Minutes of the meeting of the Board of Directors
March 25, 2009, at 7:30pm, Unit #311
Presents:
Alessandro Alasia - President
Mike Shaikin - Secretary
Henri Proulx - Director at Large
James McHugh - Axia Management Ltd.
Regrets:
Jack Cadieux - Director at Large
Maria Lo - Treasurer
Call to order. The meeting was called to order at 7:30 p.m. by the Board President Alessandro
Alasia. A quorum was noted. The meeting is recorded.
It is noted that Jack Cadieux missed six Board meetings in a row for travel and health reasons. It
was suggested asking him if he prefered to indicate a possible substitute, who would be then
nominated by the Board.
Status Certificate. Directors and Management confirmed that they were not aware of any
circumstances that could affect the Condominium legally or may require a special assessment.
Manager confirms that the current condition of the Corporation is good and the wording would be
modified in the next Status Certificate to reflect this.
Signing authority document requested by TD are filled with complete name and address of all
Directors.
The cheque number 0419-005531 made to Environtower Inc. is put on hold because the
company it did oes not provide the information requested by Board for invoices. The cheque
refers to a work completed in July (hence approved by the previous Board) and the invoice does
not provide enough information on the type of work/service.
Review of the Reserve Fund account and transfer of funds to the RF: the Manager report that,
over the next month, there should be a transfer approximately $60,000 to the reserve fund.
New policy for invoices: It is proposed that a new procedure be followed for new invoices
received for payment. All invoices and cheques are to be presented to the Board at the Board
meeting for signature, with the exception of utility bills which have a due date before the monthly
Board meeting. All in favour. Approved.
1
No major maintenance or repair work is reported since the last Board meeting. An invoice of
$1,200 is presented for a work done recently but refers to a damage caused by a flood that
happened two years ago. The work was approved by previous Board. Cheque signed.
No more invoices for repairs that occurred in the past are expected.
Snow removal from balconies: The Board discussed, voted on expense and outlined of a policy
on this. It was proposed a split 50/50 of the snow removal expenses (total about $500). Property
Manager will draft an explanation letter to owners. The Board will outline a policy to owners to
ensure transparency and equal access to services in the future.
Manager indicated that there were no updates on (1) testing of pipe, engineer need to come to
the building to verify the pipe; (2) the Board is still waiting for the invoice for emergency repair
(pipe replacement) conducted in February by Total Fire Protection. Update postponed to next
meeting in April.
Seasonal work. The Board discuss about plants and flowers in front of the building. One quote
was provided by Tivoli ($400). The Florist indicated that no planting should be done before the
end of May/first week of June. More detail in May.
An inventory of bike racks to be conducted in April. The Manager is asked to complete this
inventory.
Inventory of assets and materials of the corporation, the manager is asked to finalize document,
which can then be made available to owners.
It is proposed to purchase foldable chairs for meetings with owners (AGM, Special meeting) to
save on recurring chairs rental and delivery costs. The expected expenditure is about $400, for
40 chairs (foldable IKEA chairs). The expenditure is approved.
Major projects
Update on hallway renovation: most of the large samples of carpet that were requested are now
available, but some of the large samples are still expected. The Board will set tentative date for
the last meeting of the House Committee to review the proposal and the large samples of carpet
and wallcovering. The Board discussed an indicative date for meeting with owners (the meeting
could take place the beginning of May).
Discussion on planning window repairs for summer: Windows options are discussed. The
Directors ask for quotes from three companies and want to verify whether or where the defrosting
option is feasible. Henri will inquire on this option.
Furniture replacement in the lobby. Mike Shaikin will identify possible options for furniture for the
lobbies (couch/armchairs and possibly a table). Possible minor improvements in the lobby are
discussed such as frame the mail boxes, a new bulletin board, mirrors, carpet and
painting/pictures/posters. Lobby renovation will be a second phase of the renovation project.
2
The Board request to the Manager the documents concerning the current contracts of the
Corporation (copy of the documents provided in the following weeks).
Reserve Fund Study: The Board received three quotes form three engineering companies. These
will be reviewed and discussed in details at the next meetings.
Respectfully Submitted,
Mike Shaikin, Secretary
Alessandro Alasia, President