Sie sind auf Seite 1von 5

ASIYANA NAGAR RAMNAGRI NTPC BHAWAN PH 2 F/404 Patna- 800025 9977220117(M) anmishra@rediffmail.

com

Last Active:15-Apr-12 | Last Modified: 12-Mar-12

arvind nath mishra


(Resume ID : 3eec24705bc490ea30)

B E EXPERIENCE IN POWER PLANT Key Skills: power plant

Brief Profile
Work Experience: 30 Year(s) 0 Month(s) Current Employer (Designation): AVANTHAPOWER AND INFRASTCRUTUREC [Head Project( POWER PLANT)] Annual Salary : (INR) 42.0 Lac(s) Functional Area (Role): Top Management [Head/VP/GM-Commercial] Industry: Industrial Products/Heavy Machinery Highest Degree: B.Tech/B.E. [Electrical] Current (Preferred Location) : Patna [Anywhere in East India] Date of Birth (Gender): 22 Jun 1953 [Male]

Summary of Skills and Experience


Work Experience
Duration : Dec 2009 - Till Date Company : AVANTHAPOWER AND INFRASTCRUTUREC Designation : Head Project( POWER PLANT)

Duration : Apr 2007 - Dec 2009 Company : Bhushan Steel and Strips Limited

Designation : Vice President POWER PLANT

Duration : Jan 1984 - Jul 2007 Company : NTPC GOVT. OF INDIA Designation : ADDL GENERAL MANEGER

Duration : Nov 1978 - Jan 1984 Company : MADHAYA PARDESH ELECTRICITY BOARD Designation : Assistant Engineer

Education
U.G. : B.Tech/B.E. (Electrical) from Ranchi University in 1972

Affirmative Action
Physically Challenged : No

Work Authorization
Countries authorized to work in : India Job Type : Temporary / Contractual Jobseeker Employment Status : Full Time, Part Time

Candidate Text Resume


A.N. MISHRA NTPC Bhawan, (Phase - II /F 404), Ashiyana Nagar, , Ramnagari - Patna, Bihar Contact: +91- 9977220117; E-Mail: anmishra@rediffmail.com/an.mishra@avanthapower.com [pic] HEAD PROJECT (JPL) A GROUP CO,OF AVANTHA POWER &INFRASTRUCTURE B.Sc Engineering (Electrical) Track record of executing world-class projects within defined cost/time parameters. [pic] PROFILE & SKILLS < A seasoned electrical engineer with total professional experience of over 28 years in project management, techno

commercial functions, TQM and strategic business unit operations. < Demonstrated capabilities in operation and maintenance of power plant to ensure maximum availability of quality power to the clients. < Strong background in installation, erection, commissioning, modifications/up gradation/improvements of power projects. In-depth knowledge and expertise of independently handling the entire gamut of project development from concept to commissioning and establishment backed by excellent abilities in the areas of effective planning and scheduling within allocated budgets and time frame. < Successfully handled high value projects encompassing Coal based power plant installations, management of mines through MGR, maintenance of ash handling dry and wet systems and construction and maintenance of ash dyke. < Demonstrated abilities in interacting with the regulatory authorities for statutory compliances along with obtaining licenses and clearances. < Competent multi-tasker with progressive bent of mind and expertise of handling turnkey projects. Core Competencies Strategic Business Unit Operations ~ Project Management~ Techno-Commercial Operations ~ Quality Benchmarks ~ Legal Compliances & Modalities ~ High Value Power Projects [pic] CAREER SUMMARY Head Project (JPL) PROJECT INCHARGE 2*600 MW DEC.3RD 2009 CONTINUE TILL DT. PROJECT IS UNDER ERECTION STAGE BHUSHAN STEEL LTD. Apr 2007- date 26 04 2007 Vice President- Power Plant Over all project, operation and maintenance management Preparation of annual budget and effective utilization Human resource management Chairman of plant pollution committee Develop MIS for power plant performance monitoring Associated with D R I plant production Associated with S M S production plant Capable to mange over all steel and power plant including Administration and finance. NPTC LTD. MM 1984- Mar 2007 Additional General Manager Commrcialjun2004-mar2007) Additional General Manager/ Dy. General Manager O&M.(sep2001-may2004) Dy. General Manager Mechanical Maintenanceagus1998-agst2001) Senior Manager (july 1994-july1998) Manager (july1990 july1994) Deputy Manage (jun1987 jun1990) Senior Engineer (jan1984 jun1987) < Overall responsibility for Operation & Maintenance of a (NTPC) Shaktinagar (Singrauli super thermal power plant station SSTPS) [5x200 + 2x500] Mw ,Power Station of (2000 Mw) capacity < Formulated monthly, annual operating & maintenance plans. Structured operating budgets and monitored implementation of plans to ensure required efficiency levels. < Ensured compliance to all statutory provisions in implementation/operations of power projects. < Planned and deployed required manpower at all times to handle entire operation/maintenance jobs within purview of contractual commitments. < Overseen entire gamut of activities - administration, personnel, accounts and budget- relating to power projects. Followed up with local and contract vendors for timely availability of contracted items/services. < Maintained regular interaction with the customers on technical, commercial and contractual matter to execute assigned jobs without any ambiguities. < Ensured maximum availability of quality power with over board reliability to the customer. < Worked as Additional General Manager for 3 Yrs. Deftly coordinated with SEB (state electricity board) Bihar ,Assam ,Bengaul ,Orissa ,Jharkhand ,Sikkim , Meghalaya for MOU signing of power purchase billing, collection and customer relationship with SEBs and other EREB constituents MPEB, KORBA. Oct 1978-dec 1983 Assistant Engineer < Supervised construction, erection, testing, commissioning & maintenance of Power Station -200 MW unit

< Ensured smooth operations and maintenance of the plant. [pic] TRAININGS < Study of Power Plant in South Africa at ESKOM Ltd.- 750 MW/500 MW, SPONSERED BY NTPC & Govt. of India, 2003 < ERP Application & Leadership, PMI, NTPC, 2002 < Advance Management Strategic Management Course, ASCI, Hyderabad, 2000 < Power Plant Operation & Maintenance - 500/660 MW, CEGB, UK (sponsored by NTPC), 1988 < Foundation course in Management Motivation, Communication etc, Power Management Institute, NTPC,1992 < Capsule Course in Personnel Management, Power Management Institute, NTPC, 1994 < Computer added training, Power Management Institute, NTPC, 1998 [pic] EDUCATIONAL & PROFESSIONAL DEVELOPMENT BSc Electrical Engineering, 1977 ( R.I.T Jamshedpur, RANCHI UNIVERSITY B.Sc Part-1,1971 ( JLN College, Chakradharpur IT SKILLS: inter net and other associated correspondence through e mail [pic] PERSONAL DETAILS Date of Birth: 22nd June 1953 Permanent Address: Village : Kathi, PO :Raghunathpur , Dist : Buxar (Bihar) References: Available on request COMMUNICATION ADDRESS NTPC BHAWAN PH 2 ASHIYANA NAGAR F 404 PATNA 800025 A N MISHRA A N Mishra BIO - DATA NAME : A.N. MISHRA

FATHER'S NAME : SRI R.A. MISHRA Date of birth - 22-06-1953 PERMANENT ADDRESS : Village : Kathi PO :Raghunathpur Dist : Buxar (Bihar) ADDRESS FOR COMMUNICATION: NTPC Bhawan, (Phase - II) Ashiyana Nagar, Ramnagari - Patna, Dist : Patna (Bihar) Ph : 0612 - 2580113 Mob; 9437576889 QUALIFICATION : |School/College |Examination Passed |Year of passing | |S.E. Rly. Higher Secondary School, Chakradharpur, Jharkhand |Bihar School Examination Board |1970 | |JLN College, Chakradharpur |Ranchi University B. SC .PART I |1971 | |R.I.T., Jamshedpur |Ranchi University B SC |1977 | | |.Engineering(Electrical).- DISTINCTION | | EXPERIENCE:

TRAINING: |Training |Organization |Duration | |Graduate Apprentice |CTI - MP Electricity Board. |1979 to 1980 - 1 Year. | |Power Plant Operation & Maintenance - |CEGB, UK (sponsored by NTPC) |1988 - for 10 weeks | |500/660 MW | | | |Foundation course in Management Motivation, |Power Management Institute, NTPC, |1992 - for 3 months. | |Communication etc. | | | |Capsule Course in Personnel Management. |Power Management Institute, NTPC |1994 - for 1 month. | |Computer added training |Power Management Institute, NTPC |1998 - for 15 days. |

|Training |Organization |Duration | |Advance Management Strategic Management |ASCI, Hyderabad. |2000 - for 21 days. | |Course. | | | |ERP Application & Leadership |PMI, NTPC |2002 - for 7 days. | |Study of Power Plant in South Africa at |NTPC & Govt. of India. |2003 - for 15 days. | |ESKOM Ltd.- 750 MW/500 MW. | | | WORK EXPERIENCE: |AREA |ORGANIZATION |POST |PERIOD | |Erection &commissioning of 200 MW unit |MPEB, Korba. |Asst. Engineer. |1980 - 1983 | |Erection commissioning,Operation & |NTPC Ltd., Singrauli - 2000 MW |Sr. Engineer. | | |Maintenance of 200mw&500mw units. |Power Station. |Dy. Manager. |1984 - 1994 | | | |Manager. | | |Mechanical Maintenance Incharge - Boiler & |NTPC Ltd., Singrauli. |Sr. Manager | | |Ash (dry & wet) Handling Plant of 5X200 MW | | |1984-1998 | |and 2X500 MW Unit. | | | | |Mechanical Maintenance Incharge (TG, Boiler, |NTPC Ltd., Singrauli. |Dy. General Manager (Mech. Maint) |1998 2004 | |AHP, Off site, CW etc) | | | | |Operation & Maintenance Incharge of Power |NTPC Ltd., Singrauli. |Addl. General Manager | | |Plant(2000MW) CAPACITY. | |(O&M)/DY.GENERAL MANAGER (O&M) |2001 - 2004 | |Incharge of Regional Commercial Wing (Eastern|NTPC - Eastern Region, Patna. |Addl. General Manager (Comml.) | | |Region) | | |2004 - 2007 | |Incharge of Power Plant: |Bhushan Steel Limited, |Vice President - |April, 2007 - | |1. 110 MW - in operation. |Meramandali, Dhenkanal, Orissa. |Incharge - Power Plant. |Continuing. | |2 2*150mw erection&commissioning. | | | | | |J P L JABALPUR ,AVANTHA POWER AND | | | |HEAD PROJECT (JPL)1*600MW+1*660MW CAPACITY |GROUP CO. |HEAD PROJECT (I/C) | | |POWER PROJECT . | | |3RD DEC.2009 TILL DT. |

(A.N. MISHRA)

Das könnte Ihnen auch gefallen