Sie sind auf Seite 1von 18

Ex-ante

Ex-post

Inflation
Nepal Rupee
US Dollar
Conversion Factor

6.0%
2.7%

6%
3%

1996
56

2003
71

144

144

740
106.56

106.6

0.75%

0.80%

Capacity
mW
Transmission Costs
per kW
Total
Annual O&M Cost

Terminal Value
Cost of Capital

Total Cost

4%

452.8

273.1

A.

Foreign
Local
Total Cost
Exchange Currency

Item
Base Cost
Preliminary Works
Civil Works
Electromechanical Equipment
Transmission Lines
Construction Engineering
Project Management
Environmental Mitigation
Loss Reduction Component
Taxes & Custom Duties
Subtotal

B.

C.

0.0
166.5
72.2
10.5
13.0
2.1
2.3
2.3
0.0
268.9

4.7
30.6
2.7
2.9
2.1
6.1
3.0
0.9
18.3
71.3

4.7
197.1
74.9
13.4
15.1
8.2
5.3
3.2
18.3
340.2

24.9
18.3
43.2

5.3
7.2
12.5

30.2
25.5
55.7

7.9

49.0

56.9

Total

320.0

132.8

452.8

Percent

70.7%

29.3%

100.0%

Contingencies
Physical
Price
Subtotal
Interest During Construction

Ex-ante
Year
Rate
Real Rate Real Rate in $
1996
4.16
4.16
0.074
1997
4.75
4.48
0.080
1998
5.13
4.57
0.082
1999
5.45
4.58
0.082
2000
6.08
4.82
0.086
2001
6.08
4.54
0.081
2002
7.30
5.15
0.092
2003
9.06
6.03
0.108
2004
9.06
5.68
0.102

Year

Rate
2003
2004
2005
2006
2007
2008
2009

Ex-post
Real Rate
8.10
8.10
8.60
8.11
8.60
7.65
9.20
7.72
12.10
9.58
12.10
9.04
12.10
8.53

ost
Real Rate in $
0.114
0.114
0.108
0.109
0.135
0.127
0.120

Economic
2003

0.177

Total Project
Cost

452.8
Initial Costs

Year
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034

% Project
Cost
1%
14%
20%
38%
23%
4%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

Project
Cost
4.528
63.392
90.560
172.064
104.144
18.112
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Interest & Price


Contingencies
0.824
11.536
16.480
31.312
18.952
3.296
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Maintainence Cost
Transmission &
Distribution
costs
1.066
14.918
21.312
40.493
24.509
4.262
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Annual
O&M Cost
0.000
0.000
0.000
0.000
0.000
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577

Capex
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
74.900
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Total Cost
Total Cost
4.770
66.774
95.392
181.245
109.701
22.656
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
78.477
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577

Revenues
GWh
0.000
0.000
0.000
0.000
0.000
581.000
749.000
712.000
709.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000

$ Rate
0.074
0.080
0.082
0.082
0.086
0.081
0.092
0.108
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102

Net Cashflow
$ Sales
0.000
0.000
0.000
0.000
0.000
47.137
68.831
76.609
71.968
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242

Cash Flow ($) 1996


-4.770
-66.774
-95.392
-181.245
-109.701
24.481
65.253
73.032
68.391
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
-8.235
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665

FIRR
11.67%

NPV
(1996)
759.3

3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577
3.577

692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000
692.000

0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102

70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242
70.242

66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665
66.665

Total Project
Cost

273.1

Initial Costs

Year
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033

% Project
Cost
0%
16%
13%
16%
26%
19%
6%
4%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

Project
Cost
0.000
43.696
35.503
43.696
71.006
51.889
16.386
10.924
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Maintainence Cost

Transmission &
Distribution
costs

Annual
O&M Cost

0.000
17.056
13.858
17.056
27.716
20.254
6.396
4.264
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425

Capex
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
74.900
0.000
0.000
0.000
0.000
0.000

Project Cost
(Nominal)
Project Cost
(Nominal)
0.000
60.752
49.361
60.752
98.722
72.143
22.782
15.188
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Project Cost
(2003)

Total Cost
(2003)

Project Cost
(2003)

Total Cost
(2003)

0.000
73.207
57.917
69.409
109.824
78.146
24.029
15.598
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
73.207
57.917
69.409
109.824
78.146
24.029
19.023
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
78.325
3.425
3.425
3.425
3.425
3.425

Net
Cashflow

Revenues

GWh
0.000
0.000
0.000
0.000
0.000
0.000
0.000
580.000
647.000
721.000
804.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000

$ Rate
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.114
0.114
0.108
0.109
0.135
0.127
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120

$ Sales
0.000
0.000
0.000
0.000
0.000
0.000
0.000
49.627
55.450
58.294
65.604
85.247
80.421
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869

Cash Flow
($) - 2003

FIRR

0.000 0.114559
-73.207
-57.917
-69.409
-109.824
-78.146
-24.029
30.604
52.025
54.869
62.179
81.822
76.996
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
-2.456
72.444
72.444
72.444
72.444
72.444

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425
3.425

842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000

0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120

75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869
75.869

72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444
72.444

Net Present
Value (2003)
772.342497

Total Project
Cost

262.1

Initial Costs

Year
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033

% Project
Cost
0%
16%
13%
16%
26%
19%
6%
4%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

Project
Cost
0.000
41.936
34.073
41.936
68.146
49.799
15.726
10.484
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Transmission &
Distribution
costs
0.000
17.056
13.858
17.056
27.716
20.254
6.396
4.264
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Maintainence Cost
Annual
O&M Cost
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326

Capex
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
74.900
0.000
0.000
0.000
0.000
0.000

Project Cost
(Nominal)
Project Cost
(Nominal)
0.000
58.992
47.931
58.992
95.862
70.053
22.122
14.748
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Project Cost
(2003)
Project Cost
(2003)
0.000
71.086
56.239
67.398
106.642
75.882
23.333
15.146
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Total
Economic
Cost
0.000
71.086
56.239
67.398
106.642
75.882
23.333
18.472
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
78.226
3.326
3.326
3.326
3.326
3.326

Cash Flow ($) 2003

Revenues

Total Cost
GWh
0.000
0.000
0.000
0.000
0.000
0.000
0.000
580.000
647.000
721.000
804.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000

$ Rate
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177

$ Sales
0.000
0.000
0.000
0.000
0.000
0.000
0.000
76.995
85.889
95.713
106.731
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776

Cash Flow ($) 2003


0.00000
-71.08635
-56.23920
-67.39774
-106.64199
-75.88188
-23.33271
58.52300
82.56344
92.38694
103.40519
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
33.54969
108.44969
108.44969
108.44969
108.44969
108.44969

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326
3.326

842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000
842.000

0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177

111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776
111.776

108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969
108.44969

EIRR

Net Present
Value (2003)

0.158096 1371.489535