Prepared by L.

D'Alessandro ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Task Name Isolate Francis Unit #4 NTPC to mechanically block & isolate Unit and dewater Warranty Item - Replace Lower DT Cone Match mark and dis-assemble the old Lower DT Cone Assy Modify qty 4 DT Platform access covers Install winch and move old Lower DT Cone into the MIV gallery Raise old Lower DT Cone Assy to El. 183 Clean-up bottom flange of Upper DT Cone Clean-up top flange of DT Elbow Measure overall height Grind top flange of DT Elbow Descend new Lower DT Cone Install winch and move new Lower DT Cone into final position Raise Lower DT Cone, install 8 mm O-ring and lower back into position Install qty 60 M20 bolts with Molykote and torque tighten Bore Upper DT Cone lower flange 22 mm dia holes to 24 mm dia Descend the moveable disk to the MIV gallery Move the disk into position and lift using 3 chain blocks Install scissor lift tables and place disk in position with 8 mm O-ring Slide the moveable disk between the Upper and Lower DT Cones Install qty 60 M20 studs with anti-seize and torque tighten If required, pencil grinder 24 mm dia holes to ensure stud can be hand tighten Fit the 8 mm O-ring on the upper flange of the Lower DT Cone Install qty 120 clamps, bolts, lock plates and nuts with anti-seize and finger tighten Torque tighten the qty 120 M24 fasteners Do not bend over corners on locking plates - to be carried out at later date Install DT pressure gauge piping Install qty 4 access platform covers Remove qty 8 temporary brace Hand unit back to NTPC NTPC to unblock and water the unit NTPC to start-up and run for 5 minutes at full speed no load Duration 1.54 days 2 hrs 1.46 days 3 hrs 4 hrs 0.5 hrs 0.5 hrs 0.5 hrs 0.5 hrs 0.5 hrs 8 hrs 1 hr 0.5 hrs 1.5 hrs 2 hrs 6 hrs 1 hr 1 hr 1 hr 2 hrs 2 hrs 2 hrs 1 hr 1 hr 2 hrs 0 hrs 1 hr 1 hr 1 hr 0 days 2 hrs 0.1 hrs Start Jul 27 9:55 PM Jul 27 9:55 PM Jul 27 11:55 PM Jul 27 11:55 PM Jul 28 2:55 AM Jul 28 2:55 AM Jul 28 3:25 AM Jul 28 3:25 AM Jul 28 3:55 AM Jul 28 4:25 AM Jul 28 4:55 AM Jul 28 3:55 AM Jul 28 12:55 PM Jul 28 1:25 PM Jul 28 2:55 PM Jul 28 4:55 PM Jul 28 4:55 AM Jul 28 10:55 PM Jul 28 11:55 PM Jul 29 12:55 AM Jul 29 2:55 AM Jul 29 4:55 AM Jul 29 6:55 AM Jul 29 7:55 AM Jul 29 8:55 AM Jul 29 10:55 AM Jul 29 8:55 AM Jul 28 1:25 PM Jul 29 8:55 AM Jul 29 10:55 AM Jul 29 10:55 AM Jul 29 12:55 PM

Exchange of Lower DT Cone Assy Finish Predecessors Sat Jul 27 12 AM

NT2 Hydroelectric Project

1 AM

2 AM

3 AM

4 AM

5 AM

6 AM

7 AM

8 AM

9 AM

10 AM

11 AM

12 P

Jul 29 10:55 AM Jul 27 11:55 PM Jul 29 10:55 AM Jul 28 2:55 AM 2 Jul 28 6:55 AM 4 Jul 28 3:25 AM 4 Jul 28 3:55 AM 6 Jul 28 3:55 AM 6 Jul 28 4:25 AM 8 Jul 28 4:55 AM 9 Jul 28 12:55 PM 10 Jul 28 4:55 AM 7 Jul 28 1:25 PM 11,12 Jul 28 2:55 PM 13 Jul 28 4:55 PM 14 Jul 28 10:55 PM 15 Jul 28 5:55 AM 12 Jul 28 11:55 PM 16,17 Jul 29 12:55 AM 18 Jul 29 2:55 AM 19 Jul 29 4:55 AM 20 Jul 29 6:55 AM 21 Jul 29 7:55 AM 22 Jul 29 8:55 AM 23 Jul 29 10:55 AM 24 Jul 29 10:55 AM 25 Jul 29 9:55 AM 24 Jul 28 2:25 PM 5,13 Jul 29 9:55 AM 24 Jul 29 10:55 AM 27,28,29,25 Jul 29 12:55 PM 30 Jul 29 1:01 PM 31

Task Milestone Date: Jul 24 10:41 AM Summary Rolled Up Task Rolled Up Milestone

Rolled Up Progress Split External Tasks Project Summary Group By Summary

Inactive Task Inactive Milestone Inactive Milestone Inactive Summary Manual Task Page 1 of 3

Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only

External Tasks External Milestone Progress Deadline

Prepared by L. D'Alessandro

Exchange of Lower DT Cone Assy July 28, 2013 Sun Jul 28 12 AM 1 AM

NT2 Hydroelectric Project

12 PM

1 PM

2 PM

3 PM

4 PM

5 PM

6 PM

7 PM

8 PM

9 PM

10 PM

11 PM

2 AM

3 AM

4 AM

5 AM

6 AM

7 AM

8 AM

9 AM

10 AM

11 AM

12 PM

1 PM

2 PM

Task Milestone Date: Jul 24 10:41 AM Summary Rolled Up Task Rolled Up Milestone

Rolled Up Progress Split External Tasks Project Summary Group By Summary

Inactive Task Inactive Milestone Inactive Milestone Inactive Summary Manual Task Page 2 of 3

Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only

External Tasks External Milestone Progress Deadline

Prepared by L. D'Alessandro Mon Jul 29 12 AM

Exchange of Lower DT Cone Assy

NT2 Hydroelectric Project

2 PM

3 PM

4 PM

5 PM

6 PM

7 PM

8 PM

9 PM

10 PM

11 PM

1 AM

2 AM

3 AM

4 AM

5 AM

6 AM

7 AM

8 AM

9 AM

10 AM

11 AM

12 PM

1 PM

2 PM

3 PM

4 PM

7/29

7/29

Task Milestone Date: Jul 24 10:41 AM Summary Rolled Up Task Rolled Up Milestone

Rolled Up Progress Split External Tasks Project Summary Group By Summary

Inactive Task Inactive Milestone Inactive Milestone Inactive Summary Manual Task Page 3 of 3

Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only

External Tasks External Milestone Progress Deadline