ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED KOTHAGUDEM THERMAL POWER STATION, STAGE-V&VI

From:To: The Chief Engineer The Chief Engineer, Operation & Maintenance, Generation-I, K.T.P.S., V&VI-Stage, APGENCO, Vidyut Soudha Paloncha 507 115. Hyderabad. Lr.No.CE/O&M/KTPS/V&VI-Stg/Safety/F.No.21/D.No. 377 /2012,Dt: 08.11.2012. Sir, Sub:- KTPS/VI-Stage Safety-Fire Mock Drill conducted on 31.10.2012 at 10:54 Hrs. Near ESP hoppers at XI Unit area of KTPS VI-Stage Detailed Report Reg. **** It is to inform that the class A Fire Mock Drill is conducted near ESP hoppers of XI Unit area at 10.54 hrs, KTPS VI-Stage on 31.10.2012. The following Engineers and staff have been participated in the Fire Mock Drill. Sarva Sri 1. CH.Appaji : DE/safety/KTPS-V&VI 2. M.Srinivas rao : DE/I&C/KTPS-VI 3. K.Suri babu : DE/CAM/KTPS-VI 4. Md. Anwar Pasha : ADE/Safety/V Stage 5. S.Nagaiah : ADE/Safety/VI Stage 6. M.Adinarayanan murthy : ADE/Shift/AHP/ VI Stage 7. B.Nagesh : ADE/CAM/KTPS-VI 8. CH.Krishna Prasad : ADE/LT/KTPS-VI 9. V.Kanthaiah : ADE/I&C/ VI Stage 10. T.Visweswara rao : AAE/Safety&Staff/VI Stage 11. A.Madhu : AE/CAM/ VI Stage 12. M.Chandra shekar : AE/LT/ VI Stage 13. M.Venkateswarlu : AE/I&C/ VI Stage 14. S.M.Sharif : AE/HT/ VI Stage 15. O.Ravindra ; Sub Engineer /Shift/ AHP/ VI Stage 16. V.Rami reddy , : Contract worker /Santosh Constructions 17. D.Yakub : Contract worker /Santosh Constructions 18. SK. Naimuddin : Contract worker /Santosh Constructions 19. D.Yakub : Contract worker /Santosh Constructions 20. P.Shiva Prasad : Contract worker /ICL 21. B.Ram murthy : Contract worker/ICL 22. Md.Waheed : Contract worker /ICL Fire tender Staff:1. B. Ramakrishnareddy : Station Fire Officer 2. M. Chandrasekharreddy : L/F / Fire 3. G.R.Sudhakarreddy : D/OP/Fire 4. MD. Abdul samad : F.M(LF Incharge) The Fire Mock Drill is conducted on 31.10.2012 near ESP hoppers at XI Unit area of KTPS VI-Stage is started at 10:54 Hrs and Fire Quenching operations are carried out from 11:01 Hrs. onwards. The Fire is completely Quenched off at 11-24 Hrs. The DE/Safety, ADE/Safety and Fire Tender Staff had given training to the participants regarding operation and fixing of Nozzles, Hoses to Hydrants and Fire quenching Techniques to Staff present to Fire Mock Drill. (Sd/- M.Sidhaiah ) Encl:- 1 sheet operations and Chief Engineer/O&M Carried out. K.T.P.S. V& VI -Stage. CS : to S.E Tech to the Director/Thermal/APGENCO/V.S/Hyderabad. Cc : to Chief of Vigilance & Security /APGENCO./V.S/Hyderabad Cc : to All Superintending Engineers /KTPS/V&VI-Stage // FORWARDED BY ORDER // Cc : to All HODS /KTPSV&VI-Stage. Cc : to Security Officer/KTPS/V&VI-Stage. Cc : to Deputy. Chief Inspector of Factories/Warangal . DIVISIONAL ENGINEER Cc: to Inspector of Factories/Khammam. SAFETY, KTPS V&VI-Stage

OPERATIONS CARRIED OUT DURING FIRE MOCK DRILL ON 31.10.2012 AT 10:54 HRS. Near ESP hoppers of XI Unit at KTPS VI STAGE

Time 1. 2. 10:54 Hrs.:

Operations Carried out

Fire is observed by Sri V. Rami reddy / CL/Santosh constructions , while carrying Out ESP hoppers of XI Unit works area . 10:54 Hrs. : Sri . V. Rami reddy / Contract worker/Santosh constructions immediately intimated to Sri M.Adinarayanan murthy / ADE/Shift/AHP/ VI Stage by shouting FIRE-FIRE- FIRE Sri M. Adinarayanan murthy / ADE/Shift/AHP/ VI Stage immediately informed over phone to Fire Station and requested to send the Fire Tender immediately for fire quenching operations. 10:57 Hrs. : Sri M. Adinarayanan murthy / ADE/Shift/AHP/ VI Stage and their staff are attended the spot along with Fire hoses and Nozzles from Ash handling plant -XI Unit connected to Hydrant point and started fire quenching operations 10:58 Hrs : Sri M.Adinarayanan murthy / ADE/Shift/AHP/ VI Stage, immediately telephoned to DE/Shift/UCB, CE/O&M / KTPS/V&VI-Stage & SE / E&M-I, Factory Manager, Safety officer, Security Officer, DE/General and requested to arrange assistance and to witness the fire 10:59 Hrs.: The Fire Tender Staff along with Fire Tender attended to the spot. 11:01 Hrs. : The Fire Staff connected the Fire Hoses to Hydrant point and Started Fire quenching operations. . 11:02 Hrs. : The ADE/Safety, and other staff attended to the spot for Assisting and witnessing the fire quenching operations. 11:04 Hrs. : The Fire Staff and other existing staff completely quenched off the Fire at ESP hoppers -XI Unit area. 10. 11:14 Hrs. : The Fire staff trained the following Staff gathered at near ESP hoppers -XI Unit area in Fire quenching operations.
10:56 Hrs. :

3.

4.

5.

6. 7. 8. 9.

11:24 Hrs.: After ensuring as no more fire in that area and after giving training to the staff all the staff members including Fire Staff left the spot. Sarva Sri
1. M.Adinarayanan murthy 2. M.Srinivas rao 3. CH.Krishna Prasad 4. V.Kanthaiah 5. M.Chandra shekar 6. M.Venkateswarlu 7. S.M.Sharif 8. O.Ravindra 9. V.Rami reddy 10. B.Ram murthy : : : : : : : ; : : ADE/Shift/AHP/ VI Stage DE/I&C/KTPS-VI ADE/LT/KTPS-VI ADE/I&C/ VI Stage AE/LT/ VI Stage AE/I&C/ VI Stage AE/HT/ VI Stage Sub Engineer /Shift/ AHP/ VI Stage Contract worker /Santosh Constructions Contract worker/ICL

11.

( Sd/- M.Sidhaiah ) Chief Engineer/O&M K.T.P.S., V & VI-Stage.