230
0
0
0
0
0

Unit-2
231
0
0
0
0
0

Unit-3
232
0
0
0
0
0

Unit-4
233
0
0
0
0
0

Unit-5
234
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

Station
235
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Forced Outage Others (Hrs.)

Unit-1
236
0
0
0
0
0

Unit-2
237
0
0
0
0
0

Unit-3
238
0
0
0
0
0

Unit-4
239
0
0
0
0
0

Unit-5
240
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
1
0

0
0
0
0

Station
241
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0

Forced Outage Water (Hrs.)

Unit-1
242
0
0
0
0
0

Unit-2
243
0
0
0
0
0

Unit-3
244
0
0
0
0
0

Unit-4
245
0
0
0
0
0

Unit-5
246
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
2.45
0

0
0
0
0

Station
247
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.45
0

Unit-1
248
0
0
0
0
0

Unit-2
249
0
0
0
0
0

Unit-3
250
0
0
0
0
0

Unit-4
251
0
0
0
0
0

Unit-5
252
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

Station
253
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Das könnte Ihnen auch gefallen